Information processing method and device for production material procurement and automated production
By finding reference standard parts for non-standard parts in material management data and generating purchase orders, the problem of inefficient procurement of non-standard parts is solved, the efficient operation of the automated production process is achieved, the processing process of non-standard parts is simplified, and the improvement of the Overall efficiency.
Patent Information
- Application Number
- CN202010730925.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-27
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2040-07-27
AI Technical Summary
The procurement efficiency of non-standard parts in traditional production processes is inefficient, resulting in inefficient automation production processes. The existing technology cannot effectively deal with the procurement and replacement of non-standard parts.
By finding reference standard parts matching non-standard parts in material management data, generating purchase orders, and finding available standard parts in inventory management data to replace non-standard parts, optimizing procurement processes and improving the efficiency of automated production.
No large amount of manual processing of non-standard parts is required, which improves the efficiency of material procurement and production processes, simplifies order processing, reduces workload, reduces redundant data, and improves the working efficiency of the system.
Smart Images

Figure CN111861340B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data processing in industrial production scenarios, and in particular to an information processing method and device for production material procurement and automated production. Background Art
[0002] In the traditional production process, after an order is placed, the purchasing staff will sort out the materials to be purchased through Excel, separate the suppliers corresponding to each material, and communicate with the suppliers separately for purchase. After the goods arrive, they need to check the materials with the delivery note and the purchase order, and then arrange production after the verification is correct. It can be seen that this process is time-consuming and labor-intensive and is not conducive to ensuring efficient and accurate production.
[0003] In order to make up for this defect, information processing methods can be introduced to automate some or all of the links from procurement to production. In the existing related technologies, the procurement process is designed based on standard parts. Specifically, the database can record the relevant information of standard parts. When procurement is needed, the information can be retrieved and sent to the supplier.
[0004] However, non-standard parts are usually determined based on current actual needs, and their information is usually not recorded in the database. Even if the information of a non-standard part is recorded in the database, when purchasing other non-standard parts later, the information recorded in the past usually cannot be used. As a result, the automated processing of non-standard parts procurement cannot be achieved, which will lead to inefficiency in procurement and automated production processes including the procurement process. Summary of the invention
[0005] The present invention provides an information processing method and device for production material procurement and automated production to solve the problem of low efficiency.
[0006] According to a first aspect of the present invention, there is provided a method for processing information of production material procurement, comprising:
[0007] Obtaining a current bill of materials, wherein the current bill of materials records the materials required to complete the target order; wherein the materials recorded in the current bill of materials include non-standard parts;
[0008] Searching for a reference standard part that matches the non-standard part among the standard parts recorded in the material management data; the reference standard part matches at least one of the following information of the non-standard part: category information, name information, model information, shape information, material information, application scenario information, and size information;
[0009] Generate corresponding N purchase orders according to the current bill of materials, the reference standard parts and the inventory management data, where N is an integer greater than or equal to 1;
[0010] The N purchase orders are sent to corresponding suppliers.
[0011] Optionally, if there is no available standard part corresponding to the non-standard part in the inventory materials recorded in the inventory management data, then: at least one purchase order records the reference standard part; the available standard part refers to a material determined to be able to replace the non-standard part after processing;
[0012] Optionally, generating corresponding N purchase orders according to the current bill of materials, the reference standard parts and the inventory management data, including:
[0013] Determining a current size deviation threshold value according to the category information of the non-standard part and the correspondence between different category information and different size deviation threshold values;
[0014] Searching for a candidate standard part in the inventory materials recorded in the inventory management data according to the size information of the reference standard part and the current size deviation threshold; the size deviation between the candidate standard part and the reference standard part does not exceed the current size deviation threshold;
[0015] If no candidate standard part is found, or if at least one candidate standard part is found but the available standard part is not selected from the at least one candidate standard part, then: the reference standard part is recorded in the corresponding purchase order.
[0016] Optionally, after searching for a candidate standard part in the inventory materials recorded in the inventory management data according to the size information of the reference standard part and the current size deviation threshold, the method further includes:
[0017] If at least one candidate standard component is found, the preset identification information of the at least one candidate standard component is displayed externally;
[0018] If externally input standard component selection information is acquired, one of the at least one candidate standard component is selected as the available standard component according to the standard component selection information.
[0019] Optionally, if the number of the candidate standard components is at least two, then: displaying the at least one candidate standard component externally includes:
[0020] Determining, according to the numerical value of the size deviation between the reference standard component and the candidate standard component, sorting information of the preset identification information of at least two candidate standard components;
[0021] According to the sorting information, preset identification information of the at least two candidate standard components is displayed externally.
[0022] According to a second aspect of the present invention, there is provided an information processing method for automated production, comprising:
[0023] Implement the information processing method for purchasing production materials involved in the first aspect and its optional solutions;
[0024] After all materials recorded in the current bill of materials have been put into storage, the production scheduling information of the target order is obtained, wherein the production scheduling information represents the production processes required to complete the target order, as well as the workshops and / or production personnel implementing each production process;
[0025] According to the production scheduling information, the production instruction information of the target order is sent to the terminals of at least some of the personnel involved in each production process to instruct the corresponding personnel to carry out production.
[0026] Optionally, before obtaining the production scheduling information of the target order, the method further includes:
[0027] Obtaining a material entry signal, wherein the material entry signal is fed back by a terminal of a warehouse staff when detecting that the materials recorded in the N purchase orders have entered the warehouse;
[0028] According to the material warehousing signal, update the inventory management data;
[0029] If it is determined according to the inventory management data that all the materials recorded in the current material list have been put into storage, a production scheduling notification is sent to the terminal of the supervisor, and the production scheduling notification is used to instruct the supervisor to determine the production scheduling information.
