Rapid dewatering and curing equipment for dredged sediment
By adopting a two-way drainage path in the dredging sediment treatment equipment, combined with negative pressure and gravity, more efficient sediment moisture removal is achieved, solving the problem of low dehydration efficiency of existing equipment, significantly improving treatment efficiency and sludge processing volume.
Patent Information
- Application Number
- CN202420513090.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-15
AI Technical Summary
The dehydration and drying efficiency of existing dredging sediment dehydration equipment is low and cannot effectively accelerate the removal of moisture from the sediment, resulting in insufficient treatment efficiency and sludge treatment capacity.
A device for rapid dehydration and solidification of dredged sediment is designed. It adopts a two-way drainage path of an upper seepage drainage pipeline and a lower seepage drainage pipeline, sucks water from the upper part of the yard through a negative pressure system, and uses gravity to seep down to accelerate the lower part of the yard. The drainage of moisture ensures even negative pressure distribution and rapid drainage.
It significantly speeds up the dehydration rate of dredged sediment and sludge processing capacity, solves the problem of low dehydration and drying efficiency of dewatering equipment, and improves the processing capacity within the same time.
Smart Images

Figure CN221917727U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of bottom mud treatment, and in particular relates to a dredged bottom mud rapid dehydration and solidification device. Background Art
[0002] River and lake sediments refer to unconsolidated fine or ultrafine soils that are deposited in rivers and lakes in still water or slow-flowing water environments and formed by physical, chemical and biological processes. They generally contain garbage such as construction, domestic and solid hazardous wastes. The proportion of endogenous pollution caused by sediment release is becoming increasingly larger as exogenous pollution is controlled. River sediment treatment includes sediment dredging, sediment transportation, sediment dehydration and solidification, sediment comprehensive utilization, and residual water treatment.
[0003] The dehydration and solidification of sludge is a process that is currently receiving more attention. This process should be combined with the amount of sludge to be treated and the treatment period. Natural drying, vacuum preloading, geotube bags, pipe extrusion and mechanical separation and other process technologies can be selected according to local conditions to dehydrate the sludge to reduce the moisture content and meet the requirements of subsequent disposal procedures. At present, the conventional disposal methods for dredged sludge mainly include stacking, filling and mud throwing. While these disposal methods solve the problem of sludge outlet, they also bring various problems. Simply stacking without other control measures will occupy a large amount of land on the one hand, and on the other hand, it will cause secondary pollution due to rainwater erosion, and environmental and water protection problems will be prominent. In addition, the resource-usable components cannot be fully utilized, resulting in a waste of resources.
[0004] A Chinese invention patent with authorization announcement number CN101705680B discloses a method for constructing a storage yard that can accelerate the dehydration and drying process of dredged sludge. The main scheme is to set a drainage pipe at the bottom of the storage yard, and set a vertical conduit in the middle of the drainage pipe. The vertical conduit is connected to an external vacuum negative pressure, and the free water in the storage yard sludge enters the drainage pipe. The external vacuum system sucks the drainage pipe to a negative pressure state, thereby increasing the drainage head of the storage yard sludge and accelerating the removal of water from the sludge. Compared with existing conventional disposal methods, this patent scheme accelerates the sludge dehydration rate, but because the depth of the sludge storage yard is usually about several meters, and the drainage pipe is set at the far end of the negative pressure system, it is impossible to ensure that sufficient negative pressure is provided to the drainage pipe, and it is even more impossible to ensure that uniform negative pressure is provided to each position of the drainage pipe, and thus it is impossible to effectively increase the drainage speed of the storage yard sludge.
[0005] Based on the above analysis, this application designs a device that can effectively accelerate the dewatering of dredged sludge. Summary of the invention
[0006] The utility model aims to provide a dredged sludge rapid dehydration and solidification device to solve the problem of low dehydration and drying efficiency of the existing dehydration equipment.
