Variable parameter multi-element cascade thermal-electric decoupling system and adjustment method for thermal power heating unit
By using a variable-parameter, multi-stage thermoelectric decoupling system for thermal power generating units, steam pressure and temperature are regulated. Combined with high-pressure and low-pressure bypasses and electric boilers, the problem of insufficient peak-shaving capacity of thermal power generating units is solved, and flexible thermoelectric decoupling and deep peak-shaving are achieved.
Patent Information
- Application Number
- CN202010654938.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-09
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2040-07-09
AI Technical Summary
Existing thermal power unit heat and electricity decoupling technology requires a large increase in hardware equipment, resulting in significant investment. Furthermore, its peak-shaving capacity is insufficient, making it difficult to flexibly meet the demands of both the heating network's heating load and the power grid's power generation load.
The system adopts a variable parameter multi-stage thermoelectric decoupling system for thermal power units. By adjusting the steam pressure and temperature, and combining high-pressure and low-pressure bypasses and electric boilers, it achieves multi-stage thermoelectric decoupling and flexibly adjusts the power generation and heating loads.
It achieves deep thermoelectric decoupling of thermal power units, flexibly meets the heating load of the heating network and the power generation load of the grid, improves peak-shaving capacity, has a simple structure and requires less investment.
Smart Images

Figure CN111852597B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of thermal power heating unit thermoelectric decoupling systems, and in particular to a thermal power heating unit variable parameter multi-element cascade thermoelectric decoupling system and an adjustment method. Background Art
[0002] As the proportion of renewable energy in China's power grid increases, the operational safety and reliability of the power grid face great challenges. In order to absorb more renewable energy in the power grid, the peak-shaving demand of the power grid has increased rapidly, and the peak-to-valley difference can reach 1 / 3 of the maximum load of the power grid. Due to the type and structural characteristics of power generation in China's power grid, the task of peak-shaving of the power grid is mainly undertaken by thermal power generating units. At present, the thermal power generating units in service include pure condensing generating units and heating units, and the installed capacity of heating units accounts for 1 / 3. During the heating period, the heating load of thermal power heating units determines that their power generation load adjustment capacity decreases, that is, the peak-shaving capacity decreases. In response to this, the thermal power heating unit thermal decoupling technology has emerged. This technology enables the thermal power heating unit to meet the heating load of the heating network and the power grid load separately and simultaneously. The existing thermal power decoupling technology only changes the heating load and power generation load of the unit by diverting and shifting the amount of boiler steam. It has certain limitations and requires a large amount of hardware equipment to be added and changed, which requires a large investment.
[0003] Currently, no effective solution has been proposed for the problems in the related technologies. Summary of the invention
[0004] In view of the above technical problems in the related technologies, the present invention proposes a variable parameter multi-element cascade thermoelectric decoupling system for a thermal power heating unit, which has a simple structure, improves the thermoelectric decoupling depth of the thermal power heating unit, and can flexibly meet the heating load of the heat network and the power generation load of the power grid.
[0005] To achieve the above technical objectives, the technical solution of the present invention is implemented as follows:
[0006] A variable parameter multi-element cascade thermoelectric decoupling system for a thermal power heating unit, comprising a boiler, the boiler comprising a burner, a steam drum, a superheater, a reheater, a water spray desuperheater, a pressure transmitter, a temperature sensor and a controller, the outlet of the steam drum being connected to the inlet of the superheater through a pipeline, characterized in that the outlet of the superheater is connected to the steam inlet of the high-pressure cylinder of the steam turbine through a pipeline provided with a high-pressure main steam valve, the exhaust port of the high-pressure cylinder of the steam turbine is connected to the inlet of the reheater through a pipeline, and the outlet of the reheater is connected to the steam inlet of the high-pressure cylinder of the steam turbine through a pipeline provided with a medium-pressure steam regulating valve The pipeline of the door is connected to the steam inlet of the intermediate pressure cylinder of the steam turbine, the steam exhaust port of the intermediate pressure cylinder of the steam turbine is connected to the heat network heater through a pipeline provided with a heat network valve, the water outlet of the heat network heater is connected to the inlet of the condenser through a pipeline provided with a drain pump, the outlet of the condenser is connected to the inlet of the steam drum through a return pipe provided with a condensate pump and a feed water pump in sequence, the high pressure cylinder of the steam turbine and the intermediate pressure cylinder of the steam turbine are respectively connected to the generator through a transmission mechanism, and the generator is connected to the power grid through a first power supply line provided with a power grid switch and an on-grid main transformer.
