Prestressed reinforcement device and prestressed loading construction method
By burying anchor assembly and carbon fiber reinforcement in concrete grooves and applying prestress using reaction frame components and tensioning components, the existing CFRP prestressing reinforcement device has solved the problem of large space and high cost, and the cantilever beam is realized and efficient reinforcement of bridge decks.
Patent Information
- Application Number
- CN202010550675.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-06-16
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2040-06-16
AI Technical Summary
The existing CFRP prestressing reinforcement devices occupy a large space, affect the appearance and are cost-effective, and are not suitable for reinforcement of structures such as cantilever beams and bridge decks.
Design a prestressing reinforcement device including a first anchor assembly, a second anchor assembly, a carbon fiber rib, a reaction frame member and a tensioning member by burying the anchor assembly and a carbon fiber rib in a concrete groove and utilizing the reaction force The frame member and the tensioning member are applied to the prestress, and the elongation direction of the tensioning member is parallel to the axis of the carbon fiber ribs, so as to implement prestressing on the tensioning of the carbon fiber ribs outside the concrete groove.
The device does not take up additional space, reduces cost, reduces prestress losses, and is easy to disassemble and reuse. It is suitable for reinforcement of structures such as cantilever beams and bridge decks.
Smart Images

Figure CN111794545B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building anchoring, in particular to a prestressed reinforcement device and a prestressed loading construction method. Background Art
[0002] CFRP (Carbon Fiber Reinforced Plastic, CFRP for short) has the advantages of high strength and corrosion resistance, and is widely used in the reinforcement of concrete structures. Applying prestress to CFRP and anchoring it on the beam can not only reduce the deflection of the beam and improve its normal performance, but also increase the utilization rate of the material strength. When using CFRP bars (plates, rods) to reinforce reinforced concrete structures, embedded prestressed reinforcement is a very effective way to improve the bearing capacity of the structure and improve the utilization rate of CFRP materials.
[0003] The existing CFPR prestressed reinforcement device usually adopts an embedded method, that is, a tensioning end and an anchoring end are set at both ends outside the beam body.
[0004] Chinese patent CN108386002A discloses a carbon fiber reinforcement device for reinforced concrete beams and slabs, comprising a fixed end bracket, a fixed end anchor, a connecting frame, a tensioning end bracket, a tensioning end anchor, a tensioning component and carbon fiber bars, wherein the fixed end bracket and the tensioning end bracket are respectively fixed at the two ends of the reinforced concrete beam and slab to be reinforced, the fixed end anchor is installed on the fixed end bracket, the tensioning end anchor is installed on the tensioning end bracket, one end of the carbon fiber bar is connected to the fixed end anchor, and the other end is connected to the tensioning end anchor, the tensioning component is fixedly installed on the reinforced concrete beam and slab, the tensioning component is fixedly connected to the connecting frame, and the connecting frame is tightly connected to the tensioning end anchor.
[0005] The reinforcement device of the above structure places the CFRP bars outside the concrete. After the installation is completed and the removable parts are removed, a large space at the bottom of the beam is occupied, which affects the appearance and increases the cost required for leveling. Moreover, after the installation is completed, the finished surface is not smooth with the original finished surface, so it is not suitable for the reinforcement of structures such as cantilever beams and bridge decks. In addition, because the jack and the carbon fiber bars of the above structure reinforcement device are coaxially arranged for tensioning, if the carbon fiber bars are to be buried in the concrete, the jack needs to be placed in the concrete as well. Since the jack is generally large in size, the construction is inconvenient and the cost is high. Summary of the invention
[0006] The technical problem to be solved by the present invention is to overcome the technical problems in the prior art that the CFRP bars are placed outside the concrete, which occupies a large space at the bottom of the beam, affects the appearance and has a high cost, thereby providing a detachable prestressed reinforcement device and a prestressed loading construction method with a simple structure and easy installation.
[0007] To this end, an object of the present invention is to provide a prestressed reinforcement device, comprising:
[0008] A first anchor assembly is used to be fixed to one end of a concrete groove pre-opened in the concrete structure to be reinforced;
[0009] a second anchor assembly, arranged at the other end of the concrete groove opposite to the first anchor assembly;
[0010] A carbon fiber reinforcement, adapted to be embedded in the concrete groove and having one end fixed to the first anchor assembly and the other end fixed to the second anchor assembly;
[0011] A reaction frame component, used for being installed on the concrete structure to be reinforced and located outside the concrete trough;
[0012] A force-bearing frame assembly is installed on the second anchor assembly, and includes a force-bearing frame component that is relatively spaced apart from the reaction frame component and a connecting frame component that is slidably connected to the concrete structure to be reinforced, wherein the force-bearing frame component can directly bear force and transmit the force to the connecting frame component and the second anchor assembly to apply prestress to the carbon fiber reinforcement;
[0013] The tensioning component has two ends respectively mounted on the force-bearing frame component and the reaction frame component and applies a thrust to the force-bearing frame component away from the reaction frame component; the elongation direction of the tensioning component is parallel to the axial direction of the carbon fiber rib.
