Silicon carbide deck spraying device

By designing a silicon carbide shed spraying device containing multiple spray parts and transport parts, the problem that existing equipment cannot spray uniformly on the entire surface is solved, and efficient and uniform spraying effect is achieved, and product quality and speed are improved.

CN222551189UActive Publication Date: 2025-03-04TANGSHAN CHENHAO REFRACTORY CERAMICS PROD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420410136.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-04
Publication Date
2025-03-04
Estimated Expiration
2034-03-04

AI Technical Summary

Technical Problem

Existing equipment cannot spray all surfaces of the silicon carbide shed panel evenly, resulting in the inability to fully guarantee the spray speed and quality.

Method used

A silicon carbide shed plate spraying device is designed, including a base frame, a transport part, a first spray part, a second spray part, a drying part, a transport part and a third spray part. Through the coordinated work of these components, the shed plate is ensured to complete spraying during transportation.

Benefits of technology

The silicon carbide shed plate is uniformly sprayed on the entire surface, which improves the spraying speed and quality, ensures that all surfaces are completely sprayed, and improves the appearance and quality of the finished product.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222551189U_ABST
    Figure CN222551189U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of spraying, and provides a silicon carbide shelf board spraying device which comprises a conveying part, a spraying device and a spraying device, the first spraying piece and the second spraying piece are arranged on the bottom frame, the first spraying piece is used for spraying the top face of the shed plate, and the second spraying piece is used for spraying the side edge, parallel to the conveying direction, of the shed plate; the sliding direction of the conveying piece is perpendicular to the spraying direction of the first spraying piece. The drying piece is arranged on the bottom frame, the first spraying piece, the second spraying piece and the drying piece are arranged in sequence, and the drying piece is used for drying the shelf board; the transfer part is arranged on the bottom frame and grabs the top of the dried shed plate; the third spraying piece is arranged on the bottom frame, located on one side of the drying piece and used for spraying the non-sprayed face of the shed plate. By means of the technical scheme, the problem that in the prior art, the speed and quality cannot be completely guaranteed when the whole surface of the silicon carbide deck is sprayed is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of spraying, and specifically to a silicon carbide shelf spraying device. Background Art

[0002] Silicon carbide shed boards are resistant to high temperatures, have strong resistance to deformation at high temperatures, and have good chemical stability, so they have strong application prospects. When silicon carbide shed boards are produced, they usually need to be sprayed to enhance the anti-oxidation performance of silicon carbide shed boards, thereby improving their overall quality. Generally, aluminum oxide or other anti-oxidation spray materials are used for spraying.

[0003] During spraying, it is usually necessary to spray all surfaces of the silicon carbide slab to ensure the quality of the slab. However, the existing equipment cannot spray all surfaces of the slab because the slab needs to be fixed. Forced spraying will affect the spraying quality of the slab surface. Utility Model Content

[0004] The utility model provides a silicon carbide shelf spraying device, which solves the problem in the related art that the speed and quality cannot be fully guaranteed when the entire surface of the silicon carbide shelf is sprayed.

[0005] The technical solution of the utility model is as follows:

[0006] A silicon carbide slab spraying device, comprising:

[0007] chassis;

[0008] A transport member, slidably disposed on the base frame;

[0009] The first spraying member and the second spraying member are arranged on the base frame, the first spraying member is used for spraying the top surface of the shelf plate, and the second spraying member is used for spraying the side of the shelf plate parallel to the conveying direction; the sliding direction of the conveying member is perpendicular to the spraying direction of the first spraying member;

[0010] A drying component is arranged on the base frame, wherein the first spraying component, the second spraying component and the drying component are arranged in sequence, and the drying component is used for drying the shelf board;

[0011] A transfer piece is arranged on the bottom frame, and the transfer piece grabs the top of the dried shelf board;

[0012] The third spraying part is arranged on the base frame and located at one side of the drying part. The third spraying part is used for spraying the unsprayed surface of the shelf.

[0013] As a further technical solution, the transfer piece includes:

[0014] A sliding rod, slidably arranged on the base frame;

[0015] A suction nozzle is arranged on the sliding rod and is used for sucking the top of the shelf board.

[0016] As a further technical solution, the drying element comprises:

[0017] A drying box is arranged on the base frame, the drying box has a drying space, and the top and bottom of the drying space have openings;

[0018] A lifting frame, passing through the opening and being lifted and disposed in the drying space;

[0019] There are a plurality of partitions which are arranged on the base frame at intervals in the vertical direction, and the partitions are used to receive the shelf plates.

