A material receiving device and cutting equipment
By designing a collection device with spaced tubular structural sections and flexible positioning rings, the problem of low screw positioning efficiency in cutting polymer insulating film materials is solved, efficient positioning and stable material collection are achieved, and production efficiency and equipment stability are improved. .
Patent Information
- Application Number
- CN201810514638.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-05-25
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2038-05-25
AI Technical Summary
During the cutting process of existing polymer insulating film materials, a large number of screws are needed for positioning and fixing, which results in low production efficiency and a lot of man-hours. It is also difficult to ensure the verticality of the axis of the rewinding roll and the rewinding rod, which can easily lead to shaking or collapse, affecting Production.
Design a collection device that sets multiple tubular structural segments of different diameters at intervals, and sets flexible positioning rings on the tubular structural segments with small diameters. It uses inflatable expansion to fix the collection ring, and combines adjustment components to adapt to different widths of the collection device. Material ring simplifies the positioning and replacement process.
It improves production efficiency, reduces positioning and replacement hours, ensures the perpendicularity of the material roll plane and the axis of the rewinding rod, avoids rewinding interruptions and equipment shutdowns, and enhances the stability and practicality of the equipment.
Smart Images

Figure CN110524615B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of polymer material processing machinery and equipment, in particular to a material receiving device and a cutting device. Background Art
[0002] With the development of social production, the application of polymer insulating film materials is becoming more and more extensive, and it is increasingly favored by all walks of life, and has penetrated and applied to various industries, especially in the photovoltaic industry, and has become a part of the development of the photovoltaic industry. When polymer insulating film materials are used in the photovoltaic industry, it is usually necessary to cut the raw materials provided by the supplier into the size required by the product before they can be put into production. The working process of the film cutting machine in the prior art is: the raw material of the whole film needs to be cut according to the product size. Before cutting, use two screws to fix a winding ring on the predetermined position on the receiving rod for positioning, and then position the required winding rings at the predetermined positions in turn, and then cut the whole film raw material according to the predetermined size, and paste the cut small section of film on the winding ring. Start the cutting machine, rotate the receiving rod and drive the winding ring to rotate for cutting and collecting.
[0003] The coil ring needs to be positioned on the take-up rod by screws. Every two screws determine the distance between the two coil rings, and every two screws fix one coil ring. Therefore, a large number of screws are required for positioning the film for cutting and rewinding, resulting in a large amount of time spent on positioning the coil ring before production each time, which consumes a lot of man-hours and has extremely low production efficiency. Summary of the invention
[0004] (I) Purpose of the invention
[0005] The object of the present invention is to provide a material receiving device, which is designed to have tubular structure segments with different diameters arranged at intervals, and a flexible positioning ring is arranged on the tubular structure segment with a small diameter, so that the flexible positioning ring expands in an inflated state, so as to limit the position of the material receiving ring when the material receiving ring is sleeved on the outside of the flexible positioning ring, thereby solving the problem of the prior art that a large number of screws must be arranged on the material receiving rod to position the coil ring when receiving the material in the center. The material receiving device of the present application is easy to use, has accurate positioning, saves labor time, and improves production efficiency.
[0006] (II) Technical solution
[0007] To solve the above problems, the first aspect of the present invention provides a material collecting device, comprising a plurality of first tubular structure segments and a plurality of second tubular structure segments arranged at intervals; each of the second tubular structure segments is connected to two adjacent first tubular structure segments, and the diameter of the second tubular structure segment is smaller than the diameter of the first tubular structure segment; a flexible positioning ring is arranged on the second tubular structure segment; the flexible positioning ring is arranged to expand in an inflated state so as to limit the material collecting ring when the material collecting ring is sleeved on the outside of the flexible positioning ring.
[0008] Furthermore, the material collecting device also includes a third tubular structure segment nested in the multiple first tubular structure segments and the multiple second tubular structure segments arranged at intervals; the first tubular structure segments located at both ends are respectively connected to the two ends of the third tubular structure segment to form a closed space; the flexible positioning ring and the second tubular structure segment are respectively provided with through holes to connect the flexible positioning ring with the closed space; the first tubular structure segment, the second tubular structure segment or the third tubular structure segment are provided with air holes, and the air holes are connected to the closed space.
[0009] Furthermore, the diameter of the first tubular structure segment is smaller than the diameter of the material receiving ring, so that the material receiving ring can pass through the first tubular structure segment and be sleeved on the outside of the second tubular structure segment.
[0010] Furthermore, the material receiving device also includes a plurality of annular adjustment components; the adjustment components are sleeved on the outside of part of the second tubular structure segment to fix the material receiving ring when the width of the material receiving ring is smaller than the width of the second tubular structure segment.
[0011] Furthermore, the adjustment assembly includes at least one first adjustment member and at least one second adjustment member; the first adjustment member and the second adjustment member are connected to form a ring structure.
[0012] Furthermore, the first adjusting member and the second adjusting member are magnetically connected.
[0013] Furthermore, the sum of the width of the adjusting component and the width of the receiving ring is equal to the width of the second tubular structure segment, so that the receiving ring can be fixed to one end of the second tubular structure segment.
