Rapid treatment system and method for mine well wall water inrush
Through a rapid treatment system composed of a dual-liquid grouting machine and a mixing section high-pressure hose, a paste-like slurry is formed to quickly seal the well wall inrush, solving the problem of difficult water inrush in the well wall in traditional methods and achieving rapid and effective water damage control.
Patent Information
- Application Number
- CN202510712365.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-30
- Publication Date
- 2025-07-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional methods are difficult to quickly and effectively control the water in the well wall during underground mining, resulting in the intensification of disaster impact.
A rapid treatment system consisting of a dual-liquid grouting machine, a mixer, a mixing section high-pressure hose, a grouting tee and a water stop casing is adopted to form a paste-like slurry through the mixing section high-pressure hose, which quickly seals the water burst point.
It has achieved rapid water blockage, improved emergency response capabilities for water damage control, and has the advantages of good governance effect and short construction period.
Smart Images

Figure CN120231612A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mine water prevention and control, and in particular to a system and method for quickly controlling water inrush from a mine shaft wall. Background Art
[0002] In the process of underground mining, water inrush from the shaft wall is a common and serious disaster. It not only interrupts the normal production process, but also threatens the life safety of underground personnel and the normal operation of equipment.
[0003] Traditional treatment methods are often time-consuming, resource-consuming and ineffective. This situation is more prominent in underground mining environments such as coal mines and metal mines, especially in shafts constructed using the freezing method. When the frozen wall melts, water from the aquiferous strata may flow into the shaft through construction joints or weak parts of the shaft wall, causing water inrush accidents. Traditional methods are difficult to effectively control water inrush in a timely manner, which will aggravate the impact of disasters. Therefore, in view of the underground mining environment and water inrush, it is very necessary to develop a method and device that can respond quickly and efficiently control water inrush from the shaft wall. Summary of the invention
[0004] In view of this, the present invention provides a rapid control system for water inrush from a mine shaft wall, which can achieve rapid water blocking and improve the emergency response capability for water hazard control.
[0005] To achieve the above object, the present invention provides the following technical solutions: A rapid treatment system for water inrush from a mine shaft wall comprises a double-liquid grouting machine, a mixer connected in sequence behind the double-liquid grouting machine, a mixing section high-pressure hose, a grouting tee and a water-stopping sleeve.
[0006] Among them, the double-liquid grouting machine has two slurry outlets, which are connected with the first slurry inlet hole and the second slurry inlet hole of the mixer through the first slurry outlet pipe and the second slurry outlet pipe respectively. The cement slurry in the first slurry outlet pipe and the water glass slurry in the second slurry outlet pipe are mixed in the mixer; a pressure relief valve is installed on the mixer, and the pressure is relieved through the pressure relief valve when the pressure in the mixer is greater than the set pressure; one end of the high-pressure hose of the mixing section is connected with the slurry outlet hole of the mixer, and the other end is connected with the water-stop casing through the grouting tee. The mixed slurry entering the high-pressure hose of the mixing section from the mixer is fully mixed and reacts quickly in the high-pressure hose of the mixing section, so that the mixed slurry forms a paste slurry at the outlet end of the high-pressure hose of the mixing section, and the paste slurry is pressed into the water bursting point of the well wall through the water-stop casing to quickly seal the water bursting point.
[0007] Preferably, the length calculation formula of the mixing section high pressure hose is: ; In the formula, L is the length of the high-pressure hose in the mixing section, t is the solidification time of the mixed slurry, v is the flow rate of the double-liquid grouting machine, and d is the diameter of the high-pressure hose in the mixing section.
[0008] Preferably, a high-pressure ball valve is installed on the water-stop casing, the grouting tee is communicated with the water-stop casing through the high-pressure ball valve, and the mixed slurry enters the water-stop casing through the high-pressure ball valve.
[0009] Preferably, pressure gauges are provided on both the double-fluid grouting machine and the grouting tee for observing the grouting pressure.
[0010] Preferably, a pressure relief valve is also installed on the grouting tee, and when the pressure in the grouting tee is greater than the set pressure, it is relieved through the pressure relief valve.
