A curved track ship loader

Through the combination of arc-shaped rail ship loading machine and screw conveyor, combined with bag dust collector and telescopic roller, the problem that traditional ship loading machines cannot control fly ash dust is solved, and the safe and effective loading of fly ash is achieved. Transportation reduces transportation costs and environmental pollution.

CN110239976BActive Publication Date: 2024-11-12CHINA HUADIAN ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910584479.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-07-01
Publication Date
2024-11-12
Estimated Expiration
2039-07-01

AI Technical Summary

Technical Problem

Traditional ship loaders cannot effectively control dust pollution when transporting fly ash, resulting in environmental pollution, and the transportation cost of fly ash is relatively high.

Method used

A curved track ship loading machine was designed, using curved tracks and screw conveyors, combined with bag dust collectors and telescopic rollers, which achieved safe and effective ship loading and transportation of fly ash, reducing the transportation of fly ash. cost.

Benefits of technology

Effectively prevent fly ash dust pollution, greatly reduce fly ash transportation costs, improve transportation efficiency and environmental protection effects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110239976B_ABST
    Figure CN110239976B_ABST
Patent Text Reader

Abstract

The present invention discloses a curved track ship loader, wherein the rear support seat is fixedly arranged at the front of the wharf, the curved track is arranged between the rear support seat and the cargo ship berth with the axis of the rear support seat as the center, a walking mechanism is arranged at the bottom of the front support seat, the walking mechanism is slidably arranged on the curved track, and the front support seat can slide along the curved track. The present invention transports fly ash through a main arm screw conveyor that can rotate horizontally around the rear support seat and a secondary arm screw conveyor that can rotate horizontally around the front support seat, and finally the fly ash is put into the cargo ship by the chute. The present invention realizes the loading and transportation of fly ash by the ship loader, takes comprehensive protective measures to prevent the leakage of fly ash from polluting the atmosphere, and the present invention can be directly connected to the ash conveying pipe of the power plant, which greatly reduces the transportation cost of fly ash. At the same time, the present invention has a wide range of applications and can also be used for the loading and transportation of bulk materials such as cement, limestone powder and coal powder.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bulk fly ash transportation, in particular to an arc-shaped track ship loader. Background Art

[0002] When transporting materials such as cement and coal, in order to save transportation costs and increase loading and unloading speed, the materials are generally not packaged, but transported in bulk. Ship loaders are an important equipment used to load bulk materials at the dock. They use conveyor belts to receive and transport the materials, and finally drop them onto the cargo ship through chutes. Ship loaders are widely used to load bulk materials with high density such as ore, coal, and grain.

[0003] Traditional ship loaders use conveyor belts to receive and transport materials, so that bulk materials are exposed during the entire loading process. Therefore, dust will be generated when the ship loader transports dusty bulk materials such as fly ash. Fly ash is the main solid waste of thermal power plants. If a large amount of fly ash is not treated, it will pollute the atmosphere and needs to be strictly controlled during transportation. However, there is currently no ship loader that can effectively control fly ash dust, so it is urgent to improve the traditional ship loader to meet the use requirements. Summary of the invention

[0004] The purpose of the present invention is to provide a curved track ship loader, which can realize the transportation and loading of dust bulk materials, especially fly ash, by the ship loader, and a comprehensive protection design is provided for the ship loader, which can prevent the fly ash from leaking and polluting the atmosphere during transportation to the greatest extent, and adopts a curved track design fixed at the front of the wharf, so that the ship loader can be directly connected to the ash conveying pipe of the power plant, thereby reducing the transportation cost of the fly ash of the thermal power plant. At the same time, the present invention can also be used for the loading and transportation of bulk materials such as cement, limestone powder and coal powder.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions: an arc track loader, fixedly installed at the front edge of the wharf, used for loading and transporting fly ash from thermal power plants, comprising a rear support seat, a main boom, a buffer storage tank, a front support seat, a walking mechanism, an arc track, a gantry column, a gantry pull rod, a secondary boom, a main arm impeller feeder, a secondary arm impeller feeder, a main arm screw conveyor, a secondary arm screw conveyor and a chute, the rear support seat is fixedly arranged at the front edge of the wharf, the arc track is arranged between the rear support seat and the cargo ship berth with the axis of the rear support seat as the center, a walking mechanism is provided at the bottom of the front support seat, the walking mechanism is slidably arranged on the arc track, and the front support seat can slide along the arc track.

