An integral hoisting device for roof color steel plate and its preparation method

By designing an integral lifting device suitable for roof color steel plates, and using the structure of splicing lifting unit, the problems of inconvenience, deformation and cost increase in color steel plates in the prior art are solved, and efficient and economical color steel plate transportation and construction are achieved.

CN111517208BActive Publication Date: 2025-05-09MCC TIANGONG GROUP
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202010430854.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-20
Publication Date
2025-05-09
Estimated Expiration
2040-05-20

AI Technical Summary

Technical Problem

The existing roof color steel plate lifting methods have problems such as welding after cutting affects the appearance quality, increases process and construction costs, and affects the construction progress. At the same time, overall handling is likely to cause color steel plates to deform.

Method used

An integral lifting device for roof color steel plates is designed. Through several mutually spliced ​​lifting units, the support structures of bottom beams, transverse braces and pillars are used to adapt to the transportation of color steel plates of different lengths, avoid cutting, and prevent deformation of color steel plates.

Benefits of technology

The transportation of color steel plates without cutting is realized, which avoids deformation, reduces construction costs and construction periods, and improves construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111517208B_ABST
    Figure CN111517208B_ABST
Patent Text Reader

Abstract

The invention discloses an integral hoisting device for roof color steel plates and a preparation method thereof, comprising a plurality of hoisting units spliced ​​with each other, the hoisting units comprising two spaced bottom beams, the bottom beams being connected as an integral mechanism by a plurality of spaced cross braces, a plurality of spaced pillars being fixed on the bottom beam, a top beam being welded on one end of the pillar away from the bottom beam, a waist beam being fixed on the pillar between the top beam and the bottom beam, a grid-shaped cover plate being rotatably connected on the top beam, and two adjacent hoisting units being spliced ​​together by a plug-in section and a receiving section. The device can adapt to the transportation of color steel plates of different lengths through the splicing of the hoisting units without cutting, and can effectively prevent the color steel plates from being deformed through the support of the bottom beam and the cross brace. The invention is simple to manufacture, efficient, convenient, economical and practical. It can effectively avoid deformation of large-span color steel plates during hoisting and damage during on-site transportation, can reduce cutting and welding of color steel plates, save construction costs, and shorten construction period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of color steel plate hoisting, and in particular relates to an integral hoisting device for roof color steel plates and a preparation method thereof. Background Art

[0002] The traditional method of lifting color steel plates on roofs is to press the color steel plates on site or have them produced by a manufacturing plant, then transport them to the lifting site, tie the vertical straps of the color steel plates on the lifting rods, add diagonal straps at both ends, and lift them to the roof with a car crane.

[0003] The color steel plates on the roofs of some factories are long. If they are cut and then assembled on the roof, the quality of each weld cannot be guaranteed, and the visual quality will be affected. In addition, it will increase the number of processes, construction costs, and overall construction progress. If the long color steel plates are directly transported to the roof with slings, the rigidity of the color steel plates themselves will limit the deformation of the color steel plates, affecting the quality of the installation. In addition, the length of the color steel plates will have different size requirements as the construction area changes, which increases the complexity of the lifting work. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide an integral lifting device for roof color steel plates and a preparation method thereof, so as to solve the inconvenience of existing roof color steel plate lifting, which often requires cutting of the color steel, and the welding of the cut color steel affects the appearance quality, and increases the construction cost and affects the construction progress. The overall handling process easily causes the color steel to deform, which affects the paving quality.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0006] An integral hoisting device for roof color steel plate comprises a plurality of hoisting units spliced ​​with each other, the hoisting unit comprises two spaced bottom beams, the bottom beams are connected as an integral mechanism through a plurality of spaced cross braces, a plurality of spaced pillars are fixed on the bottom beam, a top beam is welded on one end of the pillar away from the bottom beam, a waist beam is also fixed on the pillar between the top beam and the bottom beam, a grid-shaped cover plate is rotatably connected to one of the top beams, and the cover plate is supported on the top beam on the other side after rotation, the bottom beams at one end of the hoisting unit are extended forward for a section to form a receiving section, the bottom beams at the other end of the hoisting unit are also extended forward for a section to form a plug-in section, the bottom beams between the plug-in sections are connected through cross braces, the bottom beams of the plug-in section are also vertically welded with pillars, the ends of the waist beam and the top beam are extended and welded on the pillars, and two adjacent hoisting units are spliced ​​together through the plug-in section and the receiving section. The device can adapt to the transportation of color steel plates of different lengths through the splicing of the hoisting units without cutting, and can effectively prevent the color steel plates from deforming through the support of the bottom beam and the cross brace.

