A PHC pile internal drilling and hammering machine

By designing the integrated drilling and hammering machine for drilling and drilling holes in PHC pipe piles, the tower inclination angle is adjusted by using telescopic inclination poles to achieve the same inclination between the guide holes and hammers, the shortcomings of existing equipment in construction accuracy and site coordination are solved. , improve construction efficiency and safety.

CN110952539BActive Publication Date: 2024-11-26GUANGDONG LIYUAN HYDRAULIC MACHINERY +1
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN201911302395.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-17
Publication Date
2024-11-26
Estimated Expiration
2039-12-17

AI Technical Summary

Technical Problem

The existing PHC pipe pile construction equipment has shortcomings in construction accuracy, site coordination and construction efficiency, especially when dealing with large-diameter PHC pipe piles passing through thick sandy soil layers and construction inclined piles, which affects the quality of the project and Safety.

Method used

A integrated machine for drilling and hammering in PHC pipe piles is designed, and the tower inclination angle is adjusted using two telescopic inclination poles to achieve the same inclination between the guide hole and the hammer, and the construction efficiency and safety are improved in combination with the hoisting mechanism.

Benefits of technology

Accurate inclination angle control of PHC pipe piles is achieved, construction accuracy and efficiency are improved, construction site is saved, and project quality and safety are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110952539B_ABST
    Figure CN110952539B_ABST
Patent Text Reader

Abstract

The present invention discloses a PHC pipe pile internal drilling, hole-drawing and hammering integrated machine, comprising a mainframe platform, a tower, a moving mechanism, a hole-drawing mechanism, a hammering mechanism, a first telescopic diagonal brace, and a second telescopic diagonal brace. The lower end of the tower is hinged to the front end of the mainframe platform, and the upper and lower ends of the first telescopic diagonal brace and the second telescopic diagonal brace are respectively hinged to the middle of both sides of the tower and the rear end of both sides of the mainframe platform. The hammering mechanism is vertically slidably connected to the front side of the tower. The interior of the tower is hollow and forms a vertical sliding cavity. The hole-drawing mechanism is installed in the vertical sliding cavity and vertically slidably connected to it. The hoisting mechanism is installed in the middle of the side of the tower. The PHC pipe pile internal drilling, hole-drawing and hammering integrated machine utilizes the telescopic control of two telescopic diagonal braces to realize the precise construction of PHC pipe piles with a set inclination angle; the hammering and hole-drawing are designed in an integrated manner, so that the hole-drawing and hammering maintain a relatively high same inclination during the construction process, while saving construction sites and improving construction efficiency, quality and safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pile foundation construction equipment, and in particular to a PHC pipe pile inner drilling, hole-drawing and hammering integrated machine. Background Art

[0002] Existing pile foundation construction generally includes steel piles, bored cast-in-place piles, and PHC pipe piles.

[0003] Steel piles are made of steel, which has good hardness and toughness. A large hammering force will not damage the piles. At the same time, due to the high strength of steel and the small cross-section of the piles, the piles have good penetration ability in the soil layer. Generally, the quality of passing through thick sandy soil layers is guaranteed. However, steel piles are too expensive. It is difficult for ordinary owners to afford so much expensive steel in the ground. Nowadays, steel piles are used less and less in engineering foundation treatment.

[0004] Bored piles can penetrate most soil layers and are currently the most commonly used solution for problems such as penetrating thick sandy soil layers. However, bored piles have the following disadvantages:

[0005] 1) Due to the absence of soil squeezing effect, the bearing capacity of a single pile of the same diameter is lower than that of a PHC pile.

[0006] 2) The quality of pile driving is restricted by on-site construction conditions. On-site drilling, steel cage production, and concrete pouring are complex and tedious, making it difficult to control the quality of pile driving.

[0007] 3) The project cost is lower than that of steel pipe piles and significantly higher than that of PHC piles.

[0008] 4) The construction speed is restricted by the equipment, and the sinking speed of each pile for each pile foundation is slower than that of PHC piles.

[0009] 5) The bored pile construction site will be dirty with mud all over the ground, and there will be a busy scene of pumping water and piling and transporting soil everywhere.

[0010] 6) If caves or underground rivers appear in the soil layer of the pile foundation, a large amount of concrete will be over-filled, causing great economic losses.

[0011] Compared with traditional concrete cast-in-place piles, PHC pipe piles have the advantages of intuitive quality, easy inspection, low cost, easy to ensure the quality of pile making process, short construction period, and environmental protection, making them the main force and development direction of current construction piles.

