Single valve control device for drainer and drainer made of same

By designing an automatic control device, the gas pipeline and the air pressure sensor of the control valve are used to automatically adjust the valve status, which solves the problem of low manual adjustment efficiency, realizes the automated operation of the coal mine gas drainage system, and improves efficiency and safety.

CN111120868BActive Publication Date: 2024-10-29HENAN ZHILIN MINING EQUIP TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010026241.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-01-10
Publication Date
2024-10-29
Estimated Expiration
2040-01-10

AI Technical Summary

Technical Problem

In the existing coal mine gas drainage system, the manual adjustment of the water discharger is inefficient and cannot achieve automatic control, which affects the gas drainage efficiency.

Method used

A single valve control device including a gas pipeline, a control valve and a pneumatic delay pressure controller is designed. The valve status is automatically adjusted through the air pressure sensor to realize automatic control of the water discharger.

Benefits of technology

The automatic operation of the water discharger is realized, the gas drainage efficiency is improved, safety is provided and costs are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111120868B_ABST
    Figure CN111120868B_ABST
Patent Text Reader

Abstract

A single-valve control device for a water discharger includes a main gas circuit, the inner end of which is connected to four gas pipelines: gas pipeline A, gas pipeline B, gas pipeline C, and gas pipeline D, and the four gas pipelines are in parallel relationship; gas pipeline C is connected to the air inlet of control valve B, and control valve B is provided with an air inlet and two air outlets, one air outlet is connected to execution gas circuit A, and the other air outlet is connected to execution gas circuit B, and control valve B is also provided with two air inlet control ports: air inlet control port A and air inlet control port B. The present invention also discloses a water discharger made by using the single-valve control device of the water discharger. Compared with the prior art, the technical effect of the present invention is that the present invention uses a pneumatic delay pressure controller to realize automatic control of the water discharge operation of the water discharger, thereby improving the safety of the water discharger and reducing the cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a mining apparatus. Background Art

[0002] At present, before mining, coal mines need to place gas drainage pipes to drain gas in the mine, and the water discharger connected to the gas drainage pipe is used to discharge water. In order to improve the efficiency of gas extraction, the water discharger generally has a sealed water discharge port, which is only opened during water discharge, and at this time, the connection between the water discharger and the gas drainage pipe is cut off (otherwise it will affect the extraction efficiency).

[0003] At present, the adjustment of the above valves mainly relies on manual adjustment. Summary of the invention

[0004] The technical problem to be solved by the present invention is that the efficiency of manual adjustment is too low, and it is very necessary to develop "an automatic control device to meet the needs of automatically controlling the water discharge operation of the water discharger".

[0005] The technical solution of the present invention is specifically as follows:

[0006] A single valve control device for a water discharger comprises a main gas circuit, the inner end of which is connected to four gas pipelines: gas pipeline A, gas pipeline B, gas pipeline C, and gas pipeline D, and the four gas pipelines are in a parallel relationship; gas pipeline C is connected to the air inlet of control valve B, and control valve B is provided with an air inlet and two air outlets, one of which is connected to execution gas circuit A, and the other is connected to execution gas circuit B. Control valve B is also provided with two air inlet control ports: air inlet control port A and air inlet control port B. When the air pressure at air inlet control port A is greater than When the air pressure of the air inlet control port B is greater than that of the air inlet control port B, the air inlet of the control valve B is connected to the executing air circuit A; when the air pressure of the air inlet control port A is less than that of the air inlet control port B, the air inlet of the control valve B is connected to the executing air circuit B; the gas pipeline A is connected to the air inlet of the pneumatic delay pressure controller A, the air outlet of the pneumatic delay pressure controller A is connected to the gas pipeline H, and the gas pipeline H is connected to the air inlet control port A of the control valve A; the gas pipeline D is connected to the air inlet of the pneumatic delay pressure controller B, and the air outlet of the pneumatic delay pressure controller B is connected to the gas pipeline I , gas pipeline I is connected to the air inlet control port B of control valve B; gas pipeline B is connected to the air inlet of control valve A, control valve A is provided with an air inlet and two air outlets, one air outlet is connected to gas pipeline F, and the other air outlet is connected to gas pipeline G. Control valve A is also provided with two air inlet control ports: air inlet control port A and air inlet control port B. When the air pressure of air inlet control port A is greater than the air pressure of air inlet control port B, the air inlet of control valve B is connected to gas pipeline F; when the air pressure of air inlet control port A is less than the air pressure of air inlet control port B, The air inlet of the control valve B is connected to the gas pipeline G; the gas pipeline G is connected to two parallel branches through a tee: gas pipeline branch C and gas pipeline branch D, and gas pipeline branch C is connected to the switch of the pneumatic delay pressure controller A; the gas pipeline branch D is connected to the air inlet control port B of the control valve B; the gas pipeline F is connected to two parallel branches through a tee: gas pipeline branch A and gas pipeline branch B, and gas pipeline branch B is connected to the switch of the pneumatic delay pressure controller B; the gas pipeline branch A is connected to the air inlet control port A of the control valve B.

