A high-fill anti-settlement roadbed structure and construction method
Through the combined structure of reinforced concrete modules and drainage pipes, combined with the use of extrusion columns, the problem of easy subsidence of high-fill soil roadbed is solved, achieving structural stability and simplicity of construction, and reducing maintenance costs.
Patent Information
- Application Number
- CN202010714442.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-23
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2040-07-23
AI Technical Summary
High-fill soil roadbed is easily damaged by the external environment, resulting in high settlement and maintenance costs. The existing waterproof slopes have poor reliability, complex construction, and slow progress.
The base module, slope module and roof module made of reinforced concrete are used, combined with drainage pipes and extrusion columns, to form a stable roadbed structure. The structural strength and drainage effect are improved through concrete pouring and steel mesh construction.
It effectively prevents subgrade collapse and sliding, improves stability, reduces maintenance costs, simplifies the construction process, and improves the anti-settlement performance of the subgrade.
Smart Images

Figure CN111663393B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of road construction, and in particular to a high-fill anti-settlement roadbed structure and a construction method. Background Art
[0002] Roadbed refers to a strip structure built according to the route location and certain technical requirements, and is the foundation of the road surface. In terms of materials, roadbeds can be divided into three types: earth roadbed, stone roadbed and earth-rock roadbed. The main function of the roadbed is to provide necessary conditions for track laying, road pavement laying and vehicle operation, to bear the load from the track, road surface and vehicles, and to transfer and diffuse the load deep into the foundation. In civil engineering, roadbed occupies an important position in terms of construction quantity, land area and investment.
[0003] High fill roadbed refers to a roadbed with a height of more than 6m built with fine-grained kernels in rice fields or areas with long-term waterlogging, and a total fill height of more than 18m (soil) or more than 20m (stone) in other areas. Due to the large fill height of high fill roadbed, it is easy to be damaged by the regional environment, weather, human activities and geological movements, resulting in the loss of the firmness, stability and durability of the roadbed. In particular, the roadbed is exposed to the external environment for a long time and is easily eroded by rainwater. The base of the roadbed is easily infiltrated by water and swells or loosens, causing the roadbed to become unstable, resulting in the overall or partial sinking of the roadbed, which hinders traffic or makes driving unsafe. Therefore, the roadbed needs to be maintained frequently, which is time-consuming and labor-intensive, with high labor intensity and high roadbed maintenance costs.
[0004] At present, roadbed construction generally prevents roadbed sinking by setting up asphalt barrier layers and waterproof slopes. However, due to the large fill height of high fill roadbed, the construction of the asphalt barrier layer is more complicated, resulting in slow progress. In addition, slope waterproofing is achieved by setting up waterproof membranes, which has poor reliability and the substrate will still be soaked in water after a long time. Summary of the invention
[0005] In view of the above problems existing in the prior art, the first technical problem to be solved by the present invention is to provide a high-fill anti-settlement roadbed structure with a simple structure and practicality.
[0006] The second technical problem to be solved by the present invention is to provide a construction method of a high-fill anti-settlement roadbed structure which is simple to construct.
[0007] In order to solve the above-mentioned first technical problem, the present invention adopts the following technical solution 1:
[0008] A high-fill anti-settlement roadbed structure comprises a base, a slope module, a bottom plate module, a top plate module and a plurality of extrusion columns.
[0009] The base plate module is a reinforced concrete structure, and the base plate module is placed on the original ground by pouring.
[0010] The slope module is a reinforced concrete structure. There are two slope modules, which are respectively located above the base plate module near the left and right sides. The lower ends of the two slope modules and the upper surface of the base plate module are cast into a whole.
[0011] The two slope modules are each provided with a drainage pipe near the lower end, the water inlet ends of the two drainage pipes are located between the two slope modules, the water outlet ends of the two drainage pipes extend to the outside of the two slope modules respectively, and the water outlet ends of the two drainage pipes are both inclined downward.
[0012] The base is located above the bottom plate module and between the two slope modules. The upper surface of the base is flush with the upper ends of the two slope modules. The base is composed of a crushed stone layer and a lime soil rammed earth layer from bottom to top.