[0006] The buffer storage tank is located above the rear support seat and is reinforced by support rods. The inlet of the buffer storage tank is connected to the ash conveying pipe of the power plant. The fly ash generated by the combustion of the thermal power plant can be directly connected to the ship loader by the ash conveying pipe of the power plant, which can greatly save the transportation cost of transporting fly ash. The outlet of the buffer storage tank is connected through the main arm impeller feeder and one end of the main arm screw conveyor. The main arm impeller feeder is arranged at the top of the rear support seat. The main arm impeller feeder can rotate around the rear support seat and drive the main arm screw conveyor to rotate horizontally. The other end of the main arm screw conveyor is connected to one end of the auxiliary arm screw conveyor through the auxiliary arm impeller feeder to realize the transfer of fly ash from the main arm to the auxiliary arm. The other end of the auxiliary arm screw conveyor extends to the cargo ship berth and is connected to the chute. The fly ash is pneumatically conveyed to the buffer storage tank of the ship loader by the ash conveying pipe of the power plant, and then passes through the main arm screw conveyor and the auxiliary arm screw conveyor in sequence, and finally enters the cargo ship through the chute to complete the loading process.

[0007] The main boom and auxiliary boom are truss or plate beam structures. The main boom is erected on the outside of the main boom screw conveyor, and the auxiliary boom is erected on the outside of the auxiliary arm screw conveyor to provide support and necessary protection for the main boom screw conveyor and the auxiliary arm screw conveyor.

[0008] The gantry column is an L-shaped steel frame, with the short side arranged horizontally and the long side arranged vertically. The short side of the gantry column is rotatably arranged at the top of the front support seat, and the gantry column can rotate horizontally around the front support seat. The jib impeller feeder is arranged on the gantry column, fixedly connected to the gantry column, and can move with the gantry column. Since the jib frame extends toward the cargo ship berth and there is no support below, a gantry tie rod is required to fix it to ensure the structural stability of the jib frame. One end of the gantry tie rod is fixedly connected to the top of the long side of the gantry column, and the other end of the gantry tie rod is connected to the end of the jib frame away from the front support seat.

[0009] The aforementioned curved track ship loader also includes a counterweight mechanism and a counterweight rod, the counterweight mechanism includes a counterweight rod and a counterweight block, one end of the counterweight rod is connected to the long side of the gantry column, the other end of the counterweight rod is connected to the counterweight block, and the counterweight block is far away from the auxiliary arm frame, one end of the counterweight rod is fixedly connected to the top of the long side of the gantry column, and the other end of the counterweight rod is connected to the end of the counterweight rod away from the gantry column. Adding a counterweight mechanism and a counterweight rod can ensure the force balance of the gantry column, thereby improving the stability of the entire ship loader.

[0010] The aforementioned curved track ship loader, with the vertical line between the rear support seat and the front line of the wharf as the standard machine position line, when the main arm screw conveyor and the auxiliary arm screw conveyor of the ship loader are both located on the standard machine position line, the force is stable and the structure is safe. The radius of the curved track is 8 to 10m, specifically, it can be 9m, the arc vertex of the curved track is located on the standard machine position line, the rotation angle range of the main arm screw conveyor is -45° to +45° of the standard machine position line, the rotation angle range of the auxiliary arm screw conveyor is -90° to +90° of the standard machine position line, the main arm screw conveyor and the auxiliary arm screw conveyor rotate within this range to cover the entire cargo ship, ensuring uniform loading of fly ash, the moving speed of the walking mechanism along the curved track is 0-8m / min, and the ship loader can adjust the moving speed of the walking mechanism in actual work to adapt to different work requirements.

