A three-dimensional maintenance platform for EMUs with centralized power sharing the same column as the existing structure

By designing a three-dimensional maintenance operation platform with common columns and a length of power-concentrated EMUs, the problems of low maintenance efficiency and unsuitable facilities for power-concentrated EMUs have been solved, and the entire EMU can be inspected at the top, reducing engineering costs and labor. The difficulty of the operation improves the efficiency and safety of maintenance.

CN110758458BActive Publication Date: 2024-10-01CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910888820.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-09-19
Publication Date
2024-10-01
Estimated Expiration
2039-09-19

AI Technical Summary

Technical Problem

During maintenance of power-concentrated EMUs, due to the short inspection warehouse line, it is unable to meet the requirements for summit maintenance of the entire vehicle, and the traditional passenger train maintenance facilities cannot adapt to its maintenance, summit maintenance and vehicle storage requirements, resulting in low maintenance efficiency and engineering Big investment.

Method used

A full-length three-dimensional maintenance work platform for power centralized EMUs that shares columns with the existing structure is designed, including a full-length maintenance work shed, a catenary arm, a full-length middle and top work platform, and a suspended lightweight protective net. , by transforming the maintenance shed and stock track of the passenger house, the whole EMU can be inspected at the top, and the difficulty of manual work and inspection time can be reduced.

Benefits of technology

It realizes the whole-vehicle maintenance of power-concentrated EMUs, reduces engineering costs, improves maintenance efficiency, and ensures the safety of workers. The structure is compact and takes up little space, making it suitable for transportation and maintenance of large parts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110758458B_ABST
    Figure CN110758458B_ABST
Patent Text Reader

Abstract

The invention discloses a three-dimensional maintenance operation platform for a power-concentrated EMU sharing a common column with an existing structure, which is characterized in that it is used to transform an existing maintenance shed and track of a passenger maintenance depot, and comprises a full-length maintenance operation shed (1), a contact network wrist arm (2), a full-length middle-level operation platform (4), a full-length top-level operation platform (3), a suspended lightweight protective net (5) and existing maintenance shed columns (7); by transforming the existing maintenance shed and track of the passenger maintenance depot, the platform meets the requirements of the whole-car top-level maintenance operation of the power-concentrated EMU, greatly reducing the difficulty of manual operation, shortening the maintenance operation time and improving the maintenance efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of reconstruction of existing passenger maintenance depots and maintenance of power-concentrated EMUs, and specifically relates to a three-dimensional maintenance operation platform for power-concentrated EMUs that shares a common column with an existing structure. Background Art

[0002] At present, railway passenger trains are mainly divided into EMUs (distributed power type) and ordinary passenger trains. EMUs and ordinary passenger trains have been in use for many years, and their operation and maintenance technical standard system and related facilities are relatively complete, providing a strong guarantee for the safe transportation of railway passengers. As a series product of the "Fuxing" EMU, the power-concentrated EMU plays an important role in improving the efficiency of transportation organization and improving the travel conditions of passengers. Compared with the traditional "locomotive + vehicle" ordinary speed train, the power-concentrated EMU adopts a non-disassembly operation mode, which reduces the time for disassembly, end change and other operations, and adopts a fixed locomotive and vehicle formation and integrated maintenance mode.

[0003] At present, the maintenance work of centralized power EMU mainly faces the following two problems:

[0004] 1) When the centralized power EMU enters the EMU operation depot inspection and maintenance without disassembly, the inspection depot line is often too short to meet the maintenance requirements, and the entire vehicle cannot be inspected on the top. In addition, the maintenance tracks of traditional passenger maintenance depots are not electrified and connected to the grid, which cannot meet the running requirements of centralized power EMUs.

[0005] 2) The centralized power EMU is optimized and designed with reference to the experience and requirements of existing EMUs in China. Its structural parameters are quite different from those of traditional EMUs. If a new EMU operation depot is built for its maintenance, the project investment will be large and the construction period will be long. If the engineering shunting locomotive is used to haul the passenger maintenance depot for maintenance and maintenance, the maintenance facilities of the passenger maintenance depot cannot meet the requirements of maintenance, top maintenance and storage of centralized power EMUs. Summary of the invention

[0006] In response to at least one of the above defects or improvement needs in the prior art, the present invention provides a three-dimensional maintenance operation platform for power-centralized EMUs that shares a common column with the existing structure, which is used to transform the existing maintenance shed and track of the passenger maintenance depot to meet the requirements of full-vehicle climbing maintenance operations for power-centralized EMUs, greatly reducing the difficulty of manual operations, shortening maintenance operation time, and improving maintenance efficiency.

