Tunnel lining drainage system

By designing the tunnel lining drainage system, and using the layered settings of the water collection pipeline and drainage pipeline to adjust the groundwater level, the problem of tunnel lining being subjected to high soil and water pressure loads and groundwater level reduction is solved, and cost control and ecological protection are achieved.

CN110725715BInactive Publication Date: 2024-11-05CHINA RAILWAY SIYUAN GRP SOUTHWEST SURVEY & DESIGN CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910999256.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-10-21
Publication Date
2024-11-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the construction of urban rail transit tunnels, the tunnel lining needs to withstand high soil and water pressure loads, and the design of no drainage is high and the durability is poor. The complete drainage design will lead to a decrease in the groundwater level, affecting the urban ecological environment and the safety of the building.

Method used

A tunnel lining drainage system was designed, including water collection pipelines, water supply pipelines, drainage containers, transverse pipelines, first switching valves and drainage pipelines. The groundwater water level is adjusted through layered lateral pipelines to achieve groundwater restrictions. easing, avoiding the safety risk of groundwater levels lowered below the tunnel and reducing tunnel lining design costs.

Benefits of technology

The system can adjust the groundwater level according to the ground hydrological and environmental conditions, meet the tunnel stress design requirements, control costs, protect the ecological environment and ensure the safety of buildings around the tunnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110725715B_ABST
    Figure CN110725715B_ABST
Patent Text Reader

Abstract

The embodiment of the present application provides a tunnel lining drainage system, including a water collection pipeline, a water supply pipeline, a water discharge container, a plurality of transverse pipelines, a plurality of first switch valves and a drainage pipeline; the water collection pipeline is arranged between the primary lining and the secondary lining of the tunnel, and is used to collect groundwater; the top of the water supply pipeline is closed; the top of the water discharge container is connected to the atmosphere; a plurality of transverse pipelines are arranged in layers along the vertical direction, connecting the water supply pipeline and the water discharge container; a plurality of the first switch valves are respectively arranged on the transverse pipelines, and are used to control the connection or closing of the corresponding transverse pipelines; the drainage pipeline connects the water collection pipeline and the water supply pipeline, and is located below the bottom transverse pipeline. The tunnel lining drainage system provided by the present application can adjust the groundwater level through the layered transverse pipelines, thereby realizing restricted groundwater discharge.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of geotechnical engineering, and in particular to a tunnel lining drainage system. Background Art

[0002] During the construction of urban rail transit, the geological environment has become increasingly complex. When urban rail transit passes through adverse geological conditions such as hard rock, spheroidal weathering bodies, and bedrock protrusions, it is often necessary to use the mining method to build tunnels. The tunnel is usually built in a fully waterproof mode, and the tunnel lining needs to bear all the water and soil pressure loads during its service life. For mining tunnels that pass through small mountains in the city, the groundwater pressure on the tunnel lining usually reaches several hundred kilopascals. If the tunnel lining adopts a completely undrained design, the tunnel lining needs to be designed to be very thick, which is costly and has poor durability. If the tunnel lining adopts a completely drained design to lower the groundwater level below the tunnel, the drop in groundwater level may pose a great threat to the urban ecological environment and the safety of surrounding buildings and structures, and the cost of pumping is also very high. Summary of the invention

[0003] In view of this, the embodiment of the present application hopes to provide a tunnel lining drainage system to solve the technical problem of tunnel lining drainage. To solve the above technical problem, the technical solution of the embodiment of the present application is implemented as follows:

[0004] The present application provides a tunnel lining drainage system, including:

[0005] A water collection pipeline is arranged between the primary lining and the secondary lining of the tunnel and is used to collect groundwater;

[0006] A water supply pipeline, the top end of which is closed;

[0007] A water discharge container, the top of which is connected to the atmosphere;

[0008] A plurality of transverse pipelines are arranged in layers along the vertical direction, connecting the water supply pipeline and the water discharge container;

[0009] a plurality of first switch valves, respectively disposed on the transverse pipelines, for controlling the connection or closing of the corresponding transverse pipelines; and

[0010] The drainage pipeline connects the water collection pipeline and the water supply pipeline and is located below the horizontal pipeline at the lowest layer.