[0011] The present invention also proposes a rapid treatment method for water inrush in a mine shaft wall, including: S1, determining the water inrush point on the shaft wall; S2, selecting grouting materials; S3, arranging a plurality of drill holes around the water inrush point and burying water-stop casings in each drill hole; S4, installing high-pressure ball valves on each water-stop casing and conducting a pressure resistance test on each high-pressure ball valve. After the test is completed, the grouting drill holes in the high-pressure ball valves are reamed; S5, selecting any drill hole below the water inrush point to install a rapid treatment system for water inrush in the mine shaft wall and conducting a water pressure test; S6, after the water pressure test is passed, use the rapid treatment system for water inrush in the mine shaft wall to conduct grouting to quickly plug the water inrush point; S7, if the plugging is ineffective, all drill holes need to be reamed and another drill hole below the water inrush point is reselected to repeat steps S5 and S6.
[0012] Preferably, the water pressure test includes: conducting water pressure on the selected drill hole and keeping the high-pressure ball valves of the remaining drill holes open, observing the water conduction conditions of each drill hole and the water inrush point, and proceeding to the next step after all or partial conduction.
[0013] Preferably, the installation of the rapid treatment system for water inrush in the mine shaft wall includes: calculating the length of the high-pressure rubber hose in the mixing section according to the setting time of the grouting material, the flow rate of the double-fluid grouting machine, and the diameter of the high-pressure rubber hose in the mixing section; installing the rapid treatment system for water inrush in the mine shaft wall equipped with the high-pressure rubber hose in the mixing section.
[0014] Preferably, S2 includes: selecting cement-sodium silicate double slurry as the grouting material and determining the setting time of the grouting material.
[0015] Preferably, the cement-sodium silicate double slurry includes: the cement type is P.O42.5, the modulus M of sodium silicate is 3.0, the concentration of sodium silicate is 40Be′, the water-cement ratio of the cement slurry is 1:1 or 0.6:1, and the volume ratio of the cement-sodium silicate slurry is 1:0.5 or 1:1.
[0016] Preferably, the setting time of the cement-sodium silicate double slurry includes: when the water-cement ratio of the cement slurry is 0.6:1: when the volume ratio of the cement-sodium silicate slurry is 1:0.5, the setting time is 34 seconds; when the volume ratio is 1:1, the setting time is 67 seconds; when the water-cement ratio of the cement slurry is 0.8:1: when the volume ratio of the cement-sodium silicate slurry is 1:0.5, the setting time is 42 seconds; when the volume ratio is 1:1, the setting time is 92 seconds; when the water-cement ratio of the cement slurry is 1:1: when the volume ratio of the cement-sodium silicate slurry is 1:0.5, the setting time is 52 seconds; when the volume ratio is 1:1, the setting time is 112 seconds.
[0017] Preferably, the grouting using the rapid treatment system for water inrush from the mine shaft wall includes the following: the grouting process is carried out by applying a pressure 2-3 times the water pressure at the current water inrush point, thick slurry, limited flow, and intermittent grouting. Among them, when the slurry continuously gushes out from the water inrush point and becomes thick, intermittent grouting starts, and the intermittent grouting time is less than the initial setting time of the mixed slurry in the high-pressure rubber hose in the mixing section; during grouting, if the drilling hole and the water inrush point continuously gush out slurry, the high-pressure ball valves of each drilling hole are closed one by one. When there is no more slurry flowing out from the water inrush point and the grouting pressure reaches the designed grouting pressure, the grouting operation stops.
[0018] Preferably, the arrangement of the drilling holes around the water inrush point includes: taking the water inrush point as the center, at least 4 drilling holes are arranged around the water inrush point at the same distance.
[0019] Preferably, step S2 specifically includes: arranging a plurality of drilling holes around the water inrush point, the drilling depth is less than 10 cm of the shaft wall thickness; burying a water-stop casing; extending the drilling hole in the water-stop casing, and the extended drilling depth enters the surrounding rock layer not less than 1 m.
[0020] The beneficial effects of the present invention are: compared with the prior art, a rapid treatment system for water inrush from the mine shaft wall disclosed in the present application can achieve rapid water plugging and effectively improve the emergency disposal ability for water disaster treatment. A rapid treatment method for water inrush from the mine shaft wall disclosed in the present application has the advantages of good treatment effect and short construction period, and has high application and promotion value.
