A rare earth metal casting continuous combined production system and production method thereof

By designing a continuous combined production system after rare earth metal casting, the automation and continuity of the process are realized, which solves the problems of low manual operation efficiency and impurities affecting the analysis results in the later stage of rare earth metal casting, and improves production efficiency and accuracy of analysis results.

CN110695711BActive Publication Date: 2024-10-22LESHAN YOUYAN RARE EARTH NEW MATERIAL CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911045215.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-10-30
Publication Date
2024-10-22
Estimated Expiration
2039-10-30

AI Technical Summary

Technical Problem

In the later stages of rare earth metal casting, the existing processes are still relatively backward. There are problems such as low manual operation efficiency, high safety hazards, impurities affecting analysis results, and long working hours, resulting in poor production efficiency and accuracy of analysis results.

Method used

A continuous combined production system after rare earth metal casting is designed, including a cooling conveyor belt, stripping device, grinding device, marking and sampling device, to achieve the continuity of the entire production process through automated processes, adding grinding steps to reduce impurities, and using liquid Media spray cooling, high-frequency vibration or high-pressure gas stripping, wire brush grinding and automatic sorting system based on visual recognition.

Benefits of technology

It realizes the automation of the process, improves production efficiency, reduces employee labor intensity, ensures the accuracy of sample analysis, and adjusts furnace parameters in a timely manner to improve production stability and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110695711B_ABST
    Figure CN110695711B_ABST
Patent Text Reader

Abstract

The present invention provides a rare earth metal casting continuous combined production system and a production method thereof, which relate to the technical field of industrial equipment automation, and include a cooling conveyor belt, a stripping device, a grinding device, an intermediate conveyor belt and a stacking device which are sequentially installed on a working platform, wherein the intermediate conveyor belt is installed at the rear end of the grinding device to receive and transport the rare earth metal blocks polished by the grinding device; the intermediate conveyor belt is sequentially provided with an identification device for engraving an identifier on the rare earth metal block and a sampling device for sampling and testing the rare earth metal block; the present invention has reasonable design, simple structure, easy maintenance, low production cost, realizes the automation of the entire process, replaces the existing manual operation, thereby improving production efficiency, reducing the labor intensity of employees, and achieving cost reduction and efficiency improvement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of industrial equipment automation, and in particular to a rare earth metal casting continuous combined production system and a production method thereof. Background Art

[0002] As the world's largest producer of rare earth metals, China still lags behind in the automation of the later processes after rare earth electrolytic production and casting. Most of the domestic rare earth metal production and casting processes are cooling-peeling-labeling-sampling-stacking, and the cooling-peeling-polishing-labeling-sampling-stacking process has partially achieved automation of a single process, but has not achieved automation of the entire process.

[0003] After the casting of rare earth metals is completed, the metal must be cooled by physical or natural methods, and then the rare earth metals are stripped. At present, most domestic rare earth metal smelting companies still use manual stripping of metal surface attachments, which has low work efficiency and high labor intensity. There are also certain safety hazards when separating attachments; after the stripping process is completed, the metal is printed and marked. At present, most of the coding processes use steel stamping identification methods, which have the danger of mobile coding operations, and the entire coding process takes a long time, the overall work efficiency is low, and the coding effect is not good; after the coding is completed, a special person is required to collect the metal and then collect it in a centralized and unified manner. Most domestic rare earth metal smelting companies use manual manual drills to take samples and then send them for inspection. The metal surface is not further polished before sampling. The samples taken out contain some impurities, which affect the analysis results, and the work efficiency is low. At the same time, it takes a long time to collect the metal in a centralized manner, which affects the time for issuing analysis results, and the guidance effect in front of the furnace is delayed, affecting production stability. Summary of the invention

[0004] The first object of the present invention is to provide a rare earth metal casting continuous modular production system, which realizes the automation of the entire process, replaces the existing manual operation, thereby improving production efficiency, reducing employee labor intensity, and achieving cost reduction and efficiency improvement.