[0011] In the aforementioned curved track ship loader, the chute is a telescopic chute, which is composed of multiple sections and can be extended and retracted vertically. Specifically, the extension and retraction of the chute can be controlled by a wire rope. The chute can be extended and retracted in the vertical direction according to different water levels and the draft of the cargo ship, and the chute outlet is kept close to the cargo ship as much as possible to prevent dust leakage due to the impact of falling fly ash. The chute is an important device for unloading the ship loader. It can be directly loaded on an open ash ship or connected to a professional sealed filling ash ship through a matching interface.

[0012] The aforementioned arc track ship loader also includes a main arm rotation drive mechanism and a secondary arm rotation drive mechanism, which are composed of an electric motor, a limit torque coupling and a reducer, and the final transmission can be a gear or a ring gear transmission. The main arm rotation drive mechanism is arranged on the traveling mechanism, which is used to provide power for the traveling mechanism, drive the front support seat to move along the arc track, and then drive the main arm frame to rotate horizontally around the rear support seat, and the secondary arm rotation drive mechanism is arranged at the connection between the short side of the gantry column and the front support seat, which is used to provide power for the gantry column and the secondary arm screw conveyor to rotate horizontally around the front support seat. The arc track ship loader also includes a spare rotation drive mechanism. When the main arm rotation drive mechanism or the secondary arm rotation drive mechanism fails, the spare rotation drive mechanism can be used to return the main arm frame or the secondary arm frame of the ship loader to the standard machine position line, thereby ensuring the safety and stability of the ship loader.

[0013] The aforementioned curved track ship loader also includes an air lock, and the connection between the buffer storage tank and the main arm impeller feeder and the connection between the main arm screw conveyor and the auxiliary arm impeller feeder are both provided with an air lock. The air lock can prevent the air from flowing when the fly ash enters the main arm impeller feeder from the buffer storage tank or enters the auxiliary arm impeller feeder from the main arm screw conveyor, thereby preventing the fly ash from passing smoothly due to air cross-flow, and can ensure the smooth passage of the fly ash.

[0014] The aforementioned curved track ship loader also includes two bag dust collectors, one of which is located above the main boom and connected to the chute through a pipeline, and the other bag dust collector is located above the buffer storage tank. When the ash conveying pipe of the power plant delivers ash to the buffer storage tank and the chute is unloaded, the fly ash is lifted up due to the impact of falling. In order to prevent the fly ash from leaking and polluting the atmosphere, a bag dust collector is required to filter and absorb the dust-containing air in the system and discharge it after it meets the standards. The chute is located at the end of the auxiliary arm screw conveyor away from the front support seat, and the auxiliary arm frame is fixed by the gantry pull rod. The bag dust collector used to absorb the dust from the chute is installed on the main boom frame, which is conducive to the structural stability of the auxiliary arm frame.

[0015] In the aforementioned curved track ship loader, the capacity of the buffer tank is not less than 400m 3 When the loader arm rotates or the cargo ship shifts, the chute needs to stop unloading to prevent fly ash leakage. The buffer tank has a large capacity to continue storing fly ash and avoid ash transport stagnation in the power plant.

[0016] In the aforementioned curved track ship loader, a pressure relief valve is provided above the bag filter on the buffer storage tank, and a material level monitoring device and a maintenance manhole are also provided on the buffer storage tank. The pressure relief valve can release the air in the buffer storage tank to prevent the tank from being over-pressurized due to the large amount of fly ash entering, which will affect the ash conveying pipe of the power plant to continue to deliver ash. The material level monitoring device can provide the control personnel with the fly ash level data in the buffer storage tank, which is convenient for adjusting the ash conveying speed of the power plant, the rotation speed of the main arm screw conveyor and the auxiliary arm screw conveyor. The maintenance manhole can facilitate the maintenance personnel to inspect and maintain the buffer storage tank, thereby increasing the service life of the ship loader.

