Steam generator for ironing machine and ironing machine

By adopting a double heating design and the arrangement of multiple steam chambers in the steam ironing machine, the problems of uneven heating and insufficient vaporization of the heated water in the steam ironing machine are solved, and faster and more uniform steam generation is achieved. Improved usage effect.

CN111853746BActive Publication Date: 2024-10-11HANGZHOU BOLE IND PROD DESIGN
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010916640.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2019-10-11
Filing Date
2020-09-03
Publication Date
2024-10-11
Estimated Expiration
2040-09-03

AI Technical Summary

Technical Problem

Existing steam ironing machines are heated unevenly during the process of heating water to steam, resulting in long heating time and insufficient vaporization, which affects the use effect.

Method used

The double heating design of the first heating device and the second heating device is adopted, and the arrangement of multiple steam chambers and partitions ensures that the water flow in each chamber is sufficiently heated and vaporized, reducing the heating time, and through the heating tube body Designed to improve heating efficiency.

Benefits of technology

It greatly shortens the time for heating cold water to steam, improves the uniformity and efficiency of vaporization, reduces the user's waiting time, avoids the problem of water spraying out in liquid form, and improves the user experience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111853746B_ABST
    Figure CN111853746B_ABST
Patent Text Reader

Abstract

The present invention discloses a steam generator, comprising a generator housing, a first heating device and a second heating device, wherein the generator housing comprises a first compartment provided with the first heating device and a second compartment provided with the second heating device; the first compartment comprises a plurality of steam chambers arranged from a water inlet to a steam outlet, the plurality of steam chambers are sequentially connected, and the first heating device passes through a plurality of steam chambers; the second heating device comprises a heating pipe body for temporarily storing preheated water, a heating body arranged in the pipe body, a water inlet port and a water outlet port connected with both ends of the heating pipe body, the water outlet port passes through the first compartment to enter the steam chamber, and the water inlet port passes through the second compartment to be connected with an external water pipe. The present invention also discloses an ironing machine provided with the steam generator, wherein the heating time is greatly shortened by heating and temperature raising by the first heating device and the second heating device, and the double heating makes the chamber heated evenly and vaporization more complete.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to steam ironing equipment, in particular to a steam generator and an ironing machine. Background Art

[0002] Ironing machine is a widely used household appliance, mainly used for the flattening process of bed sheets, tablecloths, cloths, etc. A handheld steam ironing machine is a more compact, convenient and fast small household appliance derived from a hanging ironing machine. Existing portable steam ironing machines include a shell and a nozzle. A steam generating chamber is arranged in the shell. Cold water from the outside or in a water storage box enters the steam generating chamber. The heating element at the bottom of the steam generating chamber heats the cold water in the steam generating chamber into steam that can be used for ironing clothes, etc. The heating element needs to heat all the water in the steam generating chamber before it can spray out steam. Therefore, it takes a long time from the heating element being powered on to the steam being sprayed out. If you want to shorten this time, you can only pour a small amount of water into the heating chamber. Pouring a small amount of water will result in a short continuous ironing time. If there is no water, the machine needs to be stopped and water needs to be added, which is inconvenient to use. At the same time, when the steam generator of a traditional steam iron heats the cold water inside into steam, in the initial stage of startup, the heating of each chamber of the steam generator is uneven and the vaporization is insufficient. As a result, the water is easily sprayed out in liquid form after startup instead of in a fully vaporized form, which affects the user's use effect.

[0003] For example, the prior art discloses a steam ironing machine with multiple water inlet points and multiple chambers to isolate water channels (Chinese patent number CN201711370587.5). The above invention provides a first receiving chamber and a second receiving chamber that are independently set, as well as a temperature sensor, to prevent condensation from being generated on the ironing board when the steam ironing machine is working, and solves the problem of water spraying caused by excessive water on one side when the steam ironing machine is tilted to one side. However, the above invention is only provided with a single receiving chamber for heating, without other preheating chambers or reheating chambers, so the heating process takes a long time and the water in the chamber is easily heated unevenly, and the heating path of the heating body in the receiving chamber is short, and the heat provided is short in time, which makes it difficult to fully vaporize the water. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a steam generator and an ironing machine. The heating time is greatly shortened by heating the first heating device and the second heating device. The double heating makes the chamber heated evenly and the vaporization is more complete.

[0005] The present invention is solved by the following technical solutions:

[0006] A steam generator comprises a generator housing, a first heating device and a second heating device, wherein the generator housing comprises a first compartment provided with the first heating device and a second compartment provided with the second heating device;

[0007] The first compartment has a plurality of steam chambers arranged from the water inlet to the steam outlet, the plurality of steam chambers are connected in sequence, and the first heating device passes through a plurality of the steam chambers;

[0008] The second heating device includes a heating tube body for temporarily storing preheated water, a heating body arranged in the tube body, a water inlet port and a water outlet port connected to both ends of the heating tube body, the water outlet port passes through the first compartment into the steam chamber, and the water inlet port passes through the second compartment and is connected to an external water pipe.

[0009] Preferably, the steam chamber is composed of a plurality of partitions for separating water flows, and part and / or all of the partitions are connected to the end surface of the first heating device.

