T-shaped steel and threaded casing assembly connection steel-concrete composite pipe T-shaped node
By using T-shaped steel and threaded casing assembled connected steel concrete composite pipes in the T-shaped node, combining the embedded tie ribs and crack-resistant mesh, the problem of insufficient integrity and seismic resistance of the existing T-shaped node structure is solved. It achieves efficient connection strength and construction quality, meeting the requirements of modern prefabricated buildings.
Patent Information
- Application Number
- CN201910278382.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-04-09
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2039-04-09
AI Technical Summary
The T-shaped node structure in existing prefabricated buildings is not intact and has poor seismic resistance, which leads to deformation and cracks of prefabricated walls, and the connection form cannot meet the high requirements of modern prefabricated buildings.
T-shaped steel and threaded casing assembled connecting steel concrete composite pipe T-shaped nodes, through the embedded tie bars and crack-resistant mesh, combined with the casting of concrete blocks, a stable connection structure is formed to ensure balanced stress and wind and earthquake resistance. ability.
It significantly improves the connection strength and reliability of T-shaped nodes, meets the overall stress, energy saving and seismic resistance requirements of modern prefabricated buildings, and improves construction efficiency and quality.
Smart Images

Figure CN109944362B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of prefabricated building construction, and specifically relates to a T-shaped node of a steel-concrete composite pipe assembled and connected by a T-shaped steel and a threaded sleeve. Background Art
[0002] The single-section steel-concrete composite pipe used in prefabricated buildings is a rectangular cylindrical structure as a whole. It is manufactured in the factory and then transported to the construction site for assembly. The biggest problem in the promotion and application of existing prefabricated buildings is that it is impossible to form a stable and unified system. The key to this problem lies in the node connection between the steel-concrete composite pipes. The T-node is one of the most common nodes in prefabricated buildings. The existing T-node structure has the disadvantages of weak structural integrity and poor seismic resistance, which can easily cause deformation and cracks in the prefabricated wall. Its connection form cannot meet the higher requirements of prefabricated buildings. Summary of the invention
[0003] In order to solve the deficiencies in the prior art, the present invention provides a T-shaped steel and threaded sleeve assembled connection type steel-concrete composite pipe T-shaped node with compact and reasonable structure, balanced force, strong stability, and strong wind and earthquake resistance.
[0004] In order to solve the above technical problems, the present invention adopts the following technical scheme: a T-shaped node of a steel-concrete composite pipe assembled and connected by a T-shaped steel and a threaded sleeve, comprising a first steel-concrete composite pipe and a second steel-concrete composite pipe arranged perpendicular to each other, the front side of the first steel-concrete composite pipe is adjacent to the rear end of the second steel-concrete composite pipe, the first steel-concrete composite pipe comprises a first rectangular steel plate structure and a first concrete layer cast on the outer side of the first rectangular steel plate structure, the second steel-concrete composite pipe comprises a second rectangular steel plate structure and a second concrete layer cast on the outer side of the second rectangular steel plate structure, a plurality of first screw tie bars are arranged between the front side plate and the rear side plate of the first rectangular steel plate structure, the front and rear ends of the first screw tie bars are pre-embedded in the first concrete layer, a plurality of second screw tie bars are arranged between the left and right sides of the second rectangular steel plate structure, the left and right ends of the second screw tie bars are pre-embedded in the second concrete layer, the rear end of the second rectangular steel plate structure exposes the end steel plate, and the front of the first steel-concrete composite pipe is provided with a plurality of first screw tie bars. The first concrete layer on the side is pre-embedded with internal threaded sleeves corresponding to the left and right sides of the second concrete layer respectively, the front end of the first screw tie bar corresponding to the internal threaded sleeve is threadedly connected to the rear half of the internal threaded sleeve, the front half of the internal threaded sleeve is threadedly connected to a connecting stud, and the left and right sides of the rear side of the end steel plate are respectively welded with a vertically arranged T-shaped steel, the T-shaped steel includes a web and a wing plate perpendicular to each other, the front side of the web plate is welded to the rear side of the end steel plate, the rear side of the web plate is fixedly connected to the middle part of the front side of the wing plate, and mounting holes corresponding to the front and rear of the web plate are opened on the wing plate, and a plurality of mounting holes are arranged along the vertical direction of the web plate and correspond to the connecting studs one by one, and a wrench operation hole corresponding to the mounting hole is opened on the rear side of the web plate, the connecting stud passes through the mounting hole and extends into the wrench operation hole, and the front end of the connecting stud is threadedly connected to a connecting nut located in the wrench operation hole, and the connecting nut presses the rear side of the wing plate to the front side of the first steel-concrete composite pipe.
