Dishwasher with layered cleaning function and manufacturing method thereof
By designing a layered cleaning structure and automated operations in the dishwasher, the existing dishwasher's problems of low cleaning efficiency and oil residue are solved, and efficient and water-saving cleaning effects are achieved.
Patent Information
- Application Number
- CN202010029797.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-01-13
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2040-01-13
AI Technical Summary
Existing dishwashers are inefficient when cleaning dishes and chopsticks, which can easily cause oil residues and require multiple cleanings to be completely cleaned.
Design a layered cleaning dishwasher, and divides the dishwasher into a first cleaning chamber and a second cleaning chamber through a partition. The first cleaning chamber is used to rinse the residue on the dishes and chopsticks, and the second cleaning chamber is used to rinse the two Second cleaning, combined with the lifting mechanism and boosting mechanism to achieve automatic operation, and circulating cleaning is performed using the spray arm and water tank.
It greatly improves the cleaning efficiency, prevents oil and soil residues from affecting the cleaning effect, saves water resources, reduces the labor intensity of manual operation, is suitable for dishwashers of different sizes, and increases the storage capacity of dishes and chopsticks.
Smart Images

Figure CN111110154B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a dishwashing machine for layered cleaning and a manufacturing method thereof. Background Art
[0002] With the improvement of living standards, kitchen decoration and the selection of kitchen appliances have attracted much attention, among which dishwashers have also begun to enter the public's field of vision.
[0003] However, the dishwashers in the prior art all use a single cavity to clean the dishes, which not only easily causes oil stains to remain on the dishes and the inner surface of the dishwasher, but also requires multiple cleanings to clean them, resulting in low cleaning efficiency. Summary of the invention
[0004] The purpose of the present invention is to provide a technical solution for a dishwasher with layered cleaning and a manufacturing method thereof in view of the deficiencies in the prior art. A first box body is divided into a first cleaning chamber and a second cleaning chamber by a partition door. The first cleaning chamber is used to rinse the residue on the dishes and the second cleaning chamber is used for secondary cleaning, which greatly improves the cleaning efficiency and prevents the residual oil on the inner wall of the first cleaning chamber from affecting the cleaning effect. The cleaning efficiency is high. The manufacturing method of the dishwasher has simple steps, which can not only meet the processing and installation of dishwashers of different sizes and increase the dishware storage capacity of the dishwasher, but also improve the cleaning effect of the dishes through secondary cleaning, saving water resources. At the same time, it can realize automatic operation and reduce the labor intensity of manual operation.
[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0006] A dishwasher for layered cleaning, characterized in that it comprises a first box body, a second box body and a bowl basket rack, a partition door is vertically arranged in the first box body, the partition door is connected to the first box body through a lifting mechanism, the partition door divides the first box body into a first cleaning chamber and a second cleaning chamber, a first spray arm and a second spray arm are arranged on the top surface and the side surface of the first cleaning chamber and the second cleaning chamber, the second box body is fixedly connected to the bottom of the first box body, a first water tank and a second water tank are arranged in the second box body, the first water tank and the second water tank are communicated with the first cleaning chamber and the second cleaning chamber respectively, the first water tank and the second water tank are connected to the first spray arm and the second spray arm respectively, and the bowl basket rack is movably connected to the first cleaning chamber and the second cleaning chamber through a booster mechanism; The door divides the first box into a first cleaning chamber and a second cleaning chamber. The first cleaning chamber is used to rinse the residue on the dishes and chopsticks, and the second cleaning chamber is used for secondary cleaning, which greatly improves the cleaning efficiency and prevents the residual oil on the inner wall of the first cleaning chamber from affecting the cleaning effect. The lifting mechanism can drive the partition door to move up and down to achieve the closure of the first cleaning chamber and the second cleaning chamber. After opening, the bowl basket rack can be moved in the first box through the booster mechanism to achieve automatic chamber change cleaning. The first spray arm and the second spray arm can clean the dishes and chopsticks from the top and the side to improve the cleaning efficiency. The dishes and chopsticks after cleaning flow into the first water tank and the second water tank, and then flow back to the first spray arm and the second spray arm through the first water tank and the second water tank to achieve water recycling.
[0007] Furthermore, the lifting mechanism includes a first cylinder and a lifting plate, the lifting plate is fixedly connected to the top surface of the partition door through a column, ear plates are symmetrically arranged on both sides of the lifting plate, two first cylinders are symmetrically arranged on the top surface of the first box body, the first cylinder is connected to the ear plate through a first piston rod, and when the bowl basket rack needs to be moved, the first cylinder drives the first piston rod and the ear plate to move upward to realize the movement of the lifting plate, and then the partition door is lifted upward through the column until the first cleaning chamber is fully connected with the second cleaning chamber.
[0008] Furthermore, a bottom plate is provided at the bottom of the first cleaning chamber and the second cleaning chamber, and a first limiting groove, a second limiting groove, a first water passing groove, a second water passing groove and a door panel groove are provided on the top surface of the bottom plate, the door panel groove is located at the center of the bottom plate, the first limiting groove and the second limiting groove are respectively located on both sides of the door panel groove, and the first limiting groove and the second limiting groove are vertically connected to each other, the first water passing groove and the second water passing groove are symmetrically arranged on both sides of the door panel groove, the first limiting groove and the second limiting groove can be used to limit the bowl basket rack, thereby improving the stability and reliability of the bowl basket rack during movement, the first limiting groove can enable the bowl basket rack to slide into or out of the first box body, and the second limiting groove can enable the bowl basket rack to move between the first cleaning chamber and the second cleaning chamber, the door panel groove is used for sealing the partition door to prevent the first cleaning chamber or the second cleaning chamber from allowing water to flow into the cleaning chamber on the other side during operation, and the first water passing groove and the second water passing groove can guide the sewage during cleaning into the first water tank or the second water tank to achieve circulation cleaning.
