Concrete pouring device and method for building engineering construction

By introducing two parts of the vibration mechanism and mold conveyor before and after pouring into the concrete pouring device, up and down floating vibration is achieved, solving the problem of uneven concrete vibration in the prior art, and improving the pouring quality and construction efficiency.

CN119388542APending Publication Date: 2025-02-07刘庆珑
View PDF 0 Cites 6 Cited by

Patent Information

Application Number
CN202411602788.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-11
Publication Date
2025-02-07

AI Technical Summary

Technical Problem

It is difficult for existing concrete pouring devices to achieve up and down floating vibration during the pouring process, resulting in uneven vibration of concrete and many bubbles, which affects the pouring quality of prefabricated structural parts.

Method used

A concrete pouring device for construction engineering construction is designed, including two parts of the vibration mechanism before and after pouring. The automatic conveying of the mold and the automatic floating vibration mechanism after pouring are realized through the mold conveyor.

Benefits of technology

Through previbration and floating vibration, the uniformity of the concrete is significantly improved, the number of bubbles is reduced, the casting quality of prefabricated structural parts is improved, and the construction efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119388542A_ABST
    Figure CN119388542A_ABST
Patent Text Reader

Abstract

The invention discloses a concrete pouring device for constructional engineering construction, which is mainly used for producing and pouring concrete prefabricated structural members and comprises a pouring hopper and a mold conveyor, and the pouring hopper is erected and mounted at the outlet end of the mold conveyor through a support. A pouring mold is conveyed to the position below a discharging opening of a pouring hopper through a mold conveyor, a before-pouring vibrating mechanism is installed at the discharging opening in the lower end of the pouring hopper, and concrete is pre-vibrated through the before-pouring vibrating mechanism before discharging. Traditional vibration treatment is conducted through vibration of the vibration mechanism after pouring, then the vibration mechanism after pouring is driven by the floating mechanism to float up and down, so that concrete is evenly vibrated up and down, comprehensive and even vibration of the concrete in a pouring mold is achieved in cooperation with conveying of the mold conveyor to the pouring mold, bubbles in the concrete can be reduced, and the concrete quality is improved. Therefore, the pouring quality of the concrete prefabricated structural member is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of building construction, and in particular to a concrete pouring device and method for building engineering construction. Background Art

[0002] Concrete has a wide range of applications in the construction field. Concrete contains raw materials such as sand, stone and water, which are mixed in a certain proportion. During use, concrete needs to be poured in a designated area and then formed into a relatively solid object after cooling.

[0003] In the process of construction projects, it is often necessary to produce and cast prefabricated reinforced concrete structures. It is necessary to first mix raw materials such as cement, sand, stone, etc. according to a proportion, and add an appropriate amount of admixtures to prepare concrete that meets the design requirements. Then, pour the concrete in the mold of the prefabricated structure. During the pouring process, it is usually necessary to use a vibrating device to vibrate the concrete to ensure that the concrete is uniform and dense.

[0004] The prior art discloses a concrete pouring device for construction engineering, including a filling hopper and a feeding barrel, the feeding barrel is used for conveying mixed concrete, the outer surface of the feeding barrel is connected with a telescopic hose, the top end of the telescopic hose is connected with the filling hopper, the end of the feeding barrel away from the telescopic hose is connected with a pouring assembly, the position of the pouring assembly away from the feeding barrel is fixedly connected with a knocking assembly, and the inner surface of the feeding barrel is rotatably connected with a spiral rotating rod.

[0005] When pouring the concrete prefabricated structural parts, the concrete pouring device mentioned in the above prior art needs to place the prefabricated structural part mold in the unloading area, and then simply vibrate the poured concrete through the vibrating assembly installed at the bottom. Although it can play a certain vibrating role, it still has the following shortcomings:

[0006] 1. During pouring, the vibrator is simply inserted into the concrete for vibration. It is difficult to achieve slight up and down floating after insertion. The actual vibration effect is poor, and the concrete is not vibrated evenly, which leads to more bubbles in the concrete, thus affecting the pouring quality of prefabricated structural parts.

[0007] 2. If the concrete is vibrated only after pouring, there may be many bubbles in the concrete before pouring, which may easily reduce the pouring quality of the prefabricated structural parts;

[0008] 3. Simply relying on manual placement of molds is inefficient, and it is difficult to combine automatic loading of the molds with automatic floating vibration, resulting in low actual casting efficiency of precast concrete structures. Summary of the invention

[0009] To this end, the present application provides a concrete pouring device and method for construction engineering construction to solve the problem that ordinary vibrating components in the prior art are difficult to achieve up and down floating vibration, the actual vibration effect is poor, the concrete vibration is not uniform, which leads to the presence of more bubbles in the concrete, thereby affecting the pouring quality of prefabricated structural parts.

