Buoyancy simulation device, suspended tunnel structure research device and research method
The buoyancy simulation device simulates the buoyancy of a suspended tunnel in water in the air, which solves the problem of difficulty in studying the mechanical properties of suspended tunnels in underwater experiments due to water interference, and enables in-depth research on suspended tunnel structures in an anhydrous environment and multi-liquid fluids. Environmentally applicable effects.
Patent Information
- Application Number
- CN201911155533.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-22
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2039-11-22
AI Technical Summary
In the existing technology, physical experimental research on suspended tunnels is mainly limited to water tank tests. Due to water interference, underwater experiments are difficult to accurately understand the mechanical properties of the suspended tunnel structure, and cannot comprehensively study the stress behavior of the suspended tunnel in a waterless environment.
Design a buoyancy simulation device that provides pulling force opposite to gravity through hoisting parts to simulate the buoyancy of a suspended tunnel in water. It abandons the influence of the water body and studies the mechanical characteristics of the suspended tunnel structure in the air. It is suitable for other underwater or water surface structures. Research.
It can effectively simulate the force behavior of suspended tunnels in a waterless environment, gain an in-depth understanding of the mechanical characteristics of the suspended tunnel structure itself, avoid water interference, and is suitable for research in a variety of liquid fluid environments.
Smart Images

Figure CN110796932B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a suspended tunnel physical experiment device, in particular to a buoyancy simulation device, a suspended tunnel structure research device and a research method. Background Art
[0002] The suspended tunnel is suspended at a certain depth in the water by the combined action of net buoyancy and anchor cable force. Buoyancy is an important component of the structural balance system. In the prior art, physical experimental research on suspended tunnels is often limited to water tank tests. However, in underwater experiments, the water body has a relatively obvious interference with the suspended tunnel model itself. Therefore, although underwater experiments are an important part of the physical experimental research on suspended tunnels, they are not conducive to the experimenters' understanding of the mechanical properties of the suspended tunnel structure itself. Therefore, for the physical model experimental research of suspended tunnels, only underwater experiments are not enough. Summary of the invention
[0003] The purpose of the present invention is to provide a buoyancy simulation device, a suspended tunnel structure research device and a research method to address the problem that the prior art only has water tank experimental research, so as to achieve the purpose of studying the force behavior of the suspended tunnel structure in a waterless environment and deepening the understanding of the characteristics of the suspended tunnel structure system itself.
[0004] In order to achieve the above object, the technical solution adopted by the present invention is:
[0005] A buoyancy simulation device is used to simulate the buoyancy of an object to be studied in a liquid, comprising a hanging part and a top fixing part, wherein the first end of the hanging part is connected to the top fixing part, and the second end of the hanging part is used to be connected to the object to be studied; the hanging part is used to provide a pulling force opposite to gravity to the object to be studied, and the hanging part is constructed to allow the object to be studied to generate displacement or displacement component in a direction perpendicular to gravity. In the scheme provided by the present invention, a hanging part is provided in the buoyancy simulation device, and a pulling force is provided by the hanging part to simulate the buoyancy of the object to be studied when it is in water, so that the external force on the structure is basically the same as that in water, and because the structure is located in the air, the influence of the water body is abandoned during the experiment, which is conducive to reflecting and studying the mechanical properties of the structure itself. The scope of use of the above-mentioned buoyancy simulation device may not be limited to the study of suspended tunnels, but may also be used to study the mechanical properties of other underwater or surface structures themselves; the scope of use of the above-mentioned buoyancy simulation device may not be limited to the simulation of the buoyancy of the object to be studied in water, but may also be used to simulate the buoyancy of the object to be studied in other liquid fluids.
[0006] As a preferred solution of the present invention, the top fixing member includes a top beam and a connecting member, the connecting member is arranged on the top beam, and the first end of the hanging member is connected to the connecting member. Through the above solution, when it is necessary to simulate a buoyancy equal to gravity through the buoyancy simulation device, that is, to simulate the object to be studied floating on a fluid, or suspended in a fluid with a density equal to that of the object to be studied, the object to be studied is connected through the top fixing member and the hanging member, and under the gravity of the object to be studied, the hanging member exerts a pulling force on the object to be studied that is equal to gravity and opposite in direction, and the pulling force can be used to simulate buoyancy.
[0007] As a preferred solution of the present invention, the hanging member includes at least two hanging ropes, and the top beam is provided with at least two connecting members for connecting with the hanging ropes, and the connecting members are evenly distributed on the top beam. In the above preferred solution, the object to be studied is connected by at least two evenly distributed hanging ropes, so that the tension on the object to be studied is evenly distributed, which is closer to the actual effect of buoyancy.
[0008] As a preferred embodiment of the present invention, the sling is made of a flexible material. In the above preferred embodiment, while the sling provides tension, it can avoid applying excessive radial force to the research object so that the deformation of the research object in the horizontal direction will exceed the allowable error range of the experiment, thereby making the tension provided by the sling as close to the buoyancy as possible. Specifically, the flexible material can be selected as: braided hemp rope, fishing line, steel wire, etc. Furthermore, under the condition that the horizontal displacement of the tube body is constant, the longer the length of the sling, the smaller the displacement angle of the sling, and the smaller the component of the sling tension in the horizontal direction. The displacement angle of the sling refers to: the ratio of the horizontal displacement of the sling to the length of the sling.
[0009] Furthermore, the length of the suspension rope is set such that the maximum value of the cosine value of the suspension rope displacement angle is within 0.05.