[0009] Furthermore, support blocks are symmetrically arranged on the bottom surface of the bowl basket rack, and rolling balls are arranged on the support blocks. The rolling balls match the first limiting groove and the second limiting groove. The design of the rolling balls not only improves the supporting strength of the bowl basket rack, improves the stability and reliability of the bowl basket rack when moving, but also enables the bowl basket rack to move from the longitudinal direction to the transverse direction, thereby improving the flexibility of the movement of the bowl basket rack.
[0010] Furthermore, arc-shaped sealing blocks are symmetrically arranged on the bottom surface of the partition door, the arc-shaped sealing blocks match the door panel grooves, and sealing strips are arranged on the sides of the partition door. The arc-shaped sealing blocks and the sealing strips improve the sealing effect of the partition door.
[0011] Furthermore, the top surfaces of the first water tank and the second water tank are connected to the first cleaning chamber and the second cleaning chamber respectively through a water collecting trough, and filtering components are provided in the first cleaning chamber and the second cleaning chamber. Water inlet pipes and water outlet pipes are provided on the sides of the first water tank and the second water tank, and valves are provided on the water inlet pipes and the water outlet pipes respectively. The first water tank and the second water tank are connected to the water supply pipe through a guide pipe, and the water supply pipe is respectively connected to the first spray arm and the second spray arm through a diversion pipe, and a water pump is provided on the guide pipe. After cleaning, water flows into the first water tank or the second water tank through the water collecting trough, and the residue is filtered through the filtering component. The filtered water flows into the corresponding first spray arm or the second spray arm through the guide pipe, the water supply pipe and the diversion pipe to realize circulating flushing. The water inlet pipe is used to fill water into the first water tank or the second water tank. After cleaning, the water in the first water tank or the second water tank can be output through the water outlet pipe.
[0012] Furthermore, the filter assembly includes a positioning bar and a frame, the frame is fixedly connected to the positioning bar, a filter net is arranged between the positioning bar and the frame, the positioning bar facilitates pulling out the frame and the filter net, and facilitates cleaning of the residue on the filter net, and the frame improves the stability and reliability of the filter net installation.
[0013] Furthermore, the boosting mechanism includes a second cylinder and a boosting plate. The two second cylinders are arranged in parallel on the rear side surface of the first box body, and the second cylinders are connected to the second piston rod. The boosting plate is fixedly connected to the second piston rod through a connecting rod. A guide groove is arranged in parallel on the inner side of the rear side surface of the first box body, and the connecting rod matches the guide groove. A first arc block and a second arc block are arranged on the front side surface of the boosting plate, and the first arc block and the second arc block are arranged perpendicular to each other. The boosting plate is driven to move horizontally along the guide groove through the second cylinder via the second piston rod to realize automatic adjustment of the bowl basket rack. The first arc block can push the bowl basket rack, and the second arc block supports the bowl basket rack, thereby improving the stability and reliability of the bowl basket rack when moving.
[0014] Furthermore, cabinet doors are symmetrically arranged on the front side of the first box body, and observation windows are arranged on the cabinet doors. The cabinet doors are convenient for taking and placing the bowl basket rack, and the observation window can intuitively see the working status of the dishwasher.
[0015] The manufacturing method of a dishwasher for layered cleaning as described above is characterized by comprising the following steps:
[0016] 1) First box processing
[0017] a. First, the first box body of corresponding size is processed according to the design requirements, and the inner and outer sides of the first box body are polished. The installation positions of the first spray arm and the second spray arm are determined along the inner side of the first box body, and installation holes are opened at the corresponding positions. At the same time, two guide grooves are opened in parallel up and down along the inner side of the rear side of the first box body, and a straight through groove is opened along the center of the top surface of the first box body, which is convenient for the installation and disassembly of the first spray arm, the second spray arm and the partition door, and is conducive to cleaning the interior of the first box body to prevent residues from adhering to the inner side of the first box body;
[0018] b. Then, two cabinet doors of matching sizes are processed according to the size of the front side of the first cabinet, and observation windows are installed on the cabinet doors. The processed cabinet doors are then installed on the first cabinet to facilitate the placement of dishes and chopsticks and to facilitate observation of the working conditions inside the dishwasher;
[0019] c. Then, the corresponding bottom plate is processed according to the size of the first box body, a door plate groove is opened along the center of the top surface of the bottom plate, and then the first limiting groove, the second limiting groove, the first water groove and the second water groove are symmetrically opened along the two sides of the door plate groove. When processing the first limiting groove and the second limiting groove, ensure that their width and depth are equal and they are vertically connected to each other. The first water groove and the second water groove penetrate the bottom plate. The first limiting groove and the second limiting groove improve the stability of the movable installation of the bowl basket rack, and the bowl basket rack can be moved horizontally or vertically. At the same time, the bowl basket rack can be prevented from colliding with the second spray arm on the inner wall of the first box body, thereby extending the service life of the dishwasher. The first water groove and the second water groove can allow the water used for washing dishes to flow into the first water tank and the second water tank, thereby preventing the accumulation of sewage at the bottom of the first cleaning chamber and the second cleaning chamber, thereby affecting the cleaning effect of the dishes;
[0020] d. Finally, the first spray arm and the second spray arm are respectively installed in the installation holes in the first box body, and the diversion pipes are respectively installed on the first spray arm and the second spray arm, so that the first spray arm and the second spray arm can realize washing the dishes from the top and the side;
[0021] The processing steps of the first box are simple and convenient, and can meet the processing and installation requirements of dishwashers of different sizes, thereby increasing the dishware storage capacity of the dishwasher and improving the dishware cleaning effect.
