Construction method of span box girder

By using the closed ring structure formed by the pipe rack and the traveling vehicle and the easy disassembly and assembly method implemented by the spreader during the construction of the span-empty box girder, the problems of vibration of the sprinkler equipment and construction complexity are solved, and the service life and life of the equipment are improved. Construction efficiency.

CN110528398BActive Publication Date: 2024-10-01CITIC GUOAN CONSTR GRP CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN201910939833.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-09-30
Publication Date
2024-10-01
Estimated Expiration
2039-09-30

AI Technical Summary

Technical Problem

In the existing construction of empty span box girders, the pipe rack of the sprinkler equipment vibrates violently, affecting the service life and safety. At the same time, the disassembly and assembly process relies on the formwork, which increases the complexity of the construction and the problems of low efficiency.

Method used

A closed ring structure formed by a pipe rack and a traveling carriage is used, and a spreader is used to implement an easy-to-disassemble construction method, which reduces vibration and avoids reliance on formwork. A single crane is used to complete the installation and disassembly of the pipe rack.

Benefits of technology

It effectively reduces the vibration of the pipe rack of the sprinkler equipment, extends the service life and improves safety, while simplifying the construction process and improving construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110528398B_ABST
    Figure CN110528398B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for constructing a box girder across space, which includes a method for disassembling and assembling a spraying device for spraying and maintaining the outer wall of the box girder, wherein the spraying device includes a traveling vehicle, a traveling track, a pipe rack, and a spraying pipe; the combination formed by the pipe rack and the traveling vehicle is a closed annular structure sleeved on the outer side of the box girder; when disassembling and assembling the spraying device, the hoisting is completed by a hoist; the specific hoisting is as follows: after the traveling vehicle is installed on the box girder through the traveling track, the connection between the upper frame and the traveling vehicle is completed; the connection between the cross bar and the lifting steel rope on the crane is completed; the lead-out section is connected at the upper end of the side frame, and the position of the cross bar in space is controlled by the crane, and the position of the combination relative to the cross bar is controlled by the winch. This construction method is not only beneficial to the service life and safety of the spraying device, but also provides a construction method that is easy to realize the disassembly and assembly of the spraying device, does not rely on the formwork, and is easy to realize the disassembly and assembly of the spraying device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction of a spanning box girder, in particular to a construction method of a spanning box girder. Background Art

[0002] In the existing field of span box girder construction, the research and development projects involve: research on the basic theory of continuous beam bridge design and commonly used construction methods, research on key technologies of cast-in-place box girder formwork and support design, research on cast-in-place box girder support design and construction control, research on cast-in-place continuous box girder construction organization design, research on optimization of cast-in-place box girder support erection methods in narrow spaces in urban center areas, research on key technologies for cast-in-place box girder construction with supports in mountainous areas, research on mobile formwork construction technology for cast-in-place box girders, research on common quality problems and treatment measures for cast-in-place box girders, etc.

[0003] In the past, during the delicate construction of large-span cast-in-place box girders, after the cast-in-place box girders were cast and the formwork was removed, the box girders needed to be watered for maintenance. In order to solve the problems of uneven quality of watering maintenance, difficult maintenance of the sides and lower part of the box girder, high labor intensity, certain risks, and large labor requirements during the watering maintenance process, spray equipment specifically used for box girder maintenance has appeared in the prior art.

[0004] The above spraying equipment generally includes a traveling vehicle that can make linear reciprocating motion along the length direction of the box girder, the vehicle is equipped with a water tank, and also includes a pipe rack fixedly connected to the traveling vehicle, the pipe rack carries a spray pipe extending along the pipe rack, and also includes a water pump for extracting water from the water tank and injecting it into the spray pipe. By setting a plurality of nozzles on the spray pipe and arranged at intervals along the length direction of the spray pipe, mechanized spraying maintenance of the box girder is realized.

