Through the monitoring platform and balance controller system in the train compartment, the distribution of goods is monitored and allocated in real time, and the problems of speed limit and safety hazards of the ultra-biased load meter are solved, achieving efficient and safe train load-based balance, meeting the cold chain logistics High timeliness requirement.
Patent Information
- Application Number
- CN201810277653.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-03-30
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2038-03-30
AI Technical Summary
In the prior art, the super load meter is used to monitor the train load skew condition and has a speed limit and adverse impact on the rail civil construction foundation, which cannot meet the high-time requirements of high-speed rail freight, especially cold chain logistics transportation, and may bring safety hazards. .
A high-speed rail freight balance control system is designed, including a monitoring platform, an equalization controller and a guide. By monitoring the distribution of goods in the train compartment in real time, a cargo allocation plan is generated to ensure the load balance of the train, and there is no need to conduct steel rails or carriages. Renovation.
Real-time balanced monitoring and allocation of train loads is realized, derailment and overturning accidents are reduced, rail wear is reduced, and the high-time efficiency requirements of cold chain logistics are met, and safety hazards are not posed.
Smart Images

Figure CN110320818B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of railway transportation, and more specifically, relates to a high-speed railway freight balance control system and method. Background Art
[0002] According to the "Railway Container Transport Rules", when loading, the goods should be fully stacked and evenly loaded, without overloading or unbalanced weight. Unbalanced weight means that the goods should be evenly placed in the vehicle according to their weight, and heavy goods should not be placed on a certain carriage or a certain shelf in the carriage, causing uneven load on the vehicle.
[0003] When high-speed trains are used for cargo transportation, placing the cargo in a reasonable and balanced manner has a significant impact on the operation of high-speed trains. First, it has great benefits for the operational stability and safety of the trains, and can effectively avoid derailment and overturning accidents when the trains turn. Secondly, balanced loading of cargo on the trains allows the rails to evenly bear the pressure from the trains, reducing uneven rail wear caused by eccentric loading of the trains, further reducing the impact of uneven rail wear on the train wheels, and increasing the service life of the rails and train structures. Finally, balanced loading of cargo on the trains facilitates simultaneous operation of all carriages during unloading, thereby improving unloading efficiency, especially reducing the impact of environmental factors on the refrigerated temperature of cargo in cold chain transportation, and better ensuring the quality of the cargo.
[0004] In the prior art, an overload and eccentric load meter is usually used to monitor and test the overload and eccentric load of a train in real time. The overload and eccentric load meter analyzes the eccentric load of a freight train by measuring the pressure value obtained by the dynamic measurement of the bogie by a scale installed under the rail. The overload and eccentric load meter installed under the rail has an adverse effect on the continuity of the rail and the civil engineering foundation, and the speed of the train when measured by the overload and eccentric load meter generally cannot be higher than 60km / h. Therefore, the overload and eccentric load meter is used to test the eccentric load of the train, which cannot meet the high timeliness requirements of high-speed rail freight, especially cold chain logistics transportation. In addition, the modification of the civil engineering foundation of the track by the overload and eccentric load meter has brought hidden dangers to driving safety to a certain extent, which is not conducive to the safe operation of railway freight. Summary of the invention
[0005] In view of the above defects or improvement needs of the prior art, the present invention provides a high-speed railway freight balance control system and method, which can monitor the distribution of cargo in each carriage of the train in real time, and automatically generate cargo allocation information between different carriages and between different shelves in the same carriage when the train is unbalanced, and guide the cargo loading personnel to allocate cargo to balance the train load.
[0006] To achieve the above object, according to one aspect of the present invention, a high-speed rail freight balancing control system is provided, comprising a monitoring platform, a balancing controller and a guide; the monitoring platform and the guide are both in communication connection with the balancing controller;
[0007] The monitoring platform is fixed on the carriage floor and is used to monitor the distribution of cargo in each carriage of the train and collect the pressure data of its load. The monitoring platform includes a base, a pressure sensor, a communication module and / or a data interface; the base is a hollow flat plate structure, and the pressure sensors are evenly arranged on the inner side of the upper end surface of the base to collect pressure data;
[0008] The balancing controller stores the correspondence between pressure sensors and shelves, monitoring platforms, and carriages. The balancing controller is used to generate train load distribution results for different carriages based on the pressure data of each pressure sensor obtained through the communication module and / or data interface and the above-mentioned correspondence. If unbalanced loading occurs, an unbalanced loading warning is generated, and a cargo allocation plan is generated using a balancing algorithm. The cargo allocation plan includes cargo allocation information and personnel guidance information; the guide is used to display or broadcast the cargo allocation plan generated by the balancing controller in real time.
