A temporary consolidation support for cantilever construction of continuous beam bridge

Through the combination of grid tube segmentation and FRP anchoring bars, the problem of difficulty and low efficiency in dismantling traditional temporary consolidated supports is solved, and the rapid, easy removal and efficient construction of temporary supports in the cantilever construction of continuous girder bridges are achieved.

CN111305080BActive Publication Date: 2024-10-29NANJING FORESTRY UNIV
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202010247851.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-03-31
Publication Date
2024-10-29
Estimated Expiration
2040-03-31

AI Technical Summary

Technical Problem

The removal efficiency of temporary consolidation supports in the cantilever construction of traditional continuous girder bridges is low, and the anchoring steel bars are difficult to remove, resulting in a long construction period, high costs, and easy damage to the main structure.

Method used

Grating tubes are used to divide the temporary supports, and vertical isolation layers and FRP anchoring bars are set up. They can be directly mechanically cut and removed later to reduce friction and improve the rationality of structural stress.

Benefits of technology

The temporary support can be quickly and easily dismantled, which reduces the construction cost and construction period, avoids damage to the main structure, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111305080B_ABST
    Figure CN111305080B_ABST
Patent Text Reader

Abstract

A temporary consolidation support for cantilever construction of a continuous beam bridge includes a pier, a box beam, a permanent support, FRP anchor bars, a temporary support, a grating pipe, and an isolation layer. A permanent support is arranged at the center of the top surface of the pier body of the pier. Two rows of temporary supports are symmetrically arranged on both sides of the permanent support along the front and rear of the bridge. The box beam is supported on the top surfaces of the permanent support and the temporary support at the pier position. A grating pipe is pre-arranged in the temporary support and is divided into a plurality of columns or honeycombs by the grating pipe. A plurality of FRP anchor bars are arranged on both sides of the front and rear of the permanent support along the bridge. The upper and lower ends of the FRP anchor bars are respectively anchored to the box beam and the pier to form a fixed anchor for the box beam. The temporary support in the present invention makes the structure bear force reasonably, and it is convenient and quick to chisel out in the later stage, which solves the problems of difficult removal of traditional temporary supports, long chiseling period, and large amount of manpower and financial resources.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a construction device, in particular to a temporary consolidation support for cantilever construction of a continuous beam bridge, and belongs to the technical field of bridge construction. Background Art

[0002] A continuous beam bridge refers to a continuous beam bridge with two or more spans. It is an over-static system with few expansion joints on the bridge deck. Under the action of constant live loads, continuous beams are often designed with variable cross-sections according to the characteristics of their stress state. The beam height gradually decreases from the support to the mid-span, thereby increasing the clearance under the bridge and saving materials. It also has high rigidity, good integrity, high overload capacity, and high safety. For variable cross-section continuous beam bridges, cantilever construction is often used, that is, cantilever casting construction or cantilever assembly construction. Taking cantilever casting construction as an example, cantilever casting construction refers to setting up a working platform on both sides of the pier, starting from the pier top section, symmetrically casting on both sides of the section, and cantilever casting the construction beam section in a balanced manner towards the mid-span section by section until the bridge span structure is closed.

