All material dam
By designing a full-material dam and using a variety of natural materials and structural forms, the shortcomings in safety and material utilization efficiency of dams in water conservancy projects are solved, and the effect of efficient flood flooding and environmental protection on soft base foundations is achieved.
Patent Information
- Application Number
- CN202010772591.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-04
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2040-08-04
AI Technical Summary
The dams in existing water conservancy projects have shortcomings in terms of safety and material utilization efficiency in resisting flood floods. In particular, rigid material dams have high foundation requirements and large land area, and the scattered material dams have poor safety in resisting floods beyond the standard. , and the inability to effectively utilize various natural materials, resulting in poor environmental benefits.
Design a full-material dam, using various natural excavated and mined stone, gravel, earth or mixture to build dams, including concrete dams, cement dams and backfilled dams, and set up anti-seepage layers and protections. The layer is adapted to the soft base foundation and adopts a dam structure with multiple slope ratios, combining retaining walls and overflow dam sections to achieve material utilization without scrap.
The safety of building dams on soft foundations and cover layers and flood-flooding ability are achieved, and the comprehensive use of various natural materials is reduced, material waste is significantly improved, and environmental protection benefits are reduced, and the impact of dam construction on the environment is reduced.
Smart Images

Figure CN111979982B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy engineering, and in particular to a full-material dam. Background Art
[0002] The full-material dam in the relevant technology refers to the use of all kinds of natural excavated and mined stones, gravel, soil or mixed materials to build the dam. According to the type and quantity of raw materials and the stability and stress of the dam structure, the dam is reasonably designed to achieve on-demand material acquisition, balanced excavation and construction, and on-site dam construction. Dams in water conservancy and hydropower projects are mainly divided into two categories: rigid material dams and granular material dams. Rigid material dams generally include: normal concrete dams, roller-compacted concrete dams, rockfill concrete dams and mortar masonry dams, etc. Granular material dams generally include: earth dams, earth-rock dams, rockfill dams, etc.
[0003] Rigid material dams require cement and other cementitious materials and high-strength rocks as the main raw materials. They have the advantages of low material consumption and small footprint. However, rigid material dams have high requirements for raw materials and foundations.
[0004] Granular material dams are mainly made of earth and stone, also known as local material dams. Their advantage is that they are more compatible with raw materials of various properties. However, in order to ensure the stability of the dam structure, the size, land area and raw material consumption of granular material dams are several times that of rigid dams, and their safety in resisting excessive floods is not as good as that of rigid dams. Summary of the invention
[0005] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, one purpose of the present invention is to propose a full-material dam, which has strong adaptability to the foundation, can be built on soft foundations and overburden, can resist flooding, has excellent safety, can fully use various natural building materials, achieves no waste residue, and has outstanding environmental benefits.
[0006] According to the all-material dam of an embodiment of the present invention, the all-material dam is built using various naturally excavated and mined stones, gravel, soil or mixed materials, and the all-material dam includes: a dam body, which includes at least one of a concrete dam body, a binder dam body and a backfill material dam body; an impermeable layer, which is arranged on the upstream surface of the dam body; a protective layer, which is arranged on the downstream surface of the dam body, and the thickness of the protective layer is not less than 0.5m.
[0007] The all-material dam according to the embodiment of the present invention has strong adaptability to the foundation, can be built on soft foundations and covering layers, can resist flooding, has excellent safety, can fully use various natural building materials, achieves no waste, and has outstanding environmental benefits.
[0008] In addition, the all-material dam according to the above embodiment of the present invention also has the following additional technical features:
[0009] According to some embodiments of the present invention, the upstream face of the dam body is configured as a vertical face; or, the upstream face of the dam body is configured as an inclined face inclined toward the downstream side; or, the upstream face of the dam body is configured to include a vertical face and an inclined face inclined toward the downstream side; when the upstream face of the dam body includes an inclined face, the slope ratio of the upstream face is a single slope ratio, or, the upstream face is composed of multiple slope ratios.
[0010] According to some embodiments of the present invention, the all-material dam further comprises: a retaining wall, wherein the retaining wall is arranged at the downstream toe of the dam body, the upstream side of the retaining wall is constructed as a stepped structure, and the downstream side of the retaining wall is constructed as a slope.
[0011] According to some embodiments of the present invention, when the dam body includes a concrete dam body and / or a binder dam body, the all-material dam also includes: an overflow dam section, which is arranged on the downstream surface of the concrete dam body and / or the binder dam body, an overflow hole is formed on the overflow surface, and the downstream surface of the overflow dam section is constructed as an overflow surface; a gate pier is provided on the top of the dam body, and a guide wall is provided on the side of the overflow surface.