[0010] As a preferred embodiment of the present invention, the connecting member includes a fixed pulley and a weight, the first end of the sling is connected to the weight, and the weight is used to be placed on both sides of the fixed pulley with the object to be studied. In the above preferred embodiment, the cooperation between the weight and the fixed pulley makes the tension applied to the hanging member constant, which is closer to the actual situation of buoyancy. Once the displacement volume of the object to be studied and the fluid environment to be simulated are determined, the buoyancy to be simulated can be calculated, so that the gravity of the weight can be determined accordingly, and the gravity of the weight can be applied to the object to be studied through the fixed pulley. Through this scheme, the buoyancy of various objects to be studied in various fluids can be simulated by adjusting the gravity of the weight connected to the fixed pulley, which has a wider scope of application, and the tension acting on the hanging member is constant and closer to the actual situation.
[0011] As a preferred solution of the present invention, the top beam is a long strip structure, the number of fixed pulleys is at least two, and the at least two fixed pulleys are evenly distributed along the length direction of the top beam; at least two suspension ropes are connected to the same weight. Through the above preferred solution, each weight cooperates with at least two suspension ropes, and adjusting the position of one weight is equivalent to adjusting the positions of at least two suspension ropes at the same time, which reduces the difficulty of adjustment. In addition, when the lengths of the suspension ropes connected to the same weight are equal, it is also possible to determine whether the tensions on the suspension ropes connected to the same weight are equal by observing whether the direction of the weight is parallel to the horizontal plane.
[0012] As a preferred solution of the present invention, the connecting member further comprises a movable pulley, the fixed pulley and the movable pulley form a pulley block structure, the lifting rope cooperates with the pulley block, and one end of the lifting rope is connected to the weight. By providing a movable pulley, a relatively large pulling force can be provided by a light weight, which is conducive to reducing costs.
[0013] As a preferred embodiment of the present invention, the hanging member includes a hanger, and the first end of the hanger is hinged to the connecting member. In the present invention, in addition to using a flexible hanging rope, the simulation of buoyancy can also be achieved by hingedly connecting the hanger and the connecting member. The reason is that, although the rigidity of the hanger is often large, the influence of the rigidity of the hanger cannot be ignored during the experiment, but since the upper end of the hanger is connected to the connecting member in a hinged manner, when the external force acts on the suspended tunnel model in the horizontal direction and the suspended tunnel model does not produce severe deformation, the hanger can allow the suspended tunnel model to be displaced in the horizontal direction, so that the rigidity of the hanger itself will not actually have a significant effect on the deformation of the suspended tunnel elastic model. Therefore, it can also be considered that the tension of the hanger on the suspended tunnel model can simulate the vertical buoyancy.
[0014] As a preferred embodiment of the present invention, the buoyancy simulation device also includes an anchor assembly, one end of the anchor assembly is connected to the ground, and the other end of the anchor assembly is connected to the object to be studied. Through the above-mentioned scheme, the object to be studied is subjected to the pulling force (this pulling force is used to simulate buoyancy) of the hanging member, gravity and the external force of the anchor assembly. By adjusting the interaction force between the anchor assembly and the object to be studied, the pulling force on the hanging member can be adjusted, thereby adjusting the size of the buoyancy that the buoyancy simulation device is used to simulate. When it is necessary to simulate a buoyancy that is not equal to the gravity by the buoyancy simulation device, that is, when simulating that the object to be studied is placed in a fluid that is not equal to its own density, an additional external force can be applied to the object to be studied by the anchor assembly to adjust the pulling force on the hanging member, thereby changing the size of the pulling force, so that the pulling force on the hanging member is equal to the buoyancy to be simulated.
[0015] A suspended tunnel structure research device includes a suspended tunnel model and the above-mentioned buoyancy simulation device; the suspended tunnel model is used as the object to be studied; one end of the anchor assembly is connected to the ground, and the other end of the anchor assembly is used to connect to the suspended tunnel model, and the hanging parts of the buoyancy simulation device are connected to the suspended tunnel model. During the experiment, the anchor assembly is used to provide the anchoring force of the suspended tunnel model, and the buoyancy is simulated by the buoyancy simulation device. At this time, a load is applied to the suspended tunnel model, that is, the force response of the suspended tunnel structure itself can be simulated when the two ends are not constrained.
[0016] As a preferred solution of the present invention, the suspended tunnel structure research device also includes an end restraint device, which includes an articulated device and / or a fixed device. By setting the end restraint device, the force response of the suspended tunnel structure itself under the end articulated restraint or fixed restraint can be simulated.
[0017] As a preferred embodiment of the present invention, the end restraining device includes an articulated device and a fixed device, the articulated device is used to be connected to the suspended tunnel model, the fixed device includes a clamping piece and a limiting piece, an openable clamping space is formed on the clamping piece, the clamping space is used to adapt to the suspended tunnel model, the limiting piece is used to be detachably connected to the suspended tunnel model, and the limiting piece, when connected to the suspended tunnel model, is used to prevent the suspended tunnel model from rotating in the clamping space and moving axially.
[0018] As a preferred solution of the present invention, the fixing device includes a first clamping block and a second clamping block, the first clamping block and the second clamping block are detachably connected, and the first clamping block and the second clamping block are used to splice to form a clamping space. Through the above structure, when the first clamping block and the second clamping block are clamped together, the suspended tunnel model is placed in the clamping space, and the inner wall of the clamping space forms a constraint on the suspended tunnel model, limiting the translation of the part of the model connected to the clamping space within the plane where the cross section of the suspended tunnel model is located, and the rotation of the part around any straight line direction in the cross section of the suspended tunnel model.
[0019] As a preferred solution of the present invention, the limiting member is constructed as a key, and the inner wall of the engaging space is provided with a key groove adapted to the limiting member.
[0020] As a preferred embodiment of the present invention, the articulated device includes an angular contact ball bearing and an anti-torsion component; the inner ring of the angular contact ball bearing is used to adapt to the suspended tunnel model, the anti-torsion component is fixedly connected to the outer ring of the angular contact ball bearing, and the anti-torsion component is used to prevent the matching section of the suspended tunnel model and the angular contact ball bearing from rotating relative to the outer ring of the angular contact ball bearing.