[0007] In order to solve the above problems, the present application provides a dredged sludge rapid dehydration and solidification device, including an upper infiltration drainage pipeline and a lower infiltration drainage pipeline, the upper infiltration drainage pipeline includes a plurality of drainage pipes vertically arranged in the yard, the upper ends of the plurality of drainage pipes are connected to an external vacuum system, the bottom ends are blind ends and have a certain distance from the bottom of the yard; the lower infiltration drainage pipeline includes a seepage pipe composed of a main seepage pipe and a branch seepage pipe, the main seepage pipe is arranged at the bottom of the yard and axially along the yard, one end of the main seepage pipe extends to a water collection well, the branch seepage pipeline includes a plurality of branches, the plurality of branch seepage pipes are evenly distributed at the bottom of the yard and connected to the main seepage pipe.
[0008] As a preferred solution of the present application, the bottom end of the drainage pipe is located at 1 / 2-2 / 3 of the height of the yard.
[0009] As a preferred solution of the present application, the outer circumference of the drainage pipe and the seepage pipe is wrapped with at least one layer of filter yarn, and the filter yarn can be made of any one of polypropylene, polyester or stainless steel.
[0010] As a preferred solution of the present application, a drainage ditch is provided at the bottom of the yard, the main seepage pipe is arranged in the drainage ditch, the branch seepage pipe is connected to the main seepage pipe through a pipe joint and its bottom is in contact with the bottom of the yard.
[0011] As a preferred solution of the present application, a plurality of branch seepage pipes are arranged in parallel, and the distance between two adjacent branch seepage pipes is 2-4m.
[0012] As a preferred solution of the present application, the drainage pipe and the seepage pipe are both made of PVC material, wherein the diameter of the drainage pipe is 40-45mm, the diameter of the main seepage pipe is 100-300mm, and the diameter of the branch seepage pipe is 50-100mm.
[0013] As a preferred solution of the present application, the bottom of the yard is provided with a slope inclined toward one side of the water collection well.
[0014] As a preferred solution of the present application, the upper ends of the plurality of drainage pipes are connected to the external vacuum system via a horizontal collecting pipe.
[0015] Compared with the prior art, the advantages of the dredged sludge rapid dehydration and solidification equipment in this application are:
[0016] The equipment forms a two-way drainage path by setting up an upper seepage drainage pipeline and a lower seepage drainage pipeline, wherein the upper seepage drainage pipeline is used to suck and discharge the moisture near the upper part of the yard through the negative pressure system, and the lower seepage drainage pipeline is used to discharge the moisture near the lower part of the yard that enters the seepage pipe through gravity infiltration. By setting up this two-way drainage path, the drainage rate can be accelerated. At the same time, compared with the existing traditional methods, the sludge processing capacity can be increased within the same time, solving the problem of low dehydration and drying efficiency of existing dehydration equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 A side structural schematic diagram of a dredged sludge rapid dehydration and solidification device provided in an embodiment of the utility model.
[0018] Figure 2 A schematic diagram of the layout structure of the seepage water drainage pipeline provided in an embodiment of the utility model.
[0019] Figure 3 A schematic diagram of the arrangement structure of the seepage pipe at the bottom of the storage yard provided in an embodiment of the utility model.
[0020] Figure 4 The embodiment of the utility model provides Figure 3 A local enlarged schematic diagram of point A in the middle.
[0021] Figure 5 A schematic diagram of the top structure of the upper seepage water drainage pipeline provided in an embodiment of the utility model.
[0022] Reference numerals
[0023] Stockyard 1, water collection well 2, vacuum pump 3, drainage pipe 4, horizontal collection pipe 5, main seepage pipe 6, branch seepage pipe 7, water pump 8, drainage ditch 9, pipe joint 10. DETAILED DESCRIPTION
[0024] The present invention will be further described in detail below in conjunction with specific implementations and with reference to the accompanying drawings. It should be emphasized that the following description is merely exemplary and is not intended to limit the scope of the present invention and its application.