[0010] In order to achieve the above objectives, this application provides the following technical solutions:

[0011] A concrete pouring device for construction engineering is mainly used for production and pouring of concrete prefabricated structural parts, such as concrete cover plates, concrete beams, concrete wall panels, etc. The device includes a pouring hopper and a mold conveyor. The pouring hopper is installed at the outlet end of the mold conveyor through a bracket. The pouring mold is conveyed to the bottom of the discharge port of the pouring hopper by the mold conveyor. A pre-pouring vibrating mechanism is installed at the discharge port of the lower end of the pouring hopper. The pre-pouring vibrating mechanism is used to pre-vibrate the concrete before unloading.

[0012] A height-adjustable post-casting vibrating mechanism and a floating mechanism are installed on one side of the bracket close to the outlet end of the mold conveyor. The post-casting vibrating mechanism is installed on the movable end of the floating mechanism. The vibrating end of the post-casting vibrating mechanism is arranged downward and inserted into the concrete for vibrating. The post-casting vibrating mechanism in the working state is driven by the floating mechanism to float and vibrate up and down.

[0013] A vibrating plate assembly is installed on the post-casting vibration mechanism, and the vibrating plate assembly is used to assist in vibrating the cast products with different casting thicknesses.

[0014] Optionally, the pre-pouring vibration mechanism includes a pre-vibration box, a discharge pipe, vibrating blades and a first vibrating motor. The pre-vibration box is installed at the lower end of the discharge port of the pouring hopper, the discharge pipe is installed at the bottom of the pre-vibration box, and the pouring hopper, the pre-vibration box and the discharge pipe are connected to each other. The vibrating blades are arranged in the inner cavity of the pre-vibration box and are driven to vibrate by the first vibrating motor to pre-vibrate the concrete before discharge.

[0015] Further optionally, the vibrating blade is in the shape of a spiral blade and is driven to vibrate by a first vibrating motor installed outside the pre-vibrating box.

[0016] Optionally, the post-pouring vibration mechanism includes a second vibrating motor, a connecting rod, and a vibrating rod. The second vibrating motor is installed on the movable end of the floating mechanism, the connecting rod is installed on the output shaft of the second vibrating motor, and the vibrating rod is installed at the lower end of the connecting rod and is perpendicular to the conveying surface of the mold conveyor.

[0017] Further optionally, the vibrating plate assembly includes a movable ring, a vibration transmission rod, and a vibrating plate. The movable ring is slidably mounted on the connecting rod, one end of the vibration transmission rod is connected to a side of the movable ring close to the discharge port of the mold conveyor, the other end of the vibration transmission rod extends downward and is connected to the vibrating plate, and the vibrating plate is horizontally arranged and is pressed onto the upper surface of the prefabricated structure when working.

[0018] Further optionally, the outer diameter of the connecting rod is smaller than the outer diameter of the vibrating rod, and a limit strip arranged along its height is installed on the outer surface of the connecting rod, a sleeve hole matching the outer circumference of the connecting rod is opened in the middle of the movable ring, the movable ring is sleeved on the connecting rod through the sleeve hole, a limit groove matching the limit strip is opened on the inner wall of the sleeve hole, and the movable ring is slidably connected with the limit strip through the limit groove.

[0019] Further optionally, a pressure plate is arranged parallel to the lower surface of the vibrating plate, and the upper end surface of the pressure plate is connected to the lower end surface of the vibrating plate via a spring, and the number of the springs is multiple and evenly distributed.

[0020] Optionally, the floating mechanism includes a box body, a movable rod, an end cover, a return spring, and a cam. The box body is installed on a bracket and has an adjustable height. The movable rod is movably sleeved on the bottom of the box body. The upper end of the movable rod extends into the box body and is installed with an end cover. The lower end surface of the end cover is connected to the bottom of the inner cavity of the box body through a return spring. The lower end of the movable rod extends to the bottom of the box body and is connected to the top of the post-pouring vibration mechanism. The cam is rotatably installed above the inner cavity of the box body and driven by a motor. The outer peripheral bottom of the cam abuts against the upper end surface of the end cover.

[0021] Optionally, a lift is installed on the side of the bracket close to the outlet end of the mold conveyor, the lift is an electric slide rail, and the slider of the electric slide rail is arranged on the side away from the casting hopper, and the floating mechanism is installed on the slider of the electric slide rail.