[0007] The control valve A has any of the following two specific structures:

[0008] The first type: the control valve A is provided with a hollow part, the air inlet of the control valve A is connected to two goal branches: goal branch A and goal branch B, the hollow part is connected to goal branch A, goal branch B, the first air outlet, the second air outlet, the air inlet control port A, and the air inlet control port B, a sliding valve core is provided in the hollow part, and a through hole is provided on the sliding valve core, the air inlet is connected to the gas pipeline B, the first air outlet is connected to the gas pipeline G, the second air outlet is connected to the gas pipeline F, the air inlet control port A is connected to the gas pipeline H, and the air inlet control port B is connected to the gas pipeline I; when the air pressure of the gas pipeline H is lower than the air pressure of the gas pipeline I, the sliding valve core moves to the side of the air inlet control port A, and at the same time, the through hole connects the gas pipeline C to the gas pipeline G; when the air pressure of the gas pipeline H is higher than the air pressure of the gas pipeline I, the sliding valve core moves to the side of the air inlet control port B, and at the same time, the through hole connects the gas pipeline C to the gas pipeline F;

[0009] The second type: the control valve A is provided with a hollow portion, the hollow portion is connected to the air inlet, the air inlet control port A and the air inlet control port B of the control valve A, a sliding valve core is provided in the hollow portion, and two through holes are provided on the sliding valve core, one through hole is connected to the first air outlet, and the other through hole is connected to the second air outlet, the air inlet is connected to the gas pipeline B, the first air outlet is connected to the gas pipeline G, the second air outlet is connected to the gas pipeline F, the air inlet control port A is connected to the gas pipeline H, and the air inlet control port B is connected to the gas pipeline I; when the air pressure of the gas pipeline H is lower than the air pressure of the gas pipeline I, the sliding valve core moves to the side of the air inlet control port A and connects the gas pipeline B to the gas pipeline G at the same time; when the air pressure of the gas pipeline H is higher than the air pressure of the gas pipeline I, the sliding valve core moves to the side of the air inlet control port B and connects the gas pipeline B to the gas pipeline F at the same time.

[0010] The inner end of the main gas line is connected to four gas pipelines through a connecting vessel.

[0011] The inner end of the main gas path is also connected to a water pressure gas pipe, and the water pressure gas pipe can be connected to an air inlet for drainage.

[0012] A drain made using the single-valve control device of the drain, comprises a water collecting tank and a buffer chamber fixed together, the water collecting tank is connected to the buffer chamber via a first valve, when the first valve is opened, water in the buffer chamber can flow to the water collecting tank, when the first valve is closed, the buffer chamber and the water collecting tank are sealed; a drainage air inlet is fixed on the water collecting tank, the drainage air inlet is provided with a second valve, a drainage pipe is fixed on the water collecting tank, the drainage pipe is provided with a one-way valve. The air inlet for drainage is connected to the outside world or a high-pressure pipeline, the first valve and the second valve are an integrated air-controlled three-way valve, the air-controlled three-way valve comprises a first inlet, a second inlet, an outlet, a first air-controlled port, and a second air-controlled port, wherein the first inlet and the outlet are the inlet and outlet of the first valve, and the second inlet and the outlet are the inlet and outlet of the second valve; a track cavity for valve core movement is provided in the air-controlled three-way valve, the track cavity connects the first air-controlled port and the second air-controlled port, when the air pressure of the first air-controlled port is lower than the air pressure of the second air-controlled port, the valve core moves to the side of the first air-controlled port to connect the first valve; when the air pressure of the first air-controlled port is higher than the air pressure of the second air-controlled port, the valve core moves to the side of the second air-controlled port to connect the second valve; the first inlet is connected to the buffer chamber, the second inlet is connected to the air inlet for drainage, the outlet is connected to the water collecting tank, the first air-controlled port is connected to the execution air path A, and the second air-controlled port is connected to the execution air path B.

[0013] The buffer chamber is the bottom of the gas extraction pipe, which is located above the water collecting tank.