[0005] Further research on box girder maintenance technology so that it can better serve box girder construction is a technical problem that needs to be urgently solved by technical personnel in this field. Summary of the invention

[0006] Further research on the above-mentioned box girder maintenance technology so that it can better serve the box girder construction is a technical problem that needs to be solved by those skilled in the art. The present invention provides a method for constructing a box girder across space. This construction method can not only reduce the vibration of the pipeline rack during the pipeline-type mechanized spraying maintenance process, which is beneficial to the service life and safety of the spraying equipment, but also provides a construction method that is easy to realize the disassembly and assembly of the spraying equipment without relying on the formwork, and the disassembly and assembly of the spraying equipment is easy to realize.

[0007] In view of the above problems, the present invention provides a method for constructing a box girder with a gap to solve the problem through the following technical points: a method for constructing a box girder with a gap to solve the problem, the method comprising a method for disassembling and assembling a spraying device for spraying and curing the outer wall of the box girder, the spraying device comprising a traveling vehicle, a plurality of traveling tracks as the traveling vehicle tracks on the box girder, a pipe rack fixedly connected to the traveling vehicle, and a spraying pipe laid on the pipe rack;

[0008] The combination of the pipeline rack and the traveling vehicle is a closed annular structure sleeved on the outside of the box beam;

[0009] The pipe rack includes two upper frames, two side frames and a lower frame, one end of each of the upper frames is fixedly connected to the traveling vehicle, each end of the lower frame is connected to a side frame, and the free end of each side frame is respectively connected to a different upper frame;

[0010] When the spray equipment is disassembled and assembled, the assembly formed by the side frame and the lower frame is hoisted by a hoist: the hoist includes a crossbar and a winch installed in the middle of the crossbar, and a winch steel rope is wound on the winch. The winch steel rope has two lead-out sections relative to the winch, and the two lead-out sections extend downward from different ends of the crossbar. When the winch is working, the two lead-out sections are synchronously wound or released;

[0011] The specific hoisting is as follows: after the traveling vehicle is installed on the box beam through the traveling track, the upper frame is connected to the traveling vehicle; the crossbar is connected to the lifting steel rope on the crane, and the crossbar is in a horizontal state;

[0012] Then, the lower ends of different lead-out sections are connected to the upper ends of the two side frames respectively, and the position of the cross bar in space is controlled by a crane, and the position of the assembly relative to the cross bar is controlled by a winch to complete the assembly and disassembly.

[0013] In the prior art, for the spray maintenance of cast-in-place box girders, the pipe rack used to support the spray pipe is generally a cantilever beam structure. Since the spray pipe itself is relatively long, the pipe rack generally covers the top, side walls and lower part of the box girder. When the spray pipe is working, the pipe rack generally has a large vibration. The above vibration not only affects the spray effect, but also accelerates the fatigue of the pipe rack, which is not conducive to the service life and safety of the spray equipment.

[0014] Based on the above problems, this solution provides a specific implementation method of the spray equipment. In this solution, the combination formed by the pipe rack and the traveling vehicle is arranged as a closed ring structure sleeved on the outside of the box beam. In this way, the traveling vehicle can actually impose constraints on the two ends of the pipe rack. In this way, the intensity of the vibration of the pipe rack induced by the spray pipe during operation can be effectively reduced, thereby achieving the purpose of extending the service life and safety of the spray equipment.

[0015] At the same time, based on the structural design of the above spray equipment, this solution also provides a method for disassembling and assembling the spray equipment: since the pipe rack provided by this solution includes a lower frame, and the bottom of the span box girder is suspended in the air, this solution provides a construction method in which the assembly of the pipe rack does not rely on the formwork and can be disassembled and assembled using a single crane.

[0016] Specifically, when a single crane is used to lift the assembly formed by the lower frame and the side frame to complete the assembly and disassembly of the pipe rack, since the lower frame needs to be located on the lower side of the box beam, the box beam is actually an obstacle during the lifting process. Considering the safety of the lifting, it is not allowed for the lifting wire on the crane to contact the box beam. To avoid the above situation, if a fixed pulley is set on both sides of the upper end of the box beam, this not only increases the number of construction devices, but also requires consideration of the fixation of the fixed pulley and the box beam. From the perspective of the appearance of the box beam, achieving the above fixation is also unfavorable to the appearance of the box beam. Therefore, in this solution, the lifting device provided above is used during the specific construction: the lifting device includes a cross bar and a winch installed in the middle of the cross bar. The winch is also wound with a winch steel rope. The winch steel rope has two lead-out sections relative to the winch. The two lead-out sections extend downward from different ends of the cross bar. When the winch is working, the two lead-out sections are synchronously reeled or released;