[0012] In actual projects, there are soft soil layers (weak underlying layers) in the soil layer. Since the project has high requirements for settlement control, the soil layer below the soft soil layer must be used as the bearing layer. Therefore, generally speaking, PHC pipe piles need to pass through the soft soil layer and the hard soil layer above, which is generally a sandy soil layer. When the thickness of the sandy soil layer is large (generally more than 10m), especially for large-diameter (generally more than 120cm in diameter) PHC pipe piles, due to the soil plug effect, it is very difficult to sink large-diameter PHC pipe piles regardless of whether hammering or static pressure pile sinking technology is used. For projects that generally need to pass through thicker sandy soil layers (generally more than 10m) and have longer pile lengths (generally more than 40m), most traditional foundation treatment methods use steel piles or bored cast-in-place piles.

[0013] Prior art, the invention patent with application number CN200710156471.1, discloses a construction process of PHC pipe piles with full pre-drilling holes and hammering into rock. This method uses a rotary pile driver with a long spiral drill rod to pre-drill the pile foundation in the whole process, and then inject yellow mud into the pre-drilling hole to form a mud wall in the hole. Finally, the hammer pile driver is used to hammer the PHC pipe pile to the designed depth. In actual engineering, especially in large-scale railway bridge engineering, single pier cap pile group pile foundation is often used. The cap is composed of multiple piles, and some piles have an inclination (inclined piles). This method has the following disadvantages:

[0014] 1) Since a rotary pile driver and a hammer pile driver are used to respectively complete the boring and hammering construction of the PHC pile, it is difficult to ensure the same inclination and the construction accuracy is poor.

[0015] 2) Due to the narrow site for pile group construction, two devices, a rotary pile driver and a hammer pile driver, are used. The coordination of the two devices is difficult, which has a great impact on the project cost, quality, safety, and progress.

[0016] Therefore, it is urgent to design a new PHC pipe pile construction equipment to solve the above problems. Summary of the invention

[0017] The purpose of the present invention is to provide a PHC pipe pile internal drilling, hole-drawing and hammering integrated machine in view of the above-mentioned deficiencies. The PHC pipe pile internal drilling, hole-drawing and hammering integrated machine utilizes the telescopic control of two telescopic diagonal support rods to adjust the inclination angle of the tower, thereby accurately controlling the inclination angle of the PHC pipe pile, realizing precise construction of the PHC pipe pile with a set inclination angle, and completing the construction of the inclined piles; the hammering and hole-drawing are designed as an integrated unit, so that the hole-drawing and hammering maintain a relatively high same inclination during the construction process, while saving the construction site and improving the construction efficiency, quality and safety.

[0018] The technical solution is as follows:

[0019] A PHC pipe pile internal drilling and hole hammering integrated machine comprises a main platform, a tower, a moving mechanism, a hole-guiding mechanism, a hammering mechanism, a first telescopic diagonal brace, a second telescopic diagonal brace, and a hoisting mechanism, wherein the lower end of the tower is hinged to the front end of the main platform, the upper ends of the first telescopic diagonal brace and the second telescopic diagonal brace are respectively hinged to the middle parts of both sides of the tower, the lower ends of the first telescopic diagonal brace and the second telescopic diagonal brace are respectively hinged to the rear ends of both sides of the main platform, the first telescopic diagonal brace and the second telescopic diagonal brace are respectively located on two opposite sides of the tower, the hammering mechanism is vertically slidably connected to the front side surface of the tower, the interior of the tower is hollow and forms a vertical sliding cavity, the hole-guiding mechanism is installed in the vertical sliding cavity and is vertically slidably connected to it, the hoisting mechanism is installed in the middle part of the side surface of the tower, and the moving mechanism is installed at the bottom of the main platform.

[0020] The first telescopic diagonal brace rod includes a first support rod and a first diagonal brace cylinder, and the second telescopic diagonal brace rod includes a second support rod and a second diagonal brace cylinder. The upper ends of the first diagonal brace cylinder and the second diagonal brace cylinder are respectively hinged to the middle parts of both sides of the tower through the first support rod and the second support rod, and the lower ends of the first diagonal brace cylinder and the second diagonal brace cylinder are respectively hinged to the rear ends of both sides of the main platform.

[0021] The hoisting mechanism includes a first hoisting mechanism and a second hoisting mechanism. The first hoisting mechanism includes a first lifting jib, a first lifting winch, a first lifting pulley, and a first lifting wire rope. The second hoisting mechanism includes a second lifting jib, a second lifting winch, a second lifting pulley, and a second lifting wire rope. The rear ends of the first lifting jib and the second lifting jib are respectively installed in the middle of both sides of the tower, and the front ends of the first lifting jib and the second lifting jib extend toward the front side of the tower respectively. The first lifting pulley and the second lifting pulley are respectively installed at the front ends of the first lifting jib and the second lifting jib, and the first lifting winch and the second lifting winch are respectively installed on the main engine platform. The two ends of the first lifting wire rope are respectively wound around the first lifting pulley and the first lifting winch, and the two ends of the second lifting wire rope are respectively wound around the second lifting pulley and the second lifting winch.