[0007] Furthermore, the steam exhaust port of the intermediate-pressure cylinder of the steam turbine is also connected to the steam inlet of the low-pressure cylinder of the steam turbine through a pipeline provided with a low-pressure steam regulating valve, the low-pressure steam regulating valve is connected in parallel with an auxiliary regulating valve, the steam outlet of the low-pressure cylinder of the steam turbine is connected to the inlet of the condenser through a pipeline, and the low-pressure cylinder of the steam turbine is connected to the generator through a transmission mechanism.
[0008] Furthermore, the outlet of the superheater is also connected to the inlet of the reheater via a high-pressure bypass respectively provided with a first bypass valve and a first temperature and pressure reducing device.
[0009] Furthermore, the outlet of the reheater is also connected to the inlet of the condenser through a low-pressure bypass which is sequentially provided with a fourth bypass valve, a second bypass valve, a second temperature and pressure reducing device and a third bypass valve, and the low-pressure bypass is also connected to the heat network heater through a pipeline provided with a heat network valve, and the heat network valve is connected between the second temperature and pressure reducing device and the third bypass valve.
[0010] Furthermore, the heating network heater is also connected to a heating network return pipe and a heating network water supply pipe, the heating network return pipe is respectively provided with a heating network circulation pump and a heating network return valve, the heating network water supply pipe is respectively provided with a water supply valve, the generator is also connected to the electric boiler through a second power supply line respectively provided with a plant power line switch and a plant power transformer, the electric boiler is connected to the heating network return pipe through a pipeline provided with an electric boiler valve, the electric boiler is also connected to the heating network water supply pipe through pipelines respectively provided with a hot water storage tank and a water tank valve, the second power supply line is also connected to an inverter, and the inverter is also connected to a flywheel energy storage device.
[0011] Furthermore, the return pipe is also provided with a condensate pump regulating valve, a deaerator, a feed water pump regulating valve, a plurality of low-pressure heat recovery heaters and a plurality of high-pressure heat recovery heaters, respectively; the condensate pump regulating valve is located between the condensate pump and the condenser, the deaerator is located between the condensate pump and the feed water pump, the low-pressure heat recovery heater is located between the deaerator and the condensate pump, the feed water pump regulating valve is located between the feed water pump and the deaerator, and the high-pressure heat recovery heater is located between the feed water pump and the steam drum.
[0012] The present invention also provides a method for adjusting a variable parameter multi-element cascade thermoelectric decoupling system of a thermal power heating unit, which is characterized by comprising the following steps:
[0013] S1 adjusts the pressure P0 and temperature T0 of the new steam entering the high-pressure cylinder of the steam turbine and the pressure Pr and temperature Tr of the reheated steam entering the intermediate-pressure cylinder of the steam turbine, and at the same time adjusts the opening of the high-pressure main steam valve and the intermediate-pressure steam regulating valve to reduce the work done by the high-pressure cylinder of the steam turbine and the intermediate-pressure cylinder of the steam turbine, reduce the power generation of the generator, and thus realize the first-stage thermal-electric decoupling.
[0014] Furthermore, the method further comprises the following steps:
[0015] S2 adjusts the opening of the low-pressure steam regulating valve and the auxiliary regulating valve to make the low-pressure cylinder of the steam turbine do zero work, further reducing the power generation of the generator, thereby realizing two-stage thermal-electric decoupling.
[0016] Furthermore, the method further comprises the following steps:
[0017] S3 activates the high-pressure bypass and the low-pressure bypass, so that part of the new steam passes through the first temperature reducing device and then enters the reheater to become the reheated steam, and part of the reheated steam passes through the second temperature reducing device and then enters the heat network heater or the condenser, thereby reducing the flow of the new steam entering the high-pressure cylinder of the steam turbine and the flow of the reheated steam entering the intermediate-pressure cylinder of the steam turbine, reducing the work done by the high-pressure cylinder of the steam turbine and the intermediate-pressure cylinder of the steam turbine, and further reducing the power generation of the generator, thereby realizing the third-stage thermal and electrical decoupling.
[0018] Furthermore, the method further comprises the following steps:
[0019] S4 starts the electric boiler to consume the electricity generated by the generator to achieve the fourth stage of thermal-electric decoupling.