[0021] The additional aspects and advantages of the present invention will be partly given in the following description, partly will become obvious from the following description, or be understood through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 is a schematic structural diagram of the rapid treatment system for water inrush from the mine shaft wall of the present invention; Figure 2 is a three-dimensional view of the drilling hole arrangement at the water inrush point of the shaft wall of the present invention.
[0023] Reference Signs: 1. Double-fluid grouting machine; 11. First slurry outlet pipe; 12. Second slurry outlet pipe; 2. Mixer; 3. High-pressure rubber hose for mixing section; 4. Grouting tee; 5. Water-stop casing; 6. High-pressure ball valve; 7. Pressure gauge; 8. Pressure relief valve; 9. Shaft wall; 10. Surrounding rock stratum; 20. Borehole; 30. Water inrush point. Detailed implementation mode
[0024] The present invention discloses a rapid treatment system for water inrush in a mine shaft wall, which can achieve rapid water plugging and improve the emergency disposal ability for water disaster treatment.
[0025] The embodiments of the present invention will be described in detail below. The examples of the embodiments are shown in the drawings, where the same or similar reference numerals denote the same or similar elements or elements with the same or similar functions from beginning to end. The embodiments described below with reference to the drawings are exemplary and are intended to explain the present invention and should not be construed as limiting the present invention.
[0026] In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be construed as indicating or implying relative importance or implicitly specifying the quantity of the indicated technical features. Thus, the features defined with "first" and "second" may explicitly or implicitly include one or more of such features. In the description of the present invention, "a plurality" means two or more unless otherwise specifically defined.
[0027] Next, refer to Figure 1 and Figure 2 to describe the rapid treatment system for water inrush in the mine shaft wall in the embodiments of the present invention.
[0028] The embodiments of the present application disclose a rapid treatment system for water inrush in a mine shaft wall, including: a double-fluid grouting machine 1, a mixer 2, a high-pressure rubber hose for the mixing section 3, a grouting tee 4, and a water-stop casing 5 connected in sequence behind the double-fluid grouting machine 1.
[0029] Among them, the double-fluid grouting machine 1 has 2 slurry outlets, which are respectively communicated with the first slurry inlet hole and the second slurry inlet hole of the mixer 2 through the first slurry outlet pipe 11 and the second slurry outlet pipe 12. The cement slurry in the first slurry outlet pipe 11 and the sodium silicate slurry in the second slurry outlet pipe 12 are mixed at the mixer 2; a pressure relief valve 8 is installed on the mixer 2, and when the pressure in the mixer 2 is greater than the set pressure, it is relieved through the pressure relief valve 8; one end of the high-pressure rubber hose for the mixing section 3 is communicated with the slurry outlet hole of the mixer 2, and the other end is communicated with the water-stop casing 5 through the grouting tee 4. The mixed slurry entering the high-pressure rubber hose for the mixing section 3 from the mixer 2 is fully mixed and quickly reacts in the high-pressure rubber hose for the mixing section 3, so that a paste-like slurry is formed at the outlet end of the high-pressure rubber hose for the mixing section 3. The paste-like slurry is pressed into the water inrush point 30 of the shaft wall 9 through the water-stop casing 5 to quickly plug the water inrush point 30.
[0030] In the prior art, the technical solution of using grouting plugging method to plug the water inrush point 30 on the shaft wall 9 has the technical problem that the injected slurry is easily diluted and washed away by the flowing water. The main reasons for the above technical problems are that the slurry is relatively thin as a whole when injected, and there is still a period of time before solidification. At the same time, the water flow pressure is large, which easily washes away the slurry, and the solidification environment of the thin slurry is poor.
[0031] The rapid treatment system for water inrush in the mine shaft wall in this embodiment effectively solves the above technical problems by installing a high-pressure rubber hose 3 in the mixing section between the double-fluid grouting machine 1 and the water-stop casing 5. Specifically, by installing the high-pressure rubber hose 3 in the mixing section, the just-mixed slurry can fully mix and react in the high-pressure rubber hose 3 in the mixing section to form a paste-like slurry, and the paste-like slurry is used to plug the water inrush point 30 on the shaft wall 9. The paste-like slurry has the characteristics of high anti-washability, stable structure, short solidification time, and is not easily washed away by flowing water, and can effectively solve the problems that the currently injected slurry is easily washed away by flowing water and is not easy to solidify.