[0010] Preferably, the first heating device is a heating body extending along the arrangement of the plurality of partitions, and the first heating device is provided with an electrical connection port passing through the first compartment and connected to the outside.

[0011] Preferably, the first heating device is embedded in the lower end surface of the first compartment, and forms a plurality of concave surfaces and / or convex surfaces with the lower end surfaces of the plurality of steam chambers.

[0012] Preferably, the plurality of steam chambers include a first chamber, a second chamber, a third chamber, a fourth chamber and a fifth chamber connected in sequence, wherein:

[0013] A first chamber, wherein the water outlet port portion of the heating tube body is disposed in the first chamber;

[0014] A second chamber, wherein the plurality of partitions are laterally staggered and connected to a portion of the end surface of the first heating device;

[0015] A third chamber, disposed on the concave surface of the steam chamber;

[0016] a fourth chamber, longitudinally connected to the first compartment, and a plurality of partitions of the fourth chamber are longitudinally disposed on the convex surface of the steam chamber;

[0017] The fifth chamber is parallel to the fourth chamber and is provided with a plurality of steam outlets communicating with the outside.

[0018] Preferably, the first chamber and the second chamber are composed of a plurality of partitions that make the water flow path S-shaped; the outlet three of the third chamber is located in the middle of the fourth chamber; and the fourth chamber is provided with at least two outlets four connected to the fifth chamber.

[0019] Preferably, a first cover body for closing the plurality of steam chambers is provided on an upper portion of the first compartment, and a second cover body for closing the first compartment and the second compartment is provided on an upper portion of the generator housing.

[0020] An ironing machine, comprising any of the above-mentioned steam generators, a first housing for holding by hand, and a second housing for supporting the steam generator, wherein the second housing is connected to the upper part of the first housing;

[0021] The first shell is provided with a water pump assembly for supplying water to the heating tube body;

[0022] The second shell is provided with a water storage device for supplying water to the water pump assembly, and a power supply assembly connected to at least two ends of the heating tube body, and the water storage device is installed at the lower part of the steam generator.

[0023] Preferably, the water storage device is provided with a detachable water storage box, and a water supply channel connected to the water pump assembly is provided in the water storage box.

[0024] Preferably, one end of the water pump assembly is connected to the water inlet port of the heating tube body, and the other end of the water pump assembly is connected to the water supply channel.

[0025] The present invention achieves the following beneficial effects:

[0026] The steam generator is provided with a first heating device and a second heating device, and first preheats the water to increase the temperature, and then heats the water for a second time to vaporize it. Such a double heating device can fully heat the water, vaporize it more evenly, and greatly shorten the time it takes for the cold water to be heated to steam. Compared with some existing steam generators, most of which only have one heating device, the cold water directly enters the heating device for heating, liquefaction and steaming, etc., all of which are completed by one heating device. Therefore, the user needs to wait for a long time during use. If some users are impatient, the heating device in the steam generator has not heated the water enough, and the steam is not fully vaporized. Therefore, in the initial stage of starting the ironing machine, it is easy to cause the water to be sprayed out in liquid form after starting, rather than in a fully vaporized form, which affects the user's use effect. In addition, the steam generator housing of the present invention includes a first compartment provided with a first heating device and a second compartment provided with a second heating device, rather than installing the first heating device and the second heating device in the same space. Through such two independent heating spaces, not only can the heating work be carried out at the same time, reducing the heating and steaming time, but also avoiding the interference between the two heating devices in water vaporization or heating during operation.

[0027] Furthermore, the first compartment has a plurality of steam chambers arranged from the water inlet to the steam outlet, the plurality of steam chambers are connected in sequence, and the first heating device passes through a plurality of steam chambers. Therefore, the first compartment mainly reheats the heated water through the first heating device to make it reach a vaporized state, and the plurality of steam chambers of the first compartment are connected in sequence, so that the water flow in each chamber is sufficiently heated and vaporized, and the vaporized water is firstly led out to the outside to reduce the vaporization time. If the water flow is not vaporized in the chamber, it will flow into the next chamber in sequence, thereby greatly increasing the path of the water flow through the first heating device, so that the water vaporizes more fully. Compared with some existing steam generators, most of them are only provided with a single chamber. In this process, the water flow is fixed in one position and cannot flow in the chamber. Therefore, the water close to the heating device is heated and vaporized first, and the water far away from the heating device is difficult to heat up. The heating and vaporization are uneven, and the efficiency is low.

[0028] At the same time, the second heating device includes a heating tube body for temporarily storing preheated water and a heating body arranged in the tube body. Therefore, the second heating device mainly preheats the incoming cold water through the heating body therein, and effectively controls the water flow rate, avoiding that one end of the heating tube body is connected to a water inlet port that passes through the second compartment and is connected to the external water pipe, and the cold water directly enters the heating tube body for sealing and centralized heating and temperature rise, providing a heat basis for the heating and liquefaction of the steam chamber in the next step, thereby improving the heating efficiency. In addition, the other end of the heating tube body is connected to a water outlet port, and the heated hot water is discharged through the water outlet port, and the water outlet port passes through the first compartment and directly enters the steam chamber, ensuring the water flow transfer and circulation between the first compartment and the second compartment, and the structure is simple, avoiding the loss of heat energy in the process of transmitting water flow due to the complex connection structure, which is more timely and effective.

