A powder negative pressure conveying system and method

By using wind speed and vacuum measurement devices in the powder conveying system, the discharge speed is adjusted in real time, and the problem of difficult to accurately judge the conveying situation in the prior art is solved, the risk of pipe blocking is reduced, and the working efficiency and production capacity of the system are improved.

CN109969794BActive Publication Date: 2024-11-12BEIJING GOLDENTEAM TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910363384.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-04-30
Publication Date
2024-11-12
Estimated Expiration
2039-04-30

AI Technical Summary

Technical Problem

The existing powder conveying system is difficult to timely and accurately judge the material conveying situation in the system, and it is impossible to quickly adjust the material conveying volume according to the actual situation, resulting in the risk of pipeline blockage.

Method used

The powder negative pressure conveying system is adopted. By setting up a wind speed measurement device at the beginning of the material transportation pipeline, combining the controller and the vacuum degree measurement device, the wind speed and vacuum degree are monitored in real time, the discharge control command is generated, and the discharge speed is adjusted to adapt to the conveying line. The wind speed changes to avoid blocking of pipes.

Benefits of technology

Accurate and timely adjustment of the powder material conveying volume is achieved, reducing the risk of pipe blockage in the conveying system, and ensuring production capacity and system work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109969794B_ABST
    Figure CN109969794B_ABST
Patent Text Reader

Abstract

The present invention relates to a negative pressure powder conveying system and method, the system includes a controller and at least one powder conveying line; the powder conveying line includes a material bin, a material buffer bin and a vacuum feeder; the material bin and the material buffer bin are connected through a material transport pipeline, a wind speed measuring device is provided at the air supply port at the starting end of the material transport pipeline, the material bin puts materials into the material transport pipeline through a discharge device, and the vacuum feeder is connected to a vacuum source; the controller is electrically connected to each wind speed measuring device and the discharge device, and is used to generate corresponding discharge control instructions according to the wind speed measured by the wind speed measuring device in each powder conveying line, and send them to the discharge device in the powder conveying line. The present invention can timely and accurately adjust the material conveying amount according to the material conveying state in the pipeline.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of material conveying, and in particular to a powder negative pressure conveying system and method. Background Art

[0002] At present, in the powder material conveying system, due to the characteristics of the powder material itself, especially the wet material, it is particularly easy to form accumulation in the corners or bends of the pipeline, resulting in pipeline blockage and affecting the normal operation of the system. In order to achieve uninterrupted conveying of powder materials, it is often necessary to control the material conveying volume according to the pressure of the conveying system.

[0003] However, in the material conveying system, the factors that affect pressure changes are complex, and the pressures at different locations are often different. Pressure changes cannot intuitively reflect the material conveying conditions in the pipeline. Therefore, regulating and controlling based on the pressure of the conveying system usually cannot accurately and timely adjust the material conveying volume, and may still cause pipeline blockage and affect system use. Summary of the invention

[0004] 1. Technical issues to be resolved

[0005] The technical problem to be solved by the present invention is to solve the problem that the powder conveying system in the prior art is difficult to timely and accurately judge the material conveying situation in the system and cannot quickly adjust the material conveying amount according to the actual situation.

[0006] (II) Technical solution

[0007] In order to solve the above technical problems, the present invention provides a powder negative pressure conveying system, comprising a controller and at least one powder conveying line;

[0008] The powder conveying line includes a material bin, a material buffer bin and a vacuum feeder; the material bin and the material buffer bin are connected through a material transport pipeline, a wind speed measuring device is provided at the air supply port at the starting end of the material transport pipeline, the material bin puts materials into the material transport pipeline through a discharge device, the material buffer bin is connected to the vacuum feeder for receiving materials, and the vacuum feeder is connected to a vacuum source;

[0009] The controller is electrically connected to each of the wind speed measuring devices and the discharging devices, and is used to generate corresponding discharging control instructions according to the wind speed measured by the wind speed measuring device in each of the powder conveying lines, and send them to the discharging device in the powder conveying line.

[0010] Preferably, it also includes a vacuum measuring device, which is electrically connected to the controller and is used to measure the system vacuum and provide feedback to the controller. The controller generates corresponding discharge control instructions based on the vacuum measured by the vacuum measuring device and sends them to the corresponding discharge device.

[0011] Preferably, it comprises a plurality of powder conveying lines, wherein the material bins of at least two of the powder conveying lines are fed into the same material buffer bin through the material transport pipeline to achieve mixed loading.

