Centrifugal concrete pile production line

By setting up different functional areas in the multi-span factory building and using transport vehicles for efficient transportation, the layout of the centrifugal concrete pile production line was optimized, the conflict problem between mold transportation and process layout was solved, and more efficient automated production was achieved.

CN109227920BActive Publication Date: 2024-10-11俞向阳
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201810748843.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-07-10
Publication Date
2024-10-11
Estimated Expiration
2038-07-10

AI Technical Summary

Technical Problem

The existing centrifugal concrete pile production line has conflicts and inconveniences in mold transportation and process layout, which limits the development of automated and intelligent production.

Method used

A centrifugal concrete pile production line including a feeding mold clamping area, a centrifugal area and a curing area is designed. Different functional areas are set up in a multi-span factory building, and mold transporters and pile transporters are used to efficiently transport molds and concrete piles. , to avoid interference between cranes and optimize the assembly line layout.

Benefits of technology

It achieves smoother assembly line operations, reduces lifting distance and time, improves production efficiency and automation level, reduces costs and floor space, and improves site utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109227920B_ABST
    Figure CN109227920B_ABST
Patent Text Reader

Abstract

The present invention relates to a centrifugal concrete pile production line, comprising a feeding and mold-closing area, a centrifugal area, and a curing area, characterized in that: it also comprises a mold transport vehicle, and a first span plant, a second span plant, and a third span plant that are adjacent in sequence; a first area for placing and curing the pile mold is provided in the first span plant; a second area for hoisting the upper half mold of the mold is provided in the second span plant, and a third area for installing the steel cage on the lower half mold of the mold is provided in the third span plant, or a third area for installing the steel cage on the lower half mold of the mold is provided in the second span plant, and a second area for hoisting the upper half mold of the mold is provided in the third span plant; the mold transport vehicle can run back and forth between the first span plant and the second span plant, and the mold transport vehicle can run back and forth between the second span plant and the third span plant along the length direction of the mold. It is a centrifugal concrete pile production line with a reasonable layout, ensuring orderly operation of mold removal and production, so as to improve the automation level of concrete pile production.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a production line of centrifugal concrete piles. Background Art

[0002] Pre-tensioned prestressed centrifugal concrete piles are an important pile foundation material in my country and belong to the technical field of concrete products. Their factory production can be traced back to the 1960s. In the 1980s, as a heavy prefabricated component, its main processes were cutting the steel bars to a fixed length, forming the steel bars into a cage shape, installing the end plates, placing the steel cages with end plates into the bottom mold, cleaning the upper mold and the bottom mold, applying the isolation agent, concrete mixing, laying, mold closing, tensioning, centrifugal forming, steam curing, demolding and other processes. In order to realize the factory production of centrifugal prefabricated piles, we need to arrange each process according to production efficiency and safety to form a reasonable assembly line. Since the day when centrifugal piles were invented, the design of the assembly line has always been a key consideration for professionals in the industry. It is also an important part of the production process of centrifugal concrete piles. Whether the assembly line is reasonable is related to product quality, production safety, production efficiency, and labor intensity of the labor force. Now it is also related to energy saving, environmental protection, and whether it has the basis of automation and intelligent production.

[0003] There are two main forms of water flow for centrifugal concrete piles in my country: one is longitudinal water flow, see P30 of Prestressed Concrete Piles by Ruan Qinan; a 55m PHC pipe pile production plant disclosed in patent application number 200710036609.4. The other is transverse water flow, which is divided into single-span reciprocating transverse water flow, such as Concrete Piles and Cement Products by Zou Wenxiao, 2012, No. 8, page 32; and a precast concrete pile production method disclosed in patent application number 201010604071.4; and a new type of efficient, energy-saving and environmentally friendly centrifugal concrete pile manufacturing system disclosed in patent application number 200910186075.2. And multi-span circulating transverse water flow, such as Concrete Piles and Cement Products by Yan Zhilong, 2006, No. 5, page 21.

