Hydraulic engineering management method and system based on digital twinning
Real-time monitoring and risk assessment of water conservancy projects through digital twin technology solves the problem that traditional methods are difficult to reflect the status of water conservancy projects and adapt to environmental changes in real time, and achieves more efficient and safe water conservancy projects management.
Patent Information
- Application Number
- CN202411551915.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-01
- Publication Date
- 2025-02-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional water conservancy engineering management methods are difficult to reflect the changes in the state of water conservancy engineering in real time, and they are poorly adaptable to environmental changes.
The water conservancy engineering management method based on digital twins is adopted to obtain the design, operation and environmental data of water conservancy projects, and conduct digital twin space modeling, virtual simulation analysis, water flow distribution and structural stress and load analysis, and conduct risk assessment and decision-making management.
Real-time monitoring and risk assessment of water conservancy projects have been achieved, the ability to adapt to environmental changes has been improved, the safe and stable operation of facilities has been ensured, and scientific management decisions have been supported.
Smart Images

Figure CN119475748A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of water conservancy project management, and in particular to a water conservancy project management method and system based on digital twins. Background Art
[0002] With the rapid development of the Internet of Things, cloud computing and big data technologies, digital twin technology has gradually become an important means to improve the management efficiency of water conservancy projects. Digital twins can effectively integrate various sensor data by creating virtual models of physical water conservancy facilities and real-time monitoring and analysis of them, and reflect hydrological, meteorological and water resource changes in real time. Through high-precision sensors and remote sensing technology, the operation data of water conservancy projects, including key parameters such as water level, flow rate, and pressure, are collected in real time. The digital twin model is built using these data to dynamically reflect the physical state of water conservancy facilities. The digital twin model can provide real-time monitoring capabilities, allowing managers to view the operating status of water conservancy facilities at any time. Through data analysis algorithms, potential faults and risks can be identified, early warning capabilities can be improved, and the safe and stable operation of facilities can be ensured. Environmental data such as meteorology and hydrology can be integrated into the digital twin model to enhance the adaptability to changes in external factors. It can simulate the performance of the project under different environmental conditions and support decision makers in formulating more scientific management strategies. However, traditional water conservancy project management methods rely on offline data analysis, which makes it difficult to reflect the state changes of water conservancy projects in real time, and have poor adaptability to environmental change factors. Summary of the invention
[0003] Based on this, it is necessary for the present invention to provide a water conservancy project management method and system based on digital twins to solve at least one of the above-mentioned technical problems.
[0004] To achieve the above purpose, a water conservancy project management method based on digital twins includes the following steps:
[0005] Step S1: Acquire water conservancy project design data, water conservancy project operation data and water conservancy project environmental data, and perform digital twin space modeling on the corresponding water conservancy project based on the water conservancy project design data to obtain a digital twin space model of the water conservancy project;
[0006] Step S2: Based on the water conservancy project operation data and water conservancy project environmental data, a virtual simulation analysis of the operation conditions of the water conservancy project digital twin space model is performed to obtain a water conservancy project simulation operation process sub-model under different operation operations and environmental change conditions;
[0007] Step S3: analyzing the change of water flow distribution on the hydraulic engineering simulation operation process sub-model under different operation and environmental change conditions, so as to obtain the hydraulic engineering water flow distribution change simulation field under different operation and environmental change conditions; analyzing the engineering structure stress load on the corresponding hydraulic engineering simulation operation process sub-model based on the hydraulic engineering water flow distribution change simulation field under different operation and environmental change conditions, so as to obtain the hydraulic engineering structure stress load data under different operation and environmental change conditions;
[0008] Step S4: Based on the simulation field of water flow distribution changes in the water conservancy project under different operating operations and environmental change conditions and the stress load data of the water conservancy project structure, the corresponding water conservancy project simulation operation process sub-model is evaluated for engineering operation risk, and the water conservancy project simulation operation process risk data under different operating operations and environmental change conditions are obtained; based on the water conservancy project simulation operation process risk data under different operating operations and environmental change conditions, the corresponding water conservancy project is processed for risk decision management, and a water conservancy project operation process risk management decision is generated to execute the corresponding water conservancy project operation risk management adjustment work.
[0009] Further, step S1 includes the following steps:
[0010] Step S11: extracting engineering structure design data from the engineering design drawings corresponding to the water conservancy project to obtain initial design data of the water conservancy project structure;
[0011] Step S12: dynamically monitor and collect operation data of the water conservancy project through the real-time operation monitoring system to obtain dynamic monitoring operation data of the water conservancy project;
[0012] Step S13: using a water conservancy project environment monitoring sensor to monitor and collect environmental data on environmental changes around the water conservancy project in real time, thereby obtaining real-time monitoring data of the environment around the water conservancy project;
[0013] Step S14: performing data preprocessing and time series synchronization processing on the initial design data of the water conservancy project structure, the dynamic monitoring and operation data of the water conservancy project, and the real-time monitoring data of the surrounding environment of the water conservancy project, so as to obtain the water conservancy project design data, water conservancy project operation data, and water conservancy project environmental data in the same time dimension;
[0014] Step S15: Perform digital twin space modeling on the corresponding water conservancy project based on the water conservancy project design data to obtain a digital twin space model of the water conservancy project.
[0015] Further, step S15 includes the following steps:
[0016] Step S151: classifying the functional components of the water conservancy project to obtain each functional component part of the water conservancy project, wherein each functional component part of the water conservancy project includes a water flow system component part, a project structure component part and a water conservancy control system component part;
[0017] Step S152: classifying and dividing the water conservancy project design data into component design data based on each water conservancy project functional component part to obtain each water conservancy project functional component design sub-data;
[0018] Step S153: Performing statistical analysis on the component design requirements and structural characteristics of each water conservancy project functional component design sub-data to obtain component design requirement data and component structural characteristic data corresponding to each water conservancy project functional component;
[0019] Step S154: digitally describe and model the corresponding functional components of the water conservancy project based on the component design requirement data and component structure characteristic data corresponding to each water conservancy project functional component, so as to obtain a digital virtual model of each water conservancy project functional component;
[0020] Step S155: Perform functional component connection analysis on each water conservancy project functional component part to obtain the engineering structure geometric connection relationship between each water conservancy project functional component; based on the engineering structure geometric connection relationship between each water conservancy project functional component, perform digital twin space modeling on the digital virtual model of each water conservancy project functional component to obtain a digital twin space model of the water conservancy project.
[0021] Further, step S154 includes the following steps:
[0022] Perform component material property and mechanical property function decomposition processing on the component design requirement data corresponding to each water conservancy project functional component, and obtain component material function property data and component mechanical property data corresponding to each water conservancy project functional component;
[0023] Based on the component structure characteristic data corresponding to each water conservancy project functional component, a digital virtual component design is performed on the corresponding water conservancy project functional component part to generate a digital virtual component of each water conservancy project functional component;
[0024] Based on the component material function attribute data and component mechanical property data corresponding to each water conservancy project functional component, the material property and mechanical property assignment modeling of each water conservancy project functional component digital virtual component is performed to obtain a virtual model of the material mechanical property of each water conservancy project functional component;
[0025] Based on the virtual model of the mechanical properties of the materials of each water conservancy project functional component, the corresponding water conservancy project functional component parts are tested and analyzed for environmental adaptability, and the virtual test performance data of the environmental adaptability corresponding to each water conservancy project functional component model is obtained;
[0026] According to the environmental adaptability virtual test performance data corresponding to each water conservancy project functional component model, the virtual model of the material mechanical properties of each water conservancy project functional component is digitally optimized and adjusted to obtain a digital virtual model of each water conservancy project functional component.
[0027] Further, step S2 includes the following steps:
[0028] Step S21: analyzing the change pattern of the operation state attributes of the water conservancy project operation data to obtain the change pattern of the operation state attributes of the water conservancy project;
[0029] Step S22: designing operation simulation conditions for the operation data of the water conservancy project based on the change pattern of the operation state attributes of the water conservancy project to generate operation scenario simulation conditions for the water conservancy project;
[0030] Step S23: Based on the water conservancy project operation state attribute change mode, the water conservancy project environment data is evaluated and analyzed for the operation environment change association, and the water conservancy project operation state environment change impact association data is obtained;
[0031] Step S24: performing operation environment scenario simulation design on the water conservancy project environmental data based on the associated data of the impact of the water conservancy project operation state environmental change, so as to generate the water conservancy project operation environment change scenario simulation conditions;
[0032] Step S25: Based on the simulation conditions of the water conservancy project operation scenario and the simulation conditions of the water conservancy project operation environment change scenario, the operation condition virtual simulation analysis is performed on the digital twin space model of the water conservancy project to obtain a sub-model of the water conservancy project simulation operation process under different operation and environmental change conditions.
[0033] Further, step S3 includes the following steps:
[0034] Step S31: monitoring and processing the water conservancy operation flow and operation duration of the water conservancy project simulation operation process sub-model under different operation operations and environmental change conditions, and obtaining the water conservancy project simulation operation flow and water conservancy project simulation operation duration under different operation operations and environmental change conditions;
[0035] Step S32: analyzing the hydraulic operation velocity parameters of the hydraulic project simulation operation process sub-model under different operation operations and environmental change conditions based on the hydraulic project simulation operation flow rate and the hydraulic project simulation operation duration under different operation operations and environmental change conditions, and obtaining the hydraulic project operation velocity parameters under different operation operations and environmental change conditions;
[0036] Step S33: quantitatively analyzing the water level change of the hydraulic project under different operation and environmental change conditions on the hydraulic project simulation operation process sub-model, and obtaining the water level change parameters of the hydraulic project under different operation and environmental change conditions;
[0037] Step S34: Based on the water conservancy project operation flow velocity parameters and water conservancy project operation water level change parameters under different operation operations and environmental change conditions, the corresponding water conservancy project simulation operation process sub-model is simulated and analyzed to obtain a water conservancy project water flow distribution change simulation field under different operation operations and environmental change conditions;
[0038] Step S35: Based on the simulation field of water flow distribution changes in the water conservancy project under different operating operations and environmental change conditions, the corresponding water conservancy project simulation operation process sub-model is subjected to engineering structure stress load analysis to obtain the water conservancy project structure stress load data under different operating operations and environmental change conditions.
[0039] Further, step S34 includes the following steps:
[0040] Step S341: Analyze the spatial distribution characteristics of the water conservancy project operation flow velocity parameters and the water conservancy project operation water level change parameters under different operation operations and environmental change conditions, and obtain the spatial distribution characteristics of the water conservancy project operation flow velocity and the water conservancy project operation water level change under different operation operations and environmental change conditions;
[0041] Step S342: performing spatial distribution correlation mining analysis on the spatial distribution characteristics of the water conservancy project operating flow velocity and the spatial distribution characteristics of the water level change under different operating operations and environmental change conditions, and obtaining the spatial distribution correlation relationship between the water conservancy project operating flow velocity and the water level change under different operating operations and environmental change conditions;
[0042] Step S343: Performing water flow change scenario simulation design on the spatial distribution correlation between the water flow velocity and water level change of the water conservancy project under different operation and environmental change conditions, so as to generate water flow change simulation scenarios of the water conservancy project under different operation and environmental change conditions;
[0043] Step S344: Based on the simulation scenario of water flow changes in the water conservancy project under different operating operations and environmental change conditions, the corresponding water conservancy project simulation operation process sub-model is simulated and analyzed to obtain a simulation field of water flow distribution changes in the water conservancy project under different operating operations and environmental change conditions.