[0013] The top plate module is a reinforced concrete structure, and is located above the base and the two side slope modules. The upper ends of the two side slope modules and the lower surface of the top plate module are cast into a whole.
[0014] A plurality of circular through holes are vertically arranged on the top plate module.
[0015] The plurality of extrusion columns correspond to the plurality of circular through holes one by one, the extrusion columns pass through the circular through holes and are located in the rammed earth layer of lime soil, and the extrusion columns are gap-matched with the circular through holes.
[0016] By setting up the bottom plate module, slope module and top plate module made of concrete, the base can be effectively protected, making it less likely for the base to collapse, break and slide due to the external environment. By setting up drainage pipes, the water in the base can be effectively drained to prevent the roadbed from being soaked in water and reducing stability. Traditional equipment cannot completely compact the soil. By driving in the squeezing column, the squeezing column causes secondary squeezing of the compacted gray soil, thereby further increasing the compactness of the gray soil rammed soil layer, improving the stability of the base, and making the base have a good anti-settlement effect.
[0017] Preferably, a filter screen is provided at the water inlet end of the drain pipe, and the filter screen is fixedly connected to the water inlet end of the drain pipe.
[0018] By setting up a filter net, it is possible to effectively prevent the silt in the matrix from entering the drain pipe with the water flow, causing the drain pipe to be blocked and thus causing the drain pipe to lose its drainage function, thereby greatly improving the working stability of the anti-subsidence structure of the roadbed.
[0019] Preferably, the diameters of the plurality of circular through holes are all 8-12 cm.
[0020] By setting a circular through hole with a diameter of 8-12 cm, the extrusion column can be driven into the lime soil rammed earth layer through the circular through hole to extrude the lime soil rammed earth layer, thereby improving the compactness of the lime soil rammed earth layer. If the diameter of the circular through hole is less than 8 cm, the extrusion effect of each extrusion column is small, so that a large number of circular through holes are required. The large number of circular through holes makes it more troublesome to cast concrete to form the top plate module. At the same time, the structural strength of the top plate module is reduced due to the large number of circular through holes. If the diameter of the circular through hole is greater than 12 cm, the extrusion effect of each extrusion column is large, so that the number of circular through holes required is small. However, due to the large diameter of the circular through hole, the concrete is easy to collapse and deform before solidification. At the same time, the structural strength of the top plate module is reduced after the concrete is solidified and formed.
[0021] Preferably, the lower end of the extrusion column is conical.
[0022] By setting the lower end of the extrusion column to be conical, the extrusion column is subjected to less resistance when being driven into the lime soil rammed earth layer, making it easier to drive the extrusion column.
[0023] In order to solve the above second technical problem, the present invention adopts the following technical solution 2:
[0024] A construction method of a high-fill anti-settlement roadbed structure, using a high-fill anti-settlement roadbed structure according to technical solution 1, comprises the following steps:
[0025] S100: Clean the original ground, drain the water on the original ground, and compact the original ground.
[0026] S200: Build a steel mesh on the original ground and pour concrete to obtain the base plate module.
[0027] S300: After the base plate module is solidified and formed, gravel is laid on the base plate module and compacted to form a gravel layer.
[0028] S400: Spreading lime soil on the gravel layer and compacting it to form a lime soil rammed earth layer.
[0029] S500: A steel mesh is built above the bottom plate module near the left and right sides, and drainage pipes are set at the positions of the steel meshes on both sides near the bottom plate module, and then concrete is poured to the slope module.
[0030] S600: After the slope module is solidified and formed, a steel mesh is built between the two slope modules, a number of cylindrical rods are vertically arranged in the steel mesh area, the lower ends of the cylindrical rods are inserted into the lime soil rammed earth layer, and then concrete is poured.
[0031] S700: After the concrete is solidified and formed, a plurality of cylindrical rods are taken out to obtain a top plate module having a plurality of circular through holes.
[0032] S800: Select some circular through holes to drive extrusion columns into the lime soil rammed earth layer. When lime soil emerges from the remaining circular through holes or there is a large resistance to driving the extrusion columns, stop driving the extrusion columns into the remaining circular through holes.