[0011] Furthermore, the water collection pipeline comprises:

[0012] At least two annular water collecting pipes are arranged at intervals along the longitudinal direction of the tunnel, each of the annular water collecting pipes is arranged annularly along the tunnel and is connected to the drainage pipeline.

[0013] Furthermore, the water collecting pipeline includes a longitudinal water collecting pipe, and the annular water collecting pipe is connected with the drainage pipeline through the longitudinal water collecting pipe.

[0014] Furthermore, the annular water collecting pipe is a soft permeable pipe;

[0015] And / or, the longitudinal water collecting pipe is a high-density polyethylene pipe with through holes provided in the pipe wall.

[0016] Furthermore, the distance between two adjacent annular water collecting pipes is 2m to 10m.

[0017] Furthermore, the drainage pipeline comprises:

[0018] A longitudinal drainage pipe is arranged in the tunnel along the arch line of the tunnel and is connected to the water collection pipeline;

[0019] A water pipe connects the water supply pipeline and the longitudinal drainage pipe.

[0020] Furthermore, the tunnel lining drainage system includes an inspection well arranged on the water pipe and at least two second switch valves located at both ends of the inspection well, and the second switch valves are used to control the connection or closing of the water pipe.

[0021] Furthermore, the tunnel lining drainage system includes a first water pressure gauge arranged on the water pipe, and the first water pressure gauge is used to measure the water pressure in the water pipe.

[0022] Furthermore, the tunnel lining drainage system includes a second water pressure gauge arranged on the transverse pipeline, and the second water pressure gauge is used to measure the water pressure in the transverse pipeline.

[0023] Furthermore, the water launching container comprises:

[0024] A sewer pipe, the top of which is connected to the atmosphere, and the groundwater in the sewer pipe can be discharged.

[0025] Furthermore, the water launching container comprises:

[0026] The water collection tank is connected with the sewer pipe and is used for containing groundwater.

[0027] The tunnel lining drainage system provided by the present application forms a communicating vessel, and the groundwater level can be adjusted through the layered transverse pipes, so as to achieve restricted discharge of groundwater, avoid the safety risks caused by the groundwater level lowering below the tunnel when the tunnel lining adopts a complete drainage design, and avoid the high cost and poor durability of the tunnel lining when the tunnel lining adopts a completely non-drainage design. The tunnel lining drainage system provided by the embodiment of the present application can adjust the groundwater level according to the hydrological and environmental conditions of the tunnel location. It can not only meet the tunnel force design requirements and control costs, but also protect the ecology and ensure the safety of buildings and structures around the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a structural schematic diagram of a tunnel in the prior art;

[0029] Figure 2 A schematic diagram of the structure of a tunnel lining drainage system in the implementation of this application;

[0030] Figure 3 This is a schematic diagram of the structure of the water collection pipeline and the drainage pipeline in the embodiment of the present application;

[0031] Figure 4 for Figure 2 Schematic diagram of the connection between the central water collection pipeline and the drainage pipeline.

[0032] Description of Reference Numerals

[0033] Tunnel 1000; cavity 1000a; arch foot 1000b; arch crown 1000c; arch waist 1000d; primary lining 1100; secondary lining 1200; surrounding rock 2000; road surface 3000; water collection pipeline 10; annular water collection pipe 11; longitudinal water collection pipe 12; sub-longitudinal water collection pipe 121; water supply pipeline 20; water discharge container 30; sewer pipe 31; water collection tank 32; transverse pipeline 40; first switch valve 50; drainage pipeline 60; longitudinal drainage pipe 61; sub-longitudinal drainage pipe 611; water guide pipe 62; inspection well 70; second switch valve 80; first water pressure gauge 90; second water pressure gauge 100; transverse drainage pipeline 200; three-way joint 300. DETAILED DESCRIPTION

[0034] It should be noted that, in the absence of conflict, the embodiments and technical features in the embodiments of the present application can be combined with each other, and the detailed description in the specific implementation method should be understood as an explanation of the purpose of the present application and should not be regarded as an improper limitation on the present application.