[0005] The second object of the present invention is to provide a continuous combined production method for rare earth metal casting, which adds a polishing step between the stripping and marking steps to reduce impurities in the sample and ensure the accuracy of the analysis results.

[0006] The third object of the present invention is to provide a production method using the continuous combined production system after rare earth metal casting as described above, which can quickly and stably process the rare earth metal blocks after casting, timely detect the rare earth metal blocks, and can timely adjust the furnace parameters to achieve high-quality and stable production.

[0007] The embodiment of the present invention is achieved as follows:

[0008] A rare earth metal casting continuous combined production system, characterized in that:

[0009] A cooling conveyor belt, which is installed on the working platform to receive the cast rare earth metal blocks and perform cooling and conveying;

[0010] A stripping device, which is installed at the rear end of the cooling conveyor belt to receive the rare earth metal block conveyed by the cooling conveyor belt after cooling and to strip off the attachments on the surface of the rare earth metal block;

[0011] A grinding device, which is installed at the rear end of the stripping device to receive and grind the rare earth metal block stripped by the stripping device;

[0012] An intermediate conveyor belt, which is installed at the rear end of the grinding device to receive and transport the rare earth metal block polished by the grinding device; the intermediate conveyor belt is sequentially provided with an identification device for engraving an identifier on the rare earth metal block and a sampling device for sampling and testing the rare earth metal block;

[0013] A palletizing device is installed at the rear end of the intermediate conveyor belt to receive the rare earth metal blocks sent out by the intermediate conveyor belt and palletize the rare earth metal blocks.

[0014] Furthermore, the cooling conveyor belt is provided with a cooling device.

[0015] Furthermore, the cooling device is a liquid medium spraying device, the spraying cooling medium surface of the liquid medium spraying device is greater than or equal to 1.2 times the surface area of ​​the rare earth metal block, and the spraying angle of the liquid medium spraying device is perpendicular to the surface of the rare earth metal block.

[0016] Furthermore, the stripping device is provided with a high-frequency vibration stripping mechanism or a mechanical knocking stripping mechanism.

[0017] Furthermore, the stripping device also includes a high-pressure gas auxiliary device for impacting high-pressure gas on the rare earth metal block.

[0018] Furthermore, the grinding device is provided with a wire brush or a high-pressure gas grinding mechanism.

[0019] Furthermore, the sampling device includes a sampling mechanism for sampling one end face of a rare earth metal block, a flipping mechanism for flipping the sampling end face downward, a vibrating mesh plate for vibrating and dropping the sample obtained by the sampling mechanism, and a sample bag installed under the vibrating mesh plate for receiving the falling sample. The sampling mechanism is a drill sampling mechanism or a knocking block sampling mechanism.

[0020] Furthermore, it also includes

[0021] A delivery conveyor belt installed at the rear end of the stacking device to transport the rare earth metal blocks arranged by the stacking mechanism;

[0022] An automatic rare earth metal sorting system based on visual recognition is provided at the rear end of the delivery conveyor belt to sort rare earth metal blocks.

[0023] Furthermore, the stripping device has a slag drop-off hole at the lower end for discharging the slag peeled off from the surface of the rare earth metal block; the grinding device has a slag drop-off hole at the lower end for discharging the grinding slag; and it also includes a material recovery device, which is arranged directly below the stripping device and the grinding device.

[0024] A continuous combined production method after rare earth metal casting includes cooling, stripping, marking, sampling and sorting steps in sequence, and also includes a grinding step using the grinding device as described above between the stripping and marking steps.