[0014] Furthermore, the outer diameter of the adjusting component is substantially equal to the inner diameter of the collecting ring; and the inner diameter of the adjusting component is equal to the outer diameter of the second tubular structure segment.
[0015] Furthermore, the flexible positioning ring is configured such that its outer diameter after expansion is greater than or equal to the inner diameter of the material receiving ring sleeved on the outside thereof.
[0016] Furthermore, the difference between the radius of the first tubular structure segment and the radius of the second tubular structure segment is 8-12 mm.
[0017] According to another aspect of the present invention, there is provided a cutting device, comprising any one of the above-mentioned material collecting devices, wherein the material collecting device is sleeved on the material collecting rod of the cutting device through the third tubular structure segment.
[0018] Summary of technical solutions
[0019] The present application designs a material receiving device, in which a plurality of first tubular structure segments and a plurality of second tubular structure segments are arranged at intervals. Since the diameter of the first tubular structure segment is different from the diameter of the second tubular structure segment, a regular and orderly concave-convex structure can be formed, and a flexible positioning ring is provided on the second tubular structure segment with a small diameter, that is, a flexible positioning ring is provided at the concave part of the concave-convex structure, and a material receiving ring is put on the flexible positioning ring. When receiving the material, the flexible positioning ring is inflated and expanded, and the volume increases, thereby completing the fixing and positioning processing of the material receiving ring, and the material can be rotated to receive the material.
[0020] (III) Beneficial effects
[0021] The above technical solution of the present invention has the following beneficial technical effects:
[0022] The material receiving device of the present application arranges a plurality of first tubular structure segments and a plurality of second tubular structure segments at intervals. Since the diameter of the first tubular structure segment is different from that of the second tubular structure segment, a regular and orderly concave-convex structure can be formed, and a flexible positioning ring is provided on the second tubular structure segment with a smaller diameter, that is, a flexible positioning ring is provided at the concave part of the concave-convex structure, and the material receiving ring is put on the flexible positioning ring. When receiving the material, the flexible positioning ring is inflated and expanded, and the volume increases, so that the fixing and positioning processing of the material receiving ring is completed, and the material can be rotated to receive the material. Before receiving the material, the film needs to be positioned; since the concave structures in the present application are arranged in a certain regularity, one of the pre-cut film strips can be selected, and the position of the film strip can be compared with the flexible positioning ring fixed in the concave structure to complete the position calibration of all film strips, which simplifies the position calibration procedure, saves working time, and improves work efficiency. On the other hand, due to the limitation of the concave structure and the fixation of the flexible positioning ring, when the film is collected to a certain amount on the collection ring, the plane of the material roll can still maintain the verticality of the axis of the collection rod, and the material can be collected continuously. This avoids the positioning of the passing point in the prior art, which makes it difficult to ensure the verticality of the collection roll and the axis of the collection rod; as a result, the collection roll will shake violently or even collapse in the subsequent production process, causing the interruption of collection, the scrapping of materials and the abnormal shutdown of equipment, which seriously affects production.
[0023] The present application designs a third tubular structure segment, which, together with the first tubular structure segment and the second tubular structure segment, forms a closed space, and can inflate the closed space to allow the structure segment itself to expand to a certain extent, thereby increasing the stability during use. In addition, the design of the flexible positioning ring is connected to the closed space through the position of the second tubular structure segment, so that it is inflated and expanded, and the volume increases, so as to further fix the receiving ring.
[0024] In addition, the present application is also provided with an adjustment component, and the width of the adjustment component is adjusted. The width specifications of the adjustment component are different to match the different width specifications of the material receiving ring, so that the sum of the widths of the two is the same as the width of the second tubular structure section, thereby improving the practicality of the material receiving device. In production, when replacing the coiling rings of different widths, the prior art also needs to remove the screws that fix the position of the coiling ring one by one, and then install them one by one. However, the present application directly replaces the position through the width adjustment component, which is simple and convenient to operate, and shortens the time used for production. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the structure in which a coiling ring is installed on a receiving rod in the prior art;
[0026] Figure 2 It is a structural schematic diagram of a film cutting machine in the prior art;
[0027] Figure 3 is a schematic structural diagram of a material receiving device according to an embodiment of the present application;
[0028] Figure 4 It is an enlarged assembly diagram of a receiving ring sleeved on a flexible positioning ring according to an embodiment of the present application;
[0029] Figure 5 is an assembly cross-sectional view of a receiving ring, an adjustment assembly, and a flexible positioning ring according to an embodiment of the present application;
[0030] Figure 6 is a schematic diagram of the structure of the adjustment component 70 according to an embodiment of the present application;
[0031] Figure 7 is a schematic diagram of the structure of the first adjustment component or the second adjustment component according to an embodiment of the present application;
[0032] Figure 8 is a schematic diagram of the assembly of the adjustment component according to an embodiment of the present application;
[0033] Fig. 9 It is a schematic diagram of a ring structure formed by two arc-shaped sheet structures of a receiving ring according to an embodiment of the present application after being butted together;
[0034] Fig.10It is a schematic diagram of assembling the adjustment component and the material collecting ring on the material collecting device according to an embodiment of the present application;
[0035] Fig.11 It is a schematic diagram of the working state of the cutting device according to the present application.