[0022] 2) Partition door installation
[0023] a. First, determine the size of the partition door according to the height and width of the first box body, form the required partition door by casting, and polish the partition door to ensure that the two arc-shaped sealing blocks at the bottom of the partition door are integrally formed with the partition door, and install sealing strips along the side and bottom of the partition door. The arc-shaped sealing blocks and sealing strips greatly improve the sealing degree between the partition door and the first box body to prevent sewage leakage;
[0024] b. Then vertically insert the partition door into the linear groove on the first box body until the top edge of the partition door is flush with the top surface of the first box body, and then make corresponding columns and lifting plates according to the travel height of the partition door, and fix the lifting plate on the top surface of the partition door through the columns. At the same time, ear plates are symmetrically installed on both sides of the lifting plate. The lifting plate can drive the partition door to move up and down through the columns to meet the need for lateral movement of the bowl basket rack and improve the cleaning effect;
[0025] c. Then, the first cylinder is symmetrically installed along the two sides of the linear groove on the first box body, and the ear plate is connected to the first cylinder through the first piston rod. The partition door can be driven up and down by the first cylinder through the first piston rod to realize the connection or closing of the first cleaning chamber and the second cleaning chamber;
[0026] The installation method of the partition door has simple steps, which not only improves the installation accuracy of the partition door, but also ensures that the partition door does not collide with the bowl basket after it is raised, thereby improving the working stability and reliability of the dishwasher.
[0027] 3) Bowl and basket rack installation
[0028] a. First, select a suitable second cylinder and a second piston rod according to the length of the guide groove, and fix the second cylinder at a set position on the rear side of the first box body, and then install the second piston rod on the second cylinder to ensure that the second piston rod moves in the horizontal direction, thereby improving the stability and reliability of the bowl and basket rack when it moves horizontally;
[0029] b. Then, a corresponding booster plate is manufactured according to the design requirements, and a first arc block and a second arc block are installed along the front side of the booster plate to locate the side of the bowl basket rack. The processed booster plate is connected to the second piston rod through a connecting rod, and the connecting rod is made to pass through the guide groove. The connecting rod is driven by the second piston rod to move horizontally along the guide groove, and then the bowl basket rack can be driven to move horizontally through the first arc block and the second arc block on the booster plate, thereby realizing an automatic cavity changing operation and improving work efficiency;
[0030] c. Then, a corresponding bowl basket rack is manufactured according to the sizes of the first cleaning chamber and the second cleaning chamber, and four support blocks are symmetrically installed at the bottom end of the bowl basket rack. Rollers are installed along the bottom surfaces of the support blocks. The bowl basket rack can be supported by the rollers and the support blocks, and the rollers move along the first limiting groove and the second limiting groove;
[0031] The installation method of the bowl-basket rack has simple steps, which not only improves the stability and reliability of the movement of the bowl-basket rack, but also can realize automatic operation.
[0032] 4) Second box processing
[0033] a. First, according to the design requirements, the corresponding second box body, the first water tank and the second water tank are manufactured, the second box body is fixedly installed at the bottom of the first box body, and the first water tank and the second water tank are respectively connected to the first cleaning chamber and the second cleaning chamber through the water collecting tank, and the water inlet pipe and the water outlet pipe are installed along the sides of the first water tank and the second water tank, and valves are respectively installed on the water inlet pipe and the water outlet pipe, and the first water tank and the second water tank can be filled or drained through the water inlet pipe and the water outlet pipe, and the valve is used to control the switch of the water inlet pipe and the water outlet pipe;
[0034] b. Then, a guide pipe with a water pump is installed along the sides of the first water tank and the second water tank, so that the guide pipe passes through the side of the second box body, and a water delivery pipe is installed in the vertical direction, and the water delivery pipe is connected with the guide pipe and the diversion pipe, and a sealing treatment is performed. The water in the first water tank and the second water tank can be sent to the water delivery pipe through the guide pipe through the water pump, and then flow into the first spray arm and the second spray arm respectively through the diversion pipe, so as to achieve the cleaning of the dishes;
[0035] c. Then, according to the size of the water collection tank, the corresponding positioning strips and frames are processed, the frame is fixedly installed on one side of the positioning strip, the filter screen is horizontally installed along the inner side of the frame and the positioning strip, and the processed filter assembly is inserted into the water collection tank along the front side of the second box body. The residue in the sewage can be filtered through the filter assembly;
[0036] 5) Dishwasher test run
[0037] a. First, connect the water inlet pipes and the water outlet pipes on both sides with the external pipes, put the dishes and chopsticks into the bowl basket and push it into the first washing chamber, so that the bowl basket is fixedly connected with the first arc block and the second arc block on the booster plate, and the rolling ball is limited in the first limit groove. At this time, the partition door is lowered by the lifting mechanism until it is completely closed, and the cabinet door on one side of the first washing chamber is closed;
[0038] b. Then, water is injected into the first water tank and the second water tank respectively, and the water pump on one side of the first water tank is started, so that the water in the first water tank is sent to each branch pipe through the guide pipe and the water delivery pipe respectively, and the dishes are preliminarily rinsed through the first spray arm and the second spray arm to remove stains;
[0039] c. After the first cleaning is completed, the partition door is opened by the lifting mechanism, so that the bowl basket rack moves into the second cleaning chamber under the action of the booster mechanism. After it is in place, the partition door is closed by the lifting mechanism, and the water pump on one side of the second water tank is started. Water is transported to each diversion pipe through the guide pipe and the water delivery pipe, and the bowls and chopsticks are cleaned twice through the first spray arm and the second spray arm;
[0040] d. After cleaning, open the cabinet door on one side of the second cleaning chamber, take out the dishes and chopsticks, and start cleaning the next batch of dishes and chopsticks.
[0041] The manufacturing method of the dishwasher has simple steps, which can not only meet the processing and installation requirements of dishwashers of different sizes and increase the bowl and chopstick storage capacity of the dishwasher, but also improve the washing effect of the bowl and chopsticks through secondary washing, save water resources, and realize automatic operation at the same time, reducing the labor intensity of manual operation.
[0042] The present invention has the following beneficial effects due to the adoption of the above technical solution:
[0043] 1. The first box is divided into a first cleaning chamber and a second cleaning chamber by a partition door. The first cleaning chamber is used to rinse the residue on the dishes and chopsticks, and the second cleaning chamber is used for secondary cleaning, which greatly improves the cleaning efficiency and prevents the residual oil on the inner wall of the first cleaning chamber from affecting the cleaning effect.