[0007] In order to further optimize the lifting device, the scheme can be optimized.

[0008] The two bottom beams are parallel to each other, and the diagonal positions of the quadrilateral formed by the bottom beams and the cross braces are fixed with diagonal rods. The parallel arrangement of the bottom beams can ensure that the cross braces have the same specifications for uniform processing, and the diagonal rods can increase the stability of the bottom beams after welding.

[0009] The bottom beam, waist beam and top beam are parallel to each other. By making the three beams parallel to each other, the strength can be increased while the material usage can be kept to a minimum, thus saving costs.

[0010] The receiving section is provided with a first bolt mounting hole, and the plug-in section is provided with a second bolt mounting hole. After the hoisting units are spliced, they are fixed together by connecting bolts that penetrate the first bolt mounting hole and the second mounting hole. The bolt connection method can be dismantled and reused

[0011] The pillars are parallel to each other and perpendicular to the bottom beam. The vertically arranged pillars can play an equal blocking role on the edge of the color steel plate, and can prevent the color steel plate from shaking back and forth between the pillars and damaging the color steel plate.

[0012] The bottom of the bottom beam is also equipped with universal wheels, which is convenient for carrying and moving the hoisting device after it is filled with color steel.

[0013] The cover plate is formed by welding a plurality of steel plates, which can save materials and prevent the color steel plate from being separated from the lifting device.

[0014] A method for preparing the above-mentioned integral hoisting device for the roof color steel plate comprises the following steps:

[0015] Step 1: Determine the length of the horizontal brace and diagonal rod in the hoisting unit according to the size of the color steel plate to be hoisted;

[0016] Step 2: Cut and cut the bottom beam, end beam, waist beam and pillar, reserve the receiving section and plug-in section on the bottom beam, weld the parallel bottom beams together through the cross brace, then weld the diagonal rod in the quadrilateral formed by the bottom beam and the cross brace, then weld the pillar vertically to the end beam, and weld the end beam and waist beam to the pillar respectively;

[0017] Step 3: Cut and weld the grid-shaped cover plate;

[0018] Step 4: Adjust the lengths of the receiving section and the plug-in section in step 2 so that the two lengths are the same;

[0019] Step 5: Process the first bolt installation hole on the receiving section and the second bolt installation hole on the plug-in section;

[0020] Step 6: Install a hinge on one of the top beams welded in step 2, and connect one side edge of the cover plate in step 3 to the top beam through the hinge;

[0021] Step 7: Install the universal wheel at the bottom of the bottom beam;

[0022] Step 8: Determine the number of hoisting units according to the actual size of the hoisting construction, and repeat steps 1-7 to prepare the remaining hoisting units;

[0023] Step 9: Connect all the lifting units in step 8 to obtain a lifting device.

[0024] The beneficial effects of the present invention are: the present invention is simple to manufacture, efficient, convenient, economical and practical. It can effectively avoid deformation of large-span color steel plates during hoisting and damage during on-site transportation, reduce cutting and welding of color steel plates, save construction costs and shorten construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention.

[0026] Figure 2 It is a top view of the present invention.

[0027] Figure 3 It is a side view of the present invention.

