A prestressed concrete-steel composite beam and preparation method thereof
By adding pressurized steel plates and prefabricated steel mesh to the steel-concrete composite beam, combining the adhesive layer and pre-tallized prefabricated concrete structure, the instability problem and insufficient prestress of the combined beam at the negative bending distance are solved, and the problem of insufficient prestressing of the combined beam is achieved. The structural stiffness and bending bearing capacity are improved, vibration and noise pollution are reduced, and construction progress is accelerated.
Patent Information
- Application Number
- CN201911156714.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-22
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2039-11-22
AI Technical Summary
Existing steel-concrete composite beams are prone to partial or overall instability under the action of negative bending distance, and the prestressed rib setting is not enough to meet the overall structural bearing capacity requirements of large-span bridges, and vibration and noise pollution problems in urban rail transit serious.
Prestressed concrete-steel composite beam structure is adopted, including concrete bridge deck, T-shaped steel beam, prestressed concrete base plate and pressed steel plate. It is connected by bolts and bonding layers to increase pressed steel plate and concrete bridge on the lower edge of the steel beam. The thickness of the panel and the prefabricated steel mesh are combined with the pre-tensioning prefabricated concrete structure to improve structural stiffness and bending bearing capacity, and use viscoelastic damping materials to reduce vibration and noise.
It improves the bending bearing capacity and overall stiffness of the structure, reduces vibration and noise pollution, is suitable for large-span bridges, accelerates construction progress, and reduces the use of steel.
Smart Images

Figure CN110886191B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge structures, and in particular to a prestressed concrete-steel composite beam and a preparation method thereof. Background Art
[0002] Steel-concrete composite beams can give full play to the tensile properties of steel and the compressive properties of concrete, but the common steel-concrete composite beam structure of railway bridges consists of a concrete bridge deck, an I-beam and shear keys. The concrete bridge deck is connected to the upper flange of the I-beam through mechanical shear keys such as bolts or perforated steel plates. However, due to the low stiffness of the lower steel beam of the composite beam, it is easy to cause local or overall instability under the action of negative bending moment, and the I-beam cannot be directly poured with concrete in the box like a box beam, making construction inconvenient. On the other hand, the prestressed tendons set in the bridge deck can only prevent the bridge deck from cracking, and have little effect on the improvement of the overall bearing capacity of the structure. It cannot meet the requirements of large-span bridges, and it is not easy to arrange the external prestressed tendons in the I-beam. In addition, rail transit planning and design is often restricted by factors such as geographical environment, station location, and minimum curve radius. Rail transit lines, especially urban rail transit lines, are often close to buildings, sometimes with a distance of only a few meters or even passing through buildings. When rail transit passes through a city, elevated structures are often used to save land resources and cross urban roads. As train speeds continue to increase, passenger capacity gradually increases, further exacerbating rail transit vibration and noise pollution. Summary of the invention
[0003] In view of the problems existing in the prior art, the present invention provides a prestressed concrete-steel composite beam and a preparation method thereof, which can improve structural rigidity and bearing capacity and reduce structural vibration and noise pollution.
[0004] The technical solution adopted by the present invention is: a prestressed concrete-steel composite beam, comprising a concrete bridge deck, a steel beam and a prestressed concrete bottom plate; the steel beam is a T-shaped steel, and a plurality of bolts are arranged on the upper surface of the steel beam; a trapezoidal platform structure notch corresponding to the bolts is arranged on the concrete bridge deck; the lower edge of the steel beam is connected to a corrugated steel plate; the corrugated steel plate is connected to the prestressed concrete bottom plate through a first bonding layer; a second bonding layer is arranged on the upper surface of the steel beam except for the bolt positions; and cast-in-place concrete is filled in the notch.
[0005] Furthermore, the corrugated steel plate has a corrugated structure, and the surface of the prestressed concrete bottom plate cooperates with it.
[0006] Furthermore, a first steel mesh is embedded in the concrete bridge deck; a second steel mesh is embedded in the prestressed concrete bottom plate; and prestressed tendons are arranged in the second steel mesh.
[0007] Furthermore, the bolts are welded to the upper surface of the steel beam by arc stud welding; the length of the bolts is not less than four times the diameter of the rod, the spacing between the two bolts along the axis of the beam is not less than five times the diameter of the rod, and not less than 100 mm; the spacing between the two bolts perpendicular to the axis of the beam is not less than four times the diameter of the rod.
[0008] Furthermore, the thickness of the concrete bridge deck is ≥180mm, the thickness extending from the center line of the steel beam is ≥150mm, and the thickness extending from the upper flange of the steel beam is ≥50mm.
