FLNG (floating liquefied natural gas) output barge

By designing FLNG outbound barges, combining rigid and flexible LNG conveying pipelines, efficient connection between FLNG and LNG transport ships is achieved, solving the problems of strict environmental requirements and low efficiency in the existing technology, and ensuring safety and efficiency, and control LNG leakage under special circumstances.

CN222117054UActive Publication Date: 2024-12-06DALIAN SHIPBUILDING INDUSTRY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323410339.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-14
Publication Date
2024-12-06
Estimated Expiration
2033-12-14

AI Technical Summary

Technical Problem

The existing FLNG export methods have problems such as strict environmental requirements, low efficiency, low temperature and immature long-distance hose delivery technology. Especially in the development of my country's deep-sea natural gas in the South China Sea, it is difficult to achieve safe and efficient LNG export.

Method used

A FLNG export barge was designed, using a square barge main body, with an anti-collision chamber and a service platform, combining rigid and flexible LNG conveying pipelines, and connected to the flexible LNG conveying pipelines through a quick release device, and equipped with a pipe grabbing crane and inflatable protection. The sideways and mooring system ensures a safe and reliable transport connection.

Benefits of technology

The efficient LNG connection is realized, combining the advantages of rigid and flexible pipelines, ensuring the safety and efficiency of external transport operations. The stationary position of the ship is ensured through mooring tension monitoring and dynamic positioning system, and the LNG leakage is controlled. to adapt to special conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222117054U_ABST
    Figure CN222117054U_ABST
Patent Text Reader

Abstract

A barge body is located between FLNG and an LNG ship, anti-collision cabins are arranged below a barge body deck and at the bow end and the stern end, service platforms are symmetrically fixed to the upper portions of the anti-collision cabins, each service platform is composed of a straight section and a bent section, the bent sections are arranged on the outer side and partially extend out of the barge body, and the outer sides of the straight sections extend out of the barge body. The curved surface radius of the bending section is not smaller than the minimum bending radius of the flexible LNG conveying pipeline; the middle of the rigid LNG conveying pipeline is located below a deck of the barge body, the two ends of the rigid LNG conveying pipeline upwards penetrate through the deck to climb to the service platform and are connected with the flexible LNG conveying pipeline through a quick release device, and the other end of the flexible LNG conveying pipeline is connected with an LNG ship or FLNG through a quick connector. According to the invention, efficient tandem transportation of the LNG between the FLNG and the LNG transport ship is realized, and a rigid LNG pipeline and flexible LNG pipeline combined transportation mode is innovatively provided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of FLNG, and in particular relates to an FLNG export barge. Background Art

[0002] my country's South China Sea has a huge amount of deepwater oil and gas geological resources, of which natural gas accounts for about 83%. The traditional offshore gas field development model is pipeline transportation, which faces difficulties such as long offshore distance, large submarine pipeline investment, and prominent flow safety issues. In addition, it also needs to face the downstream demand for the natural gas market. The floating liquefied natural gas production, storage and unloading device (Floating Liquid Natural Gas, FLNG) is a new type of marine engineering equipment. The device integrates offshore natural gas processing, liquefaction, storage and loading and unloading. It has the characteristics of short construction period, flexible mining, independent development, recyclability and transportability, and no need for pipeline transportation. It is very suitable for the development of deep-sea natural gas resources [1].

[0003] [1] Xie Bin, Yu Xichong, Han Xuliang, et al. Current status of FLNG research and its application prospects in the development of deep-sea gas fields in the South China Sea [J]. China Offshore Oil and Gas, 2017, 29(2).

[0004] As an emerging offshore floating structure, FLNG faces major technical challenges in its external transmission system. [2]

[0005] [2] ZHAO Wenhua, YANG Jianmin, HU Zhiqiang. RRecent developments on thehydrodynamics of floating liquid natural gas(FLNG)[J]. Ocean Engineering, 2011, 38 (14 / 15): 1555-1567.

[0006] At present, there are two main ways to transport FLNG and LNG, namely, side-by-side transport and series transport:

[0007] When using the side-by-side export method, the LNG ship and FLNG are moored side by side, connected by mooring cables, and fenders are used to prevent the two ships from colliding with each other. This export method has strict environmental requirements and can only ensure safety when the significant wave height is no more than 2.5m. This sea condition is rare in the South my country Sea, and the export window period is short and the efficiency is low.