[0014] Optionally, in the prestressed reinforcement device, both the first anchor assembly and the second anchor assembly include:
[0015] A sleeve matching the concrete groove and extending along the elongation direction of the carbon fiber reinforcement, having a cavity therein and at least one end connected to the carbon fiber reinforcement being an open end, the open end being connected to a positioning nut, the positioning nut being provided with a positioning hole for the carbon fiber reinforcement to pass through; the two ends of the carbon fiber reinforcement respectively pass through the positioning holes and the open end corresponding to the respective anchor assemblies and are fixed in the corresponding cavities;
[0016] a plate-shaped member connected to the sleeve, wherein the other end of the sleeve opposite to the end connected to the positioning nut is at least partially inserted into the plate; and
[0017] The stopper is threadedly connected to the other end and resists the plate when the tensioning member applies thrust to the force-bearing frame assembly. Optionally, in the prestressed reinforcement device, the stopper is a nut with a closed end and an inner thread.
[0018] Optionally, in the prestressed reinforcement device, at least a glue injection hole and a vent hole communicating with the cavity are provided on the side wall of the sleeve.
[0019] Optionally, in the prestressed reinforcement device, the connecting frame assembly comprises:
[0020] Two connecting frame components relatively movably arranged on both sides of the concrete groove for connecting the force-bearing frame component and the second anchor assembly;
[0021] One end of any of the connecting frame components is connected to the end faces of the load-bearing frame component and the second anchor assembly facing each other, and the other end is slidably connected to the side wall of the concrete structure to be reinforced.
[0022] Optionally, in the prestressed reinforcement device, any of the connecting frame components is L-shaped, including a first connecting frame component parallel to the plate of the second anchor assembly and a second connecting frame component perpendicular to the plate of the second anchor assembly;
[0023] The first connecting frame component is provided with a fourth connecting hole extending in a direction perpendicular to the elongation direction of the tensioning component, and the two connecting frame components can slide along the extension direction of the fourth connecting hole;
[0024] The second connecting frame component is provided with a fifth connecting hole extending along the elongation direction of the tensioning component, and the second anchor assembly and the force-bearing frame assembly can slide along the fifth connecting hole when subjected to thrust.
[0025] Optionally, in the prestressed reinforcement device, the force-bearing frame component and the reaction frame component are also L-shaped and are each provided with a reinforcing rib.
[0026] Optionally, in the prestressed reinforcement device, the tensioning component is a jack, and the end surfaces of the reaction frame component and the force-bearing frame assembly facing each other are provided with convex columns coaxially arranged with the elongation direction of the tensioning component, and the two ends of the tensioning component are respectively limited on the convex columns.
[0027] Another object of the present invention is to provide a prestressed loading construction method, comprising the following method steps:
[0028] S1: According to the reinforcement requirements of the concrete structure to be reinforced, a concrete groove is pre-opened transversely on one surface of the concrete structure to be reinforced according to preset requirements;
[0029] S2: The first anchor assembly is embedded and fixed at one end in the concrete groove, the second anchor assembly is embedded in the other end of the concrete groove but not completely fixed to the concrete structure to be reinforced, and the carbon fiber reinforcement is placed transversely in the concrete groove and its two ends are respectively fixed to the first anchor assembly and the second anchor assembly;
[0030] S3: fix the reaction frame component to the outside of the concrete groove, install the force frame assembly on the second anchor assembly, and slide the connecting frame assembly part against the side wall of the concrete structure to be reinforced, and install the tensioning component between the reaction frame component and the force frame assembly simultaneously, so that the axis of the tensioning component is parallel to the axis of the carbon fiber reinforcement;
[0031] S4: starting the tensioning component so that the force-bearing frame component drives the second anchor assembly to pull the carbon fiber reinforcement in a direction away from the reaction frame component to apply prestress to the carbon fiber reinforcement;
[0032] S5: When the displacement corresponding to the preset prestressing level is reached, the second anchor assembly is fixed in the concrete groove;
[0033] S6: Spray mortar or plaster in the concrete tank to complete the construction, and disassemble the reaction frame components, load-bearing frame components and tensioning components.
[0034] Preferably, the prestressed loading construction method further includes, after S6: disassembling the first stopper and the first plate of the first anchor assembly and the second stopper and the second plate of the second anchor assembly, leaving only the first sleeve of the first anchor assembly, the second sleeve of the second anchor assembly and the carbon fiber reinforcement in the concrete groove.
[0035] The technical solution of the present invention has the following advantages:
[0036] 1. The prestressed reinforcement device of the present invention comprises: a first anchor assembly, which is used to be fixed on one end of a concrete groove pre-opened on the concrete structure to be reinforced; a second anchor assembly, which is used to be arranged at the other end of the concrete groove opposite to the first anchor assembly; a carbon fiber reinforcement, which is suitable for being buried in the concrete groove and fixed at one end to the first anchor assembly and the other end to the second anchor assembly; a reaction frame component, which is used to be installed on the concrete structure to be reinforced and is located outside the concrete groove; a force-bearing frame component, which is installed on the second anchor assembly, and comprises a force-bearing frame component which is arranged relatively spaced from the reaction frame component and a connecting frame component which is slidably connected to the concrete structure to be reinforced, wherein the force-bearing frame component can directly bear force and transmit force to the second anchor assembly to apply prestress to the carbon fiber reinforcement; a tensioning component, whose two ends are respectively installed on the force-bearing frame component and the reaction frame component and applies a thrust away from the reaction frame component to the force-bearing frame component; the elongation direction of the tensioning component is parallel to the axial direction of the carbon fiber reinforcement.