[0012] Preferably, the material buffer bin is provided with a material measuring module for measuring the material quantity inside the material buffer bin; the controller is electrically connected to each of the material measuring modules for generating corresponding discharge control instructions according to the measurement results of the material measuring module in each of the powder conveying lines, and sending the instructions to the discharge device in the powder conveying line.

[0013] Preferably, the controller is also electrically connected to each of the vacuum feeders, and the controller comprises:

[0014] A vacuum degree judgment unit, used to compare and judge the vacuum degree measured by the vacuum degree measuring device with the stored set working value, and when it is judged that the vacuum degree is higher than the set working value, generate a start work instruction and send it to the corresponding vacuum loader;

[0015] A wind speed judgment unit is connected to the vacuum judgment unit, and is used to compare and judge the wind speed measured by the wind speed measuring device with the stored wind speed threshold after the vacuum feeder starts working, generate a discharge control instruction according to the judgment result, and send it to the corresponding discharge device; wherein the wind speed threshold includes an initial threshold, a first threshold, and a second threshold; when it is judged that the wind speed is greater than the initial threshold, a discharge start instruction is generated; when it is judged that the wind speed is less than the first threshold, a discharge speed reduction instruction is generated; when it is judged that the wind speed is greater than the second threshold and continues to exceed the time threshold, a discharge speed increase instruction is generated;

[0016] The timing unit is connected to the wind speed judgment unit and is used to start timing when the wind speed judgment unit judges that the wind speed is greater than a second threshold value, and to provide feedback to the wind speed judgment unit after the timing reaches the stored time threshold value.

[0017] Preferably, the initial threshold v0 and the first threshold v1 and the second threshold v2 satisfy v1<v2<v0, and the first threshold v1 ranges from 0.45v0 to 0.55v0, and the second threshold ranges from 0.6v0 to 0.8v0.

[0018] The present invention also provides a powder negative pressure conveying method, which uses the powder negative pressure conveying system as described in any one of the above items to realize powder material conveying, and specifically includes the following steps:

[0019] S1. Turn on the vacuum source and vacuum loader;

[0020] S2. Measure the wind speed at the air supply port at the starting end of the material transportation pipeline. If the wind speed is greater than the initial threshold, open the discharge device of the corresponding material bin to discharge the material and start transporting the material;

[0021] S3, real-time monitoring of the wind speed at the air supply port at the starting end of the material transport pipeline, if the wind speed is less than the first threshold, executing step S4; if the wind speed is greater than or equal to the first threshold and less than or equal to the second threshold, controlling the corresponding discharge device to maintain the current discharge speed; if the wind speed is greater than the second threshold, executing step S5;

[0022] S4, control the corresponding discharge device to reduce the discharge speed and reduce the material conveying amount;

[0023] S5. Start timing. If the wind speed is greater than the second threshold for a duration exceeding the time threshold, control the corresponding discharge device to increase the discharge speed and increase the material conveying capacity.

[0024] Preferably, the step S4 comprises:

[0025] The corresponding discharging device is controlled to suspend discharging, and after the wind speed rises to the third threshold, the corresponding discharging device is controlled to start discharging and the discharging speed is reduced compared with that before the suspension.

[0026] Preferably, in step S5, if the wind speed is greater than the second threshold value and the duration does not exceed the time threshold, the corresponding discharge device is controlled to maintain the current discharge speed to transport the material.

[0027] Preferably, the first threshold v1, the second threshold v2 and the third threshold v3 satisfy v1<v2<v3<v0, and the range of the first threshold v1 is 0.45v0~0.55v0, the range of the second threshold is 0.6v0~0.8v0, and the range of the third threshold is 0.8v0~0.95v0.

[0028] (III) Beneficial effects

[0029] The above technical solution of the present invention has the following advantages: the present invention provides a powder negative pressure conveying system, including a controller and at least one powder conveying line, and a wind speed measuring device is provided at the starting end of each powder conveying line, that is, the air supply port at the starting end of the material transportation pipeline, which can measure the air supply volume (air intake volume) of the powder conveying line in real time, and the wind speed at the air supply port can intuitively reflect the density of the material in the pipeline; the controller is connected to each wind speed measuring device, and can make accurate judgments based on the changes in wind speed, timely adjust the system conveying speed, and effectively reduce the risk of pipe blockage in the conveying system.

