Fully automatic loading and unloading system for three-dimensional coordinate measuring machine

By designing a fully automatic loading and unloading system for a three-dimensional coordinate measuring machine, and using a transitional docking device to realize automatic docking of AGVs of different heights and measuring stations, the problem of height mismatch between AGVs and measuring machines is solved, and product inspection efficiency and measurement compatibility are improved. Reduced equipment costs.

CN109436711BActive Publication Date: 2024-10-01海克斯康制造智能技术(青岛)有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201811557392.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-12-19
Publication Date
2024-10-01
Estimated Expiration
2038-12-19

AI Technical Summary

Technical Problem

The height mismatch between different types of automated guided vehicles (AGVs) and the measuring stations of coordinate measuring machines results in difficulty in application and reduces the versatility of AGVs.

Method used

A fully automatic loading and unloading system for a three-dimensional coordinate measuring machine is designed, including a pallet, an AGV loading and unloading device, a measuring station loading and unloading device and a transitional docking device. The pallet is realized through the docking power mechanism, lifting adjustment mechanism, limit mechanism and induction device. Height adjustment and centering adjustment ensure automatic docking of AGVs of different heights with measuring stations.

Benefits of technology

It realizes efficient and fully automatic loading and unloading of AGV, improves product inspection efficiency, enhances measurement compatibility, reduces equipment costs, and is suitable for products of various shapes and sizes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109436711B_ABST
    Figure CN109436711B_ABST
Patent Text Reader

Abstract

The present invention provides a fully automatic loading and unloading system for a three-dimensional coordinate measuring machine, including a pallet, an AGV loading and unloading device, and a measuring station loading and unloading device, and also includes a transition docking device; the transition docking device includes a first frame, a docking power mechanism for driving the pallet to enter and exit the docking station, a first lifting and adjusting mechanism for adjusting the height of the pallet, and a front and rear limiting mechanism for preventing the pallet from being offside when the pallet moves to the docking station. The present invention realizes the full automation of the loading process, reduces the intensity of manual labor, realizes the automatic docking of AGVs of different heights and measuring stations and the automatic adjustment of the pallet height, improves the versatility of AGV products, and reduces equipment costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of measuring machines, and in particular is a fully automatic loading and unloading system for a three-coordinate measuring machine, which can realize highly efficient fully automatic loading and unloading. Background Art

[0002] With the advent of the era of intelligent manufacturing, the production and inspection of most industrial products are moving towards automation. The role of automatic feeding devices is becoming more and more obvious. They replace manual feeding, reduce workers' labor, and improve product production and inspection efficiency. They are indispensable devices in automated production and inspection.

[0003] With the rapid development of science and technology, there are more and more types of unmanned guided vehicles (AGVs). Due to the different sizes of different types of AGVs, it is difficult to connect AGVs with measuring machines when they are used for three-dimensional coordinate measurement. This is because the height of the AGV is not necessarily the same as the height of the measuring station of the measuring machine, unless an AGV that matches the height of the measuring machine is selected, but this reduces the versatility of the AGV to a certain extent. Summary of the invention

[0004] The present invention provides a fully automatic loading and unloading system for a three-coordinate measuring machine, which realizes full automation of the loading process, reduces manual labor intensity, realizes automatic docking of AGVs of different heights with measuring stations and automatic adjustment of the tray height, improves the versatility of AGV products, and reduces equipment costs.

[0005] In order to achieve the purpose of solving the above technical problems, the present invention adopts the following technical solutions to achieve the goal: a fully automatic loading and unloading system for a three-coordinate measuring machine, including a tray for carrying a product to be measured, an AGV loading and unloading device and a measuring station loading and unloading device located on the measuring machine table, the AGV loading and unloading device including an AGV and an automatic loading and unloading device installed on the AGV; the fully automatic loading and unloading system for a three-coordinate measuring machine also includes a transition docking device located between the AGV loading and unloading device and the measuring station loading and unloading device to connect the AGV loading and unloading device and the measuring station loading and unloading device; the transition docking device includes a first frame, a docking power mechanism for driving the tray to enter and exit the docking station, a first lifting and adjusting mechanism for adjusting the height of the tray, and front and rear limit mechanisms for preventing the tray from being out of position when the tray moves to the docking station.