[0022] The moving mechanism includes a longitudinal moving mechanism, which includes two long boats, four outrigger cylinders, two longitudinal telescopic cylinders, and four longitudinal walking wheel groups. The four outrigger cylinders are respectively installed on the front and rear ends of both sides of the main engine platform, and each longitudinal walking wheel group is respectively installed at the lower end of each outrigger cylinder. The front and rear ends of each long boat are respectively connected to the longitudinal walking wheel group in a longitudinal sliding manner. One end of each longitudinal telescopic cylinder is hinged to the middle part of each long boat, and the other end of each longitudinal telescopic cylinder is hinged to the longitudinal walking wheel group.

[0023] The moving mechanism also includes a transverse moving mechanism, which includes two short boats and two transverse telescopic cylinders. The two short boats are respectively connected to the front end and the rear end of the main engine platform in a transverse sliding manner. One end of the two transverse telescopic cylinders is respectively hinged to the front end and the rear end of the main engine platform, and the other ends of the two transverse telescopic cylinders are respectively hinged to the middle parts of the two short boats.

[0024] The hole-guiding mechanism comprises a power head, a top support frame, a telescopic drill rod, a spiral drill tool, a drill tool winch, a power head winch, a drill tool telescopic wire rope, and a power pulling wire rope. The power head and the top support frame are vertically slidably connected to the vertical sliding cavity. The top support frame is located above the power head. The power head has a guide sleeve. The telescopic drill rod comprises an outer layer rod and an inner layer rod. The inner layer rod is telescopically nested inside the outer layer rod. The upper end of the outer layer rod is rotatably connected to the top support frame. The lower end of the outer layer rod passes through the guide sleeve and is rotatably connected thereto. The inner layer rod telescopically passes through the guide sleeve and is connected to the upper end of the spiral drill tool. The drill tool winch and the power head winch are respectively installed on the main platform. The two ends of the power pulling wire rope are respectively connected to the power head winch and the power head. A lifter is provided on the top of the inner layer rod. The two ends of the drill tool telescopic wire rope are respectively connected to the drill tool winch and the lifter.

[0025] It also includes a guide hole vertical guide rail, which is installed on the rear side surface of the vertical sliding cavity. The power head and the top support frame are vertically slidably connected with the vertical sliding cavity through the guide hole vertical guide rail.

[0026] The hammer mechanism includes a pile hammer, a hanging hammer winch, and a hanging hammer wire rope. The pile hammer is vertically slidably connected to the front side of the tower, the hanging hammer winch is installed on the main platform, and the two ends of the hanging hammer wire rope are respectively connected to the pile hammer and the hanging hammer winch.

[0027] It also includes a hammering vertical guide rail, which is installed on the front side of the tower. The pile driving hammer is vertically slidably connected to the front side of the tower through the hammering vertical guide rail.

[0028] It also includes a lifting device, which includes a lifting bracket, a lifting winch, and a lifting wire rope. The lifting bracket and the lifting winch are respectively installed in the middle of the main platform, one end of the lifting wire rope is connected to the lifting winch, and the other end of the lifting wire rope is connected to the upper part of the tower through the lifting bracket.

[0029] It also includes a control room and a hydraulic power station. The hydraulic power station is installed at the rear end of the main engine platform, and the control room is installed in the middle of the main engine platform and is close to the rear side of the tower.

[0030] It should be noted that:

[0031] The aforementioned “first, second…” do not represent specific quantity and order, but are only used to distinguish the names.

[0032] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, or are the orientations or positional relationships in which the products of the present invention are usually placed when in use, or are the orientations or positional relationships commonly understood by those skilled in the art. These are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0033] The advantages or principles of the present invention are described below:

[0034] 1. The PHC pipe pile internal drilling, hole-guiding and hammering integrated machine provided by the present invention comprises a mainframe platform, a tower, a moving mechanism, a hole-guiding mechanism, a hammering mechanism, a first telescopic diagonal brace, a second telescopic diagonal brace, and a hoisting mechanism. The lower end of the tower is hinged to the front end of the mainframe platform, so that the first telescopic diagonal brace and the second telescopic diagonal brace are conveniently used to adjust the inclination of the tower with the hinge as the rotation center, so as to realize the inclination angle control of the PHC pipe pile construction. The hole-guiding mechanism and the hammering mechanism are respectively connected to the tower in a vertical sliding manner, so that the hole-guiding mechanism and the hammering mechanism complete the PHC pipe pile construction along the same inclination direction of the tower. The construction of HC piles ensures the same inclination of PHC pile construction; the PHC pile internal drilling, hole-drawing and hammering integrated machine uses the telescopic control of two telescopic diagonal braces to adjust the inclination angle of the tower, thereby accurately controlling the inclination angle of the PHC piles and realizing the precise construction of PHC piles with a set inclination angle; the setting of the hoisting mechanism is used for lifting the PHC piles during piling; the integrated design of hammering and hole-drawing enables the hole-drawing and hammering to maintain a relatively high same inclination during the construction process, while saving construction space and improving construction efficiency, quality and safety.