[0020] The beneficial effects of the present invention are as follows: the structure is simple, and it has four-stage thermal-electric decoupling modes, which can flexibly meet the heating load of the heating network and the power generation load of the power grid according to the initial and final stages of heating, peak periods, and deep peak regulation of the power grid load demand. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0022] Figure 1 It is a schematic diagram of a variable parameter multi-element cascade thermoelectric decoupling system for a thermal power heating unit according to an embodiment of the present invention.
[0023] In the figure:
[0024] 1. Boiler; 2. Superheater; 3. High-pressure cylinder of steam turbine; 4. Medium-pressure cylinder of steam turbine; 5. Low-pressure cylinder of steam turbine; 6. Auxiliary regulating valve; 7. High-pressure main steam valve; 8. Medium-pressure steam regulating valve; 9. Steam regulating valve; 10. Heating network valve; 11. First temperature and pressure reducing device; 12. Second temperature and pressure reducing device; 13. First bypass valve; 14. Second bypass valve; 15. Heating network valve; 16. Third bypass valve; 17. Condenser; 18. Condensate pump; 19. Heating network heater; 20. Heating network circulation pump; 21. Heating network return valve; 22. Water supply valve; 23. Water tank valve; 24. Electric boiler valve; 25. Heat storage tank; 26. Plant power transformer; 27. Plant power line switch; 28. Grid switch; 29. Main transformer for access to the grid; 30. Drain valve; 31. Drain pump; 32. Converter; 33. Flywheel energy storage device; 34. Electric boiler; 35. Low-pressure regenerative heater; 36. Feedwater pump; 37. High-pressure regenerative heater; 38. Generator; 39. Deaerator; 40. Fourth bypass valve; 41. Feedwater pump regulating valve; 42. Condensate pump regulating valve; 43. Exhaust valve. DETAILED DESCRIPTION
[0025] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.
[0026] like Figure 1As shown, a variable parameter multi-element cascade thermoelectric decoupling system of a thermal power heating unit according to an embodiment of the present invention comprises a boiler 1, wherein the boiler 1 comprises a burner, a steam drum, a superheater 2, a reheater, a water spray desuperheater, a pressure transmitter, a temperature sensor and a controller, wherein the outlet of the steam drum is connected to the inlet of the superheater 2 through a pipeline, the outlet of the superheater 2 is connected to the steam inlet of the high-pressure cylinder 3 of the steam turbine through a pipeline provided with a high-pressure main steam valve 7, the exhaust port of the high-pressure cylinder 3 of the steam turbine is connected to the inlet of the reheater through a pipeline, and the outlet of the reheater is connected to the outlet of the steam turbine through a pipeline provided with a medium-pressure steam regulating valve 8. The steam inlet of the steam turbine intermediate pressure cylinder 4, the steam exhaust port of the steam turbine intermediate pressure cylinder 4 is connected to the heat network heater 19 through a pipeline provided with a heat network valve 10, the water outlet of the heat network heater 19 is connected to the inlet of the condenser 17 through a pipeline provided with a drain pump 31, and the outlet of the condenser 17 is connected to the inlet of the steam drum through a return pipe provided with a condensate pump 18 and a feed water pump 36 in sequence, the steam turbine high pressure cylinder 3 and the steam turbine intermediate pressure cylinder 4 are respectively connected to a generator 38 through a transmission mechanism, and the generator 38 is connected to the power grid through a first power supply line provided with a power grid switch 28 and a main transformer 29 for access to the grid.
[0027] In a specific embodiment of the present invention, the exhaust port of the intermediate-pressure cylinder 4 of the steam turbine is also connected to the steam inlet of the low-pressure cylinder 5 of the steam turbine through a pipeline provided with a low-pressure steam regulating valve 9, the low-pressure steam regulating valve 9 is connected in parallel with an auxiliary regulating valve 6, the steam outlet of the low-pressure cylinder 5 of the steam turbine is connected to the inlet of the condenser 17 through a pipeline, and the low-pressure cylinder 5 of the steam turbine is connected to the generator 38 through a transmission mechanism.
[0028] In a specific embodiment of the present invention, the outlet of the superheater 2 is also connected to the inlet of the reheater via a high-pressure bypass provided with a first bypass valve 13 and a first temperature and pressure reducing device 11 .