[0037] The prestressed reinforcement device of the above structure does not occupy additional space and has a low cost by placing the carbon fiber reinforcement, the first anchor assembly and the second anchor assembly in a concrete groove pre-opened in the concrete structure to be reinforced. At the same time, the carbon fiber reinforcement and the anchor assembly are both in the concrete groove, which can reduce the prestress loss; the second anchor assembly is equipped with a force frame assembly, the force frame assembly includes a force frame component and a connecting frame assembly, and tensioning components are arranged on the force frame component and the reaction frame component. The elongation direction of the tensioning component is parallel to the axis of the carbon fiber reinforcement, so that the elongation direction of the tensioning component is not coaxial with the axis of the carbon fiber reinforcement, so as to realize the prestressing of the carbon fiber reinforcement on the outside of the concrete groove. The non-coaxial arrangement facilitates the removal of the tensioning component as well as the force frame assembly and the reaction frame component.
[0038] 2. The prestressed reinforcement device of the present invention, the first anchor assembly and the second anchor assembly both include: a sleeve matching the concrete groove and extending along the elongation direction of the tensioning component, having a cavity therein and at least one end connected to the carbon fiber reinforcement being an open end, the open end being connected to a positioning nut, the positioning nut being provided with a positioning hole for the carbon fiber reinforcement to pass through; the end of the carbon fiber reinforcement passes through the positioning hole and the open end and is fixed in the cavity; a plate-shaped plate connected to the sleeve, the other end of the sleeve opposite to the end connected to the positioning nut being at least partially inserted into the plate; and a stopper, which is threadedly connected to the other end and resists the plate when the tensioning component applies a thrust to the load-bearing frame component. The casing and carbon fiber reinforcement are buried together in the concrete groove, and the prestressing level is maintained by the bonding strength of the adhesive poured in the concrete groove; the positioning nut can prevent the cured adhesive from sliding out of the casing cavity as a whole; the setting of the stopper allows the carbon fiber reinforcement to move with the second plate and the second sleeve of the second anchor assembly and the load-bearing frame component. The plate is fastened to the concrete by expansion bolts or chemical bolts, and the prestressing level is maintained in conjunction with the casing, which is suitable for the situation where the prestressing level target requirement is low; and the plate and the stopper are removed, and only the casing and carbon fiber reinforcement are kept in the concrete groove, which can adapt to the situation where the prestressing level target requirement is low.
[0039] 3. In the prestressed reinforcement device of the present invention, the blocking member is a nut with one end closed and internal threads, which has a simple structure, is easy to assemble and disassemble, and has a low cost.
[0040] 4. The prestressed reinforcement device of the present invention comprises a force-bearing frame assembly comprising a force-bearing frame component and two relatively movably arranged connecting frame components, the two connecting frame components are both L-shaped, including a first connecting frame component parallel to the plate of the second anchor assembly and a second connecting frame component perpendicular to the plate of the second anchor assembly, the first connecting frame component is provided with a fourth connecting hole perpendicular to the elongation direction of the tensioning component, through the setting of the fourth connecting hole, the spacing between the two connecting frame components can be easily adjusted to adapt to the width of the concrete to be reinforced; the second connecting frame component is provided with a fifth connecting hole extending along the elongation direction of the tensioning component, through the setting of the fifth connecting hole, it is convenient for the force-bearing frame assembly and the second anchor assembly to be tensioned along the extension direction of the fifth connecting hole during the tensioning process, thereby playing a guiding and limiting role.
[0041] 5. In the prestressed reinforcement device of the present invention, the end surfaces of the second reaction frame component and the second force-bearing frame component facing each other are both provided with convex columns arranged parallel to the axis of the carbon fiber ribs, and the two convex columns are arranged coaxially. The arrangement of the convex columns facilitates the installation of the tensioning component.
[0042] 6. In the prestressed reinforcement device of the present invention, the reaction frame component and the force-bearing frame component are both L-shaped and are both provided with reinforcing ribs. The structural strength can be improved by providing the reinforcing ribs.
[0043] 7. In the prestressed reinforcement device of the present invention, the reaction frame components, the force frame components and the tensioning components can all be removed after the tensioning is completed. At the same time, the first plate component, the first stop component of the first anchor component and the second plate component and the second stop component of the second anchor component can all be selectively disassembled for reuse according to the target level of prestress, and the application range is wide. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0045] Figure 1 It is a schematic diagram of the three-dimensional structure of the prestressed reinforcement device of the present invention;
[0046] Figure 2 It is a structural schematic diagram of the prestressed reinforcement device of the present invention and the reinforcement cooperation of the concrete structure to be reinforced;
[0047] Figure 3It is a structural schematic diagram of the first anchor assembly, the second anchor assembly and the carbon fiber reinforcement of the prestressed reinforcement device of the present invention when they are fixed (excluding the force frame assembly, the reaction frame component and the tensioning component);
[0048] Figure 4 It is a structural schematic diagram of a first sleeve of a first anchor assembly or a second sleeve of a second anchor assembly of a prestressed reinforcement device of the present invention;
[0049] Figure 5 It is a structural schematic diagram of the connecting frame component of the prestressed reinforcement device of the present invention;
[0050] Figure 6 It is a structural schematic diagram of a positioning nut of a prestressed reinforcement device of the present invention;
[0051] Figure 7 The present invention is a structural schematic diagram of a concrete structure to be reinforced having a concrete groove.