[0022] A pouring method of a concrete pouring device for construction engineering, the specific steps are as follows:

[0023] S1 injects the mixed concrete into the casting hopper through the injection equipment, so that the inner cavity of the casting hopper is gradually filled with concrete;

[0024] S2 During the concrete pouring process, the casting mold is horizontally conveyed to the lower part of the pouring hopper by the mold conveyor. During the conveying process of the casting mold, the valve of the discharge port at the lower end of the pouring hopper is opened, so that the concrete in the casting hopper enters the pre-casting vibrating mechanism, and the concrete is pre-vibrated by the pre-casting vibrating mechanism;

[0025] S3 When the front end of the casting mold moves to below the discharge port of the casting hopper, the concrete pre-vibrated in the pre-casting vibrating mechanism is injected downward into the casting mold. With the continuous conveying of the mold conveyor, the casting mold is gradually filled with concrete.

[0026] S4 During the pouring process, the front end of the pouring mold moves to the bottom of the post-pouring vibrating mechanism, and the post-pouring vibrating mechanism and the floating mechanism are driven downward by the elevator, so that the vibrating rod is quickly inserted into the concrete at the front end of the pouring mold, and the connecting rod and the vibrating rod are driven by the second vibrating motor to vibrate, and the concrete is vibrated again;

[0027] S5 When the vibrating rod is inserted into the concrete, the pressing plate will press on the upper surface of the concrete. When the concrete pouring thickness is high, the pressing plate will drive the vibration transmission rod to move upward, and the vibration transmission rod will drive the movable ring to move upward along the connecting rod and the limit bar, and the vibration will be transmitted to the vibrating plate and the pressing plate through the connecting rod, so as to realize the auxiliary vibration of the upper end surface of the concrete precast structure;

[0028] During the vibration process of the vibrating rod S6, the cam is driven to rotate by the motor so that the protrusion of the cam is in intermittent contact with the upper end of the end cover. When the protrusion is in contact with the upper end of the end cover, the end cover is squeezed downward to drive the movable rod and the post-casting vibrating mechanism to move downward, and the reset spring is in a compressed state. When the protrusion is not in contact with the end cover, the reset spring returns to its original state and drives the movable rod and the end cover to move upward, so that the post-casting vibrating mechanism moves upward and resets, thereby realizing the up and down floating vibration of the post-casting vibrating mechanism.

[0029] Compared with the prior art, this application has at least the following beneficial effects:

[0030] (i) During pouring, by adjusting the height of the post-pouring vibrating mechanism and the floating mechanism, the vibrating end of the post-pouring vibrating mechanism is inserted into the concrete in the lower casting mold. The traditional vibration treatment can be performed by the vibration of the post-pouring vibrating mechanism, and then the post-pouring vibrating mechanism is driven by the floating mechanism to float up and down, so that the concrete is vibrated evenly up and down, and the casting mold is transported by the mold conveyor to achieve comprehensive and uniform vibration of the concrete in the casting mold, which can reduce bubbles in the concrete, thereby improving the casting quality of the concrete prefabricated structure;

[0031] (ii) By installing a pre-casting vibrating mechanism at the discharge port of the casting hopper, and then pre-vibrating the concrete before discharge through the pre-casting vibrating mechanism, the concrete before discharge is made more uniform, thereby reducing bubbles in the discharged concrete. Combining the post-casting vibrating mechanism and the floating vibration of the floating mechanism helps to improve the actual vibration effect, thereby improving the casting quality;

[0032] (3) Automatically conveying the casting mold through the mold conveyor, combined with the automatic floating vibration of the vibrating mechanism and the floating mechanism after casting, can effectively improve the actual casting efficiency, thereby speeding up the construction process of the building project. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more intuitively illustrate the prior art and the present application, exemplary drawings are given below. It should be understood that the specific shapes and structures shown in the drawings should not generally be regarded as limiting conditions for implementing the present application; for example, those skilled in the art are capable of easily making conventional adjustments or further optimizations to the addition / reduction / attribution division, specific shapes, positional relationships, connection methods, dimensional ratios, etc. of certain units (components) based on the technical concepts and exemplary drawings disclosed in the present application.

[0034] Figure 1 A schematic diagram of the front structure of a concrete pouring device for construction engineering provided by one embodiment of the present application;

[0035] Figure 2 A schematic diagram of the structure of a pre-casting vibrating mechanism of a concrete casting device for construction engineering provided in one embodiment of the present application;

[0036] Figure 3 A schematic diagram of the structure of a telescopic mechanism of a concrete pouring device for construction engineering provided by one embodiment of the present application;

[0037] Figure 4 A schematic diagram of the side structure of a post-pour vibrating mechanism of a concrete pouring device for construction engineering provided in one embodiment of the present application.