[0003] For continuous beams of cantilever construction, temporary consolidation technology of piers and beams is the key in cantilever construction. Taking cantilever casting construction as an example, especially in the processes of moving the hanging basket forward, tying steel bars, pouring concrete, etc., it is inevitable that the weight on both sides of the T structure will be inconsistent, resulting in unbalanced bending moments. The main purpose of setting up temporary consolidation of piers and beams is to resist unbalanced bending moments, thereby ensuring the safety and smooth progress of cantilever casting construction. Traditional temporary consolidation technology for piers and beams is often achieved by setting up temporary sulfur mortar supports and anchoring steel bars. The temporary sulfur mortar supports are made of sulfur mortar and concrete, and the beams and piers are anchored together with anchoring steel bars. This traditional temporary pier and beam support has low chiseling efficiency and a long chiseling period. The anchoring steel bars are also difficult to remove, which often requires a lot of manpower, material resources, and financial resources, and is easy to damage the main structure of the pier and beam. As a technical improvement, a resistance wire is embedded in the casting of the temporary sulfur mortar support, and the sulfur mortar is melted by electricity when it is removed, so as to be faster. There is a method for removing temporary bearings, but the resistance wire in this method is easy to break and fail, thus losing its effect. Another example is Chinese patent CN209144660U which discloses a temporary consolidation structure for continuous beam bridge piers, which includes bridge piers, No. 0 blocks and spherical bearings, etc. It adopts temporary bearings composed of pads and polytetrafluoroethylene plates, and is provided with multiple anchoring steel bars anchored in the bridge piers and extending upward through the temporary bearings to the top of No. 0 blocks. This structural structure makes it difficult to chisel out the temporary bearings and remove the anchoring steel bars in the later stage, and the operation time is long, making it difficult to remove.

[0004] In summary, traditional temporary supports are made of mortar and concrete. The efficiency of removing temporary supports in the later stage is low. The pre-embedded resistance wire in the mortar will melt and the resistance wire will break and fail. The anchoring steel bars are also difficult to remove. The removal of temporary supports often requires a lot of manpower, material and financial resources, and the removal period is long. Summary of the invention

[0005] The purpose of the present invention is to provide a temporary consolidation support for cantilever construction of a continuous beam bridge, which can resist unbalanced bending moment, play an anti-overturning role, and is low-cost and easy to remove. The present invention uses a grid pipe to divide the temporary support when pouring it, so that it becomes a number of columns or honeycombs, and a vertical isolation layer is set between the temporary support and the box beam and the bridge pier. Multiple isolation layers can also be set in the temporary support, and an isolation agent is applied to play an isolation role, reduce friction, and reduce and avoid horizontal stress on the beam body. The temporary support makes the structure stress reasonable, and it is convenient and fast to chisel out later. The anchoring bar adopts FRP bar, which has the advantages of light weight and high tensile strength. It can be directly mechanically cut when it is dismantled in the later stage, and it is easy to dismantle. It is necessary to set a jacket metal tube at both ends of the FRP bar to effectively anchor the FRP bar, ensure the bonding ability of the FRP bar and concrete, and reduce the slippage of the FRP bar in the concrete. The present invention effectively solves the problem of reasonable stress on the temporary support and the difficulty of removing the temporary support and anchoring steel bars, and the construction is simple, safe and economical.

[0006] The technical solution of the present invention is a temporary consolidation support for cantilever construction of a continuous beam bridge, which is characterized by comprising a pier, a box beam, a permanent support, FRP anchor bars, a temporary support, a grating tube, and an isolation layer. A permanent support is arranged at the center position of the top surface of the pier body of the pier, and two rows of temporary supports are symmetrically arranged on both sides of the permanent support forward and backward along the bridge. The box beam is supported on the top surfaces of the permanent support and the temporary support at the pier position. A grating tube is pre-arranged in the temporary support and is divided into a plurality of columns or honeycombs by the grating tube. When divided into a plurality of columns, the grating tube can provide effective constraints on the internal materials; when divided into a honeycomb shape, the interior of the grating tube is empty, providing a honeycomb structure with high bearing capacity and easy removal. Multiple horizontal isolation layers are set inside the temporary support and at the interface between it and the box girder and pier. The temporary support is divided into multiple discrete parts by the grid pipe and the isolation layer. On the one hand, it prevents the temporary support from being a whole, making it easy to chisel it out; on the other hand, the grid pipe and the isolation layer do not destroy the vertical continuity of the temporary support and do not reduce its load-bearing function; the isolation layer reduces the horizontal force on the beam body and ensures the free deformation of the structure under the action of temperature.

[0007] A number of FRP anchor bars are arranged on the front and rear sides of the permanent support along the bridge direction. The upper and lower ends of the FRP anchor bars are respectively anchored to the box girder and the pier to form a fixed anchor for the box girder. The FRP anchor bars are light in weight and high in tensile strength, and can anchor the unbalanced load during cantilever construction. At the same time, the FRP anchor bars have low shear strength and are easy to cut and remove.

