Prefabricated platform slab of subway station and hoisting and installation method thereof

Through prefabricated platform slabs and hoisting installation methods, the problems of numerous construction procedures, large material consumption, and serious environmental pollution in the construction of existing subway station platform slabs have been solved, achieving simple and fast installation and efficient and energy-saving construction effects, and improving the structure. stability and construction efficiency.

CN111119521BActive Publication Date: 2024-10-25CHINA RAILWAY 23RD CONSTR BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010019671.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-01-08
Publication Date
2024-10-25
Estimated Expiration
2040-01-08

AI Technical Summary

Technical Problem

The existing cast-in-place construction method of subway station platform slabs has the problems of numerous construction procedures, large material consumption, serious environmental pollution, long construction period, high cost and poor structural stability. It is difficult to meet the requirements of high quality, high efficiency, energy saving and environmental protection. Requirements for sustainable development and construction.

Method used

Prefabricated platform panels and their hoisting and installation methods are used. By reserving installation limit holes and embedded steel bars in the station floor, the support frame is realized by using the cooperation of the bosses, grooves, embedded screws and sleeves of the support frame and panel. and panels are installed simply and quickly, and the prefabricated components are placed on the station floor through lifting equipment to ensure structural stability.

Benefits of technology

The platform plate of the subway station is simple in structure, easy and fast to install, reduces construction costs, improves construction efficiency and structural stability, and meets the sustainable development needs of high efficiency, energy saving, and environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111119521B_ABST
    Figure CN111119521B_ABST
Patent Text Reader

Abstract

The present invention discloses a prefabricated platform slab of a subway station which has a simple structure, is easy and quick to install and can save construction costs, and a lifting and installation method thereof. The prefabricated platform slab comprises a panel, a lower surface of which is provided with a boss extending in the length direction, a first end of which is provided with a first reserved through hole penetrating in the up-down direction, and a second end of which is provided with a second reserved through hole penetrating in the up-down direction; a top surface of a support frame is provided with a groove, a first embedded screw and a second embedded screw extending upward are pre-embedded in the top surface, a countersunk hole is reserved on the lower end surface of a support leg, and a sleeve is pre-embedded in the countersunk hole; a plurality of support frames are arranged in a row on a station floor along the longitudinal direction of the subway station, top surfaces of two adjacent support frames are respectively overlapped with the first and second ends of the same panel, top surfaces of two adjacent support frames are overlapped with at least one panel in a row along the transverse direction of the subway station, and the first end of one of the two adjacent panels in the same row is butted with the second end of the other of the two adjacent panels in the same row.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a platform slab of a subway station and a construction technology thereof, and in particular to a prefabricated platform slab of a subway station and a hoisting and installation method thereof. Background Art

[0002] In order to facilitate passengers to get on and off the train, it is necessary to set up platform slabs at subway stations. Due to the special location of the platform slabs, they are generally not cast at the same time as the main body of the station. Especially in stations where shield construction needs to pass, the platform slabs must be cast later.

[0003] During the construction phase, subway stations are usually used as the starting or arrival site for shield tunneling. Therefore, secondary structures such as platform slabs inside the station can only be constructed after the main structure is completed and the construction of sections at both ends of the station does not need to occupy the platform structure area. Previously, the platform slabs inside the subway station were constructed using the cast-in-place method. This construction method is to reserve air duct steel bars during the construction of the main structure of the subway station. After the main structure is completed, the platform slabs are cast by tying steel bars and pouring concrete on the construction site to form a whole with the main body of the subway station. However, the cast-in-place construction method of the platform slab inside the subway station will bring some problems, mainly: first, it is necessary to invest more manpower and material resources on the construction site for construction, there are many construction processes, and all structural components need to be completed on the construction site, and it is necessary to wait for the concrete age. This production method has a low degree of industrialization, low construction efficiency, and a long construction period; second, the existing cast-in-place construction method of the platform slab inside the subway station still has problems such as large consumption of materials, resources and energy, large amount of construction waste, poor construction environment, large dust pollution on site, and cross-operation with interval construction, and mutual constraints on construction periods; it cannot meet the requirements of high-quality, high-efficiency, energy-saving and environmentally friendly sustainable development construction; third, due to the particularity of the structure and position of the platform slab, the construction space is small, concrete vibration and surface smoothing are difficult, and the construction quality is not easy to guarantee; fourth, the cast-in-place construction of the platform slab inside the subway station means that the civil construction needs to enter the site twice, which often takes up the time for the later mechanical and electrical installation and decoration, directly affecting the opening period of the entire line.