[0006] The first lifting adjustment mechanism includes a first lifting platform, a first lifting driving component and a lifting guide mechanism. The first lifting driving component is installed on the first frame, and the first lifting platform is fixedly connected to the lifting moving body of the first lifting driving component.

[0007] The transition docking device also includes a centering adjustment mechanism for centering the pallet. The centering adjustment mechanism is installed on the first frame and is located outside the two side edges of the pallet parallel to the loading and unloading direction.

[0008] The centering adjustment mechanism comprises a centering cylinder and a positioning column. The output shaft of the centering cylinder is a horizontal shaft and is perpendicular to the loading and unloading direction. The positioning column is fixedly connected to the output shaft of the centering cylinder.

[0009] The front and rear limit mechanisms include a front limit mechanism and a rear limit mechanism, and both the front limit mechanism and the rear limit mechanism include a vertically arranged limit cylinder and a limit column, and the limit column is fixedly connected to the output shaft of the limit cylinder and is driven by the limit cylinder to achieve limit when extending.

[0010] The transition docking device also includes a sensing device for detecting whether the pallet has completely entered the docking station.

[0011] The loading and unloading device of the measuring station comprises a second frame, a traction mechanism for traction the pallet to the measuring station, a driving device for providing power to the traction mechanism, and a positioning mechanism for positioning the pallet when the pallet is at the measuring station.

[0012] The driving device is a rodless cylinder installed on one side of the second frame. The traction mechanism includes a traction plate, a synchronization rod and a guide rail slider mechanism located on both sides of the second frame. The slider of the guide rail slider mechanism on the same side as the rodless cylinder is connected to the moving body of the rodless cylinder. The two ends of the traction plate are respectively fixedly connected to the sliders of the guide rail slider mechanism on both sides. The two ends of the synchronization rod are respectively fixedly connected to the sliders of the guide rail slider mechanism on both sides through bearings. Gears are respectively installed on the two ends of the synchronization rod. The gears are respectively meshed with racks. The racks are fixed on the second frame.

[0013] The measuring station loading and unloading device also includes a second lifting adjustment mechanism, which includes a second lifting table and a second lifting drive component. The second lifting drive component is installed on the second frame, and the second lifting table is fixedly connected to the lifting moving body of the second lifting drive component.

[0014] The positioning mechanism is at least two positioning balls installed on the second frame, and an arc-shaped positioning groove is correspondingly arranged on the bottom surface of the tray. The positioning balls are located below the second lifting platform, and an avoidance hole for avoiding the positioning balls is arranged on the second lifting platform.

[0015] Compared with the prior art, the present invention has the following advantages and positive effects:

[0016] 1. The loading and unloading process is fully automated, thus improving the inspection efficiency of the product;

[0017] 2. The transition docking device can adjust the height of the pallet, so it can successfully dock with different types of measuring machines and AGV loading and unloading devices;

[0018] 3. The present invention can be applied to products of various shapes, sizes and weights, thus improving product measurement compatibility. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the overall structure of the fully automatic loading and unloading system of the three-coordinate measuring machine of the present invention;

[0020] Figure 2 for Figure 1 A top view of the transition docking device in FIG.

[0021] Figure 3 for Figure 1 A side view of the transition docking device in FIG.

[0022] Figure 4 A top view of the pallet when it enters the transition docking device;

[0023] Figure 5 It is a structural schematic diagram of a loading and unloading device for a measuring station of a fully automatic loading and unloading system of a three-coordinate measuring machine of the present invention;

[0024] Figure 6 for Figure 5 A top view of the traction mechanism (the gear boxes at both ends of the traction mechanism are omitted);

[0025] Figure 7 for Figure 1 Enlarged view of the structure of part I in the middle. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] like Figure 1As shown, the present embodiment is a fully automatic loading and unloading system for a three-dimensional coordinate measuring machine, comprising a tray 100 for carrying a product to be measured, an AGV loading and unloading device 200, and a measuring station loading and unloading device 400 located on a measuring machine table 300, wherein the AGV loading and unloading device 200 comprises an AGV 210 and an automatic loading and unloading device 220 installed on the AGV 210; the fully automatic loading and unloading system for a three-dimensional coordinate measuring machine further comprises a transition docking device 500 located between the AGV loading and unloading device 200 and the measuring station loading and unloading device 400 to connect the two; Figures 2 to 4 As shown, the transition docking device 500 includes a first frame 510, a docking power mechanism 520 for driving the pallet 100 to enter and exit the docking station, a first lifting and lowering adjustment mechanism 530 for adjusting the height of the pallet 100, and a front and rear limiting mechanism 540 for preventing the pallet 100 from moving forward or backward when the pallet 100 moves to the docking station. The directional words "front" and "rear" described in this embodiment are based on the loading direction, with the direction consistent with the loading direction being forward and the direction opposite to the loading direction being backward.