[0008] When using tandem transport, the bow of the LNG ship is connected to the stern of the FLNG through mooring cables, and LNG is transported through long-distance cryogenic liquid pipelines. Since the temperature of LNG is as low as -160°C when it is transported, the long-distance hose transportation technology is not mature yet and is still in the research stage; at the same time, the design of long-distance rigid transmission pipelines is difficult. Summary of the invention

[0009] In order to solve the above problems, the present invention proposes an FLNG export barge, the technical solution adopted by the present invention is:

[0010] A FLNG export barge comprises a square barge body floating on the sea surface, the barge body is located between the FLNG and the LNG ship, and collision cabins are arranged at the bow and stern ends below the deck of the barge body, and a service platform is fixed above the collision cabin. The two service platforms are symmetrically arranged, and the service platform consists of a straight section and a curved section. The curved section is arranged on the outside and partially extends out of the barge body, and the curved radius of the curved section is not less than the minimum bending radius of the flexible LNG transmission pipeline; the middle part of the rigid LNG transmission pipeline is located below the deck of the barge body, and both ends pass through the deck upward to climb to the service platform, and are connected to the flexible LNG transmission pipeline through a quick release device, and the other end of the flexible LNG transmission pipeline is connected to the LNG ship or FLNG through a quick connector.

[0011] Starting from the quick release device, the length of the flexible LNG transmission pipeline is not less than 60 meters. A pipe grab crane is installed on the service platform and a living building is installed in the middle of the barge body.

[0012] In the above-mentioned FLNG export barge, further, the pipe grabbing crane is an explosion-proof crane.

[0013] In the above-mentioned FLNG export barge, further, the bottom of the service platform is welded to the barge deck, and the top surface is covered with a rubber layer.

[0014] In the above-mentioned FLNG export barge, further, the service platform is a truss structure, which is supported by steel pipes above the deck at the bow and stern of the barge.

[0015] The above-mentioned FLNG export barge, further, is provided with inflatable fenders and a mooring system on both sides of the bow and stern of the barge body. The mooring system has a mooring winch, and a cable is wound around the mooring winch. The cable is connected to the FLNG and the LNG transport ship to form a mooring configuration of three ships in series: FLNG, the barge of the present invention, and the LNG transport ship. The cable tension is monitored by a mooring tension monitoring system. The fenders are usually stored on the deck and lowered into the seawater when the barge is moored with the LNG transport ship and the FLNG.

[0016] In the above-mentioned FLNG export barge, further, the length of the curved section of the service platform extending out of the barge body is L1, and the diameter of the inflatable fender L2 is greater than 1.6L1.

[0017] The above-mentioned FLNG export barge further has four mooring winches, two of which are placed at the bow and two at the stern, and the braking force of each winch is not less than 250t.

[0018] The above-mentioned FLNG export barge, further, has a thruster disposed at each of the four corners of the barge body.

[0019] In the above-mentioned FLNG export barge, further, there is a complete watertight bulkhead between the collision compartment and the barge body.

[0020] In the above-mentioned FLNG export barge, further, the releasable length of the cable on the mooring winch is not less than 100 meters.

[0021] The beneficial effects of the present invention are:

[0022] 1. The present invention realizes efficient serial transmission of LNG between FLNG and LNG transport ship.

[0023] 2. The present invention sets the rigid LNG transmission pipeline in the barge hull and the flexible LNG pipeline at the bow and stern of the barge, innovatively proposing an external transmission method combining the rigid LNG pipeline and the flexible LNG pipeline, which is different from the existing pure flexible hose external transmission (still in the research stage) and pure rigid pipeline external transmission, and opens up a new direction for LNG external transmission.

[0024] 3. The present invention is provided with a mooring tension monitoring system and a dynamic positioning system, the combination of which can ensure that the positions of the FLNG, LNG transport ship and the barge of the present invention are relatively fixed, thereby ensuring the safety of the external transmission operation.

[0025] 4. The present invention is also provided with anti-collision facilities and emergency quick release devices, which can control the leakage of LNG to a minimum under special emergency conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a side view structural schematic diagram of the present invention;

[0027] Figure 2 It is a schematic diagram of the top view of the structure of the present invention;

[0028] Figure 3 It is a schematic diagram of the storage of flexible LNG transmission pipeline (top view);

[0029] Figure 4 It is a schematic diagram of the side view structure of the LNG service platform and the inflatable fender;

[0030] Figure 5 This is a top view of the LNG service platform and the inflatable fender structure;

[0031] Figure 6 This is a schematic diagram of the barge and FLNG maintaining a safe distance;

[0032] Figure 7 This is a schematic diagram of the safe distance between the LNG carrier and the barge;

[0033] Among them: 1-barge body, 2-rigid LNG transmission pipeline, 3-quick release device, 4-flexible LNG transmission pipeline, 5-pipe grab crane, 6-service platform, 7-inflatable fender, 8-mooring winch, 9-thruster, 10-collision compartment, 11-living building, 12-quick connector, 13-rubber layer, A-FLNG, B-LNG transport ship, C-sea surface. DETAILED DESCRIPTION

[0034] The present invention will be further described in conjunction with the accompanying drawings.