[0033] S900: injecting concrete into the plurality of circular through holes, leveling the concrete in the plurality of circular through holes, and obtaining an anti-settlement structure of a high fill roadbed after the concrete solidifies and forms.
[0034] By thoroughly cleaning the original ground, the force on the bottom plate module can be made more stable; by building a steel mesh and then pouring, the structural strength of the bottom plate module, slope module and top plate module can be improved; by setting up drainage pipes during pouring, the installation of drainage pipes is more convenient and avoids difficulties in installation after pouring; by inserting cylindrical rods during pouring, a circular through hole is formed after the top plate module solidifies, avoiding damage to the top plate module caused by drilling after pouring.
[0035] Preferably, the slope ratio of the slope module to the base plate module is less than 1:2.
[0036] By limiting the slope ratio to less than 1:2, the slope module is made more stable and can better cope with the pressure from the substrate, thereby making the roadbed have better bearing capacity and greater stability.
[0037] Preferably, the steel meshes in the slope module, the bottom plate module and the top plate module are interconnected into a whole.
[0038] By connecting the steel meshes in the slope module, the bottom plate module and the top plate module to each other as a whole, the connection between the slope module, the bottom plate module and the top plate module is more stable, making it less likely for the roadbed to deform or collapse.
[0039] Preferably, a filter screen is provided at the water inlet end of the drain pipe in S500, and the filter screen is fixedly connected to the drain pipe.
[0040] By setting up a filter net, it is possible to effectively prevent the silt in the matrix from entering the drain pipe with the water flow, causing the drain pipe to be blocked and thus causing the drain pipe to lose its drainage function, thereby greatly improving the working stability of the anti-subsidence structure of the roadbed.
[0041] Preferably, in S800, the extrusion column is vertically driven into the lime soil rammed earth layer through the circular through hole.
[0042] By vertically driving the extrusion column into the lime-soil rammed earth layer through the circular through hole, the extrusion column is prevented from hitting the top plate module and damaging the top plate module. At the same time, the extrusion direction of several extrusion columns on the lime-soil rammed earth layer is consistent, making the extrusion of the lime-soil rammed earth layer by the extrusion column more uniform.
[0043] Preferably, the length of the extrusion column in S800 is adjusted according to the height of the lime-soil rammed earth layer. After the extrusion column is driven into the lime-soil rammed earth layer, the lower end of the extrusion column is higher than the gravel layer, and the upper end of the extrusion column is lower than the upper surface of the top plate module.
[0044] By adjusting the length of the extrusion column according to the height of the rammed earth layer, the lower end of the extrusion column is prevented from colliding with the gravel layer. The upper end of the extrusion column is lower than the upper surface of the top plate module, so as to avoid the extrusion column affecting the subsequent construction of the upper surface of the roadbed.
[0045] Compared with the prior art, the present invention has at least the following advantages:
[0046] 1. The present invention can effectively protect the base by setting a bottom plate module, a slope module and a top plate module made of concrete, so that the base is not easy to collapse, break and slide due to the external environment. By setting a drainage pipe, the water in the base can be effectively discharged to prevent the roadbed from being soaked in water and the stability from decreasing. Traditional equipment cannot completely compact the soil. By driving in the squeezing column, the squeezing column causes secondary squeezing of the compacted gray soil, thereby further increasing the compactness of the gray soil rammed soil layer, improving the stability of the base, and making the base have a good anti-settlement effect.
[0047] 2. The present invention can effectively prevent the sediment in the matrix from entering the drain pipe with the water flow by setting the filter net, causing the drain pipe to be blocked, thereby causing the drain pipe to lose its drainage function, thereby greatly improving the working stability of the anti-subsidence structure of the roadbed.
[0048] 3. The present invention sets the lower end of the extrusion column to be conical, so that when the extrusion column is driven into the lime soil rammed earth layer, the extrusion column encounters less resistance, making it easier to drive the extrusion column.
[0049] 4. The present invention can make the stress of the bottom plate module more stable by thoroughly cleaning the original ground; the structural strength of the bottom plate module, the slope module and the top plate module is improved by building a steel mesh and then pouring; a drainage pipe is set during pouring, which makes the setting of the drainage pipe more convenient and avoids the difficulty of setting after pouring; a cylindrical rod is inserted during pouring, so that a circular through hole is formed after the top plate module solidifies, avoiding damage to the top plate module caused by drilling after pouring.