[0017] The specific hoisting is as follows: after the traveling vehicle is installed on the box beam through the traveling track, the upper frame is connected to the traveling vehicle; the crossbar is connected to the lifting steel rope on the crane, and the crossbar is in a horizontal state;

[0018] Then, the lower ends of different lead-out sections are connected to the upper ends of the two side frames respectively, and the position of the cross bar in space is controlled by a crane, and the position of the assembly relative to the cross bar is controlled by a winch to complete the assembly and disassembly.

[0019] In this way, when the installation of the pipe rack is completed, since the cross bar needs to be located on the upper side of the box beam, and the length of the crane's boom is certain, at this time, if the overhead height of the box beam is relatively high, after the crane constrains the cross bar through the lifting wire, the lower frame and side frame assembly on the ground is lifted to a position close to the lower part of the box beam by the winch on the cross bar and the hoisting steel rope, and then the cross bar is lifted and moved by the lifting wire to complete the relative position matching of the above assembly and the upper frame to facilitate the connection; when the disassembly of the pipe rack is completed, the above assembly can be released by the winch. That is, by adopting this scheme, whether the above assembly is installed or disassembled, since the position of the upper end of each lead-out section is limited by the cross bar, when a crane is used, it is also possible to achieve the problem of the box beam affecting the wire rope during the disassembly and assembly of the pipe rack without setting a device such as a fixed pulley between the box beam and the wire rope. At the same time, since the pipe rack can be disassembled and assembled using a single crane, the structural design of the pipe rack in this solution does not require dependence on the formwork during use, thus avoiding the spray curing process occupying the formwork and affecting the construction efficiency of the entire project. That is, this solution also provides a construction method that is easy to disassemble and assemble the spray equipment without relying on the formwork and is easy to disassemble and assemble the spray equipment.

[0020] Further technical solutions are:

[0021] To facilitate the connection of the pipe rack, it is set as follows: the lower frame and the side frame are both hingedly connected by a hinge shaft, and the axis of the hinge shaft is parallel to the length direction of the box beam, the assembly is bolted to the upper frame, and when the assembly is assembled with the upper frame, the lower frame and the side frame are relatively rotated around the hinge shaft to match the bolt connection position of the assembly and the upper frame.

[0022] Since the upper frame and the lower frame need to have greater rigidity than the side frames, as a solution with light weight and good bending resistance, it is set as follows: the upper frame and the lower frame are both truss structures.

[0023] The construction method includes a method for using a spraying device, wherein the spraying device includes a water tank and a water pump installed on a traveling vehicle, and a spraying pipe laid along a pipe rack;

[0024] Along the extension direction of the spray pipe, a plurality of pipe joints are arranged at intervals on the spray pipe;

[0025] The number of the water pumps is equal to the number of pipe joints, and each pipe joint is connected to a separate water pump, which is used to extract water from the water tank and pump it into the spray pipe through the pipe joint. In this solution, since the spray equipment can cover the top, side and bottom surfaces of the box girder, the above solution is adopted to replenish water through the pipe joints through the spray pipe sections, so that the fluid output by each nozzle on the spray pipe can be relatively more uniform, so as to achieve better spray maintenance effect under the premise of water saving.

[0026] Since different box girders have different sizes and shapes, in order to make the spray pipe universal and the direction of the nozzle thereon easy to control, it is configured as follows: the spray pipe is formed by a plurality of pipe sections connected in series, and the pipe sections are connected by flanges.

[0027] In order to control the output of spray water in different areas according to the actual maintenance needs when the spray equipment is working, it is set up as follows: each pipe section is connected with a pipe joint, and each pipe section is a blind pipe with closed ends, and each water pump can work independently.

