Pile culvert integrally assembled steel-reinforced concrete integrated pipeline corridor
Through the design of the integrated prefabricated steel-bonded concrete comprehensive pipe corridor of pile culverts, prefabricated pipe piles and steel structures, combined with cast-in-place concrete layer, the problems of low construction efficiency and great environmental impact of traditional pipe corridors are solved, and fast and safe The construction of underground pipeline corridors has improved the foundation bearing capacity and waterproof performance, and reduced the damage to the environment caused by construction.
Patent Information
- Application Number
- CN201910184158.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-03-12
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2039-03-12
AI Technical Summary
The construction of traditional direct buried pipelines occupies a large amount of road space, affecting the road traffic and environment. The cast-in-place pipeline corridor has a long construction period and high cost. The foundation treatment cycle of prefabricated pipeline corridors is long when they are soft-soiled, resulting in low construction efficiency and serious environmental damage.
The integrated prefabricated steel-bonded concrete comprehensive pipe corridor is adopted, and prefabricated concrete and steel structures are used to enhance the foundation bearing capacity and waterproof performance through the overall assembly of prefabricated pipe piles and pipe corridor main body, combining cast-in-place concrete layer and steel plate layer, thereby enhancing the foundation bearing capacity and waterproof performance, reducing Use formwork to improve construction efficiency and safety.
It shortens the foundation processing time, improves the prefabricated assembly rate of the pipe corridor, reduces the impact of construction on the environment, enhances the anti-float and overturning capabilities, and reduces construction costs and noise pollution.
Smart Images

Figure CN109972657B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a novel pile culvert integrally assembled steel-framed concrete integrated pipe gallery, belonging to the technical field of municipal facility construction. Background Art
[0002] Since traditional direct buried pipelines occupy a lot of underground space under the road, and the laying of pipelines often cannot be synchronized with the construction of roads, frequent road excavation has not only affected the normal traffic of the road, but also brought environmental pollution such as noise and dust. Direct buried pipelines in some cities have frequently experienced safety accidents. Therefore, some economically developed cities in my country have begun to learn from foreign advanced municipal pipeline construction and maintenance methods and build comprehensive pipeline corridor projects. Comprehensive pipeline corridors are essentially municipal public facilities built underground in cities for laying urban engineering pipelines in accordance with unified planning, design, construction and maintenance principles.
[0003] In recent years, the construction of integrated pipe corridors in my country has entered a relatively high-speed period. However, the cast-in-place pipe corridors currently used are long in construction period, serious ground damage, and high in noise and dust pollution, which greatly affects the urban environment and traffic. The prefabricated assembly technology of "factory processing of components and on-site assembly of structures" has been gradually introduced into the construction of integrated pipe corridors, greatly improving the construction quality and efficiency and realizing green construction. Based on this, several patents related to prefabricated pipe corridors have been disclosed, such as prefabricated wedge-shaped flexible interface assembled pipe corridor (CN 204040062 U), an assembled prefabricated bamboo composite pipe corridor (CN204940337 U), a steel structure urban integrated pipe corridor (CN 204898721 U), and a partially prefabricated steel-concrete combined underground integrated pipe corridor (CN 106381886 B). These patents include prefabricated integrated pipe corridors made of various materials such as prefabricated concrete, steel-concrete combination, steel, and bamboo. In areas with shallow groundwater and soft soil, it is usually necessary to treat the soil on the site separately before carrying out the construction of prefabricated pipe corridors, which greatly increases the construction period of the pipe corridor and reduces the prefabrication rate of the pipe corridor construction. Especially when it comes to the construction of pipe corridors in historical and cultural and urban central blocks, the construction will cause great damage to the surrounding environment. How to quickly complete the entire construction process of these pipe corridors is crucial. The applicant previously applied for a formwork-free partially prefabricated steel-concrete composite underground comprehensive pipe corridor (ZL 201710907889.5), which is suitable for site conditions with hard soil foundations. Even though it greatly shortens the construction period of the box culvert itself, when it is used in soft soil, especially in the central blocks of Jiangnan water towns, the foundation needs to be treated for a long time, which greatly increases the various costs of engineering construction; and due to the separate structural characteristics of the pile-culvert, the joint effect of the pile-culvert in anti-floating and anti-overturning conditions cannot be fully exerted.