[0029] Additional aspects and detailed advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0031] Attached Figure 1 The figure is a schematic diagram of the overall structure of a steam generator disclosed in an embodiment.

[0032] Attached Figure 2 Another overall structural schematic diagram of a steam generator disclosed in an embodiment.

[0033] Attached Figure 3 The figure is an exploded schematic diagram of a second compartment of a steam generator disclosed in an embodiment.

[0034] Attached Figure 4 Another overall structural schematic diagram of a steam generator disclosed in an embodiment.

[0035] Attached Figure 5 The diagram is a partial cross-sectional diagram of a steam generator disclosed in an embodiment.

[0036] Attached Figure 6 Another partial cross-sectional schematic diagram of a steam generator disclosed in an embodiment.

[0037] Attached Figure 7 Another overall structural schematic diagram of a steam generator disclosed in an embodiment.

[0038] Attached Figure 8 Another overall structural schematic diagram of a steam generator disclosed in an embodiment.

[0039] Attached Fig. 9 The figure is a schematic diagram of the overall exploded structure of a steam generator disclosed in one embodiment.

[0040] Attached Fig.10 The figure is a schematic diagram of the overall structure of an ironing machine disclosed in an embodiment.

[0041] Attached Fig.11 Another overall structural schematic diagram of an ironing machine disclosed in an embodiment.

[0042] Attached Fig.12 Another overall structural schematic diagram of an ironing machine disclosed in an embodiment. DETAILED DESCRIPTION

[0043] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention. It should be noted that the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same and similar parts between the embodiments can be referenced to each other.

[0044] In the description of the present invention, it is necessary to understand that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0045] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0046] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0047] In the present invention, unless otherwise clearly specified and limited, the first feature being “above”, “above” and “above” the second feature includes the first feature being directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. The first feature being “below”, “below” and “below” the second feature includes the first feature being directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0048] like Figure 1-3As shown, as an embodiment of the present invention, a steam generator is disclosed, which can be used for ironing machines, drying machines, hairdressing machines and other equipment that require heating and / or steam, which can be heated by the steam generator, or the present invention can be applied to places that require heating and / or steam, such as sauna rooms and boiler rooms, or the product body can be installed on the steam generator for heating and steaming. The steam generator of the present invention includes a generator housing 3, a first heating device 1 and a second heating device 2, and the generator housing 3 includes a first compartment 31 provided with the first heating device 1 and a second compartment 32 provided with the second heating device 2. The steam generator of the present invention is provided with a first heating device 1 and a second heating device 2, which first preheats the water to increase the temperature, and then heats the water for a second time to vaporize it. Such a double heating device can fully heat the water, vaporize it more evenly, and greatly shorten the time used to heat cold water to steam. Compared with some existing steam generators, most of which only have one heating device, the cold water directly enters the heating device for heating, liquefaction and steaming, etc., all of which are completed by one heating device. Therefore, the user needs to wait for a long time during use. If some users are impatient, the heating device in the steam generator has not heated the water enough and the steaming is not sufficient. Therefore, in the initial stage of starting the ironing machine, it is easy to appear that the water is sprayed out in liquid form after starting, rather than in a fully vaporized form, which affects the user's use effect. In addition, the steam generator housing 3 of the present invention is provided with a first compartment 31 of the first heating device 1 and a second compartment 32 of the second heating device 2, rather than installing the first heating device 1 and the second heating device 2 in the same space. Through such two independent heating spaces, not only can the heating work be carried out at the same time, reducing the heating and steaming time, but also avoiding the interference between the two heating devices in the water vaporization or heating when working. In addition, in this embodiment, the first heating device 1 and the second heating device 2 are both provided as one. In other embodiments, in order to have a better heating and vaporization effect, a plurality of first heating devices 1 and / or second heating devices 2 can be provided accordingly. In addition, the first compartment 31 and the second compartment 32 in this embodiment are arranged in parallel, which can effectively utilize and save space. In other embodiments, they can of course be arranged in series, or when there are multiple first compartments 31 and second compartments 32, they can also be interspersed and staggered with each other.

[0049] Furthermore, the first compartment 31 has a plurality of steam chambers 33 arranged from the water inlet to the steam outlet, and the plurality of steam chambers 33 are connected in sequence, and the first heating device 1 passes through a plurality of steam chambers 33. Therefore, the first compartment 31 mainly reheats the heated water through the first heating device 1 to make it reach a vaporized state, and the plurality of steam chambers 33 connected in sequence in the first compartment 31 make the water flow sufficiently heated and vaporized in each chamber, and the vaporized water is firstly led out to the outside to reduce the vaporization time, and the water flow that is not vaporized in the chamber flows into the next chamber in sequence, thereby greatly increasing the path of the water flow through the first heating device 1, so that the water vaporization is more sufficient. Compared with some existing steam generators, most of them are only provided with a single chamber, and the water flow is fixed in one position during this process and cannot flow in the chamber, so the water close to the heating device is heated and vaporized first, and the water far from the heating device is difficult to heat up, so the heating and vaporization of different areas in the chamber are uneven, and the efficiency is low.