[0009] Preferably, in the above-mentioned high-speed rail freight balancing control system, the pressure sensors are evenly arranged in a matrix at the four corner positions on the inner side of the base, or at the inner side positions of the base corresponding to the four corners of each shelf.
[0010] Preferably, the monitoring platform of the above-mentioned high-speed rail freight balancing control system also includes a magnetic disk, which is arranged at four corners on the inner side of the lower end surface of the base, and is used to fix the base on the floor of the carriage to prevent the monitoring platform from moving during the operation of the vehicle.
[0011] Preferably, the monitoring platform of the above-mentioned high-speed railway freight balancing control system also includes a power supply interface, and the monitoring platform directly obtains electrical energy from the train through the power supply interface.
[0012] Preferably, the high-speed rail freight balancing control system has one end of its base configured as an L-shaped notch structure, and the communication module and / or data interface and power interface are all placed in the L-shaped notch structure space, which provides good protection without affecting use.
[0013] Preferably, the upper end surface of the base of the high-speed rail freight balancing control system is paved with an anti-slip protective layer to increase the friction between the monitoring platform and the shelf, prevent the shelf from moving during transportation, and prevent mechanical damage to the surface of the monitoring platform.
[0014] Preferably, the above-mentioned high-speed rail freight balancing control system also includes an on-board display, which has a communication connection with the balancing controller and is used to display in real time the train cargo load distribution results generated by the balancing controller, so as to facilitate the operator to obtain intuitive information for real-time monitoring of the train cargo distribution balance.
[0015] Preferably, the above-mentioned high-speed rail freight balancing control system also includes a loading guidance display, which has a communication connection with the balancing controller, and is used to display the unbalanced load warning in the form of a flashing light, and is used to display the cargo allocation information and personnel guidance information in real time. The personnel guidance information is displayed in the form of a route map and a data table.
[0016] According to another aspect of the present invention, a freight balance control method based on the above-mentioned high-speed railway freight balance control system is provided, comprising the following steps:
[0017] S1. Each monitoring platform collects the load pressure information of the carriage where it is located and obtains pressure data;
[0018] S2, the balancing controller generates the load distribution results of each compartment according to the pressure data and the corresponding relationship between the monitoring platform and the compartment;
[0019] S3, the balance controller determines whether the loads between different carriages of the train and between different shelves in the same carriage are unbalanced according to the load distribution result, if not, it returns to step S1; if yes, it proceeds to the next step;
[0020] S4, the balance controller uses the balance algorithm to calculate and analyze the obtained pressure data to obtain the average cargo load W of the carriage, the average load L of the shelf, and the cargo load deviation X of each carriage. N And the load deviation Y of each shelf in each carriage M ; Where N is the carriage number and M is the shelf number;
[0021] S5, the balancing controller is based on the average cargo load W of the carriage, the average load L of the shelf, and the cargo deviation X of each carriage. N , the load deviation Y of each shelf in each carriage M And generate corresponding cargo allocation plans based on specific cargo loading and unloading scenarios, which include cargo allocation information and personnel guidance information;
[0022] S6. The cargo loading personnel allocate cargo according to the cargo allocation information and the personnel guidance information to achieve cargo balance on the train.
[0023] Preferably, in the above-mentioned high-speed rail freight balance control method, when only loading, the cargo allocation plan is:
[0024] When the deviation of the part of the carriage is X N > 0, the overweight cargo in the carriage is deployed to the adjacent deviation X N <0, and do not make its cargo volume exceed the average cargo volume W of the carriage; allocate goods from the warehouse to the deviation X N For each carriage with a value less than 0, the allocation amount is the corresponding carriage load deviation X N The absolute value of the cargo is first loaded to the deviation YM <0, and make its load equal to the average load L of the shelf; M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M On the shelf with <0;
[0025] When the deviation of all carriages is X N <0, the goods are allocated from the warehouse to each carriage, and the allocation quantity is the corresponding deviation X of each carriage. N The absolute value of the cargo is first loaded to the deviation Y M <0, and make its load equal to the average load L of the shelf; M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M On the shelf with <0.