[0021] The hinge device in the preferred embodiment of the present invention adopts the above structure. First, it is connected to the suspended tunnel model through an angular contact ball bearing. When only the hinge device provides constraints, the part where the suspended tunnel model is connected to the angular contact ball bearing is allowed to rotate within the contact angle range of the angular contact ball bearing. This rotation is roughly the same as the rotation in the common ball joint connection in the prior art. The difference is that the amplitude of rotation is limited by the contact angle of the angular contact ball bearing, so that the rotation amplitude is small. However, in the present application, the suspended tunnel model is a slender piece, and the hinge constraint is set at the end. The rotation amplitude that may be generated by the connecting section is often within the range of several degrees. Therefore, the rotation amplitude that the angular contact ball bearing can provide can meet the requirements of the present application scheme, and the cost of the angular contact ball bearing is much lower than the cost of the ball joint support with the same size. By adopting the angular contact ball bearing, there is no need to set a special hinge joint on the suspended tunnel model, and the connection is more convenient. Secondly, in order to prevent the suspended tunnel model from rotating relative to the outer ring of the angular contact ball bearing, an anti-twist component is provided, and the anti-twist component is connected to the outer ring and the suspended tunnel model, thereby providing a reliable hinge constraint.
[0022] As a preferred embodiment of the present invention, the anti-twist assembly includes an anti-twist ring and an anti-twist rod. The anti-twist ring is provided with a connecting hole for the anti-twist rod to pass through. One end of the connecting hole penetrates to the inner surface of the anti-twist ring, and the other end of the connecting hole penetrates to the outer surface of the anti-twist ring. The anti-twist ring is fixedly connected to the outer ring of the angular contact ball bearing. The anti-twist ring is used to be mounted on the suspended tunnel model, and the inner diameter of the anti-twist ring is larger than the inner diameter of the angular contact ball bearing.
[0023] The anti-twist assembly adopts the above structure, and the anti-twist ring cooperates with the anti-twist rod to prevent the section of the suspended tunnel model connected to the angular contact ball bearing from rotating. In addition, the inner diameter of the anti-twist ring is larger than the inner diameter of the angular contact ball bearing, so that the setting of the anti-twist ring does not affect the deformation of the suspended tunnel model under the hinge constraint.
[0024] As a preferred solution of the present invention, one end of the anti-twist bar used for adapting and connecting with the suspended tunnel model is constructed as a hemispherical head structure. When in use, a hemispherical groove adapted to the hemispherical head structure is provided on the suspended tunnel model. When the suspended tunnel model is deformed under the action of external force and the end hinge constraint, the hemispherical head structure on the anti-twist bar rotates in the hemispherical groove in the suspended tunnel model, so that the setting of the anti-twist bar will not have an adverse effect on the deformation of the suspended tunnel model, which is conducive to obtaining more reliable experimental results.
[0025] As a preferred embodiment of the present invention, the anchoring assembly includes at least two cables, one end of the cable is used to connect to the suspended tunnel model, and the other end of the cable is used to connect to the ground; the cable includes a cable, a tensioning device, a spring and a tension measuring device, and the tensioning device, the spring and the tension measuring device are connected by the cable. During the experiment, the spring is used to provide the rigidity of the cable so that the cable in the anchoring assembly maintains elasticity similar to that of the prototype, the tensioning device is used to adjust the initial tension on the cable, and the tension measuring device is used to measure the tension on the cable. The above-mentioned anchoring assembly and cable structure can be used to simulate the anchoring of cables with different stiffnesses to the suspended tunnel during the experiment, and the force response of the elastic model of the suspended tunnel under different initial tensions can also be obtained.
[0026] A method for studying a suspended tunnel structure, used for installing the above-mentioned suspended tunnel structure research device, comprises the following steps: connecting one end of a hanging piece on a suspended tunnel structure connection device to a top fixing piece, and connecting the other end of the hanging piece to a suspended tunnel model; connecting one end of an anchor assembly to the suspended tunnel model, and connecting the other end of the anchor assembly to the ground; adjusting the tension on the anchor assembly and the pulling force on the hanging piece; applying a load to the suspended tunnel model, and observing the response of the suspended tunnel model under the load. The research method provided by the present invention can be carried out in the air, and the buoyancy of the suspended tunnel is simulated by a vertical upward pulling force, so that the influence of the water body can be eliminated, and the structural characteristics of the suspended tunnel itself can be obtained, which helps to deepen the understanding of the suspended tunnel structure itself.
[0027] As a preferred embodiment of the present invention, the suspended tunnel structure research device further includes an end restraint device, and the end restraint device includes a hinge device and / or a fixed device; before adjusting the tension on the anchor assembly and the tension on the hanging part, the research method further includes the following steps: installing the end restraint device at the end of the suspended tunnel model. In the research method provided by the present invention, different end restraints are provided to the suspended tunnel model through the end restraint device, which is beneficial to the force response of the suspended tunnel structure under different restraint conditions.
[0028] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0029] 1. The buoyancy simulation device provided by the present invention provides tension through the hanging parts to simulate the buoyancy of the suspended tunnel model in the liquid, so that the external force on the structure is basically the same as that in water or other liquid fluids. Since the structure is located in the air, the influence of water or other liquid fluids is abandoned during the response, which is beneficial to the mechanical properties of the reaction structure itself;
[0030] 2. The suspended tunnel structure research device and research method provided by the present invention simulate buoyancy through a buoyancy simulation device, and also include an anchoring assembly. During the experiment, the anchoring assembly is used to provide an anchoring force for the suspended tunnel model. The buoyancy is simulated by the buoyancy simulation device. At this time, a load is applied to the suspended tunnel model, that is, the structural characteristics of the suspended tunnel model itself are studied. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a structural schematic diagram of the buoyancy simulation device provided in Example 1 of the present invention.
