Construction device and construction method for high voltage cable bridge passage

By designing a high-voltage cable bridge channel construction device that integrates mobile and lifting functions, fixed components, rails and mobile lifting components are used to solve the problem of low construction efficiency, achieving rapid installation and resource saving effects.

CN111827121BActive Publication Date: 2024-12-10THE FOURTH ENG CO LTD OF CHINA ZHONGTIEMAJOR BRIDGE ENG GRP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202010701152.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-20
Publication Date
2024-12-10
Estimated Expiration
2040-07-20

AI Technical Summary

Technical Problem

The construction efficiency of high-voltage cable bridge passages is low, and traditional cranes are limited by space, so it is difficult to build a facility platform and workload is high.

Method used

Design a construction device, including two rows of fixed components and two tracks arranged along the longitudinal direction of the bridge, and two pairs of moving lifting components are used to lift and install high-voltage cable bridge passages, integrating movement and lifting functions to avoid the establishment of a large number of construction platforms. .

Benefits of technology

It improves construction efficiency, saves manpower and material resources, realizes the rapid installation of high-voltage cable bridge channels, and solves the problem of low construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111827121B_ABST
    Figure CN111827121B_ABST
Patent Text Reader

Abstract

The present invention discloses a construction device and a construction method for a high-voltage cable bridge passage, and relates to the technical field of high-voltage cable bridge passage construction. The construction device comprises: two rows of fixed components, two tracks and two pairs of mobile lifting components; the two rows of fixed components are arranged longitudinally along the bridge, and the two rows of fixed components are arranged at intervals transversely along the bridge, and each of the fixed components is connected to the steel beam of the bridge; the two tracks are movably connected to the two rows of fixed components, respectively, and each of the tracks can move along a corresponding row of fixed components; the two pairs of mobile lifting components are used to hoist the high-voltage cable bridge passage to be installed, and the two pairs of mobile lifting components are respectively arranged on the two tracks, and can move along a corresponding track. The present invention can improve the construction efficiency of the high-voltage cable bridge passage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of high-voltage cable bridge passage construction, and in particular to a construction device and a construction method for a high-voltage cable bridge passage. Background Art

[0002] The high-voltage cable bridge channel is a cable structure on the bridge used to accommodate high-voltage cables and related accessories. For dual-use steel truss bridges for highway and railway, the high-voltage cable bridge channel is generally arranged along the entire length of the bridge below the highway bridge deck between the main truss and the secondary truss of the steel beam.

[0003] If a traditional crane is used to install a high-voltage cable bridge, the working space of the traditional crane is limited and the construction efficiency is low; if a construction platform is set up to install a high-voltage cable bridge, the setting up is difficult, the workload is large, and the construction efficiency is low.

[0004] It can be seen that the current high-voltage cable bridge passage has the technical problem of low construction efficiency. Summary of the invention

[0005] The embodiments of the present invention provide a construction device and a construction method for a high-voltage cable bridge passage, so as to solve the technical problem of low construction efficiency of the high-voltage cable bridge passage in the related art.

[0006] In a first aspect, a construction device for a high-voltage cable bridge passage is provided, comprising:

[0007] Two rows of fixing assemblies are arranged longitudinally along the bridge, the two rows of fixing assemblies are arranged transversely along the bridge at intervals, and each of the fixing assemblies is connected to the steel beam of the bridge;

[0008] Two rails, which are movably connected to the two rows of fixed components respectively, and each of the rails can move along a corresponding row of fixed components;

[0009] Two pairs of mobile lifting components are used to lift the high-voltage cable bridge channel to be installed. The two pairs of mobile lifting components are respectively arranged on the two tracks and can move along the corresponding one of the tracks.

[0010] In some embodiments, each of the fixing components comprises:

[0011] Two fixed seats arranged at intervals, the upper ends of which are connected to the steel beams of the bridge;

[0012] An upper plate connected to the lower end of the fixing seat;

[0013] Two side panels, which are respectively located on both sides of the upper panel and connected to the upper panel;

[0014] Two protrusions are respectively arranged on the inner sides of the two side plates, and a gap is left between the protrusions and the upper plate.

[0015] In some embodiments, each of the rails is an I-beam, an upper flange of which passes through the gaps of a corresponding row of the fixing components and is suspended on the protrusion.

[0016] In some embodiments, through holes are provided on the lower end of the fixing seat, the upper plate and the track, and the lower end of the fixing seat, the upper plate and the track are detachably connected through the through holes.