[0026] Preferably, in the above-mentioned high-speed rail freight balance control method, when only unloading, the cargo allocation plan is:
[0027] When the deviation of the part of the carriage is X N <0, the adjacent car with deviation X N >0, the overweight cargo in the carriage shall be allocated to this carriage without causing the deviation X N <0 exceeds the average cargo capacity W of the carriages; N >0 unload the overweight cargo in the carriage, the unloading amount is X N , starting with the deviation Y M >0 until its load reaches the average load L of the shelf; M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M On the shelf with <0;
[0028] When the deviation of all carriages is X N >0, unload the overweight cargo from each carriage, starting with deviation Y M >0 until its load reaches the average load L of the shelf; M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M On the shelf with <0.
[0029] Preferably, in the above-mentioned high-speed rail freight balance control method, when loading and unloading, the cargo allocation plan is:
[0030] When the deviation of all carriages is X N <0, each car is based on the deviation |X N | Order of size, shelves in the carriage according to deviation |Y M|The cargo is unloaded in order of size. After one car is unloaded, the next car is unloaded until the unloading demand is reached; each car is unloaded according to the deviation |X N | Order of size, shelves in the carriage according to deviation |Y M | Loading is carried out in order of size. When the load of one shelf reaches the average load of the shelf L, the next shelf is loaded. When the load of the carriage reaches the average load of the carriage W, the next carriage is loaded until the loading is completed;
[0031] When the deviation of part or all of the carriages is X N >0, first unload all the cargo in each carriage that exceeds the average cargo capacity W, so that the cargo capacity in each carriage reaches the average cargo capacity W; each carriage is unloaded according to the deviation |X N | Order by size or order by carriage number, shelves in carriage according to deviation |Y M |The cargo is unloaded in order of size. After one car is unloaded, the next car is unloaded until the unloading demand is reached; each car is unloaded according to the deviation |X N | Order of size, shelves in the carriage according to deviation |Y M | Load the goods in order of size. When the load of one shelf reaches the average load of the shelf L, the next shelf will be loaded. When the load of the carriage reaches the average load of the carriage W, the next carriage will be loaded. M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M On the shelf with <0.
[0032] Preferably, the above-mentioned high-speed rail freight balance control method also includes the step of displaying the generated train freight load distribution results in the form of a dot matrix diagram and a data table.
[0033] Preferably, the above-mentioned high-speed rail freight balance control method also includes the step of displaying cargo allocation information and personnel guidance information in the form of a route map and a data table.
[0034] In general, the above technical solutions conceived by the present invention can achieve the following beneficial effects compared with the prior art:
[0035] (1) The high-speed rail freight balancing control system and method provided by the present invention adopts a monitoring platform placed in the train car to monitor the distribution of cargo in each car of the train in real time. Once the train is unbalanced, the balancing controller calculates the pressure data collected by the monitoring platform according to the balancing algorithm, and generates cargo allocation information and personnel guidance information between different cars and between different shelves in the same car. The cargo loading personnel allocate cargo according to the obtained cargo allocation information and personnel guidance information to balance the train load, reduce high-speed rail derailment and overturning accidents, and reduce uneven wear of rails caused by eccentric loading. The monitoring platform is an independent module placed in the car. Its installation process does not require modification of the rail civil engineering or the interior of the car, does not cause safety hazards, and can meet the high timeliness requirements of cold chain logistics transportation.
[0036] (2) In the high-speed rail freight balancing control system and method provided by the present invention, the monitoring platform is fixed to the floor of the carriage by a magnetic disk, thereby preventing the monitoring platform from moving during the operation of the vehicle and facilitating the disassembly and maintenance of the monitoring platform without modifying the carriage.
