Extension formwork for bridge piers and construction method

Through the combined structure of fixed formwork and pier column formwork, the problems of waste of materials and long construction cycles in bridge pier column construction are solved, and the construction cost and construction period are controlled, ensuring the construction safety of bridge reconstruction projects in river channels and deep trenches and quality.

CN110886234BActive Publication Date: 2024-11-19ROAD & BRIDGE INT CO LTD +1
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN201911308141.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-17
Publication Date
2024-11-19
Estimated Expiration
2039-12-17

AI Technical Summary

Technical Problem

The existing bridge pier column construction method requires the use of completed bearings as the foundation for formwork assembly, resulting in waste of materials and long construction cycles. Most of the rebuilt bridges are located in rivers and deep ditches. The construction of conventional pier column forms from bottom to top cannot meet the construction requirements. Impact safety and efficiency.

Method used

Using a combined structure of fixed formwork and pier templates, the pier templates are carried and overlapped by fixed formwork, and the template is only equipped with templates at the joints. Rubber pads and fasteners are used to ensure stability and safety, changing the traditional template overlap Way.

Benefits of technology

The construction cost and construction period are controlled, the construction time is shortened, material waste is avoided, and construction safety and quality are ensured in bridge reconstruction projects in rivers and deep trenches.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110886234B_ABST
    Figure CN110886234B_ABST
Patent Text Reader

Abstract

The present invention application discloses a template and construction method for extending bridge piers, including a fixed template, which is arranged around the upper end of the old pier of the bridge body; a pier template, which is arranged on the fixed template; the fixed template at least bears the weight of the fixed template and the pier template, and is detachably arranged on the upper end of the old pier of the bridge body, connected to the pier template, and serves as a base for the construction of the pier template. The present invention application solves the technical problem that the conventional pier construction needs to use the completed abutment as the assembling foundation of the pier template, and the pier extension project can only be constructed after the template is extended, and the rebuilt bridges are mostly located in rivers and deep ditches, and the conventional pier template construction from bottom to top cannot meet the construction requirements at all.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of communications, and in particular, to an extension formwork and a construction method for bridge piers. Background Art

[0002] With the development of the domestic transportation industry, the existing roads cannot meet the existing traffic volume, and the number of highway bridge reconstruction and expansion projects has gradually increased. In this project, the existing bridge superstructure and cap beam are demolished, and the original piers are reused and extended at the same time. Since the bridge basically crosses the river or deep ditch, conventional construction methods cannot meet the requirements of bridge extension construction. It is worth exploring how to use reasonable construction technology to ensure construction safety and quality while extending the original bridge piers.

[0003] At present, conventional pier construction requires the use of completed caps as the basis for assembling pier formwork. The formwork is placed on the cap for assembly, and concrete is poured after the formwork is installed. There is no cap or foundation available in the reconstruction and expansion of the bridge. At the same time, the pier extension project can only be constructed after the formwork is extended, which wastes materials and takes a long construction period, and does not improve the overall production efficiency of the project. Moreover, most of the rebuilt bridges are located in rivers and deep ditches, and the conventional pier formwork cannot meet the construction requirements from bottom to top, and safe production cannot be guaranteed. Summary of the invention

[0004] The main purpose of the present invention application is to provide an extension formwork and construction method for bridge piers, so as to solve the technical problems caused by the fact that conventional pier construction requires the use of a completed abutment as the basis for assembling the pier formwork, and the pier extension project can only be constructed after the formwork is extended, and most of the rebuilt bridges are located in rivers and deep ditches, and the conventional pier formwork is constructed from bottom to top and cannot meet the construction requirements at all.

[0005] In order to achieve the above-mentioned object, according to one aspect of the present application, a lengthening formwork for bridge piers is provided.

[0006] The extension formwork for bridge piers according to the present invention comprises:

[0007] Fixed formwork is set around the upper ends of the old piers of the bridge body;

[0008] The pier column formwork is set on the fixed formwork;

[0009] The fixed formwork at least bears the weight of the fixed formwork and the pier formwork, and is detachably arranged on the upper end of the old pier of the bridge body, connected to the pier formwork, and serves as a base for the construction of the pier formwork.

[0010] Furthermore, the pier column formwork is arranged on the upper edge of the fixed formwork.