[0017] The aforementioned curved track ship loader also includes a main arm support frame, which is arranged below the main arm frame, one end of the main arm support frame is rotatably connected to the rear support seat, and can rotate horizontally around the rear support seat, the other end of the main arm support frame is fixedly connected to the front support seat, and the main arm support frame is also fixedly connected to the main arm frame via a connecting rod. The main arm support frame can provide necessary support for the main arm frame, thereby improving the structural stability of the ship loader.

[0018] Compared with the prior art, the present invention is beneficial in that it provides a curved track ship loader, which can realize the transportation of fly ash by the ship loader, and comprehensively protects the ship loader, which can effectively prevent the fly ash from leaking and polluting the atmosphere, and has a simple structure and convenient maintenance. The present invention adopts a curved track design fixed at the front of the wharf, which can be directly connected to the ash conveying pipe of the power plant, which can greatly reduce the transportation cost of fly ash in the thermal power plant and improve the efficiency of the thermal power plant in handling fly ash. At the same time, the present invention can also be used for the loading and transportation of dusty bulk materials such as cement, limestone powder and coal powder, and has a wide range of applications. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1It is a schematic diagram of the structure of the present invention;

[0020] Figure 2 It is a structural schematic diagram of the main arm in the present invention;

[0021] Figure 3 It is a schematic diagram of the structure of the auxiliary arm in the present invention;

[0022] Figure 4 It is a top view of the present invention.

[0023] The meaning of the accompanying drawings: 1-rear support seat, 2-main arm frame, 3-buffer storage tank, 4-front support seat, 5-travel mechanism, 6-arc track, 7-gantry column, 8-gantry pull rod, 9-auxiliary arm frame, 10-main arm impeller feeder, 11-auxiliary arm impeller feeder, 12-main arm screw conveyor, 13-auxiliary arm screw conveyor, 14-chute, 15-counterweight mechanism, 16-counterweight pull rod, 17-counterweight rod, 18-counterweight block, 19-main arm rotation drive mechanism, 20-auxiliary arm rotation drive mechanism, 21-air lock, 22-bag dust collector, 23-pressure release valve, 24-main arm support frame.

[0024] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments. DETAILED DESCRIPTION

[0025] Embodiment 1 of the present invention: Figure 1 or Figure 4 As shown, an arc track loader is fixedly installed at the front edge of the wharf and is used for loading and transporting fly ash from thermal power plants. It includes a rear support seat 1, a main boom 2, a buffer storage tank 3, a front support seat 4, a walking mechanism 5, an arc track 6, a gantry column 7, a gantry pull rod 8, a secondary arm 9, a main arm impeller feeder 10, a secondary arm impeller feeder 11, a main arm screw conveyor 12, a secondary arm screw conveyor 13 and a chute 14. The rear support seat 1 is fixedly installed at the front edge of the wharf, and the arc track 6 is arranged between the rear support seat 1 and the cargo ship berth with the axis of the rear support seat 1 as the center of the circle. A walking mechanism 5 is provided at the bottom of the front support seat 4, and the walking mechanism 5 is slidably arranged on the arc track 6, and the front support seat 4 can slide along the arc track 6.

[0026] like Figure 1As shown, the buffer storage tank 3 is located above the rear support seat 1, and the inlet of the buffer storage tank 3 is connected to the ash conveying pipe of the power plant. The fly ash generated by the combustion of the thermal power plant can be directly transported to the buffer storage tank 3 of the ship loader through the ash conveying pipe of the power plant, which improves the transportation efficiency of the fly ash and greatly reduces the transportation cost of the fly ash. The outlet of the buffer storage tank 3 is connected through the main arm impeller feeder 10 and one end of the main arm screw conveyor 12. The main arm impeller feeder 10 is arranged at the top of the rear support seat 1. The main arm impeller feeder 10 can drive the main arm screw conveyor 12 to rotate horizontally around the rear support seat 1. The other end of the main arm screw conveyor 12 is connected to one end of the auxiliary arm screw conveyor 13 through the auxiliary arm impeller feeder 11. The other end of the auxiliary arm screw conveyor 13 extends to the cargo ship berth and is connected to the chute 14, realizing the complete process of fly ash being transported from the buffer storage tank 3 through the main arm screw conveyor 12 and the auxiliary arm screw conveyor 13 to the chute 14, and finally being loaded on the ship by the chute 14.