[0037] (3) The high-speed rail freight balancing control system and method provided by the present invention generates different cargo allocation plans for different cargo loading requirements, such as loading only, unloading only, and both loading and unloading, and guides the loaders to allocate cargo according to the optimal cargo allocation plan, thereby improving loading efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a block diagram of the composition of the high-speed rail freight balance control system provided by an embodiment of the present invention;
[0039] Figure 2 is a schematic diagram of the distribution of the monitoring platform provided by an embodiment of the present invention;
[0040] Figure 3 is a schematic diagram of the spatial position of a monitoring platform provided by an embodiment of the present invention;
[0041] Figure 4 are top and cross-sectional views of a monitoring platform provided by an embodiment of the present invention;
[0042] Figure 5 is a flow chart of a high-speed rail freight balance control method provided by an embodiment of the present invention;
[0043] In all the drawings, the same reference numerals represent the same technical features, specifically: 1-monitoring platform, 2-carriage, 3-rail, 4-shelf, 101-pressure sensor, 102-base, 103-power interface, 104-data interface, 105-communication module, 106-magnetic disk. DETAILED DESCRIPTION
[0044] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0045] The embodiment of the present invention provides a high-speed rail freight balance control system, such as Figure 1 As shown, it includes a monitoring platform 1, a balance controller and a personnel guide;
[0046] The monitoring platform 1 is used to monitor the distribution of cargo in each carriage 2 of the train and collect load pressure data; Figure 2 and Figure 3 They are respectively a schematic diagram of the distribution of monitoring platforms and a schematic diagram of the spatial position. The monitoring platform 1 is a separate module placed on the floor of the carriage 2. The shelves 4 loaded with goods are placed on the monitoring platform 1. At least one monitoring platform 1 is set in each carriage 2 to monitor the distribution of goods in the carriage 2;
[0047] The balancing controller is arranged in the cargo loading and unloading control room, and is used to generate the train load distribution result corresponding to the carriage 2 according to the pressure data collected by the monitoring platform in each carriage 2, generate an eccentric load warning if there is an eccentric load, and generate a cargo allocation plan using the balancing algorithm; the monitoring platform 1 has a corresponding relationship with the carriage 2 where it is located, and the corresponding relationship needs to be pre-set and stored in the balancing controller; the cargo allocation plan includes cargo allocation information and personnel guidance information;
[0048] The personnel guide is installed on the loading vehicle or held by the loader. It communicates with the balancing controller through a wireless local area network and is used to display or broadcast cargo allocation information in real time for the cargo loaders to obtain intuitively. The loaders can also use the personnel guide to provide real-time feedback on the cargo allocation status and allocation completion information to the cargo loading and unloading control room.
[0049] Furthermore, the balancing control system also includes an on-board display, which is installed in the cargo loading and unloading control room and is used to display the train cargo load distribution result generated by the balancing controller in the form of a load distribution dot matrix diagram in real time, and the depth of the color indicates the size of the pressure; the specific pressure data will also be displayed in the form of a data table, so that the operator can obtain intuitive information to monitor the balance of the train cargo distribution in real time;
[0050] Furthermore, the balancing control system also includes a loading guidance display, which is installed in the cargo loading and unloading control room, and is used to display the overload warning in the form of a flashing light, and is used to display the cargo allocation information and personnel guidance information in the cargo allocation plan in real time, so that the operating personnel can obtain intuitive information to monitor the cargo allocation process in real time. The personnel guidance information is displayed in the form of a personnel guidance route map and a data table.
[0051] Figure 4 The top view and cross-sectional view of the monitoring platform, the monitoring platform 1 includes a base 102, a pressure sensor 101, a power interface 103, a data interface 104, a communication module 105 and a magnetic disk 106;
[0052] like Figure 4 As shown, the base 102 is a hollow flat plate structure, and the shelf 4 loaded with goods is placed on the base 102. The pressure sensor 101 is arranged on the inner side of the upper end surface of the base 102, and is mainly used to collect pressure data; the number of pressure sensors 101 can be configured according to the requirements of monitoring accuracy, for example, a pressure sensor 101 is arranged at each of the four corner positions of the monitoring platform 1, or a pressure sensor 101 is arranged at each of the four corner positions of each shelf 4. The more the number of pressure sensors 101, the higher the monitoring accuracy; the multiple pressure sensors 101 are preferably evenly distributed in a matrix type, and each pressure sensor 101 has an ID number corresponding to it. The pressure sensor 101 has a corresponding relationship with the shelf 4, the monitoring platform 1, and the carriage. The corresponding relationship is pre-set and stored in the balancing controller. After the balancing controller obtains the pressure data of each pressure sensor 101, it generates a train load distribution result corresponding to the carriage according to the above-mentioned corresponding relationship.
[0053] The monitoring platform 1 can transmit the pressure data collected by the pressure sensor 101 to the equalizing controller in a wireless transmission manner through the communication module, or it can be connected to the train's own monitoring system through the data interface 104 to transmit the pressure data collected by the pressure sensor 101 to the equalizing controller through the data interface 104; the monitoring platform 1 obtains electrical energy directly from the train through the power interface 103.