[0038] Description of reference numerals:

[0039] 1. Casting hopper;

[0040] 2. Mould conveyor;

[0041] 3. Vibration mechanism before pouring; 31. Pre-vibration box; 32. Feeding pipe; 33. Vibration blade; 34. First vibrating motor;

[0042] 4. Bracket;

[0043] 5. Casting mold;

[0044] 6. Vibration mechanism after pouring; 61. Second vibration motor; 62. Connecting rod; 63. Vibration rod; 64. Limiting strip;

[0045] 7. floating mechanism; 71. box body; 72. movable rod; 73. end cover; 74. return spring; 75. cam;

[0046] 8. Vibrating plate assembly; 81. Movable ring; 82. Vibration transmission rod; 83. Vibrating plate; 84. Pressing plate;

[0047] 9. Control switch;

[0048] 10. Elevator;

[0049] 11. Material elevator. DETAILED DESCRIPTION

[0050] The present application is further described below in detail through specific embodiments in conjunction with the accompanying drawings.

[0051] A concrete pouring device for construction engineering, mainly used for the production and pouring of prefabricated concrete structural parts, such as concrete cover plates, concrete beams, concrete wall panels, etc.;

[0052] like Figure 1 As shown, the device includes a pouring hopper 1 and a mold conveyor 2. The pouring hopper 1 is mounted on the outlet end of the mold conveyor 2 through a bracket 4. The pouring mold 5 is conveyed to the bottom of the discharge port of the pouring hopper 1 through the mold conveyor 2. A pre-pouring vibrating mechanism 3 is installed at the discharge port of the lower end of the pouring hopper 1. The pre-pouring vibrating mechanism 3 is used to pre-vibrate the concrete before discharging, so that the concrete is more uniform before discharging, thereby reducing bubbles in the discharging concrete, helping to improve the actual vibration effect, and thus improving the pouring quality;

[0053] It also includes a material hoist 11, which is installed above the inlet end of the mold conveyor 2 through a support frame. The discharge port of the material hoist 11 is inclined upward and communicated with the upper end of the inner cavity of the casting hopper 1. The mixed concrete can be obliquely transferred upward to the casting hopper 1 through the material hoist 11 to complete the feeding operation, and at the same time, it does not affect the transmission of the casting mold 5 from the inlet end of the mold conveyor 2;

[0054] A height-adjustable post-casting vibrating mechanism 6 and a floating mechanism 7 are installed on one side of the bracket 4 close to the outlet end of the mold conveyor 2. The post-casting vibrating mechanism 6 is installed on the movable end of the floating mechanism 7. The vibrating end of the post-casting vibrating mechanism 6 is arranged downward and inserted into the concrete for vibration. The post-casting vibrating mechanism 6 in the working state is driven by the floating mechanism 7 to float and vibrate up and down.

[0055] After pouring, a vibrating plate assembly 8 is installed on the vibrating mechanism 6, and the vibrating plate assembly 8 is used to assist in vibrating the poured products with different pouring thicknesses;

[0056] During pouring, by adjusting the height of the post-pouring vibrating mechanism 6 and the floating mechanism 7, the vibrating end of the post-pouring vibrating mechanism 6 is inserted into the concrete in the casting mold 5 below, and the traditional vibration treatment can be performed by the vibration of the post-pouring vibrating mechanism 6, and then the post-pouring vibrating mechanism 6 is driven by the floating mechanism 7 to float up and down, so that the concrete is vibrated evenly up and down, and the casting mold 5 is transported by the mold conveyor 2 to achieve comprehensive and uniform vibration of the concrete in the casting mold 5, which can reduce bubbles in the concrete, thereby improving the casting quality of the concrete prefabricated structural parts. The casting mold 5 is automatically transported by the mold conveyor 2, combined with the automatic floating vibration of the post-pouring vibrating mechanism 6 and the floating mechanism 7, which can effectively improve the actual casting efficiency, thereby accelerating the construction progress of the construction project.

[0057] Specifically, Figure 2 As shown, the pre-casting vibrating mechanism 3 includes a pre-vibrating box 31, a feeding pipe 32, a vibrating blade 33 and a first vibrating motor 34. The pre-vibrating box 31 is installed at the lower end of the discharge port of the casting hopper 1, and the feeding pipe 32 is installed at the bottom of the pre-vibrating box 31. The casting hopper 1, the pre-vibrating box 31 and the feeding pipe 32 are interconnected. The vibrating blade 33 is arranged in the inner cavity of the pre-vibrating box 31 and is driven to vibrate by the first vibrating motor 34 to pre-vibrate the concrete before feeding.