[0030] The present invention also provides a method for negative pressure conveying of powders, which detects the wind speed of the system, and starts conveying when the wind speed reaches the requirement; the wind speed of the system is detected in real time during the conveying process, and the discharge speed is quickly adjusted according to the wind speed to change the material conveying frequency. When the wind speed is low, it indicates that there is a lot of material in the pipeline, and it is necessary to reduce the discharge speed of the discharge device in time, reduce the material conveying frequency, and prevent the material from blocking the pipe; when the wind speed is high, it indicates that there is less material in the pipeline and the conveying is smoother. At this time, the discharge speed of the discharge device can be appropriately increased, the material conveying frequency can be increased, and the production capacity can be guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 Schematic diagram of the structure of the powder negative pressure conveying system in the first embodiment of the present invention;

[0032] Figure 2 It is a schematic diagram of the steps of the powder negative pressure conveying method in the second embodiment of the present invention.

[0033] In the figure: 1: material warehouse; 2: wind speed measuring device; 3: discharge device; 4: material transportation pipeline; 5: material buffer warehouse; 6: vacuum loader; 7: vacuum degree measuring device. DETAILED DESCRIPTION

[0034] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] Embodiment 1

[0036] like Figure 1 As shown, a powder negative pressure conveying system provided by an embodiment of the present invention includes a controller and at least one powder conveying line, which is specifically described below:

[0037] Figure 1The figure shows a powder negative pressure conveying system with a powder conveying line (the controller is not shown), wherein the powder conveying line includes a material bin 1, a material buffer bin 5 and a vacuum feeder 6. The material bin 1 and the material buffer bin 5 are connected through a material conveying pipeline 4. The starting end of the material conveying pipeline 4 is provided with an air supply port (such as Figure 1 The port shown on the left in the figure) is provided with a wind speed measuring device 2 at the air supply port. The material bin 1 puts the material into the material transport pipeline 4 through the discharge device 3, and the material placement is located behind the air supply port. The material buffer bin 5 is connected to the vacuum feeder 6 to receive the material transported from the material bin 1. The vacuum feeder 6 is connected to the vacuum source, and the vacuum source ( Figure 1 (not shown) is used to evacuate and provide a negative pressure transport environment, Figure 1 The direction indicated by the arrow at the right port is the vacuum direction of the vacuum source.

[0038] The controller is electrically connected to each wind speed measuring device 2 and the discharging device 3. The system includes at least one powder conveying line, and the controller is used to generate corresponding discharging control instructions according to the wind speed measured by the wind speed measuring device 2 in each powder conveying line, and send them to the discharging device 3 in the powder conveying line to control the working state of the corresponding powder conveying line.

[0039] In the prior art, the negative pressure conveying system regulates the material conveying state according to the system pressure. However, since the system pressure cannot directly reflect the material conveying state in the system, if the conveying volume is not reduced in time, pipe blockage is likely to occur. If the conveying volume is not increased in time, the conveying efficiency will be affected. The present invention provides a powder negative pressure conveying system. During the conveying process, the material conveying volume of the system is regulated according to the wind speed at the air supply port. The wind speed can accurately and timely reflect the density of the powder material conveyed in the pipeline, thereby accurately and quickly adjusting the feed speed to avoid material blockage while ensuring production capacity.

[0040] Preferably, the system further comprises a vacuum degree measuring device 7, which is preferably arranged at the place where the vacuum feeder 6 is connected to the vacuum source, and is electrically connected to the controller, for measuring the vacuum degree of the system and feeding back to the controller, and the controller generates corresponding discharge control instructions according to the vacuum degree measured by the vacuum degree measuring device, and sends them to the corresponding discharge device. The system takes the vacuum degree meeting the required value as the condition for starting the conveying, ensuring that there is sufficient vacuum pressure in the system, and providing sufficient power for the conveying of powder materials.

[0041] Preferably, the powder negative pressure conveying system further comprises a plurality of powder conveying lines, wherein the material bins 1 of at least two powder conveying lines are fed into the same material buffer bin 5 through the material transport pipeline 4, that is, at least two powder conveying lines share the same material buffer bin 5. The system can convey materials from a plurality of material bins 1 into the same material buffer bin 5 to achieve mixed loading.