[0054] A plurality of magnetic disks 106 are arranged on the inner side of the lower end surface of the base 102. The monitoring platform 1 can be directly placed in the carriage and fixed with the help of the magnetic disks 106 to prevent the monitoring platform 1 from moving during the operation of the vehicle and to facilitate the disassembly and maintenance of the monitoring platform 1 without modifying the carriage. The number of magnetic disks 106 is not less than four, and a magnetic disk 106 needs to be placed at each of the four corners of the monitoring platform 1.
[0055] Furthermore, one end of the base 102 is configured as an L-shaped notch structure, and the power interface 103, the data interface 104 and the communication module 105 are all placed in the L-shaped notch structure space, which provides good protection without affecting the use.
[0056] Furthermore, an anti-skid protective layer is laid on the outer side of the upper end surface of the base 102 to increase the friction between the monitoring platform 1 and the shelf 4 to prevent the shelf 4 from moving during transportation and to prevent mechanical damage to the surface of the monitoring platform 1.
[0057] A high-speed rail freight balance control method provided by an embodiment of the present invention is as follows: Figure 5 As shown, the following steps are included:
[0058] S1. After the train stops at the designated location, the pressure sensors in each monitoring platform start to collect the load pressure information of the corresponding carriage, obtain the pressure data and transmit it to the balancing controller;
[0059] S2, the balancing controller generates a load distribution result corresponding to the high-speed rail carriage according to the ID number of the pressure sensor and the corresponding pressure data;
[0060] S3, the balancing controller determines whether the loads between different carriages of the train and between different shelves in the same carriage are unbalanced according to the load distribution result of the high-speed rail carriage. If not, it returns to step S1; if yes, it proceeds to the next step;
[0061] S4, the balance controller uses the balance algorithm to calculate and analyze the pressure data obtained to obtain the cargo deviation X of each carriage. N (N is the carriage number) and the load deviation Y of each shelf in each carriage M (M is the shelf number);
[0062] S5, the balance controller is based on the cargo deviation X of each carriage. N , the load deviation Y of each shelf in each carriage M And generate corresponding cargo allocation plans based on specific cargo loading and unloading scenarios, which include cargo allocation information and personnel guidance information;
[0063] S6. The balance controller transmits the cargo allocation information and the personnel guidance information to the personnel guide through the wireless local area network. The personnel guide displays or broadcasts the cargo allocation information and the personnel guidance information in real time in the form of charts or language. The cargo loading personnel perform cargo allocation according to the cargo allocation information and the personnel guidance information.
[0064] S7. The cargo loading personnel uses the personnel guide to feedback the loading completion information to the cargo loading and unloading control room.
[0065] Furthermore, the balancing control method also includes the step of displaying the generated train cargo load distribution result in the form of a dot matrix diagram on an on-board display.
[0066] Furthermore, the balance control method also includes the step of displaying the cargo allocation information and personnel guidance information on the loading guidance display in the form of a route map and a data table.
[0067] The balancing algorithm is mainly used to calculate the cargo deviation X of each carriage. N And the load deviation Y of each shelf in each carriage M , the specific steps are as follows:
[0068] S41, calculating the average cargo volume W of the carriage after loading / unloading is completed; divided into the following three cases:
[0069] (1) Loading only: Calculate the average cargo capacity W of the carriage after loading based on the sum of the loading capacity and the existing cargo capacity;
[0070] (2) Unloading only: Calculate the average cargo volume W of the carriage after unloading based on the difference between the unloading volume and the existing cargo volume;
[0071] (3) Both loading and unloading: Based on the sum and difference of the loading volume, unloading volume and existing cargo volume, calculate the average cargo volume W of the carriage after loading and unloading;
[0072] S42, calculating the average load L of each shelf in each carriage according to the average cargo load W of the carriage;
[0073] S43, calculate the deviation X between the existing cargo capacity of different carriages of the train and the average cargo capacity W of the carriages N , and calculate and update in real time according to the allocation of goods;
[0074] S44. Calculate the deviation Y between the existing load of different racks in each carriage and the average load L of the racks M , and calculated and updated in real time according to the allocation of goods.