[0028] The construction method includes a method for using the spraying equipment, the travel track is laid on the box girder along the length direction of the box girder, and a travel switch is provided at each end of the travel track. The travel switch obtains the position of the travel vehicle and controls the travel vehicle to perform linear reciprocating motion on the travel track. With this solution, the travel switch is used to provide a basis for judging the arrival of the travel vehicle.

[0029] It also includes a control module, the signal output end of the travel switch is connected to the signal input end of the control module, and the signal output end of the control module is connected to the control system of the traveling vehicle, and the movement of the traveling vehicle on the traveling track is automatically controlled through the control module. This solution provides a spray equipment implementation solution that can work automatically.

[0030] The construction method includes a method for using the spraying equipment, and the nozzle on the spraying pipe is an atomizing nozzle. This solution provides an implementation solution that can make the water spray more uniform.

[0031] The water pump used to provide water to the sprinkler pipe is a piston pump. This solution provides an implementation solution that is easier to obtain a greater water pressure.

[0032] The present invention has the following beneficial effects:

[0033] The present solution provides a specific implementation method of the spray equipment. In the present solution, the combination formed by the pipe rack and the traveling vehicle is configured as a closed ring structure sleeved on the outside of the box beam. In this way, the traveling vehicle can actually impose constraints on the two ends of the pipe rack. In this way, the intensity of the vibration of the pipe rack induced by the spray pipe during operation can be effectively reduced, thereby achieving the purpose of benefiting the service life and safety of the spray equipment.

[0034] At the same time, based on the structural design of the above spray equipment, this solution also provides a method for disassembling and assembling the spray equipment: since the pipe rack provided by this solution includes a lower frame, and the bottom of the span box girder is suspended in the air, this solution provides a construction method in which the assembly of the pipe rack does not rely on the formwork and can be disassembled and assembled using a single crane.

[0035] Specifically, when a single crane is used to lift the assembly formed by the lower frame and the side frame to complete the assembly and disassembly of the pipe rack, since the lower frame needs to be located on the lower side of the box beam, the box beam is actually an obstacle during the lifting process. Considering the safety of the lifting, it is not allowed for the lifting wire on the crane to contact the box beam. To avoid the above situation, if a fixed pulley is set on both sides of the upper end of the box beam, this not only increases the number of construction devices, but also requires consideration of the fixation of the fixed pulley and the box beam. From the perspective of the appearance of the box beam, achieving the above fixation is also unfavorable to the appearance of the box beam. Therefore, in this solution, the lifting device provided above is used during the specific construction: the lifting device includes a cross bar and a winch installed in the middle of the cross bar. The winch is also wound with a winch steel rope. The winch steel rope has two lead-out sections relative to the winch. The two lead-out sections extend downward from different ends of the cross bar. When the winch is working, the two lead-out sections are synchronously reeled or released;

[0036] The specific hoisting is as follows: after the traveling vehicle is installed on the box beam through the traveling track, the upper frame is connected to the traveling vehicle; the crossbar is connected to the lifting steel rope on the crane, and the crossbar is in a horizontal state;

[0037] Then, the lower ends of different lead-out sections are connected to the upper ends of the two side frames respectively, and the position of the cross bar in space is controlled by a crane, and the position of the assembly relative to the cross bar is controlled by a winch to complete the assembly and disassembly.

[0038] In this way, when the installation of the pipe rack is completed, since the cross bar needs to be located on the upper side of the box beam, and the length of the crane's boom is certain, at this time, if the overhead height of the box beam is relatively high, after the crane constrains the cross bar through the lifting wire, the lower frame and side frame assembly on the ground is lifted to a position close to the lower part of the box beam by the winch on the cross bar and the hoisting steel rope, and then the cross bar is lifted and moved by the lifting wire to complete the relative position matching of the above assembly and the upper frame to facilitate the connection; when the disassembly of the pipe rack is completed, the above assembly can be released by the winch. That is, by adopting this scheme, whether the above assembly is installed or disassembled, since the position of the upper end of each lead-out section is limited by the cross bar, when a crane is used, it is also possible to achieve the problem of the box beam affecting the wire rope during the disassembly and assembly of the pipe rack without setting a device such as a fixed pulley between the box beam and the wire rope. At the same time, since the pipe rack can be disassembled and assembled using a single crane, the structural design of the pipe rack in this solution does not require dependence on the formwork during use, thus avoiding the spray curing process occupying the formwork and affecting the construction efficiency of the entire project. That is, this solution also provides a construction method that is easy to disassemble and assemble the spray equipment without relying on the formwork and is easy to disassemble and assemble the spray equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1This is a schematic diagram of the structure of a combination obtained by combining a spray device with a box beam in a specific embodiment of the method for constructing a spanning box beam of the present invention;