[0014] The buffer chamber is a buffer water tank, which is located on the upper side of the water collecting tank. The buffer chamber can be connected to the gas extraction pipe. The first valve is fixed on the upper part of the partition between the buffer chamber and the water collecting tank, and a sealing door is fixed on the lower part of the partition.

[0015] The buffer chamber is welded and fixed to the water collecting tank, and a frame is fixed below the buffer chamber.

[0016] A sewage discharge pipe is arranged below the buffer chamber, and a sewage discharge valve is connected to the sewage discharge pipe.

[0017] The pressurized water air pipe is connected to the air inlet for drainage.

[0018] Compared with the prior art, the technical effect of the present invention is that the present invention uses a pneumatic time-delay pressure controller to realize automatic control of the water discharge operation of the water discharger, thereby improving the safety of the water discharger and reducing costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram (1) of a water discharger of the present invention.

[0020] Figure 2 A schematic diagram of the control device.

[0021] Figure 3 This is an enlarged schematic diagram of a one-inlet, two-outlet control valve (a).

[0022] Figure 4 This is an enlarged schematic diagram of a one-inlet, two-outlet control valve (II).

[0023] Figure 5 It is the schematic diagram (two) of the water discharger of the present invention.

[0024] Figure 6 Enlarged schematic diagram of the air-controlled three-way valve. DETAILED DESCRIPTION

[0025] In this figure, the lines of the gas pipeline, execution gas pipeline, gas pipeline branch and other gas pipes are divided into single lines and double lines, which are only used to distinguish the control gas pipe from other gas pipes (single lines are control gas pipes, double lines are other gas pipes), and they are not used as an explanation of the thickness of the gas pipe. The specific thickness of the gas pipe shall be subject to the ability of a person skilled in the art to complete the implementation of this specification.

[0026] The tee in this specification is interpreted in a broad sense to include all components that can achieve "simultaneous connection of one air inlet and two air outlets".

[0027] like Figure 2 A single valve control device for a water discharger includes a main gas circuit 70, the outer end of which can be connected to an external gas source 50, and the external gas source 50 can provide high-pressure gas to the device to maintain its normal operation.

[0028] The inner end of the main gas circuit 70 is connected to four gas pipelines: gas pipeline A71, gas pipeline B72, gas pipeline C73, and gas pipeline D74. The four gas pipelines are in parallel.

[0029] The gas pipeline C73 is connected to the air inlet of the control valve B62. The control valve B62 is provided with an air inlet and two air outlets. One air outlet is connected to the execution air circuit A85, and the other air outlet is connected to the execution air circuit B86. The control valve B62 is also provided with two air inlet control ports: air inlet control port A (see the left side in the attached figure) and air inlet control port B (see the right side in the attached figure). When the air pressure of the air inlet control port A is greater than the air pressure of the air inlet control port B, the air inlet of the control valve B62 is connected to the execution air circuit A85; when the air pressure of the air inlet control port A is less than the air pressure of the air inlet control port B, the air inlet of the control valve B62 is connected to the execution air circuit B86.

[0030] The gas pipeline A71 is connected to the air inlet of the pneumatic delay pressure controller A53, the air outlet of the pneumatic delay pressure controller A53 is connected to the gas pipeline H78, and the gas pipeline H78 is connected to the air inlet control port A of the control valve A60 (see the left side in the figure).

[0031] The gas pipeline D74 is connected to the air inlet of the pneumatic delay pressure controller B54, the air outlet of the pneumatic delay pressure controller B54 is connected to the gas pipeline I79, and the gas pipeline I79 is connected to the air inlet control port B of the control valve B62.

[0032] The gas pipeline B72 is connected to the air inlet of the control valve A60. The control valve A60 (whose structure is similar to that of the control valve A) is provided with an air inlet and two air outlets. One air outlet is connected to the gas pipeline F76, and the other air outlet is connected to the gas pipeline G77. The control valve A60 is also provided with two air inlet control ports: air inlet control port A (see the left side in the accompanying drawing) and air inlet control port B (see the right side in the accompanying drawing). When the air pressure of the air inlet control port A is greater than the air pressure of the air inlet control port B, the air inlet of the control valve B62 is connected to the gas pipeline F76; when the air pressure of the air inlet control port A is less than the air pressure of the air inlet control port B, the air inlet of the control valve B62 is connected to the gas pipeline G77.