[0004] The aforementioned documents not only disclose the single-span and multi-span circulating horizontal flow lines commonly used in my country today, but also disclose the current assembly line layouts in South Korea and Japan. Vertical flow lines are mainly used in the production of centrifugal piles with a length greater than 30 meters and a diameter greater than φ600mm in my country. Because it is in a single-span factory building, the flow lines between the various processes are not clear, and the cranes are prone to bumping into each other when going back and forth, so it is limited to the production of long piles. (Because if long piles are used with horizontal flow lines, the factory building width is very wide, which is not realistic in production). As for the production of centrifugal piles below 30 meters, horizontal flow is usually adopted now. There are single-span workshop production methods and multi-span workshop circulation production lines. In the layout of these horizontal flow lines, the same crane has to carry more than several different types of workpieces, and multiple cranes are set in a span workshop. There is a conflict of avoidance when the cranes carry different workpieces, and the prestressed molds must be lifted horizontally to the centrifuge by the crane, or lifted horizontally from the transfer trolley to the centrifuge. The process of the mold on the assembly line is to move the mold from one operation point to another by the crane. When it is operated between the two spans of the factory, it is mainly transported by the trolley, that is, the mold is lifted on the trolley by the crane, and when it arrives at the other span of the factory, it is lifted from the trolley to the work site. All of these seriously restrict the production of centrifugal concrete piles to develop in the direction of automation and intelligence. It can be seen from these background technology assembly lines that these crane equipments are engaged in the work of multiple different nature processes, and the molds are not accurately positioned at the work site, which is not conducive to the realization of automation and intelligence.

[0005] For example, in Concrete Piles and Cement Products, written by Zou Wengang, Issue 8, 2012, page 32, the scheme disclosed that there are conflicts between multiple cranes in the single-span round trip process. Among the three cranes in the multi-span circulation line located in the demoulding area, except for one crane dedicated to lifting the piles to the autoclave (high-pressure steaming equipment), the other two cranes have to remove the upper mold and transport the upper and lower molds to the material distribution line, which has a round-trip conflict. In the Japanese production line, there are two cranes that have to put the mold that has been automatically molded on the material distribution table, and then reverse the mold after the material distribution to the tensioning lift. After the prestressing is tensioned, it has to cross the material distribution table and be lifted to the centrifuge for centrifugation. In the Korean production line, there are also two cranes that need to lift the upper and lower molds of the interval process, which has a round-trip conflict.

[0006] How to design a reasonable automated and intelligent production line around the mold transportation of centrifugal concrete piles has become a top priority. Otherwise, precast pile companies will have no work available in three to five years. Summary of the invention

[0007] The technical problem to be solved by the present invention is to provide a centrifugal concrete pile production line with a reasonable layout to ensure orderly operation of demoulding and production, so as to improve the automation level of concrete pile production.

[0008] The technical solution adopted by the present invention to solve the above technical problems is: a centrifugal concrete pile production line, including a feeding and mold closing area, a centrifugal area, and a curing area, characterized in that it also includes a mold transport vehicle, and a first-span factory building, a second-span factory building, and a third-span factory building that are adjacent in sequence; a first area for placing and curing pile molds is provided in the first-span factory building; a second area for lifting the upper half of the mold is provided in the second-span factory building, and a third area for installing the steel cage on the lower half of the mold is provided in the third-span factory building, or a third area for installing the steel cage on the lower half of the mold is provided in the second-span factory building, and a second area for lifting the upper half of the mold is provided in the third-span factory building; the mold transport vehicle can run back and forth between the first-span factory building and the second-span factory building along the length direction of the mold, and the mold transport vehicle can run back and forth between the second-span factory building and the third-span factory building along the length direction of the mold.

[0009] In addition, the lower half of the mold can be transported between the second span factory building and the third span factory building by a mold transport vehicle.

[0010] Since a first area for placing and curing the piled molds is provided in the first-span factory building, and the centrifugal, curing and mold bolt removal processes are three adjacent processes, it is a preferred layout to locate the centrifugal area, curing area and first area in the first-span factory building. Preferably, the curing area is located between the centrifugal area and the first area, which can reduce the lifting distance.