[0052] Description of reference numerals:
[0053] 10-first anchor assembly; 100-first connecting hole; 11-first sleeve; 110-cavity; 111-first glue injection hole; 112-first vent hole; 12-first plate; 13-first stopper;
[0054] 20 - second anchor assembly; 21 - second sleeve; 221 - second connecting hole; 22 - second plate; 23 - second stopper;
[0055] 30-reaction frame component; 31-first reaction frame component; 311-sixth connecting hole; 32-second reaction frame component; 33-first reinforcing rib;
[0056] 40-stress frame component; 41-first stress frame component; 411-third connecting hole; 42-second stress frame component; 43-second reinforcing rib;
[0057] 50-connecting frame component; 51-first connecting frame component; 511-fourth connecting hole; 52-second connecting frame component; 521-fifth connecting hole;
[0058] 60-positioning nut; 61-annular stop portion;
[0059] 70-carbon fiber reinforcement;
[0060] 80- tensioning component;
[0061] 90-concrete structure to be reinforced; 91-concrete trough. DETAILED DESCRIPTION
[0062] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0063] Example 1
[0064] See also Figures 1 to 7 The present invention provides a prestressed reinforcement device, comprising a first anchor assembly 10, a second anchor assembly 20, a reaction frame component 30, a force frame component, a tensioning component 80 and a carbon fiber rib 70, wherein the first anchor assembly 10, the carbon fiber rib 70 and the second anchor assembly 20 are all arranged in a concrete groove 91 pre-opened in a concrete structure 90 to be reinforced. Figure 1 The first anchor assembly 10 is fixed at the left end of the concrete groove 91, and the second anchor assembly 20 is arranged at the right end of the concrete groove 91. It is not fixed during installation, that is, the second anchor assembly 20 can slide along the concrete groove 91; the left end of the carbon fiber reinforcement 70 is fixed to the first anchor assembly 10 by an adhesive such as epoxy resin, and the right end is also fixed to the second anchor assembly 20 by an adhesive such as epoxy resin; the reaction frame component 30 is installed on the upper surface of the concrete structure 90 to be reinforced and is located outside the concrete groove 91 and between the first anchor assembly 10 and the second anchor assembly 20; the force frame component is installed on the second anchor assembly 20, including The reaction frame component 30 is relatively spaced apart from the force frame component 40 and the connecting frame assembly which is slidably connected to the concrete structure 90 to be reinforced; the two ends of the tensioning component 80 are respectively mounted on the reaction frame component 30 and the force frame component 40, and the tensioning component 80 can apply a force to the force frame component in a direction away from the reaction frame component 30 so as to increase the spacing between the reaction frame component 30 and the force frame component 40; the second anchor assembly 20 and the force frame assembly synchronously move in a direction away from the reaction frame component 30 to tension the carbon fiber tendons 70, thereby applying prestress to the carbon fiber tendons 70; the elongation direction of the tensioning component 80 is parallel to the axial direction of the carbon fiber tendons 70.
[0065] For the first anchor assembly 10 and the second anchor assembly 20, as Figures 1 to 4 As shown, the first anchor assembly 10 and the second anchor assembly 20 are both composed of a sleeve extending along the concrete groove 91 and a plate connected to the sleeve. The sleeve has a cavity 110. Both ends of the sleeve are provided with external threads (not shown). A positioning nut 60 is screwed on the external threads at one end (the end close to each other). Figure 6As shown, one end of the positioning nut 60 is open, and the other end is an annular retaining portion 61 with a positioning hole (not shown) in the middle, and the annular retaining portion 61 is an integral structure with the positioning nut 60; the other end of the sleeve (the end facing away from each other) is threaded with a stopper on the external thread, and the stopper resists the plate during the tensioning process of the tensioning member 80, so that the carbon fiber rib 70 moves with the sleeve and the plate, as shown in FIG. Figure 1 As shown, the stopper is a nut with one end open and the other end completely closed; two through holes connected to the cavity are provided on the side wall of the sleeve, one through hole with a larger diameter is a glue injection hole, which is used to inject adhesive into the cavity so that the carbon fiber rib 70 is fixed in the cavity 110 in the sleeve; the other through hole with a smaller diameter is a vent hole, which is used to exhaust air when injecting adhesive and make the injection smoother. Optionally, the first plate 12 of the first anchor assembly 10 and the first sleeve 11 can be connected in a detachable manner or in a non-detachable manner, that is, fixedly connected, preferably in a detachable manner; similarly, the second plate 22 of the second anchor assembly 20 and the second sleeve 21 can be connected in a detachable manner or in a non-detachable manner, that is, fixedly connected, preferably in a detachable manner.