[0050] 5. The present invention limits the slope ratio to less than 1:2, so that the slope module is more stable and can better cope with the pressure from the substrate, thereby making the roadbed have better bearing capacity and stronger stability.
[0051] 6. The present invention vertically drives the extrusion column into the lime-soil rammed earth layer through a circular through hole to avoid the extrusion column from colliding with the top plate module and damaging the top plate module. At the same time, the extrusion direction of the several extrusion columns on the lime-soil rammed earth layer is consistent, making the extrusion of the lime-soil rammed earth layer by the extrusion column more uniform. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] Figure 1 It is a schematic diagram of the roadbed structure of the present invention.
[0053] Figure 2 It is an enlarged view of point A in the schematic diagram of the roadbed structure of the present invention.
[0054] Figure 3 It is a top view of the top plate module in the present invention.
[0055] In the figure, 1-base, 11-gravel layer, 12-lime soil rammed earth layer; 2-slope module, 21-drainage pipe, 22-filter screen; 3-bottom plate module, 4-top plate module, 41-circular through hole; 5-extruded column, 6-original ground. DETAILED DESCRIPTION
[0056] The present invention will be further described in detail below in conjunction with the accompanying drawings.
[0057] For the convenience of description, the following description concepts are introduced in the writing of this invention:
[0058] In the present invention, "front", "rear", "left", "right", "up", and "down" all refer to Figure 1 The direction in which 'front' refers to the Figure 1 In the figure, the back is relative to the paper surface. Figure 1 The center faces inward relative to the paper.
[0059] See also Figure 1-3 , Example 1:
[0060] A high-fill anti-settlement roadbed structure comprises a base 1, a slope module 2, a bottom plate module 3, a top plate module 4 and a plurality of extrusion columns 5.
[0061] The base plate module 3 is a reinforced concrete structure, and the base plate module 3 is placed on the original ground 6 by pouring.
[0062] The slope module 2 is a reinforced concrete structure. There are two slope modules 2. The two slope modules 2 are respectively located above the base plate module 3 near the left and right sides. The lower ends of the two slope modules 2 and the upper surface of the base plate module 3 are cast into a whole.
[0063] The two slope modules 2 are each provided with a drainage pipe 21 near the lower end, the water inlet ends of the two drainage pipes 21 are located between the two slope modules 2, the water outlet ends of the two drainage pipes 21 extend to the outside of the two slope modules 2 respectively, and the water outlet ends of the two drainage pipes 21 are both inclined downward.
[0064] The base 1 is located above the bottom plate module 3 and between the two slope modules 2. The upper surface of the base 1 is flush with the upper ends of the two slope modules 2. The base 1 is composed of a crushed stone layer 11 and a lime soil rammed earth layer 12 from bottom to top.
[0065] The top plate module 4 is a reinforced concrete structure, and is located above the base 1 and the two side slope modules 2 . The upper ends of the two side slope modules 2 and the lower surface of the top plate module 4 are cast into a whole.
[0066] The top plate module 4 is vertically provided with a plurality of circular through holes 41 .
[0067] The plurality of extrusion columns 5 correspond to the plurality of circular through holes 41 one by one, and the extrusion columns 5 pass through the circular through holes 41 and are located in the lime soil rammed earth layer 12, and the extrusion columns 5 are clearance-matched with the circular through holes 41. In a specific implementation, the extrusion columns 5 are made of metal material, and the outer surface of the extrusion columns 5 is sprayed with waterproof paint, which can effectively prevent the extrusion columns 5 from rusting and extend the service life of the extrusion columns 5.
[0068] Furthermore, a filter screen 22 is provided at the water inlet end of the drain pipe 21 , and the filter screen 22 is fixedly connected to the water inlet end of the drain pipe 21 .