[0035] like Figure 1 , 2 As shown, an FLNG export barge has a square barge body floating on the sea surface, the barge body is located between the FLNG and the LNG ship, and collision cabins are arranged at the bow and stern ends below the deck of the barge body, and a service platform is fixed above the collision cabin. The two service platforms are symmetrically arranged, and the service platform consists of a straight section and a curved section. The curved section is arranged on the outside and partially extends out of the barge body, and the curved radius of the curved section is not less than the minimum bending radius of the flexible LNG transmission pipeline; the middle part of the rigid LNG transmission pipeline is located below the deck of the barge body, and both ends pass through the deck upward to climb to the service platform, and are connected to the flexible LNG transmission pipeline through a quick release device.

[0036] Starting from the quick release device, the length of the flexible LNG transmission pipeline is not less than 60 meters. A pipe grab crane is installed on the service platform and a living building is installed in the middle of the barge body.

[0037] There is a complete watertight bulkhead between the collision compartment and the main hull, which extends from the bottom plate to the main deck and to the side plates at both ends of the hull. The internal structure of the collision compartment is designed to enable the compartment to absorb 30,000J of impact energy. In the event of misoperation by personnel or sudden emergency at sea, the main hull will not be damaged after the collision compartment absorbs the impact energy.

[0038] The main body of the barge has independent tightness and buoyancy, and can still float on the sea and maintain stability after the collision compartment is broken.

[0039] The living building is located in the middle of the main deck of the barge. The living building is mainly for service places such as personnel cabins, dining rooms and kitchens. At the same time, the cab is located on the top floor of the living building, with the best view, and can observe the operation of the bow and stern hoses and the conditions of the FLNG and LNG transport ships. If a problem is found, the barge of the present invention can be operated in the first time, thereby avoiding the occurrence of accidents or reducing the consequences of accidents to a certain extent.

[0040] The rigid LNG pipeline is located in a special compartment in the main body of the barge, and passes through the main deck from the main hull, extends upward to the LNG service platform, and is connected to the quick release device. Most of the rigid LNG pipeline is protected by the main hull, and the bow and stern ends are also within the vertical range of the main hull, and do not enter the bow and stern collision compartments. At the same time, the distance between the rigid LNG pipeline and the living building at any position should be no less than 4 meters to prevent the explosion caused by accidental LNG leakage from affecting the safety of people in the living building.

[0041] The quick release device is located on the bow and stern LNG service platform, within the vertical range of the main hull, connecting the rigid LNG delivery pipeline and the flexible LNG delivery pipeline. When an emergency occurs, the quick release device can quickly cut off the connection between the rigid LNG delivery pipeline and the flexible LNG delivery pipeline, ensuring that the LNG leakage at the quick release device is almost zero, and at the same time locking the LNG that has not flowed out of the pipeline in the pipeline.

[0042] The quick release device can be inspected and maintained by staff on the LNG service platform, and it must be ensured that it can be used normally before each export operation.

[0043] The flexible LNG delivery pipeline is usually stored in the horizontal area of ​​the bow and stern LNG service platform, one end of which is connected to the quick release device and the other end has a quick connector, such as Figure 3 When storing, the bends of the flexible LNG transmission pipeline must meet the minimum bending radius requirements of the pipeline to avoid damage to the pipeline.

[0044] When the flexible LNG transmission pipeline is used for LNG export operation, the quick connector end of the flexible LNG transmission pipeline is lifted by a pipe grab crane and transported to the interface on the FLNG and the interface on the LNG transport ship respectively to complete the connection of the LNG export system.

[0045] The length of the flexible LNG transmission pipeline from the quick release device shall not be less than 60 meters to ensure the safe distance between the barge and FLNG and between the barge and LNG transport ship.

[0046] The pipe grab crane is located on the LNG service platform, and the crane cylinder is close to the bow and stern of the barge, so as to obtain a larger outreach and make it easier to transport the quick connector end of the flexible LNG transmission pipeline to the FLNG and the LNG carrier.

[0047] The pipe grab crane should have sufficient lifting height and operating radius to transport the quick connector of the flexible LNG transmission pipeline to the FLNG and the deck of the LNG carrier.