[0033] The gas pipeline G77 is connected to two parallel branches through a tee: gas pipeline branch C771 and gas pipeline branch D772. The gas pipeline branch C771 is connected to the switch of the pneumatic delay pressure controller A53 (that is, whether the gas pipeline branch C771 is connected determines whether the pneumatic delay pressure controller A53 enters the working state); the gas pipeline branch D772 is connected to the air inlet control port B of the control valve B62 (see the right side in the attached figure).

[0034] The gas pipeline F76 connects two parallel branches through a tee: gas pipeline branch A761 and gas pipeline branch B762. The gas pipeline branch B762 is connected to the switch of the pneumatic delay pressure controller B54 (that is, whether the gas pipeline branch B762 is connected determines whether the pneumatic delay pressure controller B54 enters the working state); the gas pipeline branch A761 is connected to the air inlet control port A of the control valve B62 (see the left side in the attached figure).

[0035] The control valve B62 and the control valve A60 have the same structure, and both can be of the following two specific structures, or other equivalent structures.

[0036] The first type (taking control valve A60 as an example):

[0037] See also Figure 3The control valve A60 is provided with a hollow portion 573. The air inlet 570 of the control valve A60 is connected to two goal branches: goal branch A571 and goal branch B572. The hollow portion 573 is connected to goal branch A571, goal branch B572, the first air outlet 578, the second air outlet 579, the air inlet control port A574, and the air inlet control port B575. A sliding valve core 576 is provided in the hollow portion 573. A through hole 577 (one or two are OK, determined by the distance between the first air outlet 578 and the second air outlet 579) is provided on the sliding valve core 576. The air inlet 570 is connected to the gas pipeline B72 (the corresponding gas pipeline C73 at the control valve B), the first air outlet 578 is connected to the gas pipeline G77 (the corresponding gas pipeline B86 at the control valve B), the second air outlet 579 is connected to the gas pipeline F76 (the corresponding gas pipeline A85 at the control valve B), the air inlet control port A574 is connected to the gas pipeline H78 (the corresponding gas pipeline branch A761 at the control valve B), and the air inlet control port B575 is connected to the gas pipeline I79 (the corresponding gas pipeline branch D772 at the control valve B).

[0038] When the air pressure of the gas pipeline H78 is lower than the air pressure of the gas pipeline I79, the slide valve core 576 moves to the side of the air inlet control port A574, and at the same time, the through hole 577 connects the gas pipeline C73 to the gas pipeline G77 (see Figure 3 ); When the air pressure of the gas pipeline H78 is greater than the air pressure of the gas pipeline I79, the sliding valve core 576 moves to the side of the intake control port B575, and at the same time, the through hole 577 connects the gas pipeline C73 to the gas pipeline F76.

[0039] Second type:

[0040] See also Figure 4 The control valve A60 is provided with a hollow portion 573, the hollow portion 573 is connected to the air inlet 570, the air inlet control port A574, and the air inlet control port B575 of the control valve A60, a sliding valve core 576 is provided in the hollow portion 573, and two through holes 577 are provided on the sliding valve core 576, one through hole 577 is connected to the first air outlet 578, and the other through hole 577 is connected to the second air outlet 579, and the air inlet 570 is connected to the gas pipeline B72 (the corresponding gas pipeline C7 at the control valve B) 3), the first air outlet 578 is connected to the gas pipeline G77 (the corresponding one at the control valve B is the executive gas pipeline B86), the second air outlet 579 is connected to the gas pipeline F76 (the corresponding one at the control valve B is the executive gas pipeline A85), the air inlet control port A574 is connected to the gas pipeline H78 (the corresponding one at the control valve B is the gas pipeline branch A761), and the air inlet control port B575 is connected to the gas pipeline I79 (the corresponding one at the control valve B is the executive gas pipeline branch D772).

[0041] When the air pressure of the gas pipeline H78 is lower than the air pressure of the gas pipeline I79, the slide valve core 576 moves to the side of the air intake control port A574, and at the same time, the gas pipeline B72 is connected to the gas pipeline G77; when the air pressure of the gas pipeline H78 is higher than the air pressure of the gas pipeline I79, the slide valve core 576 moves to the side of the air intake control port B575, and at the same time, the gas pipeline B72 is connected to the gas pipeline F76 (see Figure 4 ).

[0042] The inner end of the main gas path 70 is connected to four gas pipelines through the connecting vessel 52 .

[0043] The inner end of the main gas path 70 is also connected to the water pressure gas pipe 90, and the water pressure gas pipe 90 can be connected to the water drainage air inlet 12.