[0035] 2. The first telescopic diagonal brace of the present invention includes a first support rod and a first diagonal brace cylinder, and the second telescopic diagonal brace includes a second support rod and a second diagonal brace cylinder. The first diagonal brace cylinder and the second diagonal brace cylinder are respectively connected by extending the first support rod and the second support rod, so as to facilitate the support connection between the first telescopic diagonal brace, the second telescopic diagonal brace and the tower.

[0036] 3. The hoisting mechanism of the present invention comprises a first hoisting mechanism and a second hoisting mechanism. The arrangement of the two hoisting mechanisms facilitates the hoisting of the PHC pile.

[0037] 4. The moving mechanism of the present invention includes a longitudinal moving mechanism, which includes two long boats, four outrigger cylinders, two longitudinal telescopic cylinders, and four longitudinal walking wheel groups. The two long boats are lifted and lowered by the four outrigger cylinders. The two long boats are longitudinally slidably connected to the longitudinal walking wheel groups at the lower ends of the four outrigger cylinders. Through the extension and retraction of the two longitudinal telescopic cylinders, the longitudinal walking wheel groups are respectively driven to roll on the steel rails of the long boats, thereby driving the main platform and the tower to move forward and backward.

[0038] 5. The mobile mechanism of the present invention also includes a transverse moving mechanism, which includes two short boats and two transverse telescopic cylinders. The two transverse telescopic cylinders are extended and retracted at the same time to drive the main platform to move left and right respectively, or the two transverse telescopic cylinders are displaced (one extends and the other contracts) to realize the steering of the main platform. When the short boat is used for walking or turning, the two long boats must leave the ground.

[0039] 6. The hole-drilling mechanism of the present invention includes a power head, a top support frame, a telescopic drill rod, a spiral drill, a drill winch, a power head winch, a drill telescopic wire rope, and a power lifting wire rope. The power head provides hole-drilling power for the spiral drill, and the power head winch and the power lifting wire rope provide power for the vertical sliding of the power head. The provision of the telescopic drill rod saves the design height of the tower, and for equipment with the same tower height, telescopic drilling of a longer depth of hole can be achieved. The drill winch and the drill telescopic wire rope provide power for the extension and retraction of the telescopic drill rod.

[0040] 7. The power head and the top support frame of the present invention are vertically slidably connected with the vertical sliding cavity through the vertical guide rail of the guide hole, so that the vertical sliding of the guide hole mechanism is smoother.

[0041] 8. The hammer mechanism of the present invention comprises a pile hammer, a hanging hammer winch and a hanging hammer wire rope. The pile hammer is used to hammer and sink PHC pipe piles. The hanging hammer winch and the hanging hammer wire rope provide power for the pile hammer to slide vertically.

[0042] 9. The pile hammer of the present invention is vertically slidably connected with the front side of the tower by hammering the vertical guide rail, so that the vertical sliding of the pile hammer is smoother.

[0043] 10. The present invention also includes a lifting device, which includes a lifting bracket, a lifting winch, and a lifting wire rope. The lifting device serves as a lifting support for lifting the tower from a horizontal state to a vertical state or returning from a vertical state to a horizontal state, thereby facilitating the lifting and installation of the tower. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1The three-dimensional structure of the integrated machine for drilling, guiding and hammering the inner hole of a PHC pile according to the embodiment of the present invention is shown in FIG. Figure 1 .

[0045] Figure 2 The three-dimensional structure of the integrated machine for drilling, guiding and hammering the inner hole of a PHC pile according to the embodiment of the present invention is shown in FIG. Figure 2 .

[0046] Figure 3 It is a three-dimensional structural schematic diagram of the hole-drawing mechanism of the PHC pipe pile internal drilling and hammering integrated machine according to an embodiment of the present invention.