[0036] Reference numerals:
[0037] 10: first tubular structure segment; 20: second tubular structure segment; 30: flexible positioning ring; 40: material collection ring; 50: third tubular structure segment; 60: air hole; 70: adjustment component; 701: first adjustment component; 702: second adjustment component; 703: third adjustment component; 100: material collection rod; 101: screw; 102: winding ring. DETAILED DESCRIPTION
[0038] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.
[0039] Obviously, the described embodiments are only some embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] In the description of the present invention, it should be noted that the terms “first”, “second” and “third” are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0041] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0042] The present invention will be described in more detail below with reference to the accompanying drawings. In each of the accompanying drawings, the same elements are represented by similar reference numerals. For the sake of clarity, the various parts in the accompanying drawings are not drawn to scale.
[0043] See also Figure 1 and Figure 2 , Figure 1 It is a schematic diagram of the structure in which a coiling ring is installed on a receiving rod in the prior art; Figure 2 It is a structural schematic diagram of a film cutting machine in the prior art.
[0044] The working process of the film cutting machine is: the raw material of the whole film needs to be cut according to the product size. The cutting machine of the existing technology, such as Figure 1 and Figure 2 As shown, before cutting, two screws 101 are used to fix a winding ring 102 at a predetermined position on the receiving rod 100 for positioning, and the required winding rings 102 are positioned at the predetermined positions in turn, and then the whole sheet of film raw material is cut according to the predetermined size, and the cut small section of film is pasted and wound on the winding ring, and the cutting machine is started to rotate the receiving rod 100 and drive the winding ring 102 to rotate for cutting and receiving.
[0045] The coil ring 102 needs to be positioned on the take-up rod 100 by screws 101. Every two screws 101 determine the distance between the two coil rings 102, and every two screws 101 fix one coil ring 102. Therefore, when positioning the film for cutting and positioning the film for take-up, a large number of screws 101 are required, resulting in a large amount of time required to position the coil ring 102 before each production, which consumes a lot of man-hours and has extremely low production efficiency.
[0046] See also Figure 3 and Figure 4 , Figure 3 is a schematic structural diagram of a material receiving device according to an embodiment of the present application; Figure 4 It is an enlarged assembly diagram of a material receiving ring sleeved on a flexible positioning ring according to an embodiment of the present application.
[0047] According to one embodiment of the present invention, Figure 3 and Figure 4 The material collecting device shown comprises a plurality of first tubular structure segments 10 and a plurality of second tubular structure segments 20 arranged at intervals; each of the second tubular structure segments 20 is connected to two adjacent first tubular structure segments 10, and the diameter of the second tubular structure segment 20 is smaller than the diameter of the first tubular structure segment 10; a flexible positioning ring 30 is arranged on the second tubular structure segment 10; the flexible positioning ring 30 is arranged to expand in an inflated state so as to limit the position of the material collecting ring 40 when the material collecting ring 40 is sleeved on the outside of the flexible positioning ring 30.
[0048] In this embodiment, a plurality of first tubular structure segments 10 and a plurality of second tubular structure segments 20 may be alternately arranged to form a long tubular structure, and the tubular structure forms an orderly arranged concave-convex structure along the length direction, wherein the number of the first tubular structure segments 10 may be equal to the number of the second tubular structure segments 20, may be less than the number of the second tubular structure segments 20, or may be more than the number of the second tubular structure segments 20. Preferably, the number of the first tubular structure segments 10 is more than the number of the second tubular structure segments 20. One specific arrangement may be: a first tubular structure segment 10, a second tubular structure segment 20, another first tubular structure segment 10, another second tubular structure segment 20, another first tubular structure segment 10, another second tubular structure segment 20, and finally a first tubular structure segment 10, but is not limited to the above enumeration. The connection method between the first tubular structure segment 10 and the second tubular structure segment 20 of the present application can be a fixed connection or an integral molding, preferably an integral molding; wherein the fixed connection method can be welding, riveting, screw connection, etc., preferably welding or riveting; but not limited to the above, for example, adhesive bonding can also be used. Before collecting the material, the film needs to be positioned; since the second tubular structure segment 20 and the first tubular structure segment 10 are arranged regularly as above in the present application, one of the pre-cut film strips can be selected, and the position of the film strip is compared with the flexible positioning ring 30 positioned at the second tubular structure segment 20, and the position calibration of all film strips can be completed, which simplifies the position calibration procedure, saves working time, and improves work efficiency.
[0049] It should be noted that the first tubular structure segment 10 and the second tubular structure segment 20 can be directly sleeved on the material receiving rod of the cutting device, and the inner diameter of the second tubular structure segment 20 matches the outer diameter of the material receiving rod to be clamped on the material receiving rod. The inner wall of the second tubular structure segment 20 can also be provided with an internal thread, and the material receiving rod can be provided with an external thread, and fixed to the material receiving rod by threaded connection. A hole can also be provided on the first tubular structure segment 10, and fixed to the material receiving rod by a fixed connection method, such as screw connection, pin connection, etc. Among them, multiple first tubular structure segments 10 and multiple second tubular structure segments 20 can be alternately arranged to form a long tubular structure, and the total length of the structure can match the length of the material receiving rod 100, that is, it can be greater than the length of the material receiving rod 100, or it can be equal to the length of the material receiving rod 100 or less than the length of the material receiving rod, preferably equal to or less than the length of the material receiving rod 100, specifically 490-530 mm, more preferably 500-520 mm, for example 500 mm, 502 mm, 504 mm, 506 mm, 508 mm, 510 mm, 512 mm, 514 mm, 516 mm, 518 mm or 520 mm, the optimal length is 510 mm, but not limited to the large range listed above.