[0044] like Figure 1 , 5 A water discharger includes a water collecting tank 10 and a buffer chamber 11 fixed together. The water collecting tank 10 is connected to the buffer chamber 11 through a first valve 20. When the first valve 20 is opened, the water in the buffer chamber 11 can flow to the water collecting tank 10. When the first valve 20 is closed, the buffer chamber 11 and the water collecting tank 10 are sealed.

[0045] The water collecting box 10 is provided with a drainage air inlet 12, which is provided with a second valve 21. The water collecting box 10 is provided with a drainage pipe 13, which is provided with a check valve 131. The drainage air inlet 12 is connected to the outside or a high-pressure pipeline.

[0046] The first valve 20 and the second valve 21 are an integrated pneumatically controlled three-way valve 91, which includes a first inlet 93, a second inlet 92, an outlet 94, a first pneumatically controlled port 95, and a second pneumatically controlled port 96, wherein the first inlet 93 and the outlet 94 are the inlets and outlets of the first valve 20, and the second inlet 92 and the outlet 94 are the inlets and outlets of the second valve 21.

[0047] A track cavity 97 for the movement of the valve core 98 is provided in the air-controlled three-way valve 91, and the track cavity 97 is connected to the first air-controlled port 95 and the second air-controlled port 96. When the air pressure of the first air-controlled port 95 is lower than the air pressure of the second air-controlled port 96, the valve core 98 moves to the side of the first air-controlled port 95, so that the first valve 20 (between the first inlet 93 and the outlet 94) is connected (at this time, the second valve 21 is not connected); when the air pressure of the first air-controlled port 95 is higher than the air pressure of the second air-controlled port 96, the valve core 98 moves to the side of the second air-controlled port 96, so that the second valve 21 (between the second inlet 92 and the outlet 94) is connected (at this time, the first valve 20 is not connected).

[0048] The mechanism of the air-controlled three-way valve refers to control valve A.

[0049] The first inlet 93 is connected to the buffer chamber 11, the second inlet 92 is connected to the drainage air inlet 12, the outlet 94 is connected to the water collecting tank 10, the first air control port 95 is connected to the execution air path A85, and the second air control port 96 is connected to the execution air path B86.

[0050] The buffer chamber 11 has two structures:

[0051] The first one, see Figure 1 The buffer chamber 11 is the bottom of the gas extraction pipe, which is located above the water collecting tank 10. When the first valve 20 is opened, the water in the buffer chamber 11 flows to the water collecting tank 10 by relying on the gravity of the water.

[0052] The second one, see Figure 5 The buffer chamber 11 is a buffer water tank, which is located on the upper side of the water collecting tank 10. The buffer chamber 11 can be connected to the gas extraction pipe. The first valve 20 is fixed on the upper part of the partition between the buffer chamber 11 and the water collecting tank 10, and the sealing door is fixed on the lower part of the partition.

[0053] If the first valve 20 is closed (the water collecting tank 10 is in a draining state at this time, and the air pressure inside it is greater than or equal to atmospheric pressure), the air pressure 9 of the buffer chamber 11 (always negative pressure) is less than the air pressure of the water collecting tank 10, and the air pressure of the water collecting tank 10 makes the sealing door seal on the partition to form a sealed state. If the first valve 20 is opened (the water collecting tank 10 is in a sealed state at this time), the air pressure of the buffer chamber 11 is equal to the air pressure of the water collecting tank 10 (connected by the first valve 20), and the water in the buffer chamber 11 flows into the water collecting tank 10 by gravity, forming a water storage state.

[0054] See also Figure 5 The buffer chamber 11 is welded and fixed to the water collecting tank 10, and a frame 15 is fixed below it.

[0055] See also Figure 5 A sewage pipe 16 is provided below the buffer chamber 11 , and a sewage valve 40 is connected to the sewage pipe 16 .

[0056] The water pressure air pipe 90 is connected to the air inlet 12 for drainage.

[0057] Its working principle is:

[0058] by Figure 1 Take the water discharger as an example, the description is as follows:

[0059] Prepare:

[0060] When the system is just running, it is in the water collecting state, that is, the water in the buffer chamber 11 enters the water collecting tank 10. At this time, the first valve 20 is in the open state, and the second valve 21 is in the closed state.

[0061] Turn on the switch 51 of the external gas source 50 , and the high-pressure gas enters the gas pipeline A71 , the gas pipeline B72 , the gas pipeline C73 , the gas pipeline D74 , and the pressurized water gas pipe 90 at the same time.

[0062] Because there is no signal in the gas pipeline branch C771 temporarily, the pneumatic delay pressure controller A53 is temporarily not working.

[0063] Because there is no signal in the gas pipeline branch B762 temporarily, the pneumatic delay pressure controller B54 is temporarily not working.

