Gas cylinder inner wall adsorption saturation device

Through the automated adsorption saturation device of the inner wall of the gas cylinder, the problems of cumbersome and time-consuming manual operation are solved, rapid gas transfer and release are achieved, cost and operation error risks are reduced, and standard gas formulation efficiency and safety are improved.

CN222047371UActive Publication Date: 2024-11-22FUJIAN METROLOGY INST
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420775142.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-15
Publication Date
2024-11-22
Estimated Expiration
2034-04-15

AI Technical Summary

Technical Problem

The adsorption presaturation process of the internal wall of the existing gas cylinder depends on manual operations, which is cumbersome and time-consuming, resulting in the extended standard gas formulation cycle. Especially when the low-concentration mixed gas is prepared, the analysis value of the component value is significantly different from the theoretical value, which increases the workload and labor. Possibility of operation errors.

Method used

Design an automated gas cylinder inner wall adsorption saturation device, including box, gas cylinder cabinet, pump body, control panel, temperature control panel, gas pipeline and electric gas valve. By automatically controlling the gas flow and pressure, the gas transfer and Release, simplify the operation process.

Benefits of technology

It realizes the rapid transfer of mixed gases with specific magnitudes, reduces the mixing gas formulation volume in standard gas production, reduces labor costs and gas source material costs, shortens the adsorption saturation time of the inner wall of the gas cylinder, and improves work efficiency and safety. sex.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222047371U_ABST
    Figure CN222047371U_ABST
Patent Text Reader

Abstract

The gas cylinder inner wall adsorption saturation device comprises a box body and one or more gas cylinder cabinets which are connected with the box body and are used for placing gas cylinders, a pump body is arranged in the box body, and a control panel and a temperature control panel are arranged on the front end wall of the box body; a first gas pipeline and a second gas pipeline are arranged in the box body; the first gas pipeline and the second gas pipeline intersect and converge to form a third gas pipeline, and the third gas pipeline is provided with a first branch gas circuit used for exhausting, a second branch gas circuit used for being connected with the pump body and one or more third branch gas circuits used for being connected with gas cylinders. An electric valve and a spiral gas pipe are arranged on the third branch gas path; a quick connector is arranged at the tail part of the spiral gas pipe and is connected with a gas cylinder to be treated. According to the utility model, the mixed gas with a specific quantity value level can be quickly obtained and transferred into the gas cylinder to be treated, so that the preparation quantity of the mixed gas in the standard gas production process can be greatly reduced, and the labor cost and the material cost of a gas source are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of pre-treatment of gas cylinders filled with standard gas, and specifically refers to an adsorption saturation device for the inner wall of a gas cylinder. Background Art

[0002] With the development of modern industry, the application of standard gases is increasing. Standard gases are generally mixed gases. They usually use nitrogen and air as carrier gases and are stored in gas cylinders under high pressure. The concentration of effective components is quantitatively expressed in the form of mole fractions. Before preparing standard gases, the corresponding gas cylinders need to be vacuum pre-treated, and then the corresponding gases are filled into the gas cylinders in turn to obtain the target mixed gas. For common mixed gases with hydrogen, oxygen, and methane as components, the analytical values ​​of the component concentrations are basically close to the theoretical values. However, for mixed gases containing nitrogen and sulfur as components such as nitrogen dioxide and sulfur dioxide, the analytical values ​​of the component concentrations are generally lower than the theoretical values. This is because the inner walls of gas cylinders are generally composed of metal linings, fibers, resins, etc. These materials will adsorb some component gases, resulting in a decrease in the concentration of the target mixed gas. In particular, when preparing standard gases at low concentration levels, the difference between the theoretical value and the analytical value of the component quantity values ​​is more obvious. Therefore, when preparing mixed gases of these components, it is generally necessary to perform an adsorption saturation operation on the inner walls of the gas cylinders, that is, transfer a small amount of mixed gas close to the target concentration into a vacuum-cleaned gas cylinder so that the inner walls of the gas cylinders can be in the atmosphere of these mixed gases. After a certain period of adsorption and saturation, the gas in the cylinder can be released before the standard gas preparation operation can continue.