[0004] To this end, the concept of pile culvert integration and prefabrication of pipe piles is used, the advantages of concrete waterproofing and light steel structure are fully utilized, the pile culvert integrated nodes are reasonably designed, and the intermediate concrete cast-in-place layer is used to solve the waterproofing problems of nodes and joints. Thus, an underground comprehensive pipeline corridor with an overall assembled steel-framed concrete system of pile culverts in which piles and culvert bodies are all prefabricated and assembled on site is invented, which provides new ideas for the construction of prefabricated comprehensive pipeline corridors. Summary of the invention
[0005] The purpose of the present invention is to provide a pile-culvert integrally assembled steel-framed concrete integrated pipe gallery, which comprehensively utilizes the respective advantages of steel and concrete materials on the premise of ensuring foundation reliability and basic functions of the pipe gallery, overcomes the shortcomings of the current cast-in-place pipe gallery formwork engineering, such as high cost, slow construction progress, and great environmental impact, and overcomes the shortcomings of conventional prefabricated pipe galleries, such as long foundation treatment cycle and high waterproofing treatment cost when facing groundwater and soft soil foundations.
[0006] In order to achieve the above object, the present invention provides the following technical solutions:
[0007] A pile culvert integrally assembled steel-framed concrete integrated pipe gallery comprises a pipe gallery body and prefabricated pipe piles, wherein the prefabricated pipe piles are fixed at the bottom of the pipe gallery body, and the pipe gallery body and the prefabricated pipe piles jointly transfer longitudinal loads to the foundation.
[0008] Furthermore, the main body of the pipe gallery is placed on a cushion layer, and its cross-section is a single-compartment or multi-compartment rectangle. The main body of the pipe gallery includes an inner layer, a middle layer and an outer layer. The outer layer is a precast concrete layer, the middle layer is a cast-in-place concrete layer and a precast steel plate layer, and the inner layer is a steel skeleton composed of circumferential steel beams and longitudinal steel beams.
[0009] Furthermore, the precast concrete layer is composed of a bottom precast plate and a side precast plate, the bottom precast plate and the side precast plate are connected by a precast joint, and shear-resistant steel bars extending out of the inner surface of the precast concrete layer are embedded in the precast concrete layer.
[0010] Furthermore, the prefabricated steel plate layer is made of flat steel plates or corrugated steel plates, one side of the prefabricated steel plate layer is connected to the steel frame, and the other side is connected to the cast-in-place concrete layer, and steel sleeves and bolts are welded on the prefabricated steel plate layer connected to one side of the cast-in-place concrete layer, and multiple prefabricated steel plates are connected circumferentially and longitudinally by bolts or welding.
[0011] Furthermore, the shear steel bars and the steel sleeves are connected by inserting steel bars.
[0012] Furthermore, the annular steel beam is formed by splicing a horizontal ring beam and a vertical ring beam through a steel frame node, and the annular steel beam is connected into a whole by a longitudinal steel beam, and the longitudinal steel beam and the annular steel beam are connected by bolts.
[0013] Furthermore, the prefabricated pipe piles are prefabricated steel or steel-framed concrete piles, and the prefabricated pipe piles are fixed to the bottom of the corridor body through a pile culvert connection node, and the pile culvert connection node is composed of an embedded steel plate, an embedded anchor bolt, a cast-in-place steel plate and an installation nut. The embedded steel plate is cast inside the prefabricated pipe pile, one end of the embedded anchor bolt is cast in the prefabricated pipe pile and welded to the embedded steel plate, and the other end passes through the bottom of the corridor body and is fixed to the corridor body through an installation nut, and the cast-in-place steel plate is arranged in the bottom of the corridor body and is sleeved and welded to the embedded anchor bolt.