[0032] Figure 2 It is a structural schematic diagram of the buoyancy simulation device provided in Example 2 of the present invention.
[0033] Figure 3 It is a structural schematic diagram of the buoyancy simulation device provided in Example 3 of the present invention.
[0034] Figure 4 It is a schematic structural diagram of the first top fixing member provided in Example 3 of the present invention.
[0035] Figure 5 It is a schematic structural diagram of the second top fixing member provided in Example 3 of the present invention.
[0036] Figure 6 It is a schematic structural diagram of a third top fixing member provided in Example 3 of the present invention.
[0037] Figure 7 It is a schematic diagram of the structure of the top fixing member provided in Example 4 of the present invention.
[0038] Figure 8 It is a schematic structural diagram of the first anchoring assembly provided in Example 5 of the present invention.
[0039] Fig. 9 yes Figure 8 A partial enlarged view of part A in the middle.
[0040] Fig.10 It is a schematic structural diagram of the second anchoring assembly provided in Example 5 of the present invention.
[0041] Fig.11 It is a schematic structural diagram of the third anchoring assembly provided in Example 5 of the present invention.
[0042] Fig.12 It is a schematic structural diagram of the fourth anchoring assembly provided in Example 5 of the present invention.
[0043] Fig.13 yes Fig.12 A partial enlarged view of part B in the middle.
[0044] Fig.14It is a schematic diagram of the structure of the end restraint device provided in Example 5 of the present invention.
[0045] Fig.15 It is a schematic diagram of the structure of the hinge device provided in Example 5 of the present invention.
[0046] Fig.16 It is a schematic diagram of the structure of the anti-twist part of the hinge device provided in Example 5 of the present invention.
[0047] Fig.17 It is a structural schematic diagram of a suspended tunnel model adapted to an anti-twist member.
[0048] Fig.18 It is a schematic diagram of the structure of the fixing device provided in Example 5 of the present invention.
[0049] Icons: 1- buoyancy simulation device; 2- anchoring assembly; 3- end restraint device; 4- floating tunnel model; 11- hoisting parts; 12- top fixing parts; 121- top beam; 122- connecting ring; 123- fixed pulley; 124- weight; 125- movable pulley; 21- cable; 211- cable; 212- tensioning device; 213- spring; 214- tension measuring device; 22- guide assembly; 221- guide rail; 222- slider; 223- connecting piece; 23- anchoring pulley; 31- hinged device; 32- fixed device; 33- support; 311- angular contact ball bearing; 312- anti-twist bar; 313- anti-twist ring; 321- first block; 322- second block; 323- limiter. DETAILED DESCRIPTION
[0050] The present invention will be described in detail below in conjunction with the accompanying drawings.
[0051] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0052] Example 1
[0053] See also Figure 1 An embodiment of the present invention provides a buoyancy simulation device 1, which is used to simulate the buoyancy of an object to be studied in a liquid, and includes a hanging part 11 and a top fixing part 12.
[0054] The first end of the sling 11 is connected to the top fixing member 12, and the second end of the sling 11 is used to connect to the object to be studied. The sling 11 is used to suspend the object to be studied, thereby providing a pulling force opposite to gravity to the object to be studied. The sling 11 is constructed to allow the object to be studied to generate displacement or displacement components in a direction perpendicular to gravity, that is, on the one hand, the sling 11 suspends the object to be studied, thereby simulating buoyancy; on the other hand, under the action of external load, the sling 11 will not generate resistance in the horizontal direction of the object to be studied, or the horizontal resistance generated by the sling 11 is not enough to prevent the object to be studied from generating displacement or displacement components in the horizontal direction. Thereby, the object to be studied can generate displacement or deformation under the action of external load, thereby more accurately simulating the underwater environment.
[0055] Specifically, the top fixing member 12 includes a top beam 121 and a connecting member 223, and the connecting member 223 is arranged on the top beam 121. In this embodiment, the connecting member 223 is configured as a connecting ring 122 structure. The hanging member 11 includes at least two hanging ropes. One hanging rope is connected to one connecting ring 122. The hanging rope is made of a flexible material, for example, the hanging rope can be configured as: a soft braided rope, a fishing line, etc. A strain gauge for monitoring the tension of the hanging rope is provided on the hanging rope.
[0056] The working principle and beneficial effects of the buoyancy simulation device 1 provided in this embodiment are:
[0057] The buoyancy simulation device 1 provided by the present invention is used in a waterless environment, and provides a vertical upward pulling force through a suspension rope to simulate the buoyancy of the object to be studied in water or other fluids. When there is no other external load, the total pulling force on the suspension rope in the above structure is equal to the gravity of the weight 124, that is, the above structure can be used to simulate the situation where the object to be studied floats on the surface of the liquid (buoyancy equals gravity) or is suspended in a fluid of equal density (buoyancy equals gravity). At this time, the object to be studied is not surrounded by water, so its response under the action of external force can truly reflect the characteristics of the structure itself, thereby helping to deepen the understanding of the characteristics of the structure itself.
[0058] Example 2
[0059] See also Figure 2 An embodiment of the present invention provides a buoyancy simulation device 1. The buoyancy simulation device 1 in this embodiment includes a hanging component 11, a top fixing component 12 and an anchoring assembly 2.
[0060] The first end of the sling 11 is connected to the top fixing member 12, and the second end of the sling 11 is used to connect to the object to be studied. The sling 11 is used to suspend the object to be studied, thereby providing a pulling force opposite to gravity to the object to be studied. The sling 11 is constructed to allow the object to be studied to generate displacement or displacement components in a direction perpendicular to gravity, that is, on the one hand, the sling 11 suspends the object to be studied, thereby simulating buoyancy; on the other hand, under the action of external load, the sling 11 will not generate resistance in the horizontal direction of the object to be studied, or the horizontal resistance generated by the sling 11 is not enough to prevent the object to be studied from generating displacement or displacement components in the horizontal direction. Thereby, the object to be studied can generate displacement or deformation under the action of external load, thereby more accurately simulating the underwater environment.