[0044] 2. The lifting mechanism can drive the partition door to move up and down to close the first cleaning chamber and the second cleaning chamber. After opening, the bowl basket rack can be moved in the first box through the booster mechanism to realize automatic chamber change and cleaning.
[0045] 3. The first spray arm and the second spray arm can wash the dishes from the top and the side to improve the washing efficiency. The washed dishes flow into the first water tank and the second water tank, and then flow back to the first spray arm and the second spray arm through the first water tank and the second water tank to realize the recycling of water.
[0046] 4. The manufacturing method of the dishwasher is simple in steps, which can not only meet the processing and installation requirements of dishwashers of different sizes, increasing the dishwashing storage capacity of the dishwasher, but also improve the cleaning effect of the dishes through secondary cleaning, saving water resources, and at the same time can realize automatic operation, reducing the labor intensity of manual operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] The present invention will be further described below in conjunction with the accompanying drawings:
[0048] Figure 1 It is a rendering of a dishwasher for layered cleaning and a manufacturing method thereof of the present invention;
[0049] Figure 2 It is a schematic diagram of the internal structure of the present invention;
[0050] Figure 3 It is a structural schematic diagram of the boosting mechanism in the present invention;
[0051] Figure 4 It is a schematic diagram of the connection between the booster plate and the second piston rod in the present invention;
[0052] Figure 5 It is a structural schematic diagram of the bottom plate of the present invention;
[0053] Figure 6 It is a structural schematic diagram of the partition door of the present invention;
[0054] Figure 7 It is a schematic diagram of the structure of the filter assembly in the present invention;
[0055] Figure 8 It is a schematic diagram of the connection between the rolling ball and the supporting block in the present invention.
[0056] In the figure: 1-first box; 2-second box; 3-cabinet door; 4-observation window; 5-partition door; 6-lifting plate; 7-column; 8-ear plate; 9-first cylinder; 10-first piston rod; 11-water inlet pipe; 12-water outlet pipe; 13-water delivery pipe; 14-diversion pipe; 15-positioning strip; 16-second cleaning chamber; 17-bowl basket rack; 18-first spray arm; 19-second spray arm; 20-first cleaning chamber; 21-second water tank; 22-first water tank; 23- Water collecting trough; 24-filter screen; 25-rolling ball; 26-guide pipe; 27-water pump; 28-guide groove; 29-second cylinder; 30-second piston rod; 31-boost plate; 32-first arc block; 33-second arc block; 34-connecting rod; 35-bottom plate; 36-door plate groove; 37-first limiting groove; 38-second limiting groove; 39-first water channel; 40-second water channel; 41-arc sealing block; 42-sealing strip; 43-frame; 44-support block. DETAILED DESCRIPTION
[0057] like Figures 1 to 8 As shown, a dishwasher for layered cleaning of the present invention comprises a first box body 1, a second box body 2 and a bowl basket rack 17. A partition door 5 is vertically arranged in the first box body 1, and the partition door 5 is connected to the first box body 1 through a lifting mechanism. The lifting mechanism comprises a first cylinder 9 and a lifting plate 6. The lifting plate 6 is fixedly connected to the top surface of the partition door 5 through a column 7. Ear plates 8 are symmetrically arranged on both sides of the lifting plate 6. Two first cylinders 9 are symmetrically arranged on the top surface of the first box body 1. The first cylinder 9 is connected to the ear plate 8 through a first piston rod 10. When the bowl basket rack 17 needs to be moved, the first piston rod 10 and the ear plate 8 are driven to move upward by the first cylinder 9 to realize the movement of the lifting plate 6, and then the partition door 5 is lifted upward by the column 7 until the first cleaning chamber 20 is completely connected with the second cleaning chamber 16.
[0058] The partition door 5 divides the first box body 1 into a first cleaning chamber 20 and a second cleaning chamber 16. The first cleaning chamber 20 and the second cleaning chamber 16 are provided with a first spray arm 18 and a second spray arm 19 on the top surface and the side surface. The first cleaning chamber 20 and the second cleaning chamber 16 are provided with a bottom plate 35 at the bottom. The top surface of the bottom plate 35 is provided with a first limiting groove 37, a second limiting groove 38, a first water channel 39, a second water channel 40 and a door plate groove 36. The door plate groove 36 is located at the center of the bottom plate 35. The first limiting groove 37 and the second limiting groove 38 are respectively located on both sides of the door plate groove 36, and the first limiting groove 37 and the second limiting groove 38 are vertically connected to each other. The first water channel 39 and the second water channel 40 are provided. 0 is symmetrically arranged on both sides of the door panel groove 36. The first limiting groove 37 and the second limiting groove 38 can limit the bowl basket rack 17, thereby improving the stability and reliability of the bowl basket rack 17 when moving. The first limiting groove 37 can make the bowl basket rack 17 slide into or out of the first box body 1, and the second limiting groove 38 can make the bowl basket rack 17 move between the first cleaning chamber 20 and the second cleaning chamber 16. The door panel groove 36 is used to seal the partition door 5 to prevent the first cleaning chamber 20 or the second cleaning chamber 16 from causing water to flow into the cleaning chamber on the other side during operation. The first water channel 39 and the second water channel 40 can guide the sewage during cleaning into the first water tank 22 or the second water tank 21 to achieve cyclic cleaning. The bottom surface of the partition door 5 is symmetrically provided with an arc-shaped sealing block 41, which matches the door panel groove 36. The side of the partition door 5 is provided with a sealing strip 42. The arc-shaped sealing block 41 and the sealing strip 42 improve the sealing effect of the partition door 5.