[0017] In some embodiments, the mobile lifting assembly is provided with two connected electric running mechanisms, and the running wheels of the two electric running mechanisms are symmetrically suspended on the lower flange of the track.

[0018] In some embodiments, the mobile lifting assembly is further provided with an electric winch connected to the two electric walking mechanisms.

[0019] In some embodiments, the protrusion is a roller.

[0020] In a second aspect, a construction method based on the construction device of the high-voltage cable bridge channel is provided, comprising the following steps:

[0021] Connecting each of the two rows of fixing assemblies to the steel beam of the bridge in the longitudinal direction of the bridge;

[0022] A track is movably connected to each of the two rows of fixed components, and a pair of movable lifting components are respectively arranged on the two tracks;

[0023] Use two pairs of mobile lifting assemblies to lift a segment of the high-voltage cable bridge channel and install the segment on the steel beam of the bridge. Move two rails and two pairs of mobile lifting assemblies along the longitudinal direction of the bridge to lift and install the next segment of the high-voltage cable bridge channel until all segments of the high-voltage cable bridge channel are installed on the steel beam of the bridge.

[0024] In some embodiments, when lifting and installing a section of a high-voltage cable bridge channel, two rails are locked with two rows of fixed components. When the section is installed, the two rails are unlocked from the two rows of fixed components, and the two rails are moved longitudinally along the bridge so that the two pairs of movable lifting components reach the lifting position of the next section.

[0025] In some embodiments, when lifting and installing a segment of a high-voltage cable bridge channel, two pairs of movable lifting assemblies are moved along two tracks to adjust the longitudinal distance between the segment and the previous segment.

[0026] The beneficial effects brought about by the technical solution provided by the present invention include:

[0027] The embodiment of the present invention provides a construction device and a construction method for a high-voltage cable bridge passage. By arranging two rows of fixed components, two tracks and two pairs of mobile lifting components, the two tracks and the two pairs of mobile lifting components can move along the longitudinal direction of the bridge. At the same time, the two pairs of mobile lifting components can lift the sections of the high-voltage cable bridge passage. The construction device integrates the movement and lifting functions. The construction is not limited by space and there is no need to set up a large number of construction platforms, which saves manpower and material resources and improves construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0029] Figure 1 A schematic diagram of the structure of a construction device for a high-voltage cable bridge passage provided by an embodiment of the present invention;

[0030] Figure 2 for Figure 1 A-direction view;

[0031] Figure 3 for Figure 1 BB direction view;

[0032] Figure 4 A schematic diagram of the structure of the connection between the fixing assembly and the track provided in an embodiment of the present invention;

[0033] Figure 5 for Figure 4 Left view;

[0034] Figure 6 Another structural schematic diagram of a construction device for a high-voltage cable bridge passage provided by an embodiment of the present invention;

[0035] Figure 7 A schematic diagram of the structure of a high-voltage cable bridge channel during construction provided by an embodiment of the present invention;

[0036] Figure 8 for Figure 7 Left view;

[0037] In the figure: 1. fixed component; 11. fixed seat; 12. upper plate; 13. side plate; 14. protrusion; 15. gap; 16. through hole; 2. track; 21. cross connection; 3. mobile lifting component; 31. electric walking mechanism; 32. electric winch; 4. steel beam; 5. segment of high-voltage cable bridge channel. DETAILED DESCRIPTION

[0038] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] The embodiment of the present invention provides a construction device for a high-voltage cable bridge channel, which can solve the technical problem of low construction efficiency in the existing high-voltage cable bridge channel construction.

[0040] See also Figure 1 , Figure 2 and Figure 3 As shown, a construction device for a high-voltage cable bridge channel includes: two rows of fixed components 1, two rails 2 and two pairs of movable lifting components 3.

[0041] Two rows of fixed components 1 are arranged longitudinally along the bridge and are spaced apart transversely along the bridge, and each fixed component 1 is connected to the steel beam 4 of the bridge. The present invention takes a road-rail dual-purpose steel truss bridge as an example, and the steel beam 4 of the bridge can be considered as the crossbeam of the steel truss bridge. Two tracks 2 are movably connected to the two rows of fixed components 1, respectively, and each track 2 can move along a corresponding row of fixed components 1. Two pairs of mobile lifting components 3 are used to lift the high-voltage cable bridge passage to be installed. The two pairs of mobile lifting components 3 are respectively arranged on two tracks 2 and can move along a corresponding track 2.

