A construction method for anti-drainage and waterproofing of a concealed diversion trough bathroom

Through the dark buried diversion slot in the bathroom, and connecting with the floor drain, the problem of stagnant water in the floor tiles below the bathroom floor tiles cannot be effectively discharged, and effective water guidance is achieved, reducing the leakage risk and maintenance costs.

CN111173113BActive Publication Date: 2025-01-28SHAANXI CONSTR ENG DINGSHENG DECORATION CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202010116001.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-02-25
Publication Date
2025-01-28
Estimated Expiration
2040-02-25

AI Technical Summary

Technical Problem

In the prior art, water accumulation in the adhesion layer of the floor tiles below the bathroom floor tiles cannot be effectively discharged, which increases the risk of leakage and may cause moisture reflux on the bathroom exterior wall, with more maintenance processes and higher maintenance costs.

Method used

The method of buried stream grooves is used to install horizontal and vertical diversion tanks on the waterproof protection layer of the bathroom, and connect to the floor drain, open the opening along the top side of the guide groove and the side, bring together the floor tiles to paste the inner water, and and the water, and the water in the layer of the stagnation, and Eliminate the floor drain through a diversion slot.

Benefits of technology

Effectively prevent the stagnation of the bathroom floor tiles invading the adjacent room through the waterproof threshold, solve the problem of effectively excretion of water accumulation, and reduce the risk of leakage and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111173113B_ABST
    Figure CN111173113B_ABST
Patent Text Reader

Abstract

The present invention discloses a construction method for anti-drainage and waterproofing of a concealed guide groove bathroom, including a base cleaning process, a leveling layer laying process, a waterproof layer coating process, a water-tightness test process, a waterproof protective layer laying process, a concealed guide groove process and a surface layer paving process. The base cleaning process includes a step of sweeping the base surface and a step of filling the potholes with composite mortar; the concealed guide groove process includes a step of preparing the opening of the guide groove, a step of installing the guide groove and a step of temporarily fixing the guide groove. Horizontal and vertical guide grooves are installed on the waterproof protective layer of the bathroom, and are connected with the floor drain. The accumulated water in the floor tile adhesive layer can be collected in the guide groove and discharged into the floor drain through the guide groove. Under the floor tile adhesive layer on the inner side of the door sill of the bathroom door, a guide groove parallel to the door sills on both sides of the bathroom door is installed, which can effectively prevent the accumulated water in the floor tile adhesive layer of the bathroom from invading the adjacent room through the waterproof barrier.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bathroom waterproof construction, and specifically relates to a method for combining anti-drainage and waterproof construction of a bathroom with a concealed guide trough. Background Art

[0002] The bathroom has various functions, integrating toilet, bath, laundry and other functions in one, so its waterproof performance needs to meet the usage requirements.

[0003] Traditional bathroom waterproofing only focuses on prevention without considering drainage, so that the water accumulated in the floor tile adhesive layer 7 below the bathroom floor tiles 8 cannot be effectively discharged, increasing the risk of bathroom leakage. In addition, due to the influence of the paving thickness of the door sill 1, the waterproof sill should not be made too high, resulting in the water accumulated in the floor tile adhesive layer 7 easily crossing the waterproof sill 10 under the door sill 1 and invading other non-waterproof rooms, causing moisture on the outer wall of the bathroom, more maintenance procedures, and higher maintenance costs. Summary of the invention

[0004] The purpose of the present invention is to provide a construction method for anti-drainage and waterproofing of a concealed diversion trough in a bathroom, so as to solve the problem in the prior art that water accumulated in the tile adhesive layer below the bathroom floor tiles cannot be effectively discharged.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a method for anti-drainage and waterproof construction of a concealed diversion trough bathroom, comprising a base cleaning process, a leveling layer laying process, a waterproof layer coating process, a water-tightness test process, a waterproof protective layer laying process, a concealed diversion trough process and a surface paving process, wherein the base cleaning process comprises a step of sweeping the base surface and a step of filling composite mortar into potholes and uneven places; the concealed diversion trough process comprises a step of preparing the diversion trough opening, a step of installing the diversion trough and a step of temporarily fixing the diversion trough.

[0006] Preferably, the process of laying the leveling layer includes: A. applying the leveling layer on the base layer; B. drying and curing the leveling layer.