[0009] Furthermore, an anti-corrosion layer is provided on the outer surface of the steel beam.
[0010] Furthermore, the flange thickness of the steel beam is ≥16mm, and the web thickness is ≥12mm; the flange width of the steel beam is ≥250mm, and is not greater than 24 times its thickness.
[0011] Furthermore, the first adhesive layer and the second adhesive layer are epoxy resin structural adhesives, and both have a thickness of 3 to 5 mm and a roughness of 0.7 to 1.0 mm.
[0012] A method for preparing a prestressed concrete-steel composite beam comprises the following steps:
[0013] Step 1: Make a prestressed concrete base plate by pre-tensioning method; the upper surface formwork structure is matched with the corrugated steel plate structure;
[0014] Step 2: Weld the studs and corrugated steel plates to the upper and lower edges of the steel beam respectively;
[0015] Step 3: Apply a first bonding layer on the upper surface of the prestressed concrete base plate, and place the steel beam with the corrugated steel plate welded on the lower edge on the first bonding layer;
[0016] Step 4: Prefabricate the concrete bridge deck, and reserve notches on the concrete bridge deck;
[0017] Step 5: Apply the second bonding layer on the upper surface of the steel beam, hoist the concrete bridge deck and pour concrete in the reserved grooves.
[0018] The beneficial effects of the present invention are:
[0019] (1) The present invention adds a corrugated steel plate to the lower edge of the steel beam, thereby improving the bending bearing capacity of the structure and increasing the overall stiffness of the composite beam. It fully utilizes the advantages of steel beams, concrete and prestressed tendons, and solves the problems of large deformation and deflection of the beam body and easy lateral torsional instability.
[0020] (2) The bonding layer between the steel structure and the concrete structure in the present invention solves the connection problem of the two structures. Moreover, the bonding layer adopts viscoelastic damping material, which has the effect of reducing vibration and noise to a certain extent, which is conducive to the smooth running of the train.
[0021] (3) The welded steel mesh is used in both the concrete bridge deck and the prestressed concrete bottom plate of the present invention, which can improve the shear strength of the structure and reduce the cracking of the concrete structure;
[0022] (4) The present invention adopts the pre-tensioning method to crack the end of the prestressed concrete structure, which can reduce the use of steel. The concrete bridge deck and the prestressed concrete bottom plate are both prefabricated and assembled, which speeds up the construction progress. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the elevation structure of the present invention.
[0024] Figure 2 It is a schematic diagram of the side structure of the present invention.
[0025] In the figure: 1-concrete bridge deck, 2-bolts, 3-steel beam, 401-first bonding layer, 402-second bonding layer, 5-prestressed concrete bottom plate, 6-prestressed tendons, 7-corrugated steel plate, 8-notch, 9-first steel mesh, 10-second steel mesh. DETAILED DESCRIPTION
[0026] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0027] like Figure 1 and Figure 2 As shown, a prestressed concrete-steel composite beam comprises a concrete bridge deck 1, a steel beam 3 and a prestressed concrete bottom plate 5; the steel beam 3 is a T-shaped steel, and a plurality of studs 2 are arranged on the upper surface of the steel beam 3; a trapezoidal step structure notch 8 corresponding to the studs 2 is arranged on the concrete bridge deck 1; the lower edge of the steel beam 3 is connected to a corrugated steel plate 7; the corrugated steel plate 7 is connected to the prestressed concrete bottom plate 5 through a first adhesive layer 401; a second adhesive layer 402 is arranged on the upper surface of the steel beam 3 except for the position of the studs 2; and the notch 8 is filled with cast-in-place concrete.
[0028] The corrugated steel plate 7 has a wavy structure, and the surface of the prestressed concrete bottom plate 5 cooperates with it. A first steel mesh 9 is embedded in the concrete bridge deck 1; a second steel mesh 10 is embedded in the prestressed concrete bottom plate 5; and prestressed tendons 6 are arranged in the second steel mesh 10. The concrete bridge deck 1 and the prestressed concrete bottom plate 5 are prefabricated in the factory and assembled on site. The notches 8 for the studs 2 need to be reserved in the concrete bridge deck 1. The steel beam 3 adopts a T-shaped steel with the corrugated steel plate 7 welded at the lower edge. The prestressed concrete bottom plate 5 is prefabricated in the factory by the pre-tensioning method. In order to increase the bonding force, the upper surface of the prestressed concrete bottom plate 5 is cast into the wavy shape of the corrugated steel plate 7, and is bonded to the corrugated steel plate 7 at the lower edge of the steel beam by a binder. The upper flange of the steel beam 3 is provided with a hybrid shear key formed by the combination of the studs 2 and the second bonding layer 402. The concrete bridge deck 1 is hoisted on the steel beam 3, and concrete is poured in the reserved notch 8, and the steel beam 3 is used to connect the concrete bridge deck 1 into a whole.