[0064] The gas pipeline C73 is connected to the air inlet of the control valve B62, and the sliding valve core is originally on the side of the air inlet control port A. At this time, the gas pipeline C73 is connected to the execution air circuit B86, and the valve core 98 moves to the side of the first air control port 95, so that the first valve 20 (between the first inlet 93 and the outlet 94) is connected and remains connected, and the first valve 20 is in an open state.

[0065] At the same time, the gas pipeline B72 is connected to the air inlet of the control valve A60, the spool is originally on the side of the air inlet control port A, and the gas pipeline B72 is connected to the gas pipeline G77. At this time, two actions are triggered:

[0066] First, the gas pipeline branch C771 receives a signal and the pneumatic delay pressure controller A53 starts working.

[0067] Second, the gas pipeline branch D772 is connected to the air intake control port B of the control valve B62, and continues to press the sliding valve core to be originally on the side of the air intake control port A. The gas pipeline C73 is connected to the execution air circuit B86. The gas in the execution air circuit B86 enters the second air control port 96, and the valve core 98 moves to the side of the first air control port 95. The first valve 20 remains open (at the same time, the second valve 21 is disconnected).

[0068] First release of water:

[0069] After time T1 has passed (T1 is the drain time, which can be manually adjusted in advance), the pneumatic time-delay pressure controller A53 ventilates the gas pipeline H78 (that is, connects the gas pipeline A71 to the gas pipeline H78), and the gas pipeline H78 forces the slide valve core of the control valve A60 to move toward the air inlet control port B, and the gas pipeline B72 connects the gas pipeline F76. At this time, four changes occur simultaneously:

[0070] First, the gas pipeline branch B762 receives a signal, and the pneumatic delay pressure controller B54 starts working;

[0071] Second, there is no signal from the gas pipeline branch C771, the pneumatic delay pressure controller A53 stops working, and there is no signal from the gas pipeline H78;

[0072] Third, the gas pipeline branch D772 is disconnected, and is no longer connected to the air intake control port B of the control valve B62, so the air pressure at the air intake control port B decreases.

[0073] Fourth, the gas pipeline branch A761 receives a signal and connects to the air intake control port A of the control valve B62. The valve core of the control valve B62 moves toward the air intake control port B, so that the gas pipeline C73 connects to the execution gas circuit A85. The valve core 98 moves to the second air control port 96, so that the second valve 21 is in an open state (at the same time, the first valve 20 is disconnected).

[0074] The second valve 21 is in the open position and the first valve 20 is in the closed position at the same time. This is the time for the drainer to drain water. Figure 1 The water collecting tank 10 is sealed with the buffer chamber 11 and connected to the outside through the air inlet 12 to drain the water.

[0075] Collect water again:

[0076] After time T2 has passed (T2 is the water collection time, which can be manually adjusted in advance), the pneumatic time-delay pressure controller B54 ventilates the gas pipeline I79 (that is, the gas pipeline D74 is connected to the gas pipeline I79), and the gas pipeline I79 presses the slide valve core 576 to move toward the air inlet control port A574 (because the gas pipeline H78 no longer presses the slide valve core 576). At this time, four changes occur simultaneously:

[0077] First, the gas pipeline branch C771 receives a signal, and the pneumatic delay pressure controller A53 starts to work;

[0078] Second, there is no signal from the gas pipeline branch B762, the pneumatic delay pressure controller B54 stops working, and there is no signal from the gas pipeline I79;

[0079] Third, the gas pipeline branch A761 is disconnected, and is no longer connected to the air intake control port A of the control valve B62, so the air pressure of the air intake control port A decreases.

[0080] Fourth, the gas pipeline branch D772 receives a signal and connects to the air intake control port B of the control valve B62. The valve core of the control valve B62 moves toward the air intake control port A, so that the gas pipeline C73 connects to the execution gas circuit A86. The valve core 98 moves to the side of the first air control port 95, and the first valve 20 remains open (at the same time, the second valve 21 is disconnected).

[0081] The first valve 20 is in the open position and the second valve 21 is in the closed position at the same time. This is the water collection state time of the water discharger. Figure 1 The water collecting box 10 is connected to the buffer chamber 11 and is no longer connected to the outside to collect water.

[0082] After time T1 has passed, as mentioned above, it switches to the water release time.

[0083] After time T2 has passed, as mentioned above, it switches to the water collection time.

[0084] Moreover, the times T1 and T2 are pre-adjusted (if inappropriate, they can be readjusted), realizing the automatic switching of water release and water collection, which is very convenient.