[0025] like Figure 1As shown, a dredged sludge rapid dehydration and solidification device provided in this embodiment includes an upper seepage drainage pipeline and a lower seepage drainage pipeline. The upper seepage drainage pipeline includes multiple drainage pipes 4 vertically arranged in the yard 1. The upper ends of the multiple drainage pipes 4 are connected to the external vacuum system through a horizontal collecting pipe 5, and the bottom ends are blind ends and have a certain distance from the bottom of the yard 1. The upper seepage drainage pipeline is used to absorb and discharge the infiltrated water near the upper part of the yard 1 through negative pressure. In this embodiment, the bottom end of the drainage pipe 4 is preferably located at 1 / 2-2 / 3 of the height direction of the yard 1. This can reduce the distance between the bottom end of the drainage pipe 4 and the vacuum system, thereby ensuring that a basically uniform negative pressure state is provided for each part of the drainage pipe 4, which is beneficial to the rapid discharge of water from the upper part of the yard 1. The lower seepage water drainage pipeline includes a seepage pipe composed of a main seepage pipe 6 and a branch seepage pipe 7. The main seepage pipe 6 is arranged at the bottom of the yard 1 and axially along the yard 1. One end of the main seepage pipe 6 extends to the collection well 2, which is used to guide the gathered seepage water into the collection well 2. It can be understood that a pump 8 should be provided in the collection well 2 to discharge the water in the collection well 2. The branch seepage pipe 7 includes multiple branches, and the multiple branch seepage pipes 7 are evenly distributed at the bottom of the yard 1 and connected to the main seepage pipe 6. It can be understood that the free ends of the multiple branch seepage pipes 7 should extend to the outer edge of the bottom of the yard 1 to achieve as uniform coverage of the bottom of the yard 1 as possible to avoid dead corners. The multiple groups of branch seepage pipes 7 are used to collect the seepage water near the bottom of the yard 1 and transport it to the main seepage pipe 6.
[0026] It can be understood that both the drainage pipe 4 and the seepage pipe should be provided with water holes, and the aperture and number of the water holes are selected according to actual needs. In this embodiment, the sum of the areas of the water holes on each pipe is preferably larger than the cross-sectional area of the corresponding pipe; in this embodiment, at least one layer of filter yarn is wrapped around the outer circumference of the drainage pipe 4 and the seepage pipe, and the filter yarn can be made of any one of polypropylene, polyester or stainless steel. This can avoid the influence of sludge particles on the water holes during negative pressure infiltration and gravity infiltration, thereby ensuring the normal use of the drainage pipe 4 and the seepage pipe.
[0027] Compared with the existing traditional disposal methods, the present embodiment sets up a two-way drainage path consisting of an upper seepage drainage pipeline and a lower seepage drainage pipeline, wherein the upper seepage drainage pipeline is used to suck and discharge the moisture near the upper part of the yard 1 through the negative pressure system, and the lower seepage drainage pipeline is used to discharge the moisture near the lower part of the yard 1 that enters the seepage pipe through gravity infiltration. That is, the present embodiment can divide the yard 1 into multiple paths and drain them synchronously by setting up the two-way drainage path, thereby accelerating the drainage speed and improving the drying efficiency. At the same time, the sludge treatment capacity can be increased within the same time, thereby solving the existing deficiencies.
[0028] like Figure 2As shown, it is a schematic diagram of the positional relationship between a plurality of branch seepage pipes 7 and a main seepage pipe 6 provided in the present embodiment. In the schematic diagram, a plurality of branch seepage pipes 7 are arranged in parallel with each other and are arranged perpendicularly relative to the axis of the main seepage pipe 6. Of course, this is the preferred scheme of the present embodiment. In other embodiments of the present application, a plurality of branch seepage pipes 7 may also be arranged obliquely relative to the axis of the main seepage pipe 6; each branch seepage pipe 7 is arranged in parallel with each other and the spacing between two adjacent branch seepage pipes 7 is 2-4m. It can be understood that the specific spacing between two adjacent branch seepage pipes 7 can be selected according to the actual situation such as the site area of the yard 1.
[0029] In order to prevent the seepage water from being retained or accumulated in the seepage pipe, in this embodiment, a slope inclined toward the water collection well 2 is provided at the bottom of the yard 1, and the slope size may preferably be between 0.5% and 1%. In this embodiment, if necessary, a slope inclined from both sides toward the position of the main seepage pipe 6 may also be provided at the bottom of the yard 1, so that the water flow speed in the branch seepage pipe 7 can be accelerated.
[0030] The drainage pipe 4 and the seepage pipe are both made of PVC, wherein the diameter of the drainage pipe 4 is 40-45 mm, which is conducive to forming the required uniform negative pressure in the drainage pipe 4; the diameter of the main seepage pipe 6 is 100-300 mm, and the diameter of the branch seepage pipe 7 is 50-100 mm; it can be understood that the above data are all preferred schemes of this embodiment, and the specific selection can be made according to the site area of the yard 1 and the actual drainage needs.