[0029] In a specific embodiment of the present invention, the outlet of the reheater is also connected to the inlet of the condenser 17 through a low-pressure bypass which is sequentially provided with a fourth bypass valve 40, a second bypass valve 14, a second temperature-reducing and pressure-reducing device 12 and a third bypass valve 16. The low-pressure bypass is also connected to the heat network heater 19 through a pipeline provided with a heat network valve 15. The heat network valve 15 is connected between the second temperature-reducing and pressure-reducing device 12 and the third bypass valve 16.
[0030] In a specific embodiment of the present invention, the heating network heater 19 is also connected to a heating network return pipe and a heating network water supply pipe, the heating network return pipe is respectively provided with a heating network circulation pump 20 and a heating network return valve 21, and the heating network water supply pipe is respectively provided with a water supply valve 22. The generator 38 is also connected to an electric boiler 34 through a second power supply line respectively provided with a plant power line switch 27 and a plant power transformer 26, and the electric boiler 34 is connected to the heating network return pipe through a pipeline provided with an electric boiler valve 24. The electric boiler 34 is also connected to the heating network water supply pipe through a pipeline respectively provided with a hot water storage tank 25 and a water tank valve 23, and the second power supply line is also connected to an inverter 32, and the inverter 32 is also connected to a flywheel energy storage device 33.
[0031] In a specific embodiment of the present invention, the return pipe is also provided with a condensate pump regulating valve 42, a deaerator 39, a feed water pump regulating valve 41, a plurality of low-pressure heat recovery heaters 35 and a plurality of high-pressure heat recovery heaters 37, the condensate pump regulating valve 42 is located between the condensate pump 18 and the condenser 17, the deaerator 39 is located between the condensate pump 18 and the feed water pump 36, the low-pressure heat recovery heater 35 is located between the deaerator 39 and the condensate pump 18, the feed water pump regulating valve 41 is located between the feed water pump 36 and the deaerator 39, and the high-pressure heat recovery heater 37 is located between the feed water pump 36 and the steam drum.
[0032] The present invention also provides a method for adjusting a variable parameter multi-element cascade thermoelectric decoupling system of a thermal power heating unit, comprising the following steps:
[0033] S1 adjusts the pressure P0 and temperature T0 of the new steam entering the high-pressure cylinder 3 of the steam turbine and the pressure Pr and temperature Tr of the reheated steam entering the intermediate-pressure cylinder 4 of the steam turbine, and at the same time adjusts the opening of the high-pressure main steam valve 7 and the intermediate-pressure steam regulating valve 8 to reduce the work done by the high-pressure cylinder 3 of the steam turbine and the intermediate-pressure cylinder 4 of the steam turbine, and reduce the power generation of the generator 38, thereby realizing the first-stage thermal-electric decoupling.
[0034] In a specific embodiment of the present invention, the following steps are also included:
[0035] S2 adjusts the opening of the low-pressure steam regulating valve 9 and the auxiliary regulating valve 6 to make the low-pressure cylinder 5 of the steam turbine do zero work, further reducing the power generation of the generator 38, thereby realizing two-stage thermal and electrical decoupling.
[0036] In a specific embodiment of the present invention, the following steps are also included:
[0037] S3 activates the high-pressure bypass and the low-pressure bypass, so that part of the new steam passes through the first temperature reducing and pressure reducing device 11 and enters the reheater to become the reheated steam, and part of the reheated steam passes through the second temperature reducing and pressure reducing device 12 and enters the heat network heater 19 or the condenser 17, thereby reducing the flow of the new steam entering the high-pressure cylinder 3 of the steam turbine and the flow of the reheated steam entering the intermediate-pressure cylinder 4 of the steam turbine, reducing the work done by the high-pressure cylinder 3 of the steam turbine and the intermediate-pressure cylinder 4 of the steam turbine, and further reducing the power generation of the generator 38, thereby realizing the third-stage thermal and electrical decoupling.
[0038] In a specific embodiment of the present invention, the following steps are also included:
[0039] S4 starts the electric boiler 34 to consume the electricity generated by the generator 38 to achieve the fourth stage of thermal-electric decoupling.
[0040] In order to facilitate understanding of the above technical solutions of the present invention, the above technical solutions of the present invention are described in detail below through specific usage methods.
[0041] The variable parameter multi-element cascade thermoelectric decoupling system of the thermal power heating unit described in the present invention can meet the thermoelectric decoupling requirements of 300MW to 1000MW units. The system includes a boiler 1, a steam turbine high-pressure cylinder 3, a steam turbine intermediate-pressure cylinder 4, a steam turbine low-pressure cylinder 5, a first temperature reducer and pressure reducer 11, a second temperature reducer and pressure reducer 12, a condenser 17, a heat network heater 19, a generator 38, etc.