[0032] In some embodiments, the length of the high-pressure rubber hose 3 in the mixing section is determined according to the formula: It is determined that in the formula, L is the length of the high-pressure rubber hose 3 in the mixing section (unit: m), t is the solidification time of the mixed slurry (unit: s), v is the flow rate of the double-fluid grouting machine 1 (unit: L / s), d is the diameter of the high-pressure rubber hose 3 in the mixing section (unit: m). When the diameter and flow rate are determined, the solidification time of the mixed slurry is proportional to the length of the high-pressure rubber hose, that is, the longer the solidification time of the mixed slurry, the longer the length of the high-pressure rubber hose, and the shorter the solidification time, the shorter the length of the high-pressure rubber hose.
[0033] According to the above formula, the maximum effective length of the high-pressure rubber hose 3 in the mixing section can be effectively calculated. Within the maximum effective length, it can be ensured that the mixed slurry will not solidify in the high-pressure rubber hose 3 in the mixing section and can make the mixed slurry fully mix and react to form a paste-like slurry.
[0034] In the actual construction environment, there are various influencing factors, which will slow down the construction progress, resulting in the paste-like slurry not being able to be transported to the water inrush point 30 within the calculated time, and then causing the paste-like slurry to solidify in the rubber hose, resulting in hose blockage. In order to avoid this situation, when arranging the high-pressure rubber hose 3 in the mixing section, the actual length of the high-pressure rubber hose 3 in the mixing section is made less than the calculated length to leave enough construction margin for construction.
[0035] For example: Select the cement type as P.O42.5, the modulus M of sodium silicate is 3.0, the concentration of sodium silicate is 40 Be′ (Be′ is Baumé degree), the water-cement ratio of the cement slurry is 0.6:1, and the volume ratio of the cement-sodium silicate slurry is 1:0.5. The setting time of the cement-sodium silicate double slurry is 34 seconds. Select a grouting pump with a pump flow rate of 16 L / min and a high-pressure rubber hose 3 with a diameter of 38 mm for the mixing section. The maximum length of the high-pressure rubber hose 3 in the mixing section calculated according to the formula is 8 meters. Considering the construction complexity and for safety reasons, the actual length of the high-pressure rubber hose 3 in the mixing section is determined to be 5 m.
[0036] In some embodiments, a high-pressure ball valve 6 is installed on the water-stop casing 5. The grouting tee 4 is connected to the water-stop casing 5 through the high-pressure ball valve 6, and the mixed slurry enters the water-stop casing 5 through the high-pressure ball valve 6. By setting the high-pressure ball valve 6 as a control valve to control the grouting on and off.
[0037] In some embodiments, pressure gauges 7 are provided on both the double-fluid grouting machine 1 and the grouting tee 4 for observing the grouting pressure.
[0038] In some embodiments, a pressure relief valve 8 is also installed on the grouting tee 4. When the pressure in the grouting tee 4 is greater than the set pressure, it is relieved through the pressure relief valve 8 to prevent damage to the grouting tee 4 caused by excessive slurry pressure.
[0039] The present invention also proposes a rapid treatment method for water inrush in a mine shaft wall, including: S1. Determine the water inrush point 30 on the shaft wall 9; S2. Select grouting materials; S3. Arrange a plurality of drill holes 20 around the water inrush point 30 and bury water-stop casings 5 in each drill hole 20; S4. Install a high-pressure ball valve 6 on each water-stop casing 5 and conduct a pressure resistance test on each high-pressure ball valve 6. After the test is completed, clean the grouting drill holes 20 in the high-pressure ball valve 6; S5. Select any drill hole 20 below the water inrush point 30 to install the rapid treatment system for water inrush in the mine shaft wall and conduct a water pressure test; S6. After the water pressure test is passed, use the rapid treatment system for water inrush in the mine shaft wall to grout and quickly seal the water inrush point 30; S7. If the sealing is ineffective, it is necessary to clean all the drill holes 20 and re-select another drill hole 20 below the water inrush point 30 to repeat steps S5 and S6.