[0031] like Figure 3-4 As shown, it is a schematic diagram of the arrangement structure of the main seepage pipe and the branch seepage pipe provided in this embodiment at the bottom of the yard. A drainage ditch 9 is provided at the bottom of the yard, and the main seepage pipe is arranged in the drainage ditch 9. In this embodiment, in order to prevent mud and sand from affecting the performance of the main seepage pipe, gravel can be preferably arranged in the drainage ditch 9. The branch seepage pipe is connected to the main seepage pipe through a pipe joint 10 and its bottom is in contact with the bottom of the yard. In this way, there is no need to set up an additional bracket to support the branch seepage pipe, saving the cost of laying pipelines.
[0032] like Figure 5 As shown, it is a schematic diagram of the top structure of the upper seepage drainage pipeline provided in this embodiment. In this figure, it is preferred that the horizontal collecting pipes 5 include multiple ones, each of which is connected to multiple drainage pipes 4 located on the same straight line, and the multiple horizontal collecting pipes 5 are connected to the vacuum pump 3 through the main pipeline; it can be understood that this is a preferred structure of the present embodiment, and the specific selection can be based on the number of drainage pipes 4 and the structure of the yard 1.
[0033] The above is only an embodiment of the utility model, and the common knowledge such as the known specific structure and characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several improvements can be made without departing from the premise of the utility model, which should also be regarded as the protection scope of the utility model, and these will not affect the effect of the implementation of the utility model and the practicality of the patent. The scope of protection required by this application shall be based on the content of the claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.
Claims
1. A dredged sludge rapid dehydration and solidification device, characterized in that: It includes an upper seepage drainage pipeline and a lower seepage drainage pipeline. The upper seepage drainage pipeline includes multiple drainage pipes vertically arranged in the yard. The upper ends of the multiple drainage pipes are connected to an external vacuum system, and the bottom ends are blind ends and have a certain distance from the bottom of the yard; the lower seepage drainage pipeline includes a seepage pipe composed of a main seepage pipe and a branch seepage pipe. The main seepage pipe is arranged at the bottom of the yard and axially along the yard. One end of the main seepage pipe extends to a water collection well. The branch seepage pipeline includes multiple branches, and the multiple branch seepage pipes are evenly distributed at the bottom of the yard and connected to the main seepage pipe.
2. The dredged mud rapid dehydration and solidification equipment according to claim 1, characterized in that: The bottom end of the drainage pipe is located at 1 / 2-2 / 3 of the height of the yard.
3. The dredged mud rapid dehydration and solidification equipment according to claim 1, characterized in that: The outer circumference of the drainage pipe and the seepage pipe is wrapped with at least one layer of filter yarn, and the filter yarn can be made of any one of polypropylene, polyester or stainless steel.
4. The dredged mud rapid dehydration and solidification equipment according to claim 1, characterized in that: A drainage ditch is provided at the bottom of the yard, the main seepage pipe is arranged in the drainage ditch, the branch seepage pipe is connected to the main seepage pipe through a pipe joint and the bottom of the branch seepage pipe is in contact with the bottom of the yard.
5. The dredged mud rapid dehydration and solidification equipment according to claim 1, characterized in that: A plurality of branch seepage pipes are arranged in parallel, and the distance between two adjacent branch seepage pipes is 2-4m.
6. The dredged mud rapid dehydration and solidification equipment according to claim 1, characterized in that: The drainage pipe and the seepage pipe are both made of PVC material, wherein the diameter of the drainage pipe is 40-45 mm, the diameter of the main seepage pipe is 100-300 mm, and the diameter of the branch seepage pipe is 50-100 mm.
7. The dredged mud rapid dehydration and solidification equipment according to claim 1, characterized in that: The bottom of the yard is provided with a slope inclined toward one side of the water collection well.
8. The dredged mud rapid dehydration and solidification equipment according to claim 1, characterized in that: The upper ends of the plurality of drainage pipes are connected to the external vacuum system through a horizontal collecting pipe.