[0040] Figure 2 A schematic diagram of the connection relationship between the side frame and the lower frame of the pipe rack on the spray equipment in a specific embodiment of the method for constructing a spanning box girder according to the present invention;

[0041] Figure 3 A schematic diagram of the shape of a spray pipe in a specific embodiment of the method for constructing a spanning box girder according to the present invention;

[0042] Figure 4 This is a schematic diagram reflecting the structure of the hoist and the connection relationship between the hoist and the lifting wire in a specific embodiment of the method for constructing a spanning box girder described in the present invention.

[0043] The markings in the figure are: 1. traveling vehicle, 2. water tank, 3. water pump, 4. pipe rack, 5. traveling track, 6. side frame, 7. hinge shaft, 8. lower frame, 9. spray pipe, 10. pipe joint, 11. cross bar, 12. winch, 13. winch rope, 14. lifting rope, 15. upper frame. DETAILED DESCRIPTION

[0044] The present invention is further described in detail below in conjunction with embodiments, but the present invention is not limited to the following embodiments:

[0045] Embodiment 1:

[0046] like Figures 1 to 4 As shown, a method for constructing a box girder across space includes a method for disassembling and assembling a spraying device for spraying and curing the outer wall of the box girder, wherein the spraying device includes a traveling vehicle 1, a plurality of traveling tracks 5 serving as tracks of the traveling vehicle 1 on the box girder, a pipe rack 4 fixedly connected to the traveling vehicle 1, and a spraying pipe 9 laid on the pipe rack 4;

[0047] The combination formed by the pipeline rack 4 and the traveling vehicle 1 is a closed annular structure sleeved on the outside of the box beam;

[0048] The pipe rack 4 includes two upper frames 15, two side frames 6, and a lower frame 8. One end of each of the upper frames 15 is fixedly connected to the traveling vehicle 1. Each end of the lower frame 8 is connected to a side frame 6. The free ends of each side frame 6 are respectively connected to different upper frames 15.

[0049] When the spray equipment is disassembled and assembled, the assembly formed by the side frame 6 and the lower frame 8 is hoisted by a hoist: the hoist comprises a cross bar 11 and a winch 12 installed in the middle of the cross bar 11, a winch steel rope 13 is wound around the winch 12, and the winch steel rope 13 has two lead-out sections extending relative to the winch 12, and the two lead-out sections extend downward from different ends of the cross bar 11. When the winch 12 is working, the two lead-out sections are synchronously wound or released;

[0050] The specific hoisting is as follows: after the traveling vehicle 1 is installed on the box beam through the traveling track 5, the upper frame 15 is connected to the traveling vehicle 1; the cross bar 11 is connected to the lifting rope 14 on the crane, and the cross bar 11 is in a horizontal state;

[0051] Then, the lower ends of different lead-out sections are connected to the upper ends of the two side frames 6 respectively, and the position of the cross bar 11 in space is controlled by a crane, and the position of the assembly relative to the cross bar 11 is controlled by a winch 12 to complete the assembly and disassembly.

[0052] In the prior art, for the spray maintenance of cast-in-place box girders, the pipe rack 4 used to support the spray pipe 9 is generally a cantilever beam structure, and because the spray pipe 9 itself is relatively long, the pipe rack 4 generally covers the top, side walls and lower part of the box girder. When the spray pipe 9 is working, the pipe rack 4 generally has a large vibration. The above vibration not only affects the spraying effect, but also accelerates the fatigue of the pipe rack 4, which is not conducive to the service life and safety of the spraying equipment.