[0050] In addition, the first tubular structure segment 10 and the second tubular structure segment 20 of the present application are both made of rigid materials, but have a certain expansion coefficient, such as resin, etc.; while the flexible positioning ring 30 is made of flexible material, and its expansion coefficient is much greater than the expansion coefficient of the first tubular structure segment 10 and the second tubular structure segment 20. When the flexible positioning ring 30 expands, the material collection ring 40 is fixed. Since the diameters of the two adjacent first tubular structure segments 10 of the second tubular structure segment 20 are greater than the second tubular structure segment 20, a concave structure is formed between every two first tubular structure segments 10, and the concave structure limits the position of the material collection ring 40, and the flexible positioning ring 30 fixes the material collection ring 40. When the film is collected to a certain amount on the material collection ring 40, the plane of the material roll can still be kept vertical to the axis of the material collection rod with accuracy, and the material collection continues. The positioning of the passing point in the prior art is avoided, which makes it difficult to ensure the verticality of the winding roll and the axis of the winding rod; as a result, the winding roll will shake violently or even collapse in the subsequent production process, causing the interruption of winding, scrapping of materials and abnormal shutdown of equipment, which seriously affects production.
[0051] It should be noted that the number of flexible positioning rings 30 matches the number of second tubular structure segments 20 . For example, one second tubular structure segment 20 is provided with one flexible positioning ring. However, the number of flexible positioning rings 30 may be less than the number of second tubular structure segments 20 .
[0052] In an optional embodiment, the material receiving device, such as Figure 3 As shown, it also includes a third tubular structure segment 50 nested in the multiple first tubular structure segments 10 and the multiple second tubular structure segments 20 arranged at intervals; the first tubular structure segments 10 located at both ends are respectively connected to the two ends of the third tubular structure segment 50 to form a closed space; the flexible positioning ring 30 and the second tubular structure segment 20 are respectively provided with through holes to connect the flexible positioning ring 30 with the closed space; the first tubular structure segment 10, the second tubular structure segment 20 or the third tubular structure segment 50 is provided with air holes 60, and the air holes 60 are connected to the closed space.
[0053] In this embodiment, a plurality of first tubular structure segments 10 and a plurality of second tubular structure segments 20 are arranged to form a long tubular structure, and the outer diameter of the third tubular structure segment 50 is smaller than the inner diameter of the second tubular structure segment 20, and the inner diameter of the third tubular structure segment 50 matches the outer diameter of the receiving rod. In addition, the length of the third tubular structure segment 50 is equal to the length of a long tubular structure formed by arranging a plurality of first tubular structure segments 10 and a plurality of second tubular structure segments 20. The third tubular structure segment 50 is nested in the long tubular structure, and the two ends are connected, so that a closed space is formed between the long tubular structure and the third tubular structure segment 50. Among them, the plurality of first tubular structure segments 10, the plurality of second tubular structure segments 20 and the third tubular structure segment 50 can be connected by a fixed connection method, or can be made by an integral molding method, preferably an integral molding method. Among them, the fixed connection method can be welding, riveting, screw connection, etc., preferably welding or riveting; but not limited to the above-mentioned, for example, an adhesive bonding method can also be used.
[0054] It should be noted that the length of a long tubular structure formed by arranging a plurality of first tubular structure segments 10 and a plurality of second tubular structure segments 20 may also be equal to the total length of two or three third tubular structure segments 50. However, it is not limited to the above examples. As long as the long tubular structure and the third long tubular structure 50 can form a sealed space, it is sufficient.
[0055] In addition, the first tubular structure segment 10 or the second tubular structure segment 20 or the third tubular structure segment 50 is provided with an air hole 60, which is connected to an external inflation device, so that the enclosed space can be inflated by the external inflation device, so that the enclosed space can be expanded to a certain extent to position the receiving ring 50.
[0056] In this embodiment, a through hole is provided on each second tubular structure segment 20, and the flexible positioning ring 30 is connected to the enclosed space through the through hole. When the external inflation device inflates the enclosed space, the gas enters the flexible positioning ring 30 through the through hole, thereby causing the flexible positioning ring 30 to expand and increase its volume, so as to fix the receiving ring 40 positioned on the second tubular structure segment 20.
[0057] In an optional embodiment, the diameter of the first tubular structure segment 10 is smaller than the diameter of the receiving ring 40 , so that the receiving ring 40 can pass through the first tubular structure segment 10 and be sleeved on the outside of the second tubular structure segment 20 .