[0004] Although the Chinese utility model patent (publication number CN 208933841 U) solves the problems caused by the aforementioned cast-in-place construction method, in the utility model patent, a support arm 5 is provided on each side of the top of the column 2; the prefabricated platform plate 1 is erected on the support arm 5; the cross-section of the support arm 5 is I-shaped, and the two support arms 5 are symmetrically distributed on both sides of the column 2, and the ends of the two support arms 5 are respectively connected to the outer side surfaces of the two wing plates 6 of the column 2 by welding; the support arm 5 includes a web 7, a top plate 8 and a bottom plate 9. The web 7 of the support arm 5 is arranged in the vertical direction, and the web 7 is connected between the bottom plate 9 and the top plate 8; the top plate 8 is arranged in the horizontal direction, and is used to support the prefabricated platform plate 1; a reinforcing plate 10 is arranged between the two wing plates 6 of the column 2; the connection between the bottom plate 9 and the wing plate 6 of the support arm 5 is flush with the reinforcing plate 10; the two sides of the reinforcing plate 10 are respectively connected to the inner sides of the two wing plates 6 of the column 2 by welding; it can be seen that the support structure of the utility model patent is complex and the production cost is relatively high. In addition, in this utility model patent, the bottom end of the column 2 is fixedly installed on the ground 3, and the ground 3 is the station floor or the edge of the roadbed. The column 2 is made of I-beam, and a support plate 4 is welded at its bottom end. A diagonal brace 13 is arranged between the support plate 4 and the column 2; the support plate 4 is fixedly installed on the ground 3 by chemical bolts 12; a post-cast concrete protective pier 11 is arranged at the connection between the bottom end of the column 2 and the ground 3; the bottom surface of the post-cast concrete protective pier 11 is in close contact with the ground, and the post-cast concrete protective pier 11 wraps the bottom end of the column 2 and the support plate 4; it can be seen that the installation of the column 2 is complicated, time-consuming and labor-intensive, and the construction cost is relatively high. In addition, in this utility model patent, the column 2 is installed at the predetermined position of the station, and the post-cast concrete protective pier 11 is poured, and then each prefabricated platform slab 1 is laid on the top of the column 2; it can be seen that the prefabricated platform slab 1 is laid on the top of the column 2. During laying, the prefabricated platform slab 1 is not easy to position, the installation is more complicated, time-consuming and labor-intensive, and the construction cost is increased. During use, the prefabricated platform slab 1 is easy to slide on the column 2, causing the stability of the entire structure to deteriorate. Summary of the invention

[0005] The object of the present invention is to provide a prefabricated platform slab of a subway station and a method for hoisting and installing the same, which has a simple structure, is easy and quick to install, and can save construction costs.

[0006] The technical solution of the present invention for achieving the above-mentioned object is as follows:

[0007] A prefabricated platform slab of a subway station, comprising:

[0008] The panel has a lower surface provided with a boss extending in the length direction, a first end provided with a first reserved through hole penetrating in the up-down direction, and a second end provided with a second reserved through hole penetrating in the up-down direction;

[0009] The support frame has a groove on its top surface, a first embedded screw and a second embedded screw extending upward are embedded in the top surface, and a countersunk hole is reserved on the lower end surface of the support leg, and a sleeve is embedded in the countersunk hole;

[0010] Among them, multiple support frames are arranged in rows on the station floor along the longitudinal direction of the subway station, and the top surfaces of two adjacent support frames are respectively overlapped with the first and second ends of the same panel, and the top surfaces of two adjacent support frames are overlapped with at least one panel in a row along the transverse direction of the subway station, and the first end of one of the two adjacent panels in the same row is docked with the second end of the other of the two adjacent panels in the same row, and the boss of the first end of one of the two adjacent panels in the same row is docked with the boss of the second end of the other of the two adjacent panels in the same row and is adapted to be accommodated in the groove of the overlapping support frame, the first embedded screw of the support frame passes through the first reserved through hole at the first end of one of the two adjacent panels to be overlapped and is screwed together with the first nut to be fastened, and the second embedded screw of the support frame passes through the second reserved through hole at the second end of the other of the two adjacent panels to be overlapped and is screwed together with the second nut to be fastened.

[0011] The support frames have a plurality of columns, and the support frames between adjacent columns are in contact with each other and arranged in rows.

[0012] There are a plurality of sleeves, which are arranged in rows along the longitudinal direction of the subway station.

[0013] The support frame has two support legs, and the support frame is an axisymmetric structure with an axis extending in the up-down direction as an axis.