[0044] Further, step S35 includes the following steps:
[0045] Step S351: Based on the simulation field of water flow distribution change of the water conservancy project under different operation and environmental change conditions, the corresponding water conservancy project simulation operation process sub-model is analyzed for engineering structure force distribution, and the water conservancy project structure force distribution data under different operation and environmental change conditions are obtained;
[0046] Step S352: performing structural force identification analysis on the force distribution data of the hydraulic engineering structure under different operation and environmental change conditions to obtain the fluid dynamic pressure and hydrostatic pressure of the hydraulic engineering structure under different operation and environmental change conditions;
[0047] Step S353: based on the simulation field of water flow distribution change of the water conservancy project under different operation and environmental change conditions, the water flow distribution impact quantitative calculation is performed on the corresponding water conservancy project structure in the water conservancy project simulation operation process sub-model to obtain the water flow distribution impact strength value of the water conservancy project structure under different operation and environmental change conditions;
[0048] Step S354: Based on the fluid dynamic pressure and hydrostatic pressure of the hydraulic engineering structure under different operation and environmental change conditions, the corresponding hydraulic engineering structure in the hydraulic engineering simulation operation process sub-model is evaluated and calculated to obtain the hydraulic engineering structure stress and compression capacity factor under different operation and environmental conditions;
[0049] Step S355: Based on the impact strength value of the water flow distribution of the hydraulic engineering structure under different operating operations and environmental change conditions and the stress and compressive capacity factor of the hydraulic engineering structure, the corresponding hydraulic engineering simulation operation process sub-model is subjected to engineering structure stress load analysis to obtain the hydraulic engineering structure stress load data under different operating operations and environmental change conditions.
[0050] Further, step S4 includes the following steps:
[0051] Step S41: analyzing the dynamic change trend of water flow distribution in the simulation field of water flow distribution change of the water conservancy project under different operation and environmental change conditions, and obtaining the dynamic change trend of water flow distribution of the water conservancy project under different operation and environmental change conditions;
[0052] Step S42: performing load state change mapping analysis on the load data of the hydraulic engineering structure under different operation and environmental change conditions, and obtaining the load state change law of the hydraulic engineering structure under different operation and environmental change conditions;
[0053] Step S43: Based on the dynamic change trend of water flow distribution of the water conservancy project under different operation and environmental change conditions and the change law of the load state of the water conservancy project, the corresponding water conservancy project simulation operation process sub-model is evaluated for engineering operation risk, and the water conservancy project simulation operation process risk data under different operation and environmental change conditions is obtained;
[0054] Step S44: performing operation risk response suggestion analysis on the risk data of the hydraulic engineering simulation operation process under different operation operations and environmental change conditions, and obtaining operation risk response suggestion schemes for the hydraulic engineering under different operation operations and environmental change conditions;
[0055] Step S45: Perform risk decision management processing on the corresponding water conservancy project based on the water conservancy project operation risk response recommendation plan under different operating operations and environmental change conditions, generate water conservancy project operation process risk management decisions, and execute corresponding water conservancy project operation risk management adjustment work.
[0056] Furthermore, the present invention also provides a water conservancy project management system based on digital twins, which is used to execute the water conservancy project management method based on digital twins as described above. The water conservancy project management system based on digital twins includes:
[0057] The water conservancy project digital twin spatial modeling module is used to obtain the water conservancy project design data, water conservancy project operation data and water conservancy project environmental data, and to perform digital twin spatial modeling of the corresponding water conservancy project based on the water conservancy project design data, thereby obtaining a digital twin spatial model of the water conservancy project;
[0058] The operation and environmental change condition simulation module is used to perform virtual simulation analysis of the operation conditions of the digital twin space model of the water conservancy project based on the operation data and environmental data of the water conservancy project, so as to obtain the simulation operation process sub-model of the water conservancy project under different operation and environmental change conditions;
[0059] The water flow distribution and structural load analysis module is used to analyze the water flow distribution changes of the hydraulic engineering simulation operation process sub-model under different operation and environmental change conditions, so as to obtain the hydraulic engineering water flow distribution change simulation field under different operation and environmental change conditions; based on the hydraulic engineering water flow distribution change simulation field under different operation and environmental change conditions, the corresponding hydraulic engineering simulation operation process sub-model is analyzed for engineering structure load, so as to obtain hydraulic engineering structure load data under different operation and environmental change conditions;
[0060] The water conservancy project operation risk management module is used to conduct project operation risk assessment on the corresponding water conservancy project simulation operation process sub-model based on the simulation field of water flow distribution changes in the water conservancy project under different operating operations and environmental changes and the stress load data of the water conservancy project structure, and obtain the risk data of the water conservancy project simulation operation process under different operating operations and environmental changes; based on the risk data of the water conservancy project simulation operation process under different operating operations and environmental changes, the corresponding water conservancy project is processed for risk decision management, and a water conservancy project operation process risk management decision is generated to execute the corresponding water conservancy project operation risk management adjustment work.
[0061] Beneficial effects of the present invention:
[0062] 1. Compared with the prior art, the water conservancy project management method based on digital twin proposed by the present invention has the beneficial effect of providing detailed structural design data for water conservancy projects by extracting engineering structure design data from engineering design drawings corresponding to water conservancy projects. This step not only ensures the accuracy of design data, but also provides a solid foundation for subsequent monitoring and evaluation. By dynamically monitoring and collecting operation data of water conservancy projects, the operation data of the project can be obtained in real time. This process enables project managers to understand the operation status of the project in a timely manner, including key indicators such as water flow, pressure, and temperature. Dynamic monitoring can not only improve the operation efficiency of the project, but also respond quickly when abnormal situations occur, reducing potential risks. By real-time monitoring and collection of the surrounding environment of the water conservancy project, the environmental changes around the water conservancy project can be understood in detail. This process can capture environmental data such as water quality, soil moisture, and rainfall, providing important external reference information for the operation of the water conservancy project. At the same time, by conducting digital twin spatial modeling of the corresponding water conservancy project based on the water conservancy project design data, a digital model corresponding to the actual water conservancy project structure can be constructed. This model not only accurately reflects the structural characteristics and operating status of the water conservancy project, but also can perform virtual simulation and predictive analysis. The digital twin model provides an intuitive visualization tool for the management of water conservancy projects. Engineers can simulate various scenarios of the project in a virtual environment and evaluate the performance of the project under different operating and environmental conditions, thereby providing a solid guarantee for the realization of more efficient and safer water conservancy project operation. Secondly, by conducting virtual simulation analysis of the operating conditions of the digital twin spatial model of the water conservancy project based on the water conservancy project operation data and water conservancy project environmental data, the simulation operation process sub-model under different operating operations and environmental change conditions can be obtained. This analysis can provide deep insights for managers of water conservancy projects and help understand the behavior and performance of the project under different conditions. Through virtual simulation, engineers can identify potential operating risks and optimize operating strategies to improve the efficiency and safety of the project. It also lays the foundation for future technical improvements and management decisions, so as to better reflect the changes in the operating status of the water conservancy project in real time and promote the development of water conservancy projects in a more intelligent and efficient direction. Then, by simulating and analyzing the changes in water flow distribution in the sub-model of the hydraulic engineering simulation operation process under different operating operations and environmental changes, the water flow distribution behavior under different operating and environmental conditions can be more intuitively displayed. This simulation analysis not only helps to understand the distribution characteristics of water flow under different conditions, but also provides an intuitive basis for engineering design. By simulating the distribution scenario of water flow, the changing laws of fluid dynamics can be identified, and then the impact on the engineering structure can be evaluated.By analyzing the engineering structure stress load of the corresponding hydraulic engineering simulation operation process sub-model based on the simulation field of water flow distribution change of hydraulic engineering under different operation and environmental change conditions, the safety and stability of hydraulic engineering under different operation and environmental conditions can be evaluated. The structural stress load is an important factor affecting the safety of the project. Accurate stress analysis can help identify potential safety hazards and guide engineering design and maintenance. Through this analysis, we can better understand the force of water flow on the engineering structure, thereby providing the necessary basis for structural design, ensuring the reliability of water conservancy facilities in actual operation, and providing guidance for the transformation and upgrading of hydraulic engineering to improve its ability to cope with extreme weather and environmental changes, thereby improving the adaptability of subsequent engineering management processes to environmental change factors. Finally, by conducting engineering operation risk assessment on the corresponding hydraulic engineering simulation operation process sub-model based on the simulation field of water flow distribution change of hydraulic engineering under different operation and environmental change conditions and the stress load data of hydraulic engineering structure, we can systematically identify the potential risks of hydraulic engineering under different conditions. The results of risk assessment will provide important reference for decision makers, enabling them to more accurately grasp the safety status and potential hazards of the project. This process can not only identify the current risk points, but also predict the possible risk situations in the future through comprehensive analysis of historical data and existing models, and provide data support for scientific decision-making. In addition, by conducting risk decision management on the corresponding water conservancy projects based on the risk data of the simulated operation process of water conservancy projects under different operating operations and environmental changes, risk management decisions that meet the actual situation can be systematically formulated. This process combines the theory and practice of risk management, and ensures that water conservancy projects can effectively respond to various risk conditions through the evaluation and optimization of specific implementation plans. The generation of this decision will consider a variety of factors, such as the current operation status of the project, changes in the external environment, historical data analysis, etc., so as to formulate a scientific and reasonable adjustment plan. After implementing these decisions, it is possible to respond to emergencies in a timely manner, reduce losses and improve the overall resilience of water conservancy projects. In addition, through systematic risk management decisions, not only the operating efficiency of water conservancy projects is improved, but also a reliable reference basis is provided for the future water conservancy project management process, thereby promoting the sustainable development of water conservancy project management.
[0063] 2. The water conservancy project management system based on digital twin proposed in the present invention is composed of a water conservancy project digital twin spatial modeling module, an operation and environmental change condition simulation module, a water flow distribution and structural force load analysis module and a water conservancy project operation risk management module. It can realize any water conservancy project management method based on digital twin described in the present invention, and is used to combine the operations between computer programs running on each module to realize the water conservancy project management method based on digital twin. The internal structures of the system cooperate with each other, which can greatly reduce duplication of work and manpower investment, and can quickly and effectively provide a more accurate and efficient water conservancy project management process based on digital twin, thereby simplifying the operation process of the water conservancy project management system based on digital twin. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments thereof made with reference to the following drawings:
[0065] Figure 1 It is a schematic diagram of the steps of the water conservancy project management method based on digital twins of the present invention;
[0066] Figure 2 for Figure 1 Detailed step flow diagram of step S1;
[0067] Figure 3 for Figure 2 Detailed step flow chart of step S15 in FIG. DETAILED DESCRIPTION
[0068] The technical method of the present invention is described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by technicians in this field without creative work are within the scope of protection of the present invention.
[0069] In addition, the accompanying drawings are only schematic illustrations of the present invention and are not necessarily drawn to scale. The same reference numerals in the figures represent the same or similar parts, and their repeated description will be omitted. Some of the block diagrams shown in the accompanying drawings are functional entities and do not necessarily correspond to physically or logically independent entities. The functional entities can be implemented in software form, or implemented in one or more hardware modules or integrated circuits, or implemented in different networks and / or processor methods and / or microcontroller methods.
[0070] It should be understood that, although the terms "first", "second", etc. may be used herein to describe various units, these units should not be limited by these terms. These terms are used only to distinguish one unit from another unit. For example, without departing from the scope of the exemplary embodiments, the first unit may be referred to as the second unit, and similarly the second unit may be referred to as the first unit. The term "and / or" used herein includes any and all combinations of one or more of the listed associated items.