[0058] In this embodiment, the inner diameter of the material collecting ring 40 can be set to be larger than the outer diameter of the first tubular structure segment 10, so that the material collecting ring 40 can pass through the first tubular structure segment 10 and be sleeved on the outside of the second tubular structure segment 20, and be fixed by the flexible positioning ring 30. In one embodiment, the material collecting ring 40 can be set to be composed of two arc-shaped sheet structures, and the two arc-shaped sheet structures can form a ring structure after docking, that is, the material collecting ring 40, the inner diameter of the ring structure is larger than the outer diameter of the second tubular structure segment 20, and the outer diameter of the ring structure is smaller than the outer diameter of the first tubular structure segment 10, so that the material collecting ring 40 can be directly sleeved on the outside of the second tubular structure segment 20.
[0059] In another embodiment, the collecting ring 40 can also be set as an annular structure, and the inner surface of the annular structure has a groove; the annular structure is set to an openable and closable structure. An arc-shaped piece with the same curvature as the annular structure is arranged in the groove, and the annular structure is opened and closed by sliding along the curvature direction of the groove. The inner diameter of the collecting ring 40 is greater than or equal to the outer diameter of the second tubular structure segment 20, and the outer diameter of the collecting ring 40 is less than or equal to the outer diameter of the first tubular structure segment 10. When the annular structure is opened, the second tubular structure segment 20 is placed in the ring, and when the annular structure is closed, the collecting ring 40 is sleeved on the outside of the second tubular structure. Among them, a buckle is also provided at the groove, and when the buckle is opened, the arc-shaped piece can be retracted into the groove to open the annular structure; when the arc-shaped piece extends out of the groove to form a closed annular structure, the bayonet is closed to ensure the stability of the closed loop.
[0060] The material collection ring 40 described in the above embodiment ensures that its arc is the same as the arc of the material collection rod and the second tubular structure section 20, so that when collecting materials, the plane of the material roll and the axis of the material collection rod are kept vertically accurately, and the material collection is continued.
[0061] See also Figure 6 and Figure 5 , Figure 5 is an assembly cross-sectional view of a receiving ring, an adjustment assembly, and a flexible positioning ring according to an embodiment of the present application; Figure 6 It is a schematic diagram of the structure of the adjustment component 70 according to the embodiment of the present application.
[0062] In an alternative embodiment, if Figure 6 and Figure 5 As shown, the material collecting device further includes a plurality of annular adjustment components 70; the adjustment components 70 are sleeved on the outside of part of the second tubular structure segment 20 to fix the material collecting ring 40 when the width of the material collecting ring 40 is smaller than the width of the second tubular structure segment 20.
[0063] In this embodiment, the adjustment component 70 can be set to a circular ring shape or a ring structure with a polygonal cross section. In addition, the adjustment component 70 can be set to a structure with a cavity or a solid structure. The adjustment component 70 is made of a rigid material, which can be stainless steel or resin, preferably stainless steel, but is not limited to the above.
[0064] The present application also provides an adjustment component 70, and the width of the adjustment component 70 is different, so as to match the different width specifications of the material receiving ring 40, so that the sum of the widths of the two is the same as the width of the second tubular structure section 20, thereby improving the practicality of the material receiving device. In production, when replacing the material coiling rings of different widths, the prior art needs to remove the screws that fix the position of the material coiling ring one by one, and then install them one by one. However, the present application directly replaces the position through the width adjustment component 70, which is simple and convenient to operate, and shortens the time used for production.
[0065] See also Figure 7 and Figure 6 , Figure 6 is a schematic diagram of the structure of the adjustment component 70 according to an embodiment of the present application; Figure 7 It is a schematic diagram of the structure of the first adjustment component or the second adjustment component according to the implementation mode of the present application.
[0066] In an alternative embodiment, if Figure 6 and Figure 7 As shown, the adjustment assembly 70 includes at least one first adjustment member 701 and at least one second adjustment member 702; the first adjustment member 701 and the second adjustment member 702 are connected to form a ring structure.
[0067] In this embodiment, each first adjusting member 701 and each second adjusting member 702 form a pair, and the widths of the first adjusting member 701 and the second adjusting member 702 are equal. After the two are connected, they can form a ring structure, which is sleeved on the outside of the second tubular structure segment 20. Different pairs of first adjusting members 701 and second adjusting members 702 have different widths to match the receiving rings 40 of different widths, so that the sum of the width of each pair of first adjusting members 701 and second adjusting members 702 and the width of the receiving ring 40 is the width of the second tubular structure segment 20. The width of the receiving ring 40 can be 15-170 mm, for example, 168 mm, 15.75 mm, 41.75 mm and 45.75 mm, but is not limited to the above.
[0068] It should be noted that the first adjusting member 701 and each second adjusting member 702 can be a strip-shaped sheet structure respectively, and the strip-shaped sheet structure has a certain curvature to form a semi-ring shape. When the two semi-rings are connected, a complete ring structure is formed, which is sleeved on the outside of the second tubular structure 20.
[0069] See also Figure 6 , Figure 6 It is a schematic diagram of the structure of the adjustment component 70 according to the embodiment of the present application.
[0070] In an alternative embodiment, if Figure 6 As shown, the first adjusting member 701 and the second adjusting member 702 are magnetically connected.