[0005] A plurality of first through holes are provided on the web of the T-shaped steel, and each of the first through holes is located at the rear side between two upper and lower adjacent wrench operation holes.
[0006] A plurality of second through holes arranged at intervals are provided in the vertical direction on the exposed end steel plate at the rear end of the second reinforced concrete composite pipe.
[0007] A first tie-tie anti-cracking mesh connected to the front and rear ends of the first screw tie bar is pre-embedded in the first concrete layer, and a second tie-tie anti-cracking mesh is pre-embedded in the second concrete layer. The rear side of the second tie-tie anti-cracking mesh extends to the outside of the connecting studs adjacent to the front side of the first steel-concrete composite pipe and on both sides.
[0008] A concrete block with T-shaped steel, connecting studs and exposed second tie-tie anti-cracking mesh embedded therein is cast in the rectangular columnar space between the rear side of the end steel plate and the first steel-concrete composite pipe. The outer side surfaces of the concrete block are respectively connected with the left and right side surfaces of the second concrete layer and kept flush. Inner concrete is cast in the second steel-concrete composite pipe, and the concrete block and the inner concrete are connected as a whole through the second through hole.
[0009] By adopting the above technical solution, the first concrete layer outside the first steel-concrete composite pipe and the embedded first tie-cracking mesh, the first screw tie-bar, the internal threaded sleeve and the second concrete layer outside the second steel-concrete composite pipe and the embedded second tie-cracking mesh and the second screw tie-bar are all prefabricated in the factory. When prefabricated in the factory, the end steel plate of the second steel-concrete composite pipe and the rear end of the second tie-cracking mesh are exposed, the T-shaped steel is pre-opened with a mounting hole and a first through hole, and the end steel plate is opened with a second through hole.
[0010] After the first steel concrete composite pipe and the second steel concrete composite pipe are transported to the construction site, they are assembled so that the first steel concrete composite pipe and the second steel concrete composite pipe are arranged vertically, and a connecting stud is inserted in the rectangular columnar space between the rear side of the end steel plate and the front side of the first steel concrete composite pipe, and a T-shaped steel is installed on the connecting stud, and a wrench is used to clamp the connecting nut in the wrench operation hole and screw it onto the connecting stud, so that the wing plate of the T-shaped steel is crimped with the front side of the first steel concrete composite pipe, and then the front side of the web of the T-shaped steel is welded to the end steel plate as a whole, and finally the templates are supported on the left and right sides of the rectangular columnar space, and concrete is poured between the templates to solidify into concrete blocks, and the concrete blocks are connected to each other through the first through hole and the wrench operation hole, so that the first steel concrete composite pipe and the second steel concrete composite pipe are firmly connected as a whole. The second tie anti-cracking mesh is also poured into the concrete block, so as to ensure that the surface of the second concrete layer and the concrete block at the connection does not crack. While pouring the concrete block, inner concrete is poured inside the second steel-concrete composite pipe. The concrete block and the inner concrete inside the second steel-concrete composite pipe are connected as a whole through a plurality of second through holes, further improving the connection strength at the T-shaped node.