[0011] Furthermore, the pier column template fits the old pier column of the bridge body, and the fixed template encloses the pier column template and is arranged on the periphery of the old pier column of the bridge body.

[0012] Furthermore, it is characterized in that a rubber pad is provided between the pier formwork and / or the fixed formwork and the old pier of the bridge body.

[0013] Furthermore, the fixed formwork includes fasteners, an enclosure formwork and stirrups, and the fasteners fix the enclosure formwork on the old piers of the bridge body through the stirrups.

[0014] Furthermore, the fastener is fixedly connected to the enclosing formwork via anchor bolts.

[0015] In order to achieve the above object, according to another aspect of the present invention, a construction method for extending a bridge pier is provided.

[0016] The construction method for extending a bridge pier according to the present invention includes any one of the above-mentioned templates for extending a bridge pier.

[0017] The specific steps include:

[0018] The template is polished before installation, and the template includes a fixed template and a pier template;

[0019] Use standardized steel formwork to install pier column formwork;

[0020] The pier column formwork is fixed by fixing the formwork.

[0021] Furthermore, it includes the provision of rubber pads, wherein rubber pads are provided between the pier formwork and / or the fixed formwork and the old pier of the bridge body.

[0022] Furthermore, the templates are bolted together.

[0023] In the application embodiment of the present invention, the method of changing the overlap of the pier formwork is adopted, and the pier formwork is supported and overlapped by a fixed formwork, so that the purpose of only equipping the pier formwork for the extension project and not equipping the formwork for all piers is achieved, thereby achieving the technical effect of being beneficial to the control of construction costs and construction periods and shortening construction periods, and further solving the technical problem that the conventional pier construction requires the use of the completed abutment as the basis for assembling the pier formwork, and the pier extension project can only be constructed after the formwork is extended, and the rebuilt bridges are mostly located in rivers and deep ditches, and the conventional pier formwork is constructed from bottom to top and cannot meet the construction requirements at all. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The drawings constituting a part of the present invention are used to provide a further understanding of the present invention, so that other features, purposes and advantages of the present invention become more obvious. The drawings and descriptions of the schematic embodiments of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0025] Figure 1 It is a schematic diagram of the overall structure of an extension formwork for bridge piers according to an embodiment of the present invention.

[0026] Reference numerals

[0027] 1: Fixed formwork; 2: Pier formwork. DETAILED DESCRIPTION

[0028] In order to enable those skilled in the art to better understand the present invention, the technical solutions in the embodiments of the present invention will be described clearly and completely in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only embodiments of a part of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0029] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0030] In the present application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present invention and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.

[0031] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those skilled in the art, the specific meanings of these terms in the present invention can be understood according to specific circumstances.

[0032] In addition, the terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0033] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present invention can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0034] like Figure 1 As shown, the present application relates to an extension formwork for bridge piers, comprising a fixed formwork 1 and a pier formwork 2, wherein the fixed formwork 1 is arranged around the upper end of an old pier of the bridge body, and the pier formwork 2 is arranged on the fixed formwork 1; the fixed formwork 1 at least bears the weight of the fixed formwork 1 and the pier formwork 2, and is detachably arranged on the upper end of an old pier of the bridge body, and the fixed formwork 1 is connected to the pier formwork 2 to serve as a base for the construction of the pier formwork 2.

[0035] In a preferred embodiment of the present invention, the pier formwork 2 is arranged on the upper edge of the fixed formwork 1. At this time, the fixed formwork 1 and the pier formwork 2 are directly arranged in contact with the old piers of the bridge body, and the size of the new piers used for splicing is not larger than the size of the old piers.

[0036] In other embodiments of the present invention, the pier column template 2 fits the old pier of the bridge body, and the fixed template encloses the pier column template and is arranged on the periphery of the old pier of the bridge body. In a further preferred embodiment of the present invention, a rubber pad is provided between the pier column template 2 and / or the fixed template 1 and the old pier of the bridge body to prevent friction and rubbing between the pier column template 2 and / or the fixed template 1 during the tightening process, or damage to the pier or template (pier column template / fixed template) of the bridge body due to friction.