[0071] In this embodiment, the ends of the first adjusting member 701 and the second adjusting member 702 are set as magnetic structures, and are connected to each other by magnetic force to form a ring. The two ends of the first adjusting member 701 can be set to the same magnetic properties, and the two ends of the second adjusting member 702 are also set to the same magnetic properties, and the magnetic properties are opposite to those of the two ends of the first adjusting member 701. Alternatively, the two ends of the first adjusting member 701 are set to opposite magnetic properties, and the two ends of the second adjusting member 702 are also set to opposite magnetic properties. When the first adjusting member 701 and the second adjusting member 702 are docked, the magnetism of the docked two ends is opposite. In an optional embodiment, a third adjusting member may also be included; the first adjusting member 701, the second adjusting member 702 and the third adjusting member are magnetically connected.
[0072] See also Figure 8 , Figure 8 It is a schematic diagram of assembling the adjustment component according to an embodiment of the present application.
[0073] In this embodiment, the first adjusting member 701, the second adjusting member 702 and the third adjusting member 703 are all configured as strip-shaped sheet structures, and the strip-shaped sheet structures have a certain curvature, forming a one-third ring. When the three are magnetically connected, a ring is formed to be sleeved outside the second tubular structure segment 20, and the inner diameter of the formed ring is larger than the outer diameter of the second tubular structure segment 20, and the outer diameter of the ring is smaller than the outer diameter of the first tubular structure segment 10. The first adjusting member 701, the second adjusting member 702 and the third adjusting member 703 have opposite magnetic ends connected to each other.
[0074] In an optional embodiment, the adjustment component 70 includes at least one adjustment member; the adjustment member is configured as an annular structure having a groove on the inner surface; the annular structure is configured as an openable and closable structure. An arc-shaped sheet having the same arc as the annular structure is disposed in the groove, and the annular structure is opened and closed by sliding along the arc direction of the groove, thereby sleeved on the outside of the second tubular structure segment 20. The inner diameter of the adjustment member is larger than the outer diameter of the second tubular structure segment 20, and the outer diameter of the adjustment member is smaller than the outer diameter of the first tubular structure segment 10.
[0075] See also Figure 5 and Fig.10 , Figure 5is an assembly cross-sectional view of a receiving ring, an adjustment assembly, and a flexible positioning ring according to an embodiment of the present application; Fig.10 It is a schematic diagram of the assembly of the adjustment component and the material collecting ring on the material collecting device according to the embodiment of the present application.
[0076] In an alternative embodiment, if Figure 5 and Fig.10 As shown, the sum of the width of the adjustment assembly 70 and the width of the receiving ring 40 is equal to the width of the second tubular structure segment 20 , so as to fix the receiving ring 40 at one end of the second tubular structure segment 20 .
[0077] In this embodiment, due to the limitation of the width of the cutting material in actual work, the adjustment component 70 and the material receiving ring 40 are usually designed to have different specifications, for example, the width of the material receiving ring 40 can be 15-170 mm, for example, 168 mm, 15.75 mm, 41.75 mm and 45.75 mm, but not limited to the above. The two ends of the second tubular structure segment 20 are respectively connected to the first tubular structure segment 10, and the diameter of the second tubular structure segment 20 is smaller than the diameter of the first tubular structure segment 10 at both ends. When the material receiving ring 40 (for example, the width is 41.75 mm) is sleeved on the outside of the second tubular structure segment 20, an adjustment component 70 is required to be added, so that one end of the width of the adjustment component 70 is abutted against the end of the first tubular structure segment 10 at one end, the other end of the width of the adjustment component 70 is abutted against one end of the material receiving ring 40, and the other end of the material receiving ring 40 is abutted against the end of the first tubular structure segment 10 at the other end; so that the adjustment component 70 further positions the position of the material receiving ring 10.
[0078] In an optional embodiment, the outer diameter of the adjusting component 70 is substantially equal to the inner diameter of the collecting ring 40 ; the inner diameter of the adjusting component 70 is equal to the outer diameter of the second tubular structure segment 20 .
[0079] In this embodiment, when the receiving ring 40 passes through the first tubular structure segment 10 and is sleeved on the outside of the second tubular structure segment 20, the inner diameter of the receiving ring 40 is substantially equal to the outer diameter of the first tubular structure segment 10. The outer diameter of the adjustment component 70 is substantially equal to the inner diameter of the receiving ring 40, so that the adjustment component 70 can be sleeved on the outside of the second tubular structure segment 20 and abut against the end of a first tubular structure segment 10 connected to the second tubular structure segment 20. The receiving ring 40 is sleeved on the flexible positioning ring 30, and the flexible positioning ring 30 is between the adjustment component 70 and another first tubular structure segment 10 connected to the second tubular structure segment 20. When the flexible positioning ring 30 expands and has a certain rigidity, it is positioned by the adjustment component 70 and the first tubular structure segment 10 on both sides thereof, and the expansion of the flexible positioning ring 30 fixes the receiving ring 30.
[0080] See also Fig. 9 , Fig. 9 It is a schematic diagram of the two arc-shaped sheet structures of the receiving ring according to the embodiment of the present application forming a ring structure after being butt-jointed.