[0020] As a further technical solution, the transport unit includes:

[0021] A first screw rod is rotatably disposed on the base frame;

[0022] A guide rod, disposed on the base frame, the guide rod is parallel to the first screw rod, and the guide rod and the first screw rod are both located below the first spraying member and the second spraying member;

[0023] A receiving plate is slidably arranged on the guide rod, and the first screw rod is threadably matched with the receiving plate;

[0024] The first driving member is arranged on the base frame, and the first driving member is used for driving the first screw to rotate.

[0025] As a further technical solution, it also includes:

[0026] A plurality of rollers are arranged on the receiving plate to rotate at intervals, the rotation axis of the rollers is parallel to the axis of the first screw, one end of the rollers has a gear, and the rollers are in contact with the shelf;

[0027] A rack, relatively arranged on the receiving plate;

[0028] The telescopic member is arranged on the base frame, and the rack is arranged on the telescopic member. After the telescopic member drives the rack to slide, the rack meshes with the gear for transmission. After the roller rotates, the shelf enters into the drying member.

[0029] As a further technical solution, the second spraying parts are provided with two pieces, both of which are arranged on the base frame, and the second spraying parts are located between the receiving plate and the drying part.

[0030] As a further technical solution, the third spray-coated part includes:

[0031] The first spraying section is located below the sliding rod, and after the suction nozzle drives the shelf to move, the shelf is located above the first spraying section;

[0032] The second spraying section has two sections, which are respectively located at two ends of the first spraying section. After the shelf moves, it is located between the two sections of the second spraying section.

[0033] The working principle and beneficial effects of the utility model are:

[0034] In the utility model, after placing the shed board to be sprayed on the transport part, the first spray part and the second spray part will spray the top surface and two side edges of the shed board. After the three surfaces are sprayed, the shed board will be transported to the drying part for drying. After the drying is completed, the transport part transports the dried shed board. During the transportation process, the third spray part will spray the remaining unsprayed surface to ensure that all surfaces of the shed board are completely sprayed. The three spray parts are all set on the shed board transportation path, so that the shed board can be sprayed during transportation, which speeds up the spraying speed. At the same time, the transport part adopts a uniform speed transportation method to ensure the uniform thickness of the spraying and improve the quality of the spraying. After the spraying of the three surfaces is completed, it will be dried first to ensure that the sprayed surface will not be damaged due to subsequent transportation, ensuring the quality of the spraying and the appearance of the finished product. At the same time, the transport part will contact the surface that has been sprayed to ensure that the unsprayed surface will not be blocked, further improving the quality of the spraying and ensuring that all surfaces of the shed board are sprayed evenly and completely. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] The preferred implementation modes will be described below in a clear and understandable manner with reference to the accompanying drawings to further illustrate the above-mentioned characteristics, technical features, advantages and implementation methods of the present utility model.

[0036] Figure 1 It is a schematic diagram of the structure of the utility model;

[0037] Figure 2 This is a schematic diagram of the structure of the utility model from another perspective;

[0038] Figure 3 It is a structural schematic diagram of the drying component in the utility model;

[0039] Figure 4 for Figure 1 A partial enlarged view of the middle part;

[0040] Figure 5 for Figure 2 A partial enlarged view of point B in the middle;

[0041] Figure 6 for Figure 2 A partial enlarged view of point C in the middle;

[0042] In the figure: 1, base frame, 2, transport part, 3, first spraying part, 4, second spraying part, 5, drying part, 6, transfer part, 7, third spraying part, 610, sliding rod, 620, suction nozzle, 8, drying box, 810, drying space, 820, opening, 830, lifting frame, 840, partition, 210, first screw rod, 220, guide rod, 230, receiving plate, 240, first driving part, 231, roller, 232, gear, 233, rack, 234, telescopic part, 710, first spraying section, 720, second spraying section. DETAILED DESCRIPTION

[0043] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the specific implementation methods of the utility model will be described below with reference to the accompanying drawings. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, they can also be understood as further technical solutions without paying creative work. In some figures, components with the same structure or function are only schematically illustrated, or only one of them is marked. In this article, "one" not only means "only one", but also means "more than one", and "several" includes "two" and "more than two".

[0044] In this article, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.

[0045] In addition, in the description of the present application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0046] Reference Figure 1 to Figure 6 , which is the first embodiment of the utility model, includes: a transport member 2 is slidably arranged on a base frame 1; a first spraying member 3 and a second spraying member 4 are arranged on the base frame 1, the first spraying member 3 is used to spray the top surface of the shelf board, and the second spraying member 4 is used to spray the side of the shelf board parallel to the conveying direction; the sliding direction of the transport member 2 is perpendicular to the spraying direction of the first spraying member 3; a drying member 5 is arranged on the base frame 1, the first spraying member 3, the second spraying member 4 and the drying member 5 are arranged in sequence, and the drying member 5 is used to dry the shelf board; a transfer member 6 is arranged on the base frame 1, and the transfer member 6 grabs the top of the shelf board after drying; a third spraying member 7 is arranged on the base frame 1, located on one side of the drying member 5, and the third spraying member 7 is used to spray the unsprayed surface of the shelf board.