[0050] At the same time, the second heating device 2 includes a heating tube body 21 for temporarily storing preheated water and a heating body 22 arranged in the tube body 21. Therefore, the second heating device 2 mainly preheats the incoming cold water through the heating body 22 therein, and effectively controls the water flow rate, avoiding that one end of the heating tube body 21 is connected to a water inlet port 211 connected to the external water pipe through the second compartment 32, and the cold water directly enters the heating tube body 21 for sealing and centralized heating and temperature rise, providing a heat basis for the heating and liquefaction of the steam chamber 33 in the next step, thereby improving the heating efficiency. In addition, the other end of the heating tube body 21 is connected to a water outlet port 212, and the heated hot water is discharged through the water outlet port 212, and the water outlet port 212 passes through the first compartment 31 and directly enters the steam chamber 33, ensuring the water flow transmission and circulation between the first compartment 31 and the second compartment 32, and the structure is simple, avoiding the loss of heat energy in the process of transmitting water due to the complex connection structure, which is more timely and effective. The heating tube body 21 in this embodiment is longitudinally connected to the first compartment 31, and the heating body 22 penetrates the entire heating tube body 21 in a spiral shape, which is conducive to sufficient preheating or heating of the water flow, and conductive heating connectors 214 are respectively provided at both ends of the heating tube body 21, so that the heating of the entire heating tube body 21 is more uniform.

[0051] In some specific embodiments, the steam chamber 33 is composed of a plurality of partitions 355 for separating water flow. Through the arrangement and connection of the plurality of partitions 355, the flowing water flow is blocked or separated to form a certain water flow path, and the water flow is carried out sequentially and regularly along the path, rather than flowing randomly in the steam chamber 33. The partitions 355 in this embodiment are partially composed of curved plate members with an arc, and partially composed of straight plate members. Therefore, each steam chamber 33 is specifically composed of a plurality of curved plate members and / or straight plate members connected, and its cross-sectional shape is also an irregular curved surface. In the process of water flow passing through each steam chamber 33, not only can the water flow path be extended, the heating speed be increased, and the water vaporization be made more uniform, but also the water flow between adjacent steam chambers 33 can be smoothly transitioned and flowed, thereby increasing the water flow rate. In addition, the partition 355 is partially and / or completely connected to the end face of the first heating device 1, or connected to the lower end face of the steam chamber 33, so part of the water flow path has to pass through part of the end face of the first heating device 1, and the end face of the first heating device 1 is often the area with the highest temperature and the highest heat. Therefore, when the water flows through the first heating device 1, the water can quickly and fully obtain heat from the first heating device 1, so that it is heated and vaporized in a short time. In other embodiments, the steam chamber 33 can also be composed of other irregular, curved components that have the function of separating water flow, such as a plurality of arc chambers composed of layers of curved surfaces; or the partition 355 is not connected to the end face of the first heating device 1, but only connected to the lower end face of the steam chamber, which also has the function of separating water flow and forming the steam chamber 33, but the heating and vaporization speed is relatively low, which does not affect the main heating and vaporization functions of the steam chamber 33.

[0052] like Figure 4As shown, in other embodiments, the first heating device 1 is a heating element 11 extending along the arrangement of multiple partitions 355. Therefore, the heating element 11 is extended according to the arrangement of multiple partitions 355, so that a large range and more concentrated heating to multiple steam chambers 33 can be achieved, thereby improving the heating efficiency, rather than arranging them arbitrarily or installing the heating element 11 in each steam chamber 33 area, which not only has low heating efficiency but also has a complex structure and high cost. In this embodiment, the heating element 11 is provided with one, and is U-shaped. This U-shaped structure is equivalent to two parallel heating elements 11, and has a smooth transition at the connection, avoiding the dead corner position of the steam chamber 33, effectively and maximizing the use of space, and only one heating element 11 can cover most of the steam chamber 33. At the same time, the complex structure caused by the separate arrangement of multiple heating elements 11 is avoided. Compared with some steam generators on the market, which are usually equipped with multiple heating elements, the extension distribution is relatively random, not based on the layout design of the steam chamber or without a separated chamber, and the heating element is directly placed in a single chamber, which will cause some areas in the chamber to be completely heated, while some areas are not heated, thereby insufficient vaporization and low heating efficiency. In addition, the first heating device 1 of the present invention is provided with a power connection port 12 that passes through the first compartment 31 and is connected to the outside. In this embodiment, there are two power connection ports 12, which are connected to the two ends of the U-shaped body. The outside can act on the heating element 11 simultaneously through the two power connection ports 12, and the heating speed is faster. In other embodiments, two or more heating elements 11 in the first compartment 31 can also be provided, and the arrangement can be connected in parallel or in series, or an upper and lower layer or multi-layer connection structure can be provided. Although the structure is more complicated, the heating efficiency can be greatly improved.