[0040] By treating the water inrush in the shaft wall according to the above method, the water inrush point 30 on the shaft wall 9 can be quickly and effectively sealed, and the impact caused by the water inrush can be minimized to the greatest extent.
[0041] In some embodiments, grouting using the rapid treatment system for water inrush from a mine shaft wall includes the following: The grouting process adopts a pressure of 2-3 times the water pressure at the current water burst point 30, thick slurry, flow limiting, and intermittent grouting. Among them, when the slurry continues to emerge from the water burst point 30 and becomes thick, intermittent grouting begins, and the time of intermittent grouting is less than the initial setting time of the mixed slurry in the mixing section high-pressure hose 3; during grouting, if the borehole 20 and the water burst point 30 continue to emerge slurry, the high-pressure ball valve 6 of each borehole 20 is closed one by one, and when there is no more slurry flowing out of the water burst point 30 and the grouting pressure reaches the designed grouting pressure, the grouting operation is stopped.
[0042] In some embodiments, the water pressure test includes: pressurizing the selected borehole 20 with water and keeping the high-pressure ball valves 6 of the remaining boreholes 20 open, observing the water conduction conditions of each borehole 20 and the water burst point 30, and proceeding to the next step after all or part of the water is conducted.
[0043] In some embodiments, the installation of a rapid control system for water inrush from a mine shaft wall includes: calculating the length of a mixing section high-pressure hose based on the setting time of the grouting material, the flow rate of a dual-liquid grouting machine, and the diameter of the mixing section high-pressure hose; and installing a rapid control system for water inrush from a mine shaft wall equipped with a mixing section high-pressure hose.
[0044] In some embodiments, selecting the grouting material includes: selecting cement-water glass double grout as the grouting material and determining the setting time of the grouting material.
[0045] Furthermore, in the selection of grouting materials, cement-water glass double slurry is used, wherein the cement model is P.O42.5, the modulus M of water glass is 3.0, and the concentration of water glass is 40Be′ (Be′ is Baume degrees). In addition, the water-cement ratio of cement slurry can be 1:1 or 0.6:1, and the volume ratio of cement-water glass slurry can be 1:0.5 or 1:1. According to the combination of different water-cement ratios and volume ratios, cement-water glass double slurries with different setting times can be prepared, specifically: when the water-cement ratio of cement slurry is 0.6:1 When the volume ratio of cement-water glass slurry is 1:0.5, the setting time is 34 seconds; when the volume ratio is 1:1, the setting time is 67 seconds; when the water-cement ratio of cement slurry is 0.8:1: when the volume ratio of cement-water glass slurry is 1:0.5, the setting time is 42 seconds; when the volume ratio is 1:1, the setting time is 92 seconds; when the water-cement ratio of cement slurry is 1:1: when the volume ratio of cement-water glass slurry is 1:0.5, the setting time is 52 seconds; when the volume ratio is 1:1, the setting time is 112 seconds.
[0046] According to different actual working conditions, the above-mentioned cement-sodium silicate double slurry with different ratios can be selected. For example, when the actual working conditions require plugging the current water inrush point 30 in the shortest time, the cement-sodium silicate double slurry with a water-cement ratio of 0.6:1 and a volume ratio of cement-sodium silicate slurry of 1:0.5 can be selected. The cement-sodium silicate double slurry under this ratio has the shortest setting time and can plug the water inrush point 30 in the shortest time. When, under the actual working conditions, it is impossible to install short high-pressure rubber hoses in the construction environment and only long high-pressure rubber hoses are allowed to be arranged, the cement-sodium silicate double slurry with a long setting time in the ratio can be adopted. For example, the cement-sodium silicate double slurry with a water-cement ratio of 1:1 and a volume ratio of 1:1 is adopted. Its setting time is as long as 112 seconds. When using a grouting pump with a pump flow rate of 16 L / min and a high-pressure rubber hose 3 with a diameter of 38 mm in the mixing section, the maximum length of the high-pressure rubber hose in the mixing section can reach 26.76 m, which can fully meet the requirements of the working conditions.