[0028] Specifically, when the height of the AGV loading and unloading device 200 is inconsistent with the height of the measuring station loading and unloading device 200, taking the case where the height of the AGV loading and unloading device 200 is lower than the height of the measuring station loading and unloading device 200 as an example, during automatic loading and unloading, the AGV loading and unloading device 200 transports the product to be tested from the designated position to the docking position with the transition docking device 500 and stops, the first lifting and adjusting mechanism 530 adjusts the height of the pallet 100 to make it consistent with the height of the AGV loading and unloading device 200, and the automatic loading and unloading device 220 of the AGV loading and unloading device 200 transports the pallet 100 to the transition docking device 500. When the pallet 100 completely enters the transition docking device 500, the front and rear limit mechanisms 540 limit the position of the pallet 100; then the transition docking device 500 is driven by the first lifting and adjusting mechanism 530 to make the pallet 100 rise to the same height position as the measuring station loading and unloading device 400. At this time, the docking power mechanism 520 outputs the pallet to the measuring station loading and unloading device 400. The unloading process is the same, but in the opposite direction.

[0029] Furthermore, if Figure 2 and Figure 3As shown, the first lifting adjustment mechanism 530 includes a first lifting platform 531, a first lifting driving component 532 and a lifting guide mechanism 533. The first lifting driving component 532 is installed on the first frame 510, and the first lifting platform 531 is fixedly connected to the lifting moving body of the first lifting driving component 532. Specifically, in this embodiment, the first lifting driving component 532 is a cylinder, which is located below the center position of the first lifting platform 531, and the top of the piston rod of the cylinder is fixedly connected to the center position of the first lifting platform 531; the lifting guide mechanism 533 is a guide column and guide sleeve mechanism, specifically, the guide column is fixed at the four corners of the first lifting platform 531, and the guide sleeve is fixed on the first frame 510 and located below the first lifting platform 531 to correspond to the guide column. In addition, the docking power mechanism 520 for driving the tray 100 to enter and exit the docking station in this embodiment is an electric roller in this embodiment, but it can also be other structures, such as belt conveyors, etc. Since the first lifting platform 531 has to contact the tray 100 when driving the tray 100 to rise and fall, and when no lifting action is required, the first lifting platform 531 retracts and the tray 100 is supported by the docking power mechanism 520, then in this embodiment, the docking power mechanism 520 is preferably an electric roller, and there is a gap between adjacent rollers so that the first lifting platform 531 can extend or retract from the gap.

[0030] In order to stop and protect the pallet 100 on both sides of the moving direction, the AGV loading and unloading device 200 is provided with blocks 221 located on both sides of the pallet 100, and similarly, the transition docking device 400 is also provided with blocks 550. In order to easily put the pallet 100 into the AGV loading and unloading device 200, a larger gap is usually reserved between the edges of the two sides of the pallet 100 and the blocks 221, such as 10 mm, and on the transition docking device 400, the gap between the edges of the two sides of the pallet 100 and the blocks 550 is reserved to be 5 mm, so that it can be aligned with the measuring station as much as possible when entering the measuring station in the next step. Since the gap between the edges of the two sides of the pallet 100 and the blocks 221 is large, the pallet 100 is easy to deviate during the movement, and when it enters the transition docking device 500, it will not be in the center of the table of the transition docking device 400. To solve this problem, the transition docking device 500 further includes a centering adjustment mechanism 560 for centering the pallet 100. The centering adjustment mechanism 560 is mounted on the first frame 510 and is located outside the two sides of the pallet 100 parallel to the loading and unloading direction, that is, the side where the pallet 550 is located. Figure 4 As shown, the centering adjustment mechanisms 560 on both sides further adjust the position of the tray 100 so that the tray 100 is located in the center as much as possible, thereby ensuring that the tray can enter the measuring station smoothly and steadily.