[0075] The balancing controller uses the balancing algorithm to calculate the load deviation Y of the shelf in each carriage. M And the load deviation X of different compartments of the whole train N After that, a cargo allocation plan is generated based on the calculation results. According to different cargo loading scenarios, the cargo allocation plan can be divided into three cases:
[0076] 1. Loading only
[0077] 1. If some carriages have X N >0, the deployment order is as follows:
[0078] (1) The deviation XN >0, the overweight cargo in the carriage is transferred out, and the amount transferred out is X N And make the load of each shelf in the carriage equal to the average load L of the shelf;
[0079] (2) Using the proximity principle, the deviation X N The goods transferred from the carriage with deviation X > 0 are transferred to the nearest carriage with deviation X N <0, and the cargo capacity of the carriage shall not exceed the average cargo capacity W of the carriage;
[0080] (3) Allocate goods from the warehouse to deviation X N <0, the allocation amount of each carriage is the corresponding deviation X N The absolute value of the cargo is first loaded to the deviation Y M <0, and the load of the shelf is L;
[0081] (4) The deviation Y in each carriage M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M <0, the allocation quantity of each shelf is the corresponding deviation Y M The absolute value of .
[0082] 2. If X does not exist N >0, the deployment order is as follows:
[0083] (1) Allocate goods from the warehouse to deviation X N <0, the allocation amount of each carriage is the corresponding deviation X N The absolute value of the cargo is first loaded to the deviation Y M <0, and the load of the shelf is L;
[0084] (2) The deviation Y in each carriage M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M <0, the allocation quantity of each shelf is the corresponding deviation Y M The absolute value of .
[0085] 2. Unloading only
[0086] 1. If some carriages have X N If <0, the deployment order is as follows:
[0087] (1) Using the proximity principle, the proximity deviation X N <0 car deviation X N >0, the overweight cargo in the carriage is transferred out, and the amount transferred out is X N And make the load of each shelf in the carriage equal to L;
[0088] (2) Allocate the transferred goods to the deviation X N <0, and the cargo capacity of the carriage shall not exceed W, and the unloaded excess cargo shall be transported to the warehouse;
[0089] (3) Continue to set the deviation X N The cargo in the carriage with a value greater than 0 is unloaded, and the unloading amount is X N , starting with the deviation Y M >0, unload the goods from the shelf until the shelf load reaches L, and then transport the unloaded goods to the warehouse;
[0090] (4) The deviation Y in each carriage M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M <0, the allocation quantity of each shelf is the corresponding deviation Y M The absolute value of .
[0091] 2. If X does not exist N If <0, the deployment order is as follows:
[0092] (1) The deviation X N The cargo in the carriage with a value greater than 0 is unloaded, and the unloading amount is X N , starting with the deviation Y M >0, unload the goods from the shelf until the shelf load reaches L, and then transport the unloaded goods to the warehouse;
[0093] (2) The deviation Y in each carriage M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M <0, the allocation quantity of each shelf is the corresponding deviation Y M The absolute value of .
[0094] 3. Both loading and unloading:
[0095] 1. If X N If all values are negative, the allocation order is as follows:
[0096] (1) Preferably according to |X N |The order of carriages from large to small, the carriages are preferably arranged according to |Y M | Unload goods from the shelves in order from large to small. After one carriage is unloaded, the next carriage will be unloaded until the unloading demand is reached;
[0097] (2) Preferably according to |X N | The order of carriages from large to small, the carriages are preferably arranged in the order of Y M <0 and |Y M|The goods are loaded from large to small shelves. The next shelf is loaded only after the load of one shelf reaches L. The next carriage is loaded only after the load of the carriage reaches W, until the loading is completed.
[0098] 2. If X N If all positive values are present, the allocation order is as follows:
[0099] (1) All carriages with a cargo capacity exceeding the average cargo capacity W are N Partially unloaded, the compartment is in accordance with Y M >0 and Y M The shelves are unloaded in order from small to large, and then transported to the warehouse;
[0100] (2) The preference is based on the order of carriage numbers from small to large, and within the carriage, the preference is based on Y M >0 and Y M The shelves are unloaded in order from large to small. After one carriage is unloaded, the next carriage will be unloaded until the unloading demand is reached;
[0101] (3) Optimize according to the deviation X N The order of carriages from large to small is preferably Y M <0 and |Y M | Load the shelves in order from large to small. The next shelf will be loaded only after the load of one shelf reaches L. The next carriage will be loaded only after the load of the carriage reaches W, until the loading is completed;
[0102] (4) The deviation Y in each carriage M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M <0, the allocation quantity of each shelf is the corresponding deviation Y M The absolute value of .