[0008] The grid tubes and spaces between them are filled with filling materials to form temporary supports that divide several column structures; the inside of the grid tubes is left empty or the intervals are left empty or the spaces between the grid tubes are left empty to form temporary supports with a honeycomb structure.

[0009] The grid tube is composed of FRP tube, PVC tube, plastic tube or rubber tube. The cross section of a single hole of the grid tube is circular, polygonal or curved. The hole wall surface of the grid tube is coated with an isolating agent. When it is curved, the cross-sectional side lengths of the grid tube are arbitrary. Multiple grid tubes are closely connected or separated.

[0010] Metal tubes with outer sleeves are provided at both ends of the FRP anchor bar for anchoring. The FRP anchor bar and the metal tube are bonded together by adhesive. The lower end of the FRP anchor bar is buried in the pier for no less than 500mm, and the upper end of the FRP anchor bar is anchored in the inside or top of the box girder.

[0011] The isolation layer is a plastic film, a rubber film, a geotextile, a bamboo board or a wooden board. The upper and lower surfaces of the isolation layer are coated with an isolation agent, and the isolation agent is lubricating oil, silicone grease, paraffin or asphalt.

[0012] The filling material of the temporary support is cast by cement concrete and cement mortar.

[0013] The end of the metal pipe is provided with a thread, and an anchor ring is fixed by the thread. The inner side of the anchor ring is anchored to the outer side of the pre-set metal pad. The metal pipe can effectively anchor the two ends of the FRP anchor bar without significantly increasing the cost.

[0014] The present invention divides the temporary support with grid pipes, and sets an isolation layer between the temporary support and the box beam and the pier. Multiple isolation layers can also be set in the temporary support concrete. In combination with FRP anchor bars, metal pipes are sheathed at both ends. Compared with the prior art, the present invention has the following beneficial effects:

[0015] 1) While effectively resisting unbalanced bending moment and overturning, it reduces friction and avoids horizontal stress on the beam, so that the temporary support is reasonably stressed and avoids adverse effects on the structural stress.

[0016] 2) When pouring the temporary support, use grid pipes to evenly divide it into several columns or honeycombs. When the temporary support is chiseled off in the later stage, the chiseling period is short and the construction efficiency is high, without consuming a lot of manpower, material resources and financial resources.

[0017] 3) An isolation layer is set between the temporary support and the box girder and pier, and multiple isolation layers are also set in the temporary support concrete. An isolation agent is applied to reduce friction. While optimizing the force, it makes it faster and easier to remove the temporary support later.

[0018] 4) FRP anchor bars are lightweight and high-strength, and can be efficiently anchored. They can also be directly cut mechanically during later removal, making them easy to remove. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the overall structure of a temporary consolidation support for cantilever construction of a continuous beam bridge;

[0020] Figure 2 It is a schematic diagram of the overall structure of a temporary consolidation support for cantilever construction of a continuous beam bridge (an isolation layer is set in the temporary support);

[0021] Figure 3 It is a side view of the overall structure of a temporary consolidation support for cantilever construction of a continuous beam bridge;

[0022] Figure 4 It is a side view of the overall structure of a temporary consolidation support for cantilever construction of a continuous beam bridge (an isolation layer is set in the temporary support);

[0023] Figure 5 It is a temporary consolidation support for cantilever construction of a continuous beam bridge divided into several cylindrical planes by grid tubes;

[0024] Figure 6 It is a temporary consolidation support for cantilever construction of a continuous beam bridge, which is divided into several cylindrical planes by grid pipes (grid pipe separation);

[0025] Figure 7 It is a temporary consolidation support for cantilever construction of a continuous beam bridge divided into several rectangular column plans by grid tubes;

[0026] Figure 8 It is a temporary consolidation support for cantilever construction of a continuous beam bridge, which is divided into a circular honeycomb plan by grid tubes (with space between grid tubes);