[0066] For the convenience of distinction and description, the plate on the first anchor assembly 10 is described as the first plate 12, the sleeve on the first anchor assembly 10 is described as the first sleeve 11, the positioning nut 60 on one end of the first sleeve 11 is described as the first positioning nut, the stopper on the other end of the first sleeve 11 is described as the first stopper 13, the cavity 110 in the first sleeve 11 is described as the first cavity, the glue filling hole on the first sleeve 11 is described as the first glue filling hole 111, and the air hole on the first sleeve 11 is described as the first air hole 112. Similarly, the plate on the second anchor assembly 20 is described as the second plate 22, the sleeve on the second anchor assembly 20 is described as the second sleeve 21, the positioning nut 60 on one end of the second sleeve 21 is described as the second positioning nut, the stopper on the other end of the second sleeve 21 is described as the second stopper 23, the cavity 110 in the second sleeve 21 is described as the second cavity, the glue filling hole on the second sleeve 21 is described as the second glue filling hole, and the air hole on the second sleeve 21 is described as the second air hole. like Figure 1 As shown, the first plate 12 is provided with two rows of six first connection holes 100, three in each row, for connecting the first anchor assembly 10 to the concrete structure 90 to be reinforced. The two rows of first connection holes 100 are distributed on the front and rear sides of the first sleeve 11; Figure 1As shown, the second plate 22 is provided with two rows of four first connection holes 100 for connecting the second anchor assembly 20 and the concrete structure 90 to be reinforced, and four rows of eight second connection holes 221 are provided between the four first connection holes 100 for connecting the second plate 22 and the force-bearing frame assembly. As for the shapes of the first connection holes 100 and the second connection holes 221, they are all circular connection holes and the aperture of the second connection hole 221 on the second plate 22 is smaller than the aperture of the first connection hole 100 on the second plate 22. As for the second connection hole 221, it has a thread inside, that is, a thread Hole; during installation, a high-strength bolt is installed at the position of the second connecting hole 221 to connect it to the force-bearing frame assembly. At this time, the second anchor assembly 20 and the force-bearing frame assembly thereon can move synchronously along the elongation direction of the tensioning component 80, and a thrust is applied to the force-bearing frame assembly through the tensioning component 80, so that the force-bearing frame assembly drives the second anchor assembly 20 to move in a direction away from the first anchor assembly 10 to tension the carbon fiber reinforcement 70 and apply prestress. Thereafter, the reaction frame component 30, the force-bearing frame assembly and the tensioning component 80 are disassembled, and finally cement mortar or plastering is sprayed outside the concrete groove 91 to complete the entire construction process. Optionally, the sleeve and the plate can be fixed as one or can be a detachable structure; when the prestress level target is high, the plate and the carbon fiber rib 70 can be fixed together on the concrete structure 90 to be reinforced by connecting with the first connecting hole on the plate through chemical bolts or expansion bolts, and the prestress level can be maintained in cooperation with the sleeve; when the prestress level target is not too high, after the installation is completed, the stopper and the plate can be removed from the sleeve for reuse (at this time, the end of the sleeve equipped with the stopper is a closed end, and the end equipped with the positioning nut 60, that is, the end connected to the carbon fiber rib 70, is an open end, and the sleeve and the plate are a detachable structure), and only the sleeve and the carbon fiber rib 70 are retained in the concrete groove 91, and the prestress level is maintained by injecting an adhesive such as epoxy resin into the concrete groove 91, relying on the bonding strength of the adhesive; in the above two construction schemes, the plate and sleeve of the first anchor assembly 10 and the second anchor assembly 20 and the carbon fiber rib 70 are all buried in the concrete structure 90 to be reinforced, and will not occupy additional space.
[0067] For the reaction frame component 30, if Figure 1As shown, the reaction frame member 30 is L-shaped, including a plate-shaped first reaction frame member 31 parallel to the elongation direction of the tensioning member 80 for connecting with the concrete structure 90 to be reinforced and a plate-shaped second reaction frame member 32 perpendicular to the elongation direction of the tensioning member 80 for installing the tensioning member 80. The first reaction frame member 31 is provided with two rows of six sixth connection holes 311 for connecting with the concrete structure 90 to be reinforced, and two reinforcing ribs with a right-angled triangle cross section are provided on the outer sides of the two rows of sixth connection holes 311. For the convenience of description and distinction The reinforcing rib on the reaction frame component 30 is described as a first reinforcing rib 33, one of the right-angled sides of the first reinforcing rib 33 is fixedly connected to the first reaction frame component 31, and the other right-angled side is fixedly connected to the second reaction frame component 32; a convex column (not shown) is provided on the end face of the second reaction frame component 32, which protrudes outward and extends in the elongation direction of the tensioning component 80 and protrudes in the direction of the force-bearing frame component. For the convenience of description and distinction, the convex column on the reaction frame component 30 is described as a first convex column, and one end of the tensioning component 80 is installed and limited on the first convex column.