[0025] A production method using the above-mentioned rare earth metal casting continuous combined production system, the production steps are as follows:

[0026] S1. The cast rare earth metal block is placed on the cooling conveyor belt for cooling and transportation;

[0027] S2. The rare earth metal block after cooling is sent to the stripping device by the cooling conveyor belt, and the stripping device strips the attachments on the surface of the rare earth metal block;

[0028] S3. After the stripping device is stripped, the rare earth block is sent to the polishing device for polishing;

[0029] S4. After the polishing device polishes the rare earth metal block, the rare earth metal block is fed into the intermediate conveyor belt. During the conveying process, the marking device marks the identifier on the rare earth metal block, and the sampling device samples the rare earth metal block;

[0030] S5. Finally, the intermediate conveyor belt conveys the rare earth metal blocks into the palletizing device for palletizing.

[0031] The beneficial effects of the present invention are:

[0032] The rare earth metal casting continuous combined production system provided by the present invention has reasonable design, simple structure, easy maintenance, low production cost, realizes automation of the entire process, replaces the existing manual operation, thereby improving production efficiency, reducing employee labor intensity, and achieving cost reduction and efficiency improvement.

[0033] The continuous combined production method of rare earth metal after casting provided by the present invention adds a grinding process in the post-casting process, reduces the impurity content of the rare earth metal block in the sampling step, and thus ensures the accuracy of the sample analysis result.

[0034] The production method provided by the present invention using the above-mentioned rare earth metal casting continuous combined production system is easy to operate, can timely detect unqualified rare earth metal blocks and promptly reflect them to the furnace, which has guiding significance for furnace production. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0036] Figure 1 Schematic diagram of a continuous combined production system for rare earth metal casting provided in Example 1 of the present invention Figure 1 ;

[0037] Figure 2 Schematic diagram of a continuous combined production system for rare earth metal casting provided in Example 1 of the present invention Figure 2 ;

[0038] Icons: 1-Cooling conveyor belt, 11-Cooling device, 2-Peeling device, 3-Polishing device, 4-Intermediate conveyor belt, 41-Marking device, 42-Sampling device, 421-Sampling mechanism, 422-Turning mechanism, 423-Vibrating mesh plate, 424-Sample bag, 5-Stacking device, 6-Delivery conveyor belt, 7-Rare earth metal automatic sorting system based on visual recognition, 8-Material recovery device. DETAILED DESCRIPTION

[0039] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0040] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0041] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0042] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are the directions or positional relationships in which the inventive product is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0043] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0044] Example 1

[0045] like Figure 1 to Figure 2 As shown, this embodiment provides a rare earth metal casting continuous combined production system, including a cooling conveyor belt 1, a stripping device 2, a grinding device 3, an intermediate conveyor belt 4 and a stacking device 5.

[0046] The cooling conveyor belt 1 is installed on the working platform to receive the cast rare earth metal blocks and cool and convey them; it should be noted that the transmission method of the rare earth metal blocks adopts a chain-type assembly line transmission; the above structure can be used for natural air cooling or natural cooling. Of course, in order to achieve the cooling effect as quickly as possible, a cooling device 11 can be added to the cooling conveyor belt 1, and the cooling form of the cooling device 11 can be liquid medium immersion, liquid medium spraying or dry ice, etc. When liquid medium immersion is used, the liquid cooling medium can be water, oil or liquid Nitrogen, etc. The cooling medium usually selected is water. The lower the water temperature, the better. Of course, in order to reduce unnecessary energy consumption, the water temperature is usually room temperature. The length, width and height of the water tank should be greater than or equal to 1.5 times the length, width and height of the rare earth metal block. The water pressure is not less than 0.2MPa, and the water cooling intensity is not less than 40J / S (for example, a metal block with a temperature of 200℃ is placed in water with a mass of 5kg and a temperature of 25℃. As a result, the water temperature rises to 90℃, and the released heat load is: (△t×c×m=65℃×0.45×103 J (Kg / ℃)×5kg=1.46×10 3 KJ)); when liquid medium spraying is used, the medium selection is the same as that when liquid medium is immersed, the spray cooling medium surface is greater than or equal to 1.2 times the metal surface area, the spray speed is 0.2M / S, the water flow rate is not less than 5L / min·cm, and the spray angle is perpendicular to the metal surface. It should be noted that in order to reduce the consumption of cooling medium, the cooling medium is usually circulated in the cooling device and is not discharged. The cooling medium can be automatically replenished when appropriate.