[0047] In this embodiment, after placing the shed board to be sprayed on the transport part 2, the first spraying part 3 and the second spraying part 4 will spray the top surface and two side edges of the shed board. After the three surfaces are sprayed, the shed board will be transported to the drying part 5 for drying. After drying, the transport part 6 transports the shed board that has been dried. During the transportation process, the third spraying part 7 will spray the remaining unsprayed surface to ensure that all surfaces of the shed board are completely sprayed. The three spraying parts are all set on the shed board transportation path, so that the shed board can be sprayed during transportation, which speeds up the spraying speed. At the same time, the transport part 2 adopts a uniform speed transportation method to ensure uniform spraying thickness and improve the quality of spraying. After the spraying of the three surfaces is completed, it will be dried first to ensure that the sprayed surface will not be damaged due to subsequent transportation, thereby ensuring the quality of spraying and the appearance of the finished product. At the same time, the transport part 6 will contact the surface that has been sprayed to ensure that the unsprayed surface will not be blocked, further improving the quality of spraying and ensuring uniform and complete spraying of all surfaces of the shed board.

[0048] Furthermore, the transfer member 6 includes: a sliding rod 610 slidably arranged on the base frame 1; a suction nozzle 620 is arranged on the sliding rod 610, and the suction nozzle 620 is used to suck the top of the shelf.

[0049] In this embodiment, the transfer part 6 uses a suction nozzle 620 to contact the top surface that has been sprayed and dried, sucks up the shelf board and moves it, and uses multiple suction nozzles 620 to suck at the same time, without blocking the remaining unsprayed bottom surface, thereby ensuring the spraying quality of the bottom surface. At the same time, it will not cause pressure on the shelf board itself, ensuring that the surface that has been sprayed will not have mechanical damage such as indentation.

[0050] Furthermore, the drying part 5 includes: a drying box 8 arranged on the base frame 1, the drying box 8 has a drying space 810, and the top and bottom of the drying space 810 both have openings 820; a lifting frame 830 is lifted and set in the drying space 810 through the opening 820; there are a plurality of partitions 840, which are arranged on the base frame 1 at intervals in the vertical direction, and the partitions 840 are used to receive the shelf.

[0051] In this embodiment, the shelf board after the top and side surfaces are sprayed will be transported to the partition 840. After placement, the lifting frame 830 will descend and place the partition 840 carrying the shelf board into the drying space 810 for drying. During the drying process, the partitions 840 of other layers can continue to receive other shelf boards to ensure continuous spraying. The lifting frame 830 ensures that the surface that has been sprayed will not be directly disturbed during drying and can directly enter the drying space 810 for drying. This improves the quality and effect of spraying and also increases the speed of spraying.

[0052] Furthermore, the transport member 2 includes: a first screw 210 rotatably arranged on the base frame 1; a guide rod 220 arranged on the base frame 1, the guide rod 220 is parallel to the first screw 210, and the guide rod 220 and the first screw 210 are both located below the first spray member 3 and the second spray member 4; a receiving plate 230 is slidably arranged on the guide rod 220, and the first screw 210 is threadedly matched with the receiving plate 230; a first driving member 240 is arranged on the base frame 1, and the first driving member 240 is used to drive the first screw 210 to rotate.

[0053] In this embodiment, the unpainted shelf will be placed on the receiving plate 230. After placement, the first driving member 240 will drive the first screw 210 to rotate, so that the receiving plate 230 slides along the direction of the guide rod 220. This conveying method has a simple structure and is easy to manufacture. It has a low manufacturing cost and is relatively simple to replace even if it is damaged. The operation of the screw and the motor can not only achieve a stable moving speed, but also can serve as a further technical solution between the receiving plate 230 and the drying member 5.

[0054] Furthermore, it also includes: a plurality of rollers 231, which are arranged on the receiving plate 230 for rotation at intervals, the rotation axis of the roller 231 is parallel to the axis of the first screw 210, one end of the roller 231 has a gear 232, and the roller 231 abuts against the shelf; the rack 233 is relatively arranged on the receiving plate 1; the telescopic member 234 is arranged on the base frame 1, and the rack 233 is arranged on the telescopic member 234, after the telescopic member 234 drives the rack 233 to slide, the rack 233 and the gear 232 are meshed for transmission, and after the roller 231 rotates, the shelf enters the drying member 5.