[0042] Further preferably, the material buffer bin 5 is provided with a material measuring module for measuring the amount of material inside the material buffer bin 5, such as material weight or material height (material volume). The controller is electrically connected to each material measuring module, and is used to generate corresponding discharge control instructions according to the measurement results of the material measuring module in each powder conveying line, and send them to the discharge device 3 in the powder conveying line, so as to control the discharge amount of each powder conveying line.

[0043] Preferably, the material measuring module comprises a weighing module or a material level sensor, the weighing module is used to measure the weight of the material inside the material buffer bin, and the material level sensor is used to measure the height (material volume) of the material inside the material buffer bin.

[0044] Considering the actual use effect and system cost, the wind speed measuring device 2 is preferably a flow meter, the discharge device 3 is preferably a star valve or a screw feeder, and the vacuum measuring device 7 is preferably a pressure transmitter.

[0045] Preferably, the controller is also electrically connected to each vacuum feeder 6 to control the working state of the vacuum feeder 6. The controller includes a vacuum degree judgment unit, a wind speed judgment unit and a timing unit, wherein:

[0046] The vacuum degree judgment unit is used to compare and judge the vacuum degree measured by the vacuum degree measuring device 7 with the stored set working value. When it is judged that the vacuum degree is higher than the set working value, a start work instruction is generated and sent to the corresponding vacuum loader 6 to control the corresponding vacuum loader 6 to start working.

[0047] The wind speed judgment unit is connected to the vacuum judgment unit, and is used to compare and judge the wind speed measured by the wind speed measuring device 2 with the stored wind speed threshold after the vacuum feeder 6 starts working, and generate a corresponding discharge control instruction according to the judgment result, and send it to the corresponding discharge device 3. Among them, the wind speed threshold includes an initial threshold, a first threshold and a second threshold. When the wind speed judgment unit judges that the wind speed is greater than the initial threshold, a discharge start instruction is generated and sent to control the corresponding discharge device 3 to start discharging; when it is judged that the wind speed is less than the first threshold, a discharge speed reduction instruction is generated and sent to control the corresponding discharge device 3 to reduce the discharge speed and reduce the discharge amount; when it is judged that the wind speed is greater than the second threshold and continues to exceed the time threshold, a discharge speed increase instruction is generated and sent to control the corresponding discharge device 3 to increase the discharge speed and increase the discharge amount.

[0048] The timing unit is connected to the wind speed judgment unit, and is used to start timing when the wind speed judgment unit judges that the wind speed is greater than the second threshold, and to feed back to the wind speed judgment unit after the timing reaches the stored time threshold. The wind speed judgment unit receives the information fed back by the timing unit, so as to generate and send an instruction to increase the discharge speed when the condition that the wind speed is greater than the second threshold and continues to exceed the time threshold is met.

[0049] Further preferably, the wind speed judgment unit is used to generate and send a pause discharge instruction when it is judged that the wind speed is less than a first threshold value, control the corresponding discharge device 3 to pause discharge, wait for the wind speed to rise to a third threshold value, and then generate a start discharge control instruction and a discharge speed reduction instruction to control the corresponding discharge device 3 to restart conveying, and reduce the discharge speed to reduce the conveying amount.

[0050] In actual use, the set working value of the system vacuum degree, the initial threshold, the first threshold and the second threshold of the wind speed, and the time threshold of the time can all be set according to the specific structure of the powder negative pressure conveying system. The initial threshold, the first threshold, the second threshold and the third threshold of the wind speed can be determined by the maximum flow rate, the pipe diameter and the conveying test that the system can provide. If the maximum no-load wind speed measured in the no-load conveying test of the system is v, the range of the initial threshold v0 is preferably 0.7v~0.9v. The initial threshold v0 and the first threshold v1 and the second threshold v2 satisfy v1<v2<v0. Preferably, the range of the first threshold v1 is 0.45v0~0.55v0, and the range of the second threshold is 0.6v0~0.8v0. Further preferably, the third threshold v3 satisfies v2<v3<v0, and the range of the third threshold is 0.8v0~0.95v0.