[0028] Markings in the diagram: 1. Bottom beam; 2. Waist beam; 3. Top beam; 4. Cross brace; 5. Diagonal rod; 6. Pillar; 7. Universal wheel; 8. Cover plate; 9. Hinge; 10. Plug-in section; 11. Bracket body; 12. Support section. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] An integral hoisting device for a roof color steel plate comprises three hoisting units spliced ​​to each other, wherein the hoisting unit comprises two bottom beams 1 arranged in parallel at intervals, the bottom beams 1 being welded into an integrated structure through a plurality of cross braces 4 arranged at intervals, diagonal bars 5 being welded at the diagonal positions of the quadrilateral formed by the bottom beams 1 and the cross braces 4, all the diagonal bars 5 being welded between the two bottom beams 1 in a broken line form, four pillars 6 arranged at intervals being welded to each bottom beam 1, the pillars 6 being parallel to each other and perpendicular to the bottom beams 1, a top beam 3 being welded to one end of the pillar 6 away from the bottom beam 1, a waist beam 2 being further welded to the pillar 6 between the top beam 3 and the bottom beam 1, the bottom beam 1, the waist beam 2 and the top beam 3 being parallel to each other, and by the three being parallel to each other, the strength can be increased while Keep the materials to a minimum and save costs. A grid-shaped cover plate 8 is connected to one of the top beams 3 by a hinge 9. The cover plate 8 is supported on the top beam on the other side after rotation. The above structures are spliced ​​to form the bracket body 11 of each hanging unit. The bottom beams at one end of the hanging unit are extended forward to form a receiving section 12. The bottom beams at the other end of the hanging unit are also extended forward to form a plug-in section 11. The bottom beams between the plug-in sections 11 are connected by a cross brace. The bottom beams of the plug-in sections are also vertically welded with a pillar 6. The ends of the waist beam and the top beam are extended and welded to the pillar. The two adjacent hanging units are spliced ​​together by the plug-in section 11 and the receiving section 12. Two universal wheels 7 are also installed at the bottom of each bottom beam. The device can adapt to the transportation of color steel plates of different lengths through the splicing of the hanging units without cutting. At the same time, the color steel plates can be effectively prevented from deformation through the support of the bottom beam and the cross brace.

[0031] The cover plate 8 is welded into a rectangular frame by four steel beams of two lengths and two sections, and the inside of the frame is reinforced by two steel beams of two lengths and two sections that intersect in a cross shape.

[0032] The receiving section 12 is provided with a first bolt mounting hole, and the plug-in section 11 is provided with a second bolt mounting hole. After the hoisting units are spliced, they are fixed together by connecting bolts that penetrate the first bolt mounting hole and the second mounting hole.

[0033] A method for preparing the above-mentioned integral hoisting device for the roof color steel plate comprises the following steps:

[0034] Step 1: Determine the length of the horizontal brace and diagonal rod in the hoisting unit according to the size of the color steel plate to be hoisted;

[0035] Step 2: Cut and cut the bottom beam, end beam, waist beam and pillar, reserve the receiving section and plug-in section on the bottom beam, weld the parallel bottom beams together through the cross brace, then weld the diagonal rod in the quadrilateral formed by the bottom beam and the cross brace, then weld the pillar vertically to the end beam, and weld the end beam and waist beam to the pillar respectively;

[0036] Step 3: Cut and weld the grid-shaped cover plate;

[0037] Step 4: Adjust the lengths of the receiving section and the plug-in section in step 2 so that the two lengths are the same;

[0038] Step 5: Process the first bolt installation hole on the receiving section and the second bolt installation hole on the plug-in section;

[0039] Step 6: Install a hinge on one of the top beams welded in step 2, and connect one side edge of the cover plate in step 3 to the top beam through the hinge;

[0040] Step 7: Install the universal wheel at the bottom of the bottom beam;

[0041] Step 8: Determine the number of hoisting units according to the actual size of the hoisting construction, and repeat steps 1-7 to prepare the remaining hoisting units;

[0042] Step 9: Connect all the lifting units in step 8 to obtain a lifting device.

[0043] The three lifting units are manufactured according to the above steps and connected and fixed to each other to form an integral lifting device that meets the construction requirements of lifting the entire color steel plate. Similarly, when disassembling, the lifting units of each section are removed in turn according to the length of the color steel plate, and the disassembly can be carried out section by section.

[0044] Working principle of the present invention:

[0045] 1. By assembling the hoisting units of the roof color steel plate, an overall hoisting device that meets the hoisting construction length is formed.