[0069] Furthermore, the diameters of the plurality of circular through holes 41 are all 8-12 cm. In specific implementation, the diameters of the circular through holes 41 may be 8 cm, 10 cm, or 12 cm. If the diameter of the circular through hole is less than 8 cm, the squeezing effect of each squeezing column is relatively small, so that a large number of circular through holes are required. The large number of circular through holes makes it more troublesome to cast concrete to form the top plate module, and the large number of circular through holes reduces the structural strength of the top plate module. If the diameter of the circular through hole is greater than 12 cm, the squeezing effect of each squeezing column is relatively large, so that a small number of circular through holes are required. However, due to the large diameter of the circular through hole, the concrete is prone to collapse and deformation before solidification, and the structural strength of the top plate module is reduced after the concrete solidifies and forms.
[0070] Furthermore, the lower end of the extrusion column 5 is conical.
[0071] See also Figure 1-3 , Example 2:
[0072] A construction method of a high-fill anti-settlement roadbed structure, using the high-fill anti-settlement roadbed structure described in Example 1, comprises the following steps:
[0073] S100: cleaning the original ground 6, draining the water from the original ground 6, and compacting the original ground 6. In specific implementation, when the original ground 6 is cultivated land or loose soil, tree roots, weeds and turf on the original ground 6 should be cleaned, and then the original ground 6 should be compacted; when the original ground 6 is a pond or ditch, the water should be drained first, the silt and humus should be removed, and then the original ground 6 should be compacted.
[0074] S200: A steel mesh is built on the original ground 6 and concrete is poured to obtain a bottom plate module 3. In specific implementation, the upper surface of the bottom plate module 3 near both sides is cast to form a tooth shape.
[0075] S300 : After the bottom plate module 3 is solidified and formed, crushed stones are laid on the bottom plate module 3 and compacted to form a crushed stone layer 11 .
[0076] S400: Spreading lime soil on the gravel layer 11 and compacting it, so as to form a lime soil rammed soil layer 12. In specific implementation, the lime soil is compacted by impact rolling or heavy hammer compaction.
[0077] S500: A steel mesh is built above the bottom plate module 3 near the left and right sides, and drainage pipes 21 are set at the positions of the steel meshes on both sides near the bottom plate module 3, and then concrete is poured to the slope module 2. In specific implementation, the lower end of the slope module 2 is connected to the toothed area on the bottom plate module 3, so that the connection between the slope module 2 and the bottom plate module 3 is more stable, and the connection will not be loose due to segmented pouring; the upper surface of the slope module 2 is formed into a tooth shape by pouring.
[0078] S600: After the slope module 2 is solidified, a steel mesh is built between the two slope modules 2, and a plurality of cylindrical rods are vertically arranged in the steel mesh area. The lower ends of the plurality of cylindrical rods are inserted into the lime soil rammed earth layer 12, and then concrete is poured.
[0079] S700: After the concrete is solidified, several cylindrical rods are taken out to obtain a top plate module 4 having several circular through holes 41. In specific implementation, the lower surface of the top plate module 4 near the left and right ends is connected to the toothed area on the upper surface of the slope module 2, so that the connection between the slope module 2 and the top plate module 4 is more stable and will not be loose due to segmented pouring.
[0080] S800: Select some circular through holes 41 to drive the extrusion columns 5 into the lime-soil rammed earth layer 12. When lime emerges from the remaining circular through holes 41 or the resistance to driving the extrusion columns is large, stop driving the extrusion columns 5 into the remaining circular through holes 41.
[0081] S900: injecting concrete into the plurality of circular through holes 41, leveling the concrete in the plurality of circular through holes 41, and obtaining an anti-settlement structure of a high fill roadbed after the concrete solidifies and forms.
[0082] Furthermore, the slope ratio of the slope module 2 to the bottom plate module 3 is less than 1:2.
[0083] Furthermore, the steel meshes in the slope module 2, the bottom plate module 3 and the top plate module 4 are interconnected into a whole.
[0084] Furthermore, in the S500 , a filter screen 22 is provided at the water inlet end of the drain pipe 21 , and the filter screen 22 is fixedly connected to the drain pipe 21 .
[0085] Furthermore, in the S800 , the extrusion column 5 is vertically driven into the lime soil rammed earth layer 12 through the circular through hole 41 .