[0030] Optionally, after obtaining the production scheduling information of the target order, the method further includes:
[0031] Determining standard working hours information of at least some personnel involved in the production process according to the production scheduling information;
[0032] Obtaining real working hours information and production record information of at least some personnel involved in the production process;
[0033] The production schedule is determined according to the standard working time information, the production scheduling information, the real working time information and the production record information.
[0034] Optionally, for the production of customized doors, the non-standard parts include at least one of the following: flower branches, door bodies, door heads, door pillars, air louvers, processing materials for flower branches, processing materials for door bodies, processing materials for door heads, processing materials for door pillars, and processing materials for air louvers.
[0035] According to a third aspect of the present invention, there is provided an information processing device for production material procurement, comprising:
[0036] A bill of materials acquisition module is used to acquire a current bill of materials, wherein the current bill of materials records the materials required to complete the target order; wherein the materials recorded in the current bill of materials include non-standard parts;
[0037] A reference standard part search module is used to search for a reference standard part matching the non-standard part among the standard parts recorded in the material management data; the reference standard part matches at least one of the following information of the non-standard part: category information, name information, model information, shape information;
[0038] A purchase order generation module, used to generate corresponding N purchase orders according to the current material list, the reference standard parts and the inventory management data; wherein N is an integer greater than or equal to 1;
[0039] The purchase order sending module is used to send the N purchase orders to the corresponding supplier end.
[0040] According to a fourth aspect of the present invention, there is provided an information processing device for automated production, comprising:
[0041] A purchasing unit, used to implement the information processing method for purchasing production materials involved in the first aspect and its optional solutions;
[0042] A production scheduling information acquisition unit, used to acquire the production scheduling information of the target order after all materials recorded in the current bill of materials have been put into storage, wherein the production scheduling information represents the production processes required to complete the target order, as well as the workshops and / or production personnel implementing each production process;
[0043] The production instruction unit is used to send the production instruction information of the target order to the terminals of at least some of the personnel involved in each production process according to the production scheduling information, so as to instruct the corresponding personnel to carry out production.
[0044] According to a fifth aspect of the present invention, there is provided an electronic device, comprising a processor and a memory, wherein the memory is used to store code;
[0045] The processor is used to execute the code in the memory to implement the method involved in the first aspect or the second aspect.
[0046] According to a sixth aspect of the present invention, there is provided a storage medium having a computer program stored thereon, which, when executed by a processor, implements the method involved in the first aspect or the second aspect.
[0047] In the information processing method and device for production material procurement and automated production provided by the present invention, by searching for reference standard parts that match the non-standard parts in the standard parts recorded in the material management data, the reference standard parts can be used as one of the bases for automatically determining whether to purchase materials and / or what materials to purchase. It can be seen that in the present invention, after obtaining an order, there is no need to involve too much manual processing for non-standard parts, which effectively ensures efficient processing. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0049] Figure 1 It is a flowchart of an information processing method for production material procurement in one embodiment of the present invention;
[0050] Figure 2 is a schematic flow chart of step S13 in one embodiment of the present invention;
[0051] Figure 3 is a flow chart of step S134 in one embodiment of the present invention;
[0052] Figure 4 The following is a schematic diagram of the process of an information processing method for automated production in one embodiment of the present invention. Figure 1 ;
[0053] Figure 5 The following is a schematic diagram of the process of an information processing method for automated production in one embodiment of the present invention. Figure 2 ;
[0054] Figure 6 The following is a schematic diagram of the process of an information processing method for automated production in one embodiment of the present invention. Figure 3 ;
[0055] Figure 7 This is a schematic diagram of the workflow of automated production in one embodiment of the present invention;
[0056] Figure 8 It is a schematic diagram of program modules of an information processing device for production material procurement in one embodiment of the present invention;
[0057] Fig. 9 Schematic diagram of a program module of an information processing device for automated production in one embodiment of the present invention Figure 1 ;
[0058] Fig.10Schematic diagram of a program module of an information processing device for automated production in one embodiment of the present invention Figure 2 .
[0059] Fig.11 It is a schematic diagram of the structure of an electronic device in one embodiment of the present invention. DETAILED DESCRIPTION
[0060] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0061] The terms "first", "second", "third", "fourth", etc. (if any) in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0062] The technical solution of the present invention is described in detail with specific embodiments below. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be described in detail in some embodiments.
[0063] Figure 1 It is a flowchart of an information processing method for production material procurement in one embodiment of the present invention.
[0064] Please refer to Figure 1 , an embodiment of the present invention provides an information processing method for production material procurement, comprising:
[0065] S11: Obtaining a current bill of materials, wherein the current bill of materials records the materials required to complete the target order; wherein the materials recorded in the current bill of materials include non-standard parts and may also include standard parts;
[0066] S12: searching for a reference standard part matching the non-standard part among the standard parts recorded in the material management data; the reference standard part matches at least one of the following information of the non-standard part: category information, name information, model information, shape information, material information, application scenario information, and size information;
[0067] S13: generating corresponding N purchase orders according to the current bill of materials, the reference standard parts and the inventory management data, where N is an integer greater than or equal to 1;
[0068] S14: Send the N purchase orders to corresponding suppliers.
