Dual underpinning structure for underground storey addition of existing building in narrow and small space

By adopting a double underpinning structure in a building with a small space, using anchor piles and underpinning piles combined with underpinning beam slabs and foundation pit supports, the problems of uneven settlement of the building and difficult construction are solved, and underground layer addition construction is realized. security and economical protection.

CN221878957UActive Publication Date: 2024-10-22SHANGHAI GEOTECHN INVESTIGATIONS & DESIGN INST
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202420321482.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-21
Publication Date
2024-10-22
Estimated Expiration
2034-02-21

AI Technical Summary

Technical Problem

When carrying out underground layer addition construction in an existing building with a small space, the risk of uneven settlement of the building and structural cracking and damage is high, and the underpinning protection of anchor static pressure piles is costly and has a long construction period, making it difficult to meet the requirements of building protection.

Method used

A dual underpinning structure is adopted, including internal anchor piles and external underpinning piles. An overall system is formed through underpinning beam plates and foundation pit supports to transmit building loads and provide stable support to ensure underpinning during underground earth excavation. Protect.

Benefits of technology

It improves the safety and convenience of building additional layers underground, reduces the cost of underpinning protection, shortens the construction period, and meets the safety and economic requirements of the building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221878957U_ABST
    Figure CN221878957U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of constructional engineering, in particular to a double underpinning structure for underground storey adding of an existing building in a narrow space, which comprises an anchor rod pile arranged within the range of the existing building, and an underpinning pile and a fender post which are arranged outside the range of the existing building, wherein the anchor rod pile is anchored into the foundation, the anchor rod pile and the foundation are connected into an integral structure, the underpinning pile is located on the outer side of the anchor rod pile, the underpinning pile and the anchor rod pile are connected through an underpinning beam plate to form an underpinning system, and the fender post is located on the outer side of the underpinning pile and connected through a foundation pit support. The utility model has the advantages that the safety of the existing building (structure) in the underground storey-adding construction process can be ensured, the cost of underpinning protection of the building is reduced, the convenience of underground storey-adding earthwork excavation of the existing building (structure) can be improved, the construction period is shortened, and the safety and economy requirements of the existing building protection are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to a double underpinning structure used for adding underground floors to existing buildings in narrow spaces. Background Art

[0002] With the development of urban construction, a large number of underground spaces in old communities or public places in the central urban area cannot meet the growing demand for use, and it is necessary to carry out underground expansion and reconstruction of existing buildings (structures). Before carrying out underground expansion and expansion of existing buildings, it is necessary to first replace and protect the existing buildings (structures), then construct the foundation pit retaining structure, and excavate the earth under the building to increase the underground space.

[0003] Underground layer construction under existing buildings (structures) can easily cause uneven settlement of the building, excessive deformation, and further cracking and damage of the structure, or even collapse. For areas with open sites, the building can be relocated for protection first, and then moved back to its original position after the construction of the underground space is completed. For areas with narrow sites and no space for the building to be relocated, anchor static piles can be used to underpin and protect the building (structure), and then excavate the earth under the building. Anchor static piles rely on the deadweight of the structure as a reaction force, and the size of the deadweight of the structure affects the upper limit of the pile pressure force. When the deadweight of the upper building is small or the strength of the foundation structure is low, it is difficult to provide a large pile pressure reaction force, and the length of the anchor pile is limited. In addition, during the excavation of the underground layer, the soil on the side of the anchor pile is excavated layer by layer, and the pile side resistance gradually decreases. The underpinning bearing capacity provided by a single anchor pile is limited, and a large number of anchor piles need to be arranged to meet the requirements of building protection. The interior space of existing buildings is small and the construction space is limited. If a large number of anchor piles are arranged in existing buildings, it will not only increase the project cost, but also increase the difficulty of earth excavation construction under the existing buildings, and extend the construction period of underpinning protection and underground floor addition. Summary of the invention

[0004] The purpose of the utility model is to provide a double underpinning structure for underground layer addition of existing buildings and structures in narrow spaces in accordance with the above-mentioned deficiencies of the prior art. First, small anchor piles are used to underpin the foundation of the existing building (structure) to transfer the building load to the anchor piles. Then, underpinning piles are constructed outside the existing building, shallow earthwork inside and outside the existing building is excavated, underpinning beams and slabs are constructed, and the external underpinning piles and the underpinning beam and slab system are connected as a whole to form a new underpinning system, thereby realizing underpinning protection of the existing building during the excavation of underground layer addition.

