Leakage-proof device for oil exploitation pipeline

By designing splicing blocks and wedge surfaces at the interface of the oil extraction pipeline, equipped with sealing gaskets and leak-proof rings, the problem of oil leakage in the oil pipeline in the prior art is solved, and a tighter connection and better leak-proof effect is achieved.

CN222142311UActive Publication Date: 2024-12-10KARAMAY ZHONGSHENG MECHANIC CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420658675.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-12-10
Estimated Expiration
2034-04-02

AI Technical Summary

Technical Problem

The current oil production pipeline lacks effective leakage prevention devices, which leads to the potential for oil leakage at the pipeline connections, affecting the sealing effect and causing economic losses.

Method used

Design the splicing block and wedge surface at the pipe interface, and a leak-proof protection groove is installed on the splicing block, equipped with a sealing gasket and a sealing leakage ring, which enhances the sealing performance through the combination of the wedge surface fitting and sealing gasket.

Benefits of technology

It effectively reduces the risk of oil leakage at oil pipeline connections, improves sealing performance, and ensures the safe delivery of oil.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222142311U_ABST
    Figure CN222142311U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of petroleum pipelines, and particularly relates to a petroleum exploitation pipeline leakproof device which comprises a first pipeline and a second pipeline, a first splicing block is integrally formed at the end of the first pipeline, a second splicing block is integrally formed at the end of the second pipeline, and the first splicing block and the second splicing block are both provided with wedge-shaped faces matched with each other. The two wedge-shaped faces between the first pipeline and the second pipeline are meshed and matched with each other, and annular bodies are integrally formed on the side, located on the first splicing block, of the first pipeline and the side, located on the second splicing block, of the second pipeline. The splicing blocks are arranged at the joints between the pipelines, the wedge-shaped faces matched with each other are arranged on the splicing blocks, the wedge-shaped faces are meshed and matched during combination, meanwhile, the leakage-proof protection grooves are formed in the positions, on one sides of the splicing blocks, of the pipelines, and the sealing washers and the sealing leakage-proof rings are arranged at the positions of the leakage-proof protection grooves, so that the leakage-proof effect is perfect; the problem of oil leakage caused by imperfect leakage-proof effect of an oil exploitation pipeline at the present stage is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of oil pipelines, in particular to a leakage prevention device for oil production pipelines. Background Art

[0002] The oil pipeline is composed of oil pipes and their accessories, which are used to complete the tasks of oil loading and unloading and transportation. The pipes of the oil pipeline are generally steel pipes, which are connected into long-distance pipelines using connecting devices such as welding and flanges, and valves are used for opening and closing control and flow regulation.

[0003] The interfaces of oil pipelines are generally flanged, but the interfaces of oil pipelines lack anti-leakage protection structures, resulting in unsatisfactory sealing effects of the oil pipelines and hidden dangers of oil leakage. At present, the oil production pipelines lack effective anti-leakage devices, which makes the oil pipelines have hidden dangers of oil leakage when in use, resulting in certain economic losses. Therefore, the utility model proposes an anti-leakage device for oil production pipelines to solve this problem. Utility Model Content

[0004] 1. Technical issues to be resolved

[0005] In view of the deficiencies in the prior art, the utility model provides a leak-proof device for oil production pipelines. A splicing block is provided at the interface between the pipelines, and mutually matching wedge-shaped surfaces are provided on the splicing block. When assembled, the wedge-shaped surfaces bite and fit together. At the same time, a leak-proof protection groove is provided on one side of the splicing block of the pipeline, and a sealing gasket and a sealing leak-proof ring are provided at the leak-proof protection groove. The leak-proof effect is perfect, which solves the problem of imperfect leak-proof effect of oil production pipelines at the current stage, resulting in oil leakage.

[0006] (II) Technical solution

[0007] In order to achieve the above-mentioned purpose, the utility model specifically adopts the following technical solutions:

[0008] The invention discloses a leak-proof device for an oil production pipeline, comprising a pipeline 1 and a pipeline 2. The end of the pipeline 1 is integrally formed with a splicing block 1, and the end of the pipeline 2 is integrally formed with a splicing block 2. The splicing block 1 and the splicing block 2 are both provided with wedge-shaped surfaces that match each other. The two wedge-shaped surfaces between the pipeline 1 and the pipeline 2 are mutually engaged and matched. The pipeline 1 is located on one side of the splicing block 1, and the pipeline 2 is located on one side of the splicing block 2. Both the annular bodies are integrally formed with an annular body, and the annular bodies are provided with connecting flanges.

[0009] Furthermore, the connecting flange at one end of the pipeline abuts against the connecting flanges at the second ends of the pipeline, and mounting holes are provided on the connecting flanges.