[0047] The stripping device 2 is installed at the rear end of the cooling conveyor belt 1 to receive the rare earth metal block conveyed by the cooling conveyor belt 1 after cooling and to strip off the attachments on the surface of the rare earth metal block; the stripping device 2 is provided with a high-frequency vibration stripping mechanism or a mechanical knocking stripping mechanism. When the high-frequency vibration stripping mechanism is adopted, the frequency is not less than 150Hz, and the exciting force is not less than 300N; when the mechanical knocking stripping mechanism is adopted, the knocking force is not less than 100N; in order to achieve a better stripping effect, the stripping device 2 is often also provided with a high-pressure gas auxiliary device for impacting the rare earth metal block with high-pressure gas, and the gas pressure is not less than 2MPa to ensure that all sides of the rare earth metal can be blown; it should be noted that the device needs to turn over the rare earth metal block, so the stripping device 2 also includes a turning mechanism, which can realize horizontal turning and front and back turning of the rare earth metal block.

[0048] The grinding device 3 is installed at the rear end of the stripping device 2 to receive the rare earth metal block stripped by the stripping device 2 and grind it; a wire brush or a high-pressure gas grinding mechanism is provided in the grinding device 3. When a wire brush is used for grinding, the force is not less than 30N, the rotation speed is not less than 2800r / min, and a turning device is provided to achieve six-sided grinding; when a high-pressure gas grinding mechanism is used, the pressure of the high-pressure gas is not less than 2MPa.

[0049] In order to recycle waste materials, in this embodiment, a slag drop-off hole is provided at the lower end of the stripping device 2 to discharge the attachments stripped from the surface of the rare earth metal block; a grinding slag drop-off hole is provided at the lower end of the grinding device 3 to discharge the grinding slag; the rare earth metal post-casting continuous combined production system also includes a material recovery device 8, which is arranged directly below the stripping device 2 and the grinding device 3. Since waste materials may fall in all steps after stripping, in order to fully recover all waste materials, the material recovery device 8 can also be arranged directly below the intermediate conveyor belt 4 and the stacking device 5.

[0050] The intermediate conveyor belt 4 is installed at the rear end of the grinding device 3 to receive and transport the rare earth metal block polished by the grinding device 3; the intermediate conveyor belt 4 is sequentially provided with an identification device 41 for engraving an identifier on the rare earth metal block and a sampling device 42 for sampling and testing the rare earth metal block.

[0051] The marking device 41 can mark the metal surface by mechanical stamping, laser engraving, liquid inkjet coding (using liquid media that do not contaminate the product), etc., and mark the same end faces of the rare earth metal blocks. The marking device 41 is provided with a sorting mechanism to achieve sequential arrangement of the same end faces of the rare earth metal blocks; often the marking device 41 is also provided with a limit device to perform transmission correction on each piece of metal.

[0052] The sampling device 42 automatically samples the rare earth metal blocks transmitted from the previous process. Figure 1 As shown, the sampling device 42 includes a sampling mechanism 421 for sampling one end face of a rare earth metal block, a flip mechanism 422 for flipping the sampling end face downward, a vibration mesh plate 423 for vibrating and dropping the sample obtained by the sampling mechanism 421, and a sample bag 424 installed below the vibration mesh plate 423 for receiving the dropped sample. The sample bag 424 is provided with a number, which is printed in real time and automatically attached to the sample bag. The sample bag number can be a number, a QR code, or a bar code. The number corresponds to the rare earth metal identification number of the previous process one by one to generate an association. The above method is adopted so that each The sample of the rare earth metal block falls completely into the sample bag, effectively preventing cross contamination and affecting the accuracy of the analysis; the sampling mechanism 421 is a drill sampling mechanism or a knocking block sampling mechanism. When the drill sampling mechanism is used, the drill diameter is preferably between 2mm and 4mm, and the sampling depth is preferably between 10 and 15mm; when the knocking block sampling mechanism is used, the rare earth metal block needs to be positioned, and the positioning is achieved by the sensor controlling the transmission of the intermediate conveyor belt 4, and finally the block sampling is performed by mechanical external force; in some other embodiments, the drill sampling mechanism can also use a drill sampling mechanism that can retain the sample in the drill bit, such as Figure 2 As shown, the mechanism is installed on a base that can rotate in a horizontal plane. After the rare earth metal block is sampled, the base rotates so that the drill bit is facing the sample bag, and then the sample in the drill bit falls into the sample bag. At this time, the device does not need a flipping mechanism 422 to flip the rare earth metal block. It should be noted that the sampling method can be set according to production needs. It can be to sample each piece of rare earth metal in the same furnace separately (determine whether the sampling is completed by counting), or to selectively sample the rare earth blocks (specify the number of samples), or to perform multi-point sampling on a single piece of metal.

