A complete set of automatic clamping device for embedded channel of shield segment
Automatic clamping of T-shaped pull rods by driving the cylinder bracket and pneumatic control mechanism, the high cost and low efficiency of the fixed channel on the tunnel pipe mold are solved, and efficient and environmentally friendly channel embedding is achieved, ensuring the grooves The stable fit and high quality of the track and mold.
Patent Information
- Application Number
- CN201810819858.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-07-24
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2038-07-24
AI Technical Summary
The prior art fixing method of embedded channels on tunnel pipe sheet molds has problems such as high cost, many consumables, low installation efficiency, large safety hazards and unstable quality, and cannot effectively ensure the fit and fixation between the channels and the mold.
Using cylinder bracket, cylinder, T-shaped tie rod and pneumatic control mechanism, the T-shaped tie rod is automatically clamped and loosened by cylinder drive to ensure the continuous fit between the channel and the mold, reduce the amount of consumables, improve installation efficiency, and when pouring concrete Provides continuous clamping force.
It achieves high installation efficiency, low consumables usage, and high pre-embedding quality without destroying the channel, reduces the cost of consumables and labor costs, and improves the pre-embedding quality and production efficiency of the channel.
Smart Images

Figure CN108799264B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to tunnel production equipment, in particular to a complete set of automatic clamping devices for pre-buried channels of shield segments. Background Art
[0002] Tunnels are made up of pipe segments. In the past, the installation of cables, rails and other components in tunnels was done by drilling holes in the pipe segments where they were to be installed and placing expansion bolts. This often resulted in repeated drilling due to deviations, which seriously affected the service life of the tunnel. In order to prevent repeated construction, it is now common to embed sleeve grooves in the pipe segments in concrete, with the surface flush with the concrete. There are many types of grooves, which have an anti-loosening design and are used in conjunction with a special T-shaped pull rod 3. They are easy to fasten and can be adjusted at will. They are the preferred fasteners for many large-scale engineering projects such as railway tunnels, bridges, airports, etc. The embedded grooves can be used in rail transit, high-speed rail, buildings and other occasions. The embedded grooves in the subway shield tunnel segments in rail transit are on the mold, and the requirements for fitting and fixing are very strict. There are many fixing methods in the prior art, but there is currently no method that can completely solve the problem of fitting and fixing the grooves on the pipe segment mold.
[0003] There are three main installation solutions for embedded channel:
[0004] (1) Special bolt fixing method.
[0005] (2) Special plastic nut fixing method.
[0006] (3) Plastic rod support method.
[0007] (1) Special bolt fixing method. First, weld a protrusion on the template for the preliminary positioning of the channel. Then weld the special bolts to the steel cage. After the steel cage is in place, tighten the bolts and apply force to the embedded channel to complete the positioning. This method does not require drilling holes in the segment template, and the embedded channel is fixed by welding and bolting. This method is relatively expensive. The steel bar welding method is difficult to construct and is prone to cause unnecessary damage to the channel surface. In addition, when casting the segment, the presence of the attached vibrator causes the channel and the inner arc surface of the mold to separate, and the expected embedded effect cannot be achieved.
[0008] (2) Special plastic nut fixing method. A special plastic nut component is used to connect with the screw processed on the segment mold to install the embedded groove. Since the embedded groove is fixed with a special plastic nut and an iron bolt, the total force of the segment demoulding needs to be increased during demoulding, causing the thread inside the plastic nut to be directly damaged. This easily damages the screw connected to the mold, requiring frequent replacement of the screw, which increases the consumables of the plastic nut.
[0009] (3) Plastic rod support method. A special bracket is placed between the embedded chute and the steel cage, and the weight of the steel cage is used to form a certain pressure. A bracket is added between the steel cage and the mold cover plate, and the pressure of the cover plate and the steel cage is used to fix the chute. A large number of chute brackets and steel cage and mold cover plate brackets need to be customized. The cost of consumables is high during production, and there is a certain safety issue in installation.