[0042] The boiler 1 includes a burner, a steam drum, a superheater 2, a reheater, a water spray desuperheater, a pressure transmitter, a temperature sensor and a controller. A pressure transmitter and a temperature sensor are provided at the outlet of the superheater 2 and the outlet of the reheater. The pressure transmitter is used to measure the pressure of the steam, and the temperature sensor is used to measure the temperature of the steam.
[0043] The heating network heater 19 is connected to the inlet of the condenser 17 through a line provided with a drain valve 30 and a drain pump 31 .
[0044] The exhaust port of the high-pressure cylinder 3 of the steam turbine is connected to the inlet of the reheater through a pipeline provided with an exhaust valve 43.
[0045] Specific use: 1) During the heating period or non-heating period, the new steam from the boiler 1 (the pressure parameter and temperature parameter are P0 and T0 respectively) enters the high-pressure cylinder 3 of the steam turbine through the high-pressure main steam valve 7 to perform work, and then the new steam passes through the reheater to become reheated steam (the pressure parameter and temperature parameter are Pr and Tr respectively), and the reheated steam enters the intermediate-pressure cylinder 4 of the steam turbine to perform work through the intermediate-pressure steam regulating valve 8. At this time, the controller operates the boiler 1 with variable parameters according to the heat load demand of the heating network and the electric load demand of the power grid, so that the parameters of the new steam and the parameters of the reheated steam change at the same time (that is, the values of P0, T0, Pr, and Tr are changed). During the heating period, while ensuring the heating output, the work of the high-pressure cylinder 3 and the intermediate-pressure cylinder 4 of the steam turbine are jointly adjusted through the high-pressure main steam valve 7 and the intermediate-pressure steam regulating valve 8 to realize the first-stage thermal and electrical decoupling of the unit. During the non-heating period of the thermal power heating unit, the parameters of the new steam and the reheated steam are changed at the same time, and the work of the turbine high-pressure cylinder 3 and the turbine intermediate-pressure cylinder 4 are jointly adjusted through the high-pressure main steam valve 7 and the medium-pressure steam regulating valve 8 to keep the boiler 1 above the minimum allowable evaporation rate, ensure safe and stable combustion of the boiler, and achieve the purpose of deep peak regulation of the unit.
[0046] When the boiler 1 is operated with variable parameters, according to the design and operation regulations of the thermal power heating unit and the boiler equipment, and on the premise that the thermal power heating unit meets the heating load to the maximum extent, the parameters of the new steam and the parameters of the reheated steam are changed at the same time, the work of the high-pressure cylinder 3 of the steam turbine and the intermediate-pressure cylinder 4 of the steam turbine are reduced, and the purpose of reducing the power generation of the generator 38 is achieved. According to the set parameter values of the new steam and the parameter values of the reheated steam, the controller automatically adjusts the boiler 1 and jointly adjusts the work of the high-pressure cylinder 3 of the steam turbine and the intermediate-pressure cylinder 4 of the steam turbine through the high-pressure main steam valve 7 and the intermediate-pressure steam regulating valve 8 to achieve thermal and electrical decoupling.
[0047] The adjustment of the new steam temperature parameter T0 is firstly carried out with the help of the balance of the coal powder supply, air supply and water supply of boiler 1, as well as the control of the burner inclination angle. Then, a two-stage water spray desuperheater is used to spray water to cool the superheater 2. The first-stage water spray desuperheater is used as the main adjustment, and the second-stage water spray desuperheater is used to control the outlet steam temperature of superheater 2 as a fine adjustment. The first-stage water spray desuperheater has a large hysteresis under the corresponding heat load, and the second-stage water spray desuperheater controls the new steam temperature and responds faster. The controller automatically monitors the steam temperature through the temperature sensor, and automatically controls the operation of the water spray desuperheater and the adjustment of the burner inclination angle.
[0048] The adjustment of the reheat steam temperature parameter Tr is mainly based on the burner nozzle angle adjustment method. If the burner nozzle angle adjustment cannot meet the temperature adjustment requirements, the water spray desuperheater is used for water spraying and cooling for emergency adjustment.