[0035] The present application is further described in detail below in conjunction with the accompanying drawings and specific embodiments. In the description of the present application, the orientation or positional relationship of "upper", "lower", "inner", "outer", "top", and "bottom" is based on the state of normal use of the tunnel. The "m" used in the present application refers to the international unit meter, "mm" refers to the international unit millimeter, "longitudinal" is the direction in which the tunnel extends, and "circumferential" is the direction of the circumference of the tunnel. It should be understood that these orientation terms are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0036] See also Figure 2 The embodiment of the present application provides a tunnel lining drainage system, including a water collection pipeline 10, a water supply pipeline 20, a water supply container 30, a plurality of transverse pipelines 40, a plurality of first switch valves 50 and a drainage pipeline 60. The water collection pipeline 10 is arranged between the primary lining 1100 and the secondary lining 1200 of the tunnel 1000, and is used to collect groundwater. The top of the water supply pipeline 20 is closed. The top of the water supply container 30 is connected to the atmosphere. A plurality of transverse pipelines 40 are arranged in layers along the vertical direction. The transverse pipeline 40 connects the water supply pipeline 20 with the water supply container 30. A plurality of first switch valves 50 are respectively arranged on the transverse pipeline 40. The first switch valve 50 is used to control the connection or closing of the corresponding transverse pipeline 40. The drainage pipeline 60 connects the water collection pipeline 10 with the water supply pipeline 20. The drainage pipeline 60 is located below the bottommost transverse pipeline 40.

[0037] See also Figure 1 The lining of the existing tunnel 1000 includes a primary lining 1100 arranged on the surrounding rock 2000 and a secondary lining 1200 arranged at intervals from the primary lining 1100. That is, there is a cavity 1000a between the primary lining 1100 and the secondary lining 1200. In order to prevent groundwater from entering the tunnel 1000, a waterproof layer (not shown in the figure) is arranged between the primary lining 1100 and the secondary lining 1200, and the waterproof layer usually adopts a waterproof roll or a waterproof agent. The arch foot 1000b of the tunnel 1000 refers to the junction of the tunnel 1000 and the road surface 3000. The line formed by the arch foot 1000b along the longitudinal direction of the tunnel 1000 is the arch line. The arch crown 1000c refers to the apex of the tunnel 1000. The arch waist 1000d refers to the midpoint of the arc length of the tunnel 1000 along the arch crown 1000c to the arch foot 1000b.

[0038] The water collection pipeline 10, the water supply pipeline 20, the water discharge container 30, the multiple transverse pipelines 40 and the drainage pipeline 60 constitute the circulation channel of the groundwater. The water collection pipeline 10 is arranged between the primary lining 1100 and the secondary lining 1200 of the tunnel 1000, that is, the water collection pipeline 10 is arranged in the cavity 1000a formed by the primary lining 1100 and the secondary lining 1200. The groundwater collected by the water collection pipeline 10 enters the drainage pipeline 60. Through the drainage effect of the drainage pipeline 60, other structures such as the water supply pipeline 20, the water discharge container 30 and the multiple transverse pipelines 40 are arranged in the open space. For example, if the tunnel 1000 is an urban rail transit tunnel, the groundwater can be guided to the station location, specifically, for example, the sunny corner position of the station. If the tunnel 1000 is a mountain tunnel, the groundwater can be guided to the open area outside the tunnel 1000. The groundwater in the drainage pipe 60 enters the water supply pipe 20, and the groundwater in the water supply pipe 20 enters the lower water container 30 through the transverse pipe 40. Since the top of the lower water container 30 is connected to the atmosphere, each transverse pipe 40 is connected to the atmosphere when its corresponding first switch valve 50 is opened. The tunnel lining drainage system is formed as a communicating vessel. A plurality of transverse pipes 40 are arranged in layers along the vertical direction, that is, a plurality of transverse pipes 40 are arranged in layers from bottom to top, and the height of the groundwater level is adjusted by controlling the connection or closing of the transverse pipes 40 at different heights, so as to achieve the dynamic balance of the groundwater environment, thereby achieving the purpose of limiting the discharge of groundwater.