[0027] The main boom 2 and the auxiliary boom 9 are truss or plate beam structures. Figure 2 As shown, the main arm frame 2 is arranged outside the main arm screw conveyor 12 to provide support and protection for the main arm screw conveyor 12. Figure 3 As shown, the auxiliary arm frame 9 is arranged outside the auxiliary arm screw conveyor 13 to provide support and protection for the auxiliary arm screw conveyor 13.

[0028] like Figure 1 As shown, the gantry column 7 is an L-shaped steel frame, the short side of the L-shaped steel frame is arranged horizontally, the long side is arranged vertically, and extends upward. The short side of the gantry column 7 is arranged at the top of the front support seat 4, which can drive the gantry column 7 to rotate horizontally around the front support seat 4. The auxiliary arm impeller feeder 11 is arranged on the gantry column 7 and moves with the gantry column 7, thereby realizing the horizontal rotation of the auxiliary arm screw conveyor 13 around the front support seat 4. One end of the gantry tie rod 8 is fixedly connected to the top of the long side of the gantry column 7, and the other end of the gantry tie rod 8 is connected to the end of the auxiliary arm frame 9 away from the front support seat 4. The gantry tie rod 8 is used to connect the auxiliary arm frame 9 and the gantry column 7, thereby improving the force structure of the auxiliary arm frame 9 and further improving the stability of the ship loader.

[0029] Example 2: Figure 1 As shown, the arc track ship loader also includes a counterweight mechanism 15 and a counterweight rod 16, the counterweight mechanism 15 includes a counterweight rod 17 and a counterweight block 18, one end of the counterweight rod 17 is connected to the long side of the gantry column 7, the other end of the counterweight rod 17 is connected to the counterweight block 18, and the counterweight block 18 is far away from the auxiliary arm frame 9, one end of the counterweight rod 16 is fixedly connected to the top of the long side of the gantry column 7, and the other end of the counterweight rod 16 is connected to the end of the counterweight rod 17 away from the gantry column 7. The counterweight mechanism 15 and the counterweight rod 16 are used to balance the tension on the gantry column 7 to ensure that the gantry column is balanced.

[0030] Example 3: Figure 4 As shown, in the arc track ship loader, the vertical line between the rear support seat 1 and the front line of the wharf is the standard machine position line. When the main arm screw conveyor 12 and the auxiliary arm screw conveyor 13 of the ship loader are on the standard machine position line, the ship loader structure is most stable, which is also the position when the ship loader is stopped. The radius of the arc track 6 is 8m, and the arc vertex of the arc track 6 is located on the standard machine position line. The rotation angle range of the main arm screw conveyor 12 is -45° to +45° of the standard machine position line, and the rotation angle range of the auxiliary arm screw conveyor 13 is -90° to +90° of the standard machine position line, ensuring that the chute 14 can cover the entire cargo ship, reducing the number of times the cargo ship moves, and improving the working efficiency of the ship loader. The moving speed of the walking mechanism 5 along the arc track 6 is 0-8m / min. The moving speed of the walking mechanism 5 can be controlled by the operator and adjusted according to the actual working conditions, and can be applied to different working environments.

[0031] Embodiment 4: In the arc track ship loader, the chute 14 is a telescopic chute, which is composed of multiple sections and can be telescoped up and down in the vertical direction. The chute 14 is located at the front end of the auxiliary arm screw conveyor 13, and plays the role of guiding bulk materials and suppressing dust. The chute 14 is the last device when the ship loader is unloading. The fly ash is dropped downward into the cargo ship by the chute 14. In this process, the fly ash falls and dust will inevitably appear. The chute 14 is designed as a telescopic chute, and the length of the chute can be adjusted according to the water level and the draft of the cargo ship. The length of the chute 14 is adjusted. The chute 14 is an important device for the ship loader to unload materials. It can be directly loaded on an open ash ship or connected to a professional sealed filling ash ship through a matching interface. When used for loading an open ash ship, try to keep the lower edge of the chute 14 close to the cargo ship's hold bottom or the fly ash that has been loaded in the cargo ship, narrow the gap, and avoid dust.