[0047] Description of reference numerals:

[0048] 10. Main platform, 20. Tower, 21. Vertical guide rail for hole guiding, 22. Vertical guide rail for hammering, 31. Longitudinal moving mechanism, 311. Long ship, 312. Outrigger cylinder, 313. Longitudinal telescopic cylinder, 314. Longitudinal walking wheel set, 32. Short ship, 40. Hole guiding mechanism, 41. Power head, 411. Guide sleeve, 42. Top support frame, 43. Telescopic drill rod, 431. Outer rod, 432. Inner rod, 44. Spiral drilling tool, 45. Drilling tool winch, 46. Power head winch, 50. Hammering mechanism, 51. Pile hammer, 52. Hanging hammer winch winch, 60, first telescopic diagonal brace, 61, first support rod, 62, first diagonal brace cylinder, 70, second telescopic diagonal brace, 71, second support rod, 72, second diagonal brace cylinder, 80, lifting mechanism, 81, first lifting jib, 82, first lifting winch, 83, first lifting pulley, 84, second lifting jib, 85, second lifting winch, 86, second lifting pulley, 91, lifting device, 911, lifting bracket, 912, lifting winch, 92, control room, 93, hydraulic power station, 94, pulley block, 941, guide pulley. DETAILED DESCRIPTION

[0049] The embodiments of the present invention are described in detail below.

[0050] See also Figures 1 to 3The PHC pile internal drilling and hole-drawing hammering machine provided by the embodiment of the present invention comprises a mainframe platform 10, a tower 20, a moving mechanism, a hole-drawing mechanism 40, a hammering mechanism 50, a first telescopic diagonal brace 60, a second telescopic diagonal brace 70, and a hoisting mechanism 80. The lower end of the tower 20 is hinged to the front end of the mainframe platform 10, the upper ends of the first telescopic diagonal brace 60 and the second telescopic diagonal brace 70 are respectively hinged to the middle of both sides of the tower 20, the lower ends of the first telescopic diagonal brace 60 and the second telescopic diagonal brace 70 are respectively hinged to the rear ends of both sides of the mainframe platform 10, the first telescopic diagonal brace 60 and the second telescopic diagonal brace 70 are respectively located on two opposite sides of the tower 20, the hammering mechanism 50 is vertically slidably connected to the front side of the tower 20, the interior of the tower 20 is hollow and forms a vertical sliding cavity, the hole-drawing mechanism 40 is installed in the vertical sliding cavity and vertically slidably connected thereto, the hoisting mechanism 80 is installed in the middle of the side of the tower 20, and the moving mechanism is installed at the bottom of the mainframe platform 10.

[0051] The lower end of the tower 20 is hinged to the front end of the main platform 10, so that the first telescopic diagonal brace 60 and the second telescopic diagonal brace 70 can be used to adjust the inclination of the tower 20 with the hinge as the rotation center, so as to control the inclination angle of the PHC pile construction. The hole-guiding mechanism 40 and the hammer mechanism 50 are respectively connected to the tower 20 in a vertical sliding manner, so that the hole-guiding mechanism 40 and the hammer mechanism 50 complete the construction of the PHC pile along the same inclination direction of the tower 20, thereby ensuring the same inclination of the PHC pile construction; the PHC pile internal drilling, hole-guiding and hammering integrated machine uses the telescopic control of the two telescopic diagonal braces to adjust the inclination angle of the tower 20, thereby accurately controlling the inclination angle of the PHC pile and realizing the precise construction of the PHC pile with a set inclination angle; the hoisting mechanism 80 is set to lift the PHC pile during piling; the hammering and hole-guiding are designed as an integrated unit, so that the hole-guiding and hammering can maintain a relatively high same inclination during the construction process, while saving the construction site and improving the construction efficiency, quality and safety.

[0052] Among them, the first telescopic diagonal brace rod 60 includes a first support rod 61 and a first diagonal brace cylinder 62, and the second telescopic diagonal brace rod 70 includes a second support rod 71 and a second diagonal brace cylinder 72. The upper ends of the first diagonal brace cylinder 62 and the second diagonal brace cylinder 72 are respectively hinged to the middle of both sides of the tower 20 through the first support rod 61 and the second support rod 71, and the lower ends of the first diagonal brace cylinder 62 and the second diagonal brace cylinder 72 are respectively hinged to the rear ends of both sides of the host platform 10. The first diagonal brace cylinder 62 and the second diagonal brace cylinder 72 are respectively extended and connected by the first support rod 61 and the second support rod 71, so as to facilitate the support connection between the first telescopic diagonal brace rod 60 and the second telescopic diagonal brace rod 70 and the tower 20.