[0047] In some embodiments, the arrangement of the boreholes 20 around the water inrush point 30 includes: taking the water inrush point 30 as the center, at the same distance, at least 4 boreholes 20 are arranged around the water inrush point 30. Select any one of the boreholes 20 below the water inrush point 30 as the grouting hole, and the remaining boreholes 20 are used as guiding holes and pressure relief holes to ensure the safety and stability of the grouting process.
[0048] In some embodiments, step S3 specifically includes: arranging a plurality of boreholes 20 around the water inrush point 30, and the depth of the boreholes 20 is less than the thickness of the shaft wall 10 cm; burying a water stop casing 5; extending the boreholes 20 in the water stop casing 5, and the depth of the extended boreholes 20 enters the surrounding rock layer 10 by not less than 1 m. When drilling the boreholes 20 for the first time, avoid directly drilling through the shaft wall 9 to prevent the water flow in the shaft wall 9 from flowing out through the boreholes 20 and making it impossible to smoothly bury the water stop casing 5.
[0049] Other components and operations of the rapid treatment system for water inrush in the mine shaft wall and the method for the rapid treatment system for water inrush in the mine shaft wall according to the embodiments of the present invention are known to those of ordinary skill in the art and will not be described in detail here.
[0050] In the description of this specification, the description with reference to terms such as "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials, or characteristics described in connection with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described can be combined in a suitable manner in any one or more embodiments or examples. In addition, without contradiction, those skilled in the art can combine and combine the different embodiments or examples described in this specification and the features of different embodiments or examples.
[0051] Although embodiments of the present invention have been shown and described, those of ordinary skill in the art can understand that various changes, modifications, substitutions, and variations can be made to these embodiments without departing from the principles and spirit of the present invention. The scope of the present invention is defined by the claims and their equivalents.
Claims
1. A rapid treatment system for water inrush from the mine shaft wall, characterized in that, Comprising: A two - liquid grouting machine, a mixer, a high - pressure rubber hose for the mixing section, a grouting tee, and a water - stop casing connected in sequence behind the two - liquid grouting machine; The two - liquid grouting machine has two slurry outlets, which are respectively communicated with the first slurry inlet hole and the second slurry inlet hole of the mixer through a first slurry outlet pipe and a second slurry outlet pipe. The cement slurry in the first slurry outlet pipe and the sodium silicate slurry in the second slurry outlet pipe are mixed at the mixer; A pressure relief valve is installed on the mixer, and when the pressure in the mixer is greater than the set pressure, it is relieved through the pressure relief valve; One end of the high - pressure rubber hose for the mixing section is communicated with the slurry outlet hole of the mixer, and the other end is communicated with the water - stop casing through the grouting tee. The mixed slurry entering the high - pressure rubber hose for the mixing section from the mixer is fully mixed and rapidly reacts inside the high - pressure rubber hose for the mixing section, so that a paste - like slurry is formed at the outlet end of the high - pressure rubber hose for the mixing section. The paste - like slurry is pressed into the water - inrush point of the shaft wall through the water - stop casing to quickly plug the water - inrush point.
2. The rapid treatment system for water inrush in the mine shaft wall according to claim 1, characterized in that, The length calculation formula of the high-pressure rubber hose in the mixing section is as follows: ; In the formula, L is the length of the high - pressure rubber hose for the mixing section, t is the setting time of the mixed slurry, v is the flow rate of the two - liquid grouting machine, and d is the diameter of the high - pressure rubber hose for the mixing section.
3. The rapid treatment system for water inrush from the mine shaft wall according to claim 1, wherein, A high - pressure ball valve is installed on the water - stop casing. The grouting tee is communicated with the water - stop casing through the high - pressure ball valve, and the mixed slurry enters the water - stop casing through the high - pressure ball valve.
4. The rapid treatment system for water inrush in the mine shaft wall according to claim 1, characterized in that, Pressure gauges are provided on both the two - liquid grouting machine and the grouting tee for observing the grouting pressure.
5. The rapid treatment system for water inrush from the mine shaft wall according to claim 1, characterized in that, A pressure relief valve is also installed on the grouting tee. When the pressure in the grouting tee is greater than the set pressure, it is relieved through the pressure relief valve.