[0037] In a preferred embodiment of the present invention, the fixed formwork 1 includes fasteners, a formwork and stirrups, and the fasteners fix the enclosure formwork on the old pier of the bridge body through the stirrups; the fasteners and the enclosure formwork are fixedly connected by anchor bolts; in a further preferred embodiment of the present invention, the fixed formwork 1 includes a safety net. The safety net is arranged on the periphery of the fixed formwork 1.

[0038] The construction method for extending a bridge pier according to the present invention includes any one of the above-mentioned templates for extending a bridge pier.

[0039] The specific steps include:

[0040] The template is polished before installation, and the template includes a fixed template and a pier template;

[0041] Use standardized steel formwork to install pier column formwork;

[0042] The pier column formwork is fixed by fixing the formwork.

[0043] Furthermore, it includes the provision of rubber pads, wherein rubber pads are provided between the pier formwork and / or the fixed formwork and the old pier of the bridge body.

[0044] Specifically, the construction method for extending bridge piers involved in the present invention includes:

[0045] 1. Design and installation of support system

[0046] When using the hoop method, the hoop (fixed formwork) bears the weight of the formwork (fixed formwork / pier formwork), steel bars (hoops), concrete, working platform, etc. It is very important to ensure its safety. The load-bearing capacity of the hoop (fixed formwork) must be verified and have a safety factor of 2-4 times.

[0047] 2. Pier body formwork

[0048] The pier body formwork adopts the matching formwork produced by a professional steel structure processing factory. The formwork panel is usually made of 6mm steel plate. The specific formwork specifications are completed through professional formwork design. The formwork is uniformly processed and manufactured in the factory. The formwork processing must ensure that the formwork has sufficient strength, rigidity and flatness.

[0049] Each time after removing the formwork, check the deformation of the formwork and perform trimming to ensure that the formwork surface is smooth and flat during construction.

[0050] 3. Preparation before template installation

[0051] All newly processed templates should be polished and assembled before use to check the geometric dimensions, flatness, adjacent height difference, bolt hole connection and joint sealing of the template. After the trial assembly inspection is qualified, each template will be numbered and assembled according to the number during actual installation.

[0052] 4. Template installation

[0053] The template for installing the pier column adopts a standardized steel template, which requires a smooth surface, smooth joints, and cross-sectional dimensions that meet the requirements. The verticality of the pier column is strictly controlled. In order to ensure the apparent quality of the pier column, the template uses a newly made steel template. After assembly, the template joints are sealed, the inner wall is polished and smoothed with a grinding wheel, and the templates are connected with bolts.

[0054] The formwork is aligned by crane. A dedicated person must be assigned to command the crane, and special attention must be paid to safety. When aligning, the lower end is first aligned with the outer line of the steel formwork marked by the measurement, and the lower end of the steel formwork is fixed with wooden wedges and positioning steel bars; three cables and wind ropes are pulled out in the cross direction on the steel formwork and connected to the ground anchor, and then the length of the cables and wind ropes is adjusted to correct the upper end of the steel formwork to ensure that the center of the upper end of the steel formwork coincides with the projection center of the pier column on the pile foundation; after the coincidence, the cables and wind ropes are fixed to ensure the stability and accurate position of the steel formwork, and the debris in the steel formwork is cleaned up. After passing the inspection of the supervising engineer, the next process is carried out.

[0055] 5. Concrete pouring

[0056] The concrete of the bridge is mixed centrally at a mixing station, and the tank truck is transported to the construction site through mixing. The crane hoists the concrete and pours it into the mold through a deceleration string. The thickness of the concrete pouring layer is not more than 30cm and the material is evenly centered. A string is added to the mold mouth to reduce the height and speed of the concrete drop to prevent the concrete from segregating. The concrete is vibrated by an inserted vibrating rod. The thickness of the adjacent layers is 5 to 10cm. The vibration direction is circulated from the center to the edge. The vibration time is when the surface concrete stops sinking, no more bubbles emerge, the surface is flat, and there is slurry. It is vibrated and dense. Be careful not to touch the formwork or shift the steel bars during vibration. During the concrete pouring process, pay attention to rain protection, and avoid high temperatures during the day. If the temperature is high during pouring, sprinkle water on the formwork during the pouring process to reduce the formwork temperature. Concrete pouring needs to be continuous. If it is interrupted for some reason, the interval time should be less than the initial setting time of the previous layer of concrete. When pouring piers, when the height exceeds 2 meters, the concrete must be decelerated by a string.