[0081] In another alternative embodiment, if Fig. 9 As shown, the collecting ring 40 can be configured to be composed of two arc-shaped sheet structures, and the two arc-shaped sheet structures form an annular structure after docking. That is, the inner diameter of the annular structure of the collecting ring 40 is greater than or approximately equal to the outer diameter of the second tubular structure segment 20, and the outer diameter of the annular structure is less than or approximately equal to the outer diameter of the first tubular structure segment 10. So that the collecting ring 40 can be directly sleeved on the outside of the second tubular structure segment 20. The inner diameter of the adjustment component 70 is equal to the inner diameter of the collecting ring 40, and is greater than the outer diameter of the second tubular structure segment 20. So that the two ends of the adjustment component 70 and the collecting ring 40 after abutment are respectively abutted with the first tubular structure segment 10 at both ends of the second tubular structure segment 20.
[0082] In another embodiment, the collecting ring 40 can also be set as an annular structure, and the inner surface of the annular structure has a groove; the annular structure is set to an openable and closable structure. An arc-shaped sheet with the same curvature as the annular structure is arranged in the groove, and the annular structure is opened and closed by sliding along the curvature direction of the groove. The inner diameter of the collecting ring 40 is greater than or equal to the outer diameter of the second tubular structure segment 20, and the outer diameter of the collecting ring 40 is less than or equal to the outer diameter of the first tubular structure segment 10. When the annular structure is opened, the second tubular structure segment 20 is placed in the ring, and when the annular structure is closed, the collecting ring 40 is sleeved on the outside of the second tubular structure. The inner diameter of the adjusting component 70 is equal to the inner diameter of the collecting ring 40, and is greater than the outer diameter of the second tubular structure segment 20. So that the two ends of the adjusting component 70 and the collecting ring 40 after abutment are respectively abutted with the first tubular structure segment 10 at both ends of the second tubular structure segment 20. Among them, a buckle is also provided at the groove. When the buckle is opened, the arc-shaped piece can be retracted into the groove to open the annular structure; when the arc-shaped piece extends out of the groove to form a closed annular structure, the buckle is closed to ensure the stability of the closed loop.
[0083] In an optional embodiment, the flexible positioning ring 30 is configured such that its outer diameter after expansion is greater than or equal to the inner diameter of the receiving ring 40 sleeved on the outside thereof.
[0084] In this embodiment, since the flexible positioning ring 30 is made of a flexible material and can be enlarged by inflation. When the receiving ring 40 is sleeved on the second tubular structure segment 20, the inner diameter of the receiving ring 40 is roughly equal to the outer diameter of the first tubular structure segment 10; when the width of the receiving ring 40 is roughly equal to the width of the second tubular structure segment 20, the flexible positioning ring 30 expands, which can make up for the gap formed between the rigid receiving ring 40, the two first tubular structure segments 10 and the second tubular structure segment and form a shape that fills the gap. As the inflation amount increases, the rigidity of the flexible positioning ring 30 is enhanced, thereby fixing the position of the receiving ring 40. It should be noted that the flexible positioning ring 30 can extend from the gap between the receiving ring and the two first tubular structure segments 10, forming a semi-encirclement of the receiving ring by the flexible positioning ring 30, thereby fixing the position of the receiving ring 40.
[0085] In an optional embodiment, the difference between the radius of the first tubular structure segment 10 and the radius of the second tubular structure segment 20 is 8-12 mm.
[0086] In this embodiment, the first tubular structure segment 10 and the second tubular structure segment 20 have different radii, so that the first tubular structure segment 10 at both ends of the second tubular structure segment 20 can abut against the material receiving ring 40 itself and the combination of the adjustment component 70 and the material receiving ring 40, so as to form a positioning for the material receiving ring 40. The positioning is convenient, fast and accurate. It should be noted that the difference between the radius of the first tubular structure segment 10 and the radius of the second tubular structure segment 20 can be 8 mm, 9 mm, 10 mm, 11 mm or 12 mm, preferably 10 mm.
[0087] See also Fig.11 , Fig.11 It is a schematic diagram of the working state of the cutting device according to the present application.
[0088] According to another embodiment of the present invention, a cutting device is provided, comprising the material receiving device described in any one of the above embodiments, wherein the material receiving device is sleeved on the material receiving rod 100 of the cutting device through the third tubular structure segment 50 .
[0089] In an optional embodiment, the material receiving device is directly sleeved on the material receiving rod 100 of the cutting device through the plurality of first tubular structure segments 10 and the plurality of second tubular structure segments 20 arranged at intervals. A flexible positioning ring 30 is provided on each second tubular structure segment, and the flexible positioning ring 30 is connected to an external inflation device through an air pipe, and the air pipe passes through the first tubular structure segment 10 and extends out of the material receiving device to communicate with the external inflation device. In addition, in the present application, the length of the material receiving device only needs to match the length of the material receiving rod 100, that is, the length of the material receiving device can be greater than the length of the material receiving rod 100, or can be equal to the length of the material receiving rod 100 or less than the length of the material receiving rod 100, preferably equal to or less than the length of the material receiving rod 100, specifically 490-530 mm, more preferably 500-520 mm, for example 500 mm, 502 mm, 504 mm, 506 mm, 508 mm, 510 mm, 512 mm, 514 mm, 516 mm, 518 mm or 520 mm, the optimal length is 510 mm, but is not limited to the range listed above.