[0007] Preferably, in the step A of applying a leveling layer on the base layer, the leveling layer slopes toward the floor drain with a slope of at least 3%, and the intersection of the leveling layer and the wall corner is applied into an arc with a diameter of not less than 30 mm; in the step B of drying and curing the leveling layer, the curing time is not less than seven days.

[0008] Preferably, the waterproof layer coating process includes: A1. applying waterproof coating around pipe roots, floor drains, and wall roots; B1. applying waterproof coating film on the entirety.

[0009] Preferably, in the step A1 of applying waterproof coating around the pipe root, floor drain and wall root, the excess reserved pipe of the floor drain is cut off at the root; in the step B1 of applying waterproof coating on the whole, the coating is applied in at least four layers.

[0010] Preferably, the water-tightness test process includes A2. Indoor water storage; B2. Leakage detection. In the indoor water storage step A, the indoor water storage depth is not less than 20 mm, and the water storage time is not less than one day; the leakage detection step B includes the water storage level drop inspection and the lower ceiling leakage inspection.

[0011] Preferably, in the guide groove opening preparation step, a square water outlet with a maximum side length of ten millimeters is opened along the side of the guide groove, and the spacing between the square water outlets is not greater than thirty centimeters. A water guide hole with a diameter of not less than three millimeters is opened along the top edge of the guide groove, and the spacing between the water guide holes is not greater than thirty centimeters.

[0012] Preferably, the guide groove installation step includes a. pre-placing a vertical guide groove at the floor drain and the waterproof sill of the door; b. pre-placing a horizontal guide groove at a position not exceeding the door sill. In step a and step b, the horizontal and vertical guide grooves are connected smoothly, and the vertical guide groove is connected to the floor drain.

[0013] Preferably, the surface paving process includes A3. laying a floor tile adhesive layer; B3. laying floor tiles.

[0014] Compared with the prior art, the beneficial effects of the present invention are as follows: horizontal and vertical guide grooves are installed on the waterproof protective layer of the bathroom, and are connected with the floor drain. Through the openings opened along the top and side edges of the guide grooves, the accumulated water in the floor tile adhesive layer can be gathered into the guide grooves, and discharged into the floor drain through the guide grooves. Under the floor tile adhesive layer on the inner side of the door sill of the bathroom door, a guide groove parallel to the door sills on both sides of the bathroom door is installed, which can effectively prevent the accumulated water in the floor tile adhesive layer of the bathroom from invading adjacent rooms through the waterproof sill, thereby solving the problem in the prior art that the accumulated water in the floor tile adhesive layer below the bathroom floor tiles cannot be effectively discharged. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of the present invention;

[0016] Figure 2 It is a schematic diagram of the distribution of the guide grooves of the present invention;

[0017] Figure 3 It is a schematic diagram of the process of the present invention;

[0018] Figure 4 It is a schematic diagram of the distribution of the openings of the guide grooves of the present invention.

[0019] In the figure: 1 threshold, 2 base layer, 3 leveling layer, 4 waterproof layer, 5 waterproof protective layer, 6 guide groove, 7 floor tile adhesive layer, 8 floor tile, 9 floor drain, 10 waterproof sill. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] A construction method for anti-drainage and waterproofing of a concealed diversion trough bathroom comprises a base layer 2 cleaning process, a leveling layer 3 laying process, a waterproof layer coating process 4, a water-tightness test process, a waterproof protective layer 5 laying process, a concealed diversion trough 6 process and a surface layer paving process.

[0022] The cleaning process of the base layer 2 includes the steps of cleaning the surface of the base layer 2 and filling the uneven places with composite mortar. In the process of cleaning the surface of the base layer 2 and filling the uneven places with composite mortar, first clean the dust and debris on the base layer 2, then flatten and clean the mortar lumps and protruding parts remaining on the surface of the base layer 2, and smooth the corners into arcs or obtuse angles. The composite mortar is prepared by mixing 108 glue, cement and sand in a ratio of 1:1.5:2.5. After the composite mortar is added to the uneven places, use a scraper to scrape off the mortar that is higher than the base layer 2.