[0068] For the load-bearing frame components, Figure 1 and Figure 5 As shown, it includes a connecting frame assembly consisting of an L-shaped force-bearing frame component 40 and two connecting frame components 50 of the same structure and both in an L shape. The force-bearing frame component 40 includes a plate-shaped first force-bearing frame component 41 parallel to the elongation direction of the tensioning component 80 for connecting to the connecting frame component and the second plate 22 of the second anchor component 20, and a plate-shaped second force-bearing frame component 42 extending upwardly perpendicular to the elongation direction of the tensioning component 80. The force-bearing frame component 40 and the reaction frame component 30 are arranged relatively spaced apart, and an installation space for installing the tensioning component 80 is defined between the two; the first force-bearing frame component 41 is provided with four rows of eight third connecting holes 411 for connecting to the connecting frame component 50 and the second anchor component 20, and a second adding hole 411 with a right-angled triangle cross-section is provided between the two middle rows of third connecting holes 411. The second reinforcing rib 43 has one right-angled side connected to the first load-bearing frame component 41, and the other right-angled side connected to the second load-bearing frame component 42; each connecting frame component 50 includes a first connecting frame component 51 parallel to the plate of the second anchor assembly 20 for connecting to the load-bearing frame component 40 and the plate of the second anchor assembly 20, and a second connecting frame component 52 perpendicular to the plate of the second anchor assembly 20 for connecting to the side wall of the concrete structure 90 to be reinforced. Two rows of two fourth connecting holes 511 are provided on the first connecting frame component 51 for correspondingly connecting to the second connecting hole 221 on the second plate 22 and the third connecting hole 411 on the load-bearing frame component 40. The two fourth connecting holes 511 on each first connecting frame component 51 extend in a direction perpendicular to the elongation direction of the tensioning component 80, that is, as shown in FIG. Figure 5As shown, the two fourth connecting holes 511 are waist-shaped holes and extend in the length direction of the first connecting frame component 51, that is, along the Figure 5 The front-to-back direction is shown; the purpose of setting the waist-shaped fourth connecting hole 511 is to adjust the distance between the two connecting frame components 50 according to the width of the concrete structure 90 to be reinforced; a fifth connecting hole 521 extending in the elongation direction of the tensioning component 80 is opened on each second connecting frame component 52, and the fifth connecting hole 521 is a waist-shaped hole; a boss (not shown) protruding outward and extending in the elongation direction of the tensioning component 80 is provided on the end face of the second force-bearing frame component 42 facing the reaction frame component 30. For the convenience of description and distinction, the boss on the force-bearing frame component 40 is described as a second boss, and the other end of the tensioning component 80 is installed and limited on the second boss, and the first boss and the second boss are coaxially arranged. During installation, first install the two connecting frame components 50 on the second plate 22 in a front-to-rear manner to form a connecting frame assembly, then install the load-bearing frame component 40 above the two connecting frame components 50, and use high-strength bolts to pass through the third connection hole 411, the fourth connection hole 511 and the second connection hole 221 respectively to connect the load-bearing frame component 40, the connecting frame component 50 and the second anchor assembly 20 together, and adjust the spacing between the two connecting frame components 50 according to the width of the concrete structure 90 to be reinforced, so that the second connecting frame components 52 of the two connecting frame components 50 and the two outer wall surfaces of the concrete structure 90 to be reinforced are abutted against each other; chemical bolts or expansion bolts are passed through the fifth connection hole 5 21 is connected to the side of the concrete structure 90 to be reinforced but not completely locked to facilitate tensioning. After tensioning is in place, the chemical bolts and expansion bolts are passed through the first connecting holes 100 of the second plate 22 to lock the second anchor assembly 20 with the concrete structure 90 to be reinforced, and the reaction frame component 30, the force frame component and the tensioning component 80 are removed; according to the prestress level target, the first stopper 13 on the first anchor assembly 10, the first plate 12, the second stopper 23 and the second plate 22 on the second anchor assembly 20 are selectively removed, and only the first sleeve 11, the first positioning nut, the carbon fiber rib 70, the second positioning nut and the second sleeve 21 are retained in the concrete groove 91.
[0069] The tensioning component 80 is a common jack in the prior art, and its axial direction is parallel to the axial direction of the carbon fiber rib 70 but not coaxial. Specifically, the carbon fiber rib 70 is buried in the concrete groove 91, and the jack is located outside the concrete groove 91.
[0070] For the concrete groove 91 on the concrete structure 90 to be reinforced, its structure is adapted to the shape of the first plate 12 of the first anchor assembly 10, the carbon fiber rib 70, and the second plate 22 of the second anchor assembly 20, as shown in detail. Figure 7 As shown, no detailed description and limitation are given here.