[0039] The following is an explanation of the principle of restrictive discharge of groundwater by the tunnel lining drainage system through the communicating vessel principle. For example, the height of the lowest horizontal pipeline 40 from the reference plane is set to H1, and the height of the second horizontal pipeline 40 adjacent to the lowest horizontal pipeline 40 from the reference plane is set to H2. When the groundwater level needs to be controlled to H2, the first switch valve 50 corresponding to the second horizontal pipeline 40 is opened, and the first switch valve 50 corresponding to the lowest horizontal pipeline 40 is closed. At this time, the horizontal pipeline 40 located above the second horizontal pipeline 40 can be connected or closed. The second horizontal pipeline 40 is connected to the atmosphere. Since groundwater is a flowing water liquid, when the groundwater level is higher than H2, the pressure of the groundwater is greater than the pressure of the water liquid in the second horizontal pipeline 40. At this time, the groundwater flows into the water container 30 until the height of the groundwater level is equal to H2, and the pressure of the groundwater is equal to the pressure of the water liquid in the second horizontal pipeline 40. At this time, the groundwater stops flowing. In this way, the height of the groundwater level is controlled to be equal to H2. When the groundwater level needs to be controlled to be H1, the first switch valve 50 corresponding to the bottommost transverse pipeline 40 is opened, and the first switch valve 50 on the second-layer transverse pipeline 40 and the first switch valve 50 corresponding to the transverse pipeline 40 located above the second-layer transverse pipeline 40 can be closed or opened. The bottommost transverse pipeline 40 is connected to the atmosphere. When the groundwater level is higher than H1, the pressure of the groundwater is greater than the pressure of the water in the bottommost transverse pipeline 40, and the groundwater flows toward the water container 30 until the groundwater level is equal to H1, and the groundwater pressure is equal to the pressure of the water in the second-layer transverse pipeline 40. At this time, the groundwater stops flowing. In this way, the height of the groundwater level is controlled to be equal to H1. When the height of the groundwater level needs to be raised from H1 to H2, the first switch valve 50 corresponding to the bottommost transverse pipeline 40 can be closed. The first switch valve 50 corresponding to the second-layer transverse pipeline 40 is opened, thereby raising the height of the groundwater level from H1 to H2. It is understandable that the above is only an exemplary description, and the plurality of transverse pipes 40 can be set to 3, 4, 5, etc., which are specifically set according to the hydrological and environmental conditions of the tunnel 1000, and the embodiment of the present application does not limit the number of transverse pipes 40. The principle of controlling the height of the groundwater level through the plurality of transverse pipes 40 is the same as the above principle, and will not be repeated here.

[0040] The tunnel lining drainage system provided in the embodiment of the present application forms a communicating vessel, and the groundwater level can be adjusted through multiple horizontal pipes arranged in layers, so as to achieve restricted groundwater discharge. It avoids the safety risks caused by the groundwater level being lowered below the tunnel when the tunnel lining adopts a complete drainage design, and it can also avoid the problems of high cost and poor durability when the tunnel lining adopts a completely non-drainage design. The tunnel lining drainage system provided in the embodiment of the present application can adjust the groundwater level according to the hydrological and environmental conditions of the tunnel location to achieve a dynamic balance of the groundwater environment. It can not only meet the tunnel force design requirements and control costs, but also protect the ecology and ensure the safety of buildings and structures around the tunnel.

[0041] In one embodiment of this application, please refer to Figure 3 The water collection pipeline 10 includes at least two annular water collection pipes 11 spaced apart longitudinally along the tunnel 1000. Each annular water collection pipe 11 is arranged circumferentially along the tunnel 1000 and is connected to the drainage pipeline 60. The annular water collection pipe 11 is used to collect groundwater. The annular water collection pipe 11 is arranged circumferentially along the tunnel 1000, and the annular water collection pipe 11 has a large contact area with the groundwater, which facilitates the annular water collection pipe 11 to collect groundwater. At least two annular water collection pipes 11 are spaced apart longitudinally along the tunnel 1000, which further enhances the water collection function and facilitates groundwater to quickly pass through the annular water collection pipe 11 into the drainage pipeline 60.