[0031] Furthermore, the centering adjustment mechanism 560 includes a centering cylinder (located on both sides below the docking power mechanism 520, not shown in the figure due to viewing angle) and a positioning column 561. The output shaft of the centering cylinder is a horizontal axis and is perpendicular to the loading and unloading direction. The positioning column 561 is fixedly connected to the output shaft of the centering cylinder. Figure 2 and Figure 4 When centering, the piston rods of the centering cylinders on both sides extend to drive the positioning posts 561 close to the pallet 100. If the pallet 100 deviates, some of the positioning posts 561 will push the pallet 100 to realign. The positioning posts 561 on each side have the same stroke, and finally the pallet 100 is in the center.

[0032] The front and rear limit mechanisms 540 include a front limit mechanism and a rear limit mechanism, which respectively limit the forward movement and the backward movement of the pallet 100. The front limit mechanism and the rear limit mechanism both include a vertically arranged limit cylinder (not shown in the figure due to viewing angle reasons) and a limit column 541. The limit column 541 is fixedly connected to the output shaft of the limit cylinder. The limit cylinder drives the limit column to achieve limiting when the limit column is extended, and does not affect the normal loading and unloading operation of the pallet 100 when it is retracted.

[0033] The transition docking device 500 also includes a sensing device 570 for detecting whether the pallet 100 has completely entered the docking station. Figure 2 and Figure 4 As shown, the sensing device 570 can be an infrared sensor or other sensing switch. Figure 2 and Figure 3 As shown, the four bottom corners of the first frame 510 of the transition docking device 500 are provided with adjustable feet 580 to fine-tune the height of the device. At the same time, the first frame 510 is fixed on a horizontal base plate 590, and the horizontal base plate 590 is provided with multiple horizontal adjustment mechanisms 591 to adjust the overall levelness and further improve the docking accuracy.

[0034] For the measuring station loading and unloading device 400, in this embodiment, as Figure 5 and Figure 6As shown, it includes a second frame 410, a traction mechanism 420 for traction the pallet 100 to the measuring station, a driving device 430 for providing power to the traction mechanism 420, and a positioning mechanism for positioning the pallet 100 when the pallet 100 is at the measuring station. When the transition docking device 500 is driven by the first lifting and adjusting mechanism 530 to rise to the same height as the measuring station, the driving device 410 of the loading and unloading device 400 of the measuring station drives the traction mechanism 420 to grab the pallet 100, and then the front and rear limit mechanisms 540 descend, and the docking power mechanism 520 and the driving device 430 on the measuring station work together to pull the pallet 100 into the loading and unloading device 400 of the measuring station, and the transition power mechanism stops driving, and the driving device 430 continues to drive to completely transport the pallet 100 to the top of the measuring station, and the traction mechanism 420 disengages from the pallet 100, and then the positioning mechanism positions the pallet 100 to achieve precise positioning before measurement, and the loading process is completed; in order to make the pallet 100 run smoothly, the loading and unloading device 400 of the measuring station is provided with rollers 460. After the pallet 100 is first aligned and adjusted on the transition docking device 500, it is positioned for the second time on the loading and unloading device 400 at the measuring station. No human intervention is required to achieve precise positioning, which greatly improves the positioning accuracy of the pallet 100 before measurement, thereby indirectly ensuring the measurement repeatability, and improving the inspection efficiency, especially for high-precision products.

[0035] Furthermore, if Figure 5 and Figure 6 As shown, in this embodiment, the driving device 430 is a rodless cylinder installed on one side of the second frame 410, and the traction mechanism 420 includes a traction plate 421, a synchronization rod 422 and a guide rail slider mechanism 423 located on both sides of the second frame 410. The slider 4231 of the guide rail slider mechanism 423 on the same side as the driving device 430 (rodless cylinder) is connected to the moving body of the driving device 430 (rodless cylinder). The two ends of the traction plate 421 are respectively fixedly connected to the sliders 4231 of the guide rail slider mechanism 423 on both sides, and the two ends of the synchronization rod 422 are respectively fixedly connected to the sliders 4231 of the guide rail slider mechanism 423 on both sides through bearings. At the same time, gears 424 are respectively installed on both ends of the synchronization rod 422. The gears 424 are respectively meshed with racks 425, and the racks 425 are fixedly arranged on the second frame 410. As shown in FIG. Figure 6 As shown in the angle, the guide rail slider mechanism 423 on the right side of the loading and unloading direction is located on the side of the second frame 410, which is not shown in the figure.