[0053] like Figure 5As shown, in other embodiments, the first heating device 1 may be embedded in the lower end surface of the first compartment 31, that is, the first heating device 1 and the lower end surface of the first compartment 31 are wedged and engaged with each other, rather than being placed on the end surface of the first compartment 31. In this embodiment, part of the first heating device 1 is exposed on the upper end surface of the first compartment 31, and another part of the first heating device 1 is placed on the lower end surface of the first compartment 31. Therefore, through the embedded connection between the first heating device 1 and the first compartment 31, the first heating device 1 can form multiple concave surfaces 13 and / or convex surfaces 14 on the lower end surfaces of multiple steam chambers 33. Specifically, the first heating device 1 protrudes from the surface of the steam chamber 33 with the convex surface 14, and vice versa with the concave surface 13. Therefore, when the water flows through multiple steam chambers 33, it is not a flat surface, but needs to flow through multiple concave surfaces 13 and / or convex surfaces 14. The convex surface 14 increases the contact area between the water flow and the first heating device 1, so that the heated area is increased and the heat transfer is faster. The concave surface 13 can form a water flow slope with the convex surface 14, and the water flow direction is smoother. In addition, the first heating device 1 is connected to the lower end face of the first compartment 31 in an interlocking manner, and there is a partial overlapping end face area. Therefore, the first heating device 1 can transfer heat energy to the overlapping end face area through heat transfer, so the lower end face of the first compartment 31 will also be heated, so that the entire first compartment 31 is in a heated state, rather than only the steam chamber 33 being a heating and steaming area. On the other hand, the first heating device 1 is partially exposed on the upper end surface of the first compartment 31, and partially exposed on the lower end surface of the first compartment 31, rather than the entire first heating device 1 being installed on the upper end surface or the lower end surface of the first compartment 31. If the entire first heating device 1 is placed on the upper end surface of the first compartment 31, although the contact area between the water flow and the convex surface 14 is increased, the height difference between the convex surface 14 and the concave surface 13 is too large, resulting in large resistance, making it difficult to flow smoothly, and the water flow is slow and easy to be blocked. If the first heating device 1 is placed on the lower end surface of the first compartment 31, it is impossible to form multiple concave surfaces 13 and / or convex surfaces 14 with the first compartment 31, and the water flow has no contact surface with the first heating device 1, and is heated slowly.

[0054] like Figure 6As shown, in some other embodiments, the first heating device 1 can be placed in the lower part of the first compartment 31, separated from the first compartment 31, and an independent third compartment 4 is provided. In this embodiment, the lower end surfaces of the first compartment 31 and the second compartment 32 and the lower end surface of the partition 355 of the steam chamber 33 form a partition surface 421, and the partition surface 421 and the peripheral surface of the generator shell 3 together form a chamber 41, so the chamber 41 is connected to the lower part of the entire generator shell 3, and the first heating device 1 is provided in the chamber 41, so when the first heating device 1 is heated, it can dissipate and transfer heat to the entire chamber 41, to be precise, it mainly transfers heat to the partition surface 421, compared with heating only the first compartment 31, the heating area is expanded, so that the entire generator shell 3 is in a heating or heat preservation state, and the heat loss is slowed down. In addition, the partition 355 is set as a hollow structure connected to the end face of the first compartment 31, which effectively utilizes the space, and the heat generated by the first heating device 1 can also enter the partition 355, so that the partition 355 also has a heating effect. Of course, the second compartment 32 is also heated by the first heating device 1, rather than just heating the heat inside the heating tube body 21. In addition, in the present embodiment, the first heating device 1 in the third compartment 4 is relatively located at the lower part of the steam chamber 33 of the first compartment 31, and a curved surface of a corresponding shape is arranged on the lower end surface of the first compartment 31 according to the shape of the first heating device 1, so as to increase the heating area of ​​the end surface and make the first heating device 1 closer to the first compartment 1, so that the heating is more concentrated. In addition, the first heating device 1 is not in contact with the bottom end surface of the first compartment 31, but there is a gap, on the one hand, to prevent the first heating device 1 from damaging the material or the generator housing 3 due to long-term heating contact with the end surface; on the other hand, if the first heating device 1 is in contact with the first compartment 31, the corresponding contact area of ​​the first heating device 1 and the first compartment 31 is heated more per unit time than other non-contact areas, so the contact area is heated faster, while the non-contact area is heated slower, which will lead to uneven vaporization. In other embodiments, the generator housing 3 may also be provided with a greater number of chambers than that of the present embodiment or with a plurality of first heating devices. For example, an independent chamber may be provided at the lower end of the second compartment 32 specifically for heating the second compartment 32, or a heating device may be provided therein, etc., so as to achieve better heating or heat preservation performance, uniform evaporation of water vapor and fast heating speed.