[0055] In this embodiment, the second spraying member 4 is only used for spraying the two sides of the shed. When the telescopic member 234 moves, the spraying member starts to work, ensuring the uniform spraying of the sides of the shed, thereby improving the quality and effect of the shed spraying. The side spraying has two sides, spraying the corresponding surfaces respectively, and the spraying members on both sides do not affect each other, thereby improving the anti-interference ability.

[0056] Furthermore, the third spraying part 7 includes: a first spraying section 710 is located below the sliding rod 610, and after the suction nozzle 620 drives the shelf to move, the shelf is located above the first spraying section 710; the second spraying section 720 has two sections, which are respectively located at both ends of the first spraying section 710, and after the shelf moves, it is located between the two sections of the second spraying section 720.

[0057] In this embodiment, the first spraying section 710 is used to spray the bottom surface of the shed, and the second spraying section 720 is used to spray the side surface. The three spraying sections operate simultaneously, ensuring that the spraying is uniform and smooth during the process, and spraying can be carried out simultaneously. The spraying parts with three spraying sections can complete the spraying of three sides at one time, thereby improving work efficiency.

[0058] It should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.

Claims

1. A silicon carbide shelf spraying device, characterized in that: include: Base frame (1); A transport member (2) slidably disposed on the base frame (1); A first spraying member (3) and a second spraying member (4) are arranged on the base frame (1), the first spraying member (3) being used for spraying the top surface of the shelf plate, and the second spraying member (4) being used for spraying the side of the shelf plate parallel to the conveying direction; the sliding direction of the transport member (2) is perpendicular to the spraying direction of the first spraying member (3); A drying component (5) is arranged on the base frame (1), wherein the first spray component (3), the second spray component (4) and the drying component (5) are arranged in sequence, and the drying component (5) is used to dry the shelf board; A transfer member (6) is arranged on the base frame (1), and the transfer member (6) grabs the top of the shelf board after drying; The third spraying member (7) is arranged on the base frame (1) and is located on one side of the drying member (5). The third spraying member (7) is used to spray the unpainted surface of the shelf.

2. A silicon carbide shelf spraying device according to claim 1, characterized in that: The transfer member (6) comprises: A sliding rod (610) slidably disposed on the base frame (1); A suction nozzle (620) is arranged on the sliding rod (610), and the suction nozzle (620) is used to suck the top of the shelf board.

3. The silicon carbide shelf spraying device according to claim 1, characterized in that: The drying element (5) comprises: A drying box (8) is arranged on the base frame (1), the drying box (8) having a drying space (810), and the top and bottom of the drying space (810) both have openings (820); A lifting frame (830) is disposed in the drying space (810) through the opening (820) and is lifted and lowered; There are a plurality of partitions (840) which are arranged on the base frame (1) at intervals in the vertical direction, and the partitions (840) are used to receive the shelf plates.

4. The silicon carbide shelf spraying device according to claim 1, characterized in that: The transport element (2) comprises: A first screw rod (210) rotatably disposed on the base frame (1); A guide rod (220) is arranged on the base frame (1), the guide rod (220) is parallel to the first screw rod (210), and the guide rod (220) and the first screw rod (210) are both located below the first spraying part (3) and the second spraying part (4); A receiving plate (230) is slidably disposed on the guide rod (220), and the first screw rod (210) is threadably engaged with the receiving plate (230); A first driving member (240) is arranged on the base frame (1), and the first driving member (240) is used to drive the first screw rod (210) to rotate.

5. A silicon carbide shelf spraying device according to claim 4, characterized in that: Also includes: A plurality of rollers (231) are arranged on the receiving plate (230) to rotate at intervals, the rotation axis of the roller (231) is parallel to the axis of the first screw rod (210), one end of the roller (231) has a gear (232), and the roller (231) is in contact with the shelf plate; A rack (233) arranged relatively on the receiving plate (230); The telescopic member (234) is arranged on the receiving plate (230), and the rack (233) is arranged on the telescopic member (234). After the telescopic member (234) drives the rack (233) to slide, the rack (233) and the gear (232) mesh and transmit, and after the roller (231) rotates, the shelf enters into the drying member (5).

6. The silicon carbide shelf spraying device according to claim 4, characterized in that: The second spraying parts (4) have two parts, both of which are arranged on the base frame (1); the second spraying parts (4) are located between the receiving plate (230) and the drying part (5).

7. The silicon carbide shelf spraying device according to claim 2, characterized in that: The third spraying part (7) comprises: A first spraying section (710) is located below the sliding rod (610), and after the suction nozzle (620) drives the shelf to move, the shelf is located above the first spraying section (710); The second spraying section (720) has two sections, which are respectively located at two ends of the first spraying section (710); after the shelf moves, it is located between the two sections of the second spraying section (720).