Building pile foundation with damping structure
By adopting a combined structure of bearings, pile columns, load-bearing blocks, cushioning pads, cushioning cylinders and connecting components in the building pile foundation, the problem of poor seismic resistance of existing building pile foundations is solved, and all-round reduction is achieved The shock effect enhances the seismic resistance of the pile foundation.
Patent Information
- Application Number
- CN202420750813.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-12
- Publication Date
- 2024-12-31
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing building pile foundation has poor seismic resistance during earthquakes and other processes. The connection between the pile top and the bearing is prone to breakage, and can only shock absorption of longitudinal vibration waves, which fails to achieve a comprehensive shock absorption effect.
A building pile foundation structure including a bearing, pile column, load-bearing block, cushioning pad, cushioning cylinder, connecting block and connecting component was designed. Through the cooperation of cushioning pad, cushioning cylinder and connecting component, the All-round shock absorbing buffer between the bearing and pile columns enhances connection strength and improves earthquake resistance.
This structure not only enhances the connection strength between the bearing and the pile column, but also achieves all-round shock absorption and buffering of the building, improves the seismic resistance of the building, and ensures that the stress state of the bearing and the pile column is more stable.
Smart Images

Figure CN222275538U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building engineering, in particular to a building pile foundation with a shock-absorbing structure. Background Art
[0002] A building pile foundation is a deep foundation consisting of a pile and a pedestal connected to the top of the pile, or a single pile foundation connected by a column and the pile foundation. The existing building pile structure is relatively simple. Although it has a certain shock-absorbing ability, it can generally only achieve shock absorption of the longitudinal vibration waves exerted on the building during an earthquake, resulting in poor seismic performance of the building. In addition, the connection between the pile top and the pedestal is also susceptible to vibration and may cause fracture. Therefore, a building pile foundation with a shock-absorbing structure is urgently needed. Utility Model Content
[0003] The utility model aims to solve the above problems by providing a building pile foundation with a reasonable design and a shock-absorbing structure in view of the defects and shortcomings of the prior art.
[0004] In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions: it comprises a cap and piles, and a plurality of piles are arranged at the lower part of the cap;
[0005] It also contains:
[0006] The load-bearing blocks are in multiple numbers and are respectively fixedly mounted on multiple piles. A No. 1 shock-absorbing pad is fixedly mounted on the upper part of the load-bearing blocks, and the No. 1 shock-absorbing pad is arranged in contact with the lower part of the cap;
[0007] Shock-absorbing tubes, wherein the shock-absorbing tubes are multiple and fixedly arranged in multiple installation grooves provided on the cap, and the upper ends of the piles are fixedly inserted in the shock-absorbing tubes;
[0008] The connecting blocks are several in number and are respectively fixedly inserted on the upper parts of several shock absorbing tubes. A No. 2 shock absorbing pad is fixedly arranged at the lower part of the connecting blocks. The No. 2 shock absorbing pad is arranged in conflict with the upper part of the pedestal. The connecting blocks are connected to the piles through connecting components.
[0009] Preferably, the connection component comprises:
[0010] Vertical steel bars, which are multiple in number and are fixedly installed on the connection block with equal fillets. The lower ends of the vertical steel bars are fixedly inserted into slots provided on the piles, and any two adjacent vertical steel bars are connected by connecting steel bars.
[0011] The reinforcing rib plates are in the form of a plurality of reinforcing rib plates, which are respectively fixedly arranged on the outer ring walls of a plurality of vertical steel bars, and the upper side walls of the reinforcing rib plates are connected to the connecting blocks, and concrete is poured in the shock absorbing cylinder.
[0012] Preferably, a fixing plate is fixedly sleeved on the vertical steel bars.
[0013] Preferably, the slot opening is provided with a chamfer.
[0014] Preferably, a plurality of limit strips are fixedly provided at equal rounded corners on the outer wall of the shock absorbing tube, and the limit strips are clamped in the clamping grooves provided on the inner wall of the installation groove.