[0053] Based on the above problems, this solution provides a specific implementation method of the spray equipment. In this solution, the combination formed by the pipe rack 4 and the traveling vehicle 1 is arranged as a closed ring structure sleeved on the outside of the box beam. In this way, the traveling vehicle 1 can actually impose constraints on the two ends of the pipe rack 4. In this way, the intensity of vibration of the pipe rack 4 induced by the spray pipe 9 during operation can be effectively reduced, thereby achieving the purpose of extending the service life and safety of the spray equipment.

[0054] At the same time, based on the structural design of the above spray equipment, the present solution also provides a method for disassembling and assembling the spray equipment: since the pipe rack 4 provided by the present solution includes a lower frame 8, and the bottom of the spanning box girder is suspended in the air, the present solution provides a construction method in which the assembly of the pipe rack 4 does not rely on the formwork, and a single crane can be used to implement disassembly and assembly.

[0055] Specifically, when a single crane is used to hoist the assembly formed by the lower frame 8 and the side frame 6 to complete the disassembly and assembly of the pipe rack 4, since the lower frame 8 needs to be located at the lower side of the box beam, the box beam is actually an obstacle during the hoisting process. Considering the hoisting safety, it is not allowed for the lifting wire on the crane to contact the box beam. To avoid the above situation, if a fixed pulley is selected on both sides of the upper end of the box beam, this not only increases the construction equipment, but also needs to consider the fixation problem of the fixed pulley and the box beam. At the same time, from the perspective of the appearance of the box beam, achieving the above fixation is also disadvantageous to the appearance of the box beam. Therefore, in this scheme, the sling provided as above is used in the specific construction: the sling includes a cross bar 11, a hoist 12 installed in the middle of the cross bar 11, and a hoisting steel rope 13 is wound on the hoist 12. The hoisting steel rope 13 has two lead-out sections relative to the hoist 12, and the two lead-out sections extend downward from different ends of the cross bar 11. When the hoist 12 is working, the two lead-out sections are synchronously wound or released;

[0056] The specific hoisting is as follows: after the traveling vehicle 1 is installed on the box beam through the traveling track 5, the upper frame 15 is connected to the traveling vehicle 1; the cross bar 11 is connected to the lifting rope 14 on the crane, and the cross bar 11 is in a horizontal state;

[0057] Then, the lower ends of different lead-out sections are connected to the upper ends of the two side frames 6 respectively, and the position of the cross bar 11 in space is controlled by a crane, and the position of the assembly relative to the cross bar 11 is controlled by a winch 12 to complete the assembly and disassembly.

[0058] In this way, when the installation of the pipe rack 4 is completed, since the cross bar 11 needs to be located on the upper side of the box beam, and the length of the crane's boom is certain, at this time, if the overhead height of the box beam is high, after the crane constrains the cross bar 11 through the lifting wire, the lower frame 8 and the side frame 6 assembly on the ground are lifted to a position close to the lower part of the box beam by the winch 12 on the cross bar 11 and the hoisting steel rope 13, and then the cross bar 11 is lifted and moved by the lifting steel wire to complete the relative position matching of the above assembly and the upper frame 15 to facilitate the connection; when the disassembly of the pipe rack 4 is completed, the above assembly is released and completed by the winch 12. That is, by adopting this scheme, whether the above assembly is installed or disassembled, since the position of the upper end of each lead-out section is limited by the cross bar 11, in the case of using a crane, it is also possible to achieve the problem of the box beam affecting the steel wire rope in the process of disassembling and assembling the pipe rack 4 without setting a device such as a fixed pulley between the box beam and the steel wire rope. At the same time, since the pipe rack 4 can be disassembled and assembled by a single crane, the structural design of the pipe rack 4 in this solution does not need to rely on the formwork during use, avoiding the spray curing process occupying the formwork and affecting the construction efficiency of the entire project. That is, this solution also provides a construction method that is easy to realize the disassembly and assembly of the spray equipment without relying on the formwork and easy to realize the disassembly and assembly of the spray equipment.