[0011] Since the second steel-concrete composite pipe is generally used as the inner wall of the prefabricated building and the first steel-concrete composite pipe is used as the outer wall of the prefabricated building, the first steel-concrete composite pipe adopts a factory-manufactured integral structure, and the first steel-concrete composite pipe and the second steel-concrete composite pipe are connected as one through on-site connection. The second steel-concrete composite pipe also plays a role in supporting the first steel-concrete composite pipe.
[0012] In addition, the center line of the mounting hole on the wing plate of the T-steel is located on the plane where the web is located, so that the first screw tie bar, the connecting stud and the wing plate are subjected to force in the same plane, avoiding the situation where the steel components built into the concrete block are damaged by uneven force, thereby ensuring the reliability of the T-node connection.
[0013] In summary, the present invention can greatly improve the connection strength at the T-node between two steel-concrete composite pipes and ensure the reliability of the connection. It combines cast-in-place with prefabrication, is easy to construct, has high construction efficiency, and can ensure construction quality, fully meeting the overall stress, energy saving, earthquake resistance and other use requirements of modern prefabricated buildings. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the plane layout of the present invention;
[0015] Figure 2 yes Figure 1 Side view of the middle T-shaped steel;
[0016] Figure 3 yes Figure 2 Middle AA section view;
[0017] Figure 4 yes Figure 1 An enlarged view of the connection between the first screw tie bar, internal threaded sleeve, connecting stud and connecting nut. DETAILED DESCRIPTION
[0018] like Figure 1-Figure 4As shown, the T-shaped node of the steel-concrete composite pipe assembled and connected by T-shaped steel and threaded sleeve of the present invention comprises a first steel-concrete composite pipe and a second steel-concrete composite pipe which are arranged perpendicular to each other, the front side of the first steel-concrete composite pipe is adjacent to the rear end of the second steel-concrete composite pipe, the first steel-concrete composite pipe comprises a first rectangular steel plate structure 1 and a first concrete layer 2 cast on the outer side of the first rectangular steel plate structure 1, the second steel-concrete composite pipe comprises a second rectangular steel plate structure 3 and a second concrete layer 4 cast on the outer side of the second rectangular steel plate structure 3, a plurality of first screw tie bars 5 are arranged between the front side plate and the rear side plate of the first rectangular steel plate structure 1, the front and rear ends of the first screw tie bars 5 are pre-embedded in the first concrete layer 2, a plurality of second screw tie bars 6 are arranged between the left and right sides of the second rectangular steel plate structure 3, the left and right ends of the second screw tie bars 6 are pre-embedded in the second concrete layer 4, the rear end of the second rectangular steel plate structure 3 exposes the end steel plate 7, and the first concrete layer 2 on the front side of the first steel-concrete composite pipe is pre-embedded with the front and rear ends of the second concrete layer 4. The internal threaded sleeve 8 on the left and right sides, the front end of the first screw tie bar 5 corresponding to the internal threaded sleeve 8 is threadedly connected to the rear half of the internal threaded sleeve 8, the front half of the internal threaded sleeve 8 is threadedly connected with a connecting stud 9, and the left and right sides of the rear side of the end steel plate 7 are respectively welded with a vertically arranged T-shaped steel 10, the T-shaped steel 10 includes a web 11 and a wing plate 12 perpendicular to each other, the front side of the web 11 is welded to the rear side of the end steel plate 7, and the rear side of the web 11 is fixed to the middle of the front side of the wing plate 12 The wing plate 12 is provided with mounting holes 13 corresponding to the front and rear of the web 11. A plurality of mounting holes 13 are arranged along the vertical direction of the web 11 and correspond one to one with the connecting studs 9. The rear side of the web 11 is provided with a wrench operating hole 14 corresponding to the mounting hole 13. The connecting stud 9 passes through the mounting hole 13 and extends into the wrench operating hole 14. The front end of the connecting stud 9 is threadedly connected with a connecting nut 15 located in the wrench operating hole 14. The connecting nut 15 presses the rear side of the wing plate 12 to the front side of the first reinforced concrete composite pipe.