[0061] Specifically, the top fixing member 12 includes a top beam 121 and a connecting member 223, and the connecting member 223 is arranged on the top beam 121. In this embodiment, the connecting member 223 is configured as a connecting ring 122 structure. The hanging member 11 includes at least two hanging ropes. One hanging rope is connected to one connecting ring 122. The hanging rope is made of a flexible material, for example, the hanging rope can be configured as: a soft braided rope, a fishing line, etc. The hanging rope is provided with a strain gauge or a tensile gauge for monitoring the tension of the hanging rope.
[0062] One end of the anchor assembly 2 is connected to the object to be studied, and the other end of the anchor assembly 2 is connected to the ground. In this embodiment, the anchor assembly 2 includes at least two cables, which are used to provide additional tension to the object to be studied, thereby adjusting the force on the suspension rope and adjusting the size of the buoyancy to be simulated.
[0063] The working principle and beneficial effects of the buoyancy simulation device 1 provided in this embodiment are:
[0064] The buoyancy simulation device 1 provided by the present invention is used in a waterless environment, and provides a vertical upward pulling force through a suspension rope to simulate the buoyancy of the object to be studied in water or other fluids. The pulling force on the suspension rope can be adjusted by adjusting the force of the cable on the object to be studied, that is, the above structure can be used to simulate the situation where the buoyancy and gravity of the object to be studied are not equal. At this time, the object to be studied is not surrounded by water, so its response under the action of external force can truly reflect the characteristics of the structure itself, thereby helping to deepen the understanding of the characteristics of the structure itself.
[0065] Example 3
[0066] See also Figure 3 This embodiment provides a buoyancy simulation device 1, which is used to simulate the buoyancy of the object to be studied in the liquid, and includes a hanging part 11 and a top fixing part 12.
[0067] The first end of the sling 11 is connected to the top fixing member 12, and the second end of the sling 11 is used to connect to the object to be studied. The sling 11 is used to suspend the object to be studied, thereby providing a pulling force opposite to gravity to the object to be studied. The sling 11 is constructed to allow the object to be studied to generate displacement or displacement components in a direction perpendicular to gravity, that is, on the one hand, the sling 11 suspends the object to be studied, thereby simulating buoyancy; on the other hand, under the action of external load, the sling 11 will not generate resistance in the horizontal direction of the object to be studied, or the resistance generated by the sling 11 is not enough to prevent the object to be studied from generating displacement or displacement components in the horizontal direction. Thereby, the object to be studied can generate displacement or deformation under the action of external load, thereby more accurately simulating the underwater environment.
[0068] See also Figure 4 and Figure 5 Specifically, the top fixing member 12 includes a top beam 121 and a connecting member 223, and the connecting member 223 is arranged on the top beam 121. In this embodiment, the connecting member 223 includes a fixed pulley 123 and a weight 124, and the lifting member 11 includes a plurality of lifting ropes. One lifting rope corresponds to one fixed pulley 123. The first end of the lifting rope is connected to the weight 124. Furthermore, one weight 124 can be connected to one lifting rope, and multiple lifting ropes can also be connected to the same weight 124. The lifting rope is provided with a strain gauge or a dynamometer for monitoring the tension of the lifting rope.
[0069] See also Figure 6 In other embodiments, the connecting member 223 may also be configured as follows: the connecting member 223 includes a fixed pulley 123 and a movable pulley 125. The suspension rope is sequentially wound around the fixed pulley 123 and the movable pulley 125, and the first end of the suspension rope is connected to the weight 124, thereby reducing the weight of the weight 124 to be used, facilitating adjustment, and also helping to save costs.
[0070] The working principle and beneficial effects of the buoyancy simulation device 1 provided in this embodiment are:
[0071] By setting up a pulley structure, the tension on the suspension rope can be kept constant, which can better simulate the buoyancy effect.
[0072] Example 4
[0073] See also Figure 7 This embodiment provides a buoyancy simulation device 1, which is used to simulate the buoyancy of the object to be studied in the liquid, and includes a hanging part 11 and a top fixing part 12.
[0074] The first end of the sling 11 is connected to the top fixing member 12, and the second end of the sling 11 is used to connect to the object to be studied. The sling 11 is used to suspend the object to be studied, thereby providing a pulling force opposite to gravity to the object to be studied. The sling 11 is constructed to allow the object to be studied to generate displacement or displacement components in a direction perpendicular to gravity, that is, on the one hand, the sling 11 suspends the object to be studied, thereby simulating buoyancy; on the other hand, under the action of external load, the sling 11 will not generate resistance in the horizontal direction of the object to be studied, or the resistance generated by the sling 11 is not enough to prevent the object to be studied from generating displacement or displacement components in the horizontal direction. Thereby, the object to be studied can generate displacement or deformation under the action of external load, thereby more accurately simulating the underwater environment.
[0075] Specifically, the top fixing member 12 includes a top beam 121 and a connecting member 223, and the connecting member 223 is disposed on the top beam 121. In this embodiment, the hanging member 11 includes a hanging rod, and a first end of the hanging rod is hinged to the connecting member 223, so that the hanging rod can rotate relative to the top beam 121 around the length direction of the top beam. Specifically, the hanging rod and the connecting member 223 can be connected by a ball joint.
[0076] The hanging member 11 provided in this embodiment adopts a hanging rod structure, which can also simulate buoyancy. The principle is that since the upper end of the hanging rod is connected to the connecting member 223 in a hinged manner, when the external force acts on the object to be studied in the horizontal direction and the object to be studied does not produce severe deformation, the rigidity of the hanging rod itself will not actually have a significant effect on the deformation of the object to be studied. Therefore, it can also be considered that the tension of the hanging rod on the object to be studied can simulate the vertical upward buoyancy. The hanging rod is provided with a strain gauge or a tensile gauge for monitoring the tension of the hanging rod.