[0069] The method involved in the embodiment of the present invention (including the information processing method for production material procurement, and may also include the information processing method for automated production) can be applied to an information processing system that implements information processing.
[0070] The non-standard parts involved in step S11 can be understood as materials whose sizes are different each time during the production process and are usually used only once. In contrast, standard parts can be understood as materials whose sizes are usually the same each time.
[0071] Among them, the purchase order records the materials required to complete the target order; and: in one implementation, if there are no available standard parts corresponding to the non-standard parts in the inventory materials recorded in the inventory management data, then: at least one purchase order records the reference standard parts; the available standard parts refer to materials that are determined to be able to replace the non-standard parts after processing.
[0072] Available standard parts can refer to materials that can become non-standard parts after processing, or materials that are different from non-standard parts after processing, but since non-standard parts themselves may also need further processing, available standard parts can meet the subsequent processing needs of non-standard parts. At the same time, available standard parts may also be reference standard parts recorded in inventory management data.
[0073] The material management data can be understood as a database formed by organizing material information. The materials recorded therein can be any materials input manually or automatically, and any information related to the materials can be recorded in the material management data.
[0074] In this regard, materials are the source of procurement data. When managing non-standard parts, if you handle them as standard parts, you need to add new materials to the material management data every time you have different sizes of materials, and they may only be used once. It can be seen that this method will not only increase the workload, but also leave a lot of useless data in the material management data, making the material management data very bloated. In turn, it will greatly affect work efficiency.
[0075] Furthermore, for non-standard parts, a non-standard custom field type can be added in the material management data. The field of size, which is different every time, can be set as a non-standard custom field. In some solutions, in the material management data, this type of field does not need to be filled with a value. The value of the custom field can be managed during procurement and inventory management. Thus, non-standard parts of the same category but different sizes can be managed through one piece of data.
[0076] It can be seen that in some schemes, non-standard parts in the material management data may not have size information, and only standard parts have size information. Furthermore, the non-standard parts involved above can also be understood as materials whose size information is not recorded in the material management data. Correspondingly, the standard parts involved above can also be understood as materials whose size data is recorded in the material management data.
[0077] If the methods involved in the embodiments of the present invention are all applied to the production of customized doors, then: the non-standard parts include at least one of the following: flower branches, door bodies, door heads, door pillars, air louvers, processing materials for flower branches, processing materials for door bodies, processing materials for door heads, processing materials for door pillars, and processing materials for air louvers.
[0078] For materials such as air vents, the actual required size of each door is different, but the size of air vents varies little. At the same time, the procurement cycle of such materials is relatively long. In order to shorten the order delivery cycle, the factory will prepare some commonly used sizes of air vents and cut them according to the size when using them.
[0079] There will be standard parts of certain sizes in the material management data. Then, when implementing step S12, you can first check the material classification, find the materials under the same material classification to narrow the scope, and then check and find similar standard parts (i.e. reference standard parts) based on several key parameters (such as name and model). It can be seen that the matching in step S12 can be the same or have a certain degree of overlap.
[0080] For category information, matching of category information may refer to the same category information; for example, flower branches and door bodies belong to different categories and have different corresponding category information. If non-standard parts and certain standard parts both belong to the category of flower branches, then the category information of the two is the same. Since category information is usually standardized, matching of category information may mainly consider the same category information. In other examples, if the category information is customizable, then matching of category information may also refer to similarity and overlap being higher than a certain threshold.
[0081] For name information, the matching of name information may refer to the same name information, or may refer to a high similarity or overlap of the name information (for example, the number of overlapping characters exceeds a certain character count threshold or ratio threshold).
[0082] With respect to the model information, the matching of the model information may refer to the same model information, or may refer to the high similarity or overlap of the model information (for example, the number of overlapping words exceeds a certain word count threshold or ratio threshold).
[0083] For shape information, material information, application scenario information, etc., if text, words, characters, etc. are used to describe the shape information, material information, application scenario information, then: the matching of shape information, material information, application scenario information can mean that the corresponding information is the same, or the degree of overlap of the information is high (for example, the number of overlapping words exceeds a certain word count threshold or ratio threshold).
[0084] The application scenario information may include, for example, scenarios applied to villas and scenarios applied to high-rise buildings may be distinguished as different application scenarios, scenarios applied to residences and scenarios applied to commercial buildings may be distinguished as different application scenarios, and scenarios applied to gates and scenarios applied to room doors may be distinguished as different application scenarios. As long as the information of the application scenario dimension is used, it may be used as an example of an embodiment of the present invention.
[0085] In addition to the above examples, any other information that can be used to describe the material can be applied to step S12 to determine a matching reference standard part, and is not limited to the above examples.
[0086] The material management data involved in step S12 and the inventory management data involved in step S13 may be stored in the same data structure or in different data structures. The difference between material management data and inventory management data can be understood as follows: the materials recorded in the material management data may not be in stock, while the materials recorded in the inventory management data are usually in stock.
[0087] For non-standard material types, the inventory management data should display the non-standard custom field values, and the inventory management data can only display the inventory status of materials with quantity. Materials with a quantity of 0 are not displayed in the inventory management data, otherwise a large amount of useless data will appear. This can not only meet the convenience of material flow, but also make the system free of redundant data and improve work efficiency.
[0088] The N purchase orders involved in step S13 and step S14 may be divided according to different suppliers, for example, that is, the materials to be purchased from the same supplier may be recorded in the same purchase order.