[0055] like Figure 7As shown, in some specific embodiments, the plurality of steam chambers 33 include a first chamber 331, a second chamber 332, a third chamber 333, a fourth chamber 334 and a fifth chamber 335 connected in sequence, so the water flow path flows through the above five chambers in sequence. Specifically, in this embodiment, the first chamber 331 is the first heating chamber, so the water outlet port 212 of the heating tube body 21 is partially placed in the first chamber 331, and the water flow of the water outlet port 212 can directly reach the steam chamber 33 without passing through other connectors, thereby reducing the water flow transfer time and effectively reducing the heat loss during the water flow transmission process. In addition, the water flow inlet of the first chamber 331 is located at the intersection of the bottom of the two ends of the U-shaped heating element 11. The convex surface 14 of the steam chamber 33 in this area has a larger contact area with the water flow, and the newly-inflowing water can be heated and vaporized more quickly. The second chamber 332 is partially connected to the first chamber 331. Furthermore, in this embodiment, the second chamber 332 is provided with four mutually transversely staggered and parallel partitions 355, and distributed on the end surface of the left half of the first heating device 1. Therefore, the transversely staggered partitions 355 of the second chamber 332 are conducive to guiding the water flow to pass through the end surface of the left half of the first heating device 1 for multiple times, so that it is heated and vaporized multiple times. In addition, the water flow path of the first chamber 331 and the second chamber 332 passes through half of the end surface of the first heating device 1, which is conducive to the rapid heating and vaporization of the water flow in the initial stage. The unvaporized water flows to the third chamber 333, which is mainly formed by dividing the second chamber 332 and the fourth chamber 334 by a partial partition 355. Therefore, the third chamber 333 is not placed on the end face of the first heating device 1, but is connected to the concave surface 13 of the steam chamber. It mainly allows the water flowing through the multiple concave surfaces 13 and convex surfaces 14 of the first chamber 331 and the second chamber 332 to smoothly transition to the third chamber 333, avoiding obstruction of the water flow due to the concave and convex surfaces in the first two chambers, which makes it impossible to transition to the two rear chambers, thereby playing the role of connecting and unblocking the water flow. The fourth chamber 334 is longitudinally connected to the first compartment 31, and the multiple partitions 355 of the fourth chamber 334 are longitudinally placed on the convex surface 14 of the steam chamber 33. To be precise, the water flow can flow through the end face of the right half of the first heating device 1. Therefore, the fourth chamber 334 is the chamber with the largest contact area between the water flow and the end face of the first heating device 1 among the five chambers. It is also the last and second heating and vaporization of the water flow flowing through the first three chambers to avoid that there is still water flow that has not been vaporized and to ensure that the water vapor to be exported is in a uniform vapor state, rather than a combination of water vapor, which affects the user's use effect. After heating and vaporization in the first four chambers, the fifth chamber 335 is mainly used to export the vaporized steam. The fifth chamber 335 is parallel to the fourth chamber 334, so that the steam is exported in a certain direction and order.The fifth chamber 335 is mainly used to export steam to the outside world, so it is provided with a plurality of steam outlets 3351 connected to the outside world, and these steam outlets 3351 are connected to the outer end surface of the generator housing 1, and are not connected to other transmission pipelines. Therefore, the distance from the fifth chamber 335 to the outside world is short, which greatly reduces the heat loss during the transmission process, and has high efficiency and good use effect. In some other embodiments, the plurality of steam chambers 33 can also be set to be less than or more than the number of chambers in this embodiment, or the arrangement between different chambers can be set, all of which have the above-mentioned effects.

[0056] like Figure 8 As shown, in other specific embodiments, the first chamber 331 and the second chamber 332 are composed of a plurality of partitions 355 that make the water flow path S-shaped. In this embodiment, some of the partitions 355 of the first chamber 332 are two mutually L-shaped partitions, and the partitions 355 of the second chamber 332 are staggered transverse step-shaped, so that when the water flows through the first chamber 331 and the second chamber 332, the water flow path forms an S-shaped path according to the setting of the partitions 355. Compared with the water flow directly flowing into the chamber, this S-shaped path setting greatly extends the water flow path in terms of distance, so that the water flow is fully heated and vaporized on the first heating device 1. In addition, the outlet 3331 of the third chamber 333 is located in the middle of the fourth chamber 334, so the water flow in the third chamber 333 can be evenly diverted to the two sides of the fourth chamber 334, avoiding uneven or insufficient vaporization caused by uneven heating of the water flow on both sides. In addition, the water flow in the third chamber 333 is placed in the middle of the fourth chamber 334, and can be divided into two outlets to flow to the fourth chamber 334 at the same time. Therefore, compared with a single path outlet, without reducing the path distance and ensuring the same heating effect, the heating time can be shortened by at least half, thereby improving the work efficiency. In addition, the fourth chamber 334 is provided with at least two outlets 3341 connected to the fifth chamber. In this embodiment, an outlet 3341 is respectively provided at both ends of the fourth chamber, and the fourth chamber 334 and the fifth chamber 335 share a partition 355, so that the steam can be evenly and sequentially introduced into the fifth chamber 335 to ensure that the subsequent steam is evenly exported to the outside. Of course, in some other embodiments, the partitions of each chamber can also be other positions and arrangements with the above-mentioned functions.