[0049] 2) During the heating period, the steam regulating valve 9 and the auxiliary regulating valve 6 are used to jointly regulate the flow of the low-pressure cylinder 5 of the steam turbine. At the limit, the low-pressure cylinder 5 of the steam turbine passes through a micro-flow or a near-zero flow, achieving zero work of the low-pressure cylinder 5 of the steam turbine. At the same time, the steam extraction amount through the heat network valve 10 reaches the conventional maximum steam extraction amount of the thermal power heating unit. All of this steam enters the heat network heater 19 to heat the heat network return water, thereby realizing the second-stage thermal-electric decoupling to meet the heat load demand of the heat network and the electric load demand of the power grid.
[0050] During the heating period, the low-pressure steam (pressure and temperature parameters are P1 and T1 respectively) coming out of the exhaust port of the intermediate pressure cylinder 4 of the steam turbine is jointly regulated by the steam regulating valve 9 and the auxiliary regulating valve 6 to make the steam extraction amount continuously adjustable, thereby achieving the purpose of zero work of the low-pressure cylinder 5 of the steam turbine. In most working conditions, the low-pressure cylinder 5 of the steam turbine does not spray water, which reduces the water erosion of the last-stage blades, can fully improve the heating capacity of the unit, and can also ensure the safe operation of the last-stage blades, meet the peak regulation and frequency regulation needs of the thermal power heating unit, and realize thermal and electric decoupling.
[0051] By controlling the opening of the steam regulating valve 9 and the auxiliary regulating valve 6, the disturbance-free switching between the zero work mode of the low-pressure cylinder 5 of the steam turbine and the conventional steam extraction heating operation mode can be achieved, the low back pressure operation of the thermal power heating unit can be maintained, and the load adaptability, peak-shaving capability and heating capacity of the thermal power heating unit can be improved.
[0052] When the low-pressure cylinder 5 of the steam turbine is in zero-work operation, the steam volume is preferably 0.05 to 0.06 of the rated flow of the low-pressure cylinder 5 of the steam turbine. At this time, low back pressure operation is ideal, and cooling water does not need to be sprayed, thereby eliminating blade erosion and providing high unit safety.
[0053] 3) During the heating period, according to the heat load demand of the heating network and the power load demand of the power grid, the high-pressure bypass, low-pressure bypass, first desuperheater 11 and second desuperheater 12 are used in a timely manner, and the steam after being desuperheated and reduced (pressure parameter and temperature parameter are P2 and T2 respectively) enters the heating network heater 19, reducing the output power of the high-pressure cylinder 3 and the intermediate-pressure cylinder 4 of the steam turbine, increasing the heating capacity, and realizing the third-stage thermal-electric decoupling. During the non-heating period, according to the power load demand of the power grid, the high-pressure bypass, low-pressure bypass, first desuperheater 11 and second desuperheater 12 are used, and the steam enters the heating network heater 19 after being desuperheated and reduced, reducing the output power of the high-pressure cylinder 3 and the intermediate-pressure cylinder 4 of the steam turbine, and realizing the deep peak regulation of the thermal power heating unit.
[0054] The steam parameters in the low-pressure bypass meet the steam extraction requirements for steam turbine heating, so the high-pressure bypass and low-pressure bypass combined steam supply solution can be adopted during the heating period. To ensure the normal use of the high-pressure bypass and low-pressure bypass during the non-heating period, the steam parameters at the inlet and outlet of the high-pressure bypass and low-pressure bypass should be consistent with the design parameters. Only when operating during the heating period, the low-pressure bypass outlet temperature should be increased as needed.
[0055] During the heating period, when the heating amount needs to be increased or the grid needs to further reduce the unit's power generation load, new steam can enter the reheater through the high-pressure bypass, and then extract steam from the low-pressure bypass as a supplementary steam source for heating extraction.
[0056] During the heating period, if the power grid needs to further reduce the generating load of the unit, the new steam can enter the reheater through the high-pressure bypass and then directly enter the condenser 17 through the low-pressure bypass.
[0057] The matching method of the steam flow of the high-pressure bypass and the steam flow of the low-pressure bypass is a key factor affecting the economic and safety of the operation of the thermal power heating unit. Only when the steam flow of the high-pressure bypass and the steam flow of the low-pressure bypass are properly matched can the economic and safety of the operation of the thermal power heating unit be guaranteed. In this embodiment, when performing all thermal economic analysis, "high-pressure bypass steam flow = low-pressure bypass steam flow - high-pressure bypass desuperheating water flow" is always taken to ensure the proper matching of the high-pressure bypass steam flow and the low-pressure bypass steam flow.