[0089] In the above scheme, by searching for reference standard parts that match the non-standard parts in the standard parts recorded in the material management data, the reference standard parts can be used as one of the bases for whether to purchase materials and / or what materials to purchase. Since non-standard parts can be processed through reference standard parts or available standard parts in inventory, in the present invention, after obtaining the order, there is no need to intervene manually for non-standard parts, which effectively ensures efficient processing.
[0090] Figure 2 is a schematic flow chart of step S13 in one embodiment of the present invention; Figure 3 It is a flowchart of step S134 in one embodiment of the present invention.
[0091] In one implementation, please refer to Figure 2 , step S13 may include:
[0092] S131: determining a current size deviation threshold value according to the category information of the non-standard part and the correspondence between different category information and different size deviation threshold values;
[0093] S132: searching for a candidate standard part in the inventory materials recorded in the inventory management data according to the size information of the reference standard part and the current size deviation threshold; the size deviation between the candidate standard part and the reference standard part does not exceed the current size deviation threshold;
[0094] S133: Whether the candidate standard parts are found.
[0095] Taking flower branches, door bodies, door heads, door pillars, flower windows and other categories as examples, their corresponding size deviation thresholds may be different. Of course, in some solutions, the size deviation thresholds of some categories may be the same or similar. At the same time, the size deviation threshold may refer to the threshold of the area or volume of the entire material, or to the threshold of a single dimension or multiple dimensions (wherein the dimensions may be, for example, length, width, height, etc.).
[0096] If the judgment result of step S133 is no, step S137 may be implemented: recording the reference standard component in the corresponding purchase order, and at the same time, the corresponding purchase quantity may also be recorded.
[0097] If the judgment result of step S133 is yes (i.e. at least one candidate standard component is found), then:
[0098] In one example, the candidate standard component may be directly determined as an available standard component;
[0099] In another example, step S134 may be implemented: displaying preset identification information of at least one candidate standard part externally; the preset identification information may be any information that can identify the candidate standard part, such as its name information, model information, shape information, material information, application scenario information, and part or all of any other information.
[0100] By displaying the preset identification information of the candidate standard parts to the outside, the searched standard parts that may be used as available standard parts can be informed to the outside. At this time, you can wait for relevant personnel to select and confirm which candidate standard part can be used as the available standard part, and whether to use one of the candidate standard parts as the available standard part.
[0101] Therefore, after step S134, the following steps may be included:
[0102] S135: whether the standard part selection information input externally is obtained;
[0103] If the judgment result of step S135 is yes, step S136 can be implemented: according to the standard part selection information, one of the at least one candidate standard part is selected as the available standard part, thereby ensuring that: the reference standard part is not recorded in any purchase order due to the demand for the non-standard part.
[0104] In one example, if the judgment result of step S135 is no, further timing may be performed. At this time, if the preset time threshold is reached, it can be understood that no available standard parts can be selected.
[0105] In another example, if a feedback message of abandoning selection is received from a person (which can be understood as feedback from a person who determines that all candidate standard parts should not be used as available standard parts), it can also be understood as failure to select an available standard part.
[0106] Regardless of the method used, as long as it is determined that no available standard parts can be selected from the candidate standard parts, the reference standard parts can be recorded in the corresponding purchase order (ie, step S137 is implemented).
[0107] It can be seen that if no candidate standard part is found, or if at least one candidate standard part is found but the available standard part is not selected from the at least one candidate standard part, then: the reference standard part is recorded in the corresponding purchase order.
[0108] In a further solution, if the number of the candidate standard parts is at least two, the display mode of the candidate standard parts can be further configured to facilitate personnel to quickly select the required available standard parts. For details, please refer to Figure 3 , step S134 may include:
[0109] S1341: Determine sorting information of preset identification information of at least two candidate standard parts according to the numerical value of the size deviation between the reference standard part and the candidate standard part;
[0110] S1342: Displaying preset identification information of the at least two candidate standard parts externally according to the sorting information.
[0111] In step S1341, if the sorting information is represented by a sequence number, then it can be configured as follows: the larger the value of the size deviation, the larger the sorting sequence number. Correspondingly, in step S1342, the relationship between the display mode of each preset identification information and the sorting information is as follows: in one example, if each preset identification information is arranged and displayed from top to bottom, then: the smaller the sorting sequence number, the higher the displayed preset identification information is. In another example, if each preset identification information is of different sizes, then: the smaller the sorting sequence number, the larger the displayed preset identification information. It can be seen that the preset identification information of the candidate standard part with a smaller sequence number is displayed more preferentially.
[0112] In actual application, the user may be provided with an option of giving priority to surplus through an interactive interface. If the option of giving priority to surplus is checked, the preset identification information of the displayed candidate standard parts is configured to give priority to displaying candidate standard parts whose sizes are greater than or equal to the reference standard parts. For example, the displayed candidate standard parts are greater than or equal to the reference standard parts (i.e., candidate standard parts whose sizes are smaller than the reference standard parts are not displayed), or candidate standard parts whose sizes are greater than or equal to and smaller than the reference standard parts are displayed at the same time, but candidate standard parts whose sizes are greater than or equal to the reference standard parts are displayed first.
[0113] Among them, the candidate standard parts whose sizes are greater than or equal to the reference standard parts may refer to candidate standard parts whose sizes in all dimensions are greater than or equal to the reference standard parts, or may refer to candidate standard parts whose size in only a single dimension is greater than or equal to the reference standard parts.
[0114] Regardless of the method used, as long as the sorting information is used and differentiated display is achieved based on it, it does not depart from the scope of the embodiments of the present invention.