[0032] Example 5: Figure 2 As shown, the arc track ship loader also includes a rotary drive mechanism, specifically a main arm rotary drive mechanism 19 and a secondary arm rotary drive mechanism 20. The main arm rotary drive mechanism 19 is arranged on the walking mechanism 5 to provide power for the walking mechanism 5 and the front support seat 4 to move along the arc track 6. Since the front support seat 4 is connected to the end of the main arm screw conveyor 12 away from the rear support seat 1 through the gantry column 7 and the secondary arm impeller feeder 11, the main arm rotary drive mechanism 19 drives the main arm screw conveyor 12 to move along the arc track 6 with the rear support seat 1 as the axis. Figure 3As shown, the auxiliary arm rotary drive mechanism 20 is arranged at the connection between the short side of the gantry column 7 and the front support seat 4, and is used to provide power for the gantry column 7 and the auxiliary arm screw conveyor 13 to rotate horizontally around the front support seat 4. The rotary drive mechanism is composed of an electric motor, a limit torque coupling and a reducer, and the final drive can be a gear or ring gear drive. The ship loader is also provided with a spare rotary drive mechanism. When the main arm rotary drive mechanism 19 or the auxiliary arm rotary drive mechanism 20 fails, the spare rotary drive mechanism can drive the main arm screw conveyor 12 or the auxiliary arm screw conveyor 13 back to the standard machine position line, so as to avoid structural damage to the ship loader due to being in a deflected position for a long time.

[0033] Example 6: Figure 2 or Figure 3 As shown, the arc track ship loader further includes an air lock 21, and the connection between the buffer storage tank 3 and the main arm impeller feeder 10 and the connection between the main arm screw conveyor 12 and the auxiliary arm impeller feeder 11 are both provided with an air lock 21. The air lock 21 is a protective mechanism in the dust transportation process, which is used to prevent the fly ash from entering the main arm screw conveyor 12 from the buffer storage tank 3 or entering the auxiliary arm screw conveyor 13 from the main arm screw conveyor 12, thereby preventing the ash from being transported unsmoothly due to air cross-flow, and can maintain the smooth circulation of fly ash particles.

[0034] Example 7: Figure 1 or Figure 3 As shown, the arc track ship loader also includes two bag dust collectors 22, one of which is arranged above the main boom 2 and connected to the chute 14 through a pipeline, and the other bag dust collector 22 is arranged above the buffer storage tank 3. The bag dust collector 22 is a dry filtering device that can capture fine, dry, non-fibrous dust. In the process of transporting fly ash, there are two structures where fly ash will fall significantly, which may cause dust. One is the place where the fly ash in the ash conveying pipe of the power plant enters the buffer storage tank 3, and the other is the place where the chute 14 dumps the fly ash into the cargo ship. In order to prevent the fly ash from leaking and polluting the atmosphere, two bag dust collectors 22 are added. In addition, since the chute 14 is located at the front end of the auxiliary arm screw conveyor 13, in order to reduce the burden of the gantry pull rod 8, a bag dust collector 22 is arranged on the main boom 2 and connected to the chute 14 through a pipeline.

[0035] Embodiment 8: In the arc track ship loader, the capacity of the buffer tank 3 is not less than 400m 3 When the ship loader arm rotates or the cargo ship shifts, the ship loader needs to be shut down to prevent fly ash leakage. The buffer storage tank has a large capacity and can continue to store fly ash. The power plant can continue to transport fly ash, avoiding the shutdown of the power plant's pneumatic ash conveying device and affecting the ash conveying efficiency.