[0014] It also includes a steel plate arranged on the upper surfaces of the first and second ends of two adjacent panels that are butt-jointed with each other, and the corresponding first and second embedded screws of the support frame pass through the through holes on the steel plate and are respectively screwed and fastened with the first and second nuts.

[0015] The upper surfaces of the first and second ends of the two adjacent panels butted against each other are respectively provided with first and second concave platforms, and the concave depths of the first and second platforms are equal to the thickness of the steel plate.

[0016] A method for hoisting and installing the prefabricated platform slab of the subway station comprises the following steps:

[0017] Step 1: During the construction of the main body of the station, installation limit holes are reserved on the station floor, and the installation limit holes are arranged in a row along the longitudinal direction of the subway station. The distance between two adjacent installation limit holes is equal to the distance required for the installation of two adjacent support frames, and steel bars are embedded in the bottom surface of each installation limit hole, and the steel bars extend upward; at the same time, a first bracket is set on the surface of the station side wall facing the station center column and located between the station floor and the station center plate, and a second bracket is set on the surface of the station center column facing the station side wall and located between the station floor and the station center plate, wherein the first bracket and the second bracket are opposite to each other;

[0018] Step 2: After the main construction of the station is completed and before the prefabricated platform slab of the subway station is constructed, the first guide rail is installed on the first bracket, the second guide rail is installed on the second bracket, and then a traveling crane is laid on the first guide rail and the second guide rail, wherein the first guide rail and the second guide rail both extend in the longitudinal direction of the subway station; panels, support frames and steel plates are prefabricated in the component prefabrication yard, and the prefabricated panels, support frames and steel plates are transported to the construction site;

[0019] Step 3: transport the panels, support frames and steel plates delivered to the site through the shield lifting holes into the subway station and place them on the station floor;

[0020] Step 4: The traveling crane lifts the support frame placed on the station floor, moves it in the longitudinal direction of the subway station and / or in the transverse direction to adjust the position of the support frame, aligns the support legs of the support frame with the installation limit holes, pours concrete into the installation limit holes aligned with the support legs of the support frame, and then moves the support frame downward to insert the steel bars in the corresponding installation limit holes into the sleeves of the support legs of the support frame and extend the lower ends of the support legs of the support frame into the corresponding installation limit holes, and then leveling is performed;

[0021] Step 5, installing more support frames according to step 4 and arranging the subsequently installed support frames in a row with the previously installed support frames along the longitudinal direction of the subway station;

[0022] Step 6, the traveling crane lifts the panel placed on the station floor, moves along the longitudinal direction of the subway station and / or moves in the transverse direction to adjust the position of the panel, so that the first reserved through hole of the panel is aligned with the first embedded screw of one of the two adjacent support frames and the boss at the first end of the panel is aligned with the groove of one of the two adjacent support frames, and at the same time, the second reserved through hole of the panel is aligned with the second embedded screw of the other of the two adjacent support frames and the boss at the second end of the panel is aligned with the groove of the other of the two adjacent support frames, and then the traveling crane moves the panel downward, so that the first embedded screw passes through the first reserved through hole, the second embedded screw passes through the second reserved through hole, and the corresponding boss is adapted to be accommodated in the corresponding groove, so that the first and second ends of the panel are respectively overlapped on the top surfaces of the two adjacent support frames;

[0023] Step 7, if multiple panels are overlapped in a row on the top surfaces of two adjacent support frames in the transverse direction of the subway station, then continue to install other panels on the top surfaces of the two adjacent support frames on which panels have been installed in step 6, so that the subsequently installed panels are arranged in a row with the previously installed panels, until the top surfaces of the two adjacent support frames are fully covered with panels;

[0024] Step 8, installing panels on the top surfaces of the other two adjacent support frames according to steps 6-7, wherein the first end of one of the two adjacent panels in the same row is butted against the second end of the other of the two adjacent panels in the same row;

[0025] Step 9, the traveling crane lifts the steel plate placed on the station floor, moves the steel plate in the longitudinal direction of the subway station and / or in the transverse direction to adjust the position of the steel plate, so that the steel plate is arranged on the upper surfaces of the first and second ends of two adjacent panels butted against each other, and the first embedded screw and the second embedded screw of the corresponding support frame are passed through the through holes on the steel plate and are screwed and fastened with the first nut and the second nut accordingly;

[0026] Step 10. Complete the installation of other steel plates according to step 9.