[0071] To achieve this, please refer to Figures 1 to 3 The present invention provides a water conservancy project management method based on digital twins, the method comprising the following steps:
[0072] Step S1: Acquire water conservancy project design data, water conservancy project operation data and water conservancy project environmental data, and perform digital twin space modeling on the corresponding water conservancy project based on the water conservancy project design data to obtain a digital twin space model of the water conservancy project;
[0073] Step S2: Based on the water conservancy project operation data and water conservancy project environmental data, a virtual simulation analysis of the operation conditions of the water conservancy project digital twin space model is performed to obtain a water conservancy project simulation operation process sub-model under different operation operations and environmental change conditions;
[0074] Step S3: analyzing the change of water flow distribution on the hydraulic engineering simulation operation process sub-model under different operation and environmental change conditions, so as to obtain the hydraulic engineering water flow distribution change simulation field under different operation and environmental change conditions; analyzing the engineering structure stress load on the corresponding hydraulic engineering simulation operation process sub-model based on the hydraulic engineering water flow distribution change simulation field under different operation and environmental change conditions, so as to obtain the hydraulic engineering structure stress load data under different operation and environmental change conditions;
[0075] Step S4: Based on the simulation field of water flow distribution changes in the water conservancy project under different operating operations and environmental change conditions and the stress load data of the water conservancy project structure, the corresponding water conservancy project simulation operation process sub-model is evaluated for engineering operation risk, and the water conservancy project simulation operation process risk data under different operating operations and environmental change conditions are obtained; based on the water conservancy project simulation operation process risk data under different operating operations and environmental change conditions, the corresponding water conservancy project is processed for risk decision management, and a water conservancy project operation process risk management decision is generated to execute the corresponding water conservancy project operation risk management adjustment work.
[0076] In the embodiment of the present invention, please refer to Figure 1As shown, it is a schematic diagram of the steps of the water conservancy project management method based on digital twins of the present invention. In this example, the water conservancy project management method based on digital twins includes the following steps:
[0077] Step S1: Acquire water conservancy project design data, water conservancy project operation data and water conservancy project environmental data, and perform digital twin space modeling on the corresponding water conservancy project based on the water conservancy project design data to obtain a digital twin space model of the water conservancy project;
[0078] In an embodiment of the present invention, by obtaining the engineering design drawings corresponding to the water conservancy project, including structural drawings, construction drawings and detailed design instructions, and using computer-aided design (CAD) software such as AutoCAD or Revit, the engineering design drawings are processed for obtaining structural design data, so as to extract structural parameters, including structural design parameters such as dam height, width, material type, and load-bearing capacity, by writing a program or using existing tools, so as to obtain the initial design data of the water conservancy project structure. By using a pre-configured real-time operation monitoring system (the system consists of sensors, data collectors and a central monitoring platform), the operation data of the water conservancy project is dynamically monitored and collected in real time, so that sensors are arranged at key positions of water conservancy project facilities, responsible for collecting operation parameters such as water level, flow, and pressure, and the data collector regularly transmits the sensor data to the central monitoring platform to realize real-time storage of all collected operation data, so as to obtain the operation data of the water conservancy project for dynamic monitoring. At the same time, the environmental changes around the water conservancy project are monitored and collected in real time by using water conservancy project environmental monitoring sensors. The environmental monitoring sensors are deployed in the surrounding areas of the water conservancy project. The monitoring parameters include air quality, soil moisture, rainfall and water quality. The data of each sensor is integrated to form a comprehensive environmental monitoring data set, so as to obtain real-time monitoring data of the environment around the water conservancy project. In addition, the initial design data of the water conservancy project structure, the operation data of the dynamic monitoring of the water conservancy project and the real-time monitoring data of the environment around the water conservancy project collected in real time are preprocessed to clean the corresponding data, remove duplicate or invalid information, and perform time series synchronization processing to ensure that all types of data are aligned according to a unified time dimension. The missing data points are filled by the interpolation algorithm to form continuous time series data, so as to obtain the water conservancy project design data, water conservancy project operation data and water conservancy project environmental data under the same time dimension. Then, by combining the water conservancy project design data obtained after time-series synchronization, the digital twin technology is used to perform spatial modeling of the corresponding water conservancy project. By using three-dimensional modeling software such as SketchUp or BIM platform, the design data and monitoring data of the water conservancy project are imported to build a digital model corresponding to the actual project. The model parameters are continuously updated using data-driven methods to maintain a high degree of consistency with the actual water conservancy project design structure, and finally a digital twin spatial model of the water conservancy project is obtained.
[0079] Step S2: Based on the water conservancy project operation data and water conservancy project environmental data, a virtual simulation analysis of the operation conditions of the water conservancy project digital twin space model is performed to obtain a water conservancy project simulation operation process sub-model under different operation operations and environmental change conditions;
[0080] In an embodiment of the present invention, a statistical analysis is performed on the water conservancy project operation data (including various parameters such as water flow, water level, pressure, temperature, etc.) previously analyzed by using, for example, time series analysis or principal component analysis to identify its changing trends, such as periodic changes, sudden changes or gradual changes, and a model is constructed to describe these changing patterns. A machine learning algorithm, such as cluster analysis, can be used to help identify operating modes under similar states, and by combining the operating state attribute change patterns obtained by the previous analysis, the simulation conditions of the operating operation process of the corresponding water conservancy project operation data are designed, so as to analyze the operating operation types under different change modes, including start and stop, flow regulation, water level adjustment and other operation methods, and set corresponding simulation conditions for each operation, including operation time, operation intensity, initial state, etc., so as to simulate and generate corresponding water conservancy project operation simulation conditions. At the same time, by combining the operating state attribute change pattern obtained by the previous analysis, the corresponding water conservancy project environmental data is subjected to correlation evaluation analysis of the operating environment change, so as to collect environmental data related to the water conservancy project, such as rainfall, evaporation, soil moisture, temperature, etc., and establish a mathematical model to correlate the environmental changes with the operating state attributes. By using statistical methods such as regression analysis, the relationship between the two is explored to form an impact correlation relationship between environmental changes and operating state attribute changes. By combining the impact correlation relationship obtained by the previous analysis, the corresponding water conservancy project environmental data is simulated and designed for the operating environment scenario, so as to simulate and design the main environmental change scenarios that need to be simulated, including extreme climate events (such as floods and droughts), seasonal changes and long-term trends, so as to form a complete environmental change scenario simulation condition. Then, by combining the previous simulation design The generated water conservancy project operation simulation conditions and water conservancy project operation environment change scenario simulation conditions perform simulation analysis on the corresponding water conservancy project digital twin space model of the operation condition combination, so as to combine the operation scenario and the environmental change scenario separately, and form corresponding simulation input condition systems, and use digital twin technology to create respective dynamic virtual environments through the simulation platform using various simulation input condition systems. In the corresponding virtual environment, different operating conditions are set to simulate the operation process of the water conservancy project under the interactive conditions of respective operation and environmental change. In the simulation analysis process, the changes of key indicators in each operation process, such as flow, water level, pressure, etc., are recorded, thereby forming an operation process sub-model under respective operation conditions, and finally obtaining a water conservancy project simulation operation process sub-model under different operation and environmental change conditions.
[0081] Step S3: analyzing the change of water flow distribution on the hydraulic engineering simulation operation process sub-model under different operation and environmental change conditions, so as to obtain the hydraulic engineering water flow distribution change simulation field under different operation and environmental change conditions; analyzing the engineering structure stress load on the corresponding hydraulic engineering simulation operation process sub-model based on the hydraulic engineering water flow distribution change simulation field under different operation and environmental change conditions, so as to obtain the hydraulic engineering structure stress load data under different operation and environmental change conditions;
[0082] In an embodiment of the present invention, the water conservancy operation flow and operation duration are monitored and processed by the previously constructed water conservancy project simulation operation process sub-model under different operation operations and environmental change conditions. In the specific implementation, sensors and data acquisition systems are used to collect flow and time data at each key node, so that flow meters are used to monitor the flow of water inlets and outlets, and the duration of each operation stage is recorded by a clock. The monitored data will be input into a dedicated software for processing, thereby forming the water conservancy operation flow and operation duration under the corresponding operation operations and environmental change conditions, and by combining the water conservancy operation flow and operation duration under different operation operations and environmental change conditions obtained by the previous monitoring, the corresponding water conservancy project simulation operation process sub-model is statistically calculated for flow velocity parameters, so that the flow data obtained in the previous step is multiplied by the cross-sectional area of the water conservancy project and divided by the operation duration, and the flow velocity under different operation conditions is calculated. The flow velocity changes under different operations (such as water storage, water release, irrigation) and environmental conditions (such as rainfall, evaporation) can be analyzed through a numerical model to obtain the water conservancy project operation flow velocity parameters under the corresponding conditions. At the same time, by quantitatively analyzing the changes in the operating water level of the previously constructed hydraulic engineering simulation operation process sub-model under different operating operations and environmental change conditions, the corresponding water level sensor data is collected, and the key parameters of the water level change under different operating and environmental change conditions are statistically analyzed. The corresponding hydraulic engineering simulation operation process sub-model is also simulated and analyzed for water flow distribution scenarios by combining the hydraulic engineering operation flow velocity parameters and hydraulic engineering operation water level change parameters under different operating operations and environmental change conditions obtained by the previous statistical analysis. The existing flow velocity and water level data are input into the fluid dynamics simulation software to create a water flow distribution model under different environmental conditions. By setting different boundary conditions and initial conditions, the dynamic change distribution scenes of the water flow under various operating operations and environmental change conditions are simulated, thereby obtaining a simulation field of water flow distribution changes in hydraulic engineering under different operating operations and environmental change conditions. Then, by combining the previously simulated water flow distribution change simulation field of the water conservancy project under different operating operations and environmental change conditions, the corresponding water conservancy project simulation operation process sub-model is used to perform load statistical analysis of the engineering structure stress conditions, so as to calculate the water pressure acting on various parts of the water conservancy project according to the water flow distribution data in the simulation field, and use structural analysis software, combined with the dynamic changes of water flow, to analyze the structural stress load conditions under different operating conditions, including the deformation, stress concentration and safety factor of the water conservancy project structure under specific conditions. Load data, finally, the stress load data of the water conservancy project structure under different operating operations and environmental change conditions are obtained.
[0083] Step S4: Based on the simulation field of water flow distribution changes in the water conservancy project under different operating operations and environmental change conditions and the stress load data of the water conservancy project structure, the corresponding water conservancy project simulation operation process sub-model is evaluated for engineering operation risk, and the water conservancy project simulation operation process risk data under different operating operations and environmental change conditions are obtained; based on the water conservancy project simulation operation process risk data under different operating operations and environmental change conditions, the corresponding water conservancy project is processed for risk decision management, and a water conservancy project operation process risk management decision is generated to execute the corresponding water conservancy project operation risk management adjustment work.