[0007] To achieve the above-mentioned purpose, according to one aspect of the present invention, a three-dimensional maintenance operation platform for power-concentrated EMUs sharing a column with an existing structure is provided, which is used to transform the existing maintenance shed and track of a passenger maintenance station, and includes a full-length maintenance operation shed, a contact network arm, a full-length middle-level operation platform, a full-length top-level operation platform, a suspended lightweight protective net, and existing maintenance shed columns;

[0008] The existing maintenance shed includes existing maintenance shed columns and an existing maintenance shed ceiling;

[0009] The full-length maintenance shed shares the existing maintenance shed columns with the existing maintenance shed, and also includes full-length maintenance shed columns and a full-length maintenance shed roof; the full-length maintenance shed is arranged across the maintenance tracks with multiple trenches of the existing passenger maintenance station;

[0010] A plurality of the through-type maintenance work shed columns are arranged on the side of the existing preparation shed, and both ends of the through-type maintenance work shed ceiling are connected to the through-type maintenance work shed columns and the tops of the existing preparation shed columns;

[0011] The contact network wrist arm is provided on the outer side of the existing preparation shed column and the inner side of the full-length maintenance work shed column, and is located above the power-concentrated EMU;

[0012] The outer side of the existing preparation shed columns and the inner side of the full-length maintenance work shed columns are provided with the full-length middle-level work platform and the full-length top-level work platform, which are arranged on the side of the power-concentrated EMU;

[0013] The suspended lightweight protective net is suspended below the ceiling of the full-length maintenance work shed and above the middle of the adjacent maintenance track.

[0014] Preferably, a ladder is provided between the through-length middle-level working platform and the ground.

[0015] Preferably, a ladder with a safety door is provided between the full-length top-level working platform and the full-length middle-level working platform.

[0016] Preferably, a protective net hanging column is connected to the lower part of the ceiling of the full-length maintenance work shed, and the suspended lightweight protective net is arranged on both sides of the lower end of the protective net hanging column.

[0017] Preferably, a maintenance vehicle is provided in a channel reserved on the hardened ground between adjacent maintenance tracks and below the suspended lightweight protective net, for operations including refueling, adding water, adding grease, adding sand, and draining sewage for the power-centralized EMU.

[0018] Preferably, the bottom of the columns of the full-length maintenance work shed is poured with concrete on the existing hardened ground.

[0019] Preferably, the crossbeam support of the ceiling of the full-length maintenance work shed is connected to the top of the columns of the full-length maintenance work shed and the columns of the existing preparation shed by bolts.

[0020] Preferably, a mounting interface for the contact network arm is preset on the column of the full-length maintenance work shed.

[0021] Preferably, a mounting interface for the contact network arm is added to the existing maintenance shed column.

[0022] Preferably, the contact network arm adopts a simple chain-type suspension, and the suspension type is contact suspension.

[0023] The above-mentioned preferred technical features can be combined with each other as long as they do not conflict with each other.

[0024] In general, the above technical solution conceived by the present invention has the following beneficial effects compared with the prior art:

[0025] 1. The three-dimensional maintenance platform for EMUs with centralized power sharing the same column with the existing structure of the present invention electrifies and hangs a net on the track that needs to be renovated according to the renovation requirements. Considering the structural stress conditions of the existing preparation shed columns in the passenger maintenance depot and the limitations of the basic construction measures, the crossbeam support is bolted to the existing preparation shed columns and maintenance shed columns to form the main body of the maintenance platform. Based on the existing preparation shed columns and maintenance shed columns, the overhead contact arm, the full-length top-level maintenance platform and the full-length middle-level maintenance platform are bolted to them respectively; the protective net hanging column suspended on the top of the crossbeam support is connected to the suspended lightweight protective net to ensure the safety of the staff.

[0026] 2. The renovation plan creatively solved many technical problems such as the contradiction between renovation and operation, and the contradiction between high standards and economy, achieved a balance between reducing project costs and improving work efficiency, and generated great social and economic benefits.

[0027] 3. The reconstruction plan electrifies the tracks that need to be reconstructed and adds a full-length double-deck maintenance operation platform to the entire EMU, thus realizing the operational maintenance of the entire power-concentrated EMU at the passenger maintenance depot.

[0028] 4. The common-column full-length maintenance work platform is divided into a three-layer structure. On the premise of meeting the maintenance requirements, it also achieves the goal of compact overall layout structure, small space occupation and high maintenance efficiency.

[0029] 5. The maintenance work platform adopts a common-column full-length structure, utilizing the existing maintenance shed columns and only building new columns on the other side of the track, thus retaining the maintenance passage and ensuring a smooth maintenance process, which can meet the transportation and maintenance needs of large components.