[0057] During the concrete pouring process, the unloading speed should be controlled, special attention should be paid to the deformation of the formwork during pouring, a special person should be assigned to follow up and inspect, and keep records of the concrete pouring construction.

[0058] In the application embodiment of the present invention, the method of changing the overlap of the pier formwork is adopted, and the pier formwork is supported and overlapped by a fixed formwork, so that the purpose of only equipping the pier formwork for the extension project and not equipping the formwork for all piers is achieved, thereby achieving the technical effect of being beneficial to the control of construction costs and construction periods and shortening construction periods, and further solving the technical problem that the conventional pier construction requires the use of the completed abutment as the basis for assembling the pier formwork, and the pier extension project can only be constructed after the formwork is extended, and the rebuilt bridges are mostly located in rivers and deep ditches, and the conventional pier formwork is constructed from bottom to top and cannot meet the construction requirements at all.

[0059] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A formwork for extending bridge piers, characterized in that: include: Fixed formwork is set around the upper ends of the old piers of the bridge body; A pier column template is arranged on the fixed template; The fixed template at least bears the weight of the fixed template and the pier template, and is detachably arranged on the upper end of the old pier of the bridge body, connected to the pier template, and serves as a base for the construction of the pier template; The pier column template is arranged on the upper edge of the fixed template; The pier column template fits the old pier column of the bridge body, and the fixed template surrounds the pier column template and is arranged on the periphery of the old pier column of the bridge body; A rubber pad is provided between the pier formwork and / or the fixed formwork and the old pier of the bridge body; The fixed formwork comprises fasteners, an enclosure formwork and stirrups, and the fasteners fix the enclosure formwork on the old piers of the bridge body through the stirrups.

2. The bridge pier extension formwork according to claim 1, characterized in that: The fastener is fixedly connected to the enclosing template via anchor bolts.

3. A construction method for extending a bridge pier, characterized in that: The extension formwork for bridge piers comprises any one of claims 1 to 2; The construction method for extending the bridge piers comprises the following steps: The template is polished before installation, and the template includes a fixed template and a pier template; All newly processed templates shall be polished and assembled for trial before use to check the geometric dimensions, flatness, adjacent height difference, bolt hole connection and joint sealing of the templates; after the trial assembly inspection is passed, each template shall be numbered and assembled according to the number during actual installation; Use standardized steel formwork to install pier column formwork; The pier column template is installed with a standardized steel template, which requires a smooth surface and smooth joints; the verticality of the pier column is controlled; to ensure the appearance quality of the pier column, the template uses a newly made steel template; after assembly, the template joints are sealed, the inner wall is polished and smoothed with a grinding wheel, and the templates are connected with bolts; Fixing the pier column formwork by fixing the formwork; The formwork is hoisted and aligned by a crane; when aligning, the lower end is first aligned with the outer line of the steel formwork marked by the measurement, and the lower end of the steel formwork is fixed with wooden wedges and positioning steel bars; three cables and wind ropes are pulled out in the cross direction on the steel formwork and connected to the ground anchors, and then the length of the cables and wind ropes are adjusted to correct the upper end of the steel formwork to ensure that the center of the upper end of the steel formwork coincides with the projection center of the pier on the pile foundation; after the coincidence, the cables and wind ropes are fixed to ensure the stability and accurate position of the steel formwork, the debris in the steel formwork is cleaned up, and the next process is carried out after passing the inspection.

4. The construction method for extending a bridge pier according to claim 3, characterized in that: The method comprises setting a rubber pad, wherein a rubber pad is set between the pier formwork and / or the fixed formwork and the old pier of the bridge body.

5. The construction method for extending a bridge pier according to claim 4, characterized in that: The templates are bolted together.

Citation Information

Patent Citations

  • Support for template joist of cast-in-situ bridge and assembling method thereof

    CN101148859A

  • Bridge pier column formwork

    CN108643046A

  • Hoop-type hydraulic climbing formwork system and a construction method used for the construction of a cylindrical pier

    CN109267494A

  • Semi -prefabricated pier festival section and pier

    CN207878263U

  • Extension template for bridge pier stud

    CN211689933U