[0053] The stacking device 5 is installed at the rear end of the intermediate conveyor belt 4 to receive the rare earth metal blocks sent by the intermediate conveyor belt 4 and stack the rare earth metal blocks; the rare earth metal blocks of each furnace are stacked in a step-by-step manner, and the stacked metal blocks are counted by counting to ensure that the stacking of the metal blocks of the same furnace is completed.

[0054] To achieve higher automation, in this embodiment, the device also includes a delivery conveyor belt 6 and an overall solution of a rare earth metal automatic sorting system 7 based on visual recognition provided by the Chinese invention application with application number CN201910222726.2. The delivery conveyor belt 6 is installed at the rear end of the stacking device 5 to transport the rare earth metal blocks arranged by the stacking mechanism; the rare earth metal automatic sorting system 7 based on visual recognition is arranged at the rear end of the delivery conveyor belt 6 to sort the rare earth metal blocks; the delivery conveyor belt 6 transmits the stacked rare earth metal block pile to the rare earth metal automatic sorting system 7 based on visual recognition, and automatically matches the analysis room data by identifying the identifier on the surface of the rare earth metal block to determine the category of the rare earth metal. At the same time, weighing is completed in this process, and the data is automatically transmitted to the production report, and the rare earth metals are classified according to the established specifications, thereby realizing automatic sorting.

[0055] Example 2

[0056] This embodiment provides a continuous combined production method for rare earth metal casting, which includes cooling, stripping, marking, sampling and sorting steps in sequence. In particular, between the stripping and marking steps, a grinding step using the grinding device 3 provided in Example 1 is also included.

[0057] Example 3

[0058] This embodiment provides a production method using the rare earth metal casting continuous combined production system provided in Embodiment 1, and the production steps are as follows:

[0059] S1. The cast rare earth metal block is placed on a cooling conveyor belt 1 for cooling and transportation;

[0060] S2. The cooling conveyor belt 1 sends the rare earth metal block after cooling to the stripping device 2, and the stripping device 2 strips the attachments on the surface of the rare earth metal block;

[0061] S3. After the stripping device 2 is completed, the rare earth block is sent to the grinding device 3 for grinding;

[0062] S4. After the polishing device 3 polishes the rare earth metal block, the rare earth metal block is fed into the intermediate conveyor belt 4. During the conveying process, the identification device 41 depicts the identifier of the rare earth metal block, and the sampling device 42 samples the rare earth metal block;

[0063] S5. Finally, the intermediate conveyor belt 4 conveys the rare earth metal blocks to the stacking device 5 to stack the rare earth metal blocks.