[0115] For the above process, taking squid as an example, if the size deviation threshold is set to a size range of 20cm, when the order material requirement requires the purchase of a 100cm*100cm squid, the two 100cm can be regarded as the length and width. Then, the different stocks in the warehouse of the same material can be checked in the inventory management data, and the materials with a length in the range of 80cm-120cm and a width in the range of 80cm to 120cm are pulled out, and the corresponding difference (that is, the size deviation between the candidate standard part and the reference standard part) is calculated.
[0116] Among them, since the size deviation threshold is designed for two dimensions respectively, and the length and width of the reference standard part are 100 cm and 100 cm respectively, then, the size deviation of the length of the candidate standard part found and the 100 cm is less than the size deviation threshold of 20 cm, and the size deviation of the width of the candidate standard part found and the 100 cm is also less than the size deviation threshold of 20 cm. If the size deviation threshold is designed for a single dimension, the size deviation of the width (or length) of the candidate standard part found and the 100 cm is less than the size deviation threshold of 20 cm.
[0117] If the calculated difference is 0 (for example, the dimension deviation thresholds of length and width are both 0), it means that there are materials of the required size in the warehouse (that is, there are reference standard parts in the inventory). At this time, they can be automatically occupied without procurement. If the difference is not 0, a recommended usage sorting can be given based on the difference (that is, based on the display of each preset identification information based on the sorting information mentioned above), and the purchasing staff will decide whether to use materials of similar size as available standard parts.
[0118] If the dimension of size deviation is more than one (for example, including length and width), then when determining the sorting information, the statistical values such as the sum, product, average, etc. of the size deviations of each dimension can be further calculated, and then the sorting information can be determined based on the statistical values. Alternatively, the sorting information can be determined using only the size deviation of one dimension.
[0119] In this regard, it should be noted that the purchased materials must be processed during processing, and they can be used if the size difference is not too big.
[0120] In addition, when generating a purchase order, for standard parts, it is possible to directly compare whether there are sufficient standard parts in the inventory management data. If not, the standard parts (and their corresponding purchase quantities) are recorded in the corresponding purchase order.
[0121] Figure 4 The following is a schematic diagram of the process of an information processing method for automated production in one embodiment of the present invention. Figure 1 .
[0122] Please refer to Figure 4 , an embodiment of the present invention provides an information processing method for automated production, comprising:
[0123] S201: Implement the information processing method for production material procurement involved in the above scheme;
[0124] S202: After all materials recorded in the current bill of materials have been put into storage, obtaining production scheduling information of the target order, wherein the production scheduling information represents the production processes required to complete the target order, as well as the workshops and / or production personnel implementing each production process;
[0125] S203: Sending production instruction information of the target order to terminals of at least some personnel involved in each production process according to the production scheduling information, so as to instruct corresponding personnel to carry out production.
[0126] At least some of the personnel involved in each production process in the above step S203 may include the production personnel in step S202, the management personnel of the workshop, other personnel involved in production and management, etc. The corresponding production instruction information may be, for example, a newly generated production order, which may record at least one of the corresponding personnel, the process to be performed, the operation, the corresponding standard working time information, the processing drawing information, etc.
[0127] In the above solution, automated processing from procurement to production scheduling is achieved, which effectively improves the degree of automation and ensures higher efficiency.
[0128] Figure 5 The following is a schematic diagram of the process of an information processing method for automated production in one embodiment of the present invention. Figure 2 .
[0129] Please refer to Figure 5 In one embodiment, after step S201 and before step S202, the following may be included:
[0130] S204: Acquire a material entry signal, which is fed back by a terminal of a warehouse staff when detecting that the materials recorded in the N purchase orders have entered the warehouse; the material entry signal may carry, for example, an identification of the corresponding material (for example, a material tag);
[0131] S205: updating the inventory management data according to the material warehousing signal;
[0132] S206: According to the inventory management data, whether it is determined that all materials recorded in the current material list have been put into storage;
[0133] If the judgment result of step S206 is yes, step S207 may be implemented: sending a production scheduling notification to the terminal of the supervisor, wherein the production scheduling notification is used to instruct the supervisor to determine the production scheduling information.
[0134] The material entry signal may be any signal indicating that the corresponding material has been entered into the warehouse, and may be obtained by warehouse personnel scanning the material identification (QR code, bar code, etc.) using a corresponding terminal when the material is entered into the warehouse.
[0135] The updating in step S205 may, for example, record the materials put into storage and the corresponding quantities in the inventory management data.
[0136] The determination in step S206 may include determining whether the inventory management data has the materials recorded in the current bill of materials, and may also include determining whether the quantity of the corresponding materials in the inventory management data satisfies the current bill of materials.
[0137] If the judgment result of step S206 is no, the process returns to step S204 to wait for the next material storage signal.
[0138] In the above scheme, the automatic update of inventory management data can be realized, so that the subsequent production scheduling process can be executed in a timely manner, effectively ensuring the efficiency of automated production.
[0139] Figure 6 The following is a schematic diagram of the process of an information processing method for automated production in one embodiment of the present invention. Figure 3 .
[0140] Please refer to Figure 6 In one implementation manner, after step S203, the following steps may also be included:
[0141] S208: Determine standard working hours information of at least some personnel involved in the production process according to the production scheduling information;
[0142] S209: Acquire real working hours information and production record information of at least some personnel involved in the production process;
[0143] S210: Determine the production progress according to the standard working time information, the production scheduling information, the real working time information and the production record information.