[0027] When the support frames have multiple columns and the support frames between adjacent columns are in contact with each other and arranged in rows, the support frames and panels of other columns are installed respectively according to steps 4-8, and then the steel plates are installed according to steps 9 and 10. Under this structure, all the steel plates installed on the same row of the support frames are a whole piece, connecting all the support frames in the same row together.

[0028] The upper surfaces of the first and second ends of the two adjacent panels butted against each other are respectively provided with first and second concave platforms, and the concave depths of the first and second platforms are equal to the thickness of the steel plate.

[0029] The beneficial effects of the present invention are:

[0030] The prefabricated platform plate of the subway station of the present invention comprises a panel, a support frame and a steel plate, and has a simple structure and a low prefabrication cost. A boss and a first reserved through hole and a second reserved through hole are arranged on the panel, a groove matching with the boss and a first and a second pre-embedded screw matching with the first reserved through hole and the second reserved through hole are arranged on the support frame, a countersunk hole is reserved on the lower end surface of the supporting leg of the support frame, a sleeve is embedded in the countersunk hole, and a steel bar extending upward is embedded on the bottom surface of the installation limit hole reserved in the station floor. During installation, the steel bars are inserted into the sleeve and the lower ends of the support legs of the support frame are aligned with the installation limit holes for positioning, and then concrete is poured into the installation limit holes aligned with the support legs of the support frame. The support frame and the station floor are positioned and limited by the sleeve and the pre-embedded steel bars of the station floor, and the support legs and the installation limit holes. The support frame is easy and quick to install. At the same time, the support frame and the panel are positioned and limited by the boss and the groove, the first reserved through hole and the first embedded screw, and the second reserved through hole and the second embedded screw. The installation is easy and quick, and the panel will not move relative to the support frame, which can ensure the stability of the overall structure of the present invention. In addition, the boss extends along the length direction of the panel, which can reduce the weight of the panel while ensuring the strength of the panel. It can be seen that the present invention has a simple structure, is easy and quick to install, has good structural stability, and has low manufacturing and construction costs.

[0031] The method for hoisting and installing the prefabricated platform slab of a subway station of the present invention is adopted to install the prefabricated platform slab of the subway station, which is simple and quick to construct and can reduce the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a schematic diagram of the cross-sectional structure of the prefabricated platform slab of the subway station of the present invention (sectioned along the axial direction of the first embedded screw).

[0033] Figure 2 for Figure 1 Top view of the .

[0034] Figure 3 for Figure 1 Section view along AA.

[0035] Figure 4 It is a front view of the panel of the present invention.

[0036] Figure 5 for Figure 4 Top view of the .

[0037] Figure 6 for Figure 4 Bottom view of .

[0038] Figure 7 for Figure 4 Left view of .

[0039] Figure 8It is a schematic structural diagram of the support frame of the present invention.

[0040] Fig. 9 for Figure 8 Section view along BB.

[0041] Fig.10 The present invention is a schematic diagram of the arrangement of the overhead crane involved.

[0042] Fig.11 It is a schematic diagram of the arrangement of the installation limiting holes and the steel bars of the present invention.

[0043] Fig.12 for Fig.11 Section view along CC.

[0044] Fig.13 for Figure 1 Enlarged view of point D.

[0045] Fig.14 It is a schematic diagram (enlarged view) of the connection structure between the second embedded screw, the panel, the steel plate and the second nut of the present invention. DETAILED DESCRIPTION

[0046] The examples given below are specific descriptions of the present invention. It is necessary to point out that the following examples are only used to further illustrate the present invention and cannot be understood as limiting the scope of protection of the present invention.

[0047] In the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include at least one of the features.

[0048] Figure 1-3 An embodiment of a prefabricated platform slab of a subway station among many embodiments of the present invention is exemplified, wherein: Figure 2 In the figure, the first nut e screwed to the first embedded screw rod 22 is not shown, and the second nut f screwed to the second embedded screw rod 23 is not shown. The prefabricated platform panel of the subway station includes a panel 1, a support frame 2 and a steel plate 4.

[0049] See also Figure 4-7 The panel 1 is a rectangular plate structure. The lower surface of the panel 1 is provided with a boss 11 extending in the length direction, the first end 12 thereof is provided with a first reserved through hole 13 penetrating in the vertical direction, and the second end 14 thereof is provided with a second reserved through hole 15 penetrating in the vertical direction.

[0050] See also Figure 1 , 2, 8, 9, the top surface of the support frame 2 is provided with a groove 21, and the groove 21 extends along the longitudinal direction of the subway station. The top surface of the support frame 2 is pre-embedded with a first pre-embedded screw 22 extending upward and a second pre-embedded screw 23 extending upward, and the lower end surface of the support leg 24 of the support frame 2 is pre-reserved with a countersunk hole, and a sleeve 25 is pre-embedded in the countersunk hole. Figure 1 , 2 In the embodiments shown in FIGS. 8 and 9 , there are four grooves 21 .