[0048] The pipe grab crane should be an explosion-proof crane and have the ability to operate safely in Class 0 hazardous areas.

[0049] The LNG service platform is a steel platform, the bottom of which is welded to the barge deck, and the top surface is covered with a rubber layer to prevent the steel plate from contacting the surface of the flexible LNG pipeline and causing wear. The top is divided into two parts: a flat surface and a curved surface. The flat surface is used to store the flexible LNG pipeline, and the bending radius of the curved surface is not less than the minimum bending radius of the flexible LNG pipeline, to ensure that the flexible LNG pipeline does not produce hard bends when LNG is transported, and to ensure the safety of the flexible LNG pipeline. Figure 4 , 5 shown.

[0050] The inflatable fenders are usually stored at the bow and stern of the deck. When the barge is in the preparation stage for external transport, the fenders are placed in the seawater. When the barge collides slightly with the FLNG and LNG carrier due to improper operation, the fenders absorb the impact energy generated by the collision to ensure the safety of the barge, FLNG and LNG carrier.

[0051] The diameter of the inflatable fender should be at least 1.6 times the length of the LNG service platform extending from the bow and stern of the barge, that is, L1≥1.6L2.

[0052] The mooring system includes mooring winches, mooring ropes and fairleads.

[0053] There are four mooring winches, two at the bow and two at the stern. The braking force of each winch is not less than 250t. The mooring winch is equipped with a mooring rope tension monitoring device. When the mooring rope tension is zero, an audible and visual alarm is issued locally and in the cab. The mooring winch is equipped with a rope abandonment device. When the mooring rope tension reaches 100% of the mooring winch braking force, the rope abandonment device is activated, the mooring winch brake is fully opened, and all mooring ropes are freely released to avoid the danger of mooring rope breakage or mooring winch damage.

[0054] The mooring rope is wound on the drum of the mooring winch, and the release length is not less than 100 meters. When the barge, FLNG and LNG carrier are in place, the barge throws the guide rope part of the mooring rope onto the FLNG or LNG carrier, and the staff tightens the mooring rope at the FLNG end or LNG carrier end, and then the winch retracts the rope to tighten the rope, thereby achieving the purpose of tandem mooring.

[0055] The fairlead holes are located at the bow and stern cover plates of the barge and are used to change the direction of the mooring cables to adapt to different mooring positions on FLNG and LNG carriers.

[0056] There are four thrusters, which are installed at the four corners of the main hull of the barge. Damage to the bow and stern anti-collision tanks will not affect the use of the thrusters. The thrusters can provide power for the barge, allowing the barge to travel on the sea. At the same time, they can also play a role in maintaining the distance between ships during tandem mooring.

[0057] When FLNG needs to be transported out, the barge of the present invention travels to the FLNG and lowers the inflatable fender to the sea surface. Since the diameter of the inflatable fender is at least 1.6 times the length of the LNG service platform extending from the bow and stern of the barge, a slight collision between the barge and the FLNG or LNG transport ship will not damage the LNG service platform.

[0058] The barge propeller is turned on and it moves to the position near the tail of FLNG. The staff on the barge throws the mooring rope in the mooring system onto the FLNG, and the staff on the FLNG fastens the mooring rope to the mooring pile on the FLNG. Then the staff on the barge starts the mooring winch in the mooring system, and the mooring winch retracts the rope until the mooring rope is tightened.

[0059] The pipe-grabbing crane lifts the quick connector at the head of the flexible LNG transmission pipeline and delivers it to the FLNG. The staff on the FLNG connects the quick connector to the FLNG's external transmission pipeline.

[0060] At this time, the barge thrusters start to push the barge away from the FLNG, and the mooring winch of the mooring system slowly releases the mooring rope until there is a sufficient safety distance between the barge and the FLNG. Figure 6 After that, the thruster is kept on to keep the mooring rope of the mooring system in a certain tension. The mooring winch starts to monitor the tension of the mooring rope. If the tension of the mooring rope becomes 0, it means that the barge is approaching the FLNG and the safe distance between the two cannot be guaranteed. In this case, the thruster power needs to be increased immediately to ensure that the distance between the barge and the FLNG returns to a safe distance.

[0061] After the barge and FLNG are stabilized, the LNG carrier moves to the stern area of ​​the barge. The staff on the barge throws the mooring rope in the mooring system to the LNG carrier, and the staff on the LNG carrier fastens the mooring rope to the mooring pile on the LNG carrier. Then the staff on the barge starts the mooring winch in the mooring system, and the mooring winch retracts the rope until the mooring rope is tightened.