[0027] Fig. 9 It is a temporary consolidation support for cantilever construction of a continuous beam bridge, which is divided into a circular honeycomb plan by a grid tube (the grid tube is separated and the inside of the grid tube is empty);

[0028] Fig.10 It is a temporary consolidation support for cantilever construction of a continuous beam bridge, which is divided into a rectangular honeycomb plan by a grid tube (the grid tube is separated and the inside of the grid tube is empty);

[0029] Fig.11 It is a temporary consolidation support for cantilever construction of a continuous beam bridge, which is divided into a rectangular honeycomb plan by grid tubes (the grid tube intervals are empty).

[0030] In the attached drawings, 1 is a bridge pier, 2 is a box girder, 3 is a permanent support, 4 is an FRP anchor bar, 5 is a temporary support, 6 is a grid pipe, 7 is an isolation layer, 41 is a metal pipe, 42 is an anchor ring, and 43 is a metal pad. DETAILED DESCRIPTION

[0031] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.

[0032] A temporary consolidation support for cantilever construction of a continuous beam bridge, characterized in that it includes a pier 1, a box beam 2, a permanent support 3, FRP anchor bars 4, a temporary support 5, a grille pipe 6, and an isolation layer 7. A permanent support 3 is arranged at the center of the top surface of the pier body of the pier 1, and two rows of temporary supports 5 are symmetrically arranged on both sides of the permanent support 3 along the front and rear of the bridge. The box beam 2 is supported on the top surfaces of the permanent support 3 and the temporary support 5 at the pier position. A grille pipe 6 is pre-arranged in the temporary support 5 and is divided into a plurality of columns or honeycombs by the grille pipe 6. When divided into a plurality of columns, the grille pipe 6 can provide effective constraints on internal materials; when divided into a honeycomb shape, the interior of the grille pipe 6 is empty, providing a honeycomb structure with high bearing capacity and easy removal. A plurality of horizontal isolation layers 7 are arranged inside the temporary support 5 and at the interface between the temporary support 5 and the box girder 2 and the pier 1. The temporary support 5 is divided into a plurality of discrete parts by the grid pipe 6 and the isolation layer 7. On the one hand, the temporary support 5 is prevented from being a whole, making it easy to chisel out; on the other hand, the grid pipe 6 and the isolation layer 7 do not destroy the vertical continuity of the temporary support 5 and do not reduce its load-bearing function; the isolation layer 7 reduces the horizontal force on the beam body and ensures the free deformation of the structure under the action of temperature.

[0033] A plurality of FRP anchor bars 4 are arranged on the front and rear sides of the permanent support 3 along the bridge direction. The upper and lower ends of the FRP anchor bars 4 are respectively anchored to the box girder 2 and the pier 1 to form a fixed anchor for the box girder 2. The FRP anchor bars are light in weight and high in tensile strength, and can anchor the unbalanced load during cantilever construction. At the same time, the FRP anchor bars have low shear strength and are easy to cut and remove.

[0034] The grid tubes 6 and the spaces between them are filled with filling materials to form a temporary support 5 that divides a number of column structures; the inside of the grid tubes 6 is empty or the intervals are empty or the grid tubes 6 are empty to form a temporary support 5 with a honeycomb structure.

[0035] The grid tube 6 is composed of an FRP tube, a PVC tube, a plastic tube or a rubber tube. The cross section of a single hole of the grid tube 6 is a circular, polygonal or curved shape. An isolating agent is applied to the hole wall surface of the grid tube 6. When the grid tube is curved, the cross-sectional side lengths of the grid tube are arbitrary. Multiple grid tubes are closely connected or separated.

[0036] Metal tubes 41 with outer sleeves are provided at both ends of the FRP anchor bar 4 for anchoring. The FRP anchor bar and the metal tube are bonded together by adhesive. The lower end of the FRP anchor bar 4 is buried in the pier 1 by no less than 500 mm, and the upper end of the FRP anchor bar 4 is anchored in the interior or top of the box girder 2.