[0051] See also Figure 1-3 , 13, 14, a plurality of support frames 2 are arranged in a row on the station floor 3 along the longitudinal direction of the subway station, the top surfaces of two adjacent support frames 2 are respectively overlapped with the first and second ends 12, 14 of the same panel 1, and the top surfaces of two adjacent support frames 2 are overlapped with at least one panel 1 in a row along the transverse direction of the subway station, Figure 1-3 In the embodiment presented, the top surfaces of two adjacent support frames 2 are overlapped with four panels 1 in a row along the transverse direction of the subway station. Figure 2 The left and right directions are arranged in rows. Figure 2-9 , the first end 12 of one of the two adjacent panels 1 in the same row is butted with the second end 14 of the other of the two adjacent panels 1 in the same row, and the boss 11 of the first end 12 of one of the two adjacent panels 1 in the same row is butted with the boss 14 of the second end 14 of the other of the two adjacent panels 1 in the same row and is adapted to be accommodated in the groove 21 of the overlapping support frame 2, the first embedded screw 22 of the support frame 2 passes through the first reserved through hole 13 of the first end 12 of one of the two adjacent panels 1 in the same row and is screwed and fastened with the first nut e, and the second embedded screw 23 of the support frame 2 passes through the second reserved through hole 15 of the second end 14 of the other of the two adjacent panels 1 in the same row and is screwed and fastened with the second nut f. In this article, the longitudinal direction of the subway station is the direction in which the subway train runs, and the transverse direction of the subway station is the left and right direction when the subway train runs to the station.

[0052] In some embodiments, the support frame 2 has multiple columns, and the support frames 2 between adjacent columns are in contact with each other and arranged in rows. Figure 1-3 In the embodiment presented, the support frame 2 has three columns.

[0053] In some embodiments, there are multiple sleeves 25, which are arranged in rows along the longitudinal direction of the subway station. The sleeves 25 are arranged in rows along the longitudinal direction of the subway station so that when the support frame 2 is installed on the station floor 3, the stability of the support frame 2 in the longitudinal direction of the subway station can be guaranteed.

[0054] In some embodiments, the support frame 2 has multiple columns, and the support frames 2 between adjacent columns are in contact with each other and arranged in rows. All steel plates 4 installed on the same row of the support frames 2 are a whole piece, and all the support frames 2 in the same row are connected together to improve the stability of the support frames 2 in the same row in the longitudinal and lateral directions of the subway station.

[0055] Figure 1-3 In the embodiments presented in Figures 8 and 9, the support frame 2 has two support legs 24, and the support frame 2 is an axisymmetric structure with the axis L extending in the up-down direction as the axis. This structure ensures the stability of the support frame 2 in the lateral direction of the subway station when it is installed on the station floor 3.

[0056] See also Fig.13 , 14 In some embodiments, the present invention also includes a steel plate 4 arranged on the upper surfaces of the first and second ends 12 and 14 of the two adjacent panels 1 that are butt-jointed with each other, and the corresponding first embedded screw 22 and second embedded screw 23 of the support frame pass through the through holes on the steel plate 4 and are respectively screwed and fastened with the first nut e and the second nut f.

[0057] In some embodiments, the upper surfaces of the first and second ends of two adjacent panels 1 that are connected to each other are respectively provided with first and second concave platforms 16 and 17, and the depth of the concave first and second platforms 16 and 17 is equal to the thickness of the steel plate 4, so that the steel plate 4 can be flush with the upper surface of the panel 1, and the steel plate 4 is buried in the first and second platforms 16 and 17.

[0058] See also Figure 1-12 The present invention provides a method for hoisting and installing a prefabricated platform slab of a subway station, comprising the following steps:

[0059] Step 1: During the construction of the main body of the station, installation limit holes 31 are reserved on the station floor 3, and the installation limit holes 31 are arranged in a row along the longitudinal direction of the subway station. The distance between two adjacent installation limit holes 31 is equal to the distance required for the installation of two adjacent support frames 2, and a steel bar 32 is pre-embedded on the bottom surface of each installation limit hole 31, and the steel bar 32 extends upward; at the same time, a first bracket 8 is set on the surface of the station side wall 5 facing the station center column 6 and located between the station floor 3 and the station center plate 7, and a second bracket 9 is set on the surface of the station center column 6 facing the station side wall 5 and located between the station floor 3 and the station center plate 7, wherein the first bracket 8 and the second bracket 9 are opposite to each other;