[0144] In some examples, the standard working time information in step S208 may be determined based on the various processes to be scheduled, the historical process execution status or the pre-specified execution standard. In other examples, the standard working time information in step S208 may also be determined by feeding the scheduling information back to the terminal of the relevant personnel (such as the management personnel) and then input by the personnel.
[0145] In step S210, the production scheduling information reflects each process of production. The real working time information can be understood as representing how many working hours each person actually worked during the production process. The production record information can be understood as any information that records the execution of the process, such as the operation record of the personnel during the execution of the process. Correspondingly, by comparing the real working time information with the standard working time information, it can be learned how many working hours the current production process has completed and which working hours have been reached. By comparing the production record information with the production scheduling information, it can be learned which process the current production process has reached, and: which operation process of the process has been reached. Furthermore, the information obtained can be used to represent the production progress, wherein the information obtained can be represented in the form of text, graphics, etc.
[0146] Through the above scheme, the progress of at least some of the personnel involved in the production process in the production work can be effectively monitored.
[0147] The methods involved above can all be applied to the production of customized doors, and the non-standard parts include at least one of the following: flower branches, door bodies, door heads, door pillars, air louvers, processing materials for flower branches, processing materials for door bodies, processing materials for door heads, processing materials for door pillars, and processing materials for air louvers.
[0148] Figure 7 It is a schematic diagram of the workflow of automated production in one embodiment of the present invention.
[0149] Please refer to Figure 7 Before creating an order, you can maintain some basic data, such as material management data, inventory management data, supplier information (including supplier identification, supplier material information, supplier-side information corresponding to the supplier, etc.), etc.
[0150] After the production demand of the target order is generated, the order information of the target order can be manually entered and submitted for review. After the review is passed, the current BOM (i.e. the current bill of materials mentioned above) can be entered, which can be understood as the execution of step S11. At the same time, the processing drawing information can also be entered.
[0151] When the user clicks on-demand purchase in the relevant interface of purchase management, the system can read the BOM (i.e. the current bill of materials mentioned above) of the unprocessed orders (including the target orders), calculate the inventory, and automatically split the materials to be purchased into multiple purchase orders according to the suppliers. This can be understood as the execution of step S12 and step S13.
[0152] After the purchase is confirmed, the purchase order can be sent to the supplier, which can be understood as the execution of step S14.
[0153] After receiving the purchase order, the supplier can print the corresponding purchase order and material label and arrange the production of the materials recorded in the purchase order.
[0154] After the purchased goods arrive, the warehouse staff can use their terminals to scan the material labels of each material and complete the warehousing. Specifically, after the purchased materials arrive, the factory can conduct quality inspection on them, and then scan the code to obtain the material warehousing signal before warehousing. The system verifies the materials according to the material labels, which can be understood as the implementation of steps S204 to S205. It can be seen that no manual verification is required in this process, which effectively ensures processing efficiency.
[0155] The production supervisor can view the material status and production load of each order in real time. When the materials arrive, production can be scheduled if the production load allows. At the same time, when all the materials of an order arrive, the system can send a message (i.e., production scheduling instruction information) to notify the production supervisor to remind him to arrange production, which can be understood as the implementation of step S206 and step S207.
[0156] The actual production part can be divided into production scheduling and production reporting. The production supervisor can view the current order information and material status (i.e. the target order information, and the materials recorded in the inventory material data, etc.) to be produced. Corresponding production orders can be generated for each workshop and each process. In addition, the system will configure the standard production hours for each process and each type of product. The production supervisor will schedule production according to the material status and workshop load to obtain the production scheduling information. After scheduling, production orders (which can be understood as production instruction information) will appear in the to-do list of personnel in each process of the workshop. Production employees can report work and record production, and production supervisors and managers can remotely monitor the production progress. The above process can be understood as the implementation of steps S208 to S210, steps S202 and S203.
[0157] After the target order is produced, various types of packaging labels can be printed and affixed to the outer packaging of the finished product. Warehouse staff can use their terminals to scan the code directly for storage. Specifically, they can scan the packaging QR code and the cargo location QR code to perform storage operations. Then, the business staff can communicate the shipment and submit the shipment application form for review; after the review is passed, the corresponding warehouse staff can perform the outbound operation.
[0158] To summarize, in the information processing method for production material procurement and automated production provided by the embodiment of the present invention, by searching for reference standard parts that match the non-standard parts in the standard parts recorded in the material management data, the reference standard parts can be used as one of the bases for whether to purchase materials and / or what materials to purchase. Since non-standard parts can be processed through reference standard parts or available standard parts in inventory, in the embodiment of the present invention, after obtaining the order, there is no need to intervene manually for the non-standard parts, which effectively ensures efficient processing.
[0159] Figure 8 It is a schematic diagram of program modules of an information processing device for production material procurement in one embodiment of the present invention.
[0160] Please refer to Figure 8 , the information processing device 300 for purchasing production materials comprises:
[0161] The material list acquisition module 301 is used to acquire the current material list, which records the materials required to complete the target order; wherein the materials recorded in the current material list include non-standard parts;
[0162] The reference standard part search module 302 is used to search for a reference standard part matching the non-standard part among the standard parts recorded in the material management data; the reference standard part matches at least one of the following information of the non-standard part: category information, name information, model information, shape information;
[0163] The purchase order generation module 303 is used to generate corresponding N purchase orders according to the current material list and the inventory materials recorded in the inventory management data, wherein the purchase order records the materials required to complete the target order; and: if there are no available standard parts corresponding to the non-standard parts in the inventory materials recorded in the inventory management data, then: at least one of the purchase orders records the reference standard parts; the available standard parts refer to materials that are determined to be able to replace the non-standard parts after being processed; wherein N is an integer greater than or equal to 1;
[0164] The purchase order sending module 304 is used to send the N purchase orders to the corresponding supplier end.