[0011] In the present invention, the transport line of the mold transport vehicle that runs back and forth in the first span factory building and the second span factory building can be different transport lines that are not connected to each other, so that the mold transport vehicle only runs between the two adjacent span factories and cannot run directly and continuously from the first span factory building to the third span factory building. As the optimal solution, the above-mentioned mold transport vehicle can run back and forth in the first span factory building, the second span factory building and the third span factory building along the mold length direction, and the mold transport vehicle runs back and forth in a straight line on the same transport line. In this way, only one mold transport vehicle is needed on the same straight transport line, which saves costs, and the mold transport vehicle runs back and forth in a straight line on the first span, the second span, and the third span factory building on the same transport line. The transport lines of the three span factories are connected, the transportation is more coherent and smooth, and the space occupied can be reduced, and the site utilization rate is high. Of course, two mold transport vehicles can also be used on the same straight transport line, one of which runs back and forth between the first span factory building and the second span factory building, and the other runs back and forth between the second span factory building and the third span factory building.

[0012] As a further improvement, a pile transporter is provided on one side of the mold transporter, which can run back and forth between the first span factory building and the second span factory building along the mold length direction. The pile transporter runs back and forth along the mold length direction to reduce the occupied space and improve the site utilization rate. In addition, the pile transporter is provided on one side of the mold transporter, which can quickly lift the concrete piles on the mold transporter onto the pile transporter, and then let the pile transporter pass through the second span factory building along the mold length direction to quickly complete the pile transportation. A mold transporter and a pile transporter constitute a transport unit. This production line can set up multiple groups of transport units in parallel, which can make full use of the space in each area and optimize the layout.

[0013] As a further improvement, a device for cleaning the lower mold half of the mold is provided between the third area and the second area. When the mold transport vehicle with the lower mold half placed thereon moves from the second area to the third area via the lower mold cleaning device, the lower mold cleaning device can automatically clean the impurities on the lower mold half, without spending extra time cleaning the mold. The device for cleaning the lower mold half of the mold can be conventional equipment such as an automatic rotating brush and a scraping device.

[0014] Preferably, a device for removing the support plate nuts is provided in the first area. A device for removing the mold bolts is provided in the first area or the second area. Choosing to complete the support plate removal and mold bolt removal processes in the first area is conducive to process optimization. The device for removing the support plate nuts can use existing equipment. In the process of removing the support plate nuts and the support plate, the mold is placed on the mold transport vehicle. After the removal is completed, the mold will be transported to the second area by the mold transport vehicle to ensure the automated operation of the assembly line.

[0015] As a further improvement, the third area or the second area is provided with equipment for removing the anchor plate and tension plate at the end of the concrete pile. Since the concrete pile has been lifted off the formwork transport vehicle in the second area or the third area (preferably the second area), equipment for removing the tension plate nut is provided in the second area or the third area (preferably the second area) to complete the tension plate removal process. This arrangement is optimal, and there is no need to transport the centrifugal concrete pile to other areas for the tension plate removal operation, thus shortening the transportation route, optimizing the assembly line, and improving efficiency. Preferably, during the process of removing the tension plate nut and tension plate, the centrifugal concrete pile is placed on the pile transport vehicle.

[0016] As a further optimized layout, an upper mold cleaning area is provided on one side of the second area. The upper mold can be quickly lifted sideways to the upper mold cleaning area to complete the cleaning of the upper mold. The upper mold cleaning area refers to the area for cleaning the upper mold of the mold to remove impurities in the upper mold and to apply oil to the upper mold.