[0077] Example 5
[0078] See also Figure 2 , Figure 8-Figure 18 This embodiment provides a suspended tunnel structure research device, which is based on the buoyancy simulation device 1 in Example 1, Example 3 or Example 4, and on this basis, also includes an anchoring assembly 2 and an end restraint device 3, and the object to be studied is a suspended tunnel model 4.
[0079] The suspended tunnel model 4 refers to a model that can obtain the radial, axial and circumferential stress and deformation of the suspended tunnel through experiments. Compared with the two-dimensional model used in the existing two-dimensional water tank test, the suspended tunnel model 4 in this embodiment is longer, so that the test personnel can observe its deflection under the action of external force.
[0080] The anchor assembly 2 includes a plurality of groups of cables 21. Each group of cables 21 includes at least two cables 21. One end of the cable 21 is used to be connected to the suspended tunnel model 4, and the other end is used to be connected to the ground. The cable 21 includes a cable 211, a tensioning device 212, a spring 213 and a tension measuring device 214, and the tensioning device 212, the spring 213 and the tension measuring device 214 are connected through the cable 211.
[0081] The cables 21 in each group may be arranged as follows Figure 8 , Fig. 9 , Fig.10 , Fig.11 and Fig.12 In the connection mode of the suspension tunnel model 4, each group of cables 21 is evenly distributed along the length direction of the suspension tunnel model 4.
[0082] Furthermore, the anchoring assembly 2 also includes a guide assembly 22, which includes a guide rail 221, a slider 222, a connector 223 and an anchoring pulley 23. The guide rail 221 is connected to the ground, and the cross section of the guide rail 221 is a T-shaped structure. The slider 222 is lockably slidably connected to the guide rail 221. Specifically, the slider 222 is provided with a hole, the guide rail 221 is provided with a plurality of holes, and the connector 223 is configured as a screw, one end of the screw is connected to the hole on the slider 222, and the other end of the screw is connected to another hole on the guide rail 221. The anchoring pulley 23 is provided on the slider 222. The end of the cable 21 is sleeved on the anchoring pulley 23. Through the above scheme, the anchoring form of the anchor cable can be changed by moving the slider 222.
[0083] The end restraining device 3 includes an articulated device 31, a fixing device 32 and a support 33. The articulated device 31 is used to be connected to the suspended tunnel model 4. The fixing device 32 includes a clamping piece and a limiting piece 323. An openable clamping space is formed on the clamping piece. The clamping space is used to adapt to the suspended tunnel model 4. The limiting piece 323 is used to be detachably connected to the suspended tunnel model 4. When the limiting piece 323 is connected to the suspended tunnel model 4, it is used to prevent the suspended tunnel model 4 from rotating in the clamping space and moving axially.
[0084] The articulated device 31 includes an angular contact ball bearing 311 and an anti-twist component. The angular contact ball bearing 311 is sleeved on the suspended tunnel model 4. The angular contact ball bearing 311 can be used to prevent the suspended tunnel model 4 from moving in the X and Y axis directions. Since the angular contact ball bearing 311 has a contact angle, it can allow the suspended tunnel model 4 to rotate around the X axis and around the Y axis. The amplitude of the rotation of the suspended tunnel model 4 around the X axis and the Y axis is limited by the contact angle of the angular contact ball bearing 311. In practice, the contact angle of the angular contact ball bearing 311 is often more than 10°. Since the suspended tunnel model 4 is a slender component, the rotation amplitude that can be achieved in the experiment is relatively small, usually within 10°. Therefore, it can be considered that under the constraint of the articulated device 31, the suspended tunnel model 4 can rotate freely around the X axis and around the Y axis.
[0085] The anti-twist component is used to prevent the suspension tunnel model 4 from rotating relative to the outer ring of the angular contact ball bearing 311, that is, to prevent the suspension tunnel model 4 from rotating around the Z axis, and also to prevent the suspension tunnel model 4 from moving in the Z axis direction. The inner ring of the angular contact ball bearing 311 is adapted to the size of the suspension tunnel model 4. Specifically, the inner ring of the angular contact ball bearing 311 and the suspension tunnel model 4 adopt a transition fit, which facilitates the installation between the suspension tunnel model 4 and the angular contact ball bearing 311.
[0086] The anti-twist assembly includes an anti-twist ring 313 and an anti-twist rod 312. The anti-twist ring 313 is sleeved on the suspended tunnel model 4. The outer ring of the angular contact ball bearing 311 is fixedly connected to the anti-twist ring 313. Specifically, in the present invention, the outer ring of the angular contact ball bearing 311 and the anti-twist ring 313 are integrally formed. The diameter of the inner circle of the anti-twist ring 313 is larger than the diameter of the suspended tunnel model 4, so that when the anti-twist ring 313 is connected to the suspended tunnel model 4, there is a gap between the inner surface of the anti-twist ring 313 and the suspended tunnel model 4. A connecting hole is provided on the anti-twist ring 313, one end of the connecting hole penetrates to the inner surface of the anti-twist ring 313, and the other end of the connecting hole penetrates to the outer surface of the anti-twist ring 313. The anti-twist rod 312 is a rod-shaped structure, and the anti-twist rod 312 passes through the connecting hole and abuts against the surface of the suspended tunnel model 4. Specifically, a hemispherical groove is set on the surface of the suspended tunnel model 4, and the end of the anti-torsion rod 312 is set as a hemispherical head structure. In this way, the hemispherical head structure at the end of the anti-torsion rod 312 cooperates with the hemispherical groove. When the suspended tunnel model 4 moves under the hinge constraint, the ball head structure at the end of the anti-torsion rod 312 rotates in the hemispherical groove, thereby reducing the influence of the setting of the anti-torsion rod 312 on the movement of the suspended tunnel.