[0014] Preferably, the precast pipe piles are precast steel or steel-framed concrete piles, which are fixed to the bottom of the tunnel body through a pile culvert connection node, and the pile culvert connection node is composed of an embedded steel plate, an embedded anchor bolt, a cast-in-place steel plate and an installation nut. The embedded steel plate is cast inside the precast pipe pile, one end of the embedded anchor bolt is cast in the precast pipe pile and welded to the embedded steel plate, and the other end passes through the bottom of the tunnel body and is fixed to the horizontal ring beam of the tunnel body through an installation nut, and the cast-in-place steel plate is arranged inside the cast-in-place concrete layer and is sleeved and welded to the embedded anchor bolt.
[0015] Its main principle is: the outer precast concrete layer, the middle cast-in-place concrete and precast steel plate layer, and the steel plate layer composed of the internal steel beams jointly bear the external load transmitted from the soil, and the precast pipe piles are inserted into the soil, which significantly improves the foundation bearing capacity of the corridor. The pile culvert connection node connects the corridor body and the precast pipe piles into one, increasing the integrity of force transmission and rigidity; the circumferential steel beams and longitudinal steel beams form a steel skeleton, which reduces the amount of concrete while improving the overall bearing capacity and rigidity, and reducing the overall weight of the corridor; the precast steel plate and the precast concrete layer jointly bear the load while playing the role of the inner and outer side formwork; the shear steel bars connect the precast concrete layer, the cast-in-place concrete layer and the precast steel plate layer into one, and work together; the partially cast-in-place concrete layer and the pile culvert connection node ensure the waterproof performance of the integrated corridor, and the inner layer of steel is also conducive to the installation of pipe supports in the corridor. Beneficial effects: The present invention provides
[0016] Beneficial effects: The pile-culvert integrally assembled steel-framed concrete integrated pipe corridor of the present invention makes full use of the combined action of prefabricated pipe piles and box culverts to resist the reaction force of the base and external loads. While ensuring the safety of the project and the waterproofness of the pipe corridor, it speeds up the progress of foundation construction and improves the prefabrication and assembly rate of the overall integrated pipe corridor project. The use of steel plates and prefabricated plates avoids the use of formwork. The presence of cast-in-place layers ensures the drainage performance at the connection between the pipe corridor and the pile culvert. The connection nodes greatly enhance the integrity of the pile culvert. The combined action of prefabricated pipe piles and the pipe corridor greatly enhances the overall foundation bearing capacity on the one hand, and improves the anti-floating and anti-overturning capabilities of the pipe corridor when facing groundwater on the other hand. At the same time, since prefabricated pipe piles, steel components and prefabricated concrete layers can be prefabricated in factories and assembled on site, the prefabricated and assembled construction of the overall integrated pipe corridor project is realized, which reduces the time and cost of foundation treatment, formwork support and other processes of the project, and reduces the impact of on-site construction on the environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0018] Figure 1 It is a schematic diagram of the cross-sectional structure of the present invention.
[0019] Figure 2 The present invention Figure 1 Schematic diagram of the cross-sectional structure of section 1-1.
[0020] Figure 3 It is a schematic detailed diagram of the lower corner node structure of the present invention.
[0021] Figure 4 It is a schematic detailed diagram of the upper corner node structure of the present invention.