[0058] like Figure 4 As shown, there are multiple feed pipes 32 and they are evenly distributed along the length direction of the pre-vibration box 31, and the number of vibrating blades 33 is consistent with the number of feed pipes 32 and corresponds one to one, so as to realize multi-channel pre-vibration pouring, which is beneficial to improve the uniformity of concrete distribution;

[0059] Furthermore, if Figure 2 As shown, the vibrating blade 33 is in the shape of a spiral blade and is driven to vibrate by a first vibrating motor 34 installed outside the pre-vibrating box 31. The spiral blade design can improve the vibration uniformity of the vibrating blade 33 in the pre-vibrating box 31.

[0060] Specifically, Figure 3 As shown, the post-casting vibrating mechanism 6 includes a second vibrating motor 61, a connecting rod 62, and a vibrating rod 63. The second vibrating motor 61 is installed on the movable end of the floating mechanism 7, the connecting rod 62 is installed on the output shaft of the second vibrating motor 61, and the vibrating rod 63 is installed at the lower end of the connecting rod 62 and is perpendicular to the conveying surface of the mold conveyor 2. The second vibrating motor 61 generates vibration, and the vibration is transmitted to the vibrating rod 63 through the connecting rod 62, so that the vibrating rod 63 can vibrate the poured concrete.

[0061] Furthermore, if Figure 4As shown, there are multiple connecting rods 62 and they correspond one to one with multiple discharge pipes 32. A vibrating rod 63 is installed at the lower end of each connecting rod 62, so that multiple vibrating rods 63 can vibrate concrete poured in multiple channels at the same time. Vibrating around the pouring port can improve the uniformity of vibration, make the concrete more compact, and reduce the generation of bubbles.

[0062] Specifically, Figure 3 As shown, the vibrating plate assembly 8 includes a movable ring 81, a vibration transmission rod 82, and a vibrating plate 83. The movable ring 81 is slidably mounted on the connecting rod 62. One end of the vibration transmission rod 82 is connected to a side of the movable ring 81 close to the discharge port of the mold conveyor 2. The other end of the vibration transmission rod 82 extends downward and is connected to the vibrating plate 83. The vibrating plate 83 is horizontally arranged and is pressed on the upper surface of the prefabricated structure during operation. When the vibrating rod 63 is inserted into the concrete, the vibrating plate 83 is driven to press on the upper surface of the concrete after pouring. The vibration is transmitted to the vibrating plate 83 through the movable ring 81 and the vibration transmission rod 82, so that the upper surface of the concrete is vibrated and leveled by the vibrating plate 83, which is beneficial to improving the pouring quality.

[0063] Furthermore, the outer diameter of the connecting rod 62 is smaller than the outer diameter of the vibrating rod 63, and the outer surface of the connecting rod 62 is installed with a limit strip 64 arranged along its height, and a sleeve hole matching the outer periphery of the connecting rod 62 is provided in the middle of the movable ring 81, and the movable ring 81 is sleeved on the connecting rod 62 through the sleeve hole, and a limit groove matching the limit strip 64 is provided on the inner wall of the sleeve hole, and the movable ring 81 is slidably sleeved with the limit strip 64 through the limit groove. Such a design limits the radial displacement of the movable ring 81, so that the movable ring 81 and the connecting rod 62 are more tightly assembled, which facilitates the transmission of vibration, thereby improving the uniformity of the vibration of the vibrating plate 83 on the upper surface of the concrete;

[0064] Furthermore, a pressure plate 84 is arranged parallel to the lower surface of the vibrating plate 83, and the upper end surface of the pressure plate 84 is connected to the lower end surface of the vibrating plate 83 through a spring. There are multiple springs and they are evenly distributed. Such a design enables the pressure plate 84 to evenly transmit the vibration force to the upper surface of the concrete, which helps to improve the leveling effect.

[0065] When the concrete pouring thickness is high, the pressing plate 84 will drive the vibrating plate 83, the vibration transmission rod 82 and the movable ring 81 to move upward, and the movable ring 81 will move upward along the connecting rod 62 and the limiting strip 64, so as to be suitable for concrete pouring operations of various thicknesses.

[0066] Specifically, Figure 3As shown, the floating mechanism 7 includes a box body 71, a movable rod 72, an end cover 73, a reset spring 74, and a cam 75. The box body 71 is installed on the bracket 4 and is height-adjustable. The movable rod 72 is movably sleeved on the bottom of the box body 71. The upper end of the movable rod 72 extends into the box body 71 and is installed with the end cover 73. The lower end surface of the end cover 73 is connected to the bottom of the inner cavity of the box body 71 through the reset spring 74. The lower end of the movable rod 72 extends to the bottom of the box body 71 and is connected to the top of the post-casting vibrating mechanism 6. The cam 75 is rotatably installed above the inner cavity of the box body 71 and is driven by a motor. The outer peripheral bottom of the cam 75 abuts against the upper end surface of the end cover 73.