[0010] In addition, when fixing by the above method, the efficiency is low, the cost of consumables is high, there are safety hazards, and the quality is unstable. The groove is covered by the cement of the pipe segment, and it cannot be safely and effectively fitted stably during fitting and fixing. After the pipe segment is formed, the groove embedded in the pipe segment is covered by cement, and it is easy to contaminate the template surface. Removing the cement covering the surface of the groove is labor-intensive and time-consuming, and it is not beautiful. Summary of the invention
[0011] The purpose of the present invention is to provide a shield tunnel segment pre-embedded groove complete set automatic clamping device with high installation efficiency, low consumption of consumables, no need to damage the groove, and high groove pre-embedded quality. The "pre-embedded groove complete set automatic connection device" has the characteristics of economy, environmental protection, energy saving, and high efficiency after comprehensive comparison of test results. It overcomes various drawbacks of the current traditional installation methods in the industry, and gives full play to the function of the automatic production line of the segment, especially it can ensure the quality of the finished segment and the technical indicators of the pre-embedded groove.
[0012] To achieve the above purpose, the technical solution of the present invention is:
[0013] The present invention is a complete set of automatic clamping device for embedded grooves of shield pipe segments, comprising a cylinder bracket, a cylinder, a T-shaped tie rod, and a tie rod protective cover; the cylinder bracket can be fixed on the inner arc surface of a mold, the cylinder body of the cylinder is fixed on the cylinder bracket, the piston rod end of the cylinder is connected to one end of the T-shaped tie rod, and the other end of the T-shaped tie rod is a "T"-shaped head, which can be inserted into the groove; the tie rod protective cover is sleeved on the T-shaped tie rod with a gap.
[0014] The piston rod end of the cylinder is fixedly connected with one end of the T-shaped tie rod through a tie rod pin shaft, and a split pin is provided at the protruding end of the tie rod pin shaft for positioning.
[0015] The present invention also includes a pneumatic control mechanism, which is connected to the cylinder through a pipeline to control the movement of the cylinder; the pneumatic control mechanism includes a pneumatic switch, a pressure maintaining valve, and a cylinder; the cylinder is controlled by the pneumatic switch, the pneumatic switch is connected to the air inlet of the pressure maintaining valve through a first pipeline, the air inlet of each cylinder is connected to the pressure maintaining valve through a tee, the air outlet of the pneumatic switch is connected to the air outlet of each cylinder through a second pipeline, the air outlet of the pneumatic switch is connected to another channel of the pressure maintaining valve through a tee, the cylinder gas is discharged normally, and the cylinder works normally.
[0016] After adopting the above scheme, since the present invention includes a cylinder bracket, a cylinder, a T-type tie rod, and a tie rod protective cover, the cylinder fixed on the mold can drive the T-type tie rod to extend into the groove and pull back, so that the groove and the mold surface are tightly fitted. When pouring concrete and vibrating, the air source is connected. During the overall vibration of the mold, the groove is kept in a clamped state to ensure that the groove does not loosen. After the vibration ends and the pipe segment solidifies, the cylinder drives the T-type tie rod to rise and rotate 90 degrees to let it leave the groove, so as to lift the pipe segment. The automatic clamping and loosening of the present invention is between the various process flows. After the groove is installed, it is always in a clamped state, so as to ensure that the groove and the template maintain a fixed distance. After the pipe segment is formed, the groove and the pipe segment have stable dimensions, which ensures the quality of the product. It has the advantages of high installation efficiency, low consumption of consumables, no need to damage the groove, and high quality of pre-embedded groove.
[0017] The benefits it generates are as follows:
[0018] 1. In terms of consumables, the cost of consumables is reduced by more than 20,000 per kilometer, which has brought considerable economic benefits in the use of tunnel segment grooves.
[0019] 2. Shorten the installation time of the channel and save a lot of labor costs in the actual production process.
[0020] 3. Low maintenance cost, fast replacement of spare parts and short cycle.