[0086] Furthermore, the length of the extrusion column 5 in S800 is adjusted according to the height of the lime-soil rammed earth layer 12 . After the extrusion column 5 is driven into the lime-soil rammed earth layer 12 , the lower end of the extrusion column 5 is higher than the gravel layer 11 , and the upper end of the extrusion column 5 is lower than the upper surface of the top plate module 4 .
[0087] The principle of a high fill anti-settlement roadbed structure defined by the present invention is as follows:
[0088] The bottom plate module 3, the slope module 2 and the top plate module 4 cast by concrete can effectively protect the base 1, so that the roadbed is not easy to collapse, break and slide due to the external environment. The base 1 is composed of a crushed stone layer 11 and a rammed earth layer 12, which makes the structure of the base 1 more stable and reliable. The drainage pipe 21 can effectively drain the water in the base 1 to prevent the roadbed from being soaked in water and the stability being reduced. Traditional equipment cannot completely compact the rammed earth layer 12. By driving the extrusion column 5 into the circular through hole 41, the rammed earth layer 12 is squeezed twice by the extrusion column 5, thereby increasing the compactness of the rammed earth layer 12, improving the stability of the base, and making the base have a good anti-settlement effect.
[0089] The process of the construction method of a high fill anti-settlement roadbed structure defined in the present invention is as follows:
[0090] 1. Clean the original ground 6, drain the water on the original ground 6, and compact the original ground 6.
[0091] 2. Build a steel mesh on the original ground 6 and pour concrete to obtain the base plate module 3.
[0092] 3. After the bottom plate module 3 is solidified, gravel is laid on the bottom plate module 3 to form a gravel layer 11.
[0093] 4. Spread lime soil on the gravel layer 11 and compact it to form a lime soil rammed earth layer 12.
[0094] 5. Build a steel mesh above the bottom plate module 3 near the left and right sides, and set drainage pipes 21 at the positions of the steel meshes on both sides near the bottom plate module 3. The water inlet end of the drainage pipe 21 is provided with a filter screen 22, and then pour concrete to the slope module 2.
[0095] 6. After the slope module 2 is solidified, a steel mesh is built between the two slope modules 2, and a number of cylindrical rods are vertically arranged in the steel mesh area. The lower ends of the cylindrical rods are inserted into the lime soil rammed earth layer 12, and then concrete is poured.
[0096] 7. After the concrete is solidified and formed, several cylindrical rods are taken out to obtain a top plate module 4 having several circular through holes 41.
[0097] 8. Select some circular through holes 41 to drive the extrusion columns 5 into the lime-soil rammed earth layer 12. When lime emerges from the remaining circular through holes 41 or the driving resistance of the extrusion columns 5 is large, stop driving the extrusion columns 5 into the remaining circular through holes 41.
[0098] 9. Concrete is injected into the circular through holes 41, and the concrete in the circular through holes 41 is leveled. After the concrete is solidified and formed, an anti-settlement structure of the high fill roadbed is obtained.
[0099] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.
Claims
1. A high fill anti-settlement roadbed structure, comprising a base (1), characterized in that: It comprises a slope module (2), a bottom plate module (3), a top plate module (4) and a plurality of extrusion columns (5); The base plate module (3) is a reinforced concrete structure, and the base plate module (3) is placed on the original ground (6) by pouring; The side slope module (2) is a reinforced concrete structure. There are two side slope modules (2). The two side slope modules (2) are respectively located above the bottom plate module (3) and close to the left and right sides. The lower ends of the two side slope modules (2) and the upper surface of the bottom plate module (3) are cast into a whole. The two slope modules (2) are each provided with a drainage pipe (21) near the lower end, the water inlet ends of the two drainage pipes (21) being located between the two slope modules (2), the water outlet ends of the two drainage pipes (21) extending to the outside of the two slope modules (2) respectively, and the water outlet ends of the two drainage pipes (21) both being inclined downward; The base (1) is located above the bottom plate module (3), and the base (1) is located between the two side slope modules (2), the upper surface of the base (1) is flush with the upper ends of the two side slope modules (2), and the base (1) is composed of a crushed stone layer (11) and a lime soil rammed earth layer (12) from bottom to top; The top plate module (4) is a reinforced concrete structure, the top plate module (4) is located above the base (1) and the two side slope modules (2), and the upper ends of the two side slope modules (2) and the lower surface of the top plate module (4) are cast into a whole; The top plate module (4) is vertically provided with a plurality of circular through holes (41); The plurality of extrusion columns (5) correspond to the plurality of circular through holes (41) in a one-to-one manner; the extrusion columns (5) pass through the circular through holes (41) and are located in the rammed earth layer (12); the extrusion columns (5) and the circular through holes (41) are clearance-matched; the extrusion columns (5) are made of metal material, and the outer surface of the extrusion columns (5) is sprayed with waterproof paint.