[0042] In one embodiment of this application, please refer to Figure 3 , the water collecting pipeline 10 includes a longitudinal water collecting pipe 12. The annular water collecting pipe 11 is connected to the drainage pipeline 60 through the longitudinal water collecting pipe 12. In a specific embodiment, the longitudinal water collecting pipe 12 is arranged longitudinally along the tunnel 1000. Further, the distance between the longitudinal water collecting pipe 12 and the ground 3000 is 0.4m to 0.6m. For example, 0.4m, 0.5m, 0.6m. Since groundwater is easily gathered at the arch foot 1000b of the tunnel 1000 under the action of gravity, this design is convenient for collecting groundwater accumulated at the arch foot 1000b of the tunnel 1000, and also convenient for the groundwater in the annular water collecting pipe 11 to flow to the longitudinal water collecting pipe 12, and the water in the longitudinal water collecting pipe 12 to flow to the drainage pipeline 60. The longitudinal water collecting pipe 12 is easier to communicate with the drainage pipeline 60, reducing the construction difficulty. In another specific embodiment, there are multiple longitudinal water collecting pipes 12, and both ends of each longitudinal water collecting pipe 12 are connected to the annular water collecting pipe 11. A plurality of longitudinal water collecting pipes 12 are arranged circumferentially along the tunnel 1000. In this way, the contact area between the longitudinal water collecting pipes 12 and the groundwater is increased, and the water collecting function of the water collecting pipeline 10 is further enhanced.

[0043] In one embodiment of the present application, the annular water collecting pipe 11 is a soft water permeable pipe. The soft water permeable pipe has the characteristics of small pore diameter, good water permeability, high compressive and tensile strength, long service life, corrosion resistance, good resistance to microbial erosion, soft texture, etc., and is easy to bend, collect water, and drain. In another embodiment, the annular water collecting pipe 11 can also be a hard water permeable pipe.

[0044] In one embodiment of the present application, the longitudinal water collecting pipe 12 is a high-density polyethylene pipe with through holes in the pipe wall. The through holes facilitate groundwater to enter the high-density polyethylene pipe. Furthermore, a permeable geotextile can be provided on the outer wall of the high-density polyethylene pipe. The permeable geotextile prevents impurities from clogging the through holes.

[0045] In one embodiment of this application, please refer to Figure 3 , the distance between two adjacent annular water collecting pipes 11 is 2m to 10m. In this design, the distance between two adjacent annular water collecting pipes 11 is set reasonably, which can not only maintain the annular water collecting pipes 11 to have a good ability to collect groundwater, but also avoid setting too many annular water collecting pipes 11 to cause pipeline redundancy, thereby reducing the difficulty of construction. For example, according to the properties of the surrounding rock 2000 (see Figure 1 ), under the condition of Grade V surrounding rock, the distance between two adjacent annular water collecting pipes 11 is 2m. Under the condition of Grade IV surrounding rock, the distance between two adjacent annular water collecting pipes 11 is 5m. Under the condition of Grade III surrounding rock, the distance between two adjacent annular water collecting pipes 11 is 10m. Furthermore, an annular water collecting pipe 11 can also be set near each construction joint of the tunnel 1000.

[0046] In one embodiment of this application, please refer to Figure 2 The drainage pipeline 60 includes a longitudinal drainage pipe 61 and a water guide pipe 62. The longitudinal drainage pipe 61 is arranged in the tunnel 1000 along the arch line of the tunnel 1000. The longitudinal drainage pipe 61 is connected to the water collection pipeline 10. The water guide pipe 62 connects the water supply pipeline 20 and the longitudinal drainage pipe 61. This design facilitates the groundwater in the water collection pipeline 10 to enter the longitudinal drainage pipe 61, and is also convenient for construction.

[0047] In one embodiment of this application, please refer to Figure 2 The tunnel lining drainage system includes an inspection well 70 disposed on the water pipe 62 and at least two second switch valves 80 located at both ends of the inspection well 70. The second switch valve 80 is used to control the connection or closing of the water pipe 62. The inspection well 70 can not only be used to inspect the tunnel lining drainage system, but also has the function of settling sediment.

[0048] In one embodiment of this application, please refer to Figure 2The tunnel lining drainage system includes a first water pressure gauge 90 disposed on the water pipe 62. The first water pressure gauge 90 is used to measure the water pressure in the water pipe 62. The water pressure in the water pipe 62 is measured in time by the first water pressure gauge 90, so as to monitor the flow of groundwater in the tunnel lining drainage system at any time. It should be noted that there may be multiple first water pressure gauges 90, and multiple first water pressure gauges 90 may be disposed at both ends of the inspection well 70.

[0049] In one embodiment of this application, please refer to Figure 2 The tunnel lining drainage system includes a second water pressure gauge 100 disposed on the transverse pipeline 40. The second water pressure gauge 100 is used to measure the water pressure in the transverse pipeline 40. The water pressure in the transverse pipeline 40 is measured in time by the second water pressure gauge 100, so as to monitor the flow of groundwater in the transverse pipeline 40 at any time.