[0021] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 is an axonometric view of the present invention;
[0023] Figure 2 is a three-dimensional exploded view of the present invention;
[0024] Figure 3 is a schematic diagram of a fixed channel of the present invention;
[0025] Figure 4 It is a structural schematic diagram of the pneumatic control mechanism of the present invention;
[0026] Figure 5 It is a front view of the actual use of the present invention;
[0027] Figure 6 yes Figure 5 Section view along line AA. DETAILED DESCRIPTION
[0028] like Figure 1-Figure 3 As shown, the present invention is a complete set of automatic clamping device for embedded channel of shield segment, including cylinder support 1, cylinder 2, T-type tie rod 3, tie rod protection cover 4, pneumatic control mechanism 5, tie rod pin 6, cotter pin 7.
[0029] The cylinder support 1 can be fixed on the inner arc surface of the mold 10, and the cylinder body of the cylinder 2 is fixed on the cylinder support 1. The piston rod end of the cylinder 2 is fixedly connected with one end of the T-type tie rod 3 through the tie rod pin 6. The end of the tie rod pin 6 is screwed with a split pin 7 for positioning. The other end of the T-type tie rod 3 is a "T"-shaped head 31, which can be inserted into the groove 20; the tie rod protection sleeve 4 is sleeved on the T-type tie rod 3 with a gap to prevent the cylinder 2 and the T-type tie rod 3 from being affected by leakage and affecting their reliability. The pneumatic control mechanism 5 is connected to the cylinder 2 through a pipeline to control the movement of the cylinder 2.
[0030] like Figure 4 As shown, the pneumatic control mechanism 5 includes a pneumatic switch 51, a pressure-maintaining valve 52, and a cylinder 2; the cylinder 2 is controlled by the pneumatic switch 51, the air inlet of the cylinder 2 is connected to the air outlet of the pressure-maintaining valve 52 through a first pipeline 53, the air inlet of the pressure-maintaining valve 52 is connected to the air outlet of the cylinder 2 through a second pipeline 54, and a pneumatic switch 51 is provided on the second pipeline 54 connecting the cylinder 2 and the pressure-maintaining valve 52, the air inlet and air outlet are completed by the pneumatic switch 51, and the automatic clamping and releasing are controlled. The pneumatic control mechanism 5 includes a pneumatic switch 51, a pressure-maintaining valve 52, and a cylinder 2; the cylinder 2 is controlled by the pneumatic switch 51, the pneumatic switch 51 is connected to the air inlet of the pressure-maintaining valve 52 through a first pipeline 53, the air inlet of each cylinder 2 is connected to the pressure-maintaining valve 52 through a tee, the air outlet of the pneumatic switch 51 is connected to the air outlet of each cylinder 2 (through a tee) through a second pipeline 54, the air outlet of the pneumatic switch 51 is connected to another channel of the pressure-maintaining valve 52 through a tee, the gas in the cylinder 2 is discharged normally, and the cylinder 2 works normally.
[0031] The method of using the present invention:
[0032] like Figure 5 , Figure 6As shown, according to the uniform stress point of the groove 20, holes are opened on the segment mold 10, the number is expected to be 2-4, the diameter of the hole is 12-12.3MM, the special fixed groove mechanism fixing plate is welded to the inner arc surface of the template, the segment is distributed with 2-4 fixed tensioning mechanisms, the cylinder 2 is controlled by a pneumatic switch 51, and the modified special cylinder 2 drives the T-type tie rod 3 to rotate 90 degrees and then move up and down to realize the automatic tightening and loosening of the groove 20, to prevent the segment from hitting the T-type tie rod 3 during the lifting process, damaging the mechanism, and leaking during the vibration grouting process. A tie rod protection cover 4 is designed for the T-type tie rod 3 that rotates up and down to prevent the cylinder and tie rod from being affected by the leakage. The reliability of the action. Since the actual production of the segment is a flow operation, the automatic clamping and loosening mechanism provided by the present invention needs to disconnect the air source when the next process is transferred, and a special pressure-maintaining element is required in the clamping system to ensure that the clamping parts of the device are in a continuous clamping state of the groove. When pouring concrete and before vibration, connect the air source to ensure that the groove is in a continuous clamping state during the overall vibration of the mold to ensure that the groove 10 does not loosen. After the vibration ends and the pipe segment solidifies, the control switch can release the clamping device, and the T-type pull rod 3 rises and rotates 90 degrees to open the groove and lift the pipe segment.