[0057] like Fig. 9As shown, in some embodiments, the first compartment 31 is provided with a first cover 114 for sealing a plurality of steam chambers 33, so as to ensure the sealing and heat preservation of each steam chamber 33, prevent external dust from entering the steam chamber 33 to produce polluted water flow or block the steam chamber, and also prevent water flow or steam in the steam chamber 33 from leaking in a bidirectional manner, resulting in poor heating and heat preservation performance, or even scalding the user. In addition, the upper part of the generator housing 1 is provided with a second cover 115 for sealing the first compartment 31 and the second compartment 32, so that the second cover 115 is placed on the upper part of the first cover 114, which has the functions of double sealing and heat insulation, and also seals the second compartment 32, prevents external dust from entering the second compartment 32, and prevents the user from touching the heating tube 21 in the second compartment 32. In addition, the upper end surface of the second cover body 115 is provided with a plurality of fastening bolts 116 that pass through the connection between the first cover body 114 and the plurality of partitions 355, thereby ensuring both the connection between the first cover body 114 and the second cover body 114 and the fastening of the second cover body 115 and the first compartment 31. In addition, the partition 355 is provided with a plurality of fastening holes 3551, and the fastening bolts 116 can be connected to the fastening holes 3351, so the fastening bolts 116 are used to connect the plurality of partitions 355, or the connection between the plurality of partitions 355 and the generator housing 1 and the lower end surface of the first compartment 31, to prevent the partition 355 from loosening.

[0058] like Fig.10 and 11As shown, as an embodiment of the present invention, an ironing machine is also disclosed, which includes a steam generator 53 as described in any of the above embodiments, a first shell 51 for handholding, and a second shell 52 supporting the steam generator 53, wherein the second shell 52 is connected to the upper part of the first shell 51. In this embodiment, the ironing machine 5 is a household handheld ironing machine, which can be held by the user at the end surface of the first shell 51, and the steam generator 53 in the upper second shell 52 can flatten items such as clothes, tablecloths, and cloths through steam and heating. Specifically, a water pumping assembly 511 for supplying water to the heating tube body 21 is provided in the first shell 51, and the water pumping assembly 511 is an automatic start-stop water supply device that outputs a certain flow rate and head per unit time. Therefore, the water pumping assembly 511 in this embodiment delivers water to the heating tube body 21 through a water pipe, and can pump water according to the water storage size or time setting in the heating tube body 21, rather than continuously injecting water into the heating tube body 21. If the water pump assembly 511 is not provided, but the water supply assembly is directly connected to the heating tube body 21, the water supply assembly may still supply water to the steam generator 53 when the steam generator 53 is full of water and has not yet generated steam to the outside, thereby causing water overflow or incomplete vaporization of the steam of the steam generator 53. Alternatively, when the steam generator 53 is short of water, the water supply assembly cannot supply water in time, the steam generator 53 burns empty, and the generator is easily damaged. In addition, the water pump assembly 511 is installed at the bottom of the first shell 51, and the first shell 51 supports the water pump assembly 511 and is convenient for connecting with the power cord 5112 at the bottom of the first shell 51.

[0059] Furthermore, the second housing 52 is provided with a water storage device 521 for supplying water to the water pumping assembly 511. A certain amount of water can be stored in the water storage device 521 to supply water to the water pumping assembly 511, so the user does not need to continuously add water or connect to an external water source. The amount of water in the water storage device 521 can satisfy a certain working time of the steam generator 53. In other embodiments, the water storage capacity of the water storage device 521 can be changed according to actual conditions. If it is not a handheld ironing machine, a water storage device 521 with a larger water storage capacity can be provided to avoid the user frequently adding water, or multiple water storage devices 521 can be provided accordingly. The water storage device 521 is installed at the lower part of the steam generator 53 and at the lower part of the second housing 52. The second housing 52 supports the water storage device 521. In addition, the water storage device 521 is connected to the multiple steam outlets 3351 of the steam generator 53 through the front end face 5211 of the second shell 52, and in some embodiments, the area corresponding to the front end face 5211 and the water storage device 521 and the steam outlet 3351 is a detachable structure, which is convenient for the user to replace or clean the steam outlet 3351 or to add water to the water storage device 521.

[0060] In addition, the rear end of the second shell 52 also includes a power supply assembly 522 connected to at least two ends of the heating tube body 21. Specifically, the power supply assembly 522 includes a power switch 5221 connected to the rear end face 5212 of the second shell 52, and an electronic component 5222 placed in the second shell 52. The power switch 5221 is exposed at the rear end face 5212 of the second shell 52, which is convenient for users to touch the switch or the temperature adjustment component. The electronic component 5222 is connected to a plurality of circuit ports 5223, two of which are connected to the heating tube body 21, and two of which are connected to the power connection port 12 of the first heating device 1. By connecting at least two such circuit ports 5223 to the heating tube body 21 and the first heating device 1, heat can be conducted more quickly through electric energy per unit time. In other embodiments, a plurality of circuit ports 5223 can also be provided to connect to the heating tube body 21 and the first heating device 1.