[0010] Furthermore, the pipeline 1 located between the splicing block 1 and the annular body, and the pipeline 2 located between the splicing block 2 and the annular body are both provided with leak-proof protection grooves that cooperate with each other, and the two leak-proof protection grooves respectively penetrate to the outside of the pipeline 1 and the pipeline 2, and the leak-proof protection grooves of the pipeline 1 and the pipeline 2 are provided with sealing gaskets and sealing leak-proof rings, and the sealing gaskets and sealing leak-proof rings are distributed in the leak-proof protection grooves from the inside to the outside.

[0011] Furthermore, a protrusion is formed at the end of the first splicing block, and the protrusion is adapted to be fitted into a corresponding groove formed in the second splicing block.

[0012] Furthermore, the annular body and the connecting flange are integrally formed.

[0013] (III) Beneficial effects

[0014] Compared with the prior art, the utility model provides a leakage prevention device for oil production pipelines, which has the following features:

[0015] Beneficial effects:

[0016] The utility model forms a splicing block 1 integrally at the end of the first pipe, forms a splicing block 2 integrally at the end of the second pipe, and arranges mutually matching wedge-shaped surfaces at the connection between the splicing block 1 and the splicing block 2. The design of the wedge-shaped surfaces can make the connection between the first pipe and the second pipe tighter, thereby preventing oil leakage. Meanwhile, a leak-proof protection groove is arranged at the connection between the first pipe and the second pipe, and a sealing gasket and a sealing leak-proof ring are arranged at the leak-proof protection groove between the first pipe and the second pipe, thereby further playing the role of leak-proof protection of the device, preventing oil leakage, forming leak-proof protection, and solving the problem that the connection between the oil pipelines at the current stage is not well matched and thus causes oil leakage. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the structure of the utility model;

[0018] Figure 2 For this utility model Figure 1 A magnified view of the structure at center.

[0019] In the figure: 1. Pipeline 1; 2. Pipeline 2; 3. Joint block 1; 4. Wedge surface; 5. Joint block 2; 6. Leakage-proof protection groove; 7. Ring body; 8. Connecting flange; 9. Sealing gasket; 10. Sealing leak-proof ring. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] Example

[0022] like Figure 1 and Figure 2 As shown, an oil production pipeline leakage prevention device proposed in an embodiment of the utility model comprises a pipeline 1 and a pipeline 2, wherein a splicing block 1 3 is integrally formed at the end of the pipeline 1, and a splicing block 2 5 is integrally formed at the end of the pipeline 2. The arrangement of the splicing block 1 3 and the splicing block 2 5 facilitates the splicing and assembly between the pipeline 1 and the pipeline 2, and increases the tightness. The splicing block 1 3 and the splicing block 2 5 are both provided with wedge surfaces 4 that match each other. The two wedge surfaces 4 between the pipeline 1 and the pipeline 2 fit each other, and the wedge surfaces 4 can reduce the gap, so that the fit between the pipeline 1 and the pipeline 2 is tighter, and the possibility of oil leakage is reduced. The pipeline 1 is located on one side of the splicing block 1 3, and the pipeline 2 is located on one side of the splicing block 2 5. An annular body 7 is integrally formed, and a connecting flange 8 is arranged on the annular body 7. The arrangement of the connecting flange 8 facilitates the connection and fixation between the pipeline 1 and the pipeline 2. The connecting flange 8 is arranged on the annular body 7 to achieve the fixation of the connecting flange 8.

[0023] like Figure 2 As shown, in some embodiments, the connecting flange 8 at the end of pipeline 1 and the connecting flange 8 at the end of pipeline 2 2 abut against each other, and mounting holes are provided on the connecting flanges 8. The connecting flanges 8 between pipeline 1 1 and pipeline 2 2 abut against each other, and have strong tightness, which can prevent oil leakage and realize the connection and fixation between pipeline 1 1 and pipeline 2 2.

[0024] like Figure 2As shown, in some embodiments, the pipeline 1 is located between the splicing block 1 3 and the annular body 7, and the pipeline 2 is located between the splicing block 2 5 and the annular body 7. The two leak-proof protection grooves 6 are respectively penetrated to the outside of the pipeline 1 and the pipeline 2 2. The leak-proof protection grooves 6 of the pipeline 1 and the pipeline 2 are respectively penetrated to the outside of the pipeline 1 and the pipeline 2. The sealing gasket 9 and the sealing leak-proof ring 10 are arranged. By penetrating the two leak-proof protection grooves 6 to the outside of the pipeline 1 and the pipeline 2, the sealing gasket 9 and the sealing leak-proof ring 10 are facilitated. Assemble, the sealing gasket 9 and the sealing leak-proof ring 10 are distributed from the inside to the outside in the leak-proof protection groove 6, and the sealing performance of this matching method is good; it should be noted that by opening the leak-proof protection groove 6 on both the pipeline 1 1 and the pipeline 2 2, and arranging the sealing gasket 9 and the sealing leak-proof ring 10 at the leak-proof protection groove 6, the sealing gasket 9 and the sealing leak-proof ring 10 are distributed from the inside to the outside in the leak-proof protection groove 6, which can increase the tightness of the matching between the pipeline 1 1 and the pipeline 2 2, reduce the seepage of oil in the gap, and form a good leak-proof protection effect.