[0067] The cam 75 is driven by the motor to rotate, so that the protrusion of the cam 75 is in intermittent contact with the upper end of the end cover 73. When the protrusion is in contact with the upper end of the end cover 73, the end cover 73 is squeezed downward to drive the movable rod 72 and the post-casting vibrating mechanism 6 to move downward, and the reset spring 74 is in a compressed state. When the protrusion is not in contact with the end cover 73, the reset spring 74 returns to its original state and drives the movable rod 72 and the end cover 73 to move upward, so that the post-casting vibrating mechanism 6 moves upward and resets, thereby realizing the up and down floating vibration of the post-casting vibrating mechanism 6, which is conducive to improving the vibration uniformity of the concrete and thus improving the casting quality;

[0068] It should be noted that there are multiple protrusions on the outer periphery of the cam 75, so as to increase the number of up and down floating times of the vibrating mechanism 6 after pouring, thereby improving the uniformity of vibration.

[0069] Specifically, Figure 1 and Figure 4 As shown, a lift 10 is installed on one side of the bracket 4 close to the outlet end of the mold conveyor 2. The lift 10 is an electric slide rail, and the slider of the electric slide rail is arranged on the side away from the casting hopper 1. The floating mechanism 7 is installed on the slider of the electric slide rail. The lift 10 can also be a cylinder, an electric cylinder or an electric screw in the prior art. The lift 10 drives the floating mechanism 7 to rise and fall, thereby adjusting the height of the post-casting vibrating mechanism 6 to facilitate the insertion and removal of the post-casting vibrating mechanism 6.

[0070] It should be noted that the power of the lift 10 is regulated by an external controller, so that the downward movement speed of the vibrating mechanism 6 after pouring is greater than the upward movement speed, thereby realizing the fast insertion and slow withdrawal of the vibrating mechanism 6 after pouring, which is beneficial to the actual pouring and vibrating operation;

[0071] Furthermore, a control switch 9 is installed at the bottom of one side of the bracket 4 close to the discharge port of the mold conveyor 2. When the front end of the casting mold 5 moves to the control switch 9, the control switch 9 generates a high-frequency electrical signal and transmits it to the external controller, and the external controller controls the elevator 10 to move downward, so that the post-casting vibrating mechanism 6 is inserted into the concrete at the front end of the casting mold 5. When the rear end of the casting mold 5 leaves the control switch 9, the control switch 9 generates a low-frequency electrical signal and transmits it to the external controller, and the external controller controls the elevator 10 to move upward, so that the post-casting vibrating mechanism 6 is pulled out from the concrete at the rear end of the casting mold 5.

[0072] It should be noted that the control switch 9 may be an inductive switch or a mechanical switch, and is preferably a photoelectric proximity switch.

[0073] A pouring method of a concrete pouring device for construction engineering, the specific steps are as follows:

[0074] S1 injects the mixed concrete into the casting hopper 1 through the injection equipment, so that the inner cavity of the casting hopper 1 is gradually filled with concrete;

[0075] S2 During the concrete pouring process, the casting mold 5 is horizontally conveyed to the lower part of the discharge port of the casting hopper 1 by the mold conveyor 2. During the conveying process of the casting mold 5, the valve of the discharge port at the lower end of the casting hopper 1 is opened, so that the concrete in the casting hopper 1 enters the pre-casting vibrating mechanism 3, and the concrete is pre-vibrated by the pre-casting vibrating mechanism 3;

[0076] S3 When the front end of the casting mold 5 moves to below the discharge port of the casting hopper 1, the concrete pre-vibrated in the pre-casting vibrating mechanism 3 is injected downward into the casting mold 5. With the continuous conveying of the mold conveyor 2, the casting mold 5 is gradually filled with concrete.

[0077] S4 During the pouring process, the front end of the pouring mold 5 moves to the bottom of the post-pouring vibrating mechanism 6, and the post-pouring vibrating mechanism 6 and the floating mechanism 7 are driven downward by the elevator 10, so that the vibrating rod 63 is quickly inserted into the concrete at the front end of the pouring mold 5, and the second vibrating motor 61 drives the connecting rod 62 and the vibrating rod 63 to vibrate, and the concrete is vibrated again;

[0078] S5 When the vibrating rod 63 is inserted into the concrete, the pressing plate 84 will press on the upper surface of the concrete. When the concrete pouring thickness is high, the pressing plate 84 will drive the vibration transmission rod 82 to move upward, and the vibration transmission rod 82 will drive the movable ring 81 to move upward along the connecting rod 62 and the limit bar 64, and the vibration will be transmitted to the vibrating plate 83 and the pressing plate 84 through the connecting rod 62, so as to realize the auxiliary vibration of the upper end surface of the concrete precast structure;