[0053] The hoisting mechanism 80 includes a first hoisting mechanism and a second hoisting mechanism. The first hoisting mechanism includes a first lifting jib 81, a first lifting winch 82, a first lifting pulley 83, and a first lifting wire rope. The second hoisting mechanism includes a second lifting jib 84, a second lifting winch 85, a second lifting pulley 86, and a second lifting wire rope. The rear ends of the first lifting jib 81 and the second lifting jib 84 are respectively installed in the middle of both sides of the tower frame 20. The front ends of the first lifting pulley 83 and the second lifting pulley 86 are respectively installed at the front ends of the first lifting jib 81 and the second lifting jib 84, the first lifting winch 82 and the second lifting winch 85 are respectively installed on the main platform 10, the two ends of the first lifting wire rope are respectively wound around the first lifting pulley 83 and the first lifting winch 82, and the two ends of the second lifting wire rope are respectively wound around the second lifting pulley 86 and the second lifting winch 85. The setting of the two lifting mechanisms 80 facilitates the lifting of the PHC pile.

[0054] The moving mechanism includes a longitudinal moving mechanism 31 and a transverse moving mechanism. The longitudinal moving mechanism 31 includes two long boats 311, four outrigger cylinders 312, two longitudinal telescopic cylinders 313, and four longitudinal walking wheel groups 314. The four outrigger cylinders 312 are respectively installed on the front and rear ends of both sides of the main engine platform 10, and each longitudinal walking wheel group 314 is respectively installed at the lower end of each outrigger cylinder 312. The front and rear ends of each long boat 311 are respectively connected to the longitudinal walking wheel group 314 for longitudinal sliding. One end of each longitudinal telescopic cylinder 313 is hinged to the middle part of each long boat 311, and the other end of each longitudinal telescopic cylinder 313 is hinged to the longitudinal walking wheel 314. The two long boats 311 are lifted and lowered by four outrigger oil cylinders 312. The two long boats 311 are longitudinally slidably connected to the longitudinal running wheels 314 at the lower ends of the four outrigger oil cylinders 312 respectively. Through the extension and retraction of the two longitudinal telescopic oil cylinders 313, the longitudinal running wheels 314 are respectively driven to roll on the steel rails of the long boats 311, thereby driving the main platform 10 and the tower 20 to move forward and backward.

[0055] The transverse movement mechanism includes two short boats 32 and two transverse telescopic cylinders. The two short boats 32 are respectively connected to the front and rear ends of the main platform 10 in a transverse sliding manner. One end of the two transverse telescopic cylinders is respectively hinged to the front and rear ends of the main platform 10, and the other ends of the two transverse telescopic cylinders are respectively hinged to the middle of the two short boats 32. The two transverse telescopic cylinders are extended and retracted at the same time to drive the main platform 10 to move left and right, or the two transverse telescopic cylinders are displaced (one extends and the other shrinks) to realize the steering of the main platform 10. When the short boats 32 are used for walking or turning, the two long boats 311 need to leave the ground.

[0056] The hole-guiding mechanism 40 includes a power head 41, a top support frame 42, a telescopic drill rod 43, a spiral drill 44, a drill winch 45, a power head winch 46, a drill telescopic wire rope, and a power pulling wire rope. The power head 41 and the top support frame 42 are vertically slidably connected with the vertical sliding cavity. The top support frame 42 is located above the power head 41. The power head 41 has a guide sleeve 411. The telescopic drill rod 43 includes an outer rod 431 and an inner rod 432. The inner rod 432 is telescopically nested in the outer rod 431. The upper end of 31 is rotatably connected to the top support frame 42, the lower end of the outer rod 431 passes through the guide sleeve 411 and is rotatably connected thereto, the inner rod 432 telescopically passes through the guide sleeve 411 and is connected to the upper end of the spiral drilling tool 44; the drilling tool winch 45 and the power head winch 46 are respectively installed on the main platform 10, and the two ends of the power pulling wire rope are respectively connected to the power head winch 46 and the power head 41, and a lifter is provided on the top of the inner rod 432, and the two ends of the drilling tool telescopic wire rope are respectively connected to the drilling tool winch 45 and the lifter. The power head 41 provides drilling power for the spiral drilling tool 44, and the power head winch 46 and the power pulling wire rope provide power for the vertical sliding of the power head 41; the setting of the telescopic drill rod 43 saves the design height of the tower 20, and for equipment with the same tower 20 height, telescopic drilling of a longer depth of drilling hole is achieved; the drilling tool winch 45 and the drilling tool telescopic wire rope provide power for the extension and retraction of the telescopic drill rod 43.

[0057] The hammer mechanism 50 includes a pile hammer 51, a hanging hammer winch 52, and a hanging hammer wire rope. The pile hammer 51 is vertically slidably connected to the front side of the tower 20. The hanging hammer winch 52 is installed on the host platform 10. The two ends of the hanging hammer wire rope are respectively connected to the pile hammer 51 and the hanging hammer winch 52. The pile hammer 51 is used to hammer and sink the PHC pipe pile. The hanging hammer winch 52 and the hanging hammer wire rope provide power for the pile hammer 51 to slide vertically.