[0087] Through the articulated device 31 , the translation of the suspended tunnel model 4 in the X, Y, and Z axis directions is constrained, and the rotational freedom around the Z axis is also constrained, so the suspended tunnel model 4 is allowed to rotate around the X and Y axes.
[0088] The fixing device 32 is arranged at intervals from the hinge device 31, and the fixing device 32 includes a clamping member and a limiting member 323. An openable clamping space is formed on the clamping member, and the clamping space is used for the suspension tunnel model 4 to adapt, and the limiting member 323 is detachably connected to the suspension tunnel model 4. The clamping member is used to constrain the translation of the suspension tunnel model 4 in the X direction and the Y direction, and the rotation around the X axis and the Y axis. The limiting member 323 is used to constrain the translation of the suspension tunnel model 4 in the Z direction and the rotation around the Z axis.
[0089] The clamping member includes a first clamping block 321 and a second clamping block 322, and the first clamping block 321 and the second clamping block 322 are detachably connected. In this embodiment, one end of the first clamping block 321 is detachably connected to one end of the second clamping block 322 by a bolt, and the other end of the first clamping block 321 is detachably connected to the other end of the second clamping block 322 by a bolt. The second clamping block 322 is disposed on the support 33 and fixedly connected to the support 33, and the first clamping block 321 is used to be placed above the second clamping block 322.
[0090] The inner wall of the engaging space is provided with a key slot. Specifically, due to the large volume of the suspended tunnel model 4, in order to facilitate installation, the key is set at the upper end of the suspended tunnel model 4, that is, the key slot is set on the second clamping block 322. One section of the key slot passes through the surface of the second clamping block 322, and specifically, one end of the key slot passes through the surface of the second clamping block 322 near the end of the suspended tunnel.
[0091] The limiting member 323 is a key. A key slot is also provided on the suspended tunnel model 4, so that the purpose of restricting the translation of the suspended tunnel model 4 in the Z direction and the rotation around the Z axis can be achieved through the cooperation of the key with the suspended tunnel model 4 and the first clamping block 321.
[0092] When in use, an end restraint device 3 is provided at one end of the suspended tunnel model 4, and the fixing device 32 is located near the end, and the hinge device 31 is located relatively close to the middle. The other end of the suspended tunnel model 4 is fixedly connected to the ground or wall, and the suspended tunnel model 4 is connected to the fixing device 32 and the hinge device 31;
[0093] When it is necessary to provide hinge constraints, the bolts on the fixing device 32 are removed to separate the first clamping block 321 from the second clamping block 322, open the clamping space, and release the constraint of the fixing device 32 on the floating tunnel model 4; when it is necessary to provide fixed constraints, the limiter 323 is located in the key slot, and the first clamping block 321 and the second clamping block 322 are connected;
[0094] In addition, in this embodiment, one end of the key slot is passed through to the surface of the first block 321 near the end of the suspension tunnel model 4, which can facilitate installation. During the experiment, the middle part of the suspension tunnel model 4 is deformed, and the limiter 323 is subjected to a force directed to the middle part of the suspension tunnel model 4. At this time, the end face of the key slot on the first block 321 can play the role of constraint required by the experiment.
[0095] This embodiment also provides a method for studying a suspended tunnel structure, which is based on the above-mentioned suspended tunnel structure research device and includes the following steps:
[0096] Step 1: installing an end restraint device 3 at the end of the suspended tunnel model 4;
[0097] Specifically, the end restraining device 3 is installed at one end of the suspended tunnel model 4, and the other end is fixedly connected to the ground or the wall.
[0098] Step 2: Connect one end of the hanging piece 11 on the suspended tunnel structure research device to the top fixing piece 12, and connect the other end of the hanging piece 11 to the suspended tunnel model 4;
[0099] Step 3: Connect one end of the anchoring assembly 2 to the suspended tunnel model 4, and connect the other end of the anchoring assembly 2 to the ground;
[0100] Step 4: Adjust the tension on the anchor assembly 2 and the tension on the hanging member 11;
[0101] Specifically, the tension on the anchor cables of the anchor assembly 2 is adjusted one by one, so that the tension of each suspension rope or suspension rod on the suspension component 11 can be kept basically consistent.
[0102] Step 5: Apply a load to the suspended tunnel model 4 and observe the response of the suspended tunnel model 4 under the load.
[0103] During the load application process, if the constraint state of the end is to be switched, for example, if the end hinge constraint is required, the fixing device 32 is removed and the load is applied. If the end fixed constraint is required, the fixing device 32 is installed and the load is applied.
[0104] In other embodiments of the present invention, if it is necessary to study the response of the suspended tunnel model 4 when both ends are free, there is no need to perform step 1, and the experiment can be performed directly from step 2.
[0105] The beneficial effects of the research device and research method of the suspended tunnel structure provided by the present invention are:
[0106] By providing an upward pulling force to simulate buoyancy, the buoyancy of the suspended tunnel model 4 can be simulated in the air, which helps to eliminate the influence of the water body on the force response of the suspended tunnel model 4 and provide a clearer understanding of the structural characteristics of the suspended tunnel model 4 itself;
[0107] By providing the end restraint device 3, various restraint states can be simulated.
[0108] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A buoyancy simulation device, characterized in that: Used to simulate the buoyancy of an object to be studied in a liquid, wherein the object to be studied is located in the air, and the buoyancy simulation device comprises a hanging piece and a top fixing piece, wherein a first end of the hanging piece is connected to the top fixing piece, and a second end of the hanging piece is used to be connected to the object to be studied; The sling is used to provide a pulling force opposite to gravity to the object to be studied, and the pulling force simulates buoyancy. The sling is constructed to allow the object to be studied to generate displacement or displacement component in a direction perpendicular to gravity.
2. The buoyancy simulation device according to claim 1, characterized in that: The top fixing member includes a top beam and a connecting member, wherein the connecting member is arranged on the top beam, and the first end of the hanging member is connected to the connecting member.