[0005] The purpose of this utility model is achieved by the following technical solutions:

[0006] A double underpinning structure for adding underground floors to existing structures in narrow spaces, used for underpinning existing structures, wherein the existing structures are supported on a foundation, and characterized in that the double underpinning structure comprises anchor piles arranged within the range of the existing structures and underpinning piles and retaining piles arranged outside the range of the existing structures, wherein the anchor piles are anchored in the foundation and the two are connected to form an integral structure, the underpinning piles are located on the outside of the anchor piles, the two are connected by an underpinning beam and slab to form an underpinning system, and the retaining piles are located on the outside of the underpinning piles, the two are connected by a foundation pit support.

[0007] The top of the anchor pile is connected to the foundation and the existing building through a pile cap to form an integral structure.

[0008] The anchor piles are steel pipe piles or prefabricated piles; the underpinning piles are cast-in-place piles, steel pipe piles or prefabricated piles.

[0009] A plurality of underpinning beam plates are arranged at intervals between the underpinning piles and the anchor piles.

[0010] Along the height direction of the retaining piles, a plurality of foundation pit supports are arranged at intervals between the retaining piles and the underpinning piles, and the arrangement position of the first support of the foundation pit corresponds to the arrangement position of the underpinning beam plate.

[0011] The advantages of the utility model are: it can ensure the safety of existing buildings (structures) during the underground layer construction process, reduce the cost of building replacement and protection, and also improve the convenience of excavating earth for underground layer addition of existing buildings (structures), shorten the construction period, and meet the safety and economic requirements of existing building protection. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is the plan layout of the utility model;

[0013] Figure 2 The construction steps of the utility model are as follows: Figure I ;

[0014] Figure 3 The construction steps of the utility model are as follows: Figure II ;

[0015] Figure 4 The construction steps of the utility model are as follows: Figure III ;

[0016] Figure 5 The construction steps of the utility model are as follows: Figure IV ;

[0017] Figure 6 The construction steps of the utility model are as follows: Figure V ;

[0018] Figure 7 It is a structural schematic diagram of the utility model after construction is completed. DETAILED DESCRIPTION

[0019] The following is a further detailed description of the features of the present invention and other related features through embodiments in conjunction with the accompanying drawings to facilitate understanding by technicians in the same industry:

[0020] like Figure 1-7 As shown in the figure, marks 1-10 respectively represent: existing building structure 1, foundation 2, pile hole 3, anchor pile 4, pile cap 5, underpinning pile 6, underpinning beam 7, retaining pile 8, foundation pit support 9, and structural bottom plate 10.

[0021] Example: Figures 1 to 7 As shown, the double underpinning structure for adding underground floors to existing structures in narrow spaces in this embodiment is used to underpin the supporting structure of the existing structure 1 when adding underground floors, and to transfer the construction load from the existing foundation 2 to the double underpinning structure, thereby protecting the existing structure 1 during the excavation process of adding underground floors.

[0022] Combination Figures 2 to 7 The double underpinning structure in this embodiment is described by the construction method:

[0023] 1) If Figure 2 As shown, the upper earth of the foundation 2 is excavated and pile holes 3 are opened on the foundation 2.

[0024] 2) If Figure 3 As shown, an anchor pile 4 is installed through the pile hole 3 , and the anchor pile 4 passes through the pile hole 3 and is driven into the ground.

[0025] 3) If Figure 4 As shown, the anchor pile 4 is sealed by the pile cap 5. In this embodiment, the pile cap 5 is arranged at the position of the pile hole 3, which first connects the anchor pile 4 with the foundation 2 to form an integral structure, and also further connects the foundation 2 after the pile hole 3 is opened with the existing building 1 to form an integral structure, thereby ensuring the stability of the existing building 1 during the construction process.

[0026] 4) If Figure 5 As shown, underpinning piles 6 and retaining piles 8 of the foundation pit are constructed outside the scope of the existing building structure 1, wherein the underpinning piles 6 are arranged outside the anchor piles 4, and the retaining piles 8 used for retaining and supporting the foundation pit are located outside the underpinning piles 6. In this embodiment, the burial depths of the underpinning piles 6 and the retaining piles 8 should both exceed the depth of the proposed underground layer increase, and the specific depths are determined according to the underpinning protection and retaining design requirements.