[0030] 6. The common-column full-length maintenance work platform is assembleable, and the main body adopts a light steel structure, which is low in cost, stable in structure, safe and reliable. The installation location and installation scheme fully meet the overall process layout requirements of railway locomotive maintenance. Among them, the bottom working platform adopts the existing hardened ground, which fully considers the practicality, convenience and safety of the working platform; the top working platform is equipped with a suspended lightweight protective net, which can effectively prevent casualties caused by people or objects falling from the air during the construction process. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a schematic diagram of the composition of a three-dimensional maintenance work platform for a power-concentrated EMU shared with an existing structure in accordance with an embodiment of the present invention;

[0032] Figure 2 It is a cross-sectional schematic diagram of a three-dimensional maintenance work platform for a power-concentrated EMU shared with an existing structure and having a common column according to an embodiment of the present invention;

[0033] Figure 3 It is a schematic diagram of a full-length maintenance work shed of a three-dimensional maintenance work platform of a power-concentrated EMU shared with an existing structure by a common column according to an embodiment of the present invention;

[0034] Figure 4 yes Figure 3 A partial enlarged view of the middle A;

[0035] Figure 5 It is a schematic diagram of the overhead contact arm and installation of a three-dimensional maintenance operation platform for power-concentrated EMUs sharing a common column with an existing structure according to an embodiment of the present invention;

[0036] Figure 6 It is a formal schematic diagram of a full-length middle-level working platform and a full-length top-level working platform of a full-length power-centralized EMU three-dimensional maintenance working platform that shares a column with an existing structure in an embodiment of the present invention.

[0037] Figure 7 The side view of the through-type middle-level working platform and the through-type top-level working platform of the three-dimensional maintenance working platform of the power-concentrated EMU shared with the existing structure in the embodiment of the present invention is shown. Figure 1 .

[0038] Figure 8 The side view of the through-type middle-level working platform and the through-type top-level working platform of the three-dimensional maintenance working platform of the power-concentrated EMU shared with the existing structure in the embodiment of the present invention is shown. Figure 2 .

[0039] Fig. 9 It is a schematic diagram of a suspended lightweight protective net of a three-dimensional maintenance work platform for a power-concentrated EMU that shares a column with an existing structure in an embodiment of the present invention. DETAILED DESCRIPTION

[0040] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in each embodiment of the present invention described below can be combined with each other as long as they do not conflict with each other. The present invention is further described in detail below in conjunction with specific embodiments.

[0041] As a preferred embodiment of the present invention, Figure 1-9 As shown, the present invention provides a three-dimensional maintenance work platform for power-concentrated EMUs that shares a column with an existing structure, which is used to transform the existing preparation shed and track of the passenger maintenance station, and mainly includes a full-length maintenance work shed 1, a contact network arm 2, a full-length middle-level work platform 4, a full-length top-level work platform 3, a suspended lightweight protective net 5, and existing preparation shed columns 7. In addition to the above main structures, the full-length maintenance work platform also has components such as protective net hanging columns 6, the existing preparation shed roof 10, and the power-concentrated EMU to be repaired 8.

[0042] The existing maintenance shed comprises an existing maintenance shed column 7 and an existing maintenance shed ceiling 10; a contact network is arranged in the existing maintenance shed ceiling 10.

[0043] The full-length maintenance work shed 1 shares the existing preparation shed columns 7 with the existing maintenance shed, and also includes full-length maintenance work shed columns 102 and a full-length maintenance work shed ceiling 101; the full-length maintenance work shed 1 is straddled above the multiple maintenance tracks with trenches in the existing passenger maintenance station.

[0044] A plurality of the full-length maintenance work shed columns 102 are arranged on the side of the existing preparation shed, and the two ends of the full-length maintenance work shed ceiling 101 are connected to the full-length maintenance work shed columns 102 and the top of the existing preparation shed columns 7. The bottom of the full-length maintenance work shed columns 102 is cast with concrete on the existing hardened ground. The crossbeam support of the full-length maintenance work shed ceiling 101 is connected to the full-length maintenance work shed columns 102 and the top of the existing preparation shed columns 7 by bolts.

[0045] The contact network arm 2 is provided on the outer side of the existing preparation shed column 7 and the inner side of the full-length maintenance work shed column 102, and is located above the power-concentrated EMU 8. The full-length maintenance work shed column 102 is preset with an installation interface for the contact network arm 2. The existing preparation shed column 7 is added with an installation interface for the contact network arm 2. The contact network arm 2 adopts a simple chain suspension, the suspension type is contact suspension, and the conductor combination is JTMM95+CTA120.