[0165] Optionally, the purchase order generating module 303 is specifically used for:
[0166] Determining a current size deviation threshold value according to the category information of the non-standard part and the correspondence between different category information and different size deviation threshold values;
[0167] Searching for a candidate standard part in the inventory materials recorded in the inventory management data according to the size information of the reference standard part and the current size deviation threshold; the size deviation between the candidate standard part and the reference standard part does not exceed the current size deviation threshold;
[0168] If no candidate standard part is found, or if at least one candidate standard part is found but the available standard part is not selected from the at least one candidate standard part, then: the reference standard part is recorded in the corresponding purchase order.
[0169] Optionally, the purchase order generating module 303 is further used for:
[0170] If at least one candidate standard component is found, the preset identification information of the at least one candidate standard component is displayed externally;
[0171] If externally input standard component selection information is obtained, one of the at least one candidate standard component is selected as the available standard component according to the standard component selection information, so that the reference standard component is not recorded in any purchase order.
[0172] Optionally, the purchase order generating module 303 is specifically used for:
[0173] Determining, according to the numerical value of the size deviation between the reference standard component and the candidate standard component, sorting information of the preset identification information of at least two candidate standard components;
[0174] According to the sorting information, preset identification information of the at least two candidate standard components is displayed externally.
[0175] Fig. 9 Schematic diagram of a program module of an information processing device for automated production in one embodiment of the present invention Figure 1 ; Fig.10 Schematic diagram of a program module of an information processing device for automated production in one embodiment of the present invention Figure 2 .
[0176] Please refer to Fig. 9 and Fig.10 , the information processing device 400 for automated production comprises:
[0177] The purchasing unit 401 is used to implement the information processing method for purchasing production materials involved in the above scheme;
[0178] The production scheduling information acquisition unit 402 is used to acquire the production scheduling information of the target order after all materials recorded in the current material list have been put into storage, wherein the production scheduling information represents the production process required to complete the target order, as well as the workshop and / or production personnel implementing each production process;
[0179] The production instruction unit 403 is used to send the production instruction information of the target order to the terminals of at least some of the personnel involved in each production process according to the production scheduling information, so as to instruct the corresponding personnel to carry out production.
[0180] Optional, please refer to Fig.10 , the information processing device 400 for automated production further comprises:
[0181] The storage-in signal acquisition unit 404 is used to acquire a material storage-in signal, wherein the material storage-in signal is fed back when the terminal of the warehouse personnel detects that the materials recorded in the N purchase orders have been stored;
[0182] An inventory updating unit 405, configured to update the inventory management data according to the material entry signal;
[0183] The production scheduling notification sending unit 406 is used to send a production scheduling notification to the terminal of the supervisor if it is determined according to the inventory management data that all materials recorded in the current material list have been put into storage, and the production scheduling notification is used to instruct the supervisor to determine the production scheduling information.
[0184] Optional, please refer to Fig.10 , the information processing device 400 for automated production further comprises:
[0185] A standard working time determining unit 407, configured to determine standard working time information of at least some personnel involved in the production process according to the production scheduling information;
[0186] A working time and record acquisition unit 408, used to acquire real working time information and production record information of at least some personnel involved in the production process;
[0187] The production progress determination unit 409 is used to determine the production progress according to the standard working time information, the production scheduling information, the real working time information and the production record information.
[0188] Optionally, the information processing method for automated production is applied to the production of customized doors, and the non-standard parts include at least one of the following: flower branches, door bodies, door heads, door pillars, air louvers, processing materials for flower branches, processing materials for door bodies, processing materials for door heads, processing materials for door pillars, and processing materials for air louvers.
[0189] Fig.11 It is a schematic diagram of the structure of an electronic device in one embodiment of the present invention.
[0190] Please refer to Fig.11 , an electronic device 50 is provided, comprising:
[0191] a processor 51; and
[0192] A memory 52, used to store executable instructions of the processor;
[0193] The processor 51 is configured to execute the above-mentioned method by executing the executable instructions.
[0194] The processor 51 can communicate with the memory 52 via a bus 53 .
[0195] An embodiment of the present invention further provides a computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the above-mentioned method is implemented.
[0196] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for processing information of production material procurement, characterized in that: include: Obtaining a current bill of materials, wherein the current bill of materials records the materials required to complete the target order; wherein the materials recorded in the current bill of materials include non-standard parts; In the material management data, the value of the non-standard custom field corresponding to the non-standard part is managed; wherein the material management data includes: non-standard custom fields; Searching for a reference standard part that matches the non-standard part among the standard parts recorded in the material management data; the reference standard part matches at least one of the following information of the non-standard part: category information, name information, model information, shape information, material information, application scenario information, and size information; Generate corresponding N purchase orders according to the current material list, the reference standard parts and the inventory management data, where N is an integer greater than or equal to 1; if there is no available standard part corresponding to the non-standard part in the inventory materials recorded in the inventory management data, then: at least one of the purchase orders records the reference standard part; the available standard part refers to a material determined to be able to replace the non-standard part after being processed; The generating of N corresponding purchase orders according to the current bill of materials, the reference standard parts and the inventory management data includes: Determining a current size deviation threshold value according to the category information of the non-standard part and the correspondence between different category information and different size deviation threshold values; Searching for a candidate standard part in the inventory materials recorded in the inventory management data according to the size information of the reference standard part and the current size deviation threshold; the size deviation between the candidate standard part and the reference standard part does not exceed the current size deviation threshold; If no candidate standard part is found, or if at least one candidate standard part is found but no available standard part is selected from the at least one candidate standard part, then: recording the reference standard part in a corresponding purchase order; The N purchase orders are sent to corresponding suppliers.