[0084] In an embodiment of the present invention, water flow distribution change data is obtained by acquiring water flow distribution change simulation fields of water conservancy projects under different operating operations and environmental change conditions obtained through simulation previously, so as to obtain distribution change data of water flow in different areas, extract dynamic change trends of water flow, including flow velocity changes, distribution uniformity and sensitivity to environmental changes, and by combining the stress load data of water conservancy project structures under different operating operations and environmental change conditions obtained through previous analysis, using finite element analysis (FEA) software (such as ABAQUS), a three-dimensional model of the water conservancy project structure is established, and stress load conditions under different operating operations and environmental conditions are applied, and the stress states under different conditions are mapped out through analysis of the simulation results. The changing rules, such as the maximum stress point, strain distribution and structural safety factor, are also combined with the dynamic change trend of water flow obtained in the previous analysis and the changing rules of stress state to build a comprehensive risk assessment model. This model uses the risk matrix method to combine the changing trend of water flow distribution with the changing rules of stress load state to evaluate the impact of potential risk factors on the operation of water conservancy projects. By using statistical analysis software (such as MATLAB), the data is processed to generate various risk indicators and evaluation results, including water pressure risk, flow velocity fluctuation, impact force, engineering structure strain, water level anomaly and engineering structure failure, etc., so as to obtain the risk data of the simulated operation process of water conservancy projects under different operating operations and environmental changes. Then, by using the decision support system (DSS), the risk data of the simulated operation process of the water conservancy project under different operation operations and environmental change conditions obtained by the previous evaluation and analysis are analyzed and analyzed for the quantitative suggestion analysis of the operation risk, so as to analyze and generate response suggestions for various water conservancy project operation risks through the set thresholds and rules. These suggestions include adjusting the operation parameters, strengthening monitoring measures and formulating emergency plans, and by combining the operation risk response suggestions obtained by the previous analysis, specific risk management treatment is carried out for the water conservancy projects under the corresponding operating conditions. This process includes a comprehensive analysis of the implementation cost and risk reduction effect under different operation operations and environmental change conditions, and a detailed decision support analysis is carried out using a decision tree or multi-objective optimization method, so as to adjust and optimize to form a set of systematic risk management decision documents, guide the operation management team of the water conservancy project to implement corresponding risk management adjustments, ensure the safety and stability of the project under different operation operations and environmental conditions, and finally generate water conservancy project operation process risk management decisions, including risk assessment reports, risk response plans, monitoring plans, risk management responsibility allocation, and emergency plans, so as to perform corresponding water conservancy project operation risk management adjustments.
[0085] Further, step S1 includes the following steps:
[0086] Step S11: extracting engineering structure design data from the engineering design drawings corresponding to the water conservancy project to obtain initial design data of the water conservancy project structure;
[0087] Step S12: dynamically monitor and collect operation data of the water conservancy project through the real-time operation monitoring system to obtain dynamic monitoring operation data of the water conservancy project;
[0088] Step S13: using a water conservancy project environment monitoring sensor to monitor and collect environmental data on environmental changes around the water conservancy project in real time, thereby obtaining real-time monitoring data of the environment around the water conservancy project;
[0089] Step S14: performing data preprocessing and time series synchronization processing on the initial design data of the water conservancy project structure, the dynamic monitoring and operation data of the water conservancy project, and the real-time monitoring data of the surrounding environment of the water conservancy project, so as to obtain the water conservancy project design data, water conservancy project operation data, and water conservancy project environmental data in the same time dimension;
[0090] Step S15: Perform digital twin space modeling on the corresponding water conservancy project based on the water conservancy project design data to obtain a digital twin space model of the water conservancy project.
[0091] As an embodiment of the present invention, refer to Figure 2 As shown, Figure 1 Detailed step flow diagram of step S1 in FIG. 1 , in this embodiment, step S1 includes the following steps:
[0092] Step S11: extracting engineering structure design data from the engineering design drawings corresponding to the water conservancy project to obtain initial design data of the water conservancy project structure;
[0093] In an embodiment of the present invention, by obtaining engineering design drawings corresponding to the water conservancy project, including structural drawings, construction drawings and detailed design instructions, and using computer-aided design (CAD) software, such as AutoCAD or Revit, the engineering design drawings are processed for obtaining structural design data, so as to extract structural parameters by writing a program or using existing tools, including structural design parameters such as dam height, width, material type, and load-bearing capacity, and finally obtaining the initial design data of the water conservancy project structure.
[0094] Step S12: dynamically monitor and collect operation data of the water conservancy project through the real-time operation monitoring system to obtain dynamic monitoring operation data of the water conservancy project;
[0095] In an embodiment of the present invention, a pre-configured real-time operation monitoring system (the system consists of sensors, data collectors and a central monitoring platform) is used to dynamically monitor and collect the operation data of a water conservancy project in real time, so that sensors are arranged at key positions of water conservancy project facilities to collect operation parameters such as water level, flow, and pressure. The data collector periodically transmits the sensor data to the central monitoring platform to realize real-time storage of all collected operation data, and marks them according to timestamps, so as to finally obtain dynamic monitoring operation data of the water conservancy project.
[0096] Step S13: using a water conservancy project environment monitoring sensor to monitor and collect environmental data on environmental changes around the water conservancy project in real time, thereby obtaining real-time monitoring data of the environment around the water conservancy project;
[0097] In an embodiment of the present invention, environmental monitoring sensors for water conservancy projects are used to monitor and collect environmental changes around water conservancy projects in real time. Environmental monitoring sensors are deployed in the surrounding areas of water conservancy projects, and monitoring parameters include air quality, soil moisture, rainfall, and water quality. These sensors are connected to the monitoring system through a wireless network, and regularly send monitoring data. Through data fusion technology, the data of each sensor is integrated to form a comprehensive environmental monitoring data set, and finally real-time monitoring data of the environment around the water conservancy project is obtained.
[0098] Step S14: performing data preprocessing and time series synchronization processing on the initial design data of the water conservancy project structure, the dynamic monitoring and operation data of the water conservancy project, and the real-time monitoring data of the surrounding environment of the water conservancy project, so as to obtain the water conservancy project design data, water conservancy project operation data, and water conservancy project environmental data in the same time dimension;
[0099] In an embodiment of the present invention, data preprocessing is performed on the initial design data of the water conservancy project structure, the dynamic monitoring and operation data of the water conservancy project, and the real-time monitoring data of the surrounding environment of the water conservancy project collected in real time to clean the corresponding data, remove duplicate or invalid information, and perform time series synchronization processing to ensure that various types of data are aligned according to a unified time dimension. The timestamp is used as the key field, and the missing data points are filled by the interpolation algorithm to form continuous time series data, and finally the water conservancy project design data, water conservancy project operation data and water conservancy project environmental data in the same time dimension are obtained.
[0100] Step S15: Perform digital twin space modeling on the corresponding water conservancy project based on the water conservancy project design data to obtain a digital twin space model of the water conservancy project.
[0101] In an embodiment of the present invention, the digital twin technology is used to perform spatial modeling of the corresponding water conservancy project by using the water conservancy project design data obtained after time synchronization, so that the design data and monitoring data of the water conservancy project are imported by using three-dimensional modeling software such as SketchUp or BIM platform to construct a digital model corresponding to the actual project. During the modeling process, it is ensured that the model can dynamically reflect the real-time operating conditions and environmental changes, and the model parameters are continuously updated using a data-driven method to maintain a high degree of consistency with the actual water conservancy project design structure, and finally a digital twin spatial model of the water conservancy project is obtained.
[0102] Further, step S15 includes the following steps:
[0103] Step S151: classifying the functional components of the water conservancy project to obtain each functional component part of the water conservancy project, wherein each functional component part of the water conservancy project includes a water flow system component part, a project structure component part and a water conservancy control system component part;
[0104] Step S152: classifying and dividing the water conservancy project design data into component design data based on each water conservancy project functional component part to obtain each water conservancy project functional component design sub-data;
[0105] Step S153: Performing statistical analysis on the component design requirements and structural characteristics of each water conservancy project functional component design sub-data to obtain component design requirement data and component structural characteristic data corresponding to each water conservancy project functional component;
[0106] Step S154: digitally describe and model the corresponding functional components of the water conservancy project based on the component design requirement data and component structure characteristic data corresponding to each water conservancy project functional component, so as to obtain a digital virtual model of each water conservancy project functional component;
[0107] Step S155: Perform functional component connection analysis on each water conservancy project functional component part to obtain the engineering structure geometric connection relationship between each water conservancy project functional component; based on the engineering structure geometric connection relationship between each water conservancy project functional component, perform digital twin space modeling on the digital virtual model of each water conservancy project functional component to obtain a digital twin space model of the water conservancy project.
[0108] As an embodiment of the present invention, refer to Figure 3 As shown, Figure 2 Detailed step flow diagram of step S15 in FIG. 1 , in this embodiment, step S15 includes the following steps:
[0109] Step S151: classifying the functional components of the water conservancy project to obtain each functional component part of the water conservancy project, wherein each functional component part of the water conservancy project includes a water flow system component part, a project structure component part and a water conservancy control system component part;
[0110] In an embodiment of the present invention, a detailed demand analysis is conducted on a water conservancy project to identify the core functions of its corresponding engineering structure. By investigating existing water conservancy project examples, water flow system components, engineering structure components and water control system components are classified according to functional classification standards, wherein water flow system components include waterways, pumping stations and gates, engineering structure components involve dams, dikes and bridges, and water control system components include monitoring sensors, control valves and automation systems. During classification, CAD software is used for graphical representation to ensure that the functions and structural characteristics of each component are clearly displayed, thereby forming a preliminary functional component database, and finally obtaining the functional component parts of each water conservancy project.
[0111] Step S152: classifying and dividing the water conservancy project design data into component design data based on each water conservancy project functional component part to obtain each water conservancy project functional component design sub-data;
[0112] In an embodiment of the present invention, the corresponding water conservancy project design data are classified and divided into respective component design parameter data by combining the functional components of each water conservancy project obtained by previous analysis and division, so as to divide the data according to specific design parameters such as material properties, dimensions, performance indicators, etc. according to the functional components determined in the previous steps, and establish a detailed data table for each functional component, indicating the source, usage and historical records of each design sub-data, and finally obtaining the design sub-data of each water conservancy project functional component.
[0113] Step S153: Performing statistical analysis on the component design requirements and structural characteristics of each water conservancy project functional component design sub-data to obtain component design requirement data and component structural characteristic data corresponding to each water conservancy project functional component;
[0114] In an embodiment of the present invention, statistical analysis software (such as SPSS or R) is used to conduct an in-depth analysis of the design requirements and structural characteristics of the design sub-data of each water conservancy project functional component previously divided, so as to quantify the corresponding design requirements (such as strength, stability, durability, etc.) and structural characteristics (such as shape, material, connection method, etc.) by setting relevant statistical indicators, and present the data of each component through a data visualization tool to facilitate the identification of rules and trends in component design, and finally obtain the component design requirement data and component structural characteristic data corresponding to each water conservancy project functional component.
[0115] Step S154: digitally describe and model the corresponding functional components of the water conservancy project based on the component design requirement data and component structure characteristic data corresponding to each water conservancy project functional component, so as to obtain a digital virtual model of each water conservancy project functional component;
[0116] In an embodiment of the present invention, each water conservancy project functional component is partially modeled using BIM (Building Information Modeling) technology by combining the component design requirement data and component structural characteristic data corresponding to each water conservancy project functional component obtained in the previous analysis, so as to construct a digital virtual model of each functional component using 3D modeling software (such as Revit or Tekla Structures) based on the component design requirement data and structural characteristic data obtained previously. The model should include the geometric shape, material properties and physical characteristics of each component. The model is verified by simulating water flow and mechanical behavior to ensure its effectiveness and reliability in practical applications, and finally a digital virtual model of each water conservancy project functional component is obtained.
[0117] Step S155: Perform functional component connection analysis on each water conservancy project functional component part to obtain the engineering structure geometric connection relationship between each water conservancy project functional component; based on the engineering structure geometric connection relationship between each water conservancy project functional component, perform digital twin space modeling on the digital virtual model of each water conservancy project functional component to obtain a digital twin space model of the water conservancy project.