[0051] Embodiment 2

[0052] like Figure 2 As shown, this embodiment 2 provides a method for negative pressure conveying of powder materials according to wind speed to control the conveying amount, and adopts any of the above-mentioned powder negative pressure conveying systems to realize powder material conveying. For any powder conveying line, the method specifically includes the following steps:

[0053] S1, turning on the vacuum source connected to the vacuum feeder 6 and the vacuum feeder 6; preferably, after turning on the vacuum source, measuring the vacuum degree of the system, if the vacuum degree is higher than the set working value, turning on the vacuum feeder 6;

[0054] S2, measuring the wind speed at the air supply port at the starting end of the material transportation pipeline. If the wind speed is greater than the initial threshold, the discharge device 3 of the corresponding material bin 1 is opened to discharge the material and start conveying the material;

[0055] S3, real-time monitoring of the wind speed at the air supply port at the starting end of the material transport pipeline, if the wind speed is less than the first threshold, executing step S4; if the wind speed is greater than or equal to the first threshold and less than or equal to the second threshold, controlling the corresponding discharge device 3 to maintain the current discharge speed; if the wind speed is greater than the second threshold, executing step S5;

[0056] S4, control the corresponding discharge device 3 to reduce the discharge speed and reduce the material conveying amount;

[0057] S5. Start timing. If the wind speed is greater than the second threshold value for a duration exceeding the time threshold, control the corresponding discharge device 3 to increase the discharge speed and increase the material conveying capacity.

[0058] It should be noted that when the powder negative pressure conveying system includes multiple powder conveying lines, especially when there are two or more powder conveying lines and the material warehouse 1 inputs the same material buffer warehouse 5 through the material transport pipeline 4, the specific method steps are basically the same as the above-mentioned method steps for one powder conveying line. Just pay attention to the correspondence between the devices in the same powder conveying line.

[0059] The present invention provides a method for negative pressure conveying of powders. Before starting to convey, the vacuum degree of the system is checked, and the system vacuum degree is higher than the set working value as a prerequisite for preparing for conveying, ensuring that the system has sufficient power; when conveying materials, the wind speed is used to judge the state of the conveyed materials in the system, so as to timely adjust the discharge speed of the powder materials. This method only takes the system vacuum degree as a prerequisite for starting conveying, and the conveying speed is controlled by the wind speed. It can more accurately and quickly judge the density of the powder materials conveyed in the pipeline, thereby accurately controlling the conveying volume, avoiding pipe blockage, ensuring a higher production capacity, and improving the working efficiency of the system.

[0060] Preferably, in order to further reduce the risk of pipe blockage, step S4 includes: controlling the corresponding discharge device 3 to suspend discharge, waiting for the wind speed to rise to the third threshold, controlling the corresponding discharge device 3 to start discharge, and reducing the discharge speed compared to before the suspension. When there is a sign of pipe blockage (reduced wind speed), the method first suspends discharge, and starts discharge again after the blockage is unblocked, and appropriately reduces the discharge frequency, which helps to quickly adjust the discharge speed to an appropriate range while avoiding system blockage, so that the system can transport materials stably and efficiently for a long time.

[0061] Preferably, in step S1, if the vacuum degree is lower than the set value after the vacuum source is turned on for a certain period of time, check whether the vacuum source is normal. After confirming that the vacuum source is normal and there is no fault, execute step S1 again to prevent the vacuum source fault from affecting the transportation. In step S2, if the wind speed is less than or equal to the initial threshold, check the air tightness of the material transportation pipeline. After confirming that the material transportation pipeline is airtight and there is no fault, execute step S2 again to prevent leakage in the material transportation pipeline from affecting the transportation. Preferably, in step S5, if the wind speed is greater than the second threshold for a duration not exceeding the time threshold, control the corresponding discharge device 3 to maintain the current discharge speed to transport the material, prevent the pipeline from being blocked due to a hasty increase in the delivery volume, and help to quickly adjust the discharge speed to an appropriate range.

[0062] In particular, the initial threshold, first threshold, second threshold and third threshold of wind speed can be determined by the maximum flow rate, pipe diameter and transportation test that the system can provide. If the maximum no-load wind speed measured in the no-load transportation test of the system is v, the range of the initial threshold v0 is preferably 0.7v~0.9v. Preferably, the first threshold v1, the second threshold v2 and the third threshold v3 satisfy v1<v2<v3<v0, and the range of the first threshold v1 is 0.45v0~0.55v0, the range of the second threshold is 0.6v0~0.8v0, and the range of the third threshold is 0.8v0~0.95v0.