[0017] As an optimization, the second-span workshop is provided with a second feeding and mold-closing area, and the second area and the upper mold cleaning area are both located in the second-span workshop; the upper mold cleaning area is preferably set between the second area and the mold-closing area, so that the cleaned upper mold can also be quickly lifted to the mold-closing area for mold-closing, making full use of the idle area between the areas, and reducing the lifting distance. The third-span workshop is provided with a first feeding and mold-closing area, and the area for installing the steel cage on the lower mold and the steel cage processing area are both located in the third-span workshop; the first feeding and mold-closing area and the second feeding and mold-closing area together constitute the feeding and mold-closing area. The second feeding and mold-closing area refers to the area where the lower mold with the steel cage is poured with concrete and then the upper mold is covered with the mold for mold-closing; the first feeding and mold-closing area refers to the area where the mold after feeding and mold-closing is prestressed. The functional division of each area is clear. When the feeding and mold-closing process is carried out in the second mold-closing feeding area, the steel cage tensioning operation in the first feeding and mold-closing area is not affected, reducing time cost.

[0018] As a further optimization of the spatial layout, a steel cage processing area is provided on one side of the third area, so that the steel cage can be quickly hoisted into the lower half of the third area.

[0019] Preferably, removing the mold bolts, removing the upper mold half, and installing the steel cage on the lower mold half are all completed on the mold transport vehicle.

[0020] To facilitate lifting, lifting equipment is installed in the first span factory building, the second span factory building and the third span factory building. The running tracks of the lifting equipment in each factory building are independently set and parallel to each other, so that the lifting equipment in each factory building can complete its own process independently, avoiding interference between the lifting equipment during production and making the production process smoother.

[0021] The mold transporter and pile transporter can be a trolley with rollers, a chain conveyor with chains, or a trolley that rotates on supporting wheels.

[0022] Compared with the prior art, the advantages of the present invention are: by sequentially arranging the first-span factory building, the second-span factory building and the third-span factory building adjacent to each other, areas with different demolding functions are set up in each factory building, the layout is reasonable and does not interfere with each other, and the factories are connected in series through the mold transport vehicle, so that the entire demolding assembly line is smoother and the process is orderly, which provides the possibility for realizing the automated production of centrifugal concrete piles. During operation, the mold transport vehicle is moved to the first area of ​​the first span factory building, the steamed mold with centrifugal concrete piles is lifted onto the mold transport vehicle by lifting equipment, and the mold bolts are removed on the mold transport vehicle. The best practice is to complete the support plate removal process in the first area; then the mold transport vehicle is moved to the second area located in the second span factory building or the third span factory building, the upper half mold is lifted horizontally from the second area by lifting equipment, and then the centrifugal concrete piles in the mold are lifted away by heavy lifting equipment. The best practice is to complete the removal of the tensioning plate on the centrifugal concrete piles in the third area, and the mold transport vehicle with the lower mold is moved from the second area to the third area in the third span factory building or the third area in the second span factory building, and complete the process of installing the steel cage on the lower half mold in the third area. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a structural schematic diagram of an embodiment of the present invention;

[0024] Figure 2 It is a schematic structural diagram of the mold removal and pile removal area in an embodiment of the present invention. DETAILED DESCRIPTION

[0025] The present invention is further described in detail below with reference to the accompanying drawings.

[0026] like Figure 1 , 2 Shown is a preferred embodiment of the present invention.

[0027] A centrifugal concrete pile production line comprises a feeding and mold-jointing area B, a centrifugal area A, a curing area C, a mold transport vehicle 1, and a first span plant F1, a second span plant F2, and a third span plant F3 which are adjacent in sequence; the centrifugal area A and the curing area C are located in the first span plant F1. An upper half mold cleaning area E is provided on one side of the second area Q2. The upper half mold cleaning area E is preferably provided between the second area Q2 and the feeding and mold-jointing area B. A steel cage processing area D is provided on one side of the third area Q3.

[0028] A first area Q1 for removing the mold bolts is provided in the first span workshop F1; a second area Q2 for removing the upper half of the mold is provided in the second span workshop F2; and a third area Q3 for installing the steel cage on the lower half of the mold is provided in the third span workshop F3. As an alternative, a third area Q3 for installing the steel cage on the lower half of the mold is provided in the second span workshop F2, and a second area Q2 for removing the upper half of the mold is provided in the third span workshop F3; between the third area Q3 and the second area Q2, a device 6 for cleaning the lower half of the mold is provided. A device 4 for removing the support plate nuts is provided in the first area Q1. A device 5 for removing the anchor plate and tension plate at the end of the concrete pile is provided in the second area Q2.