[0059] Support blocks 44 are symmetrically arranged on the bottom surface of the bowl basket rack 17, and rolling balls 25 are arranged on the support blocks 44. The rolling balls 25 match the first limiting grooves 37 and the second limiting grooves 38. The design of the rolling balls 25 not only improves the supporting strength of the bowl basket rack 17, improves the stability and reliability of the bowl basket rack 17 when moving, but also enables the bowl basket rack 17 to move from the longitudinal direction to the transverse direction, thereby improving the flexibility of the movement of the bowl basket rack 17.
[0060] The second box body 2 is fixedly connected to the bottom of the first box body 1, and a first water tank 22 and a second water tank 21 are arranged in the second box body 2. The first water tank 22 and the second water tank 21 are respectively connected to the first cleaning chamber 20 and the second cleaning chamber 16. The first water tank 22 and the second water tank 21 are respectively connected to the first spray arm 18 and the second spray arm 19. The top surfaces of the first water tank 22 and the second water tank 21 are respectively connected to the first cleaning chamber 20 and the second cleaning chamber 16 through the water collecting tank 23. The first cleaning chamber 20 and the second cleaning chamber 16 are both provided with filter components. The sides of the first water tank 22 and the second water tank 21 are both provided with a water inlet pipe 11 and a water outlet pipe 12, and the water inlet pipe 11 and the water outlet pipe 12 are respectively provided with The first water tank 22 and the second water tank 21 are connected to the water pipe 13 through the guide pipe 26, and the water pipe 13 is respectively connected to the first spray arm 18 and the second spray arm 19 through the diversion pipe 14. A water pump 27 is arranged on the guide pipe 26. After cleaning, the water flows into the first water tank 22 or the second water tank 21 through the water collecting tank 23, and the residue is filtered through the filtering component. The filtered water flows into the corresponding first spray arm 18 or the second spray arm 19 through the guide pipe 26, the water pipe 13 and the diversion pipe 14 to realize circulating flushing. The water inlet pipe 11 is used to inject water into the first water tank 22 or the second water tank 21. After cleaning, the water in the first water tank 22 or the second water tank 21 can be output through the water outlet pipe 12. The filter assembly includes a positioning bar 15 and a frame 43. The frame 43 is fixedly connected to the positioning bar 15. A filter screen 24 is arranged between the positioning bar 15 and the frame 43. The positioning bar 15 facilitates pulling out the frame 43 and the filter screen 24, and facilitates cleaning of the residue on the filter screen 24. The frame 43 improves the stability and reliability of the installation of the filter screen 24.
[0061] The bowl basket 17 is movably connected in the first cleaning chamber 20 and the second cleaning chamber 16 through a boosting mechanism. The boosting mechanism includes a second cylinder 29 and a boosting plate 31. The two second cylinders 29 are arranged in parallel on the rear side of the first box body 1. The second cylinders 29 are connected with second piston rods 30. The boosting plate 31 is fixedly connected to the second piston rod 30 through a connecting rod 34. A guide groove 28 is arranged in parallel on the inner side of the rear side of the first box body 1. The connecting rod 34 matches the guide groove 28. A first arc block 32 and a second arc block 33 are arranged on the front side of the boosting plate 31, and the first arc block 32 and the second arc block 33 are arranged perpendicular to each other. The boosting plate 31 is driven by the second cylinder 29 through the second piston rod 30 to move horizontally along the guide groove 28, so as to realize automatic adjustment of the bowl basket 17. The first arc block 32 can push the bowl basket 17, and the second arc block 33 supports the bowl basket 17, so as to improve the stability and reliability of the bowl basket 17 when moving. The first housing 1 is divided into a first cleaning chamber 20 and a second cleaning chamber 16 by the partition door 5. The first cleaning chamber 20 is used to rinse the residue on the dishes and the second cleaning chamber 16 is used for secondary cleaning, which greatly improves the cleaning efficiency and prevents the residual oil on the inner wall of the first cleaning chamber 20 from affecting the cleaning effect. The lifting mechanism can drive the partition door 5 to move up and down to achieve the closure of the first cleaning chamber 20 and the second cleaning chamber 16. After opening, the bowl basket 17 is moved in the first housing 1 by the booster mechanism to achieve automatic chamber change cleaning. The first spray arm 18 and the second spray arm 19 can clean the dishes from the top and the side to improve the cleaning efficiency. The cleaned dishes flow into the first water tank 22 and the second water tank 21, and then flow back to the first spray arm 18 and the second spray arm 19 through the first water tank 22 and the second water tank 21 to achieve water recycling.
[0062] The first housing 1 is symmetrically provided with cabinet doors 3 on the front side thereof, and provided with observation windows 4. The cabinet doors 3 are convenient for taking and placing the bowl basket 17, and the observation windows 4 can intuitively see the working condition of the dishwasher.