[0060] Step 2, after the main construction of the station is completed and before the prefabricated platform slab of the subway station is constructed, the first guide rail a is installed on the first corbel 8, the second guide rail b is installed on the second corbel 9, and then the overhead crane c is laid on the first guide rail a and the second guide rail b, wherein the first guide rail a and the second guide rail b both extend in the longitudinal direction of the subway station; the panel 1, the support frame 2 and the steel plate 4 are prefabricated in the component prefabrication yard, and the prefabricated panel 1, the support frame 2 and the steel plate 4 are transported to the construction site;

[0061] Step 3, the panel 1, support frame 2 and steel plate 4 transported to the site are hoisted into the subway station through the shield hoisting hole and placed on the station floor 3;

[0062] Step 4, the traveling crane c lifts the support frame 2 placed on the station floor 3, moves along the longitudinal direction of the subway station and / or moves in the transverse direction to adjust the position of the support frame 2, so that the support legs of the support frame 2 are aligned with the installation limit holes 31, and pours concrete d into the installation limit holes 31 to which the support legs of the support frame 2 are aligned, and then the traveling crane moves the support frame 2 downward, so that the steel bars 32 in the corresponding installation limit holes 31 are inserted into the sleeves 25 of the support legs of the support frame 2 and the lower ends of the support legs of the support frame 2 are extended into the corresponding installation limit holes 31, and then leveling is performed; concrete d is poured into the installation limit holes 31, which mainly plays a leveling role; after installation, the installation limit holes 31 can limit the movement of the support frame 2; during installation, the installation limit holes 31 can position the support frame 2;

[0063] Step 5, installing more support frames 2 according to step 4 and arranging the subsequently installed support frames 2 and the previously installed support frames 2 in a row along the longitudinal direction of the subway station;

[0064] Step 6, the traveling crane C lifts the panel 1 placed on the station floor 3, moves along the longitudinal direction of the subway station and / or moves in the transverse direction to adjust the position of the panel, so that the first reserved through hole 13 of the panel 1 is aligned with the first embedded screw 22 of one of the two adjacent support frames 2 and the boss 11 of the first end 12 of the panel 1 is aligned with the groove 21 of one of the two adjacent support frames 2, and at the same time, the second reserved through hole 15 of the panel 1 is aligned with the second embedded screw 23 of the other of the two adjacent support frames 2 and the boss 11 of the second end 14 of the panel 1 is aligned with the groove 21 of the other of the two adjacent support frames 2, and then the traveling crane C moves the panel downward, so that the first embedded screw 22 passes through the first reserved through hole 13, the second embedded screw 23 passes through the second reserved through hole 15, and the corresponding boss 11 is adapted to be accommodated in the corresponding groove 21, so that the first and second ends 12, 14 of the panel 1 are respectively overlapped on the top surfaces of the two adjacent support frames 2;

[0065] Step 7, if the top surfaces of two adjacent support frames 2 overlap multiple panels 1 in a row along the transverse direction of the subway station, then continue to install other panels 1 on the top surfaces of the two adjacent support frames 2 on which the panels 1 have been installed in step 6, so that the subsequently installed panels 1 are arranged in a row with the previously installed panels 1, until the top surfaces of the two adjacent support frames 2 are fully covered with panels 1;

[0066] Step 8, installing the panels 1 on the top surfaces of the other two adjacent support frames 2 according to steps 6-7, wherein the first end 12 of one of the two adjacent panels 1 in the same row is butted against the second end 14 of the other of the two adjacent panels 1 in the same row;

[0067] Step 9, the crane c lifts the steel plate 4 placed on the station floor 3, moves the steel plate in the longitudinal direction of the subway station and / or moves the steel plate in the transverse direction to adjust the position of the steel plate, so that the steel plate 4 is arranged on the upper surfaces of the first and second ends 12 and 14 of the two adjacent panels 1 butted against each other, and the first embedded screw 22 and the second embedded screw 22 of the corresponding support frame 2 pass through the through holes on the steel plate 4 and are screwed and fastened with the first nut e and the second nut accordingly;

[0068] Step 10, complete the installation of other steel plates 4 according to step 9.

[0069] Preferably, when the support frames 2 have multiple columns and the support frames 2 between adjacent columns are in contact with each other and arranged in rows, the support frames 2 and panels 1 of other columns are installed respectively according to the aforementioned steps 4-8, and then the steel plates 4 are installed according to steps 9 and 10. Under this structure, all the steel plates 4 installed on the same row of the support frames 2 are a whole piece, and all the support frames 2 in the same row are connected together to improve the stability of the support frames 2 in the same row in the longitudinal and transverse directions of the subway station.