[0029] The mold transport vehicle 1 can run back and forth in the first span factory building F1, the second span factory building F2 and the third span factory building F3 along the length direction of the mold, and the mold transport vehicle 1 runs back and forth in a straight line on the same transportation line. Removing the mold bolts, removing the upper half mold of the mold, and installing the steel cage on the lower half mold of the mold are all completed on the mold transport vehicle 1. The lower half mold of the mold is transported between the second span factory building F2 and the third span factory building F3 by the mold transport vehicle 1. Lifting equipment 2 is respectively provided in the first span factory building F1, the second span factory building F2 and the third span factory building F3. The lifting equipment 2 is used to lift the mold, the upper and lower molds of the mold, the concrete piles, the steel cage, etc. laterally.

[0030] On one side of the mold transport vehicle 1, a pile transport vehicle 3 is provided, which can run back and forth between the first span factory building F1 and the second span factory building F2 along the mold length direction. The pile transport vehicle 3 also runs back and forth along the preset route in a straight line. One mold transport vehicle and one pile transport vehicle constitute a transport unit. This production line can set up multiple groups of transport units in parallel.

[0031] The second feeding and clamping area B2 is provided in the second span factory building F2, and the second area Q2 and the upper mold cleaning area E are both located in the second span factory building F2; the first feeding and clamping area B1 is provided in the third span factory building F3, and the area Q3 for installing the steel cage on the lower mold and the steel cage processing area D are both located in the third span factory building F3; the first feeding and clamping area B1 and the second feeding and clamping area B2 together constitute the feeding and clamping area B.

[0032] The working principle and process of this pipeline embodiment are as follows

[0033] The mold transport vehicle 1 is moved to the first area Q1, and the mold with the centrifugal concrete pile that has been steamed (the mold and the centrifugal concrete pile are not shown in the drawing) is lifted from the centrifugal area A to the mold transport vehicle 1 in the first area Q1 by the lifting equipment 2 in the first span factory building F1, and then the mold bolt removal operation is carried out in the first area Q1. The mold bolt removal operation can be carried out in the existing way, and the support plate removal process is completed in the first area Q1. The support plate is a plate for tensioning and rests on the outer end surface of one side of the mold; then the mold transport vehicle 1 is moved along the preset track straight line (in the direction indicated by the arrow in the drawing) to the second area Q2, and passes through the second span factory building F1. The lifting equipment 2 in the room F2 lifts the upper half of the mold horizontally from the second area Q2 to the upper half of the mold cleaning area E, and then the lifting equipment 2 in the second span factory building F2 lifts the centrifugal concrete pile in the mold to the pile transporter 3. The best situation is that the pile transporter 3 transports the pile to the Q3 area of ​​the third span factory building, and completes the removal of the tensioning plate (the tensioning plate is not shown in the drawing) on ​​the centrifugal concrete pile on the pile transporter 3 in the third area Q3. The removal method of the tensioning plate can refer to the existing technology. After the tensioning plate is removed, the pile transporter 3 transports the pile from the third area Q3 via the second area Q2, the first area Q1, and finally out of the first area Q1; or directly transports it out of the Q3 area. The mold transport vehicle 1 with the lower half mold placed on it moves from the second area Q2 to the third area Q3 via the equipment 6 for cleaning the lower half mold. The lower mold cleaning equipment 6 can remove impurities on the lower half mold. The mold transport vehicle 1 with the lower mold placed on it enters the third area Q3. The lifting equipment 2 in the third span factory building F3 lifts the steel cage from the external area to the lower half mold placed on the mold transport vehicle 1. Then the lifting equipment 2 in the third span factory building F3 also lifts the lower half mold with the steel cage from the third area Q3 to the first feeding and clamping area B1.