[0085] For other contents, please refer to the prior art.

[0086] The above is only a preferred embodiment of the present invention. It should be pointed out that for those skilled in the art, several changes and improvements can be made without departing from the overall concept of the present invention, which should also be regarded as the scope of protection of the present invention.

Claims

1. A single valve control device for a water discharger, comprising a main gas circuit (70), characterized in that: The inner end of the main gas path (70) is connected to four gas pipelines: a gas pipeline A (71), a gas pipeline B (72), a gas pipeline C (73), and a gas pipeline D (74), wherein the four gas pipelines are connected in parallel; The gas pipeline C (73) is connected to the air inlet of the control valve B (62). The control valve B (62) is provided with an air inlet and two air outlets. One of the air outlets is connected to the execution air path A (85), and the other of the air outlets is connected to the execution air path B (86). The control valve B (62) is further provided with two air inlet control ports: the air inlet control port A and the air inlet control port B. When the air pressure of the air inlet control port A is greater than the air pressure of the air inlet control port B, the air inlet of the control valve B (62) is connected to the execution air path A (85); when the air pressure of the air inlet control port A is less than the air pressure of the air inlet control port B, the air inlet of the control valve B (62) is connected to the execution air path B (86). The gas pipeline A (71) is connected to the air inlet of the pneumatic delay pressure controller A (53), the air outlet of the pneumatic delay pressure controller A (53) is connected to the gas pipeline H (78), and the gas pipeline H (78) is connected to the air inlet control port A of the control valve A (60); The gas pipeline D (74) is connected to the air inlet of the pneumatic delay pressure controller B (54), the air outlet of the pneumatic delay pressure controller B (54) is connected to the gas pipeline I (79), and the gas pipeline I (79) is connected to the air inlet control port B of the control valve B (62); The gas pipeline B (72) is connected to the gas inlet of the control valve A (60). The control valve A (60) is provided with an inlet and two outlets, one of which is connected to the gas pipeline F (76) and the other of which is connected to the gas pipeline G (77). The control valve A (60) is further provided with two inlet control ports: the inlet control port A and the inlet control port B. When the air pressure of the inlet control port A is greater than the air pressure of the inlet control port B, the inlet of the control valve B (62) is connected to the gas pipeline F (76); when the air pressure of the inlet control port A is less than the air pressure of the inlet control port B, the inlet of the control valve B (62) is connected to the gas pipeline G (77). The gas pipeline G (77) is connected to two parallel branches via a tee: a gas pipeline branch C (771) and a gas pipeline branch D (772). The gas pipeline branch C (771) is connected to the switch of the pneumatic delay pressure controller A (53); the gas pipeline branch D (772) is connected to the air inlet control port B of the control valve B (62). The gas pipeline F (76) is connected to two parallel branches via a tee: a gas pipeline branch A (761) and a gas pipeline branch B (762); the gas pipeline branch B (762) is connected to the switch of the pneumatic delay pressure controller B (54); the gas pipeline branch A (761) is connected to the air inlet control port A of the control valve B (62); The control valve A (60) has any of the following two specific structures: The first one: The control valve A (60) is provided with a hollow portion (573). The air inlet (570) of the control valve A (60) is connected to two goal branches: goal branch A (571) and goal branch B (572). The hollow portion (573) is connected to the goal branch A (571), the goal branch B (572), the first air outlet (578), the second air outlet (579), the air inlet control port A (574), and the air inlet control port B (575). A slide valve core (576) is provided in the portion (573), a through hole (577) is provided on the slide valve core (576), the air inlet (570) is connected to the gas pipeline B (72), the first air outlet (578) is connected to the gas pipeline G (77), the second air outlet (579) is connected to the gas pipeline F (76), the air inlet control port A (574) is connected to the gas pipeline H (78), and the air inlet control port B (575) is connected to the gas pipeline I (79); When the gas pressure of the gas pipeline H (78) is lower than the gas pressure of the gas pipeline I (79), the slide valve core (576) moves to the side of the air inlet control port A (574), and at the same time, the through hole (577) connects the gas pipeline C (73) to the gas pipeline G (77); when the gas pressure of the gas pipeline H (78) is higher than the gas pressure of the gas pipeline I (79), the slide valve core (576) moves to the side of the air inlet control port B (575), and at the same time, the through hole (577) connects the gas pipeline C (73) to the gas pipeline F (76); Second type: The control valve A (60) is provided with a hollow portion (573), the hollow portion (573) being connected to an air inlet (570), an air inlet control port A (574), and an air inlet control port B (575) of the control valve A (60); a sliding valve core (576) is provided in the hollow portion (573), and two through holes (577) are provided on the sliding valve core (576), one through hole (577) being connected to a first air outlet (578), and the other through hole (577) being connected to a second air outlet (579); the air inlet (570) being connected to a gas pipeline B (72), the first air outlet (578) being connected to a gas pipeline G (77), the second air outlet (579) being connected to a gas pipeline F (76), the air inlet control port A (574) being connected to a gas pipeline H (78), and the air inlet control port B (575) being connected to a gas pipeline I (79); When the gas pressure of the gas pipeline H (78) is lower than the gas pressure of the gas pipeline I (79), the slide valve core (576) moves to the side of the air inlet control port A (574), and at the same time, the gas pipeline B (72) is connected to the gas pipeline G (77); when the gas pressure of the gas pipeline H (78) is higher than the gas pressure of the gas pipeline I (79), the slide valve core (576) moves to the side of the air inlet control port B (575), and at the same time, the gas pipeline B (72) is connected to the gas pipeline F (76); The inner end of the main gas path (70) is connected to four gas pipelines via a connecting vessel (52).