[0003] At present, the process of pre-saturation of the inner wall of the gas cylinder by adsorption mostly adopts traditional manual operation. First, the gas cylinder to be processed needs to be vacuumed, and then a small amount of mixed gas with a specific value that has been prepared in advance is transferred to the gas cylinder, so that the inner wall of the gas cylinder is in the atmosphere of the mixed gas of the concentration. After a certain period of time, the gas in the bottle is released and the standard gas preparation operation is carried out. In this process, different values ​​of mixed gases are required according to the component concentration of the target standard gas. Although the adsorption saturation operation of the gas cylinder does not require a mixed gas with an accurate value, the operation steps of preparing the gas are cumbersome, which greatly increases the workload. When the mixed gas has been transferred to the gas cylinder to be processed, the gas cylinder often needs to be disassembled from the filling station for placement or rolling to ensure adsorption saturation, and then connected to the pump body for gas release, which also prolongs the production cycle of the standard gas to a certain extent. Summary of the invention

[0004] The technical problem to be solved by the utility model is to provide a gas cylinder inner wall adsorption saturation device which can realize automatic operation.

[0005] The utility model is achieved in this way:

[0006] A gas cylinder inner wall adsorption saturation device comprises: a box body and one or more gas cylinder cabinets connected thereto for placing gas cylinders;

[0007] A pump body is arranged in the box body, and a control panel and a temperature control panel are arranged on the front end wall of the box body;

[0008] A first gas pipeline and a second gas pipeline are arranged in the box body; a first air inlet of the first gas pipeline and a second air inlet of the second gas pipeline are respectively arranged on the side wall of the box body;

[0009] The first gas pipeline is provided with a first pressure gauge, a first flow controller, and a first electric gas valve in sequence;

[0010] The second gas pipeline is provided with a second pressure gauge, a second flow controller, and a second electric gas valve in sequence;

[0011] The first gas pipeline and the second gas pipeline intersect and merge into a third gas pipeline, and the third gas pipeline is provided with a first stop valve and a third gas pressure gauge;

[0012] The third gas pipeline is provided with a first branch gas path for exhausting gas, a second branch gas path for connecting to the pump body, and one or more third branch gas paths for connecting to gas cylinders;

[0013] The first branch gas circuit is provided with a second stop valve and a third electric gas valve;

[0014] The second branch gas line is provided with a third stop valve and a fourth electric gas valve;

[0015] The third branch gas path extends out of the box and is used to be connected to the gas cylinder;

[0016] The first stop valve, the second stop valve and the third stop valve are arranged outside the box;

[0017] The third branch gas line is provided with a fifth electric valve and a spiral gas pipe; a quick interface is provided at the tail of the spiral gas pipe for connecting with the gas cylinder to be processed.

[0018] The first flow controller, the second flow controller, and the first to fifth electric gas valves are all connected to the control panel.

[0019] Furthermore, there are four gas cylinder cabinets arranged side by side, and there are four third branch gas circuits.

[0020] Furthermore, the gas cylinder cabinet is a spliced ​​structure, with a brake roller at the bottom and a gas cylinder slot at the top. A heating sleeve is provided inside the gas cylinder slot for wrapping the gas cylinder for heating.

[0021] Furthermore, the box body is provided with a cabinet door with a handle.

[0022] Furthermore, movable rollers are provided at the bottom of the box.

[0023] Furthermore, a heat dissipation plate is provided on the side wall of the box body.

[0024] The advantages of the utility model are: the utility model can quickly obtain a mixed gas of a specific value level and transfer it to the gas cylinder to be processed, which can greatly reduce the preparation amount of the mixed gas in the standard gas production process, reduce labor costs and reduce the material cost of the gas source. At the same time, the device can also accelerate the time for the inner wall of the gas cylinder to be adsorbed and saturated, and increase work efficiency. At the same time, the automation of the gas transfer and gas release process also reduces the potential possibility of manual operation errors and increases the safety of the operation process. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The present invention will be further described below in conjunction with the embodiments with reference to the accompanying drawings.

[0026] Figure 1 It is a schematic diagram of the overall appearance of the utility model.

[0027] Figure 2 It is a schematic diagram of the internal structure principle of the device of the utility model.