[0022] In the figure: 1. Precast concrete layer; 11. Bottom precast slab; 12. Side precast slab; 13. Precast joint; 2. Cast-in-place concrete layer; 3. Precast steel plate layer; 4. Ring steel beam; 41. Vertical ring beam; 42. Horizontal ring beam; 43. Steel skeleton node; 5. Longitudinal steel beam; 6. Pad layer; 7. Precast pipe pile; 8. Steel sleeve; 81. Shear steel bar; 82. Sleeve; 9. Pile culvert connection node; 91. Embedded steel plate; 92. Embedded anchor bolt; 93. Cast-in-place steel plate; 94. Installation nut. DETAILED DESCRIPTION
[0023] The present invention is further described below in conjunction with specific embodiments, but the embodiments are only exemplary and do not constitute any limitation to the scope of the present invention. It should be understood by those skilled in the art that the details and forms of the technical solution of the present invention can be modified or replaced without departing from the spirit and scope of the present invention, but these modifications and replacements all fall within the protection scope of the present invention.
[0024] A pile culvert integrally assembled steel-framed concrete integrated pipe gallery, as shown in the figure, includes a pipe gallery body and prefabricated pipe piles 7, the prefabricated pipe piles 7 are fixed at the bottom of the pipe gallery body, and the pipe gallery body and the prefabricated pipe piles 7 jointly transfer the longitudinal load to the foundation.
[0025] The main body of the pipe gallery is placed on a cushion layer 6, and its cross-section is a single-compartment or multi-compartment rectangle. The main body of the pipe gallery includes an inner layer, a middle layer and an outer layer. The outer layer is a precast concrete layer 1, the middle layer is a cast-in-place concrete layer 2 and a precast steel plate layer 3, and the inner layer is a steel skeleton composed of annular steel beams 4 and longitudinal steel beams 5.
[0026] The precast concrete layer 1 is composed of a bottom precast plate 11 and a side precast plate 12 , which are connected by a precast joint 13 , and shear steel bars 81 extending out of the inner surface of the precast concrete layer 1 are embedded in the precast concrete layer 1 .
[0027] The prefabricated steel plate layer 3 is made of flat steel plates or corrugated steel plates. One side of the prefabricated steel plate layer 3 is connected to the steel frame, and the other side is connected to the cast-in-place concrete layer 2. Steel sleeves 82 and studs are welded on the prefabricated steel plate layer 3 connected to one side of the cast-in-place concrete layer 2. Multiple prefabricated steel plates are connected circumferentially and longitudinally by studs or welding; the shear steel bars 81 and the steel sleeves 82 are connected by inserting bars.
[0028] The annular steel beam 4 is formed by splicing a horizontal ring beam 42 and a vertical ring beam 41 through a steel frame node 43. The annular steel beam is connected into a whole by a longitudinal steel beam 5. The longitudinal steel beam 5 and the annular steel beam 4 are connected by bolts. The steel frame node 43 is connected by an end plate flange and a stiffening rib is provided. The connection is designed to be rigid, semi-rigid or hinged as needed. The spacing between each annular steel beam 4 and the spacing between the longitudinal steel beams 5 are determined by the design. The cross-section of the steel beam adopts the cross-section form of applicable steel components such as welded I-shaped and H-shaped steel. When the size of the pipeline corridor is large, a steel truss beam can also be used to improve the rigidity and bearing capacity of the steel beam and save materials.
[0029] The prefabricated pipe pile 7 is a prefabricated pile of reinforced steel or steel-framed concrete. The prefabricated pipe pile 7 is fixed to the bottom of the main body of the pipe gallery through a pile culvert connection node 9. The pile culvert connection node 9 is composed of an embedded steel plate 91, an embedded anchor bolt 92, a cast-in-place steel plate 93 and an installation nut 94. The embedded steel plate 91 is cast inside the prefabricated pipe pile 7. One end of the embedded anchor bolt 92 is cast in the prefabricated pipe pile 7 and welded to the embedded steel plate 91, and the other end passes through the bottom of the main body of the pipe gallery and is fixed to the horizontal ring beam 42 of the main body of the pipe gallery through the installation nut 94. The cast-in-place steel plate 93 is arranged inside the cast-in-place concrete layer 2 and is sleeved and welded to the embedded anchor bolt 92.