[0046] 2. Utilize the overall stability of the lifting device to ensure that the color steel plate is not subjected to stress or deformation during the lifting process.

[0047] 3. Use the universal wheels under the lifting device to achieve convenient transportation in general sites and reduce the workload of crane relocation.

[0048] 4. Use the cover plate on the lifting unit to make the top beams on both sides of the upper part of the lifting device support each other, thereby improving the overall rigidity of the device and helping to resist deformation of the device during lifting.

[0049] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An integral hoisting device for roof color steel plate, characterized in that: The lifting unit comprises a plurality of mutually spliced ​​lifting units, wherein the lifting unit comprises two bottom beams arranged at intervals, the bottom beams are connected into an integrated structure through a plurality of horizontal braces arranged at intervals, a plurality of pillars arranged at intervals are fixed on the bottom beam, a top beam is welded on one end of the pillar away from the bottom beam, a waist beam is also fixed on the pillar between the top beam and the bottom beam, a grid-shaped cover plate is rotatably connected to one of the top beams, and the cover plate is supported on the top beam on the other side after rotation, the bottom beams at one end of the lifting unit are extended forward for a section to form a receiving section, the bottom beams at the other end of the lifting unit are also extended forward for a section to form a plug-in section, the bottom beams between the plug-in sections are connected by horizontal braces, pillars are also vertically welded on the bottom beams of the plug-in section, the ends of the waist beam and the top beam are extended and welded to the pillars, and two adjacent lifting units are spliced ​​together by the plug-in section and the receiving section; A method for preparing an integral hoisting device for a roof color steel plate comprises the following steps: Step 1: Determine the length of the horizontal brace and diagonal rod in the hoisting unit according to the size of the color steel plate to be hoisted; Step 2: Cut and cut the bottom beam, top beam, waist beam and pillar, reserve the receiving section and the plug-in section on the bottom beam, weld the parallel bottom beams together through the cross brace, then weld the diagonal rod in the quadrilateral formed by the bottom beam and the cross brace, then weld the pillar vertically to the top beam, and weld the top beam and waist beam to the pillar respectively; Step 3: Cut and weld the grid-shaped cover plate; Step 4: Adjust the lengths of the receiving section and the plug-in section in step 2 so that the two lengths are the same; Step 5: Process the first bolt installation hole on the receiving section and the second bolt installation hole on the plug-in section; Step 6: Install a hinge on one of the top beams welded in step 2, and connect one side edge of the cover plate in step 3 to the top beam through the hinge; Step 7: Install the universal wheel at the bottom of the bottom beam; Step 8: Determine the number of hoisting units according to the actual size of the hoisting construction, and repeat steps 1-7 to prepare the remaining hoisting units; Step 9: Connect all the lifting units in step 8 to obtain a lifting device.

2. The integral hoisting device for the roof color steel plate according to claim 1 is characterized in that: The two bottom beams are parallel to each other, and diagonal bars are fixed at the diagonal positions of the quadrilateral formed by the bottom beams and the cross braces.

3. The integral hoisting device for the roof color steel plate according to claim 1 is characterized in that: The bottom beam, waist beam and top beam are parallel to each other.

4. The integral hoisting device for the roof color steel plate according to claim 1 is characterized in that: The receiving section is provided with a first bolt mounting hole, and the plug-in section is provided with a second bolt mounting hole. After the hoisting units are spliced, they are fixed together by connecting bolts that penetrate the first bolt mounting hole and the second mounting hole.

5. The integral hoisting device for the roof color steel plate according to claim 1 is characterized in that: The pillars are parallel to each other and perpendicular to the bottom beam.

6. The integral hoisting device for the roof color steel plate according to claim 1 is characterized in that: The bottom of the bottom beam is also equipped with a universal wheel.

7. The integral hoisting device for the roof color steel plate according to claim 1 is characterized in that: The cover plate is formed by welding a plurality of steel plates.

Citation Information

Patent Citations

  • Large-span assembled double-T type plate hoisting structure

    CN110104555A

  • Integral hoisting device for roof color plate

    CN212475790U