[0079] S6 During the vibration process of the vibrating rod 63, the cam 75 is driven by the motor to rotate, so that the protrusion of the cam 75 is in intermittent contact with the upper end of the end cover 73. When the protrusion is in contact with the upper end of the end cover 73, the end cover 73 is squeezed downward to drive the movable rod 72 and the post-casting vibrating mechanism 6 to move downward, and the reset spring 74 is in a compressed state. When the protrusion is not in contact with the end cover 73, the reset spring 74 returns to its original state and drives the movable rod 72 and the end cover 73 to move upward, so that the post-casting vibrating mechanism 6 moves up and resets, realizing the up and down floating vibration of the post-casting vibrating mechanism 6.

[0080] The technical features of the above embodiments may be arbitrarily combined (as long as there is no contradiction in the combination of these technical features). To make the description concise, not all possible combinations of the technical features in the above embodiments are described; these embodiments that are not explicitly written should also be considered to be within the scope of this specification.

Claims

1. A concrete pouring device for construction engineering, comprising a pouring hopper (1) and a mold conveyor (2), wherein the pouring hopper (1) is mounted on the outlet end of the mold conveyor (2) via a bracket (4), and a pouring mold (5) is conveyed to the lower side of the discharge port of the pouring hopper (1) via the mold conveyor (2), characterized in that: A pre-casting vibrating mechanism (3) is installed at the discharge port at the lower end of the casting hopper (1), and the pre-casting vibrating mechanism (3) is used to pre-vibrate the concrete before it is discharged; A height-adjustable post-casting vibrating mechanism (6) and a floating mechanism (7) are installed on one side of the bracket (4) close to the outlet end of the mold conveyor (2); the post-casting vibrating mechanism (6) is installed on the movable end of the floating mechanism (7); the vibrating end of the post-casting vibrating mechanism (6) is arranged downward and inserted into the concrete for vibration; the post-casting vibrating mechanism (6) in a working state is driven by the floating mechanism (7) to float and vibrate up and down; A vibrating plate assembly (8) is installed on the post-casting vibration mechanism (6), and the vibrating plate assembly (8) is used to perform auxiliary vibration on cast products with different casting thicknesses.

2. A concrete pouring device for construction engineering according to claim 1, characterized in that: The pre-casting vibration mechanism (3) comprises a pre-vibration box (31), a discharge pipe (32), a vibration blade (33) and a first vibration motor (34); the pre-vibration box (31) is installed at the lower end of the discharge port of the casting hopper (1); the discharge pipe (32) is installed at the bottom of the pre-vibration box (31); the casting hopper (1), the pre-vibration box (31) and the discharge pipe (32) are interconnected; the vibration blade (33) is arranged in the inner cavity of the pre-vibration box (31) and is driven to vibrate by the first vibration motor (34) to pre-vibrate the concrete before discharge.

3. A concrete pouring device for construction engineering according to claim 2, characterized in that: The vibrating blade (33) is in the shape of a spiral blade and is driven to vibrate by a first vibrating motor (34) installed outside the pre-vibrating box (31).

4. A concrete pouring device for construction engineering according to claim 1, characterized in that: The post-casting vibration mechanism (6) comprises a second vibration motor (61), a connecting rod (62), and a vibration rod (63); the second vibration motor (61) is mounted on the movable end of the floating mechanism (7); the connecting rod (62) is mounted on the output shaft of the second vibration motor (61); and the vibration rod (63) is mounted on the lower end of the connecting rod (62) and is perpendicular to the conveying surface of the mold conveyor (2).

5. A concrete pouring device for construction engineering according to claim 4, characterized in that: The vibrating plate assembly (8) comprises a movable ring (81), a vibration transmission rod (82), and a vibrating plate (83); the movable ring (81) is slidably mounted on the connecting rod (62); one end of the vibration transmission rod (82) is connected to a side of the movable ring (81) close to the discharge port of the mold conveyor (2); the other end of the vibration transmission rod (82) extends downward and is connected to the vibrating plate (83); the vibrating plate (83) is horizontally arranged and is pressed onto the upper surface of the prefabricated structural member when in operation.

6. A concrete pouring device for construction engineering according to claim 5, characterized in that: The outer diameter of the connecting rod (62) is smaller than the outer diameter of the vibrating rod (63), and a limit strip (64) arranged along its height is installed on the outer surface of the connecting rod (62). A sleeve hole matching the outer circumference of the connecting rod (62) is opened in the middle of the movable ring (81). The movable ring (81) is sleeved on the connecting rod (62) through the sleeve hole. A limit groove matching the limit strip (64) is opened on the inner wall of the sleeve hole. The movable ring (81) is slidably sleeved with the limit strip (64) through the limit groove.