[0064] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A rare earth metal casting continuous modular production system, characterized in that: include A cooling conveyor belt (1), wherein the cooling conveyor belt (1) is installed on the working platform to receive the cast rare earth metal block and perform cooling and conveying; A stripping device (2), the stripping device (2) being installed at the rear end of the cooling conveyor belt (1) to receive the rare earth metal block conveyed by the cooling conveyor belt (1) after cooling and to strip off the attachments on the surface of the rare earth metal block; A grinding device (3), the grinding device (3) being installed at the rear end of the stripping device (2) to receive the rare earth metal block stripped by the stripping device (2) and perform grinding; An intermediate conveyor belt (4) is installed at the rear end of the grinding device (3) to receive and transport the rare earth metal block polished by the grinding device (3); the intermediate conveyor belt (4) is provided with an identification device (41) for marking an identifier on the rare earth metal block and a sampling device (42) for sampling and testing the rare earth metal block in sequence; A palletizing device (5), the palletizing device (5) being installed at the rear end of the intermediate conveyor belt (4) for receiving the rare earth metal blocks delivered by the intermediate conveyor belt (4) and palletizing the rare earth metal blocks; The sampling device (42) comprises a sampling mechanism (421) for sampling an end face of a rare earth metal block, a flipping mechanism (422) for flipping the sampling end face downward, a vibrating mesh plate (423) for vibrating and dropping the sample obtained by the sampling mechanism (421), and a sample bag (424) installed below the vibrating mesh plate (423) for receiving the dropped sample, wherein the sampling mechanism (421) is a drill sampling mechanism or a knocking block sampling mechanism; The cooling conveyor belt (1) is provided with a cooling device (11).

2. The rare earth metal casting continuous combined production system according to claim 1, characterized in that: The cooling device (11) is a liquid medium spraying device, the spraying cooling medium surface of the liquid medium spraying device is greater than or equal to 1.2 times the surface area of ​​the rare earth metal block, and the spraying angle of the liquid medium spraying device is perpendicular to the surface of the rare earth metal block.

3. The rare earth metal casting continuous combined production system according to claim 1, characterized in that: The stripping device (2) is provided with a high-frequency vibration stripping mechanism or a mechanical knocking stripping mechanism.

4. The rare earth metal casting continuous combined production system according to claim 3, characterized in that: The stripping device (2) also includes a high-pressure gas auxiliary device for impacting high-pressure gas on the rare earth metal block.

5. The rare earth metal casting continuous combined production system according to claim 1, characterized in that: The grinding device (3) is provided with a wire brush or a high-pressure gas grinding mechanism.

6. The rare earth metal casting continuous combined production system according to claim 1, characterized in that: Also includes A delivery conveyor belt (6), the delivery conveyor belt (6) being installed at the rear end of the stacking device (5) for transporting the rare earth metal blocks arranged by the stacking mechanism; An automatic rare earth metal sorting system (7) based on visual recognition is provided at the rear end of the delivery conveyor belt (6) for sorting rare earth metal blocks.

7. The rare earth metal casting continuous combined production system according to claim 1, characterized in that: The lower end of the stripping device (2) is provided with an attachment slag drop hole for discharging attachments stripped from the surface of the rare earth metal block; the lower end of the grinding device (3) is provided with a grinding slag drop hole for discharging grinding slag; the rare earth metal post-casting continuous combined production system also includes a material recovery device (8), and the material recovery device (8) is arranged directly below the stripping device (2) and the grinding device (3).

8. A production method using the rare earth metal casting continuous combined production system according to any one of claims 1 to 7, characterized in that: The production steps are as follows: S1. The cast rare earth metal block is placed on the cooling conveyor belt (1) for cooling and conveying; S2. The cooling conveyor belt (1) sends the rare earth metal block after cooling to the stripping device (2), and the stripping device (2) strips the attachments on the surface of the rare earth metal block; S3. After the stripping device (2) is completed, the rare earth block is sent to the polishing device (3) for polishing; S4. After the polishing device (3) polishes the rare earth metal block, the rare earth metal block is fed into the intermediate conveyor belt (4). During the conveying process, the marking device (41) marks the identifier on the rare earth metal block, and the sampling device (42) samples the rare earth metal block; S5. Finally, the intermediate conveyor belt (4) conveys the rare earth metal blocks to the stacking device (5) to stack the rare earth metal blocks.