[0071] Example 2
[0072] The present invention also provides a prestressed loading construction method, comprising the following method steps:
[0073] S1: Prepare a concrete structure 90 to be reinforced, and open a concrete groove 91 transversely on one surface of the concrete structure 90 to be reinforced according to preset requirements;
[0074] S2: The first anchor assembly 10 is buried and fixed at one end in the concrete groove 91, the second anchor assembly 20 is buried at the other end in the concrete groove 91 but not fixed to the concrete structure 90 to be reinforced, and the carbon fiber rib 70 is placed transversely in the concrete groove 91 and its two ends are fixed to the first anchor assembly 10 and the second anchor assembly 20 respectively;
[0075] S3: Fix the reaction frame component 30 on the outside of the concrete groove 91, install the force frame assembly on the second anchor assembly 20 and slide the connecting frame assembly part against the side wall of the concrete structure 90 to be reinforced, and install the tensioning component 80 on the reaction frame component 30 and the force frame assembly so that the axis of the tensioning component 80 is parallel to the axis of the carbon fiber rib 70;
[0076] S4: Start the tensioning component 80 to tension the force-bearing frame assembly so that the force-bearing frame assembly drives the second anchor assembly 20 to pull the carbon fiber tendons 70 in a direction away from the reaction frame component 30 to apply prestress to the carbon fiber tendons 70;
[0077] S5: When the displacement corresponding to the preset prestressing level is reached, the second anchor assembly 20 is fixed in the concrete groove 91;
[0078] S6: Spray mortar or plaster in the concrete tank 91 to complete the construction, and disassemble the reaction frame component 30, the load-bearing frame assembly and the tensioning component 80.
[0079] Preferably, after S6, it also includes: disassembling the first stopper 13 and the first plate 12 of the first anchor assembly 10 and the second stopper 23 and the second plate 22 of the second anchor assembly 20, leaving only the first sleeve 11 of the first anchor assembly 10, the second sleeve 21 of the second anchor assembly 20 and the carbon fiber rib 70 in the concrete groove 91.
[0080] The details are as follows: first, the concrete groove horizontally inserts one end of the carbon fiber reinforcement 70 into the first positioning nut and the first sleeve 11, and the first positioning nut is threadedly connected and fixed with the first sleeve 11, and then the first sleeve 11 is inserted into the first plate 12 and the first stopper 13 is fastened to the other end of the first sleeve 11 to form the first anchor assembly 10, and then the first glue hole 111 is injected with epoxy resin or other adhesive to fix the carbon fiber reinforcement 70 in the first sleeve 11; at the same time, the other end of the carbon fiber reinforcement 70 is horizontally inserted into the second positioning nut and the second sleeve 21, and the second positioning nut is threadedly connected and fixed with the second sleeve 21, and the second sleeve 21 is inserted into the second The second retaining member 23 is fastened to the plate 22 and the other end of the second sleeve to form the second anchor assembly 20, and then the second glue injection hole 211 is injected with epoxy resin or other adhesive to fix the other end of the carbon fiber reinforcement 70 in the second sleeve 21; the first anchor assembly 10, the carbon fiber reinforcement 70 and the second anchor assembly 20 that are fixed as a whole are buried in the concrete groove 91; the first connecting hole 100 on the first plate 12 of the first anchor assembly 10 is fixed to the concrete structure 90 to be reinforced by means of expansion bolts or chemical bolts, and the sixth connecting hole 311 on the reaction frame component 30 is fixed to the concrete structure 90 to be reinforced by means of expansion bolts or chemical bolts. The third connection hole 411 on the first force-bearing frame component 41 of the assembly is fixedly connected with the fourth connection hole 511 of the first connecting frame component 51 and the second connection hole 221 on the second plate 22 of the second anchor assembly 20 by high-strength bolts, and the fifth connection hole 521 on the second connecting frame component 52 is partially locked on the side wall of the concrete structure 90 to be reinforced by expansion bolts or chemical bolts; the tensioning component 80 is installed on the first boss of the reaction frame component 30 and the second boss of the force-bearing frame component 40, and the tensioning component 80 is started to apply force to the force-bearing frame component, so that the force-bearing frame component and the second anchor assembly 20 drive the carbon fiber rib 70 along the fifth connection hole 521 The extension direction is moved together in the direction away from the reaction frame component 30 or away from the first anchor assembly 10 to increase the spacing between the reaction frame component 30 and the force frame component, thereby applying prestress to the carbon fiber rib 70, and when the preset prestress magnitude is reached, that is, the displacement corresponding to the preset prestress level is reached, at this time, the reaction frame component 30, the force frame component and the tensioning component 80 can be disassembled, and finally cement mortar or plastering is sprayed on the outside of the concrete groove 91 to complete the construction. Of course, the first plate 12, the first stopper 13 of the first anchor assembly 10 and the second plate 22, the second stopper 23 of the second anchor assembly 20 can be selected to be disassembled according to the prestress target level. The prestressed reinforcement device of the present invention can simultaneously fix the two ends of the carbon fiber rib 70 horizontally on the first anchor assembly 10 and the second anchor assembly 20, greatly shortening the construction period.