[0118] In an embodiment of the present invention, the geometric connection relationship of each functional component of each water conservancy project is analyzed by using engineering drawing software to identify the connection nodes and connection methods between each functional component, establish a connection relationship database, and use finite element analysis software to perform mechanical simulation on the connection parts to ensure the rationality and safety of the connection, thereby obtaining the engineering structure geometric connection relationship between each functional component of the water conservancy project. Subsequently, based on the engineering structure geometric connection relationship between each functional component of the water conservancy project, the digital virtual model of each functional component of the water conservancy project obtained by virtual modeling is connected to build a digital twin space model of the water conservancy project, and the actual project and the virtual model are synchronized in real time using digital twin technology to form a dynamically updated digital twin environment, and finally the digital twin space model of the water conservancy project is obtained.
[0119] Further, step S154 includes the following steps:
[0120] Perform component material property and mechanical property function decomposition processing on the component design requirement data corresponding to each water conservancy project functional component, and obtain component material function property data and component mechanical property data corresponding to each water conservancy project functional component;
[0121] In an embodiment of the present invention, a functional analysis of component material properties and mechanical properties is performed on the component design requirement data (including design specifications, functional objectives, operating conditions, etc.) corresponding to each water conservancy project functional component obtained by previous analysis, so as to determine the material type and its properties required for each functional component, such as strength, toughness, corrosion resistance, etc., by utilizing material science and mechanics theory, and at the same time analyze its corresponding mechanical properties, including parameters such as elastic modulus, compressive strength, tensile strength, etc., to finally obtain component material functional property data and component mechanical property data corresponding to each water conservancy project functional component.
[0122] Preferably, based on the component structure characteristic data corresponding to each water conservancy project functional component, a digital virtual component design is performed on the corresponding water conservancy project functional component part to generate a digital virtual component of each water conservancy project functional component;
[0123] In an embodiment of the present invention, digital virtual component design is performed on the corresponding functional components of the water conservancy project by combining the component structural characteristic data corresponding to each functional component of the water conservancy project obtained by previous analysis, so as to establish a three-dimensional model of each component by using computer-aided design (CAD) software. In the modeling process, the geometric shape, size and connection method of the component are first set to ensure that the model is consistent with the actual design, and the special requirements of the water conservancy project, such as water flow characteristics, pressure distribution, etc., are taken into account, and finally the digital virtual components of the functional components of the water conservancy project are designed and generated.
[0124] Preferably, based on the component material function property data and component mechanical property data corresponding to each water conservancy project functional component, the material property and mechanical property assignment modeling is performed on the digital virtual components of each water conservancy project functional component to obtain a virtual model of the mechanical property of the material of each water conservancy project functional component;
[0125] In an embodiment of the present invention, by combining the component material function attribute data and component mechanical property data corresponding to each water conservancy project functional component obtained by previous analysis, the material properties and mechanical properties of the corresponding digital virtual components of the water conservancy project functional components are assigned and modeled, and the material property data and mechanical property data are combined with the three-dimensional model using finite element analysis (FEA) software to assign appropriate material properties to different parts of each component. The specific operation includes inputting the physical properties, mechanical parameters and environmental influencing factors of the material, and assigning them through an algorithm. This process involves dividing the model to ensure that the material properties and mechanical properties of each element can be accurately reflected in the model. After completion, the generated virtual model contains comprehensive material mechanical properties to ensure that the model can exhibit the expected performance in actual applications, and finally obtain a virtual model of the material mechanical properties of each water conservancy project functional component.
[0126] Preferably, based on the virtual model of the mechanical properties of the materials of each water conservancy project functional component, the corresponding water conservancy project functional component part is tested and analyzed for environmental adaptability, so as to obtain the environmental adaptability virtual test performance data corresponding to each water conservancy project functional component model;
[0127] In an embodiment of the present invention, the environmental adaptability test and analysis of the corresponding functional components of the water conservancy project is carried out by combining the virtual models of the material mechanical properties of each functional component of the water conservancy project obtained by previous simulation construction, so as to set a variety of environmental conditions, including temperature, humidity, corrosive media, etc., and analyze the performance of the components in different environments through numerical simulation. By utilizing multi-physics field coupling simulation technology, factors such as fluid dynamics, heat conduction and chemical reactions are integrated to establish a more comprehensive test model. When conducting virtual testing, the stress distribution, deformation and possible failure modes of the components in extreme environments are examined through time domain and frequency domain analysis, and the test results are recorded and organized to form detailed environmental adaptability performance data, and finally the environmental adaptability virtual test performance data corresponding to each functional component model of the water conservancy project is obtained.
[0128] Preferably, the virtual models of the material mechanical properties of each water conservancy project functional component are digitally optimized and adjusted according to the virtual test performance data of the environmental adaptability corresponding to each water conservancy project functional component model, so as to obtain the digital virtual models of each water conservancy project functional component.
[0129] In an embodiment of the present invention, the virtual model of the mechanical properties of the material of the corresponding functional component is digitally optimized and adjusted according to the virtual test performance data of the functional component model of each water conservancy project in the environmental adaptability test, so as to identify the deficiencies of the model under specific environmental conditions by analyzing the test results, including insufficient strength of the material, poor corrosion resistance or unreasonable structural design, and iterative adjustments are made to the identified problems by using optimization algorithms, such as genetic algorithms or particle swarm optimization. In this process, material parameters and structural designs are gradually modified, and multiple rounds of simulation tests are carried out to ensure that the optimized model can maintain optimal performance under various environmental conditions, and finally obtain digital virtual models of the functional components of each water conservancy project.
[0130] Further, step S2 includes the following steps:
[0131] Step S21: analyzing the change pattern of the operation state attributes of the water conservancy project operation data to obtain the change pattern of the operation state attributes of the water conservancy project;
[0132] In an embodiment of the present invention, a statistical analysis is performed on the water conservancy project operation data (including various parameters such as water flow, water level, pressure, temperature, etc.) obtained by previous analysis by using, for example, time series analysis or principal component analysis to identify its change trend, and by comparing data from different time periods, the key characteristics and change patterns of the operation status are extracted. By using data mining technology, potential change patterns, such as periodic changes, sudden changes or gradual changes, can be discovered. At the same time, a model is constructed to describe these change patterns. Machine learning algorithms, such as cluster analysis, can be used to help identify operation modes under similar conditions, and ultimately obtain the corresponding water conservancy project operation status attribute change pattern.
[0133] Step S22: designing operation simulation conditions for the operation data of the water conservancy project based on the change pattern of the operation state attributes of the water conservancy project to generate operation scenario simulation conditions for the water conservancy project;
[0134] In an embodiment of the present invention, by combining the change pattern of the operating state attributes of the water conservancy project obtained by previous analysis, the simulation conditions of the operating operation process of the corresponding water conservancy project operating data are designed, so as to analyze the operating operation types under different change modes, including start and stop, flow regulation, water level adjustment and other operation methods, and set corresponding simulation conditions for each operation, including operation time, operation force, initial state, etc., so as to construct a simulation model by using computer simulation software, input the identified change pattern as background data, and through parametric modeling, it is possible to quickly generate operating conditions under different scenarios. The dynamic response characteristics of the system should be taken into account in the design process to ensure that the simulation conditions can truly reflect the actual operating state of the water conservancy project, and finally simulate and generate simulation conditions for the water conservancy project operation scenario.
[0135] Step S23: Based on the water conservancy project operation state attribute change mode, the water conservancy project environment data is evaluated and analyzed for the operation environment change association, and the water conservancy project operation state environment change impact association data is obtained;
[0136] In an embodiment of the present invention, an associated evaluation analysis of operating environment changes is performed on the corresponding water conservancy project environmental data by combining the water conservancy project operating status attribute change pattern obtained by previous analysis, so as to collect environmental data related to the water conservancy project, such as rainfall, evaporation, soil moisture, temperature, etc., and establish a mathematical model to associate environmental changes with operating status attributes. Statistical methods such as regression analysis are used to explore the relationship between the two. During the analysis process, key environmental variables and their impact on the operating status are identified, and an impact correlation relationship between environmental changes and operating status attribute changes is formed, and finally the impact correlation data of environmental changes in the operating status of the water conservancy project is obtained.
[0137] Step S24: performing operation environment scenario simulation design on the water conservancy project environmental data based on the associated data of the impact of the water conservancy project operation state environmental change, so as to generate the water conservancy project operation environment change scenario simulation conditions;
[0138] In an embodiment of the present invention, by combining the previously analyzed water conservancy project operating status environmental change impact associated data, the corresponding water conservancy project environmental data is simulated and designed for operating environment scenarios, so as to simulate and design the main environmental change scenarios that need to be simulated, including extreme climate events (such as floods, droughts), seasonal changes and long-term trends, etc., and use computer simulation software to establish an environmental change model, input environmental variables and their corresponding impact data into the model, and design multiple scenarios for simulation. For example, the model operation is set under different rainfall, temperature changes or soil conditions. Through multiple simulation runs, the operating status response of the water conservancy project under each environmental scenario is recorded to form a complete environmental change scenario simulation condition, and finally the simulation generates the water conservancy project operating environment change scenario simulation condition.
[0139] Step S25: Based on the simulation conditions of the water conservancy project operation scenario and the simulation conditions of the water conservancy project operation environment change scenario, the operation condition virtual simulation analysis is performed on the digital twin space model of the water conservancy project to obtain a sub-model of the water conservancy project simulation operation process under different operation and environmental change conditions.
[0140] In an embodiment of the present invention, a simulation analysis of the operating condition combination is performed on the corresponding digital twin space model of the water conservancy project by combining the simulation conditions of the water conservancy project operation scenario and the simulation conditions of the water conservancy project operation environment change scenario generated by the previous simulation design, so as to form corresponding simulation input condition systems respectively, and utilize digital twin technology to create respective dynamic virtual environments through the simulation platform using various simulation input condition systems. In the corresponding virtual environment, different operating conditions are set to simulate the operation process of the water conservancy project under the interactive conditions of respective operation and environmental change. In the simulation analysis process, the changes of key indicators in each operation process, such as flow, water level, pressure, etc., are recorded, thereby forming an operation process sub-model under respective operation conditions, and finally obtaining a water conservancy project simulation operation process sub-model under different operation and environmental change conditions.
[0141] Further, step S3 includes the following steps:
[0142] Step S31: monitoring and processing the water conservancy operation flow and operation duration of the water conservancy project simulation operation process sub-model under different operation operations and environmental change conditions, and obtaining the water conservancy project simulation operation flow and water conservancy project simulation operation duration under different operation operations and environmental change conditions;
[0143] In an embodiment of the present invention, the water conservancy operation flow and operation duration are monitored and processed by the previously constructed water conservancy project simulation operation process sub-model under different operating operations and environmental change conditions. In the specific implementation, sensors and data acquisition systems are used to collect flow and time data at each key node, so that flow meters are used to monitor the flow at the water inlet and outlet, and the duration of each operation stage is recorded by a clock. The monitored data will be input into dedicated software for processing. For example, in the management process of irrigation of a water conservancy project, the irrigation flow and its duration under drought and normal rainfall conditions can be recorded, thereby forming the water conservancy operation flow and operation duration under corresponding operating operations and environmental change conditions, and finally the water conservancy project simulation operation flow and water conservancy project simulation operation duration under different operating operations and environmental change conditions are obtained.
[0144] Step S32: analyzing the hydraulic operation velocity parameters of the hydraulic project simulation operation process sub-model under different operation operations and environmental change conditions based on the hydraulic project simulation operation flow rate and the hydraulic project simulation operation duration under different operation operations and environmental change conditions, and obtaining the hydraulic project operation velocity parameters under different operation operations and environmental change conditions;
[0145] In an embodiment of the present invention, by combining the simulated operation flow of the water conservancy project under different operating operations and environmental change conditions obtained by previous monitoring and the simulated operation time of the water conservancy project, the flow velocity parameters of the corresponding water conservancy project simulation operation process sub-model are statistically calculated, so that the flow data obtained in the previous step is multiplied by the cross-sectional area of the water conservancy project and divided by the operation time to calculate the flow velocity under different operating conditions. The flow velocity changes under different operations (such as water storage, water release, irrigation) and environmental conditions (such as rainfall, evaporation) can be analyzed through a numerical model, and the flow velocity analysis can be performed using simulation software to generate a flow velocity distribution diagram under various operating conditions, so as to visualize the change trend of the flow velocity, and finally obtain the water conservancy project operation flow velocity parameters under different operating operations and environmental change conditions.