[0033] Comparison between the present invention and the existing installation method
[0034] Installation Position stability of fixed points Special bolt fixing method During the vibration of the bolts and the compression of the 3MM foam, there is no continuous clamping force, and there is a certain gap between the fixed point and the arc surface of the mold, which may cause leakage and result in poor appearance of the segment. Special nut fixing method During the vibration of the bolts and the compression of the 3MM foam, there is no continuous clamping force, and there is a certain gap between the fixed point and the arc surface of the mold, which may cause leakage and result in poor appearance. Plastic rod support method During the vibration process of the bolts and the compression process of the 3MM foam, a certain clamping force will be maintained under the deadweight of the steel bars and the pressure of the pressure plate. However, the plastic may fall off during movement or vibration, resulting in unstable quality of the segments. The present invention During the vibration process, the 3MM foam is compressed during the pouring process, and the cylinder can maintain a continuous clamping force to ensure that the groove fits the arc surface of the mold and the quality is stable.
[0035] Installation When the fixed point consumables unit price Consumables quantity price per ring Consumables per kilometer Special bolt fixing method 5 27*5=135 833*135=112455 Special nut fixing method 1.2 27*1.2=32.4 833*32.4=26989 Plastic rod support method 1.1 27*1=29.7 833*29.7=24740 The present invention none none none
[0036] Installation Installation time for each fixed point (minutes) Time for fixing each ring (minutes) Special bolt fixing method Need to weld and lock the bolts. It is estimated that the fixing point will take more than 2 minutes, which is inconvenient to operate. 2*27=54 Special nut fixing method Need to drill holes in the groove and lock nuts, estimated to take more than 2 minutes 27*2=54 Plastic rod support method To modify the mold fixing point, you need to install plastic accessories, which is expected to take more than 2 minutes 27*2=54 The present invention The fixed points are controlled simultaneously by the gas valve, including the auxiliary time, which is expected to be within 20 seconds. 27*20=540 seconds
[0037] Installation Fixed point maintenance Special bolt fixing method The mold is welded in a fixed position, no fixed point maintenance is required Special nut fixing method Bolts need to be installed on the mold, and they are forcibly pulled off by lifting and demoulding. The screws often need to be replaced and maintained, which will cause varying degrees of damage to the mold. Plastic rod support method The fixed points of mold modification are difficult to clean due to leakage and other reasons. The fixed points often need to be maintained and replaced. The present invention Controlled by the cylinder, it is basically maintenance-free within one year, and it only takes 1-5 minutes to replace the cylinder and T-type tie rod.
[0038] The composition of the pipe segment, the working principle and function of the present invention:
[0039] 1.1 Segment composition and device distribution
[0040] 1.1.1 A ring of segments consists of standard blocks, adjacent blocks, and capping blocks (3+2+1), totaling 6 segments.
[0041] 1.1.2 Standard blocks and connecting blocks require four clamping and fixing points, capping blocks require two clamping and fixing points, and a ring of segments requires a total of 22 clamping and fixing points, 6 sets of independent devices.
[0042] 1.2. Working principle and function of the present invention
[0043] 1.2.1 The main power of the device is air. The pneumatic switch controls the rotation of the special cylinder and the up and down movement to achieve the automatic clamping and loosening of the T-screw.
[0044] 1.2.2 Since the production of pipe segments is an assembly line operation, the gas source must be disconnected at any time, and the special pressure-maintaining valve of the device is used to ensure that the position of the groove in the pipe segment during the operation of the mold is ensured.