[0037] The isolation layer 7 is a plastic film, a rubber film, a geotextile, a bamboo board or a wooden board. The upper and lower surfaces of the isolation layer 7 are coated with an isolation agent, which is lubricating oil, silicone grease, paraffin or asphalt.

[0038] The filling material of the temporary support 5 is cast and formed by cement concrete and cement mortar.

[0039] The end of the metal tube 41 is provided with threads, and the anchor ring 42 is fixed by the threads. The inner side of the anchor ring 42 is anchored to the outer side of the pre-set metal pad 43. The metal tube 41 can effectively anchor the two ends of the FRP anchor bar without significantly increasing the cost.

Claims

1. A temporary consolidation support for cantilever construction of a continuous beam bridge, characterized in that The invention comprises a pier (1), a box girder (2), a permanent support (3), FRP anchor bars (4), a temporary support (5), a grating tube (6), and an isolation layer (7). A permanent support (3) is arranged at the center of the top surface of the pier body of the pier (1). Two rows of temporary supports (5) are symmetrically arranged on both sides of the permanent support (3) along the bridge in the forward and rearward directions. The box girder (2) is supported on the top surfaces of the permanent support (3) and the temporary support (5) at the pier position. A grating tube (6) is pre-arranged in the temporary support (5) and is divided into a plurality of columns or honeycombs by the grating tube (6). A plurality of horizontal isolation layers (7) are arranged inside the temporary support (5) and at the interface between the temporary support (5) and the box girder (2) and the pier (1). A plurality of FRP anchor bars (4) are arranged on both sides of the permanent support (3) along the bridge in the forward and rearward directions. The upper end and the lower end of the FRP anchor bar (4) are respectively anchored to the box girder (2) and the pier (1) to form a fixed anchor for the box girder (2).

2. A temporary consolidation support for cantilever construction of a continuous beam bridge as claimed in claim 1, characterized in that Filling materials are poured into the grid tubes (6) and between them to form a temporary support (5) that divides a plurality of column structures; or the inside of the grid tubes (6) is left empty or the intervals are left empty or between the grid tubes (6) are left empty to form a temporary support (5) with a honeycomb structure.

3. A temporary consolidation support for cantilever construction of a continuous beam bridge as claimed in claim 1, characterized in that The grid pipe (6) is composed of an FRP pipe, a PVC pipe, a plastic pipe or a rubber pipe. The cross section of a single hole of the grid pipe (6) is circular, polygonal or curved. The hole wall surface of the grid pipe (6) is coated with an isolating agent.

4. A temporary consolidation support for cantilever construction of a continuous beam bridge as claimed in claim 1, characterized in that Metal tubes (41) with outer sleeves are arranged at both ends of the FRP anchor bar (4) to achieve anchoring. The FRP anchor bar and the metal tube are bonded together by an adhesive. The lower end of the FRP anchor bar (4) is buried in the interior of the pier (1) by no less than 500 mm, and the upper end of the FRP anchor bar (4) is anchored in the interior or top of the box girder (2).

5. A temporary consolidation support for cantilever construction of a continuous beam bridge as claimed in claim 1, characterized in that The isolation layer (7) is a plastic film, a rubber film, a geotextile, a bamboo board or a wooden board. The upper and lower surfaces of the isolation layer (7) are coated with an isolation agent, which is lubricating oil, silicone grease, paraffin or asphalt.

6. A temporary consolidation support for cantilever construction of a continuous beam bridge as claimed in claim 1, characterized in that The filling material of the temporary support (5) is cast and formed by cement concrete or cement mortar.

7. A temporary consolidation support for cantilever construction of a continuous beam bridge as claimed in claim 4, characterized in that The end of the metal pipe (41) is provided with a thread, and an anchor ring (42) is fixedly anchored by the thread, and the inner side of the anchor ring (42) is anchored to the outer side of a pre-set metal pad (43).

Citation Information

Patent Citations

  • Temporary consolidation structure for continuous beam bridge piers

    CN209144660U

  • Continuous beam bridge cantilever construction rapid dismounting support

    CN212223622U