[0046] The outer side of the existing preparation shed column 7 and the inner side of the full-length maintenance work shed column 102 are provided with the full-length middle-level work platform 4 and the full-length top-level work platform 3, which are arranged on the side of the power-concentrated EMU 8. A ladder 9 is provided between the full-length middle-level work platform 4 and the ground. A ladder with a safety door is provided between the full-length top-level work platform 3 and the full-length middle-level work platform 4.

[0047] The suspended lightweight protective net 5 is suspended below the full-length maintenance work shed ceiling 101 and above the middle of the adjacent maintenance tracks. A protective net hanging column 6 is connected below the full-length maintenance work shed ceiling 101, and the suspended lightweight protective net 5 is arranged on both sides of the lower end of the protective net hanging column 6. A maintenance vehicle is arranged in a reserved passage on the hardened ground below the suspended lightweight protective net 5 and between adjacent maintenance tracks, which is used for operations including refueling, watering, greasing, sanding, and sewage discharge of power-concentrated EMUs.

[0048] The specific structure is described as follows.

[0049] 1) Full-length maintenance shed with common columns

[0050] A full-length maintenance shed with a common column 1 Figure 2-3 As shown, the crossbeam support of the full-length maintenance work shed ceiling 101 is connected to the existing preparation shed column 7 and the full-length maintenance work shed column 102 by bolts 11, wherein a partial enlarged view of the connection part is shown in FIG. Figure 4 As shown. The full-length maintenance work shed columns 102 and the existing preparation shed columns 7 are pre-buried and poured with concrete in the existing hardened ground; the overhead contact arm 2, the full-length top-level maintenance work platform 3 and the full-length middle-level maintenance work platform 4 are connected by bolts and installed on the existing preparation shed columns 7 and the full-length maintenance work shed columns 102; the protective net hanging columns 6 are connected to the crossbeam support by bolts; the head car 901, the tail car 902 and the passenger car 903 to be repaired are parked on the track in the maintenance work platform.

[0051] 2) Contact network arm

[0052] Contact network arm 2 Figure 5 As shown, it is installed on the upper part of the existing preparation shed column 7 and the full-length maintenance work shed column 102 by bolts 11 to support the contact suspension and transfer the load.

[0053] 3) Full-length maintenance platform

[0054] The full-length top-level maintenance operation platform 3 and the full-length middle-level maintenance operation platform 4 are as follows: Figure 6-8As shown. The full-length middle-level maintenance work platform 4 is used by maintenance personnel to clean and inspect the locomotive doors and windows and enter and exit the locomotive; the full-length top-level maintenance work platform 3 is used by maintenance personnel to detect, clean, inspect and repair the roof equipment. The full-length top-level maintenance work platform 3 and the full-length middle-level maintenance work platform 4 are connected to the existing preparation shed columns 7 and the full-length maintenance work shed columns 102 by bolts 11.

[0055] 4) Suspended lightweight protective net

[0056] Suspended lightweight protective net 5 Fig. 9 As shown, it is connected to the protective net hanging column 6 by bolts, and the protective net hanging column 6 is connected to the beam support by bolts 11. The suspended lightweight protective net 5 is mainly used to prevent casualties caused by people or objects falling from the air during construction.

[0057] The three-dimensional maintenance platform for EMUs of the present invention, which shares a column with an existing structure and is powered by centralized power, electrifies and hangs a net on the track that needs to be renovated according to the renovation requirements. Considering the structural stress conditions of the existing preparation shed columns in the passenger maintenance depot and the limitations of the basic construction measures, the crossbeam support is connected to the existing preparation shed columns and the maintenance work shed columns by bolts to form the main body of the maintenance work platform. Based on the existing preparation shed columns and the maintenance work shed columns, the overhead contact network wrist arm, the full-length top-level maintenance work platform and the full-length middle-level maintenance work platform are respectively installed thereon by bolts; the protective net hanging column suspended on the top of the crossbeam support is connected to the suspended lightweight protective net to ensure the safety of the staff.

[0058] In summary, the specific advantages of the present invention are as follows:

[0059] 1. The renovation plan creatively solved many technical problems such as the contradiction between renovation and operation, and the contradiction between high standards and economy, achieved a balance between reducing project costs and improving work efficiency, and generated great social and economic benefits.

[0060] 2. The reconstruction plan electrifies the tracks that need to be reconstructed, and adds a full-length double-deck maintenance operation platform to the entire EMU, thus realizing the operational maintenance of the entire power-concentrated EMU at the passenger maintenance depot.