[0070] It should be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present invention will not further describe various possible combinations.

[0071] The present invention has been described in detail above with reference to the embodiments, which are illustrative rather than restrictive. Changes and modifications without departing from the overall concept of the present invention are within the protection scope of the present invention.

Claims

1. A prefabricated platform slab for a subway station, characterized in that: include: A panel (1) having a lower surface provided with a boss (11) extending in the length direction, a first end (12) provided with a first reserved through hole (13) penetrating in the up-down direction, and a second end (14) provided with a second reserved through hole (15) penetrating in the up-down direction; The support frame (2) has a groove (21) on its top surface, a first embedded screw (22) and a second embedded screw (23) both extending upward are embedded in the top surface, and a countersunk hole is reserved on the lower end surface of the support leg (24), and a sleeve (25) is embedded in the countersunk hole; A plurality of support frames (2) are arranged in a row on a station floor (3) along a longitudinal direction of a subway station, the top surfaces of two adjacent support frames (2) are respectively overlapped with the first and second ends of a same panel (1), the top surfaces of two adjacent support frames (2) are overlapped with at least one panel (1) in a row along a transverse direction of the subway station, the first end (12) of one of the two adjacent panels (1) in the same row is butted against the second end (14) of the other of the two adjacent panels (1) in the same row, and the boss (11) of the first end (12) of one of the two adjacent panels (1) in the same row is butted against the second end (14) of the other of the two adjacent panels (1) in the same row. The boss (11) of the second end (14) of the other of the two adjacent panels (1) is butted against and adapted to be accommodated in the groove (21) of the overlapping support frame (2); the first embedded screw (22) of the support frame (2) passes through the first reserved through hole (13) of the first end (12) of the other of the two adjacent panels (1) and is screwed and fastened with the first nut (e); the second embedded screw (23) of the support frame (2) passes through the second reserved through hole (15) of the second end (14) of the other of the two adjacent panels (1) and is screwed and fastened with the second nut (f); The support frames (2) have a plurality of columns, and the support frames (2) between adjacent columns are in contact with each other and arranged in rows; It also includes a steel plate (4) arranged on the upper surfaces of the first and second ends of two adjacent panels (1) butted against each other, wherein the first embedded screw (22) and the second embedded screw (23) of the corresponding support frame (2) pass through the through holes on the steel plate (4) and are respectively screwed and fastened with the first nut (e) and the second nut (f); The upper surfaces of the first and second ends (12) and (14) of the two adjacent panels (1) that are butt-jointed to each other are respectively provided with first and second concave platforms (16) and (17), and the depth of the concave of the first and second platforms (16) and (17) is equal to the thickness of the steel plate (4); When the support frames (2) have multiple columns and the support frames (2) between adjacent columns are in contact with each other and arranged in rows, all the steel plates (4) installed in the same row of the support frames (2) are a whole piece, connecting all the support frames (2) in the same row together.

2. The prefabricated platform slab of a subway station according to claim 1, characterized in that: There are a plurality of sleeves (25), which are arranged in rows along the longitudinal direction of the subway station.

3. The prefabricated platform slab of a subway station according to claim 1, characterized in that: The support frame (2) has two support legs (24), and the support frame (2) is an axisymmetric structure with an axis extending in the up-down direction as an axis.