[0036] Example 9: Figure 1As shown, in the arc track ship loader, a pressure release valve 23 is provided above the bag filter 22 on the buffer tank 3. The pressure release valve 23 can discharge the excess air in the buffer tank to prevent the tank from being over-pressurized due to the large amount of fly ash entering, thereby hindering the ash conveying. The buffer tank 3 is also provided with a material level monitoring device and a maintenance manhole. The material level detection device can provide the control personnel with the fly ash storage data in the buffer tank 3, which is convenient for adjusting the ash conveying speed of the power plant, the rotation speed of the main arm screw conveyor 12 and the auxiliary arm screw conveyor 13. The function of the maintenance manhole is to facilitate the maintenance of the buffer tank 3 by the maintenance personnel.

[0037] Example 10: Figure 1 or Figure 2 As shown, the arc track ship loader further includes a main arm support frame 24, which is arranged below the main arm frame 2, one end of the main arm support frame 24 is rotatably connected to the rear support seat 1, and can rotate horizontally around the rear support seat 1, the other end of the main arm support frame 24 is fixedly connected to the front support seat 4, and the main arm support frame 24 is also fixedly connected to the main arm frame 2 via a connecting rod. The main arm support frame 24 can provide necessary support and protection for the main arm frame 2, thereby improving the structural stability of the ship loader.

[0038] The working principle of the present invention is as follows: Figure 1 As shown, the arc track loader provided by the present invention is suitable for loading fly ash. During the loading operation, the ash conveying pipe of the power plant conveys fly ash to the buffer storage tank 3, and the fly ash flows out from the outlet of the buffer storage tank 3, passes through the main arm impeller feeder 10, the main arm screw conveyor 12, the auxiliary arm impeller feeder 11 and the auxiliary arm screw conveyor 13 in sequence, and is finally dumped into the cargo ship through the chute 14 to complete the loading process.

[0039] The present invention adopts a screw conveyor to replace the conveyor belt in the traditional ship loader, thereby avoiding large-scale dust generation due to external interference during the transmission of fly ash. The present invention also effectively controls the dust generation during the falling process of fly ash by using a telescopic chute and a bag dust collector 22, and controls the fly ash dust generation within a controllable range to avoid air pollution.

[0040] The present invention is also connected to the ash conveying pipe support of the power plant, which can greatly reduce the transportation cost of fly ash in the thermal power plant and improve the transportation efficiency. Since the ash conveying pipe of the power plant is fixedly arranged, the ship loader is also fixedly arranged at the front of the dock. In order to make the chute 14 cover the cargo ship as much as possible and avoid frequent displacement of the cargo ship, the present invention adopts an arc track design, the main arm 2 can rotate around the rear support seat 1, and the auxiliary arm 9 can rotate around the front support seat 4, which can cover the entire cargo ship and improve the loading efficiency.