2. The single valve control device for a water discharger according to claim 1, characterized in that: The inner end of the main air path (70) is also connected to a water pressure air pipe (90), and the water pressure air pipe (90) can be connected to a water drainage air inlet (12).

3. A water discharger made by using the single valve control device of the water discharger according to claim 1, comprising a water collecting tank (10) and a buffer chamber (11) fixed together, the water collecting tank (10) being connected to the buffer chamber (11) through a first valve (20), when the first valve (20) is opened, water in the buffer chamber (11) can flow into the water collecting tank (10), when the first valve (20) is closed, the buffer chamber (11) and the water collecting tank (10) are sealed; A drainage air inlet (12) is fixed on the water collecting tank (10), the drainage air inlet (12) is provided with a second valve (21), a drainage pipe (13) is fixed on the water collecting tank (10), and the drainage pipe (13) is provided with a one-way valve (131); The drainage air inlet (12) is connected to the outside or a high-pressure pipeline; The first valve (20) and the second valve (21) are integrated into a pneumatically controlled three-way valve (91), the pneumatically controlled three-way valve (91) comprising a first inlet (93), a second inlet (92), an outlet (94), a first pneumatically controlled port (95), and a second pneumatically controlled port (96), wherein the first inlet (93) and the outlet (94) are the inlet and outlet of the first valve (20), and the second inlet (92) and the outlet (94) are the inlet and outlet of the second valve (21); A track cavity (97) for movement of a valve core (98) is provided in the air-controlled three-way valve (91); the track cavity (97) is connected to a first air-controlled port (95) and a second air-controlled port (96); when the air pressure of the first air-controlled port (95) is lower than the air pressure of the second air-controlled port (96), the valve core (98) moves to the side of the first air-controlled port (95), so that the first valve (20) is connected; when the air pressure of the first air-controlled port (95) is higher than the air pressure of the second air-controlled port (96), the valve core (98) moves to the side of the second air-controlled port (96), so that the second valve (21) is connected; The first inlet (93) is connected to the buffer chamber (11), the second inlet (92) is connected to the drainage air inlet (12), the outlet (94) is connected to the water collecting tank (10), the first air control port (95) is connected to the execution air path A (85), and the second air control port (96) is connected to the execution air path B (86).

4. The water discharger according to claim 3, characterized in that: The buffer chamber (11) is the bottom of the gas extraction pipe and is located above the water collecting tank (10).

5. The water discharger according to claim 3, characterized in that: The buffer chamber (11) is a buffer water tank, which is located on the upper side of the water collecting tank (10). The buffer chamber (11) can be connected to the gas extraction pipe. The first valve (20) is fixed to the upper part of the partition between the buffer chamber (11) and the water collecting tank (10), and the sealing door is fixed to the lower part of the partition.

6. The water discharger according to claim 5, characterized in that: The buffer chamber (11) is fixed to the water collecting tank (10) by welding, and a frame (15) is fixed below the buffer chamber (11).

7. The water discharger according to claim 5, characterized in that: A sewage discharge pipe (16) is provided below the buffer chamber (11), and a sewage discharge valve (40) is connected to the sewage discharge pipe (16).

8. The water discharger according to claim 5, characterized in that: The water pressure air pipe (90) is connected to the water discharge air inlet (12).

Citation Information

Patent Citations

  • Single-valve control device of water drainer and water drainer manufactured by same

    CN211694371U