[0028] Reference numerals:

[0029] 1-box, 2-gas cylinder cabinet, 3-first air inlet, 4-second air inlet, 5-first stop valve, 6-second stop valve, 7-third stop valve, 8-control panel, 9-temperature control panel, 10-cabinet door handle, 11-heating plate, 12-roller, 13-separation cabinet, 14-gas cylinder slot, 15-heating sleeve, 16a-spiral air pipe, 16b-spiral air pipe, 16c-spiral air pipe, 16d-spiral air pipe, 17-pump body, 18-first pressure gauge, 19-second pressure gauge, 20-third pressure gauge, 21-first flow controller, 22-second flow controller, V1-first electric gas valve, V2-second electric gas valve, V3-third electric gas valve, V4-fourth electric gas valve, V5-fifth electric gas valve, V6-sixth electric gas valve, V7-seventh electric gas valve, V8-eighth electric gas valve. DETAILED DESCRIPTION

[0030] like Figure 1 and Figure 2 As shown, a gas cylinder inner wall adsorption saturation device includes: a box body 1 and a gas cylinder cabinet 2, a first air inlet 3 and a second air inlet 4 are provided on the side of the box body 1, which are used to connect the component raw material gas and the diluted carrier gas respectively, and the gas paths at the top of the box body 1 and the gas cylinder cabinet 2 are connected.

[0031] A pump body is arranged in the box body 1, and a control panel 8 and a temperature control panel 9 are arranged on the front end wall of the box body 1;

[0032] A first gas pipeline and a second gas pipeline are arranged in the box body 1; a first air inlet 3 of the first gas pipeline and a second air inlet 4 of the second gas pipeline are arranged on the side wall of the box body 1 respectively;

[0033] The first gas pipeline is provided with a first pressure gauge 18, a first flow controller 21, and a first electric gas valve V1 in sequence;

[0034] The second gas pipeline is provided with a second gas pressure gauge 19, a second flow controller 22, and a second electric gas valve V2 in sequence;

[0035] The first gas pipeline and the second gas pipeline intersect and merge into a third gas pipeline, and the third gas pipeline is provided with a first stop valve 5 and a third gas pressure gauge 20;

[0036] The third gas pipeline is provided with a first branch gas path for exhausting gas, a second branch gas path for connecting to the pump body 17, and four third branch gas paths for connecting to gas cylinders;

[0037] The first branch gas line is provided with a second stop valve 6 and a third electric gas valve V3;

[0038] The second branch gas line is provided with a third stop valve 7 and a fourth electric gas valve V4;

[0039] The third gas path extends out of the box body 1 and is used to connect to the gas cylinder;

[0040] The first stop valve 5, the second stop valve 6 and the third stop valve 7 are arranged outside the box body 1;

[0041] The first third branch gas line is provided with a fifth electric valve V5 and a spiral gas pipe 16a;

[0042] The second third branch gas line is provided with a sixth electric valve V6 and a spiral gas pipe 16b;

[0043] The third third branch gas line is provided with a seventh electric valve V7 and a spiral gas pipe 16c;

[0044] The fourth third branch gas line is provided with an eighth electric valve V8 and a spiral gas pipe 16d;

[0045] The spiral air tube is a one-eighth inch air tube with a spring-like spiral structure, which can be compressed and stretched according to the height of the gas cylinder. The tails of the spiral air tubes 16a, 16b, 16c, and 16d are all provided with quick interfaces for connecting to the gas cylinders to be processed (not shown).

[0046] The first flow controller 21 , the second flow controller 22 , and the first to eighth electric valves V1 to V8 are all connected to the control panel 8 .

[0047] The first stop valve 5, the second stop valve 6 and the third stop valve 7 are arranged above the box body 1 to control the flow of gas in the gas path. A control panel 8 and a temperature control panel 9 are arranged at the front end of the box body 1, a handle 10 is arranged at the lower end to open the lower cabinet door, a heat sink 11 is arranged on the side, and a brake roller 12 is arranged at the bottom to facilitate the movement and fixation of the device.

[0048] The gas cylinder cabinet 2 is a splicing structure, with a separation cabinet 13, and a brake roller 12 at the bottom, which can be moved to form a gas cylinder slot 14 to facilitate the placement of large-volume gas cylinders. A heating sleeve 15 is provided inside the gas cylinder slot 14 to heat the gas cylinder through the temperature control panel 9.

[0049] The switch and gas flow of the electric gas valve can be set through the control panel 8.

[0050] Embodiment 1:

[0051] When it is necessary to dilute the component raw gas with a diluted carrier gas to obtain a mixed gas for the inner wall adsorption operation on the gas cylinder to be treated. The gas inlet 3 is connected to the component raw gas, and its concentration should be greater than the concentration of the standard gas to be filled. The gas pressure in the bottle is monitored by the first barometer 18. The gas inlet 4 is connected to the diluted carrier gas, and the gas pressure in the bottle is monitored by the second barometer 19. When the pressure displayed by these two barometers is lower than the expected value, such as lower than 1Mpa, the corresponding raw gas cylinder should be replaced. The gas flow rate of the first flow controller 21 and the second flow controller 22 are set according to the concentration of the standard gas to be filled. At the same time, the gas cylinder to be treated needs to be placed in the gas cylinder slot 14. When the volume of the gas cylinder is large, the separation cabinet 13 can be moved out, and then the gas cylinder is moved into the gas cylinder slot, and then the separation cabinet 13 is spliced ​​according to the original state.