[0063] The manufacturing method of a dishwasher for layered cleaning as described above comprises the following steps:
[0064] 1) Processing of the first box 1
[0065] a. First, the first box body 1 of corresponding size is processed according to the design requirements, and the inner and outer sides of the first box body 1 are polished. The installation positions of the first spray arm 18 and the second spray arm 19 are determined along the inner side of the first box body 1, and installation holes are opened at corresponding positions. At the same time, two guide grooves 28 are opened in parallel up and down along the inner side of the rear side of the first box body 1, and a straight through groove is opened along the center of the top surface of the first box body 1, so as to facilitate the installation and disassembly of the first spray arm 18, the second spray arm 19 and the partition door 5, and to facilitate the cleaning of the interior of the first box body 1 to prevent residues from adhering to the inner side of the first box body 1;
[0066] b. Then, two cabinet doors 3 of matching sizes are processed according to the size of the front side of the first housing 1, and observation windows 4 are installed on the cabinet doors 3. The processed cabinet doors 3 are then installed on the first housing 1, so as to facilitate the taking and placing of dishes and chopsticks and to facilitate the observation of the working conditions inside the dishwasher;
[0067] c. Then, the corresponding bottom plate 35 is processed according to the size of the first box body 1, and a door plate groove 36 is opened along the center of the top surface of the bottom plate 35, and then a first limiting groove 37, a second limiting groove 38, a first water groove 39 and a second water groove 40 are symmetrically opened along the two sides of the door plate groove 36. When processing the first limiting groove 37 and the second limiting groove 38, ensure that their width and depth are equal and they are vertically connected to each other. The first water groove 39 and the second water groove 40 penetrate the bottom plate 35. The first limiting groove 37 and the second limiting groove 38 improve the stability of the movable installation of the bowl basket 17, so that the bowl basket 17 can be moved horizontally or vertically, and at the same time, the bowl basket 17 can be prevented from colliding with the second spray arm 19 on the inner wall of the first box body 1, thereby extending the service life of the dishwasher. The first water groove 39 and the second water groove 40 can allow the water used for washing dishes to flow into the first water tank 22 and the second water tank 21, so as to prevent the accumulation of sewage at the bottom of the first cleaning chamber 20 and the second cleaning chamber 16, thereby affecting the cleaning effect of the dishes;
[0068] d. Finally, the first spray arm 18 and the second spray arm 19 are respectively installed in the installation holes in the first box body 1, and the shunt pipe 14 is respectively installed on the first spray arm 18 and the second spray arm 19. The first spray arm 18 and the second spray arm 19 can realize washing the dishes from the top and the side;
[0069] The processing steps of the first box body 1 are simple and convenient, and can meet the processing and installation requirements of dishwashers of different sizes, thereby increasing the dishware storage capacity of the dishwasher and improving the dishware cleaning effect.
[0070] 2) Installation of partition door 5
[0071] a. First, the size of the partition door 5 is determined according to the height and width of the first box body 1, and the required partition door 5 is formed by casting, and the partition door 5 is polished to ensure that the two arc-shaped sealing blocks 41 at the bottom of the partition door 5 are integrally formed with the partition door 5, and the sealing strip 42 is installed along the side and bottom of the partition door 5. The arc-shaped sealing blocks 41 and the sealing strip 42 greatly improve the sealing degree between the partition door 5 and the first box body 1 to prevent sewage leakage;
[0072] b. Then vertically insert the partition door 5 into the linear through groove on the first box body 1 until the top edge of the partition door 5 is flush with the top surface of the first box body 1, and then make corresponding columns 7 and lifting plates 6 according to the travel height of the partition door 5, and fix the lifting plate 6 on the top surface of the partition door 5 through the columns 7. At the same time, ear plates 8 are symmetrically installed on both sides of the lifting plate 6. The lifting plate 6 can drive the partition door 5 to move up and down through the columns 7, so as to meet the need of lateral movement of the bowl basket rack 17 and improve the cleaning effect;
[0073] c. Then, the first cylinder 9 is symmetrically installed along the two sides of the linear groove on the first box body 1, and the ear plate 8 is connected to the first cylinder 9 through the first piston rod 10. The partition door 5 can be driven up and down by the first cylinder 9 through the first piston rod 10 to realize the conduction or closing of the first cleaning chamber 20 and the second cleaning chamber 16;
[0074] The installation method of the partition door 5 is simple in steps, which not only improves the installation accuracy of the partition door 5, but also ensures that the partition door 5 does not collide with the bowl basket 17 after rising, thereby improving the working stability and reliability of the dishwasher.
[0075] 3) Installation of bowl and basket rack 17
[0076] a. First, select a suitable second cylinder 29 and a second piston rod 30 according to the length of the guide groove 28, and fix the second cylinder 29 at a set position on the rear side of the first box body 1, and then install the second piston rod 30 on the second cylinder 29 to ensure that the second piston rod 30 moves in the horizontal direction, thereby improving the stability and reliability of the bowl basket rack 17 when it moves horizontally;
[0077] b. Then, a corresponding boosting plate 31 is manufactured according to the design requirements, and a first arc block 32 and a second arc block 33 are installed along the front side of the boosting plate 31 to position the side of the bowl basket rack 17. The processed boosting plate 31 is connected to the second piston rod 30 through a connecting rod 34, so that the connecting rod 34 passes through the guide groove 28, and the connecting rod 34 is driven by the second piston rod 30 to move horizontally along the guide groove 28, and then the bowl basket rack 17 can be driven horizontally by the first arc block 32 and the second arc block 33 on the boosting plate 31, so as to realize the automatic cavity changing operation and improve the working efficiency;
[0078] c. Then, a corresponding bowl basket rack 17 is manufactured according to the sizes of the first cleaning chamber 20 and the second cleaning chamber 16, and four support blocks 44 are symmetrically installed at the bottom end of the bowl basket rack 17. Rollers are installed along the bottom surfaces of the support blocks 44. The bowl basket rack 17 can be supported by the rollers and the support blocks 44, and the rollers move along the first limiting grooves 37 and the second limiting grooves 38;
[0079] The installation method of the bowl basket rack 17 has simple steps, which not only improves the stability and reliability of the movement of the bowl basket rack 17, but also can realize automatic operation.