[0146] Step S33: quantitatively analyzing the water level change of the hydraulic project under different operation and environmental change conditions on the hydraulic project simulation operation process sub-model, and obtaining the water level change parameters of the hydraulic project under different operation and environmental change conditions;
[0147] In an embodiment of the present invention, a quantitative analysis of the operating water level changes is performed on a previously constructed sub-model of a hydraulic engineering simulation operation process under different operating operations and environmental change conditions to collect corresponding water level sensor data, and statistically analyze the key parameters of the water level changes under different operating and environmental change conditions. For example, in a reservoir management case, the water level increase during water storage operations and rainfall events can be analyzed to obtain specific water level change data, and finally the operating water level change parameters of the hydraulic engineering under different operating operations and environmental change conditions can be obtained.
[0148] Step S34: Based on the water conservancy project operation flow velocity parameters and water conservancy project operation water level change parameters under different operation operations and environmental change conditions, the corresponding water conservancy project simulation operation process sub-model is simulated and analyzed to obtain a water conservancy project water flow distribution change simulation field under different operation operations and environmental change conditions;
[0149] In an embodiment of the present invention, by combining the water velocity parameters of the water conservancy project under different operating operations and environmental change conditions and the water level change parameters of the water conservancy project under previous statistical analysis, the corresponding water conservancy project simulation operation process sub-model is simulated and analyzed for the water flow distribution scenario, so that the existing flow velocity and water level data are input into the fluid dynamics simulation software to create a water flow distribution model under different environmental conditions, and by setting different boundary conditions and initial conditions, the dynamic change distribution scenes of water flow under various operating operations and environmental change conditions are simulated, so as to analyze how the water flow affects the surrounding ecology and facilities, and finally obtain a water flow distribution change simulation field of the water conservancy project under different operating operations and environmental change conditions.
[0150] Step S35: Based on the simulation field of water flow distribution changes in the water conservancy project under different operating operations and environmental change conditions, the corresponding water conservancy project simulation operation process sub-model is subjected to engineering structure stress load analysis to obtain the water conservancy project structure stress load data under different operating operations and environmental change conditions.
[0151] In an embodiment of the present invention, by combining the previously simulated water flow distribution change simulation field of the water conservancy project under different operating operations and environmental change conditions, the corresponding water conservancy project simulation operation process sub-model is subjected to load statistical analysis of the engineering structure stress condition, so as to calculate the water pressure acting on various parts of the water conservancy project according to the water flow distribution data in the simulation field, and use structural analysis software, combined with the dynamic changes of water flow, to analyze the structural stress load conditions under different operating conditions, including load data such as deformation, stress concentration and safety factor of the water conservancy project structure under specific conditions. For a specific dam or gate, the structural stress load parameters under extreme flow conditions can be simulated to evaluate its safety and reliability, and finally the structural stress load data of the water conservancy project under different operating operations and environmental change conditions can be obtained.
[0152] Further, step S34 includes the following steps:
[0153] Step S341: Analyze the spatial distribution characteristics of the water conservancy project operation flow velocity parameters and the water conservancy project operation water level change parameters under different operation operations and environmental change conditions, and obtain the spatial distribution characteristics of the water conservancy project operation flow velocity and the water conservancy project operation water level change under different operation operations and environmental change conditions;
[0154] In an embodiment of the present invention, by performing a statistical analysis of the spatial distribution mathematical characteristics of the water conservancy project operation flow rate parameters and water conservancy project operation water level change parameters under different operation operations and environmental change conditions obtained by previous statistical calculations, the spatial distribution data of the water conservancy project operation parameters are collected and organized, including the measured values of flow rate and water level at different times and locations. These data can be obtained through sensor networks, remote sensing technology, etc., and the data are spatially interpolated using GIS (geographic information system) tools to generate spatial distribution maps of flow rate and water level. By comparing the distribution maps under different time periods and climatic conditions, the changing trends and patterns of flow rate and water level can be identified. For example, in the management process of a specific reservoir, the changes in water level and the distribution differences in flow rate between the dry season and the rainy season can be analyzed, so as to understand the operating status of the reservoir under different environmental conditions, and finally obtain the spatial distribution characteristics of the water conservancy project operation flow rate and the spatial distribution characteristics of the water level change under different operation operations and environmental change conditions.
[0155] Step S342: performing spatial distribution correlation mining analysis on the spatial distribution characteristics of the water conservancy project operating flow velocity and the spatial distribution characteristics of the water level change under different operating operations and environmental change conditions, and obtaining the spatial distribution correlation relationship between the water conservancy project operating flow velocity and the water level change under different operating operations and environmental change conditions;
[0156] In an embodiment of the present invention, after completing the analysis of the spatial distribution characteristics of flow velocity and water level, the next step is to perform spatial distribution association mining analysis. This process requires statistical analysis of the correlation of the collected spatial distribution characteristics of the flow velocity of the water conservancy project and the spatial distribution characteristics of the water level change of the water conservancy project, so as to use spatial statistical methods, such as Kriging interpolation and regression analysis, to establish a mathematical model between flow velocity and water level. In specific implementation, different operating operations (such as irrigation, water storage, water release, etc.) and environmental change conditions (such as rainfall, evaporation, etc.) are first classified and compared with the spatial distribution characteristics obtained previously. By clustering data from different regions, the correlation between flow velocity and water level and its changing trend are found. For example, in the irrigation process of a water conservancy project, the relationship between the flow velocity change and the soil moisture water level during irrigation is analyzed, which can reveal the impact of different irrigation methods on the water level, and finally obtain the spatial distribution correlation between the flow velocity and water level change of the water conservancy project under different operating operations and environmental change conditions.
[0157] Step S343: Performing water flow change scenario simulation design on the spatial distribution correlation between the water flow velocity and water level change of the water conservancy project under different operation and environmental change conditions, so as to generate water flow change simulation scenarios of the water conservancy project under different operation and environmental change conditions;
[0158] In an embodiment of the present invention, a corresponding water flow change simulation model is constructed based on the spatial distribution correlation between the operating flow rate and water level changes of the water conservancy project under different operating operations and environmental change conditions obtained by previous analysis, so as to simulate the water flow change scenes under different operating operations and environmental conditions. In the specific implementation process, the input parameters of the model are first determined, including flow rate, water level, meteorological conditions, etc., and modeling is performed using computational fluid dynamics (CFD) simulation software. The model is numerically simulated to simulate the change process of water flow under specific conditions. For example, in a water conservancy hub project, the inflow and outflow of the reservoir under heavy rainfall conditions and the spatial distribution of the influence of downstream water level changes can be simulated. Finally, the simulation scene of the water flow change of the water conservancy project under different operating operations and environmental change conditions is generated.
[0159] Step S344: Based on the simulation scenario of water flow changes in the water conservancy project under different operating operations and environmental change conditions, the corresponding water conservancy project simulation operation process sub-model is simulated and analyzed to obtain a simulation field of water flow distribution changes in the water conservancy project under different operating operations and environmental change conditions.
[0160] In an embodiment of the present invention, by combining the simulation scenes of water flow changes in the operation of the water conservancy project under different operating operations and environmental change conditions generated by the previous simulation, the corresponding water conservancy project simulation operation process sub-model is dynamically simulated and analyzed for the water flow distribution scene, so as to use the simulation software to perform dynamic simulation through a variety of operation scenarios designed by simulation, such as normal operation, extreme climate events, etc. During the operation of the model, various parameter changes are monitored in real time, and the water flow velocity, water level changes and their spatial distribution are recorded. By comparing the water flow distribution results in different scenarios, the differences and influencing factors are analyzed, and finally a simulation field of water flow distribution changes in the water conservancy project under different operating operations and environmental change conditions is generated.
[0161] Further, step S35 includes the following steps:
[0162] Step S351: Based on the simulation field of water flow distribution change of the water conservancy project under different operation and environmental change conditions, the corresponding water conservancy project simulation operation process sub-model is analyzed for engineering structure force distribution, and the water conservancy project structure force distribution data under different operation and environmental change conditions are obtained;
[0163] In an embodiment of the present invention, by combining the simulation field of water flow distribution change of the water conservancy project under different operating operations and environmental change conditions obtained by previous simulation analysis, computational fluid dynamics (CFD) software is used to perform numerical simulation of the engineering structure force on the corresponding water conservancy project simulation operation process sub-model, so as to accurately model the water flow using the Navier-Stokes equation for specific operating operations (such as water storage, water release, flow rate regulation) and environmental changes (such as rainfall, drought, seasonal changes), and process complex flow field characteristics through a high-performance computing cluster to obtain data such as water flow pressure and flow direction under different operating and environmental conditions. These data are used to analyze the force distribution of water flow on the water conservancy project structure, and finally obtain the force distribution data of the water conservancy project structure under different operating operations and environmental change conditions.
[0164] Step S352: performing structural force identification analysis on the force distribution data of the hydraulic engineering structure under different operation and environmental change conditions to obtain the fluid dynamic pressure and hydrostatic pressure of the hydraulic engineering structure under different operation and environmental change conditions;
[0165] In an embodiment of the present invention, the force distribution data of the hydraulic engineering structure under different operating operations and environmental change conditions obtained by the previous analysis is used to identify and analyze the forces acting on the structure, and the finite element analysis (FEA) tool is used to divide the hydraulic engineering structure into multiple finite element units. According to the definitions of fluid dynamic pressure and hydrostatic pressure, the pressure value applied by the water flow on each structural unit is calculated using the principles of fluid mechanics. The specific steps include performing static analysis and dynamic analysis on the hydraulic engineering structure to determine the dynamic pressure and hydrostatic pressure applied by the fluid under different operating and environmental change conditions, thereby forming a detailed pressure distribution diagram, and finally obtaining the fluid dynamic pressure of the hydraulic engineering structure and the hydrostatic pressure of the hydraulic engineering structure under different operating operations and environmental change conditions.
[0166] Step S353: based on the simulation field of water flow distribution change of the water conservancy project under different operation and environmental change conditions, the water flow distribution impact quantitative calculation is performed on the corresponding water conservancy project structure in the water conservancy project simulation operation process sub-model to obtain the water flow distribution impact strength value of the water conservancy project structure under different operation and environmental change conditions;
[0167] In the embodiment of the present invention, the dynamic model is used to analyze the impact effect of the water flow of the corresponding water conservancy project structure in the water conservancy project simulation operation process sub-model by combining the simulation field of the water flow distribution change of the water conservancy project under different operation operations and environmental change conditions obtained by the previous simulation analysis. The specific method is to use the transient fluid mechanics theory to simulate the impact of different flow rates and flow directions, and select key time points under different water flow conditions to calculate the instantaneous impact force, focusing on analyzing the impact intensity caused by the collision between the fluid and the structure surface. In this process, the numerical integration method is used to quantify the water flow impact, for example, Where I(t) is the impact strength value of the water flow distribution at time t, T is the total impact time under the corresponding operation and environmental change conditions, A is the contact area between the water flow and the structural surface, ρ is the water flow density parameter, and v(t) is usually taken as 1000 kg / m 3 , v(t) is the water velocity at time t, v ref is the water flow reference velocity under the corresponding operation and environmental change conditions, δ(t―t i ) is the Dirac Delta function, which is used to represent the instantaneous impact time point t i, to ensure the calculation of the impact strength at a specific time point. This formula integrates the impact strength of the water flow on the contact surface. First, the water flow velocity at all times is integrated within the time range [0, T]. It combines the difference between the fluid density and the reference flow velocity to reflect the instantaneous impact force of the water flow on the structural surface under different conditions. By integrating over area A, the overall impact strength can be quantified, thereby obtaining the water flow distribution impact strength value under the corresponding operating conditions and environmental change conditions, and finally obtaining the water flow distribution impact strength value of the hydraulic engineering structure under different operating conditions and environmental change conditions.