[0058] 4) The electric boiler 34 is used in a timely manner to heat the return water of the heat network, and the power supply output of the thermal power heating unit is finely adjusted. At the same time, the heat storage tank 25 is used to increase the heat supply adjustment capacity, so as to realize the fourth stage of thermal power decoupling.
[0059] When the thermal power heating unit needs to further reduce the power output, the electric boiler 34 is started to consume the power generated by the generator 38, reduce the power output of the thermal power heating unit, and the reduced power is used to heat the return water of the heating network. When the heating network needs heat load, it can directly enter the heating network, and when it is not needed, it enters the hot water storage tank 25 and is used when the heating network needs it. When the thermal power heating unit needs to increase the power output, the electric boiler 34 is turned off to increase the power output of the thermal power heating unit.
[0060] 5) Properly utilize the flywheel energy storage device 33 to quickly and accurately adjust the power supply output of the thermal power heating unit in a bidirectional manner to meet the grid frequency regulation requirements.
[0061] By utilizing the flywheel energy storage device 33 and the converter 32, when the electrical load of the unit changes over a wide range, the basic frequency regulation requirements and frequency regulation assessment requirements of the power grid for the thermal power heating unit are met.
[0062] In summary, with the help of the above technical scheme of the present invention, the demand for deep peak regulation can be met while increasing the heating capacity. First, by changing the new steam parameters and the reheated steam parameters, the power generation output of the medium-pressure cylinder of the high-pressure steam turbine is reduced. Secondly, by the zero-output transformation of the low-pressure cylinder of the steam turbine, the deep peak regulation of the thermal power heating unit and the increase of the heating capacity can be achieved. Furthermore, by providing heat through high-pressure bypass and low-pressure bypass, the combustion of the boiler can be stabilized, and the gap in the heating capacity when the low-pressure cylinder of the deep peak regulation steam turbine is zero-output can be supplemented. These four methods can flexibly meet the heating load of the heat network and the power generation load of the power grid according to the deep peak regulation of the initial and final stages of heating, peak periods, and power grid load demand.
[0063] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A variable parameter multi-element cascade thermoelectric decoupling system for a thermal power heating unit, comprising a boiler (1), wherein the boiler (1) comprises a burner, a steam drum, a superheater (2), a reheater, a water spray desuperheater, a pressure transmitter, a temperature sensor and a controller, wherein the outlet of the steam drum is connected to the inlet of the superheater (2) via a pipeline, It is characterized in that The outlet of the superheater (2) is connected to the steam inlet of the high-pressure cylinder (3) of the steam turbine via a pipeline provided with a high-pressure main steam valve (7), the exhaust port of the high-pressure cylinder (3) of the steam turbine is connected to the inlet of the reheater via a pipeline, the outlet of the reheater is connected to the steam inlet of the intermediate-pressure cylinder (4) of the steam turbine via a pipeline provided with an intermediate-pressure steam regulating valve (8), the exhaust port of the intermediate-pressure cylinder (4) of the steam turbine is connected to the heat network heater (19) via a pipeline provided with a heat network valve (10), and the heat network heater (19) ) is connected to the inlet of the condenser (17) through a pipeline provided with a drain pump (31), the outlet of the condenser (17) is connected to the inlet of the steam drum through a return pipe provided with a condensate pump (18) and a feed water pump (36) in sequence, the high-pressure cylinder (3) of the steam turbine and the intermediate-pressure cylinder (4) of the steam turbine are each connected to a generator (38) through a transmission mechanism, and the generator (38) is connected to the power grid through a first power supply line provided with a power grid switch (28) and a main transformer (29) for access to the grid; The steam exhaust port of the steam turbine intermediate pressure cylinder (4) is also connected to the steam inlet of the steam turbine low pressure cylinder (5) via a pipeline provided with a low pressure steam regulating valve (9), the low pressure steam regulating valve (9) is connected in parallel with an auxiliary regulating valve (6), the steam outlet of the steam turbine low pressure cylinder (5) is connected to the inlet of the condenser (17) via a pipeline, and the steam turbine low pressure cylinder (5) is connected to the generator (38) via a transmission mechanism; The outlet of the superheater (2) is also connected to the inlet of the reheater via a high-pressure bypass respectively provided with a first bypass valve (13) and a first temperature and pressure reducing device (11); The outlet of the reheater is also connected to the inlet of the condenser (17) via a low-pressure bypass which is provided with a fourth bypass valve (40), a second bypass valve (14), a second temperature-reducing and pressure-reducing device (12), and a third bypass valve (16) in sequence; the low-pressure bypass is also connected to the heating network heater (19) via a pipeline provided with a heating network valve (15); the heating network valve (15) is connected between the second temperature-reducing and pressure-reducing device (12) and the third bypass valve (16); The return water pipe is also provided with a condensate pump regulating valve (42), a deaerator (39), a feed water pump regulating valve (41), a plurality of low-pressure heat recovery heaters (35) and a plurality of high-pressure heat recovery heaters (37). The condensate pump regulating valve (42) is located between the condensate pump (18) and the condenser (17), the deaerator (39) is located between the condensate pump (18) and the feed water pump (36), the low-pressure heat recovery heater (35) is located between the deaerator (39) and the condensate pump (18), the feed water pump regulating valve (41) is located between the feed water pump (36) and the deaerator (39), and the high-pressure heat recovery heater (37) is located between the feed water pump (36) and the steam drum.