2. A high fill anti-settlement roadbed structure as claimed in claim 1, characterized in that: A filter screen (22) is provided at the water inlet end of the drainage pipe (21), and the filter screen (22) is fixedly connected to the water inlet end of the drainage pipe (21).
3. A high fill anti-settlement roadbed structure as claimed in claim 2, characterized in that: The diameters of the plurality of circular through holes (41) are all 8-12 cm.
4. A high fill anti-settlement roadbed structure as claimed in claim 3, characterized in that: The lower end of the extrusion column (5) is conical.
5. A construction method for a high fill anti-settlement roadbed structure, characterized in that: Using the high fill anti-settlement roadbed structure as claimed in claim 4 comprises the following steps: S100: cleaning the original ground (6), draining the water from the original ground (6), and compacting the original ground (6); S200: Building a steel mesh on the original ground (6) and pouring concrete to obtain a base plate module (3); S300: After the base plate module (3) is solidified, gravel is laid on the base plate module (3) and compacted to form a gravel layer (11); S400: laying lime soil on the crushed stone layer (11) and compacting it, thereby forming a lime soil rammed earth layer (12); S500: Building a steel mesh at positions above the bottom plate module (3) near the left and right sides, and setting drainage pipes (21) at positions of the steel mesh on both sides near the bottom plate module (3), and then pouring concrete to obtain a slope module (2); S600: After the slope module (2) is solidified and formed, a steel mesh is built between the two slope modules (2), a plurality of cylindrical rods are vertically arranged in the steel mesh area, the lower ends of the plurality of cylindrical rods are inserted into the lime soil rammed earth layer (12), and then concrete is poured; S700: After the concrete is solidified and formed, a plurality of cylindrical rods are taken out to obtain a top plate module (4) having a plurality of circular through holes (41); S800: Select some of the circular through holes (41) to drive the extrusion columns (5) into the lime soil rammed earth layer (12); when lime soil emerges from the remaining circular through holes (41), stop driving the extrusion columns (5) into the remaining circular through holes (41); S900: injecting concrete into the plurality of circular through holes (41), leveling the concrete in the plurality of circular through holes (41), and obtaining an anti-settlement structure of a high fill roadbed after the concrete solidifies and forms.
6. The construction method of a high fill anti-settlement roadbed structure as claimed in claim 5, characterized in that: The slope ratio of the slope module (2) to the bottom plate module (3) is less than 1:
2.
7. The construction method of a high fill anti-settlement roadbed structure as claimed in claim 5, characterized in that: The steel meshes in the slope module (2), the bottom plate module (3) and the top plate module (4) are interconnected to form a whole.
8. The construction method of a high fill anti-settlement roadbed structure as claimed in claim 5, characterized in that: The water inlet end of the drainage pipe (21) in the S500 is provided with a filter screen (22), and the filter screen (22) is fixedly connected to the drainage pipe (21).
9. The construction method of a high fill anti-settlement roadbed structure as claimed in claim 5, characterized in that: In the S800, the extrusion column (5) is driven vertically into the lime soil rammed earth layer (12) through the circular through hole (41).
10. The construction method of a high fill anti-settlement roadbed structure according to claim 5, characterized in that: The length of the extrusion column (5) in S800 is adjusted according to the height of the lime soil rammed earth layer (12). After the extrusion column (5) is driven into the lime soil rammed earth layer (12), the lower end of the extrusion column (5) is higher than the gravel layer (11), and the upper end of the extrusion column (5) is lower than the upper surface of the top plate module (4).
Citation Information
Patent Citations
High-filling anti-settling subgrade structure
CN212247717U