[0052] The gas cylinder is pre-treated for the adsorption process, that is, the pipeline of the device is vacuumed. If the gas cylinder to be treated has been vacuumed, after the connection preparation is carried out according to the above process, the first stop valve 5, the second stop valve 6, and the third stop valve 7 are opened, and the third electric gas valve V3 is closed by the setting of the control panel 8, and the remaining electric gas valves are opened. The pump body 17 is opened to vacuum the gas in the gas circuit, and the display value of the third pressure gauge 20 is observed. When the pressure display is lower than the expected value, such as lower than 10Pa, all electric gas valves are closed by the setting of the control panel 8. The bottle valve of the gas source and the bottle valve of the gas cylinder to be treated are opened, and then the gas filling circulation time is input on the control panel 8, which is also the switching time of the electric gas valve. At this time, the automatic operation of the adsorption of the inner wall of the gas cylinder can be performed through the control panel 8.

[0053] According to the setting, open the electric valve V1 and the electric valve V2 at the same time, and then open the third valve V3. Close the third valve V3 according to the set time (which can be set to 10s-30s). At this time, the flow displayed by the first flow controller 18 and the second flow controller 19 has reached stability. Then open the electric valve V8. At this time, the component raw material gas flows from the air inlet 3 into the gas cylinder connected to the spiral air pipe 16d, and the diluted carrier gas flows from the air inlet 4 into the gas cylinder connected to the spiral air pipe 16d.

[0054] According to the set switching time of the electric gas valve, close the electric gas valve V8, and then open the third electric gas valve V3. According to the set time (which can be set to 10s-30s), close the third electric gas valve V3. At this time, the flow displayed by the first flow controller 18 and the second flow controller 19 has reached stability, and then open the seventh electric gas valve V7. At this time, the component raw material gas flows from the gas inlet 3 into the gas cylinder connected to the spiral gas pipe 16c, and the diluted carrier gas flows from the gas inlet 4 into the gas cylinder connected to the spiral gas pipe 16c.

[0055] According to the set switching time of the electric gas valve, the seventh electric gas valve V7 is closed, and then the third electric gas valve V3 is opened. According to the set time (which can be set to 10s-30s), the third electric gas valve V3 is closed. At this time, the flow displayed by the first flow controller 18 and the second flow controller 19 has reached stability, and then the sixth electric gas valve V6 is opened. At this time, the component raw material gas flows from the gas inlet 3 into the gas cylinder connected to the spiral gas pipe 16b, and the diluted carrier gas flows from the gas inlet 4 into the gas cylinder connected to the spiral gas pipe 16b.

[0056] According to the set switching time of the electric gas valve, the sixth electric gas valve V6 is closed, and then the third electric gas valve V3 is opened. According to the set time (which can be set to 10s-30s), the third electric gas valve V3 is closed. At this time, the flow displayed by the first flow controller 18 and the second flow controller 19 has reached stability, and then the fifth electric gas valve V5 is opened. At this time, the component raw gas flows from the gas inlet 3 into the gas cylinder connected to the spiral gas pipe 16a, and the diluted carrier gas flows from the gas inlet 4 into the gas cylinder connected to the spiral gas pipe 16a.

[0057] According to the set switching time of the electric gas valve, close the fifth electric gas valve V5, and then close the first electric gas valve V1 and the second electric gas valve V2 at the same time. At this time, the component raw material gas and the diluted carrier gas have been transferred to the gas cylinder to be processed according to the required amount. Open the fourth electric gas valve V4 to vacuum the pipeline. After a period of time, close the fourth electric gas valve V4, and then close the first stop valve 5.