[0058] The PHC pile internal drilling and hammering machine also includes a hole-guiding vertical guide rail 21, a hammering vertical guide rail 22, a frame lifting device 91, an operating room 92, a hydraulic power station 93, and a pulley block 94. The hole-guiding vertical guide rail 21 is installed on the rear side of the vertical sliding cavity, and the power head 41 and the top support frame 42 are vertically slidably connected with the vertical sliding cavity through the hole-guiding vertical guide rail 21, so that the vertical sliding of the hole-guiding mechanism 40 is smoother.

[0059] The hammering vertical guide rail 22 is installed on the front side of the tower 20, and the pile hammer 51 is vertically slidably connected with the front side of the tower 20 through the hammering vertical guide rail 22. The vertical sliding of the pile hammer 51 is made smoother.

[0060] The lifting device 91 includes a lifting bracket 911, a lifting hoist 912, and a lifting wire rope. The lifting bracket 911 and the lifting hoist 912 are respectively installed in the middle of the main platform 10. One end of the lifting wire rope is connected to the lifting hoist 912, and the other end of the lifting wire rope is connected to the upper part of the tower 20 through the lifting bracket 911. The lifting device 91 serves as a lifting support for lifting the tower 20 from a horizontal state to a vertical state or returning from a vertical state to a horizontal state, which facilitates the lifting and installation of the tower 20.

[0061] The hydraulic power station 93 is installed at the rear end of the host platform 10, and the control room 92 is installed in the middle of the host platform 10 and close to the rear side of the tower 20. The control room 92 is used to control the operation of the integrated machine, and the hydraulic power station 93 can be driven by a motor or a diesel engine to provide a hydraulic source for the winch, the power head 41, etc.

[0062] The pulley block 94 is installed at the top of the tower 20. The pulley block 94 includes a plurality of guide pulleys 941. The plurality of guide pulleys 941 are used for guiding the tensioning of each steel wire rope.

[0063] The above are only specific embodiments of the present invention, and the protection scope of the present invention is not limited thereto; any replacement and improvement made on the basis of not violating the concept of the present invention shall fall within the protection scope of the present invention.

Claims

1. A PHC pile internal drilling and hammering machine, characterized in that: The present invention comprises a mainframe platform, a tower, a moving mechanism, a hole-guiding mechanism, a hammering mechanism, a first telescopic diagonal brace, a second telescopic diagonal brace, and a hoisting mechanism, wherein the lower end of the tower is hinged to the front end of the mainframe platform, the upper ends of the first telescopic diagonal brace and the second telescopic diagonal brace are respectively hinged to the middle parts of both sides of the tower, the lower ends of the first telescopic diagonal brace and the second telescopic diagonal brace are respectively hinged to the rear ends of both sides of the mainframe platform, the first telescopic diagonal brace and the second telescopic diagonal brace are respectively located on two opposite sides of the tower, the hammering mechanism is vertically slidably connected to the front side of the tower, the interior of the tower is hollow and forms a vertical sliding cavity, the hole-guiding mechanism is installed in the vertical sliding cavity and is vertically slidably connected thereto, the hoisting mechanism is installed in the middle part of the side of the tower, and the moving mechanism is installed at the bottom of the mainframe platform; The lower end of the tower is hinged with the front end of the main platform, so that the first telescopic diagonal brace and the second telescopic diagonal brace are conveniently used to adjust the inclination of the tower with the hinge as the rotation center, so as to control the inclination angle of the PHC pile construction; the hole-guiding mechanism and the hammer mechanism are respectively connected to the tower in a vertical sliding manner, so that the hole-guiding mechanism and the hammer mechanism complete the construction of the PHC pile along the same inclination direction of the tower, and ensure the same inclination of the PHC pile construction; the PHC pile internal drilling, hole-guiding and hammering integrated machine uses the telescopic control of two telescopic diagonal braces to adjust the inclination angle of the tower, accurately control the inclination angle of the PHC pile, and accurately construct the PHC pile with a set inclination angle; the hammer mechanism and the hole-guiding mechanism are designed as an integrated whole, and the hole-guiding mechanism and the hammer mechanism maintain the same inclination during the construction process; The hole-guiding mechanism includes a power head, a top support frame, a telescopic drill rod, a spiral drill, a drill winch, a power head winch, a drill telescopic wire rope, a power head pulling wire rope, and a hole-guiding vertical guide rail. The power head and the top support frame are vertically slidably connected to the vertical sliding cavity. The top support frame is located above the power head. The power head has a guide sleeve. The telescopic drill rod includes an outer rod and an inner rod. The inner rod is telescopically nested inside the outer rod. The upper end of the outer rod is rotatably connected to the top support frame. The lower end of the outer rod passes through the guide sleeve and is connected to the guide sleeve. The inner rod is connected by a telescopic mechanism and passes through the guide sleeve to be connected to the upper end of the spiral drill. The drilling tool winch and the power head winch are respectively installed on the main machine platform. The two ends of the power head pulling wire rope are respectively connected to the power head winch and the power head. A lifting device is provided on the top of the inner rod. The two ends of the drilling tool telescopic wire rope are respectively connected to the drilling tool winch and the lifting device. The guide hole vertical guide rail is installed on the rear side surface in the vertical sliding cavity. The power head and the top support frame are vertically slidably connected to the vertical sliding cavity through the guide hole vertical guide rail. The hammer mechanism comprises a pile hammer, a hanging hammer hoist, a hanging hammer wire rope, and a hammer vertical guide rail. The pile hammer is vertically slidably connected to the front side of the tower. The hanging hammer hoist is installed on the main platform. The two ends of the hanging hammer wire rope are respectively connected to the pile hammer and the hanging hammer hoist. The hammer vertical guide rail is installed on the front side of the tower. The pile hammer is vertically slidably connected to the front side of the tower through the hammer vertical guide rail. The hoisting mechanism includes a first hoisting mechanism and a second hoisting mechanism. The first hoisting mechanism includes a first lifting jib, a first lifting winch, a first lifting pulley, and a first lifting wire rope. The second hoisting mechanism includes a second lifting jib, a second lifting winch, a second lifting pulley, and a second lifting wire rope. The rear ends of the first lifting jib and the second lifting jib are respectively installed in the middle of both sides of the tower, and the front ends of the first lifting jib and the second lifting jib extend toward the front side of the tower respectively. The first lifting pulley and the second lifting pulley are respectively installed at the front ends of the first lifting jib and the second lifting jib, and the first lifting winch and the second lifting winch are respectively installed on the main engine platform. The two ends of the first lifting wire rope are respectively wound around the first lifting pulley and the first lifting winch, and the two ends of the second lifting wire rope are respectively wound around the second lifting pulley and the second lifting winch.