[0019] A plurality of first through holes 16 are formed on the web 11 of the T-shaped steel 10 . Each of the first through holes 16 is located at the rear side between two adjacent wrench operation holes 14 .
[0020] A plurality of second through holes 17 arranged at intervals are provided in the vertical direction on the exposed end steel plate 7 at the rear end of the second reinforced concrete composite pipe.
[0021] A first tie-tie anti-cracking mesh 18 connected to the front and rear ends of the first screw tie bar 5 is pre-embedded in the first concrete layer 2, and a second tie-tie anti-cracking mesh 19 is pre-embedded in the second concrete layer 4. The rear side of the second tie-tie anti-cracking mesh 19 extends to the outside of the connecting studs 9 adjacent to the front side of the first steel-concrete composite pipe and on the left and right sides.
[0022] A concrete block (not shown in the figure) with T-shaped steel 10, connecting studs 9 and exposed second tie-tie anti-cracking mesh 19 embedded therein is cast in the rectangular columnar space between the rear side of the end steel plate 7 and the first steel-concrete composite pipe. The outer side surfaces of the concrete block are respectively connected with the left and right side surfaces of the second concrete layer 4 and kept flush. Inner concrete (not shown in the figure) is cast in the second steel-concrete composite pipe. The concrete block and the inner concrete are connected as a whole through the second through hole 17.
[0023] The first concrete layer 2 on the outside of the first steel-concrete composite pipe and the pre-buried first anti-crack mesh 18, the first screw tie bar 5, the internal threaded sleeve 8 and the second concrete layer 4 on the outside of the second steel-concrete composite pipe and the pre-buried second anti-crack mesh 19 and the second screw tie bar 6 are all prefabricated in the factory. When prefabricated in the factory, the end steel plate 7 of the second steel-concrete composite pipe and the rear end of the second anti-crack mesh 19 are exposed, the T-shaped steel 10 is pre-opened with the mounting hole 13 and the first through hole 16, and the end steel plate 7 is pre-opened with the second through hole 17.
[0024] After the first steel concrete composite pipe and the second steel concrete composite pipe are transported to the construction site, they are assembled so that the first steel concrete composite pipe and the second steel concrete composite pipe are arranged vertically, and a connecting stud 9 is penetrated in the rectangular columnar space between the rear side of the end steel plate 7 and the front side of the first steel concrete composite pipe, and a T-shaped steel 10 is installed on the connecting stud 9, and a wrench is used to clamp the connecting nut 15 in the wrench operation hole 14 and screw it onto the connecting stud 9, so that the wing plate 12 of the T-shaped steel 10 is crimped with the front side of the first steel concrete composite pipe, and then the front side of the web 11 of the T-shaped steel 10 is welded to the end steel plate 7 as a whole, and finally, the templates are supported on the left and right sides of the rectangular columnar space, and concrete is poured between the templates to solidify into concrete blocks, and the concrete blocks are connected to each other through the first through hole 16 and the wrench operation hole 14. In this way, the first steel concrete composite pipe and the second steel concrete composite pipe are firmly connected as a whole. The second tie-tie anti-crack mesh 19 is also poured into the concrete block, so as to ensure that the surface of the second concrete layer 4 and the concrete block at the connection point does not crack. While pouring the concrete block, the inner concrete is poured inside the second steel-concrete composite pipe, and the concrete block and the inner concrete inside the second steel-concrete composite pipe are connected as a whole through a plurality of second through holes 17, further improving the connection strength at the T-shaped node.
[0025] Since the second steel-concrete composite pipe is generally used as the inner wall of the prefabricated building and the first steel-concrete composite pipe is used as the outer wall of the prefabricated building, the first steel-concrete composite pipe adopts a factory-manufactured integral structure, and the first steel-concrete composite pipe and the second steel-concrete composite pipe are connected as one through on-site connection. The second steel-concrete composite pipe also plays a role in supporting the first steel-concrete composite pipe.