[0042] Specifically, see Figure 1 , Figures 6 to 8 As shown, two pairs of mobile lifting assemblies 3 are used to lift a segment of the high-voltage cable bridge channel, and the segment is installed on the steel beam 4 of the bridge. Two rails 2 and two pairs of mobile lifting assemblies 3 are moved longitudinally along the bridge to lift and install the next segment of the high-voltage cable bridge channel, until all segments 5 of the high-voltage cable bridge channel are installed on the steel beam 4 of the bridge.

[0043] Compared with the prior art, an embodiment of the present invention provides a construction device for a high-voltage cable bridge passage. By arranging two rows of fixed components 1, two rails 2 and two pairs of mobile lifting components 3, the two rails 2 and the two pairs of mobile lifting components 3 can move along the longitudinal direction of the bridge. At the same time, the two pairs of mobile lifting components 3 can lift the segments 5 of the high-voltage cable bridge passage. The construction device integrates the functions of movement and lifting. The construction is not limited by space and there is no need to set up a large number of construction platforms, which saves manpower and material resources and improves construction efficiency.

[0044] As an alternative embodiment, see Figure 4 and Figure 5As shown, each fixing assembly 1 includes: two fixing seats 11 , an upper plate 12 , two side plates 13 and two protrusions 14 .

[0045] The two fixing seats 11 are arranged at intervals, and their upper ends are connected to the steel beam 4 of the bridge. The upper plate 12 is connected to the lower end of the fixing seat 11, and the two side plates 13 are respectively located on both sides of the upper plate 12 and connected to the upper plate 12. Two protrusions 14 are respectively arranged on the inner sides of the two side plates 13, and a gap 15 is left between the protrusions 14 and the upper plate 12.

[0046] Further, see Figure 5 As shown, each track 2 is an I-beam, and its upper flange passes through the gap 15 of the corresponding row of fixing components 1 and is suspended on the protrusions 14. The track 2 can slide along the two protrusions 14. Preferably, the protrusions 14 are rollers to reduce the friction when the track 2 slides.

[0047] Further, see Figure 5 As shown, through holes are provided on the lower end of the fixing seat 11, the upper plate 12 and the track 2, and the lower end of the fixing seat 11, the upper plate 12 and the track 2 are detachably connected through the through holes. When the segment 5 of the high-voltage cable bridge channel is lifted, the fastener passes through the through holes to connect the track 2 with the fixing seat 11 and the upper plate 12, and the track 2 is locked.

[0048] As an alternative embodiment, see Figure 2 As shown, the mobile lifting assembly 3 is provided with two connected electric running mechanisms 31, and the running wheels of the two electric running mechanisms 31 are symmetrically suspended on the lower flange of the track 2. The mobile lifting assembly 3 is also provided with an electric winch 32 connected to the two electric running mechanisms 31. The electric running mechanism 31 can drive the mobile lifting assembly 3 to move along the track 2, and the electric winch 32 can lift the segment 5 of the high-voltage cable bridge channel, with a high degree of electrification and convenient use.

[0049] As an alternative embodiment, see Figure 1 As shown, the two ends of the two rails 2 are connected by a transverse connection 21, which facilitates the overall movement of the two rails 2 and can also limit the longitudinal position of the rails 2.

[0050] See also Figure 1 , Figures 6 to 8 As shown, an embodiment of the present invention also provides a construction method for a high-voltage cable bridge channel, comprising the following steps:

[0051] Each fixing assembly 1 of the two rows of fixing assemblies 1 is connected to the steel beam 4 of the bridge along the longitudinal direction of the bridge.

[0052] A track 2 is movably connected to each of the two rows of fixed components 1 , and a pair of movable lifting components 3 is provided on each of the two tracks 2 .

[0053] Use two pairs of mobile lifting assemblies 3 to lift a segment of the high-voltage cable bridge channel and install the segment on the steel beam 4 of the bridge. Move two rails 2 and two pairs of mobile lifting assemblies 3 along the longitudinal direction of the bridge to lift and install the next segment of the high-voltage cable bridge channel until all segments 5 of the high-voltage cable bridge channel are installed on the steel beam 4 of the bridge.

[0054] Specifically, when lifting and installing a section of the high-voltage cable bridge channel, the two rails 2 are locked with the two rows of fixed components 1. When the section is installed, the two rails 2 are unlocked from the two rows of fixed components 1, and the two rails 2 are moved longitudinally along the bridge, so that the two pairs of mobile lifting components 3 reach the lifting position of the next section. Preferably, see Figure 1 and Figure 6 As shown, the fixing assembly 1 at the rear end of the track 2 can be disassembled and installed at the front end of the track 2, so as to save the number of fixing assemblies 1 used as much as possible and reduce the construction cost.