[0063] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A powder negative pressure conveying system, characterized in that: It includes a controller, a vacuum measuring device and multiple powder conveying lines; The powder conveying line includes a material bin, a material buffer bin and a vacuum loader; the material bin and the material buffer bin are connected through a material transportation pipeline, a wind speed measuring device is provided at the air supply port at the starting end of the material transportation pipeline, the material bin puts materials into the material transportation pipeline through a discharge device, the material buffer bin is connected to the vacuum loader for receiving materials, the material buffer bin is provided with a material measuring module for measuring the amount of material inside the material buffer bin, and the vacuum loader is connected to a vacuum source; the material bins of at least two of the powder conveying lines are fed into the same material buffer bin through the material transportation pipeline to achieve mixed loading; The controller is electrically connected to each of the wind speed measuring devices and the discharging devices, and is used to generate a corresponding discharging control instruction according to the wind speed measured by the wind speed measuring device in each of the powder conveying lines, and send the instruction to the discharging device in the powder conveying line; The vacuum degree measuring device is electrically connected to the controller, and is used to measure the vacuum degree of the system and provide feedback to the controller. The controller generates a corresponding discharge control instruction according to the vacuum degree measured by the vacuum degree measuring device, and sends it to the corresponding discharge device; The controller is also electrically connected to each of the vacuum feeders, and the controller includes: A vacuum degree judgment unit, used to compare and judge the vacuum degree measured by the vacuum degree measuring device with the stored set working value, and when it is judged that the vacuum degree is higher than the set working value, generate a start work instruction and send it to the corresponding vacuum loader; A wind speed judgment unit is connected to the vacuum judgment unit, and is used to compare and judge the wind speed measured by the wind speed measuring device with the stored wind speed threshold after the vacuum feeder starts working, generate a discharge control instruction according to the judgment result, and send it to the corresponding discharge device; wherein the wind speed threshold includes an initial threshold, a first threshold, and a second threshold; when it is judged that the wind speed is greater than the initial threshold, a discharge start instruction is generated; when it is judged that the wind speed is less than the first threshold, a discharge speed reduction instruction is generated; when it is judged that the wind speed is greater than the second threshold and continues to exceed the time threshold, a discharge speed increase instruction is generated; a timing unit connected to the wind speed determination unit, and configured to start timing when the wind speed determination unit determines that the wind speed is greater than a second threshold, and to provide feedback to the wind speed determination unit after the timing reaches a stored time threshold; The initial threshold v0 and the first threshold v1 and the second threshold v2 satisfy v1<v2<v0, and the first threshold v1 ranges from 0.45v0 to 0.55v0, the second threshold ranges from 0.6v0 to 0.8v0, the initial threshold v0 ranges from 0.7v to 0.9v, and v is the maximum no-load wind speed measured in the no-load transport test of the system; The controller is also electrically connected to each of the material measuring modules, and is used to generate corresponding discharge control instructions according to the measurement results of the material measuring modules in each of the powder conveying lines, and send them to the discharge device in the powder conveying line.

2. A method for conveying powder under negative pressure, characterized in that: The powder negative pressure conveying system according to claim 1 is used to realize powder material conveying, which specifically comprises the following steps: S1. Turn on the vacuum source and vacuum loader; S2. Measure the wind speed at the air supply port at the starting end of the material transportation pipeline. If the wind speed is greater than the initial threshold, open the discharge device of the corresponding material bin to discharge the material and start transporting the material; S3, real-time monitoring of the wind speed at the air supply port at the starting end of the material transport pipeline, if the wind speed is less than the first threshold, executing step S4; if the wind speed is greater than or equal to the first threshold and less than or equal to the second threshold, controlling the corresponding discharge device to maintain the current discharge speed; If the wind speed is greater than the second threshold, execute step S5; S4, control the corresponding discharge device to reduce the discharge speed and reduce the material conveying amount; S5, start timing, if the wind speed is greater than the second threshold value for a duration exceeding the time threshold, control the corresponding discharge device to increase the discharge speed and increase the material conveying capacity; Wherein, step S4 comprises: Control the corresponding discharge device to suspend discharge, wait for the wind speed to rise to the third threshold, control the corresponding discharge device to start discharge, and reduce the discharge speed compared with before the suspension; the first threshold v1, the second threshold v2, and the third threshold v3 satisfy v1<v2<v3<v0, and the first threshold v 1 The range is 0.45v 0 ~0.55v 0 , the second threshold range is 0.6v 0 ~0.8v 0 , the third threshold range is 0.8v 0 ~0.95v 0 ; In step S5, if the wind speed is greater than the second threshold value for a duration not exceeding the time threshold, the corresponding discharge device is controlled to maintain the current discharge speed to transport the material.