[0023] The process of laying the leveling layer 3 includes: A. applying the leveling layer 3 on the base layer 2; B. drying and curing the leveling layer 3. In step A of applying the leveling layer on the base layer 2, the leveling layer 3 slopes toward the floor drain 9 with a slope of 3%, and the intersection of the leveling layer 3 and the wall corner is smeared into a circular arc with a diameter of 30 mm, wherein the leveling layer 3 is a cement mortar layer, and the cement mortar is prepared by mixing cement, sand and water in a ratio of 1:3:0.6. In step B of drying and curing the leveling layer, the curing time is seven days, and the curing method is static curing.

[0024] The process of applying the waterproof layer 4 includes: A1. Applying waterproof coating around the pipe root, the floor drain 9, and the wall root; B1. Applying waterproof coating on the whole. In step A1 of applying waterproof coating on the pipe root, the floor drain 9, and the wall root, the redundant reserved pipe of the floor drain 9 is cut off at the root, so that the waterproof layer 4 can be circled inside the pipe. When the waterproof coating is not sticky, the whole waterproof coating is applied. In the whole waterproof coating B1, the coating is applied in four layers. After the waterproof coating is cured, the sewer pipe where the floor drain 9 is installed is blocked with cotton cloth to prevent foreign objects from falling into the pipe. The waterproof layer 4 completes the water-tightness test after 24 hours.

[0025] The closed water test process includes A2. Indoor water storage; B2. Leakage detection. Among them, in the indoor water storage step A2, the indoor water storage depth is 20 mm and the water storage time is one day; the leak detection step B2 includes the water storage surface drop inspection and the lower ceiling leakage inspection. During the implementation of steps A2 and B2, if there is no obvious drop in the water level and no leakage in the lower ceiling inspection, it is qualified. In the early stage of water storage, check downstairs once every 1 hour, and in the later stage, check downstairs once every 3 hours. If water leakage is found, drain the water immediately, improve the waterproof layer 4, and re-store water after the treatment is qualified.

[0026] The step of laying the waterproof protective layer 5 is to lay the waterproof protective layer 5 on the waterproof layer 4 .

[0027] The process of burying the guide trough includes the steps of preparing the opening of the guide trough 6 , installing the guide trough 6 , and temporarily fixing the guide trough 9 . In the preparation step for the opening of the guide groove 6, a square water inlet with a side length of ten millimeters is opened along the side of the guide groove 6, and the spacing between the square water inlets is thirty centimeters. A water guide hole with a diameter of three millimeters is opened along the top edge of the guide groove 6, and the spacing between the water guide holes is thirty centimeters. A U-shaped 20×40㎜PVC wire trough is selected as the guide groove 6, and the guide groove 6 is laid with the opening downward. The installation steps of the guide groove 6 include a. pre-placing the vertical guide groove 6 at the floor drain 9 and the waterproof sill 10 at the door; b. pre-placing the horizontal guide groove 6 at a position that does not cross the door sill 1. In steps a and b, the waterproof sill 10 is installed on both sides of the upper surface of the door sill 1. The guide groove 6 at the waterproof sill 10 is parallel to the waterproof sills 10 on both sides, and the horizontal intersection with the vertical guide groove 6 is unobstructed. The vertical guide groove 6 is connected to the floor drain 9 so as to remove the accumulated water in time. In the step of temporarily fixing the guide groove 9, the guide groove 6 is temporarily fixed to the waterproof protective layer 5 with transparent tape. On, in order to initially stabilize the placement position of the guide groove 9.

[0028] The surface paving process includes A3. laying the floor tile adhesive layer 7; B3. laying the floor tile 8. In step A3, the floor tile adhesive layer 7 is plain cement slurry, which is formed by mixing water and cement in a ratio of 0.42:1. The floor tile adhesive layer 7 slopes toward the floor drain 9 with a slope of 3%. During the implementation of step A3, step B3 is simultaneously implemented to ensure that the plain cement slurry does not dry and lose viscosity. When laying the floor tile 8, it is laid at a slope of 3% toward the floor drain 9. The floor drain position is cut in the middle of the floor tile, and the four sides are cut at 45 degrees. When installing the floor drain head, first plug the drain pipe mouth with an empty bottle, lay dry hard cement mortar around the drain pipe to test the floor drain head, and take out the floor drain head after completion, and use tools to clean the mortar at the edge of the opening on the guide groove 6 to ensure smooth drainage. After the floor tile 8 is laid, the floor drain head will be formally installed.