[0061] 3. The common-column full-length maintenance work platform is divided into a three-layer structure. On the premise of meeting the maintenance requirements, it also achieves the goal of compact overall layout structure, small space occupation and high maintenance efficiency.

[0062] 4. The maintenance work platform adopts a full-length structure with common columns, using the existing maintenance shed columns and only building new columns on the other side of the track, retaining the maintenance channel to ensure a smooth maintenance process and meet the needs of large component transportation and maintenance operations.

[0063] 5. The common-column full-length maintenance work platform is assembleable, and the main body adopts a light steel structure, which is low in cost, stable in structure, safe and reliable. The installation location and installation scheme fully meet the overall process layout requirements of railway locomotive maintenance. Among them, the bottom working platform adopts the existing hardened ground, which fully considers the practicality, convenience and safety of the working platform and the safety of the operators; the top working platform is equipped with a suspended lightweight protective net, which can effectively prevent casualties caused by people or objects falling from the air during the construction process.

[0064] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A three-dimensional maintenance work platform for power-concentrated EMUs that shares a common column with an existing structure, characterized in that: Used to renovate the existing maintenance shed and track of the passenger maintenance station, including a full-length maintenance work shed (1), a contact network arm (2), a full-length middle-level work platform (4), a full-length top-level work platform (3), a suspended lightweight protective net (5), and existing maintenance shed columns (7); The existing maintenance shed comprises existing maintenance shed columns (7) and an existing maintenance shed ceiling (10); The full-length maintenance work shed (1) shares the existing maintenance shed columns (7) with the existing preparation shed, and further comprises full-length maintenance work shed columns (102) and a full-length maintenance work shed ceiling (101); the full-length maintenance work shed (1) is arranged across the maintenance tracks with multiple trenches of the existing passenger maintenance station; A plurality of the through-length maintenance work shed columns (102) are arranged on the side of the existing preparation shed, and both ends of the through-length maintenance work shed ceiling (101) are connected to the tops of the through-length maintenance work shed columns (102) and the existing preparation shed columns (7); The contact network arm (2) is provided on the outer side of the existing preparation shed column (7) and the inner side of the full-length maintenance work shed column (102), and is located above the power-concentrated EMU (8); The outer side of the existing preparation shed column (7) and the inner side of the full-length maintenance work shed column (102) are provided with the full-length middle-level work platform (4) and the full-length top-level work platform (3), which are arranged on the side of the power-concentrated EMU (8); a ladder is provided between the full-length middle-level work platform (4) and the ground; and a ladder with a safety door is provided between the full-length top-level work platform (3) and the full-length middle-level work platform (4); The suspended lightweight protective net (5) is suspended below the ceiling (101) of the full-length maintenance work shed and above the middle of an adjacent maintenance track.

2. The three-dimensional maintenance work platform for EMUs sharing the same column with the existing structure as claimed in claim 1, characterized in that: A protective net hanging column (6) is connected and arranged below the full-length maintenance work shed ceiling (101), and the suspended lightweight protective net (5) is arranged on both sides of the lower end of the protective net hanging column (6).

3. The three-dimensional maintenance work platform for EMUs sharing the same column with the existing structure as claimed in claim 1, characterized in that: A maintenance vehicle is provided in a reserved passage on the hardened ground between adjacent maintenance tracks and below the suspended lightweight protective net (5), and is used for operations including refueling, watering, grease, sanding, and sewage removal of the power-centralized EMU.

4. The three-dimensional maintenance work platform for EMUs sharing the same column with the existing structure as claimed in claim 1, characterized in that: The bottom of the full-length maintenance work shed column (102) is cast with concrete on the existing hardened ground.

5. The three-dimensional maintenance work platform for EMUs sharing the same column with the existing structure as claimed in claim 1, characterized in that: The crossbeam support of the full-length maintenance work shed ceiling (101) is connected to the top of the full-length maintenance work shed column (102) and the existing preparation shed column (7) by bolts.

6. The three-dimensional maintenance work platform for EMUs sharing the same column with the existing structure as claimed in claim 1, characterized in that: The full-length maintenance work shed column (102) is pre-arranged with a mounting interface for the contact network arm (2).

7. The three-dimensional maintenance work platform for EMUs sharing the same column with the existing structure as claimed in claim 1, characterized in that: The existing maintenance shed column (7) is provided with a mounting interface for the contact network arm (2).

8. The three-dimensional maintenance work platform for EMUs sharing the same column with the existing structure as claimed in claim 1, characterized in that: The contact network arm (2) adopts a simple chain-type suspension, and the suspension type is contact suspension.