4. A method for hoisting and installing a prefabricated platform slab of a subway station as claimed in claim 1, 2 or 3, characterized in that: The following steps are involved: Step 1: during the construction of the main body of the station, installation limit holes (31) are reserved on the station floor (3), the installation limit holes (31) are arranged in a row along the longitudinal direction of the subway station, the distance between two adjacent installation limit holes (31) is equal to the distance required for the installation of two adjacent support frames (2), and a steel bar (32) is embedded in the bottom surface of each installation limit hole (31), and the steel bar (32) extends upward; at the same time, a first bracket (8) is arranged on the surface of the station side wall (5) facing the station center column (6) and located between the station floor (3) and the station center plate (7), and a second bracket (9) is arranged on the surface of the station center column (6) facing the station side wall (5) and located between the station floor (3) and the station center plate (7), wherein the first bracket (8) and the second bracket (9) are opposite to each other; Step 2, after the main construction of the station is completed and before the prefabricated platform slab of the subway station is constructed, the first guide rail (a) is installed on the first bracket (8), the second guide rail (b) is installed on the second bracket (9), and then a traveling crane (c) is laid on the first guide rail (a) and the second guide rail (b), wherein the first guide rail (a) and the second guide rail (b) both extend in the longitudinal direction of the subway station; the panel (1), the support frame (2) and the steel plate (4) are prefabricated in the component prefabrication yard, and the prefabricated panel (1), the support frame (2) and the steel plate (4) are transported to the construction site; Step 3, the panel (1), support frame (2) and steel plate (4) transported to the site are hoisted into the subway station through the shield hoisting hole and placed on the station floor (3); Step 4, the traveling crane (c) lifts the support frame (2) placed on the station floor (3), moves along the longitudinal direction of the subway station and / or moves in the transverse direction to adjust the position of the support frame (2), so that the support leg (24) of the support frame (2) is aligned with the installation limit hole (31), and pours concrete (d) into the installation limit hole (31) aligned with the support leg (24) of the support frame (2), and then the traveling crane (c) moves the support frame (2) downward, so that the steel bar (32) in the corresponding installation limit hole (31) is inserted into the sleeve (25) of the support leg (24) of the support frame (2) and the lower end of the support leg (24) of the support frame (2) extends into the corresponding installation limit hole (31), and then leveling is performed; Step 5, installing more support frames (2) according to step 4 and arranging the subsequently installed support frames (2) and the previously installed support frames (2) in a row along the longitudinal direction of the subway station; Step 6, the traveling crane (c) lifts the panel (1) placed on the station floor (3), moves along the longitudinal direction of the subway station and / or moves in the transverse direction to adjust the position of the panel (1), so that the first reserved through hole (13) of the panel (1) is aligned with the first embedded screw (22) of one of the two adjacent support frames (2) and the boss (11) of the first end (12) of the panel (1) is aligned with the groove (21) of one of the two adjacent support frames (2), and at the same time, the second reserved through hole (15) of the panel (1) is aligned with the groove (21) of the other of the two adjacent support frames (2). The second embedded screw (23) of a support frame (2) is aligned with the boss (11) of the second end (14) of the panel (1) and the groove (21) of the other support frame (2) of the two adjacent support frames (2), and then the panel (1) is moved downward by the crane (c), so that the first embedded screw (22) passes through the first reserved through hole (13), the second embedded screw (23) passes through the second reserved through hole (15), and the corresponding boss (11) is adapted to be accommodated in the corresponding groove (21), so that the first and second ends of the panel (1) are respectively overlapped on the top surfaces of the two adjacent support frames (2); Step 7, if the top surfaces of two adjacent support frames (2) overlap multiple panels (1) in a row along the transverse direction of the subway station, then according to step 6, continue to install other panels (1) on the top surfaces of the two adjacent support frames (2) on which the panels (1) have been installed in step 6, so that the subsequently installed panels (1) are arranged in a row with the previously installed panels (1), until the top surfaces of the two adjacent support frames (2) are fully covered with panels (1); Step 8, installing the panels (1) on the top surfaces of the other two adjacent support frames (2) according to steps 6-7, wherein the first end (12) of one panel (1) of the two adjacent panels (1) in the same row is butted against the second end (14) of the other panel (1) of the two adjacent panels (1) in the same row; Step 9, the traveling crane (c) lifts the steel plate (4) placed on the station floor (3), moves along the longitudinal direction of the subway station and / or moves in the transverse direction to adjust the position of the steel plate (4), so that the steel plate (4) is arranged on the upper surfaces of the first and second ends of two adjacent panels (1) that are butted against each other, and the first embedded screw (22) and the second embedded screw (23) of the corresponding support frame (2) are passed through the through holes on the steel plate (4) and are screwed and fastened with the first nut (e) and the second nut (f) respectively; Step 10, complete the installation of other steel plates (4) according to step 9.

5. The hoisting and installation method according to claim 4, characterized in that: When the support frames (2) have multiple columns and the support frames (2) between adjacent columns are in contact with each other and arranged in rows, the support frames (2) and panels (1) of other columns are installed respectively according to steps 4 to 8, and then the steel plates (4) are installed according to steps 9 and 10. Under this structure, all the steel plates (4) installed in the same row of the support frames (2) are a whole piece, connecting all the support frames (2) in the same row together.

6. The hoisting and installation method according to claim 4 or 5, characterized in that: The upper surfaces of the first and second ends of the two adjacent panels (1) butted against each other are respectively provided with first and second concave platforms, and the depth of the concave of the first and second platforms is equal to the thickness of the steel plate (4).