[0015] Compared with the prior art, the beneficial effect of the utility model is that the building pile foundation with a shock-absorbing structure described in the utility model not only enables the base and the pile column to have a stronger connection structure strength, but also can achieve all-round shock absorption and buffering for the building, thereby improving the seismic performance of the building. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of the utility model.
[0017] Figure 2 It is a cross-sectional view of the support platform in the utility model.
[0018] Figure 3 It is a cross-sectional view of the shock absorbing tube in the utility model.
[0019] Figure 4 yes Figure 3 Enlarged view of part A in .
[0020] Description of reference numerals:
[0021] Cap 1, pile 2, load-bearing block 3, No. 1 shock-absorbing pad 4, shock-absorbing tube 5, connecting block 6, No. 2 shock-absorbing pad 7, connecting assembly 8, vertical steel bar 8-1, connecting steel bar 8-2, reinforcing rib plate 8-3, concrete 8-4, chamfer 9, limit strip 10, fixing plate 11, installation groove 12. DETAILED DESCRIPTION
[0022] The technical solution of the utility model will be clearly and completely described below in conjunction with the accompanying drawings. The preferred embodiments in the description are only used as examples, and all other embodiments obtained by those skilled in the art without making any creative work are within the scope of protection of the utility model.
[0023] like Figure 1-Figure 4 As shown, this specific embodiment adopts the following technical solution: it comprises a cap 1 and piles 2, and a plurality of piles 2 are arranged at the lower part of the cap 1;
[0024] It also contains:
[0025] The load-bearing blocks 3 are in plurality and are respectively fixedly sleeved on the plurality of piles 2. A first shock-absorbing pad 4 is fixedly arranged on the upper part of the load-bearing blocks 3, and the first shock-absorbing pad 4 is arranged to contact with the lower part of the cap 1;
[0026] The shock absorbing tube 5 is several in number and fixedly arranged in several installation grooves 12 provided on the cap 1. The upper end of the pile column 2 is fixedly inserted in the shock absorbing tube 5. Several limiting strips 10 are fixedly arranged on the outer wall of the shock absorbing tube 5 at equal fillets. The limiting strips 10 are clamped in the clamping grooves provided on the inner wall of the installation groove 12. The limiting strips 10 can realize the limiting of the shock absorbing tube 5 in the installation groove 12.
[0027] Connecting blocks 6, there are several connecting blocks 6, which are respectively fixedly inserted on the upper parts of several shock absorbing tubes 5, and a second shock absorbing pad 7 is fixedly arranged at the lower part of the connecting block 6, and the second shock absorbing pad 7 is arranged to conflict with the upper part of the cap 1, and the connecting block 6 is connected to the pile column 2 through a connecting component 8;
[0028] The connection component 8 comprises:
[0029] Vertical steel bars 8-1, the vertical steel bars 8-1 are several, each with an equal fillet fixedly inserted on the connecting block 6, the lower end of the vertical steel bar 8-1 is fixedly inserted into a slot opened on the pile column 2, and a chamfer 9 is provided at the opening of the slot, which can provide guidance for the vertical steel bar 8-1 in the process of being inserted into the slot, and each adjacent vertical steel bar 8-1 is connected by a connecting steel bar 8-2;
[0030] There are several reinforcing rib plates 8-3, which are fixedly arranged on the outer ring walls of several vertical steel bars 8-1 respectively, and the upper side walls of the reinforcing rib plates 8-3 are connected to the connecting blocks 6. Concrete 8-4 is poured in the shock absorbing tube 5, and a fixing plate 11 is fixedly sleeved on the vertical steel bars 8-1. The fixing plate 11 can improve the connection integrity between the concrete 8-4 poured in the shock absorbing tube 5 and the vertical steel bars 8-1 after solidification.