[0103] 3. If X N If both positive and negative values exist, the allocation order is as follows:
[0104] (1) All carriages exceeding the cargo capacity W are N Partially unloaded, preferably in the carriage according to Y M >0 and Y M The shelves are unloaded in order from small to large, and then transported to the warehouse;
[0105] (2) Optimize according to the deviation |X N |The order of carriages from large to small, the preference in the carriages is based on the deviation |Y M | Unload goods from the shelves in descending order. After one carriage is unloaded, the next carriage will be unloaded until the unloading demand is reached;
[0106] (3) Optimize according to the deviation |X N | The order of carriages from large to small, the carriages are preferably arranged in the order of Y M <0 and |Y M | Load the shelves in order from large to small. The next shelf will be loaded only after the load of one shelf reaches L. The next carriage will be loaded only after the load of the carriage reaches W, until the loading is completed;
[0107] (4) The deviation Y in each carriage M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M <0, the allocation quantity of each shelf is the corresponding deviation Y M The absolute value of .
[0108] Compared with traditional over- and unbalanced load meters, the high-speed rail freight balancing control system and method provided by the present invention adopts a monitoring platform placed in the carriage to monitor the distribution of cargo in each carriage of the train in real time. Once the train is unbalanced, the balancing controller calculates the pressure data collected by the pressure sensor according to the balancing algorithm, and generates cargo allocation information and personnel guidance information between different carriages and between different shelves in the same carriage. The cargo loaders allocate cargo according to the acquired cargo allocation information and personnel guidance information to balance the train load. The monitoring platform is an independent module placed in the carriage. Its installation process does not require any modification to the rail civil engineering or the interior of the carriage, and does not create any safety hazards. At the same time, it can meet the high timeliness requirements of cold chain logistics and transportation. According to different cargo loading requirements, the balancing controller generates different cargo allocation plans to guide the loaders to allocate cargo according to the optimal cargo allocation plan, thereby improving loading efficiency.
[0109] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A high-speed rail freight balance control system, characterized in that: It includes a monitoring platform, a balancing controller and a guide; the monitoring platform and the guide are both in communication connection with the balancing controller; The monitoring platform is fixed on the carriage floor and is used to monitor the distribution of cargo in each carriage of the train and collect the pressure data of its load. The monitoring platform includes a base, a pressure sensor, a communication module and / or a data interface; the base is a hollow flat plate structure, and the pressure sensors are evenly arranged on the inner side of the upper end surface of the base to collect pressure data; The balance controller stores the corresponding relationship between the pressure sensor and the shelf, the monitoring platform, and the carriage. The balance controller is used to generate the train load distribution results of different carriages according to the pressure data of each pressure sensor obtained through the communication module and / or the data interface and the corresponding relationship. The balance controller determines whether the loads between different carriages of the train and between different shelves in the same carriage are unbalanced according to the load distribution result. If there is no imbalance, the pressure data is re-acquired, and the train load distribution results of different carriages are re-generated according to the pressure data and the corresponding relationship. The balance controller determines whether the loads between different carriages of the train and between different shelves in the same carriage are unbalanced according to the load distribution result; if there is an imbalance, the balance controller uses the balance algorithm to calculate and analyze the acquired pressure data to obtain the average cargo load W of the carriage, the average load L of the shelf, and the cargo load deviation X of each carriage. N And the load deviation Y of each shelf in each carriage M ; Where N is the carriage number and M is the shelf number; the balancing controller is based on the average carriage load W, the average shelf load L, and the load deviation X of each carriage. N , the load deviation Y of each shelf in each carriage M And a corresponding cargo allocation plan is generated according to a specific cargo loading and unloading scenario, the cargo allocation plan includes cargo allocation information and personnel guidance information; cargo loading personnel allocate cargo according to the cargo allocation information and personnel guidance information to achieve freight balance on the train; the guide is used to display or broadcast the cargo allocation plan generated by the balance controller in real time.
2. The high-speed rail freight balance control system according to claim 1, characterized in that: The pressure sensors are evenly arranged in a matrix at the four corner positions on the inner side of the base, or at the inner side positions of the base corresponding to the four corners of each shelf.