6. A rapid treatment method for water inrush from the shaft wall of a mine, characterized in that, Applied to the rapid treatment system for water inrush in the mine shaft wall described in any one of claims 1 - 5 above, comprising: S1. Determine the water - inrush point on the shaft wall; S2. Select grouting materials; S3. Arrange a plurality of drill holes around the water - inrush point and bury water - stop casings in each drill hole; S4. Install a high - pressure ball valve on each water - stop casing and conduct a pressure - resistance test on each high - pressure ball valve. After the test is completed, clean the grouting drill holes inside the high - pressure ball valves; S5. Select any drill hole below the water - inrush point to install the rapid treatment system for water inrush in the mine shaft wall and conduct a water - pressure test; S6. After the water - pressure test is passed, use the rapid treatment system for water inrush in the mine shaft wall to conduct grouting to quickly plug the water - inrush point; S7. If the plugging is ineffective, it is necessary to clean all the drill holes and re - select another drill hole below the water - inrush point to repeat steps S5 and S6.
7. The rapid treatment method for water inrush from the mine shaft wall according to claim 6, characterized in that, The water - pressure test includes: Pressurize the selected drill hole and keep the high - pressure ball valves of the remaining drill holes open, observe the water - conducting conditions of each drill hole and the water - inrush point, and proceed to the next step after all are conducting or partially conducting.
8. The rapid treatment method for water inrush from the mine shaft wall according to claim 6, characterized in that The installation of the rapid treatment system for water inrush in the mine shaft wall includes: Calculate the length of the high - pressure rubber hose for the mixing section according to the setting time of the grouting material, the flow rate of the two - liquid grouting machine, and the diameter of the high - pressure rubber hose for the mixing section; Install the rapid treatment system for water inrush in the mine shaft wall equipped with the high - pressure rubber hose for the mixing section.
9. The rapid treatment method for water inrush from the mine shaft wall according to claim 6, characterized in that, S2 includes: Select the cement - sodium silicate double slurry as the grouting material and determine the setting time of the grouting material.
10. The rapid treatment method for water inrush from the mine shaft wall according to claim 9, characterized in that, The cement - sodium silicate double slurry includes: The cement type is P.O42.5, the modulus M of sodium silicate is 3.0, the concentration of sodium silicate is 40Be′, the water-cement ratio of the cement slurry is 1:1 or 0.6:1, and the volume ratio of cement-sodium silicate slurry is 1:0.5 or 1:
1.
11. The rapid treatment method for water inrush from the mine shaft wall according to claim 6, characterized in that, The grouting using the rapid treatment system for water inrush in the mine shaft wall includes the following: During the grouting process, grouting is carried out in the way of applying a pressure 2-3 times the water pressure at the current water inrush point, thick slurry, limited flow, and intermittent grouting. Among them, when the slurry continuously gushes out from the water inrush point and becomes thick, intermittent grouting starts, and the intermittent grouting time is less than the initial setting time of the mixed slurry in the high-pressure rubber hose in the mixing section; During grouting, if the drill holes and the water inrush point continuously gush out slurry, the high-pressure ball valves of each drill hole are closed one by one. When no slurry flows out from the water inrush point and the grouting pressure reaches the designed grouting pressure, the grouting operation stops.
12. The rapid treatment method for water inrush from the mine shaft wall according to claim 6 is characterized in that, The arrangement of drill holes around the water inrush point includes: Centering on the water inrush point, at least 4 drill holes are arranged around the water inrush point at the same distance.
13. The rapid treatment method for water inrush from the mine shaft wall according to claim 6 is characterized in that, Step S2 specifically includes: Arrange multiple drill holes around the water inrush point, and the drill hole depth is less than 10 cm of the shaft wall thickness; Install a water stop casing; Deepen the drill hole in the water stop casing, and the deepened drill hole depth enters the surrounding rock layer not less than 1 m.
Citation Information
Patent Citations
Double-liquid grouting construction method
CN111852484A
Mixed grouting device for blocking high-pressure groundwater and mixing method grouting process therefor
CN1970900A
Injection gun device for chemical grout water shutoff construction
CN201722699U
Grouting system for tunnel water plugging construction
CN203488191U
Cited By
Rapid treatment system and method for single-point water inrush of coal mine tunnel
CN121611470A
A quick treatment system and method for single-point water inrush in a coal mine tunnel
CN121611470B