[0031] When using the utility model, first install the shock absorbing tube 5 into the installation groove 12, then place the cap 1 above the pile column 2, so that the upper end of the pile column 2 is inserted into the shock absorbing tube 5, and the upper part of the second shock absorbing pad 7 is in conflict with the cap 1, and then pour concrete 8-4 into the shock absorbing tube 5, and then the connecting block 6 can be inserted into the shock absorbing tube 5, and the lower part of the first shock absorbing pad 4 will also be in conflict with the cap 1, at this time, the lower end of the vertical steel bar 8-1 will be inserted into the slot, and after the concrete 8-4 solidifies, The connection assembly 8, the connection block 6 and the pile column 2 can form a whole. When the building is affected by an earthquake or the like and the pedestal 1 vibrates, the No. 1 shock-absorbing pad 4, the No. 2 shock-absorbing pad 7 and the shock-absorbing tube 5 can realize all-round shock absorption of the pedestal 1 and the building. When the pedestal 1 transfers the pressure to the pile column 2 through the load-bearing block 3, the solidified concrete 8-4 can also share the force of the load-bearing block 3, so that the stress state of the connection between the pedestal 1 and the pile column 2 is more stable.
[0032] After adopting the above structure, the beneficial effects of this specific implementation are as follows:
[0033] 1. Through the cooperation of the load-bearing block 3, the No. 1 shock-absorbing pad 4, the shock-absorbing tube 5, the connecting block 6, the No. 2 shock-absorbing pad 7 and the connecting assembly 8, not only the connection structure strength between the cap 1 and the pile column 2 can be strong, but also all-round shock absorption and buffering can be achieved for the building, thereby improving the earthquake resistance of the building;
[0034] 2. By locking the limit strip 10 in the locking groove, the initial limit of the shock absorbing tube 5 when it is installed in the installation groove 12 can be achieved.
[0035] For those skilled in the art, they can modify the technical solutions recorded in the aforementioned embodiments and make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.
Claims
1. A building pile foundation with a shock-absorbing structure, comprising a cap (1) and pile columns (2), wherein a plurality of pile columns (2) are arranged at the bottom of the cap (1); Features: It also contains: A load-bearing block (3), wherein the load-bearing blocks (3) are in plurality and are respectively fixedly sleeved on the plurality of piles (2); a first shock-absorbing pad (4) is fixedly arranged on the upper portion of the load-bearing block (3); and the first shock-absorbing pad (4) is arranged to contact the lower portion of the bearing platform (1); A plurality of shock absorbing tubes (5), each of which is fixedly arranged in a plurality of mounting grooves (12) provided on the base (1), and the upper end of the pile column (2) is fixedly inserted in the shock absorbing tube (5); A connecting block (6), wherein the connecting blocks (6) are in plurality and are respectively fixedly inserted on the upper parts of the plurality of shock absorbing tubes (5); a second shock absorbing pad (7) is fixedly arranged at the lower part of the connecting block (6); the second shock absorbing pad (7) is arranged to abut against the upper part of the bearing platform (1); and the connecting block (6) and the pile column (2) are connected via a connecting assembly (8).
2. The building pile foundation with a shock-absorbing structure according to claim 1, characterized in that: The connecting component (8) comprises: Vertical steel bars (8-1), the vertical steel bars (8-1) are multiple in number, each of which is fixedly inserted into the connection block (6) with equal rounded corners, the lower end of the vertical steel bars (8-1) is fixedly inserted into a slot provided on the pile column (2), and any two adjacent vertical steel bars (8-1) are connected by connecting steel bars (8-2); A plurality of reinforcing rib plates (8-3) are fixedly arranged on the outer ring walls of the plurality of vertical steel bars (8-1), and the upper side walls of the reinforcing rib plates (8-3) are connected to the connecting blocks (6), and concrete (8-4) is poured in the shock absorbing cylinder (5).
3. The building pile foundation with a shock-absorbing structure according to claim 2, characterized in that: A fixing plate (11) is fixedly sleeved on the vertical steel bar (8-1).
4. The building pile foundation with a shock-absorbing structure according to claim 2, characterized in that: The slot opening is provided with a chamfer (9).
5. The building pile foundation with a shock-absorbing structure according to claim 1, characterized in that: A plurality of limit strips (10) are fixedly arranged at equal rounded corners on the outer wall of the shock absorbing tube (5), and the limit strips (10) are clamped in clamping grooves provided on the inner wall of the installation groove (12).