[0029] If the concrete bridge deck 1 is too thin, the bridge deck stiffness will be low, which is not conducive to protecting the bridge deck pavement; the thickness of the concrete bridge deck 1 is ≥180mm, and no support is provided; it protrudes from the center line of the steel beam 3 by ≥150mm, and protrudes from the upper flange of the steel beam 3 by ≥50mm. The steel bar configuration in the concrete bridge deck 1 must comply with the current effective steel-concrete composite bridge design specification, and the current effective design specification is "GB50917-2013 Steel-Concrete Structure Bridge Design Specification".
[0030] The studs 2 are welded to the upper surface of the steel beam 3 by arc stud welding. In order to ensure that the studs 2 can fully exert their bearing capacity and avoid brittle failure, the length of the studs 2 should not be less than four times the diameter of the rod, the spacing between two studs 2 along the axis of the beam should not be less than five times the diameter of the rod, and not less than 100mm; the spacing between two studs 2 perpendicular to the axis of the beam should not be less than four times the diameter of the rod.
[0031] In order to improve durability, an anti-corrosion layer is provided on the outer surface of the steel beam 3. The present invention preferably uses a T-shaped steel with a corrugated steel plate 7 welded to the lower edge of the steel beam 3, and the material is Q235 or Q345. The flange thickness of the T-shaped steel is not less than 16mm, and the web thickness is ≥12mm; the flange width of the steel beam 3 is ≥250mm, and is not greater than 24 times its thickness.
[0032] The first adhesive layer 401 and the second adhesive layer 402 are epoxy resin structural adhesives, and both have a thickness of 3 to 5 mm and a roughness of 0.7 to 1.0 mm.
[0033] The second steel mesh 10 in the prestressed concrete base plate 5 uses steel strands or spiral ribbed steel wires, and appropriate measures are taken to ensure that the steel wires are reliably anchored in the concrete. The net spacing between prestressed steel strands is greater than or equal to 1.5 times their nominal diameter, and for 1×7 steel strands it should be greater than or equal to 25mm; the net spacing between prestressed steel wires is greater than or equal to 15mm. For a single prestressed steel bar, a spiral bar with a length of not less than 150mm should be set at its end; for multiple prestressed steel bars, 3 to 5 steel meshes should be set within the range of 10 times the prestressed steel bars at the end of the structure. In addition, closed stirrups with a diameter of not less than 12mm are used in the first steel mesh 9 and the second steel mesh 10, and the spacing is less than or equal to 200mm.
[0034] The original plate of the corrugated steel plate 7 should be cold-rolled, hot-rolled plate or steel strip. The unfolded length (base plate width) of the corrugated steel plate 7 should meet the requirements of the basic dimensions of 600mm, 1000mm or 1200mm series. The commonly used width dimension should be 1000mm. The base plate steel should be 250 grade (MPa) and 350 grade (MPa) structural grade steel according to the yield strength level. The nominal thickness of the base plate should not be less than 0.8mm.
[0035] A method for preparing a prestressed concrete-steel composite beam comprises the following steps:
[0036] Step 1: Make a prestressed concrete base plate 5 by pre-tensioning method: make and weld the second steel mesh 10, tension the prestressed tendons 6, and set the formwork; pour concrete, and after the concrete solidifies to a certain strength, cut the prestressed tendons 6; the upper surface formwork structure is matched with the corrugated steel plate 7 structure;
[0037] Step 2: Weld the studs 2 and the corrugated steel plate 7 to the upper and lower edges of the steel beam 3 respectively;
[0038] Step 3: Coat the first adhesive layer 401 on the upper surface of the prestressed concrete bottom plate 5, and place the steel beam 3 with the corrugated steel plate 7 welded on the lower edge on the first adhesive layer 401;
[0039] Step 4: prefabricate the concrete bridge deck 1, and reserve a notch 8 on the concrete bridge deck 1;
[0040] Step 5: Apply the second adhesive layer 402 on the upper surface of the steel beam 3, hoist the concrete bridge deck 1 and pour concrete at the reserved notch (8).