[0027] 5) If Figure 6As shown, within the scope of the foundation pit protected by the retaining piles 8, the shallow earthwork below the foundation 2 is excavated, and the underpinning beam 7 is constructed below the foundation 2. The underpinning beam 7 connects the underpinning piles 6 and the underpinning beam system outside the scope of the existing building 1 into a whole, forming a new underpinning system, so that the earthwork below the underpinning beam 7 can be excavated, thereby realizing the underpinning protection of the existing building 1 during the excavation of the underground additional layer. At the same time, a foundation pit support 9 is set between the underpinning piles 6 and the retaining piles 8 to meet the requirements for foundation pit earthwork excavation.

[0028] 6) If Figure 7 As shown, with the excavation of earthwork, foundation pit supports 9 are constructed layer by layer until the structural bottom plate 10 is reached.

[0029] The load of the existing building structure 1 is transferred from the anchor pile 4 to the underpinning beam 7 and the outer underpinning pile 6, thereby achieving double underpinning protection of the existing building structure 1 during the excavation of underground additional layers.

[0030] In this embodiment, the anchor piles 4 can be cut off and recovered in batches during the subsequent underground layer excavation construction process, thereby increasing the construction space for excavation under the building, recovering the anchor piles 4, and improving the excavation efficiency.

[0031] In addition, if conditions permit, the arrangement of the outer underpinning piles and underpinning beams and slabs can be combined with the columns, beams and slabs and pile foundations of the newly added underground structure. The underpinning piles can be used as permanent structural columns and pile foundations, and the beams and slabs can be used as beams and slabs of the underground structure.

[0032] During the specific implementation of this embodiment, the engineering parameters such as the pile type, cross-sectional size, pile length and pile spacing of the anchor piles 4 and the underpinning piles 6, and the size of the underpinning beam slab 7 need to be calculated and determined according to the requirements of building underpinning protection to meet the bearing capacity and deformation control requirements of the building (structure) during the underground floor construction.

[0033] The anchor piles 4 may be steel pipe piles or precast piles, the underpinning piles 6 may be cast-in-place piles, steel pipe piles or precast piles, the underpinning beam 7 may be a concrete structure, and the foundation pit support 9 may be a concrete support or a steel support.

[0034] Although the above embodiments have described the concepts and embodiments of the purpose of the utility model in detail with reference to the accompanying drawings, ordinary technicians in this field can recognize that various improvements and modifications can still be made to the utility model without departing from the scope of the claims, so they are not described one by one here.

Claims

1. A double underpinning structure for adding underground floors to existing buildings in narrow spaces, used to underpin existing buildings, wherein the existing buildings are supported on a foundation. Features: The double underpinning structure includes anchor piles arranged within the scope of the existing building and structure, and underpinning piles and retaining piles arranged outside the scope of the existing building and structure, wherein the anchor piles are anchored in the foundation and the two are connected to form an integral structure, the underpinning piles are located on the outside of the anchor piles, the two are connected by an underpinning beam and slab to form an underpinning system, and the retaining piles are located on the outside of the underpinning piles, the two are connected by a foundation pit support.

2. A double underpinning structure for adding underground floors to existing buildings in narrow spaces according to claim 1, Features: The top of the anchor pile is connected to the foundation and the existing building through a pile cap to form an integral structure.

3. A double underpinning structure for adding underground floors to existing buildings in narrow spaces according to claim 1 or 2, Features: The anchor piles are steel pipe piles or prefabricated piles; the underpinning piles are cast-in-place piles, steel pipe piles or prefabricated piles.

4. According to claim 1, a double underpinning structure for adding underground floors to existing buildings in narrow spaces, Features: A plurality of underpinning beam plates are arranged at intervals between the underpinning piles and the anchor piles.

5. According to claim 1, a double underpinning structure for adding underground floors to existing buildings in narrow spaces, Features: Along the height direction of the retaining piles, a plurality of foundation pit supports are arranged at intervals between the retaining piles and the underpinning piles, and the arrangement position of the first support of the foundation pit corresponds to the arrangement position of the underpinning beam plate.

Citation Information

Cited By

  • Small-bay basement shear wall reverse construction system conversion method

    CN121138354A

  • A conversion method of a small-bay basement shear wall top-down construction system

    CN121138354B

  • Underpinning method and structure of existing building foundation crossing underground traffic facilities and transformation method of internal structure

    CN121138605A