[0061] like Fig.11 and 12 As shown, in some embodiments, the water storage device 521 is provided with a detachable water storage box 523, and the water storage box 523 can be separated from the water storage device 521 by pulling. The user can fill the separated water storage box 523 with water and then assemble and connect it to the water storage device 521. Compared with taking the entire ironing machine to fill water, the detachable water storage box 523 can be more convenient and safe, and prevent the external water source from flowing into the power supply component 522, the steam generator 53 and other components during the process of taking the entire ironing machine to fill water, affecting the use effect. In addition, if it is inconvenient to remove the water storage box 523 to fill water, the rear end of the water storage box 523 is also provided with a water storage port 5231, which is buckled on the water storage box 523. The user can connect the water storage port 5231 through the external water source interface to pour water into the water storage box 523. Therefore, the above two different water storage methods can be used by the user according to actual conditions, and both are very practical and convenient. The water storage box 523 is also provided with a water supply channel 5232 connected to the water pump assembly 511. The water supply channel 5232 transmits the water in the water storage box 523 to the water pump assembly 511. Therefore, one end of the water supply channel 5232 is directly placed in the water storage box 523, and the other end is connected to the water pump assembly 511. Specifically, Fig.10 As shown, the water pump assembly is connected with a water pump outlet 1 5111 and a water pump outlet 2 5112, wherein the water pump outlet 1 5111 is connected to the water inlet port 211 of the heating tube body 21 through a water delivery pipe, and the water pump outlet 2 5112 is connected to the other end of the water supply channel 5232. In other embodiments, the outlet of the water supply channel 5232 and the water pump assembly 511 can be actually set according to various factors such as the number of water storage devices 521, the capacity, and the pipeline flow rate, and is not limited to this embodiment.

[0062] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

[0063] In conclusion, the above is only a preferred embodiment of the present invention, and all equivalent changes and modifications made according to the scope of the patent application of the present invention should fall within the scope of the patent of the present invention.

Claims

1. A steam generator for an ironing machine, characterized in that: The generator comprises a generator housing, a first heating device and a second heating device, wherein the generator housing comprises a first compartment provided with the first heating device and a second compartment provided with the second heating device; The first compartment has a plurality of steam chambers arranged from the water inlet to the steam outlet, the plurality of steam chambers are connected in sequence, and the first heating device passes through a plurality of the steam chambers; The second heating device includes a heating tube body for temporarily storing preheated water, a heating body arranged in the tube body, a water inlet port and a water outlet port connected to both ends of the heating tube body, the water outlet port passes through the first compartment to enter the steam chamber, and the water inlet port passes through the second compartment to be connected to an external water pipe; The first heating device is embedded in the lower end surface of the first compartment, and forms a plurality of concave surfaces and / or convex surfaces with the lower end surfaces of the plurality of steam chambers; The multiple steam chambers include a first chamber, a second chamber, a third chamber, a fourth chamber and a fifth chamber connected in sequence, wherein: in the first chamber, the water outlet port portion of the heating tube body is placed in the first chamber; in the second chamber, a plurality of partitions are staggered transversely and connected to a portion of the end surface of the first heating device; the third chamber is placed on the concave surface of the steam chamber; the fourth chamber is longitudinally connected to the first compartment, and a plurality of partitions of the fourth chamber are longitudinally placed on the convex surface of the steam chamber; the fifth chamber is parallel to the fourth chamber and is provided with a plurality of steam outlets connected to the outside; The heating tube body is longitudinally connected to the first compartment, and the heating body runs through the entire heating tube body in a spiral shape. Both ends of the heating tube body are respectively provided with conductive heating connectors.

2. The steam generator according to claim 1, characterized in that: The steam chamber is composed of a plurality of partitions for separating water flows, and part or all of the partitions are connected to the end surface of the first heating device.

3. The steam generator according to claim 2, characterized in that: The first heating device is a heating body extending along the arrangement of the plurality of partitions, and the first heating device is provided with an electrical connection port passing through the first compartment and connected to the outside.

4. The steam generator according to claim 3, characterized in that: The first chamber and the second chamber are composed of a plurality of partitions that make the water flow path S-shaped; the outlet three of the third chamber is located in the middle of the fourth chamber; and the fourth chamber is provided with at least two outlets four connected to the fifth chamber.

5. The steam generator according to claim 4, characterized in that: A first cover body for closing the plurality of steam chambers is disposed on the upper portion of the first compartment, and a second cover body for closing the first compartment and the second compartment is disposed on the upper portion of the generator housing.

6. An ironing machine, characterized in that: It comprises the steam generator according to any one of claims 1 to 5, a first shell for holding by hand, and a second shell for supporting the steam generator, wherein the second shell is connected to the upper part of the first shell; The first shell is provided with a water pump assembly for supplying water to the heating tube body; The second shell is provided with a water storage device for supplying water to the water pump assembly, and a power supply assembly connected to at least two ends of the heating tube body, and the water storage device is installed at the lower part of the steam generator.

7. The ironing machine according to claim 6, characterized in that: The water storage device is provided with a detachable water storage box, and the water storage box is provided with a water supply channel connected with the water pump assembly.

8. The ironing machine according to claim 7, characterized in that: One end of the water pump assembly is connected to the water inlet port of the heating tube body, and the other end of the water pump assembly is connected to the water supply channel.