3. The buoyancy simulation device according to claim 2, characterized in that: The hanging member comprises at least two hanging ropes, and the top beam is provided with at least two connecting members for connecting with the hanging ropes, and the connecting members are evenly distributed on the top beam.
4. The buoyancy simulation device according to claim 3, characterized in that: The hanging piece is made of flexible material.
5. The buoyancy simulation device according to claim 4, characterized in that: The connecting member comprises a fixed pulley and a weight, the first end of the suspension rope is connected to the weight, and the weight is used to be placed on both sides of the fixed pulley together with the object to be studied.
6. The buoyancy simulation device according to claim 5, characterized in that: The top beam is a long strip structure, the number of the fixed pulleys is at least two, and the at least two fixed pulleys are evenly distributed along the length direction of the top beam; At least two of the suspension ropes are connected to the same weight.
7. The buoyancy simulation device according to claim 5, characterized in that: The connecting member also includes a movable pulley, the fixed pulley and the movable pulley form a pulley block structure, the lifting rope cooperates with the pulley block, and one end of the lifting rope is connected to the weight.
8. The buoyancy simulation device according to claim 2, characterized in that: The hanging member comprises a hanging rod, and a first end of the hanging rod is hinged to a connecting member.
9. The buoyancy simulation device according to any one of claims 1 to 8, characterized in that: It also includes an anchoring component, one end of which is connected to the ground, and the other end of which is used to be connected to the object to be studied.
10. A suspended tunnel structure research device, characterized in that: It comprises a suspended tunnel model and the buoyancy simulation device according to claim 9, wherein the suspended tunnel model serves as the object to be studied; One end of the anchor assembly in the buoyancy simulation device is connected to the ground, and the other end of the anchor assembly is connected to the floating tunnel model; The hanging parts of the buoyancy simulation device are connected to the floating tunnel model.
11. The floating tunnel structure research device according to claim 10, characterized in that: It also includes an end restraint device, which includes a hinge device and / or a fixing device.
12. The floating tunnel structure research device according to claim 11, characterized in that: The end restraining device includes an articulated device and a fixed device, wherein the articulated device is used to be connected to the suspended tunnel model, and the fixed device includes a clamping member and a limiting member, an openable clamping space is formed on the clamping member, and the clamping space is used to be adapted to the suspended tunnel model, and the limiting member is used to be detachably connected to the suspended tunnel model, and the limiting member, when connected to the suspended tunnel model, is used to prevent the suspended tunnel model from rotating in the clamping space and moving axially.
13. The floating tunnel structure research device according to claim 12, characterized in that: The fixing device comprises a first clamping block and a second clamping block, wherein the first clamping block and the second clamping block are detachably connected to each other, and the first clamping block and the second clamping block are used to be spliced to form the clamping space.
14. The floating tunnel structure research device according to claim 12 or 13, characterized in that: The limiting member is configured as a key, and an inner wall of the engaging space is provided with a key slot adapted to the limiting member.
15. The floating tunnel structure research device according to claim 12, characterized in that: The hinge device includes an angular contact ball bearing and an anti-twist assembly; The inner ring of the angular contact ball bearing is used to adapt to the floating tunnel model, the anti-torsion component is fixedly connected to the outer ring of the angular contact ball bearing, and the anti-torsion component is used to prevent the matching section of the floating tunnel model and the angular contact ball bearing from rotating relative to the outer ring of the angular contact ball bearing.
16. The floating tunnel structure research device according to claim 15, characterized in that: The anti-twist assembly includes an anti-twist ring and an anti-twist rod, the anti-twist ring is provided with a connecting hole for the anti-twist rod to pass through, one end of the connecting hole penetrates the inner surface of the anti-twist ring, and the other end of the connecting hole penetrates the outer surface of the anti-twist ring; The anti-twist ring is fixedly connected to the outer ring of the angular contact ball bearing. The anti-twist ring is used to be sleeved on the suspended tunnel model. The inner diameter of the anti-twist ring is larger than the inner diameter of the angular contact ball bearing.
17. The floating tunnel structure research device according to claim 16, characterized in that: One end of the anti-twist rod used for being adapted and connected to the floating tunnel model is constructed as a hemispherical head structure.
18. The floating tunnel structure research device according to claim 10, characterized in that: The anchoring assembly includes at least two cables, one end of the cable is used to connect to the suspended tunnel model, and the other end of the cable is used to connect to the ground; The cable comprises a cable, a tensioning device, a spring and a tension measuring device, and the tensioning device, the spring and the tension measuring device are connected through the cable.
19. A method for studying a suspended tunnel structure, characterized in that: The suspended tunnel structure research device according to any one of claims 10 to 18 comprises the following steps: Connect one end of the hanging piece on the suspended tunnel structure research device to the top fixing piece, and connect the other end of the hanging piece to the suspended tunnel model; Connect one end of the anchor assembly to the suspended tunnel model, and connect the other end of the anchor assembly to the ground; Adjust the tension on the anchor assembly and adjust the linear deflection of the suspended tunnel body to within the preset range; Apply load to the suspended tunnel model and observe the response of the suspended tunnel model under the load.
20. The research method according to claim 19, characterized in that: The suspended tunnel structure research device also includes an end restraint device, and the end restraint device includes a hinge device and / or a fixing device; Before adjusting the tension on the anchor assembly and the tension on the hanging member, the research method further includes the following steps: An end restraint device is installed at the end of the suspended tunnel model.
21. The research method according to claim 19, characterized in that: The preset range is: the deflection of the suspended tunnel tube body is within one five hundredth of the length of the suspended tunnel tube body.
Citation Information
Patent Citations
Buoyancy experiment device for physics teaching
CN107833509A
Buoyancy simulation device and suspended tunnel structure research device
CN210722056U