2. The information processing method for production material procurement according to claim 1 is characterized in that: After searching for candidate standard parts in the inventory materials recorded in the inventory management data according to the size information of the reference standard part and the current size deviation threshold, the method further includes: If at least one candidate standard component is found, the preset identification information of the at least one candidate standard component is displayed externally; If externally input standard component selection information is acquired, one of the at least one candidate standard component is selected as the available standard component according to the standard component selection information.
3. The information processing method for production material procurement according to claim 2 is characterized in that: If the number of the candidate standard components is at least two, then: displaying the at least one candidate standard component externally includes: Determining, according to the numerical value of the size deviation between the reference standard component and the candidate standard component, sorting information of the preset identification information of at least two candidate standard components; According to the sorting information, preset identification information of the at least two candidate standard parts is displayed externally.
4. An information processing method for automated production, characterized in that: include: Implementing the information processing method for production material procurement as described in any one of claims 1 to 3; After all materials recorded in the current bill of materials have been put into storage, the production scheduling information of the target order is obtained, wherein the production scheduling information represents the production processes required to complete the target order, as well as the workshops and / or production personnel implementing each production process; According to the production scheduling information, the production instruction information of the target order is sent to the terminals of at least some of the personnel involved in each production process to instruct the corresponding personnel to carry out production.
5. The information processing method for automated production according to claim 4, characterized in that: Before obtaining the production scheduling information of the target order, the method further includes: Obtaining a material entry signal, wherein the material entry signal is fed back by a warehouse staff terminal when detecting that the materials recorded in the N purchase orders have entered the warehouse; According to the material warehousing signal, update the inventory management data; If it is determined according to the inventory management data that all the materials recorded in the current material list have been put into storage, a production scheduling notification is sent to the terminal of the supervisor, and the production scheduling notification is used to instruct the supervisor to determine the production scheduling information.
6. The information processing method for automated production according to claim 4, characterized in that: After obtaining the production scheduling information of the target order, the following steps are also included: Determining standard working hours information of at least some personnel involved in the production process according to the production scheduling information; Obtaining real working hours information and production record information of at least some personnel involved in the production process; The production progress is determined according to the standard working time information, the production scheduling information, the real working time information and the production record information.
7. The information processing method for automated production according to any one of claims 4 to 6, characterized in that: Applicable to the production of customized doors, the non-standard parts include at least one of the following: flower branches, door bodies, door heads, door pillars, air louvers, processing materials for flower branches, processing materials for door bodies, processing materials for door heads, processing materials for door pillars, and processing materials for air louvers.
8. An information processing device for purchasing production materials, characterized in that: include: A bill of materials acquisition module is used to acquire a current bill of materials, wherein the current bill of materials records the materials required to complete the target order; wherein the materials recorded in the current bill of materials include non-standard parts; A custom field management module is used to manage the value of the non-standard custom field corresponding to the non-standard part in the material management data; wherein the material management data includes: non-standard custom fields; A reference standard part search module is used to search for a reference standard part matching the non-standard part among the standard parts recorded in the material management data; the reference standard part matches at least one of the following information of the non-standard part: category information, name information, model information, shape information, and size information; A purchase order generation module is used to generate corresponding N purchase orders according to the current material list, the reference standard parts and the inventory management data, where N is an integer greater than or equal to 1; if there is no available standard part corresponding to the non-standard part in the inventory materials recorded in the inventory management data, then: at least one of the purchase orders records the reference standard part; the available standard part refers to a material determined to be able to replace the non-standard part after being processed; The purchase order generation module is specifically used for: Determining a current size deviation threshold value according to the category information of the non-standard part and the correspondence between different category information and different size deviation threshold values; Searching for a candidate standard part in the inventory materials recorded in the inventory management data according to the size information of the reference standard part and the current size deviation threshold; the size deviation between the candidate standard part and the reference standard part does not exceed the current size deviation threshold; If no candidate standard part is found, or if at least one candidate standard part is found but the available standard part is not selected from the at least one candidate standard part, then: recording the reference standard part in a corresponding purchase order; The purchase order sending module is used to send the N purchase orders to the corresponding supplier end.
9. An information processing device for automated production, characterized in that: include: A purchasing unit, used to implement the information processing method for purchasing production materials according to any one of claims 1 to 3; A production scheduling information acquisition unit, used to acquire the production scheduling information of the target order after all materials recorded in the current bill of materials have been put into storage, wherein the production scheduling information represents the production processes required to complete the target order, as well as the workshops and / or production personnel implementing each production process; The production instruction unit is used to send the production instruction information of the target order to the terminals of at least some of the personnel involved in each production process according to the production scheduling information, so as to instruct the corresponding personnel to carry out production.
10. An electronic device, characterized in that: Including processor and memory, The memory is used to store codes; The processor is used to execute the code in the memory to implement the method according to any one of claims 1 to 7.
11. A storage medium having a computer program stored thereon, wherein when the program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.