[0025] like Figure 2 As shown, in some embodiments, a protrusion is formed at the end of the splicing block 1 3, and the protrusion is adapted to the groove correspondingly opened in the splicing block 2 5; it should be noted that by providing a protrusion at the end of the splicing block 1 3, the setting of the protrusion and the groove can further increase the tight fitting effect between the splicing block 1 3 and the splicing block 2 5, and facilitate the bite connection between the splicing block 1 3 and the splicing block 2 5.

[0026] like Figure 2 As shown, in some embodiments, the annular body 7 and the connecting flange 8 are integrally formed, and the connecting flange 8 is integrally formed on the annular body 7, which has good stability.

[0027] The working principle and use steps of the utility model are as follows: before connecting the pipeline 1 and the pipeline 2, a sealing gasket 9 is placed in the leakproof protection groove 6 of the pipeline 1 or the pipeline 2, and then the sealing leakproof ring 10 is adapted to the outer side of the sealing gasket 9 to achieve the adaptation of the sealing gasket 9 and the sealing leakproof ring 10 at the leakproof protection groove 6, and then the end portions of the pipeline 1 and the pipeline 2 are spliced, so that the splicing block 1 3 is connected to the splicing block 2 5, and the wedge-shaped surfaces 4 between the splicing block 1 3 and the splicing block 2 5 are bite-fitted, so that the sealing gasket 9 and the sealing leakproof ring 10 extend to the other leakproof protection groove 6, and then the pipeline 1 and the pipeline 2 are connected and fixed through the connecting flange 8 between the pipeline 1 and the pipeline 2. When the oil pipeline is actually used, the connection gap can be reduced by the wedge-shaped surface 4 between the splicing block 1 3 and the splicing block 2 5 to prevent oil from seeping out. At the same time, a sealing gasket 9 and a sealing leakproof ring 10 are also arranged at the gap between the pipeline 1 and the pipeline 2 to further increase the leakproof protection effect and prevent oil from leaking out.

[0028] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A leak-proof device for a petroleum production pipeline, comprising a pipeline 1 (1) and a pipeline 2 (2), characterized in that: The end of the pipe one (1) is integrally formed with a splicing block one (3), and the end of the pipe two (2) is integrally formed with a splicing block two (5), and the splicing block one (3) and the splicing block two (5) are both provided with wedge-shaped surfaces (4) that match each other, and the two wedge-shaped surfaces (4) between the pipe one (1) and the pipe two (2) are mutually engaged and matched, and the pipe one (1) located on one side of the splicing block one (3) and the pipe two (2) located on one side of the splicing block two (5) are both integrally formed with an annular body (7), and the annular body (7) is provided with a connecting flange (8).

2. The oil production pipeline leakage prevention device according to claim 1 is characterized in that: The connecting flange (8) at the end of the pipeline one (1) and the connecting flange (8) at the end of the pipeline two (2) are butted against each other, and both connecting flanges (8) are provided with mounting holes.

3. The oil production pipeline leakage prevention device according to claim 1 is characterized in that: The pipeline one (1) is located between the splicing block one (3) and the annular body (7), and the pipeline two (2) is located between the splicing block two (5) and the annular body (7). Both are provided with leak-proof protection grooves (6) that cooperate with each other. The two leak-proof protection grooves (6) respectively penetrate the outside of the pipeline one (1) and the pipeline two (2). The leak-proof protection grooves (6) of the pipeline one (1) and the pipeline two (2) are provided with sealing gaskets (9) and sealing leak-proof rings (10). The sealing gaskets (9) and sealing leak-proof rings (10) are distributed in the leak-proof protection grooves (6) from the inside to the outside.

4. The oil production pipeline leakage prevention device according to claim 1 is characterized in that: The end of the splicing block 1 (3) is formed with a protrusion, which is adapted to fit into a corresponding groove of the splicing block 2 (5).

5. The oil production pipeline leakage prevention device according to claim 1 is characterized in that: The annular body (7) and the connecting flange (8) are integrally formed.