[0026] In addition, the center line of the mounting hole 13 opened on the wing plate 12 of the T-shaped steel 10 is located on the plane where the web 11 is located, so that the first screw tie bar 5, the connecting stud 9 and the wing plate 12 can be subjected to force in the same plane, avoiding the steel components built into the concrete block from being damaged by uneven force, thereby ensuring the reliability of the T-node connection.
[0027] This embodiment does not impose any formal limitation on the shape, material, structure, etc. of the present invention. Any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention shall fall within the protection scope of the technical solution of the present invention.
Claims
1. A T-shaped node of a steel-concrete composite pipe assembled and connected by a T-shaped steel and a threaded sleeve, comprising a first steel-concrete composite pipe and a second steel-concrete composite pipe arranged perpendicularly to each other, the front side of the first steel-concrete composite pipe being adjacent to the rear end of the second steel-concrete composite pipe, the first steel-concrete composite pipe comprising a first rectangular steel plate structure and a first concrete layer cast on the outer side of the first rectangular steel plate structure, the second steel-concrete composite pipe comprising a second rectangular steel plate structure and a second concrete layer cast on the outer side of the second rectangular steel plate structure, a plurality of first screw tie bars are arranged between the front side plate and the rear side plate of the first rectangular steel plate structure, the front and rear ends of the first screw tie bars are pre-buried in the first concrete layer, a plurality of second screw tie bars are arranged between the left side plate and the right side plate of the second rectangular steel plate structure, the left and right ends of the second screw tie bars are pre-buried in the second concrete layer, characterized in that: The rear end of the second rectangular steel plate structure exposes the end steel plate, and the first concrete layer on the front side of the first steel-concrete composite pipe is pre-embedded with internal threaded sleeves corresponding to the left and right sides of the second concrete layer respectively. The front end of the first screw tie bar corresponding to the internal threaded sleeve is threadedly connected to the rear half of the internal threaded sleeve, and the front half of the internal threaded sleeve is threadedly connected to a connecting stud. The left and right sides of the rear side of the end steel plate are respectively welded with a vertically arranged T-shaped steel, and the T-shaped steel includes a web and a wing plate perpendicular to each other. The front side of the web is welded to the rear side of the end steel plate, and the rear side of the web is fixedly connected to the middle part of the front side of the wing plate. Mounting holes corresponding to the front and rear of the web are opened on the wing plate, and a plurality of mounting holes are arranged along the vertical direction of the web and correspond to the connecting studs one by one. A wrench operation hole corresponding to the mounting hole is opened on the rear side of the web, and the connecting stud passes through the mounting hole and extends into the wrench operation hole. The front end of the connecting stud is threadedly connected to a connecting nut located in the wrench operation hole, and the connecting nut presses the rear side of the wing plate onto the front side of the first steel-concrete composite pipe; A plurality of first through holes are provided on the web of the T-shaped steel, and each of the first through holes is located at the rear side between two upper and lower adjacent wrench operation holes; A plurality of second through holes arranged at intervals are provided in the vertical direction on the exposed end steel plate at the rear end of the second steel-concrete composite pipe; A concrete block with T-shaped steel, connecting studs and exposed second tie-tie anti-cracking mesh embedded therein is cast in the rectangular columnar space between the rear side of the end steel plate and the first steel-concrete composite pipe. The outer side surfaces of the concrete block are respectively connected with the left and right side surfaces of the second concrete layer and kept flush. Inner concrete is cast in the second steel-concrete composite pipe, and the concrete block and the inner concrete are connected as a whole through the second through hole.
2. The T-shaped steel and threaded sleeve assembly connection type steel-concrete composite pipe T-shaped node according to claim 1 is characterized in that: A first tie-tie anti-cracking mesh connected to the front and rear ends of the first screw tie bar is pre-embedded in the first concrete layer, and a second tie-tie anti-cracking mesh is pre-embedded in the second concrete layer. The rear side of the second tie-tie anti-cracking mesh extends to the outside of the connecting studs adjacent to the front side of the first steel-concrete composite pipe and on both sides.