[0030] The production steps of the pipe gallery of the present invention are as follows:
[0031] (1) According to the designed dimensions of each part of the integrated pipe corridor, the vertical ring beam 41, the horizontal ring beam 42, the longitudinal steel beam 5 and the prefabricated steel plate layer 3 are prefabricated in the steel structure factory, and the sleeve 82 is welded at the corresponding position of the prefabricated steel plate layer 3; the bottom prefabricated plate 11, the side prefabricated plate 12 and the prefabricated pipe pile 7 are processed in the concrete component prefabrication plant, and the shear steel bars 81, the prefabricated steel plates 91 and the prefabricated anchor bolts 92 are pre-embedded;
[0032] (2) The vertical ring beam 41 and the horizontal ring beam 42 are spliced on site through the steel frame node 43 to form the annular steel beam 4, and the annular steel beam 4 is connected to form a whole with the longitudinal steel beam 5. The longitudinal and annular steel beams are connected by bolts;
[0033] (3) Drive precast pipe piles 7 into the excavated foundation pit, then pour the cushion layer 6, position and place the bottom precast slab 11, lay the precast steel plate layer 3 on the surface of the steel skeleton composed of the annular steel beam 4 and the longitudinal steel beam 5, and hoist the whole structure to the designed position; insert the shear steel bar 81 at the bottom into the sleeve 82, pass the embedded anchor bolts 92 through the bottom precast slab 11, the precast steel plate layer 3 and the annular steel beam 4, and fix them with the mounting nuts 94. If necessary, a temporary bracket can be set between the bottom precast slab 11 and the ground of the precast steel plate layer 3; pour the cast-in-place concrete layer 2 at the bottom and vibrate it.
[0034] (4) Install the side precast panels 12, which are connected to the precast joints 13 of the bottom precast panels 11 by using the process of inserting reinforcement and grouting, that is, the end of one side panel extends the steel bar and inserts it into the end hole of the other panel, and mortar is poured into the hole; at the same time, the shear steel bar 81 on the side is inserted into the sleeve 82; after the bottom surface of the cast-in-place concrete layer 2 has reached the age, the cast-in-place concrete layer 2 on the side and top surfaces is cast, vibrated and cured.
[0035] (5) After reaching the age, the construction of the next section of the tunnel begins. The precast concrete layer 1 is connected in the longitudinal direction by inserting reinforcement grouting, mortise and tenon molding or post-tensioning. The post-tensioning method is to retain holes in the precast panels and staggered prestressing steel bars to ensure the longitudinal integrity of the precast panels. If necessary, certain waterproofing measures are taken at the joints. Multiple precast steel plates are connected in the circumferential and longitudinal directions by studs, welding, etc., and the longitudinal steel beams are connected by bolted end plates. The rest of the process is the same as above until the construction of the entire tunnel is completed.