[0055] Furthermore, when lifting and installing a segment of the high-voltage cable bridge channel, two pairs of movable lifting assemblies 3 are moved along the two rails 2 to adjust the longitudinal distance between the segment and the previous segment, so as to facilitate the installation and connection of two adjacent segments.

[0056] In the description of the present invention, it should be noted that the terms "upper", "lower", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present invention. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.

[0057] It should be noted that, in the present invention, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0058] The above description is only a specific embodiment of the present invention, so that those skilled in the art can understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but should conform to the widest scope consistent with the principles and novel features of the present invention.

Claims

1. A construction device for a high-voltage cable bridge channel, characterized in that: include: Two rows of fixing components (1) are arranged longitudinally along the bridge, the two rows of fixing components (1) are arranged at intervals transversely along the bridge, and each of the fixing components (1) is connected to a steel beam of the bridge; Two rails (2) are respectively movably connected to the two rows of fixed components (1), and each of the rails (2) can move along a corresponding row of fixed components (1); Two pairs of mobile lifting assemblies (3) are used to lift the high-voltage cable bridge channel to be installed, the two pairs of mobile lifting assemblies (3) are respectively arranged on the two rails (2) and can move along a corresponding one of the rails (2); Each of the fixing components (1) comprises: Two fixed seats (11) arranged at intervals, the upper ends of which are connected to the steel beams of the bridge; An upper plate (12) connected to the lower end of the fixing seat (11); Two side panels (13), which are respectively located on both sides of the upper panel (12) and connected to the upper panel (12); Two protruding portions (14) are respectively arranged on the inner sides of the two side plates (13), and a gap (15) is left between the protruding portions (14) and the upper plate (12); Each of the rails (2) is an I-beam, the upper flange of which passes through the gap (15) of the corresponding row of the fixing components (1) and is suspended on the protrusion (14); The lower end of the fixing seat (11), the upper plate (12) and the track (2) are all provided with through holes (16); the lower end of the fixing seat (11), the upper plate (12) and the track (2) are detachably connected via the through holes (16).

2. The construction device for a high-voltage cable bridge passage according to claim 1, characterized in that: The mobile lifting assembly (3) is provided with two connected electric running mechanisms (31), and the running wheels of the two electric running mechanisms (31) are symmetrically suspended on the lower flange of the track (2).

3. The construction device for a high-voltage cable bridge passage as claimed in claim 2, characterized in that: The mobile lifting assembly (3) is also provided with an electric winch (32) connected to the two electric walking mechanisms (31).

4. The construction device for a high-voltage cable bridge passage according to claim 1, characterized in that: The protruding portion (14) is a roller.

5. A construction method based on the construction device of the high-voltage cable bridge channel according to claim 1, characterized in that: The following steps are involved: Connecting each of the two rows of fixing assemblies (1) to the steel beam of the bridge along the longitudinal direction of the bridge; A track (2) is movably connected to each of the two rows of fixed components (1), and a pair of movable lifting components (3) is provided on each of the two tracks (2); Use two pairs of mobile lifting assemblies (3) to lift a segment of the high-voltage cable bridge channel and install the segment on the steel beam of the bridge. Move two rails (2) and two pairs of mobile lifting assemblies (3) along the longitudinal direction of the bridge to lift and install the next segment of the high-voltage cable bridge channel until all segments of the high-voltage cable bridge channel are installed on the steel beam of the bridge.

6. The construction method according to claim 5, characterized in that: When lifting and installing a section of a high-voltage cable bridge channel, two rails (2) and two rows of fixing components (1) are locked. When the section is installed, the two rails (2) and the two rows of fixing components (1) are unlocked and the two rails (2) are moved longitudinally along the bridge so that the two pairs of movable lifting components (3) reach the lifting position of the next section.

7. The construction method according to claim 6, characterized in that: When lifting and installing a segment of a high-voltage cable bridge channel, two pairs of movable lifting assemblies (3) are moved along two rails (2) to adjust the longitudinal distance between the segment and the previous segment.

Citation Information

Patent Citations

  • Hoisting device for steel truss sections of steel truss cable-stayed bridge and hoisting method of hoisting device

    CN105200923A

  • Urban rail traffic prefabricated assembly O-shaped beam and overpass comprising urban rail traffic prefabricated assembly O-shaped beam

    CN109868714A

  • Rail suspension assembly

    CN111276902A

  • PVC power pipe for urban power grid construction

    CN209329608U

  • Construction device of high-voltage cable gap bridge channel

    CN212505891U