[0050] In one embodiment of this application, please refer to Figure 2 The downcomer 30 includes a downcomer 31. The top of the downcomer 31 is connected to the atmosphere. The groundwater in the downcomer 31 can be discharged. The downcomer 31 is small in size and is convenient for installation in a limited space. For example, it can be installed in narrow areas such as urban traffic line tunnels, and it is also convenient for installation in areas with rugged ground such as mountain tunnels. In this way, the tunnel lining drainage system occupies less space. The groundwater in the downcomer 31 can be drained and discharged to the wastewater pump room of the urban traffic line tunnel or the natural ditch of the mountain.

[0051] In one embodiment of this application, please refer to Figure 2 The down-water container 30 includes a water collection tank 32. The water collection tank 32 is connected to the down-water pipe 31. The water collection tank 32 is used to contain groundwater. The groundwater in the water collection tank 32 can be used as fire water or other purposes according to the water quality detection situation, and can also be discharged to the wastewater pump room of the urban traffic line tunnel for wastewater treatment.

[0052] In a specific embodiment, see Figure 4 , the longitudinal water collecting pipe 12 may include a plurality of sub-longitudinal water collecting pipes 121. The longitudinal drainage pipe 61 includes a plurality of sub-longitudinal drainage pipes 611. The tunnel lining drainage system includes a transverse drainage pipeline 200. The longitudinal water collecting pipe 12 is connected to the longitudinal drainage pipe 61 through the transverse drainage pipeline 200. Exemplarily, the two sub-longitudinal water collecting pipes 121 and the transverse drainage pipeline 200 may be connected through a tee joint 300. The two sub-longitudinal drainage pipes 611 and the transverse drainage pipeline 200 may also be connected through a tee joint 300.

[0053] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A tunnel lining drainage system, characterized in that: include: A water collection pipeline is arranged between the primary lining and the secondary lining of the tunnel and is used to collect groundwater; A water supply pipeline, the top end of which is closed; A water discharge container, the top of which is connected to the atmosphere; A plurality of transverse pipelines are arranged in layers along the vertical direction, connecting the water supply pipeline and the water discharge container; a plurality of first switch valves, respectively disposed on the transverse pipelines, for controlling the connection or closing of the corresponding transverse pipelines; and a drainage pipeline, connecting the water collection pipeline and the water supply pipeline, and located below the lowermost transverse pipeline, wherein the tunnel lining drainage system is formed as a communicating vessel; The water collection pipeline comprises: At least two annular water collecting pipes are arranged at intervals along the longitudinal direction of the tunnel, each of the annular water collecting pipes is arranged along the annular direction of the tunnel and is connected to the drainage pipeline; A longitudinal water collecting pipe, wherein the annular water collecting pipe is connected with the drainage pipeline through the longitudinal water collecting pipe; The drainage pipeline comprises: A longitudinal drainage pipe is arranged in the tunnel along the arch line of the tunnel and is connected to the water collection pipeline; A water guide pipe connecting the water supply pipeline and the longitudinal drainage pipe; The tunnel lining drainage system comprises an inspection well arranged on the water conduit, and at least two second switch valves located at both ends of the inspection well, wherein the second switch valve is used to control the connection or closing of the water conduit; The launching container comprises: A sewer pipe, the top of which is connected to the atmosphere, and the groundwater in the sewer pipe can be discharged; The water collection tank is connected with the sewer pipe and is used for containing groundwater.

2. The tunnel lining drainage system according to claim 1, characterized in that: The annular water collecting pipe is a soft permeable pipe; And / or, the longitudinal water collecting pipe is a high-density polyethylene pipe with through holes provided in the pipe wall.

3. The tunnel lining drainage system according to claim 1, characterized in that: The distance between two adjacent annular water collecting pipes is 2m~10m.

4. The tunnel lining drainage system according to claim 1, characterized in that: The tunnel lining drainage system comprises a first water pressure gauge arranged on the water conduit, and the first water pressure gauge is used to measure the water pressure in the water conduit.

5. The tunnel lining drainage system according to any one of claims 1 to 3, characterized in that: The tunnel lining drainage system includes a second water pressure gauge arranged on the transverse pipeline, and the second water pressure gauge is used to measure the water pressure in the transverse pipeline.