[0045] 1.2.3 When the concrete is vibrated, the device is connected to the air source again under high-frequency vibration. Under continuous pressure, the groove can stably fit the mold surface to ensure the accuracy of the groove position and the quality of the embedded part.
[0046] 1.2.4 This device greatly improves the working efficiency of the segment production line and the installation speed and accuracy of the groove, while avoiding the use and waste of pre-embedded consumables of the segment, ultimately ensuring the quality of the finished segment.
[0047] 3. Mould modification:
[0048] 2.1 Standard block and adjacent block segment mold, the clamping point position is offset by 150mm from the designated mold center, the arc length of the two middle holes is about 720mm, the arc length of the two side holes is about 1000mm, the opening diameter is 12.1mm, the position of the bracket of the installed cylinder is positioned on the inner arc surface through the tooling, the direction is fixed, and after adjustment, welding is carried out. (The specific distance of the opening distance is determined after on-site consultation).
[0049] 2.2 For the capping block segment mold, the clamping point is offset by 150mm from the designated mold center. The arc length between the two holes in the middle is about 720mm. The hole diameter is 12.1mm. The bracket position of the installed cylinder is positioned on the inner arc surface through the tooling, and the direction is fixed. After adjustment, welding is performed. (The specific distance of the hole is determined after on-site consultation).
[0050] 2.3 After the cylinder bracket is welded, the other accessories are assembled as required, and the action is debugged. After the action is correct, the mold
[0051] The transformation is complete.
[0052] 2.4 In the complete set of automatic connection devices for embedded grooves, in order to prevent leakage from affecting and damaging the device, induction switches, batteries, indicator lights, etc. are used to better prevent and solve the problem of the device rotating immobile due to leakage. Simple and quick processing is performed before lifting to avoid damage to the clamping and fixing points caused by leakage.
[0053] The above description is only a preferred embodiment of the present invention, and therefore cannot be used to limit the scope of implementation of the present invention. That is, equivalent changes and modifications made according to the scope of the patent application of the present invention and the contents of the specification should still fall within the scope covered by the patent of the present invention.
Claims
1. A complete set of automatic clamping device for embedded channel of shield segment, characterized by: It includes a cylinder bracket, a cylinder, a T-type tie rod, a tie rod protective cover and a pneumatic control mechanism; the cylinder bracket is fixed on the inner arc surface of the mold, the cylinder body of the cylinder is fixed on the cylinder bracket, the piston rod end of the cylinder is fixedly connected to one end of the T-type tie rod through a tie rod pin shaft, and a split pin is provided at the protruding end of the tie rod pin shaft for positioning, and the other end of the T-type tie rod is a "T"-shaped head, and the "T"-shaped head can be inserted into the groove; the tie rod protective cover is sleeved on the T-type tie rod with a gap; The pneumatic control mechanism is connected to the cylinder through a pipeline to control the movement of the cylinder; the pneumatic control mechanism includes a pneumatic switch, a pressure-maintaining valve, and a cylinder; the cylinder is controlled by the pneumatic switch, the pneumatic switch is connected to the air inlet of the pressure-maintaining valve through a first pipeline, the air inlet of each cylinder is connected to the pressure-maintaining valve through a tee, the air outlet of the pneumatic switch is connected to the air outlet of each cylinder through a second pipeline, and the air outlet of the pneumatic switch is connected to another channel of the pressure-maintaining valve through a tee; The cylinder fixed on the mold drives the "T"-shaped head of the T-type pull rod to extend into the groove and pull back, so that the groove is tightly fitted to the mold surface. Before pouring concrete and vibrating, the air source is connected to ensure that the groove is in a continuous clamping state during the overall vibration of the mold to ensure that the groove does not loosen. After the vibration ends and the pipe segment solidifies, the cylinder drives the T-type pull rod to rise and rotate 90 degrees to let it leave the groove in order to lift the pipe segment.