Claims
1. A pile culvert integrally assembled steel-framed concrete integrated pipe gallery, characterized in that: It includes a pipe gallery body and prefabricated pipe piles, wherein the prefabricated pipe piles are fixed at the bottom of the pipe gallery body, and the pipe gallery body and the prefabricated pipe piles jointly transfer the longitudinal load to the foundation. The pipe gallery body is placed on the cushion layer, and its cross section is a single-compartment or multi-compartment rectangle. The pipe gallery body includes an inner layer, a middle layer and an outer layer, wherein the outer layer is a prefabricated concrete layer, the middle layer is a cast-in-place concrete layer and a prefabricated steel plate layer, and the inner layer is a steel skeleton composed of annular steel beams and longitudinal steel beams; The prefabricated pipe piles are prefabricated steel or steel-reinforced concrete piles, which are fixed to the bottom of the pipe gallery body through a pile culvert connection node, which is composed of a pre-embedded steel plate, a pre-embedded anchor bolt, a cast-in-place steel plate and a mounting nut. The pre-embedded steel plate is cast inside the prefabricated pipe pile, one end of the pre-embedded anchor bolt is cast inside the prefabricated pipe pile and welded to the pre-embedded steel plate, and the other end passes through the bottom of the pipe gallery body and is fixed to the pipe gallery body through a mounting nut. The cast-in-place steel plate is arranged in the bottom of the pipe gallery body and is sleeved and welded to the pre-embedded anchor bolt; The prefabricated pipe piles are prefabricated steel or steel-framed concrete piles, which are fixed to the bottom of the pipe gallery body through a pile culvert connection node, which is composed of a pre-embedded steel plate, a pre-embedded anchor bolt, a cast-in-place steel plate and a mounting nut. The pre-embedded steel plate is cast inside the prefabricated pipe pile, one end of the pre-embedded anchor bolt is cast inside the prefabricated pipe pile and welded to the pre-embedded steel plate, and the other end passes through the bottom of the pipe gallery body and is fixed to the horizontal ring beam of the pipe gallery body through a mounting nut. The cast-in-place steel plate is arranged inside the cast-in-place concrete layer and is sleeved and welded to the pre-embedded anchor bolt; The outer precast concrete layer, the middle cast-in-place concrete and precast steel plate layer, and the steel plate layer composed of the internal steel beam jointly bear the external load transmitted from the soil. The precast pipe piles are inserted into the soil to improve the foundation bearing capacity of the corridor. The pile culvert connection node connects the corridor body and the precast pipe piles into one to increase the integrity of force transmission and rigidity. The annular steel beams and longitudinal steel beams constitute a steel skeleton to reduce the amount of concrete while improving the overall bearing capacity and rigidity and reducing the overall weight of the corridor. The precast steel plate and the precast concrete layer jointly bear the load and act as inner and outer formworks. The precast concrete layer is pre-embedded with shear steel bars extending out of the inner surface of the precast concrete layer. The shear steel bars connect the precast concrete layer, the cast-in-place concrete layer and the precast steel plate layer into one, and work together. The partially cast-in-place concrete layer and the pile culvert connection node ensure the waterproof performance of the comprehensive corridor. The inner layer of steel is convenient for the installation of pipe supports in the corridor.
2. The pile culvert integrally assembled steel-framed concrete integrated pipe gallery according to claim 1 is characterized in that: The precast concrete layer consists of a bottom precast plate and a side precast plate, and the bottom precast plate and the side precast plate are connected by precast joints.
3. The pile culvert integrally assembled steel-framed concrete integrated pipe gallery according to claim 1 is characterized in that: The prefabricated steel plate layer is made of flat steel plates or corrugated steel plates. One side of the prefabricated steel plate layer is connected to the steel frame, and the other side is connected to the cast-in-place concrete layer. Steel sleeves and bolts are welded on the prefabricated steel plate layer connected to one side of the cast-in-place concrete layer. Multiple prefabricated steel plates are connected circumferentially and longitudinally by bolts or welding.
4. The pile culvert integrally assembled steel-framed concrete integrated pipe gallery according to claim 3 is characterized in that: The shear-resistant steel bars and the steel sleeves are connected by inserting steel bars.
5. The pile culvert integrally assembled steel-framed concrete integrated pipe gallery according to claim 1 is characterized in that: The annular steel beam is formed by splicing a horizontal ring beam and a vertical ring beam through a steel frame node, and the annular steel beam is connected into a whole by a longitudinal steel beam, and the longitudinal steel beam and the annular steel beam are connected by bolts.
Citation Information
Patent Citations
A partially prefabricated and assembled steel-concrete composite underground utility tunnel
CN106381886B
Prefabricated assembly pipe gallery with wedge-shaped flexible connector
CN204040062U
Steel construction city utility tunnel
CN204898721U
Compound piping lane of prefabricated bamboo of assembled
CN204940337U
Soft soil foundation comprehensive pipe gallery and construction method thereof
CN107313453A