[0168] Step S354: Based on the fluid dynamic pressure and hydrostatic pressure of the hydraulic engineering structure under different operation and environmental change conditions, the corresponding hydraulic engineering structure in the hydraulic engineering simulation operation process sub-model is evaluated and calculated to obtain the hydraulic engineering structure stress and compression capacity factor under different operation and environmental conditions;
[0169] In the embodiment of the present invention, the hydraulic engineering structure corresponding to the hydraulic engineering structure in the hydraulic engineering simulation operation process sub-model is evaluated and calculated for its compressive capacity by combining the previously identified hydraulic engineering structure fluid dynamic pressure and hydraulic engineering structure hydrostatic pressure under different operation operations and environmental change conditions, so as to calculate the structural stress state under different operation and environmental conditions by establishing a mechanical model and applying the limit state design method. When implementing the specific calculation, a nonlinear finite element analysis is performed using software tools, for example, In the formula, K c is the stress and compression capacity factor of the hydraulic engineering structure, σ c,0 is the reference pressure, α is the temperature influence coefficient, W is the temperature parameter of the water conservancy project structure under the corresponding operation and environmental change conditions, W0 is the reference temperature, β is the humidity influence coefficient, H is the humidity parameter of the water conservancy project structure under the corresponding operation and environmental change conditions, H0 is the reference humidity, L is the length of the finite element calculation area, P d (x) is the fluid dynamic pressure of the hydraulic engineering structure at the finite element structure position x under the corresponding operation and environmental change conditions, P s (x) is the hydrostatic pressure of the hydraulic engineering structure at the finite element structure position x under the corresponding operating and environmental change conditions, and A(x) is the cross-sectional area of the hydraulic engineering structure at the finite element structure position x under the corresponding operating and environmental change conditions. The compressive strength factor of the hydraulic engineering structure under various conditions is evaluated according to the above calculation formula, and finally the stress and compressive strength factor of the hydraulic engineering structure under different operating and environmental conditions is obtained.
[0170] Step S355: Based on the impact strength value of the water flow distribution of the hydraulic engineering structure under different operating operations and environmental change conditions and the stress and compressive capacity factor of the hydraulic engineering structure, the corresponding hydraulic engineering simulation operation process sub-model is subjected to engineering structure stress load analysis to obtain the hydraulic engineering structure stress load data under different operating operations and environmental change conditions.
[0171] In an embodiment of the present invention, the corresponding water flow distribution impact strength value of the water conservancy project structure is corrected and calculated by combining the stress and compressive capacity factor of the water conservancy project structure under different operating operations and environmental change conditions obtained by previous analysis, so as to establish the actual stress situation of the corresponding water conservancy project simulation operation process sub-model, and use numerical simulation technology to analyze the stress state, so as to analyze the stress situation of the water conservancy project structure under different operating operations and environmental conditions, draw the corresponding force distribution diagram, and analyze the load data including deformation, stress concentration and safety factor of the water conservancy project structure under specific conditions, and finally obtain the stress load data of the water conservancy project structure under different operating operations and environmental change conditions.
[0172] Further, step S4 includes the following steps:
[0173] Step S41: analyzing the dynamic change trend of water flow distribution in the simulation field of water flow distribution change of the water conservancy project under different operation and environmental change conditions, and obtaining the dynamic change trend of water flow distribution of the water conservancy project under different operation and environmental change conditions;
[0174] In an embodiment of the present invention, water flow distribution change data is obtained by acquiring water flow distribution change simulation field of a water conservancy project under different operating operations and environmental change conditions that have been previously simulated, so as to obtain distribution change data of water flow in different areas, and statistically analyze these data under different operating operations and environmental change conditions to extract the dynamic change trend of water flow, including flow velocity change, distribution uniformity and sensitivity to environmental changes, and finally obtain the dynamic change trend of water flow distribution of a water conservancy project under different operating operations and environmental change conditions.
[0175] Step S42: performing load state change mapping analysis on the load data of the hydraulic engineering structure under different operation and environmental change conditions, and obtaining the load state change law of the hydraulic engineering structure under different operation and environmental change conditions;
[0176] In an embodiment of the present invention, a three-dimensional model of the water conservancy project structure is established by combining the stress load data of the water conservancy project structure under different operating operations and environmental change conditions obtained by previous analysis using finite element analysis (FEA) software (such as ABAQUS), and stress load conditions under different operating operations and environmental conditions are applied. By analyzing the simulation results, the change law of the stress state under different conditions is mapped out, and key data such as the maximum stress point, strain distribution and structural safety factor are extracted therefrom, and finally the change law of the stress load state of the water conservancy project under different operating operations and environmental change conditions is obtained.
[0177] Step S43: Based on the dynamic change trend of water flow distribution of the water conservancy project under different operation and environmental change conditions and the change law of the load state of the water conservancy project, the corresponding water conservancy project simulation operation process sub-model is evaluated for engineering operation risk, and the water conservancy project simulation operation process risk data under different operation and environmental change conditions is obtained;
[0178] In an embodiment of the present invention, a comprehensive risk assessment model is constructed by combining the dynamic change trend of water flow distribution of the water conservancy project under different operating operations and environmental change conditions obtained by previous analysis and the change law of the stress load state of the water conservancy project. This model uses a risk matrix method to combine the change trend of water flow distribution with the change law of the stress load state, evaluates the impact of potential risk factors on the operation of the water conservancy project, and processes the data by using statistical analysis software (such as MATLAB) to generate various risk indicators and evaluation results, including water pressure risk, flow velocity fluctuation, impact force, engineering structure strain, water level anomaly and engineering structure failure, etc., thereby forming a simulation operation process risk data set for different operating operations and environmental change conditions, and finally obtaining the simulation operation process risk data of the water conservancy project under different operating operations and environmental change conditions.
[0179] Step S44: performing operation risk response suggestion analysis on the risk data of the hydraulic engineering simulation operation process under different operation operations and environmental change conditions, and obtaining operation risk response suggestion schemes for the hydraulic engineering under different operation operations and environmental change conditions;
[0180] In an embodiment of the present invention, a decision support system (DSS) is used to perform quantitative suggestion analysis on the risk data of the simulated operation process of the water conservancy project under different operating operations and environmental change conditions obtained by previous evaluation and analysis, so as to analyze and generate response suggestion plans for various water conservancy project operation risks through set thresholds and rules. These suggestions include adjusting operating parameters, strengthening monitoring measures, and formulating emergency plans, etc., to ensure rapid response and reduce potential losses when risks occur, and finally obtain water conservancy project operation risk response suggestion plans under different operating operations and environmental change conditions.
[0181] Step S45: Perform risk decision management processing on the corresponding water conservancy project based on the water conservancy project operation risk response recommendation plan under different operating operations and environmental change conditions, generate water conservancy project operation process risk management decisions, and execute corresponding water conservancy project operation risk management adjustment work.
[0182] In an embodiment of the present invention, specific risk management processing is performed on the water conservancy project under the corresponding operating conditions by combining the water conservancy project operation risk response recommendation scheme under different operating operations and environmental change conditions obtained by previous analysis. This process includes comprehensive analysis of the implementation cost and risk reduction effect under different operating operations and environmental change conditions, and detailed decision support analysis using a decision tree or multi-objective optimization method, so as to adjust and optimize to form a set of systematic risk management decision documents, guide the water conservancy project operation management team to implement corresponding risk management adjustments, ensure the safety and stability of the project under different operating operations and environmental conditions, and finally generate water conservancy project operation process risk management decisions, including risk assessment reports, risk response plans, monitoring plans, risk management responsibility allocation, and emergency plans, etc., to perform corresponding water conservancy project operation risk management adjustment work.
[0183] Therefore, the embodiments should be regarded as illustrative and non-restrictive from all points, and the scope of the present invention is limited by the appended claims rather than the above description, and it is therefore intended that all changes falling within the meaning and range of equivalent elements of the application documents are included in the present invention.
[0184] The above description is only a specific embodiment of the present invention, so that those skilled in the art can understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but should conform to the widest scope consistent with the principles and novel features invented herein.
Claims
1. A water conservancy project management method based on digital twins, characterized in that: The following steps are involved: Step S1: Acquire water conservancy project design data, water conservancy project operation data and water conservancy project environmental data, and perform digital twin space modeling on the corresponding water conservancy project based on the water conservancy project design data to obtain a digital twin space model of the water conservancy project; Step S2: Based on the water conservancy project operation data and water conservancy project environmental data, a virtual simulation analysis of the operation conditions of the water conservancy project digital twin space model is performed to obtain a water conservancy project simulation operation process sub-model under different operation operations and environmental change conditions; Step S3: analyzing the water flow distribution change of the hydraulic engineering simulation operation process sub-model under different operation and environmental change conditions, so as to obtain a simulated field of the water flow distribution change of the hydraulic engineering under different operation and environmental change conditions; Based on the simulation field of water flow distribution change of water conservancy projects under different operation and environmental change conditions, the corresponding water conservancy project simulation operation process sub-model is used to analyze the engineering structure load, and the water conservancy project structure load data under different operation and environmental change conditions are obtained; Step S4: Based on the simulation field of water flow distribution change of the water conservancy project under different operation and environmental change conditions and the stress load data of the water conservancy project structure, the corresponding water conservancy project simulation operation process sub-model is evaluated for engineering operation risk, and the water conservancy project simulation operation process risk data under different operation and environmental change conditions is obtained; Based on the risk data of the simulated operation process of water conservancy projects under different operating operations and environmental changes, risk decision management processing is carried out on the corresponding water conservancy projects, and risk management decisions on the operation process of water conservancy projects are generated to execute corresponding water conservancy project operation risk management adjustments.
2. The water conservancy project management method based on digital twin according to claim 1 is characterized in that: Step S1 includes the following steps: Step S11: extracting engineering structure design data from the engineering design drawings corresponding to the water conservancy project to obtain initial design data of the water conservancy project structure; Step S12: dynamically monitor and collect operation data of the water conservancy project through the real-time operation monitoring system to obtain dynamic monitoring operation data of the water conservancy project; Step S13: using a water conservancy project environment monitoring sensor to monitor and collect environmental data on environmental changes around the water conservancy project in real time, thereby obtaining real-time monitoring data of the environment around the water conservancy project; Step S14: performing data preprocessing and time series synchronization processing on the initial design data of the water conservancy project structure, the dynamic monitoring and operation data of the water conservancy project, and the real-time monitoring data of the surrounding environment of the water conservancy project, so as to obtain the water conservancy project design data, water conservancy project operation data, and water conservancy project environmental data in the same time dimension; Step S15: Perform digital twin space modeling on the corresponding water conservancy project based on the water conservancy project design data to obtain a digital twin space model of the water conservancy project.