[0036] Specifically, Figure 6As shown, the driving device 430 (rodless cylinder) is driven on one side, driving the slider 4231 on the same side to move, thereby driving the traction plate 421 to move, and the traction plate 421 drives the pallet 100 to move. At the same time, the synchronizing rod 422 and the gear rack mechanism on both sides synchronize the unilateral drive of the driving device 430 to both sides of the traction plate 421, so that the two sides of the traction plate 421 move synchronously without generating torque, thereby making the loading and unloading of the pallet 100 run smoothly.

[0037] For the traction plate 421, if Figure 5 and Figure 6 As shown, two claws 4211 are fixedly provided on the side opposite to the transition docking device 500, and two slots 110 are correspondingly provided on the tray 100. When pulling, the claws 4211 cooperate with the slots 110 to grab the tray 100. Figure 6 The claw 4211 shown in the figure is oriented such that if the pallet 100 is to be grasped smoothly, the initial position of the pallet 100 should be lower than the position of the claw 4211, and then the pallet 100 moves upward so that the claw 4211 and the slot 110 can be smoothly matched. When the pallet 100 is about to enter the measuring station loading and unloading device 400 from the transition docking device 500, the pallet 100 is lower than the position of the traction plate 421, and its slot 110 is aligned with the claw 4211. The first lifting platform 531 drives the pallet 100 to rise so that it is at the same height as the measuring station, and then the traction mechanism 420 pulls the pallet 100 to the measuring station loading and unloading device 400.

[0038] Similarly, when the pallet 100 is pulled to the measuring station, if the pallet 100 is to be separated from the traction plate 421, the pallet 100 should also be lifted and lowered here. In this embodiment, the measuring station loading and unloading device 400 also includes a second lifting adjustment mechanism, which includes a second lifting table 450 and a second lifting drive component (not shown in the figure). The second lifting drive component is located below the second lifting table 450 and is installed on the second frame 410. The second lifting table 450 is fixedly connected to the lifting moving body of the second lifting drive component. In this embodiment, the second lifting drive component is also a cylinder. Since the lifting stroke of the pallet 100 is small in this process, the required cylinder is small. If the second lifting table 450 is to be lifted smoothly, the number of required cylinders is large. In this embodiment, the second lifting drive components are 4-6 and evenly distributed. Then the second lifting drive component drives the second lifting table 450 to descend, thereby driving the pallet 100 to descend, so that it can be smoothly separated from the traction plate 421, and then the pallet 100 is positioned by the positioning mechanism.

[0039] Further, the positioning mechanism is at least two positioning balls 440 installed on the second frame 410, such as Figure 5 and Figure 6As shown, there are three positioning balls 440, which are distributed in a triangle and have strong positioning stability. The bottom surface of the tray 100 is correspondingly provided with an arc-shaped positioning groove (also called a ball socket, which is not shown in the figure due to the viewing angle). The positioning ball 440 is located below the second lifting platform 450, and the second lifting platform 450 is provided with an avoidance hole 451 for avoiding the positioning ball 440. As described above, when the traction plate 421 pulls the tray 100 to the measuring station, the second lifting platform 450 descends, the traction plate 421 is separated from the tray 100, and the tray 100 is fitted with the positioning ball 440, so as to achieve precise positioning before measurement, and the loading process is completed.

[0040] For the automatic loading and unloading device 220 of the AGV loading and unloading device 200, the automatic loading and unloading device or feeding device in the prior art can be selected and directly installed on the AGV 210, such as Figure 1 and Figure 7 As shown, in this embodiment, it includes a third frame 222, an AGV loading and unloading power mechanism 223 and an AGV limiting mechanism 224. The block 221 is installed on the third frame 222. The AGV loading and unloading power mechanism 223 can also use an electric roller. The AGV limiting mechanism 224 is used to prevent the pallet 100 from being limited when it is loaded onto the automatic loading and unloading device 220 to prevent the pallet 100 from being out of place. Since the AGV loading and unloading device 200 is mainly electrically driven, the AGV limiting mechanism 224 can use an electric cylinder to drive the lifting block to rise for limiting.