[0041] The present invention adds a corrugated steel plate 7 to the lower edge of the steel beam 3, which improves the bending bearing capacity of the structure and increases the overall rigidity of the composite beam, giving full play to the advantages of the steel beam, concrete and prestressed tendons; solves the problem of large deformation and deflection of the beam body and easy lateral torsion instability, and is suitable for railway bridges with high requirements for structural rigidity, so as to achieve the transformation to a large-span bridge. The bonding layer provided in the steel structure and the concrete structure not only solves the connection problem of the two structures, but also the adhesive adopts viscoelastic damping material, which has the effect of reducing vibration and noise to a certain extent. It is conducive to the smooth running of the train. In addition, the corrugated steel plate 7 at the lower edge of the steel beam and the wavy connection with the prestressed concrete bottom plate 5 increases the mechanical bonding force. The welded steel mesh is used in both the concrete bridge deck 1 and the concrete bottom plate 5, which can improve the shear strength of the structure, reduce the cracking of the concrete structure, especially the cracking of the end of the prestressed concrete structure by the pre-tensioning method, and can reduce about 25% of the steel, reducing the cost; the concrete bridge deck 1 and the prestressed concrete bottom plate 5 are both prefabricated and assembled, which speeds up the construction progress.
Claims
1. A prestressed concrete-steel composite beam, characterized in that: The invention comprises a concrete bridge deck (1), a steel beam (3) and a prestressed concrete bottom plate (5); the steel beam (3) is a T-shaped steel, and a plurality of bolts (2) are arranged on the upper surface of the steel beam (3); a trapezoidal step structure notch (8) corresponding to the bolts (2) is arranged on the concrete bridge deck (1); the lower edge of the steel beam (3) is connected to a corrugated steel plate (7); the corrugated steel plate (7) is connected to the prestressed concrete bottom plate (5) via a first adhesive layer (401); a second adhesive layer (402) is arranged on the upper surface of the steel beam (3) except for the position of the bolts (2); and the notch (8) is filled with cast-in-place concrete; The corrugated steel plate (7) has a corrugated structure, and the surface of the prestressed concrete bottom plate (5) cooperates with it; A first steel mesh (9) is embedded in the concrete bridge deck (1); a second steel mesh (10) is embedded in the prestressed concrete bottom plate (5); and prestressed tendons (6) are arranged in the second steel mesh (10).
2. A prestressed concrete-steel composite beam according to claim 1, characterized in that: The studs (2) are welded to the upper surface of the steel beam (3) by arc stud welding; the length of the studs (2) is not less than four times the diameter of the rod; the spacing between two studs (2) along the axis of the beam is not less than five times the diameter of the rod and not less than 100 mm; the spacing between two studs (2) perpendicular to the axis of the beam is not less than four times the diameter of the rod.
3. The prestressed concrete-steel composite beam according to claim 1, characterized in that: The thickness of the concrete bridge deck (1) is ≥180 mm, the length of the concrete bridge deck protruding from the center line of the steel beam (3) is ≥150 mm, and the length of the concrete bridge deck protruding from the upper flange of the steel beam (3) is ≥50 mm.
4. The prestressed concrete-steel composite beam according to claim 1, characterized in that: The outer surface of the steel beam (3) is provided with an anti-corrosion layer.
5. The prestressed concrete-steel composite beam according to claim 1, characterized in that: The flange thickness of the steel beam (3) is ≥16 mm, and the web thickness is ≥12 mm; the flange width of the steel beam (3) is ≥250 mm, and is not greater than 24 times its thickness.
6. The prestressed concrete-steel composite beam according to claim 1, characterized in that: The first adhesive layer The (401) and second adhesive layer (402) are epoxy resin structural adhesives, and both have a thickness of 3 to 5 mm and a roughness of 0.7 to 1.0 mm.
7. A method for preparing a prestressed concrete-steel composite beam according to any one of claims 1 to 6, characterized in that: The following steps are involved: Step 1: a prestressed concrete base plate (5) is manufactured by a pre-tensioning method; the upper surface formwork structure is matched with the corrugated steel plate (7); Step 2: Welding the bolts (2) and the corrugated steel plate (7) to the upper and lower edges of the steel beam (3) respectively; Step 3: coating a first adhesive layer (401) on the upper surface of the prestressed concrete base plate (5), and placing a steel beam (3) with a corrugated steel plate (7) welded to its lower edge on the first adhesive layer (401); Step 4: prefabricate a concrete bridge deck (1), and reserve a notch (8) on the concrete bridge deck (1); Step 5: Apply a second adhesive layer (402) on the upper surface of the steel beam (3), hoist the concrete bridge deck (1) and pour concrete at the reserved notch (8).