[0058] When the gas cylinder to be processed has completed the adsorption operation, the amount of gas required for the operation is relatively small. At this time, the cylinder pressure in the gas cylinder is only about 0.5Mpa. The gas cylinder can be heated according to the needs of the target standard gas component to accelerate the saturation time of adsorption. The heating sleeve 15 can be set to maintain a specific temperature value for a certain period of time through the temperature control panel 9, which can generally be set to 50-80°C. At this time, the adsorption of the component gas by the inner wall of the gas cylinder has reached saturation, and then it is reduced to room temperature, and the residual gas in the gas cylinder is vacuumed. The switching time of the electric valve in the exhaust process is pre-set. Generally, the setting of the 8L gas cylinder with a residual of 0.5MPa is about 1min. The residual pressure in the bottle can be pre-taken as 100Pa-2000pa. According to the setting, the fourth electric valve V4 is opened at this time, and then the eighth electric valve V8 is opened to vacuum the gas cylinder connected to the spiral gas pipe 16d; according to the set switching time of the electric valve, the eighth electric valve V8 is closed, and then the seventh electric valve V7 is opened to vacuum the gas cylinder connected to the spiral gas pipe 16c; according to the set electric valve According to the switching time of the electric gas valve, the seventh electric gas valve V7 is closed, and the sixth electric gas valve V6 is opened to evacuate the gas cylinder connected to the spiral gas tube 16b; according to the set switching time of the electric gas valve, the sixth electric gas valve V6 is closed, and the fifth electric gas valve V5 is opened to evacuate the gas cylinder connected to the spiral gas tube 16a; according to the set switching time of the electric gas valve, the fifth electric gas valve V5 is closed, and the fourth electric gas valve V4 is closed to complete the gas release operation in the bottle. After the operation is completed, the valves of all gas cylinders are closed.

[0059] Embodiment 2:

[0060] When only the component raw gas needs to be transferred to the gas cylinder to be treated for inner wall adsorption operation, the gas inlet 3 is connected to the component raw gas, and its concentration should be greater than the concentration of the standard gas to be filled. The gas pressure in the bottle is monitored by the first barometer 18, and the first flow controller 21 is set. The pipeline is vacuumed according to Example 1, and then the automatic operation of adsorption on the inner wall of the gas cylinder is performed through the control panel 8.

[0061] Open the first electric gas valve V1 and the third electric gas valve V3 according to the setting, close the third electric gas valve V3 after the value of the flow controller 18 stabilizes according to the set time, and then open the eighth electric gas valve V8. At this time, the component raw gas flows from the air inlet 3 into the gas cylinder connected to the spiral gas pipe 16d.

[0062] According to the set switching time of the electric gas valve, the eighth electric gas valve V8 is closed, and then the third electric gas valve V3 is opened. After a certain period of time, the third electric gas valve V3 is closed, and then the seventh electric gas valve V7 is opened. At this time, the component raw gas flows from the gas inlet 3 into the gas cylinder connected to the spiral gas pipe 16c.

[0063] According to the set switching time of the electric gas valve, the seventh electric gas valve V7 is closed, and then the third electric gas valve V3 is opened. After a certain period of time, the third electric gas valve V3 is closed, and then the sixth electric gas valve V6 is opened. At this time, the component raw gas flows from the gas inlet 3 into the gas cylinder connected to the spiral gas pipe 16b.

[0064] According to the set switching time of the electric gas valve, the sixth electric gas valve V6 is closed, and then the third electric gas valve V3 is opened. After a certain period of time, the third electric gas valve V3 is closed, and then the fifth electric gas valve V5 is opened. At this time, the component raw gas flows from the gas inlet 3 into the gas cylinder connected to the spiral gas pipe 16a.

[0065] According to the set switching time of the electric gas valve, close the fifth electric gas valve V5, and then close the first electric gas valve V1 and the second electric gas valve V2 at the same time. At this time, the component raw gas has been transferred to the gas cylinder to be processed according to the required amount. Open the fourth electric gas valve V4 to vacuum the pipeline. After a period of time, close the fourth electric gas valve V4, and then close the first stop valve 5.

[0066] According to the need, the automated operation of accelerating adsorption saturation can be carried out in accordance with Example 1.