2. The PHC pile inner drilling and hammering machine according to claim 1, characterized in that: The first telescopic diagonal brace rod includes a first support rod and a first diagonal brace cylinder, and the second telescopic diagonal brace rod includes a second support rod and a second diagonal brace cylinder. The upper ends of the first diagonal brace cylinder and the second diagonal brace cylinder are respectively hinged to the middle parts of both sides of the tower through the first support rod and the second support rod, and the lower ends of the first diagonal brace cylinder and the second diagonal brace cylinder are respectively hinged to the rear ends of both sides of the main platform.

3. The PHC pile inner drilling and hammering machine according to claim 1, characterized in that: The moving mechanism includes a longitudinal moving mechanism, which includes two long boats, four outrigger cylinders, two longitudinal telescopic cylinders, and four longitudinal walking wheel groups. The four outrigger cylinders are respectively installed on the front and rear ends of both sides of the main engine platform, and each longitudinal walking wheel group is respectively installed at the lower end of each outrigger cylinder. The front and rear ends of each long boat are respectively connected to the longitudinal walking wheel group in a longitudinal sliding manner. One end of each longitudinal telescopic cylinder is hinged to the middle part of each long boat, and the other end of each longitudinal telescopic cylinder is hinged to the longitudinal walking wheel group.

4. The PHC pile inner drilling and hammering machine as claimed in claim 3, characterized in that: The moving mechanism also includes a transverse moving mechanism, which includes two short boats and two transverse telescopic cylinders. The two short boats are respectively connected to the front end and the rear end of the main engine platform in a transverse sliding manner. One end of the two transverse telescopic cylinders is respectively hinged to the front end and the rear end of the main engine platform, and the other ends of the two transverse telescopic cylinders are respectively hinged to the middle parts of the two short boats.

5. The PHC pile inner drilling and hammering machine according to any one of claims 1 to 4, characterized in that: It also includes a lifting device, which includes a lifting bracket, a lifting winch, and a lifting wire rope. The lifting bracket and the lifting winch are respectively installed in the middle of the main platform, one end of the lifting wire rope is connected to the lifting winch, and the other end of the lifting wire rope is connected to the upper part of the tower through the lifting bracket.

Citation Information

Patent Citations

  • Whole-course hole-preguiding hammering entering-rock PHC pile tube construction process

    CN101158159A

  • Pile driving frame of comprehensive pile driver

    CN105019456A

  • Walking pile driver

    CN105970960A

  • Mixing and pile-pressing integrated machine

    CN108330972A

  • Hole guiding, pile planting and pile driving all-in-one machine

    CN110344414A