7. A concrete pouring device for construction engineering according to claim 5, characterized in that: A pressing plate (84) is arranged parallel to the lower surface of the vibrating plate (83), and the upper end surface of the pressing plate (84) is connected to the lower end surface of the vibrating plate (83) via a spring, wherein the number of the springs is multiple and evenly distributed.

8. A concrete pouring device for construction engineering according to claim 1, characterized in that: The floating mechanism (7) comprises a box body (71), a movable rod (72), an end cover (73), a reset spring (74), and a cam (75). The box body (71) is mounted on a bracket (4) and is height-adjustable. The movable rod (72) is movably sleeved on the bottom of the box body (71). The upper end of the movable rod (72) extends into the box body (71) and is mounted with an end cover (73). The lower end surface of the end cover (73) is connected to the bottom of the inner cavity of the box body (71) through a reset spring (74). The lower end of the movable rod (72) extends to the bottom of the box body (71) and is connected to the top of a post-casting vibrating mechanism (6). The cam (75) is rotatably mounted above the inner cavity of the box body (71) and is driven by a motor. The outer peripheral bottom of the cam (75) abuts against the upper end surface of the end cover (73).

9. A concrete pouring device for construction engineering according to claim 1, characterized in that: A lift (10) is installed on the side of the bracket (4) close to the exit end of the mold conveyor (2); the lift (10) is an electric slide rail, and the slider of the electric slide rail is arranged on the side away from the casting hopper (1); the floating mechanism (7) is installed on the slider of the electric slide rail.

10. A method for pouring concrete according to any one of claims 1 to 9, characterized in that: The specific steps are as follows: S1 injects the mixed concrete into the casting hopper (1) through the injection equipment, so that the inner cavity of the casting hopper (1) is gradually filled with concrete; S2: During the process of concrete pouring, the casting mold (5) is horizontally conveyed to the lower part of the discharge port of the casting hopper (1) by the mold conveyor (2); during the conveying process of the casting mold (5), the valve of the discharge port at the lower end of the casting hopper (1) is opened, so that the concrete in the casting hopper (1) enters the pre-casting vibrating mechanism (3), and the concrete is pre-vibrated by the pre-casting vibrating mechanism (3); S3 When the front end of the casting mold (5) moves to below the discharge port of the casting hopper (1), the concrete pre-vibrated in the pre-casting vibrating mechanism (3) is poured downward into the casting mold (5), and as the mold conveyor (2) continues to convey, the casting mold (5) is gradually filled with concrete; S4: During the pouring process, the front end of the pouring mold (5) moves to the bottom of the post-pour vibrating mechanism (6), and the post-pour vibrating mechanism (6) and the floating mechanism (7) are driven downward by the elevator (10), so that the vibrating rod (63) is quickly inserted into the concrete at the front end of the pouring mold (5), and the connecting rod (62) and the vibrating rod (63) are driven to vibrate by the second vibrating motor (61), so as to vibrate the concrete again; S5 When the vibrating rod (63) is inserted into the concrete, the pressing plate (84) will press on the upper surface of the concrete. When the thickness of the concrete pouring is high, the pressing plate (84) will drive the vibration transmission rod (82) to move upward, and the vibration transmission rod (82) will drive the movable ring (81) to move upward along the connecting rod (62) and the limit strip (64), and the vibration will be transmitted to the vibrating plate (83) and the pressing plate (84) through the connecting rod (62), so as to realize auxiliary vibration of the upper end surface of the concrete precast structure; S6 During the vibration process of the vibrating rod (63), the cam (75) is driven to rotate by the motor so that the protrusion of the cam (75) is in intermittent contact with the upper end of the end cover (73). When the protrusion is in contact with the upper end of the end cover (73), the end cover (73) is pressed downward to drive the movable rod (72) and the post-casting vibrating mechanism (6) to move downward, and the reset spring (74) is in a compressed state. When the protrusion is not in contact with the end cover (73), the reset spring (74) returns to its original state and drives the movable rod (72) and the end cover (73) to move upward, so that the post-casting vibrating mechanism (6) moves upward and resets, thereby realizing the up and down floating vibration of the post-casting vibrating mechanism (6).

Citation Information

Cited By

  • Forming device and forming method based on prefabricated stair production

    CN120620426A

  • A molding device and molding method based on prefabricated staircase production

    CN120620426B

  • Recycled mixed concrete beam slab and construction method thereof

    CN121535828A

  • A device for pouring recycled mixed concrete beam slab and a construction method thereof

    CN121535828B

  • Automatic concrete pouring device for water conservancy construction engineering

    CN121802847A