[0080] 4) Processing of the second box 2
[0081] a. First, according to the design requirements, the corresponding second box body 2, the first water tank 22 and the second water tank 21 are manufactured, and the second box body 2 is fixedly installed at the bottom of the first box body 1. At the same time, the first water tank 22 and the second water tank 21 are connected to the first cleaning chamber 20 and the second cleaning chamber 16 respectively through the water collecting tank 23. The water inlet pipe 11 and the water outlet pipe 12 are installed along the sides of the first water tank 22 and the second water tank 21, and valves are installed on the water inlet pipe 11 and the water outlet pipe 12 respectively. The first water tank 22 and the second water tank 21 can be filled with water or drained with water through the water inlet pipe 11 and the water outlet pipe 12. The valve is used to control the switch of the water inlet pipe 11 and the water outlet pipe 12;
[0082] b. Then, a guide pipe 26 with a water pump 27 is installed along the sides of the first water tank 22 and the second water tank 21, so that the guide pipe 26 passes through the side of the second box body 2, and the water delivery pipe 13 is installed in the vertical direction, and the water delivery pipe 13 is connected with the guide pipe 26 and the diversion pipe 14, and a sealing treatment is performed. The water in the first water tank 22 and the second water tank 21 can be sent to the water delivery pipe 13 through the guide pipe 26 through the water pump 27, and then flow into the first spray arm 18 and the second spray arm 19 through the diversion pipe 14, so as to achieve the cleaning of the dishes;
[0083] c. Then, the corresponding positioning strips 15 and frame 43 are processed according to the size of the water collection tank 23, the frame 43 is fixedly installed on one side of the positioning strip 15, the filter screen 24 is horizontally installed along the inner side of the frame 43 and the positioning strip 15, and the processed filter assembly is inserted into the water collection tank 23 along the front side of the second box body 2, and the residue in the sewage can be filtered through the filter assembly;
[0084] 5) Dishwasher test run
[0085] a. First, connect the water inlet pipes 11 and the water outlet pipes 12 on both sides with the external pipelines, put the dishes into the bowl basket 17 and push it into the first washing chamber 20, so that the bowl basket 17 is fixedly connected with the first arc block 32 and the second arc block 33 on the booster plate 31, and the rolling ball 25 is limited in the first limiting groove 37. At this time, the partition door 5 is lowered by the lifting mechanism until it is completely closed, and the cabinet door 3 on one side of the first washing chamber 20 is closed;
[0086] b. Then, water is poured into the first water tank 22 and the second water tank 21 respectively, and the water pump 27 on one side of the first water tank 22 is started, so that the water in the first water tank 22 is respectively sent to each branch pipe 14 through the guide pipe 26 and the water delivery pipe 13, and the dishes are preliminarily rinsed through the first spray arm 18 and the second spray arm 19 to remove stains;
[0087] c. After one cleaning is completed, the partition door 5 is opened by the lifting mechanism, so that the bowl basket 17 is moved into the second cleaning chamber 16 under the action of the booster mechanism. After it is in place, the partition door 5 is closed by the lifting mechanism, and the water pump 27 on one side of the second water tank 21 is started. Water is transported to each diversion pipe 14 through the guide pipe 26 and the water delivery pipe 13, and the bowls and chopsticks are cleaned twice through the first spray arm 18 and the second spray arm 19;
[0088] d. After cleaning, open the cabinet door 3 on one side of the second cleaning chamber 16, take out the dishes and chopsticks, and then start cleaning the next batch of dishes and chopsticks.
[0089] The manufacturing method of the dishwasher has simple steps, which can not only meet the processing and installation requirements of dishwashers of different sizes and increase the bowl and chopstick storage capacity of the dishwasher, but also improve the washing effect of the bowl and chopsticks through secondary washing, save water resources, and realize automatic operation at the same time, reducing the labor intensity of manual operation.
[0090] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention to achieve basically the same technical effects are all included in the protection scope of the present invention.
Claims
1. A dishwasher for layered cleaning, characterized in that: The invention comprises a first box body, a second box body and a bowl basket rack, a partition door is vertically arranged in the first box body, the partition door is connected to the first box body through a lifting mechanism, the partition door divides the first box body into a first cleaning chamber and a second cleaning chamber, a first spray arm and a second spray arm are arranged on the top surface and the side surface of the first cleaning chamber and the second cleaning chamber, the second box body is fixedly connected to the bottom of the first box body, a first water tank and a second water tank are arranged in the second box body, the first water tank and the second water tank are respectively communicated with the first cleaning chamber and the second cleaning chamber, the first water tank and the second water tank are respectively connected to the first spray arm and the second spray arm, and the bowl basket rack is movably connected to the first cleaning chamber and the second cleaning chamber through a booster mechanism; the lifting mechanism The invention comprises a first cylinder and a lifting plate, wherein the lifting plate is fixedly connected to the top surface of the partition door through a column, ear plates are symmetrically arranged on both sides of the lifting plate, and two first cylinders are symmetrically arranged on the top surface of the first box body, and the first cylinder is connected to the ear plates through a first piston rod; the boosting mechanism comprises a second cylinder and a boosting plate, wherein the two second cylinders are arranged parallel to each other on the rear side surface of the first box body, and the second cylinders are connected to the second piston rod, and the boosting plate is fixedly connected to the second piston rod through a connecting rod, and a guide groove is arranged in parallel on the inner side of the rear side surface of the first box body, and the connecting rod matches the guide groove, and a first arc block and a second arc block are arranged on the front side surface of the boosting plate, and the first arc block and the second arc block are arranged perpendicular to each other.
2. A dishwasher for layered cleaning according to claim 1, characterized in that: A bottom plate is provided at the bottom of the first cleaning chamber and the second cleaning chamber, and a first limiting groove, a second limiting groove, a first water passing groove, a second water passing groove and a door panel groove are provided on the top surface of the bottom plate, and the door panel groove is located at the center of the bottom plate, and the first limiting groove and the second limiting groove are respectively located on both sides of the door panel groove, and the first limiting groove and the second limiting groove are vertically connected to each other, and the first water passing groove and the second water passing groove are symmetrically arranged on both sides of the door panel groove.
3. A dishwasher for layered cleaning according to claim 2, characterized in that: Support blocks are symmetrically arranged on the bottom surface of the bowl basket frame, and rolling balls are arranged on the support blocks. The rolling balls match the first limiting groove and the second limiting groove.
4. A dishwashing machine for layered cleaning according to claim 2, characterized in that: The bottom surface of the partition door is symmetrically provided with arc-shaped sealing blocks, the arc-shaped sealing blocks match the door panel grooves, and the side surfaces of the partition door are provided with sealing strips.