[0029] Horizontal and vertical guide grooves 6 are installed on the waterproof protective layer 5 of the bathroom, and are connected with the floor drain 9. Through the openings opened along the top and side of the guide groove 6, the accumulated water in the floor tile adhesive layer 7 can be gathered into the guide groove 6 and discharged into the floor drain 9 through the guide groove 6, which can effectively drain the accumulated water in the floor tile adhesive layer 7 of the bathroom. The guide groove 6 parallel to the door sill 1 is installed under the floor tile adhesive layer 7 on the inner side of the door sill 1 of the bathroom door, which can effectively prevent the accumulated water in the floor tile adhesive layer 7 of the bathroom from invading the adjacent room through the waterproof sill 10.

[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for waterproofing and anti-drainage in a concealed drainage trough bathroom, comprising a base layer (2) cleaning step, a leveling layer (3) laying step, a waterproof layer (4) coating step, a water-tightness test step, a waterproof protective layer (5) laying step, a concealed drainage trough (6) step and a surface layer paving step, characterized in that: The base layer (2) cleaning process comprises a step of cleaning the surface of the base layer (2) and a step of filling the uneven areas with composite mortar; the process of burying the diversion trough (6) comprises a step of preparing the opening of the diversion trough (6), a step of installing the diversion trough (6) and a step of temporarily fixing the diversion trough (6); In the guide groove (6) opening preparation step, a square water inlet with a maximum side length of ten millimeters is opened along the side of the guide groove (6), and the spacing between the square water inlets is not greater than thirty centimeters. A water guide hole with a diameter of not less than three millimeters is opened along the top of the guide groove (6), and the spacing between the water guide holes is not greater than thirty centimeters. The guide groove (6) is laid with the opening downward; The guide groove (6) installation steps include: a. pre-placing a vertical guide groove (6) at a floor drain (9) and a waterproof sill (10) at a door; b. pre-placing a horizontal guide groove (6) at a position that does not exceed the door sill (1); in steps a and b, the horizontal guide groove (6) and the vertical guide groove (6) are connected smoothly, the vertical guide groove (6) is connected to the floor drain (9), and the horizontal guide groove (6) and the vertical guide groove (6) are installed on the bathroom waterproof protective layer (5).

2. According to claim 1, a method for anti-drainage and waterproof construction of a concealed drainage trough bathroom, characterized in that: The process of laying the leveling layer (3) comprises: A. applying the leveling layer (3) on the base layer (2); and B. drying and curing the leveling layer (3).

3. The method for anti-drainage and waterproof construction of a concealed drainage trough bathroom according to claim 2, characterized in that: In step A of applying a leveling layer (3) on the base layer (2), the leveling layer (3) is sloped toward the floor drain (9) with a slope of at least 3%, and the intersection of the leveling layer (3) and the wall corner is applied into an arc with a diameter of not less than 30 mm; in step B of drying and curing the leveling layer (3), the curing time is not less than seven days.

4. The method for anti-drainage and waterproof construction of a concealed drainage trough bathroom according to claim 1, characterized in that: The step of applying the waterproof layer (4) comprises: A1. applying waterproof coating around the pipe base, the floor drain (9) and the wall base; B1. applying the waterproof coating film on the whole.

5. The method for anti-drainage and waterproof construction of a concealed drainage trough bathroom according to claim 4, characterized in that: In the step A1 of applying waterproof coating to the pipe base, the periphery of the floor drain (9) and the periphery of the wall base, the redundant reserved pipe of the floor drain (9) is cut off at the root; in the step B1 of applying waterproof coating to the whole, the coating is applied in at least four layers.

6. The method for anti-drainage and waterproof construction of a concealed drainage trough bathroom according to claim 1, characterized in that: The water-tightness test process includes A2. indoor water storage; B2. leak detection, wherein, in the indoor water storage step A2, the indoor water storage depth is not less than 20 mm, and the water storage time is not less than one day; the leak detection step B2 includes a water storage level drop inspection and a lower ceiling leakage inspection.

7. The anti-drainage and waterproof construction method for a concealed drainage trough bathroom according to claim 1, characterized in that: The surface paving process comprises A3. paving a floor tile adhesive layer (7); and B3. paving floor tiles (8).

Citation Information

Patent Citations

  • Novel waterproof structure for toilet and construction technology of novel waterproof structure

    CN110748015A

  • Drainage structures of formula of sinking bathroom

    CN207017406U

  • Toilet buried drainage diversion trench structure

    CN212053123U