[0081] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A prestressed reinforcement device, characterized in that: include: A first anchor assembly (10) is used to be fixed to one end of a concrete groove (91) pre-opened on the concrete structure (90) to be reinforced; A second anchor assembly (20) configured to be arranged at the other end of the concrete groove (91) opposite to the first anchor assembly (10); A carbon fiber rib (70) adapted to be embedded in the concrete groove (91) and having one end fixed to the first anchor assembly (10) and the other end fixed to the second anchor assembly (20); A reaction frame component (30) used for being installed on the concrete structure to be reinforced (90) and located outside the concrete groove (91); A force-bearing frame assembly, mounted on the second anchor assembly (20), comprising a force-bearing frame component (40) arranged at a relative interval to the reaction frame component (30) and a connecting frame component slidably connected to the concrete structure to be reinforced (90), wherein the force-bearing frame component (40) can directly bear force and transmit the force to the connecting frame component and the second anchor assembly (20) to apply prestress to the carbon fiber reinforcement (70); A tensioning component (80), two ends of which are respectively mounted on the force-bearing frame component and the reaction frame component (30) and apply a thrust force to the force-bearing frame component (40) away from the reaction frame component (30); an elongation direction of the tensioning component (80) is parallel to an axial direction of the carbon fiber rib (70); The first anchor assembly (10) and the second anchor assembly (20) both comprise: A sleeve matching the concrete groove (91) and extending along the elongation direction of the carbon fiber rib (70), having a cavity (110) therein and at least one end connected to the carbon fiber rib (70) being an open end, the open end being connected to a positioning nut (60), the positioning nut (60) being provided with a positioning hole for the carbon fiber rib (70) to pass through; the two ends of the carbon fiber rib (70) respectively pass through the positioning holes and the open end corresponding to the respective anchor assemblies and are fixed in the corresponding cavity (110); a plate-shaped member connected to the sleeve, the other end of the sleeve opposite to the end connected to the positioning nut (60) being at least partially inserted into the plate; and A stopper, threadedly connected to the other end and resisting the plate when the tensioning member (80) applies a thrust to the force-bearing frame assembly; The connecting frame assembly comprises: Two connecting frame components (50) relatively movably arranged on both sides of the concrete groove (91) and used for connecting the force-bearing frame component (40) and the second anchor assembly (20); One end of any one of the connecting frame components (50) is connected to the end faces of the load-bearing frame component (40) and the second anchor assembly (20) facing each other, and the other end is slidably connected to the side wall of the concrete structure (90) to be reinforced. Any one of the connecting frame components (50) is L-shaped, and comprises a first connecting frame component (51) parallel to the plate of the second anchor assembly (20) and a second connecting frame component (52) perpendicular to the plate of the second anchor assembly (20); The first connecting frame component (51) is provided with a fourth connecting hole (511) extending in a direction perpendicular to the elongation direction of the tensioning component (80), and the two connecting frame components (50) can slide along the extension direction of the fourth connecting hole (511); The second connecting frame component (52) is provided with a fifth connecting hole (521) extending along the elongation direction of the tensioning component (80), and the second anchor assembly (20) and the force-bearing frame assembly can slide along the fifth connecting hole (521) when subjected to thrust.
2. A prestressed reinforcement device according to claim 1, characterized in that: The blocking member is a nut with one end closed and internal threads.
3. A prestressed reinforcement device according to claim 1 or 2, characterized in that: The side wall of the sleeve is provided with at least a glue injection hole and a vent hole communicating with the cavity.
4. A prestressed reinforcement device according to claim 3, characterized in that: The force-bearing frame component (40) and the reaction frame component (30) are also both L-shaped and are each provided with a reinforcing rib.
5. A prestressed reinforcement device according to claim 4, characterized in that: The tensioning component (80) is a jack, and the end surfaces of the reaction frame component (30) and the force-bearing frame assembly facing each other are both provided with convex columns coaxially arranged with the extension direction of the tensioning component (80), and the two ends of the tensioning component (80) are respectively limited on the convex columns.
6. A prestressed loading construction method, applied to the prestressed reinforcement device according to any one of claims 1 to 5, characterized in that: The method comprises the following steps: S1: According to the reinforcement requirements of the concrete structure (90) to be reinforced, a concrete groove (91) is pre-opened transversely on a surface of the concrete structure (90) to be reinforced according to preset requirements; S2: The first anchor assembly (10) is embedded and fixed in one end of the concrete groove (91), the second anchor assembly (20) is embedded in the other end of the concrete groove (91) but is not completely fixed to the concrete structure (90) to be reinforced, and the carbon fiber reinforcement (70) is placed transversely in the concrete groove (91) and its two ends are respectively fixed to the first anchor assembly (10) and the second anchor assembly (20); S3: fixing the reaction frame component (30) on the outside of the concrete groove (91), installing the force frame assembly on the second anchor assembly (20) and partially sliding the connecting frame assembly (50) against the side wall of the concrete structure (90) to be reinforced, and synchronously installing the tensioning component (80) between the reaction frame component (30) and the force frame assembly, so that the axis of the tensioning component (80) is parallel to the axis of the carbon fiber rib (70); S4: starting the tensioning component (80), so that the force-bearing frame component drives the second anchor component (20) to pull the carbon fiber ribs (70) in a direction away from the reaction frame component (30) to apply prestress to the carbon fiber ribs (70); S5: When the displacement corresponding to the preset prestressing level is reached, the second anchor assembly (20) is fixed in the concrete groove (91); S6: spray mortar or plaster in the concrete groove (91) to complete the construction, and disassemble the reaction frame component (30), the load-bearing frame assembly and the tensioning component (80).
7. A prestressed loading construction method according to claim 6, characterized in that: After S6, the method further includes: disassembling the first stopper (13) and the first plate (12) of the first anchor assembly (10) and the second stopper (23) and the second plate (22) of the second anchor assembly (20), and only retaining the first sleeve (11) of the first anchor assembly (10), the second sleeve (21) of the second anchor assembly (20) and the carbon fiber rib (70) in the concrete groove (91).