5. The dishwasher for layered cleaning according to claim 1, characterized in that: The top surfaces of the first water tank and the second water tank are connected to the first cleaning chamber and the second cleaning chamber respectively through a water collecting trough, and filter components are provided in the first cleaning chamber and the second cleaning chamber, and water inlet pipes and water outlet pipes are provided on the sides of the first water tank and the second water tank, and valves are provided on the water inlet pipes and the water outlet pipes respectively, and the first water tank and the second water tank are connected to the water supply pipe through a guide pipe, and the water supply pipe is connected to the first spray arm and the second spray arm respectively through a diversion pipe, and a water pump is provided on the guide pipe.
6. A dishwasher for layered cleaning according to claim 5, characterized in that: The filter assembly comprises a positioning bar and a frame body, wherein the frame body is fixedly connected to the positioning bar, and a filter net is arranged between the positioning bar and the frame body.
7. The dishwasher for layered cleaning according to claim 1, characterized in that: Cabinet doors are symmetrically arranged on the front side of the first box body, and observation windows are arranged on the cabinet doors.
8. A method for manufacturing a dishwasher for layered cleaning according to any one of claims 1 to 7, characterized in that The following steps are involved: 1) First box processing a. First, the first box body of corresponding size is processed according to the design requirements, and the inner and outer sides of the first box body are polished. The installation positions of the first spray arm and the second spray arm are determined along the inner side of the first box body, and installation holes are opened at the corresponding positions. At the same time, two guide grooves are opened in parallel up and down along the inner side of the rear side of the first box body, and a straight through groove is opened along the center of the top surface of the first box body; b. Then, two cabinet doors of matching sizes are processed according to the size of the front side of the first cabinet, and observation windows are installed on the cabinet doors, and then the processed cabinet doors are installed on the first cabinet; c. Then, the corresponding bottom plate is processed according to the size of the first box body, a door plate groove is opened along the center of the top surface of the bottom plate, and then the first limiting groove, the second limiting groove, the first water groove and the second water groove are symmetrically opened along both sides of the door plate groove. When processing the first limiting groove and the second limiting groove, ensure that their width and depth are equal and they are vertically connected to each other, and the first water groove and the second water groove pass through the bottom plate; d. Finally, the first spray arm and the second spray arm are respectively installed in the installation holes in the first box body, and the shunt pipes are respectively installed on the first spray arm and the second spray arm; 2) Partition door installation a. First, determine the size of the partition door according to the height and width of the first box body, form the required partition door by casting, and grind and polish the partition door to ensure that the two arc-shaped sealing blocks at the bottom of the partition door are integrally formed with the partition door, and install sealing strips along the side and bottom edges of the partition door; b. Then vertically insert the partition door into the linear groove on the first box until the top edge of the partition door is flush with the top surface of the first box, and then make corresponding columns and lifting plates according to the travel height of the partition door, and fix the lifting plate on the top surface of the partition door through the columns, and at the same time symmetrically install ear plates on both sides of the lifting plate; c. Then, the first cylinder is symmetrically installed along both sides of the linear groove on the first box body, and the ear plate is connected to the first cylinder through the first piston rod; 3) Bowl and basket rack installation a. First, select a suitable second cylinder and a second piston rod according to the length of the guide groove, and fix the second cylinder at a set position on the rear side of the first box body, and then install the second piston rod on the second cylinder to ensure that the second piston rod moves in the horizontal direction; b. Then, make the corresponding booster plate according to the design requirements, install the first arc block and the second arc block along the front side of the booster plate to position the side of the bowl and basket rack, connect the processed booster plate to the second piston rod through the connecting rod, and make the connecting rod pass through the guide groove; c. Then, a corresponding bowl basket rack is made according to the sizes of the first cleaning chamber and the second cleaning chamber, and four support blocks are symmetrically installed at the bottom end of the bowl basket rack, and rollers are installed along the bottom surfaces of the support blocks; 4) Second box processing a. First, according to the design requirements, the corresponding second box body, the first water tank and the second water tank are manufactured, the second box body is fixedly installed at the bottom of the first box body, and the first water tank and the second water tank are connected to the first cleaning chamber and the second cleaning chamber respectively through the water collecting tank, and the water inlet pipe and the water outlet pipe are installed along the sides of the first water tank and the second water tank, and valves are installed on the water inlet pipe and the water outlet pipe respectively; b. Then install a guide pipe with a water pump along the sides of the first water tank and the second water tank, so that the guide pipe passes through the side of the second tank, install a water delivery pipe in the vertical direction, connect the water delivery pipe with the guide pipe and the diversion pipe, and do a good job of sealing; c. Then, according to the size of the water collection tank, the corresponding positioning strips and frames are processed, the frame is fixedly installed on one side of the positioning strip, the filter screen is horizontally installed along the inner side of the frame and the positioning strip, and the processed filter assembly is inserted into the water collection tank along the front side of the second box; 5) Dishwasher test run a. First, connect the water inlet pipes and the water outlet pipes on both sides with the external pipes, put the dishes and chopsticks into the bowl basket and push it into the first washing chamber, so that the bowl basket is fixedly connected with the first arc block and the second arc block on the booster plate, and the rolling ball is limited in the first limit groove. At this time, the partition door is lowered by the lifting mechanism until it is completely closed, and the cabinet door on one side of the first washing chamber is closed; b. Then, water is injected into the first water tank and the second water tank respectively, and the water pump on one side of the first water tank is started, so that the water in the first water tank is sent to each branch pipe through the guide pipe and the water delivery pipe respectively, and the dishes are preliminarily rinsed through the first spray arm and the second spray arm to remove stains; c. After the first cleaning is completed, the partition door is opened by the lifting mechanism, so that the bowl basket rack moves into the second cleaning chamber under the action of the booster mechanism. After it is in place, the partition door is closed by the lifting mechanism, and the water pump on one side of the second water tank is started. Water is transported to each diversion pipe through the guide pipe and the water delivery pipe, and the bowls and chopsticks are cleaned twice through the first spray arm and the second spray arm; d. After cleaning, open the cabinet door on one side of the second cleaning chamber, take out the dishes and chopsticks, and start cleaning the next batch of dishes and chopsticks.