2. According to claim 1, the variable parameter multi-element cascade thermoelectric decoupling system for thermal power heating units, It is characterized in that The heating network heater (19) is also connected to a heating network return pipe and a heating network water supply pipe. The heating network return pipe is provided with a heating network circulation pump (20) and a heating network return valve (21). The heating network water supply pipe is provided with a water supply valve (22). The generator (38) is also connected to an electric boiler (34) via a second power supply line provided with a plant power line switch (27) and a plant power transformer (26). The electric boiler (34) is connected to the heating network return pipe via a pipeline provided with an electric boiler valve (24). The electric boiler (34) is also connected to the heating network water supply pipe via a pipeline provided with a hot water storage tank (25) and a water tank valve (23). The second power supply line is also connected to a converter (32). The converter (32) is also connected to a flywheel energy storage device (33).
3. A method for adjusting the variable parameter multi-element cascade thermoelectric decoupling system of a thermal power heating unit according to claim 2, It is characterized in that The following steps are involved: S1 adjusts the pressure P0 and temperature T0 of the new steam entering the high-pressure cylinder (3) of the steam turbine and the pressure Pr and temperature Tr of the reheated steam entering the intermediate-pressure cylinder (4) of the steam turbine, and simultaneously adjusts the opening of the high-pressure main steam valve (7) and the intermediate-pressure steam regulating valve (8) to reduce the work done by the high-pressure cylinder (3) of the steam turbine and the intermediate-pressure cylinder (4) of the steam turbine, thereby reducing the power generation of the generator (38), thereby achieving the first-stage thermal-electric decoupling.
4. The adjustment method of the variable parameter multi-element cascade thermoelectric decoupling system of the thermal power heating unit according to claim 3, It is characterized in that The following steps are also included: S2 adjusts the opening of the low-pressure steam regulating valve (9) and the auxiliary regulating valve (6) so that the low-pressure cylinder (5) of the steam turbine performs zero work, further reducing the power generation of the generator (38), thereby achieving two-stage thermal and electrical decoupling.
5. The adjustment method of the variable parameter multi-element cascade thermoelectric decoupling system of the thermal power heating unit according to claim 3, It is characterized in that The following steps are also included: S3 activates the high-pressure bypass and the low-pressure bypass, so that part of the new steam passes through the first temperature reducing and pressure reducing device (11) and then enters the reheater to become the reheated steam, and part of the reheated steam passes through the second temperature reducing and pressure reducing device (12) and then enters the heat network heater (19) or the condenser (17), thereby reducing the flow rate of the new steam entering the high-pressure cylinder (3) of the steam turbine and the flow rate of the reheated steam entering the intermediate-pressure cylinder (4) of the steam turbine, reducing the work done by the high-pressure cylinder (3) of the steam turbine and the intermediate-pressure cylinder (4) of the steam turbine, further reducing the power generation of the generator (38), thereby realizing the third-stage thermal-electric decoupling.
6. The adjustment method of the variable parameter multi-element cascade thermoelectric decoupling system of the thermal power heating unit according to claim 3, It is characterized in that The following steps are also included: S4 starts the electric boiler (34) to consume the electricity generated by the generator (38) to achieve the fourth stage of thermal-electric decoupling.