[0090] The present invention aims to protect a material receiving device, which forms a regular and orderly concave-convex structure by arranging a plurality of first tubular structure segments and a plurality of second tubular structure segments at intervals. Since the diameter of the first tubular structure segment is different from that of the second tubular structure segment, a flexible positioning ring is provided on the second tubular structure segment with a smaller diameter, that is, a flexible positioning ring is provided at the concave part of the concave-convex structure. The material receiving ring is sleeved on the flexible positioning ring. When receiving the material, the flexible positioning ring is inflated and expanded, and the volume increases, so that the fixing and positioning of the material receiving ring is completed, and the material can be rotated to receive the material. Before receiving the material, the film needs to be positioned; since the concave structures in the present application are arranged in a certain regularity, one of the pre-cut film strips can be selected, and the position of the film strip can be compared with the flexible positioning ring positioned in the concave structure, so that the position calibration of all film strips can be completed, which simplifies the position calibration procedure, saves working time, and improves work efficiency. On the other hand, due to the limitation of the concave structure and the fixation of the flexible positioning ring, when the film is collected to a certain amount on the collection ring, the plane of the material roll can still maintain the verticality of the axis of the collection rod, and the material can be collected continuously. This avoids the positioning of the passing point in the prior art, which makes it difficult to ensure the verticality of the collection roll and the axis of the collection rod; as a result, the collection roll will shake violently or even collapse in the subsequent production process, causing the interruption of collection, the scrapping of materials and the abnormal shutdown of equipment, which seriously affects production.
[0091] The present application designs a third tubular structure segment, which, together with the first tubular structure segment and the second tubular structure segment, forms a closed space, and can inflate the closed space to allow the structure segment itself to expand to a certain extent, thereby increasing the stability during use. In addition, the design of the flexible positioning ring is connected to the closed space through the position of the second tubular structure segment, so that it is inflated and expanded, and the volume increases, so as to further fix the receiving ring.
[0092] In addition, the present application is also provided with an adjustment component, and the width of the adjustment component is adjusted. The width specifications of the adjustment component are different to match the different width specifications of the material receiving ring, so that the sum of the widths of the two is the same as the width of the second tubular structure section, thereby improving the practicality of the material receiving device. In production, when replacing the coiling rings of different widths, the prior art also needs to remove the screws that fix the position of the coiling ring one by one, and then install them one by one. However, the present application directly replaces the position through the width adjustment component, which is simple and convenient to operate, and shortens the time used for production.
[0093] It should be understood that the above specific embodiments of the present invention are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. In addition, the appended claims of the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the appended claims, or the equivalent forms of such scope and boundaries.
Claims
1. A material receiving device, characterized in that: It comprises a plurality of first tubular structure segments (10) and a plurality of second tubular structure segments (20) which are arranged at intervals; Each of the second tubular structure segments (20) is connected to two adjacent first tubular structure segments (10), and the diameter of the second tubular structure segment (20) is smaller than the diameter of the first tubular structure segment (10); The second tubular structure section (20) is provided with a flexible positioning ring (30); The flexible positioning ring (30) is configured to expand in an inflated state so as to limit the position of the receiving ring (40) when the receiving ring (40) is sleeved outside the flexible positioning ring (30); a third tubular structure segment (50) nested within the plurality of first tubular structure segments (10) and the plurality of second tubular structure segments (20) arranged at intervals; The first tubular structure segments (10) located at both ends are respectively connected to both ends of the third tubular structure segment (50) to form a closed space; The flexible positioning ring (30) and the second tubular structure section (20) are respectively provided with through holes, so that the flexible positioning ring (30) is connected with the closed space; The first tubular structure segment (10), the second tubular structure segment (20) or the third tubular structure segment (50) is provided with an air hole (60), and the air hole (60) is connected to the closed space; A plurality of annular adjustment components (70); The adjusting component (70) is sleeved on the outside of a portion of the second tubular structure segment (20) so as to fix the collecting ring (40) when the width of the collecting ring (40) is smaller than the width of the second tubular structure segment (20); The sum of the width of the adjusting component (70) and the width of the receiving ring (40) is equal to the width of the second tubular structure segment (20), so as to fix the receiving ring (40) at one end of the second tubular structure segment (20); The diameter of the first tubular structure segment (10) is smaller than the diameter of the receiving ring (40), so that the receiving ring (40) can pass through the first tubular structure segment (10) and be sleeved on the outside of the second tubular structure segment (20).
2. The material receiving device according to claim 1, characterized in that: The adjustment component (70) comprises at least one first adjustment member (701) and at least one second adjustment member (702); The first adjusting member (701) and the second adjusting member (702) are connected to form a ring structure.
3. The material receiving device according to claim 2, characterized in that: The first adjusting member (701) and the second adjusting member (702) are magnetically connected.
4. The material receiving device according to claim 1, characterized in that: The flexible positioning ring (30) is configured such that its outer diameter after expansion is greater than or equal to the inner diameter of the receiving ring (40) sleeved on the outside thereof.
5. The material receiving device according to claim 1, characterized in that: The difference between the radius of the first tubular structure segment (10) and the radius of the second tubular structure segment (20) is 8-12 mm.
6. A cutting device, characterized in that: It comprises the material receiving device according to any one of claims 1 to 5, wherein the material receiving device is sleeved on the material receiving rod (100) of the cutting equipment through the third tubular structure segment (50).