3. The high-speed rail freight balance control system according to claim 1 or 2, characterized in that: The monitoring platform also includes a magnetic disk, which is arranged at four corners of the inner side of the lower end surface of the base and is used to fix the base on the floor of the carriage.
4. The high-speed railway freight balancing control system according to claim 1 or 2, characterized in that: One end of the base is configured as an L-shaped notch structure, and the communication module and / or the data interface is placed in the L-shaped notch structure space; An anti-skid protective layer is laid on the outer side of the upper end surface of the base to increase the friction between the monitoring platform and the shelf.
5. The high-speed railway freight balancing control system according to any one of claims 1 or 2, characterized in that: It also includes an on-board display, which is in communication connection with the balancing controller and is used to display the train cargo load distribution result generated by the balancing controller in real time.
6. The high-speed railway freight balance control system according to claim 5, characterized in that: It also includes a loading guidance display, which is communicatively connected to the balancing controller and is used to display an unbalanced load warning in the form of a flashing light, and to display cargo allocation information and personnel guidance information in real time. The personnel guidance information is displayed in the form of a route map and a data table.
7. A freight balance control method based on the high-speed railway freight balance control system according to any one of claims 1 to 6, characterized in that: When only loading is carried out, the cargo allocation plan is as follows: When the deviation of the part of the carriage is X N > 0, the overweight cargo in the carriage is deployed to the adjacent deviation X N <0, and do not make its cargo volume exceed the average cargo volume W of the carriage; allocate goods from the warehouse to the deviation X N For each carriage with a value less than 0, the allocation amount is the corresponding carriage load deviation X N The absolute value of the cargo is first loaded to the deviation Y M <0, and make its load equal to the average load L of the shelf; M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M On the shelf with <0; When the deviation of all carriages is X N <0, the goods are allocated from the warehouse to each carriage, and the allocation quantity is the corresponding deviation X of each carriage N The absolute value of the cargo is first loaded to the deviation Y M <0, and make its load equal to the average load L of the shelf; M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M On the shelf with <0.
8. A freight balance control method based on the high-speed railway freight balance control system according to any one of claims 1 to 6, characterized in that: When only unloading is carried out, the cargo allocation plan is as follows: When the deviation of the part of the carriage is X N <0, the adjacent car with deviation X N >0, the overweight cargo in the carriage shall be allocated to this carriage without causing the deviation X N <0 exceeds the average cargo capacity W of the carriages; N >0 unload the overweight cargo in the carriage, the unloading amount is X N , starting with the deviation Y M >0 until its load reaches the average load L of the shelf; M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M On the shelf with <0; When the deviation of all carriages is X N >0, unload the overweight cargo from each carriage, starting with deviation Y M >0 until its load reaches the average load L of the shelf; M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M On the shelf with <0.
9. A freight balance control method based on the high-speed railway freight balance control system according to any one of claims 1 to 6, characterized in that: When both loading and unloading are carried out, the cargo allocation plan is as follows: When the deviation of all carriages is X N <0, each car is based on the deviation |X N | Order of size, shelves in the carriage according to deviation |Y M |The cargo is unloaded in order of size. After one car is unloaded, the next car is unloaded until the unloading demand is reached; each car is unloaded according to the deviation |X N | Order of size, shelves in the carriage according to deviation |Y M | Loading is carried out in order of size. When the load of one shelf reaches the average load of the shelf L, the next shelf is loaded. When the load of the carriage reaches the average load of the carriage W, the next carriage is loaded until the loading is completed; When the deviation of part or all of the carriages is X N >0, first unload all the cargo in each carriage that exceeds the average cargo capacity W, so that the cargo capacity in each carriage reaches the average cargo capacity W; each carriage is based on the deviation |X N | Order by size or order by carriage number, shelves in carriage according to deviation |Y M |The cargo is unloaded in order of size. After one car is unloaded, the next car is unloaded until the unloading demand is reached; each car is unloaded according to the deviation |X N | Order of size, shelves in the carriage according to deviation |Y M | Load the goods in order of size. When the load of one shelf reaches the average load of the shelf L, the next shelf will be loaded. When the load of the carriage reaches the average load of the carriage W, the next carriage will be loaded. M >0 Overweight cargo on the shelf is allocated to the same carriage Deviation Y M On the shelf with <0.