[0034] Through the first span factory building F1, the second span factory building F2, and the third span factory building F3 adjacent in sequence, different demoulding function areas are set up in each factory building, with reasonable layout and no interference, and the factories are connected in series through the mold transport vehicle 3, so that the entire demoulding assembly line is smoother and the process is orderly, which provides the possibility for the automatic production of centrifugal concrete piles. The main advantage is that the demoulding and pile removal, the cleaning of the lower half mold, and the installation of the steel cage are all completed on the trolley, and the production capacity of each process at each work site is relatively balanced. The various lifting equipment do not conflict with each other during operation, which is convenient for realizing a reasonable assembly line beat, the number and location of work sites, thereby establishing a good architecture for the automation and intelligent realization of the entire assembly line. This assembly line is a horizontal multi-span cyclic production process.

[0035] Although the preferred embodiments of the present invention are described in detail above, it should be clearly understood that various modifications and variations are possible for those skilled in the art. Any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A centrifugal concrete pile production line, comprising a feeding and clamping area (B), a centrifugal area (A), and a curing area (C), characterized in that: It also comprises a mold transport vehicle (1) and a first span factory building (F1), a second span factory building (F2), and a third span factory building (F3) which are adjacent in sequence; a first area (Q1) for placing the mold with piles after maintenance is provided in the first span factory building (F1); a second area (Q2) for lifting the upper half of the mold is provided in the second span factory building (F2), and a third area (Q3) for installing a steel cage on the lower half of the mold is provided in the third span factory building (F3); or, a third area (Q3) for installing a steel cage on the lower half of the mold is provided in the second span factory building (F2), and a second area (Q2) for lifting the upper half of the mold is provided in the third span factory building (F3); the mold transport vehicle (1) can run back and forth in the first span factory building (F1), the second span factory building (F2), and the third span factory building (F3) along the length direction of the mold, and the mold transport vehicle (1) runs back and forth in a straight line on the same transport line.

2. The centrifugal concrete pile production line according to claim 1, characterized in that: The centrifugal area (A) and the curing area (C) are located in the first span factory building (F1).

3. The centrifugal concrete pile production line according to claim 1, characterized in that: A pile transport vehicle (3) is provided on one side of the mold transport vehicle (1) and can travel back and forth between the first span factory building (F1) and the second span factory building (F2) along the length direction of the mold.

4. The centrifugal concrete pile production line according to claim 1, characterized in that: Between the third area (Q3) and the second area (Q2), a device (6) for cleaning the lower half of the mold is arranged.

5. The centrifugal concrete pile production line according to claim 1, characterized in that: A support plate nut removal device (4) is provided in the first area (Q1).

6. The centrifugal concrete pile production line according to claim 1, characterized in that: A mold disassembly and assembly bolt device is provided in the first area (Q1) or the second area (Q2).

7. The centrifugal concrete pile production line according to claim 1, characterized in that: Equipment (5) for removing anchor plates and tension plates at the ends of concrete piles is provided in the second area (Q2) or the third area (Q3).

8. The centrifugal concrete pile production line according to claim 1, characterized in that: An upper mold cleaning zone (E) is provided on one side of the second zone (Q2).

9. The centrifugal concrete pile production line according to claim 8, characterized in that: A second feeding and clamping area (B2) is provided in the second span building (F2), and the second area (Q2) and the upper half mold cleaning area (E) are both located in the second span building (F2); a first feeding and clamping area (B1) is provided in the third span building (F3), and the area (Q3) for installing the steel cage on the lower half mold and the steel cage processing area (D) are both located in the third span building (F3); the first feeding and clamping area (B1) and the second feeding and clamping area (B2) together constitute the feeding and clamping area (B).

10. The centrifugal concrete pile production line according to claim 1, characterized in that: A steel cage processing area (D) is provided on one side of the third area (Q3).

11. The centrifugal concrete pile production line according to claim 1, characterized in that: Removing the mold bolts, removing the upper mold half, and installing the steel cage on the lower mold half are all completed on the mold transport vehicle (1).

12. The centrifugal concrete pile production line according to claim 1, characterized in that: Lifting equipment (2) is respectively provided in the first span factory building (F1), the second span factory building (F2) and the third span factory building (F3).