[0067] Embodiment 3:

[0068] When the gas contained in the gas cylinder to be processed has not been completely discharged, the third electric gas valve V3 is opened through the setting of the control panel 8, and the other electric gas valves and all the stop valves are closed. Then the seventh electric gas valve V7 is opened, and the second stop valve 6 is opened. At this time, the residual gas in the gas cylinder connected to the spiral gas pipe 16d is discharged to the ventilation system. After the release is completed, the second stop valve 7 is closed, and then the eighth electric gas valve V8 is closed in sequence, and the seventh electric gas valve V7 is opened. At this time, the residual gas in the gas cylinder connected to the spiral gas pipe 16c is discharged to the ventilation system; then the seventh electric gas valve V7 is closed in sequence, and the sixth electric gas valve V6 is opened. At this time, the residual gas in the gas cylinder connected to the spiral gas pipe 16b is discharged to the ventilation system; then the sixth electric gas valve V6 is closed in sequence, and the fifth electric gas valve V5 is opened. At this time, the residual gas in the gas cylinder connected to the spiral gas pipe 16a is discharged to the ventilation system. When the residual gas in all gas cylinders has been discharged to the ventilation system, close the second stop valve 6, and open the eighth electric gas valve V8, the seventh electric gas valve V7, the sixth electric gas valve V6, the fifth electric gas valve V5, the fourth electric gas valve V4 at the same time, and then open the third stop valve 7. At this time, the pump body 17 performs vacuum treatment on all gas cylinders to be processed, observe the pressure indication of the third barometer 20, and end the vacuum operation when the pressure indication drops to the expected pressure.

[0069] Then, the automated operation of adsorption saturation in the bottle can be carried out according to the requirements in accordance with Example 1.

[0070] The utility model can quickly obtain a mixed gas of a specific value level and transfer it to the gas cylinder to be processed, which can greatly reduce the amount of mixed gas prepared in the standard gas production process, reduce labor costs and reduce the material cost of the gas source. At the same time, the device can also accelerate the time for the inner wall of the gas cylinder to be adsorbed and saturated, thereby increasing work efficiency. At the same time, the automation of the gas transfer and gas release process also reduces the potential possibility of manual operation errors and increases the safety of the operation process.

[0071] The above embodiments and drawings do not limit the product form and style of the present utility model. Any appropriate changes or modifications made by ordinary technicians in the relevant technical field should be deemed to be within the patent scope of the present utility model.

Claims

1. A gas cylinder inner wall adsorption saturation device, characterized in that: include: A box and one or more gas cylinder cabinets connected to it for placing gas cylinders; A pump body is arranged in the box body, and a control panel and a temperature control panel are arranged on the front end wall of the box body; A first gas pipeline and a second gas pipeline are arranged in the box body; a first air inlet of the first gas pipeline and a second air inlet of the second gas pipeline are respectively arranged on the side wall of the box body; The first gas pipeline is provided with a first pressure gauge, a first flow controller, and a first electric gas valve in sequence; The second gas pipeline is provided with a second pressure gauge, a second flow controller, and a second electric gas valve in sequence; The first gas pipeline and the second gas pipeline intersect and merge into a third gas pipeline, and the third gas pipeline is provided with a first stop valve and a third gas pressure gauge; The third gas pipeline is provided with a first branch gas path for exhausting gas, a second branch gas path for connecting to the pump body, and one or more third branch gas paths for connecting to gas cylinders; The first branch gas circuit is provided with a second stop valve and a third electric gas valve; The second branch gas line is provided with a third stop valve and a fourth electric gas valve; The third branch gas path extends out of the box and is used to be connected to the gas cylinder; The first stop valve, the second stop valve and the third stop valve are arranged outside the box; The third branch gas line is provided with a fifth electric valve and a spiral gas pipe; a quick interface is provided at the tail of the spiral gas pipe for connecting with the gas cylinder to be processed; The first flow controller, the second flow controller, and the first to fifth electric gas valves are all connected to the control panel.

2. A gas cylinder inner wall adsorption saturation device as claimed in claim 1, characterized in that: There are four gas cylinder cabinets arranged side by side, and there are four third branch gas circuits.

3. A gas cylinder inner wall adsorption saturation device as claimed in claim 2, characterized in that: The gas cylinder cabinet is a spliced ​​structure, with a brake roller provided at the bottom and a gas cylinder slot formed at the top. A heating sleeve is provided inside the gas cylinder slot for wrapping the gas cylinder for heating.

4. A gas cylinder inner wall adsorption saturation device as claimed in claim 1, characterized in that: The box body is provided with a cabinet door with a handle.

5. A gas cylinder inner wall adsorption saturation device as claimed in claim 1, characterized in that: The bottom of the box body is provided with movable rollers.

6. A gas cylinder inner wall adsorption saturation device as claimed in claim 1, characterized in that: The side wall of the box body is provided with a heat dissipation plate.

Citation Information

Cited By

  • Formaldehyde bottled standard gas preparation method and system

    CN120586768A

  • Preparation method and system of formaldehyde bottled standard gas

    CN120586768B