[0062] The pipe-grabbing crane lifts the quick connector at the head of the flexible LNG transmission pipeline and delivers it to the LNG carrier. The staff on the LNG carrier connects the quick connector to the external transmission pipeline of the LNG carrier.

[0063] At this time, the propeller of the LNG carrier is turned on to drive the LNG carrier away from the barge. At the same time, the mooring winch of the mooring system slowly releases the mooring rope until there is a sufficient safety distance between the LNG carrier and the barge. Figure 7 After that, the propeller of the LNG carrier is kept on, so that the mooring rope of the mooring system always maintains a certain tension. The mooring winch starts to monitor the tension of the mooring rope. If the tension of the mooring rope becomes 0, it means that the LNG carrier is approaching the barge and the safe distance between the two cannot be guaranteed. In this case, the power of the propeller of the LNG carrier needs to be increased immediately to ensure that the distance between the LNG carrier and the barge returns to a safe distance.

[0064] At this point, all preparations for the tandem export of LNG from FLNG to LNG transport ships have been completed and the export operation can begin.

[0065] During the entire external transmission process, the mooring winch of the mooring system constantly monitors the tension of the mooring cable. When the tension of the mooring cable is 0, it proves that the distance between the barge and FLNG or the barge and LNG transport ship at the cable is getting close to each other, bringing a collision risk. It is necessary to immediately adjust the position of the LNG transport ship or barge to avoid the collision risk.

[0066] If the FLNG and barge or the LNG transport ship and barge collide due to human error or sudden strong winds and waves, the barge's bow and stern collision compartments will be damaged. At this time, the quick release device between the rigid LNG delivery pipeline and the flexible LNG delivery pipeline is immediately activated to seal the LNG in the rigid LNG delivery pipeline and the flexible LNG delivery pipeline to avoid LNG leakage caused by the collision. Since the quick release device, rigid LNG delivery pipeline, thruster, and living building are all located outside the bow and stern collision compartments and inside the main hull, when the bow and stern collision compartments are broken, the quick release device, rigid LNG delivery pipeline, thruster, and living building are still safe.

[0067] At this time, after the LNG tanker leaves this area, the barge should start the thruster and leave this area.

Claims

1. A FLNG export barge, characterized in that: There is a square barge body floating on the sea surface, which is located between the FLNG and the LNG ship. Under the deck of the barge body, collision cabins are arranged at the bow and stern ends, and a service platform is fixed above the collision cabin. The two service platforms are symmetrically arranged, and the service platform consists of a straight section and a curved section. The curved section is arranged on the outside and partially protrudes out of the barge body. The curved radius of the curved section is not less than the minimum bending radius of the flexible LNG transmission pipeline; the middle part of the rigid LNG transmission pipeline is located under the deck of the barge body, and both ends pass through the deck upward to the service platform and are connected to the flexible LNG transmission pipeline through a quick release device. The other end of the flexible LNG transmission pipeline is connected to the LNG ship or FLNG through a quick connector; from the quick release device, the length of the flexible LNG transmission pipeline is not less than 60 meters, a pipe grab crane is arranged on the service platform, and a living building is arranged in the middle of the barge body.

2. The FLNG export barge according to claim 1, characterized in that: The pipe grab crane is an explosion-proof crane.

3. The FLNG export barge according to claim 1, characterized in that: The bottom of the service platform is welded to the barge deck and the top surface is covered with a rubber layer.

4. The FLNG export barge according to claim 1, characterized in that: The service platform is a truss structure, supported by steel pipes above the deck at the bow and stern of the barge.

5. The FLNG export barge according to claim 1, characterized in that: Inflatable fenders and mooring systems are also installed on the bow and stern of the barge body. The mooring system is equipped with a mooring winch with cables wrapped around it. The cables are connected to the FLNG and LNG transport ships, and the cable tension is monitored by a mooring tension monitoring system.

6. The FLNG export barge according to claim 5, characterized in that: The length of the curved section of the service platform extending out of the barge body is L1, and the diameter of the inflatable fender is L2>1.6L1.

7. The FLNG export barge according to claim 1, characterized in that: There are four mooring winches, two at the bow and two at the stern, and the braking force of each winch is not less than 250t.

8. The FLNG export barge according to claim 1, characterized in that: A thruster is provided at each of the four corners of the barge body.

9. The FLNG export barge according to claim 1, characterized in that: There is a complete watertight bulkhead between the collision compartment and the main body of the barge.

10. The FLNG export barge according to claim 1, characterized in that: The releasable length of the rope on the mooring winch shall not be less than 100 meters.