Claims

1. An arc track ship loader, fixedly installed at the front of the wharf, used for loading and transporting fly ash from thermal power plants, characterized by: The invention comprises a rear support seat (1), a main arm frame (2), a buffer storage tank (3), a front support seat (4), a walking mechanism (5), an arc track (6), a gantry column (7), a gantry pull rod (8), a secondary arm frame (9), a main arm impeller feeder (10), a secondary arm impeller feeder (11), a main arm screw conveyor (12), a secondary arm screw conveyor (13) and a chute (14), wherein the rear support seat (1) is fixedly arranged at the front edge of the wharf, and the arc track (6) is arranged on the rear support seat (1) with the axis of the rear support seat (1) as the center. ) and the cargo ship berth, a walking mechanism (5) is provided at the bottom of the front support seat (4), the walking mechanism (5) is slidably arranged on an arc track (6), and the front support seat (4) can slide along the arc track (6); the buffer storage tank (3) is located above the rear support seat (1), the inlet of the buffer storage tank (3) is connected to the ash conveying pipe of the power plant, and the outlet of the buffer storage tank (3) is connected through a main arm impeller feeder (10) and one end of a main arm screw conveyor (12), and the main arm impeller feeder (10) is arranged at the top of the rear support seat (1), The main arm impeller feeder (10) and the main arm screw conveyor (12) can rotate horizontally around the rear support seat (1); the other end of the main arm screw conveyor (12) is connected to one end of the auxiliary arm screw conveyor (13) via the auxiliary arm impeller feeder (11); the other end of the auxiliary arm screw conveyor (13) extends to the cargo ship berth and is connected to the chute (14); the main arm frame (2) and the auxiliary arm frame (9) are truss or plate beam structures; the main arm frame (2) is arranged outside the main arm screw conveyor (12), and the auxiliary arm frame (9) is arranged on the auxiliary arm. The outer side of the screw conveyor (13); the portal column (7) is an L-shaped steel frame, the long side is vertically arranged and extends upward, the short side is arranged at the top of the front support seat (4), the portal column (7) can rotate horizontally around the front support seat (4), and the auxiliary arm impeller feeder (11) is arranged on the portal column (7) and moves with the portal column (7); one end of the portal pull rod (8) is fixedly connected to the top of the long side of the portal column (7), and the other end of the portal pull rod (8) is connected to the end of the auxiliary arm frame (9) away from the front support seat (4); The arc track ship loader also includes a counterweight mechanism (15) and a counterweight pull rod (16), wherein the counterweight mechanism (15) includes a counterweight rod (17) and a counterweight block (18), wherein one end of the counterweight rod (17) is connected to the long side of the portal column (7), and the other end of the counterweight rod (17) is connected to the counterweight block (18), and the counterweight block (18) is far away from the auxiliary arm frame (9), and one end of the counterweight pull rod (16) is fixedly connected to the top end of the long side of the portal column (7), and the other end of the counterweight pull rod (16) is connected to one end of the counterweight rod (17) far away from the portal column (7); The chute (14) is a telescopic chute, which is composed of multiple sections and can be telescoped up and down in the vertical direction.

2. The curved track ship loader according to claim 1, characterized in that: The vertical line between the rear support seat (1) and the front line of the wharf is the standard machine position line, the radius of the arc track (6) is 8 to 10 m, the arc vertex of the arc track (6) is located on the standard machine position line, the rotation angle range of the main arm screw conveyor (12) is -45° to +45° of the standard machine position line, the rotation angle range of the auxiliary arm screw conveyor (13) is -90° to +90° of the standard machine position line, and the moving speed of the walking mechanism (5) along the arc track (6) is 0-8 m / min.

3. The curved track ship loader according to claim 1, characterized in that: It also comprises a main arm rotation driving mechanism (19) and a secondary arm rotation driving mechanism (20), wherein the main arm rotation driving mechanism (19) is arranged on the walking mechanism (5), and the secondary arm rotation driving mechanism (20) is arranged at the connection between the short side of the portal frame column (7) and the front support seat (4).

4. The curved track ship loader according to claim 1, characterized in that: It also includes an air lock (21), and the connection between the buffer storage tank (3) and the main arm impeller feeder (10) and the connection between the main arm screw conveyor (12) and the auxiliary arm impeller feeder (11) are both provided with an air lock (21).

5. The curved track ship loader according to claim 1, characterized in that: It also includes two bag dust collectors (22), one of which is arranged above the main boom (2) and connected to the chute (14) via a pipeline, and the other bag dust collector (22) is arranged above the buffer storage tank (3).

6. The curved track ship loader according to claim 1, characterized in that: The capacity of the buffer tank (3) is not less than 400m 3 .

7. The curved track ship loader according to claim 1, characterized in that: A pressure release valve (23) is provided above the bag filter (22) on the buffer storage tank (3), and a material level monitoring device and a maintenance manhole are also provided on the buffer storage tank (3).

8. The curved track ship loader according to claim 1, characterized in that: It also includes a main arm support frame (24), wherein the main arm support frame (24) is arranged below the main arm frame (2), one end of the main arm support frame (24) is rotatably connected to the rear support seat (1) and can rotate horizontally around the rear support seat (1), the other end of the main arm support frame (24) is fixedly connected to the front support seat (4), and the main arm support frame (24) is also fixedly connected to the main arm frame (2) via a connecting rod.