[0059] Embodiment 2:

[0060] This embodiment is further limited on the basis of embodiment 1, such as Figures 1 to 4 As shown, in order to facilitate the connection of the pipe rack 4, it is set as follows: the lower frame 8 and the side frame 6 are both hingedly connected by a hinge shaft 7, and the axis of the hinge shaft 7 is parallel to the length direction of the box beam, and the assembly is bolted to the upper frame 15. When the assembly is assembled with the upper frame 15, the lower frame 8 and the side frame 6 are relatively rotated around the hinge shaft 7 to match the bolt connection position of the assembly and the upper frame 15.

[0061] Since the upper frame 15 and the lower frame 8 need to have greater rigidity than the side frame 6, as a solution with light weight and good bending resistance, it is set as follows: the upper frame 15 and the lower frame 8 are both truss structures.

[0062] The construction method includes a method for using a spraying device, wherein the spraying device includes a water tank 2 and a water pump 3 installed on a traveling vehicle 1, and a spraying pipe 9 laid along a pipe rack 4;

[0063] Along the extension direction of the spray pipe 9, a plurality of pipe joints 10 are arranged at intervals on the spray pipe 9;

[0064] The number of the water pumps 3 is equal to the number of the pipe joints 10, and each pipe joint 10 is connected to a separate water pump 3, which is used to extract water from the water tank 2 and pump it into the spray pipe 9 through the pipe joint 10. In this solution, since the spray equipment can cover the top, side and bottom surfaces of the box girder, the above solution is adopted to replenish water through the spray pipe 9 in sections through the pipe joint 10, so that the fluid output by each nozzle on the spray pipe 9 can be relatively more uniform, so as to achieve a better spray maintenance effect under the premise of water saving.

[0065] Since different box girders have different sizes and shapes, in order to make the spray pipe 9 universal and the direction of the nozzle thereon easy to control, it is configured as follows: the spray pipe 9 is composed of multiple pipe sections connected in series, and the pipe sections are connected by flanges.

[0066] In order to control the output of spray water in different areas according to the actual maintenance needs when the spray equipment is working, it is set as follows: each pipe section is connected with a pipe joint 10, and each pipe section is a blind pipe with closed ends, and each water pump 3 can work independently.

[0067] The construction method includes a method for using the spraying equipment, the travel track 5 is laid on the box girder along the length direction of the box girder, and a travel switch is provided at each end of the travel track 5. The travel switch obtains the position of the travel vehicle 1 to control the travel vehicle 1 to perform linear reciprocating motion on the travel track 5. In this solution, the travel switch is used to provide a basis for judging the arrival of the travel vehicle 1.

[0068] It also includes a control module, the signal output end of the travel switch is connected to the signal input end of the control module, and the signal output end of the control module is connected to the control system of the traveling vehicle 1. Through the control module, the movement of the traveling vehicle 1 on the traveling track 5 is automatically controlled. This solution provides a spray equipment implementation solution that can work automatically.

[0069] The construction method includes a method for using the spraying equipment, and the spray head on the spraying pipe 9 is an atomizing nozzle. This solution provides an implementation solution that can make the water spray more uniform.

[0070] The water pump 3 for providing water to the spray pipe 9 is a piston pump. This solution provides an implementation solution that is easier to obtain a greater water pressure.