3. The water conservancy project management method based on digital twin according to claim 2 is characterized in that: Step S15 includes the following steps: Step S151: classifying the functional components of the water conservancy project to obtain each functional component part of the water conservancy project, wherein each functional component part of the water conservancy project includes a water flow system component part, a project structure component part and a water conservancy control system component part; Step S152: classifying and dividing the water conservancy project design data into component design data based on each water conservancy project functional component part to obtain each water conservancy project functional component design sub-data; Step S153: Performing statistical analysis on the component design requirements and structural characteristics of each water conservancy project functional component design sub-data to obtain component design requirement data and component structural characteristic data corresponding to each water conservancy project functional component; Step S154: digitally describe and model the corresponding functional components of the water conservancy project based on the component design requirement data and component structure characteristic data corresponding to each water conservancy project functional component, so as to obtain a digital virtual model of each water conservancy project functional component; Step S155: Perform functional component connection analysis on each water conservancy project functional component part to obtain the engineering structure geometric connection relationship between each water conservancy project functional component; based on the engineering structure geometric connection relationship between each water conservancy project functional component, perform digital twin space modeling on the digital virtual model of each water conservancy project functional component to obtain a digital twin space model of the water conservancy project.
4. The water conservancy project management method based on digital twin according to claim 3 is characterized in that: Step S154 includes the following steps: Perform component material property and mechanical property function decomposition processing on the component design requirement data corresponding to each water conservancy project functional component, and obtain component material function property data and component mechanical property data corresponding to each water conservancy project functional component; Based on the component structure characteristic data corresponding to each water conservancy project functional component, a digital virtual component design is performed on the corresponding water conservancy project functional component part to generate a digital virtual component of each water conservancy project functional component; Based on the component material function attribute data and component mechanical property data corresponding to each water conservancy project functional component, the material property and mechanical property assignment modeling of each water conservancy project functional component digital virtual component is performed to obtain a virtual model of the material mechanical property of each water conservancy project functional component; Based on the virtual model of the mechanical properties of the materials of each water conservancy project functional component, the corresponding parts of the water conservancy project functional component are tested and analyzed for environmental adaptability, and the virtual test performance data of the environmental adaptability corresponding to the model of each water conservancy project functional component is obtained; According to the environmental adaptability virtual test performance data corresponding to each water conservancy project functional component model, the virtual model of the material mechanical properties of each water conservancy project functional component is digitally optimized and adjusted to obtain a digital virtual model of each water conservancy project functional component.
5. The water conservancy project management method based on digital twin according to claim 1 is characterized in that: Step S2 includes the following steps: Step S21: analyzing the change pattern of the operation state attributes of the water conservancy project operation data to obtain the change pattern of the operation state attributes of the water conservancy project; Step S22: designing operation simulation conditions for the operation data of the water conservancy project based on the change pattern of the operation state attributes of the water conservancy project to generate operation scenario simulation conditions for the water conservancy project; Step S23: performing an operation environment change correlation evaluation analysis on the water conservancy project environmental data based on the water conservancy project operation state attribute change mode to obtain water conservancy project operation state environment change impact correlation data; Step S24: performing operation environment scenario simulation design on the water conservancy project environmental data based on the associated data of the impact of the water conservancy project operation state environmental change, so as to generate the water conservancy project operation environment change scenario simulation conditions; Step S25: Based on the simulation conditions of the water conservancy project operation scenario and the simulation conditions of the water conservancy project operation environment change scenario, the operation condition virtual simulation analysis is performed on the digital twin space model of the water conservancy project to obtain a sub-model of the water conservancy project simulation operation process under different operation and environmental change conditions.
6. The water conservancy project management method based on digital twin according to claim 1 is characterized in that: Step S3 includes the following steps: Step S31: monitoring and processing the water conservancy operation flow and operation duration of the water conservancy project simulation operation process sub-model under different operation operations and environmental change conditions, and obtaining the water conservancy project simulation operation flow and water conservancy project simulation operation duration under different operation operations and environmental change conditions; Step S32: analyzing the hydraulic operation velocity parameters of the hydraulic project simulation operation process sub-model under different operation operations and environmental change conditions based on the hydraulic project simulation operation flow rate and the hydraulic project simulation operation duration under different operation operations and environmental change conditions, and obtaining the hydraulic project operation velocity parameters under different operation operations and environmental change conditions; Step S33: quantitatively analyzing the water level change of the hydraulic project under different operation and environmental change conditions on the hydraulic project simulation operation process sub-model, and obtaining the water level change parameters of the hydraulic project under different operation and environmental change conditions; Step S34: Based on the water conservancy project operation flow velocity parameters and water conservancy project operation water level change parameters under different operation operations and environmental change conditions, the corresponding water conservancy project simulation operation process sub-model is simulated and analyzed to obtain a water conservancy project water flow distribution change simulation field under different operation operations and environmental change conditions; Step S35: Based on the simulation field of water flow distribution changes in the water conservancy project under different operating operations and environmental change conditions, the corresponding water conservancy project simulation operation process sub-model is subjected to engineering structure stress load analysis to obtain the water conservancy project structure stress load data under different operating operations and environmental change conditions.
7. The water conservancy project management method based on digital twin according to claim 6 is characterized in that: Step S34 includes the following steps: Step S341: Analyze the spatial distribution characteristics of the water conservancy project operation flow velocity parameters and the water conservancy project operation water level change parameters under different operation operations and environmental change conditions, and obtain the spatial distribution characteristics of the water conservancy project operation flow velocity and the water conservancy project operation water level change under different operation operations and environmental change conditions; Step S342: performing spatial distribution correlation mining analysis on the spatial distribution characteristics of the water conservancy project operating flow velocity and the spatial distribution characteristics of the water level change under different operating operations and environmental change conditions, and obtaining the spatial distribution correlation relationship between the water conservancy project operating flow velocity and the water level change under different operating operations and environmental change conditions; Step S343: Performing water flow change scenario simulation design on the spatial distribution correlation between the water flow velocity and water level change of the water conservancy project under different operation and environmental change conditions, so as to generate water flow change simulation scenarios of the water conservancy project under different operation and environmental change conditions; Step S344: Based on the simulation scenario of water flow changes in the water conservancy project under different operating operations and environmental change conditions, the corresponding water conservancy project simulation operation process sub-model is simulated and analyzed to obtain a simulation field of water flow distribution changes in the water conservancy project under different operating operations and environmental change conditions.
8. The water conservancy project management method based on digital twin according to claim 6 is characterized in that: Step S35 includes the following steps: Step S351: Based on the simulation field of water flow distribution change of the water conservancy project under different operation and environmental change conditions, the corresponding water conservancy project simulation operation process sub-model is analyzed for engineering structure force distribution, and the water conservancy project structure force distribution data under different operation and environmental change conditions are obtained; Step S352: performing structural force identification analysis on the force distribution data of the hydraulic engineering structure under different operation and environmental change conditions to obtain the fluid dynamic pressure and hydrostatic pressure of the hydraulic engineering structure under different operation and environmental change conditions; Step S353: based on the simulation field of water flow distribution change of the water conservancy project under different operation and environmental change conditions, the water flow distribution impact quantitative calculation is performed on the corresponding water conservancy project structure in the water conservancy project simulation operation process sub-model to obtain the water flow distribution impact strength value of the water conservancy project structure under different operation and environmental change conditions; Step S354: Based on the fluid dynamic pressure and hydrostatic pressure of the hydraulic engineering structure under different operation and environmental change conditions, the corresponding hydraulic engineering structure in the hydraulic engineering simulation operation process sub-model is evaluated and calculated to obtain the hydraulic engineering structure stress and compression capacity factor under different operation and environmental conditions; Step S355: Based on the impact strength value of the water flow distribution of the hydraulic engineering structure under different operating operations and environmental change conditions and the stress and compressive capacity factor of the hydraulic engineering structure, the corresponding hydraulic engineering simulation operation process sub-model is subjected to engineering structure stress load analysis to obtain the hydraulic engineering structure stress load data under different operating operations and environmental change conditions.
9. The water conservancy project management method based on digital twin according to claim 1 is characterized in that: Step S4 includes the following steps: Step S41: analyzing the dynamic change trend of water flow distribution in the simulation field of water flow distribution change of the water conservancy project under different operation and environmental change conditions, and obtaining the dynamic change trend of water flow distribution of the water conservancy project under different operation and environmental change conditions; Step S42: performing load state change mapping analysis on the load data of the hydraulic engineering structure under different operation and environmental change conditions, and obtaining the load state change law of the hydraulic engineering structure under different operation and environmental change conditions; Step S43: Based on the dynamic change trend of water flow distribution of the water conservancy project under different operation and environmental change conditions and the change law of the load state of the water conservancy project, the corresponding water conservancy project simulation operation process sub-model is evaluated for engineering operation risk, and the water conservancy project simulation operation process risk data under different operation and environmental change conditions is obtained; Step S44: performing operation risk response suggestion analysis on the risk data of the hydraulic engineering simulation operation process under different operation operations and environmental change conditions, and obtaining operation risk response suggestion schemes for the hydraulic engineering under different operation operations and environmental change conditions; Step S45: Perform risk decision management processing on the corresponding water conservancy project based on the water conservancy project operation risk response recommendation plan under different operating operations and environmental change conditions, generate water conservancy project operation process risk management decisions, and execute corresponding water conservancy project operation risk management adjustment work.
10. A water conservancy project management system based on digital twins, characterized in that: Used to execute the water conservancy project management method based on digital twins as claimed in claim 1, the water conservancy project management system based on digital twins includes: The water conservancy project digital twin spatial modeling module is used to obtain the water conservancy project design data, water conservancy project operation data and water conservancy project environmental data, and to perform digital twin spatial modeling of the corresponding water conservancy project based on the water conservancy project design data, thereby obtaining a digital twin spatial model of the water conservancy project; The operation and environmental change condition simulation module is used to perform virtual simulation analysis of the operation conditions of the digital twin space model of the water conservancy project based on the operation data and environmental data of the water conservancy project, so as to obtain the simulation operation process sub-model of the water conservancy project under different operation and environmental change conditions; The water flow distribution and structural load analysis module is used to analyze the water flow distribution changes of the hydraulic engineering simulation operation process sub-model under different operation and environmental change conditions, so as to obtain the hydraulic engineering water flow distribution change simulation field under different operation and environmental change conditions; based on the hydraulic engineering water flow distribution change simulation field under different operation and environmental change conditions, the corresponding hydraulic engineering simulation operation process sub-model is analyzed for engineering structure load, so as to obtain hydraulic engineering structure load data under different operation and environmental change conditions; The water conservancy project operation risk management module is used to conduct project operation risk assessment on the corresponding water conservancy project simulation operation process sub-model based on the simulation field of water flow distribution changes in the water conservancy project under different operating operations and environmental changes and the stress load data of the water conservancy project structure, and obtain the risk data of the water conservancy project simulation operation process under different operating operations and environmental changes; based on the risk data of the water conservancy project simulation operation process under different operating operations and environmental changes, the corresponding water conservancy project is processed for risk decision management, and a water conservancy project operation process risk management decision is generated to execute the corresponding water conservancy project operation risk management adjustment work.
Citation Information
Patent Citations
Digital twin hydraulic engineering operation safety monitoring system and operation method
CN115688227A
Digital twin system parameter control method and system
CN117572771A
Hydraulic engineering data intelligent monitoring method and system based on digital twinning
CN118410653A
Water conservancy informatization management method and management system based on digital twinborn technology
CN118822307A
Cited By
Water conservancy and hydropower engineering design method based on BIM
CN120124169A
Hydraulic engineering quality safety risk management method based on digital twinborn model
CN120996556A
Dynamic decision-making method and system for canal channel construction based on digital twinning
CN121212797A
Digital twin monitoring and fault early warning system for hydro-junction project
CN121351356A