[0041] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for a person skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to replace some of the technical features therein by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions claimed to be protected by the present invention.

Claims

1. A fully automatic loading and unloading system for a three-dimensional coordinate measuring machine, comprising a tray for carrying a product to be measured, an AGV loading and unloading device, and a measuring station loading and unloading device located on a measuring machine table, wherein the AGV loading and unloading device comprises an AGV and an automatic loading and unloading device installed on the AGV; characterized in that: The fully automatic loading and unloading system of the three-dimensional coordinate measuring machine also includes a transition docking device located between the AGV loading and unloading device and the measuring station loading and unloading device to connect the AGV loading and unloading device and the measuring station loading and unloading device; the transition docking device includes a first frame, a docking power mechanism for driving the pallet to enter and exit the docking station, a first lifting and adjusting mechanism for adjusting the height of the pallet, and front and rear limit mechanisms for preventing the pallet from being offside when the pallet moves to the docking station; The loading and unloading device of the measuring station includes a second frame, a traction mechanism for traction the pallet to the measuring station, a driving device for providing power to the traction mechanism, and a positioning mechanism for positioning the pallet when the pallet is at the measuring station; The first lifting adjustment mechanism comprises a first lifting platform, a first lifting driving component and a lifting guide mechanism, the first lifting driving component is installed on the first frame, and the first lifting platform is fixedly connected to the lifting moving body of the first lifting driving component; The front and rear limit mechanisms include a front limit mechanism and a rear limit mechanism, and both the front limit mechanism and the rear limit mechanism include a vertically arranged limit cylinder and a limit column, and the limit column is fixedly connected to the output shaft of the limit cylinder and is driven by the limit cylinder to achieve limit when extending.

2. The fully automatic loading and unloading system of a three-dimensional coordinate measuring machine according to claim 1 is characterized in that: The transition docking device also includes a centering adjustment mechanism for centering the pallet. The centering adjustment mechanism is installed on the first frame and is located outside the two side edges of the pallet parallel to the loading and unloading direction.

3. The fully automatic loading and unloading system of a three-dimensional coordinate measuring machine according to claim 2 is characterized in that: The centering adjustment mechanism comprises a centering cylinder and a positioning column. The output shaft of the centering cylinder is a horizontal shaft and is perpendicular to the loading and unloading direction. The positioning column is fixedly connected to the output shaft of the centering cylinder.

4. The fully automatic loading and unloading system of a three-dimensional coordinate measuring machine according to claim 1 is characterized in that: The transition docking device also includes a sensing device for detecting whether the pallet has completely entered the docking station.

5. The fully automatic loading and unloading system of a three-dimensional coordinate measuring machine according to claim 1 is characterized in that: The driving device is a rodless cylinder installed on one side of the second frame. The traction mechanism includes a traction plate, a synchronization rod and a guide rail slider mechanism located on both sides of the second frame. The slider of the guide rail slider mechanism on the same side as the rodless cylinder is connected to the moving body of the rodless cylinder. The two ends of the traction plate are respectively fixedly connected to the sliders of the guide rail slider mechanism on both sides. The two ends of the synchronization rod are respectively fixedly connected to the sliders of the guide rail slider mechanism on both sides through bearings. Gears are respectively installed on the two ends of the synchronization rod. The gears are respectively meshed with racks. The racks are fixed on the second frame.

6. The fully automatic loading and unloading system of a three-dimensional coordinate measuring machine according to claim 1 is characterized in that: The measuring station loading and unloading device also includes a second lifting adjustment mechanism, which includes a second lifting table and a second lifting drive component. The second lifting drive component is installed on the second frame, and the second lifting table is fixedly connected to the lifting moving body of the second lifting drive component.

7. The fully automatic loading and unloading system of a three-dimensional coordinate measuring machine according to claim 6, characterized in that: The positioning mechanism is at least two positioning balls installed on the second frame, and an arc-shaped positioning groove is correspondingly arranged on the bottom surface of the tray. The positioning balls are located below the second lifting platform, and an avoidance hole for avoiding the positioning balls is arranged on the second lifting platform.