[0071] The above contents are further detailed descriptions of the present invention in combination with specific preferred embodiments, and it cannot be determined that the specific embodiments of the present invention are limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, other embodiments obtained without departing from the technical solution of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for constructing a box girder with a gap, the method comprising a method for disassembling and assembling a spraying device for spraying and curing the outer wall of the box girder, characterized in that: The spraying equipment comprises a traveling vehicle (1), a plurality of traveling rails (5) serving as tracks for the traveling vehicle (1) on a box beam, a pipe rack (4) fixedly connected to the traveling vehicle (1), and a spraying pipe (9) laid on the pipe rack (4); The combination formed by the pipeline rack (4) and the traveling vehicle (1) is a closed annular structure sleeved on the outside of the box beam; The pipe rack (4) comprises two upper frames (15), two side frames (6), and a lower frame (8); one end of each of the upper frames (15) is fixedly connected to the traveling vehicle (1); each end of the lower frame (8) is connected to a side frame (6); and the free end of each side frame (6) is respectively connected to a different upper frame (15); When the spraying equipment is disassembled and assembled, the assembly formed by the side frame (6) and the lower frame (8) is hoisted by a hoisting device: the hoisting device comprises a cross bar (11) and a winch (12) installed in the middle of the cross bar (11); a winch steel rope (13) is wound around the winch (12); the winch steel rope (13) has two lead-out sections extending relative to the winch (12); the two lead-out sections extend downward from different ends of the cross bar (11); when the winch (12) is working, the two lead-out sections are synchronously wound or released; The specific hoisting process is as follows: after the traveling vehicle (1) is installed on the box beam via the traveling track (5), the upper frame (15) is connected to the traveling vehicle (1); the cross bar (11) is connected to the lifting steel rope (14) on the crane, and the cross bar (11) is in a horizontal state; Then, the lower ends of the different lead-out sections are connected to the upper ends of the two side frames (6), and the position of the cross bar (11) in space is controlled by a crane, and the position of the assembly relative to the cross bar (11) is controlled by a winch (12), thereby completing the assembly and disassembly of the assembly; The lower frame (8) and the side frame (6) are both hingedly connected via a hinge shaft (7), and the axis of the hinge shaft (7) is parallel to the length direction of the box beam. The assembly is bolted to the upper frame (15). When the assembly is assembled with the upper frame (15), the lower frame (8) and the side frame (6) are relatively rotated around the hinge shaft (7) to match the bolt connection position of the assembly and the upper frame (15); The construction method comprises a method for using a spraying device, wherein the spraying device comprises a water tank (2) and a water pump (3) installed on a traveling vehicle (1), and a spraying pipe (9) laid along a pipe rack (4); Along the extension direction of the spray pipe (9), a plurality of pipe joints (10) are arranged at intervals on the spray pipe (9); The number of the water pumps (3) is equal to the number of the pipe joints (10), and each pipe joint (10) is connected to a separate water pump (3). The water pump (3) is used to extract water from the water tank (2) and pump the water into the spray pipe (9) through the pipe joint (10); The spray pipe (9) is composed of a plurality of pipe sections connected in series, and the pipe sections are connected by flanges; Each pipe section is connected to a pipe joint (10), and each pipe section is a blind pipe with both ends closed, so that each water pump (3) can work independently.

2. The method for constructing a space-span box girder according to claim 1, characterized in that: The upper frame (15) and the lower frame (8) are both truss structures.

3. The method for constructing a space-span box beam according to claim 1, characterized in that: The construction method comprises a method for using the spraying equipment, wherein the travel track (5) is laid on the box girder along the length direction of the box girder, and each end of the travel track (5) is provided with a travel switch, and the position of the travel vehicle (1) is obtained by the travel switch to control the travel vehicle (1) to perform linear reciprocating motion on the travel track (5).

4. The method for constructing a space-span box beam according to claim 3, characterized in that: It also includes a control module, wherein the signal output end of the travel switch is connected to the signal input end of the control module, and the signal output end of the control module is connected to the control system of the traveling vehicle (1). Through the control module, the movement of the traveling vehicle (1) on the traveling track (5) is automatically controlled.

5. The method for constructing a space-span box beam according to claim 1, characterized in that: The construction method comprises a method for using a spray device, wherein the spray head on the spray pipe (9) is an atomizing nozzle.

6. The method for constructing a space-span box beam according to claim 5, characterized in that: The water pump (3) used to provide water to the spray pipe (9) is a piston pump.

Citation Information

Patent Citations

  • Lifting appliance special for large component conveying frame

    CN106586805A

  • Opening-closing pier passing box girder overhaul construction trolley and working method thereof

    CN106917353A

  • Auxiliary tool for concrete box girder maintenance and using method of auxiliary tool for concrete box girder maintenance

    CN107234718A

  • Spray thrower for bridge maintenance

    CN108393207A

  • Water recovery afforestation irrigation system

    CN205455050U