[0012] According to some embodiments of the present invention, when the all-material dam includes a concrete dam body, the upstream surface of the concrete dam body is constructed as a vertical surface; or, the upstream surface of the concrete dam body is constructed as an inclined surface inclined toward the downstream side; when the upstream surface of the concrete dam body is constructed as an inclined surface inclined toward the downstream side, the slope ratio of the upstream surface is 1:0-1:0.3, the slope ratio of the upstream surface is a single slope ratio, or, the upstream surface includes multiple slope ratios; the downstream side boundary of the concrete dam body is constructed as a vertical surface; or, the downstream side boundary of the concrete dam body is constructed as an inclined surface inclined toward the upstream side. ; or, the downstream side boundary of the concrete dam body is constructed in a step shape; when the downstream side boundary of the concrete dam body is constructed to be inclined toward the upstream side, the slope ratio of the downstream side boundary is 1:0-1:0.8, the slope ratio of the downstream side boundary is a single slope ratio, or, the downstream side boundary includes multiple slope ratios; transverse joints are provided on the concrete dam body, and water-stopping facilities are provided between two adjacent transverse joints, and the spacing between the transverse joints is not less than a predetermined width; the strength grade of the concrete dam body material is C10-C50, and the concrete dam body is at least one of rockfill concrete, roller-compacted concrete or normal concrete.
[0013] According to some embodiments of the present invention, when the all-material dam includes a concrete dam body and a binder dam body, the upstream side of the binder dam body is tightly connected to the downstream side of the concrete dam body to form a whole; the downstream side boundary of the binder dam body is constructed to be inclined toward the upstream side, the slope ratio of the binder dam body is 1:0-1:1, the slope ratio of the binder dam body is a single slope ratio, or the slope ratio of the binder dam body includes multiple slope ratios; or, the downstream side boundary of the binder dam body is constructed in a step shape; the strength grade of the binder in the binder dam body is C2-C15, the binder is fully cemented or partially cemented, and the binder is cemented rockfill, cemented gravel or cemented soil.
[0014] According to some embodiments of the present invention, when the all-material dam includes a binder dam body and a backfill material dam body, the upstream side of the backfill material dam body is tightly connected to the downstream side of the binder dam body to form a whole; the downstream side boundary of the backfill material dam body is constructed to be inclined toward the upstream side, and the slope ratio of the backfill material dam body is 1:1-1:2.5, the slope ratio of the backfill material dam body is a single slope ratio, or the slope ratio of the backfill material dam body includes multiple slope ratios; the backfill material in the backfill material dam body is at least one of rockfill, earth and stone, gravel or soil.
[0015] According to some embodiments of the present invention, when the all-material dam includes a concrete dam body, a binder dam body and a backfill material dam body, the concrete dam body and the binder dam body can be used as an integral rigid dam to carry out anti-sliding stability analysis and stress analysis during the construction period and the operation period. During the analysis, in addition to considering the conventional load of the dam, the earth pressure load generated by the backfill material dam body should also be considered.
[0016] According to some embodiments of the present invention, when the all-material dam includes a backfill material dam body, the backfill material dam body should be subjected to stability, seepage, stress, strain and settlement analysis during the construction period and the operation period according to the performance of the backfill material and the requirements of earth dam, earth-rock dam and rockfill dam; when the stability, strength, modulus and deformation of the backfill material dam body cannot meet the design requirements, grouting and bonding can be used to improve the corresponding performance.
[0017] According to some embodiments of the present invention, when the all-material dam includes a concrete dam body, a binder dam body and a backfill material dam body, the concrete dam body can be directly constructed on a foundation not lower than the requirements of a weakly weathered rock foundation; the binder dam body can be directly constructed on a foundation not lower than the requirements of a strongly weathered rock foundation; when the construction foundations of the concrete dam body and the binder dam body do not meet the requirements, reinforcement measures should be taken; the foundation of the backfill material dam body is a rock foundation, a gravel covering layer or a soil foundation.
[0018] In some embodiments of the present invention, among the excavated and mined materials, stones that are not lower than the requirements of harder rocks are preferentially used for concrete dam bodies, protective layers and retaining walls at the toe of the dam; among the stones that meet the requirements of harder rocks, stones with a particle size of not less than 150 mm are used as rockfill materials for rockfill concrete, and the remaining stones can be used to process concrete aggregates; stones not used for the concrete dam body can be used for the cementitious dam body or the backfilling dam body; softer rocks and soft rock materials, gravel, earth and stone materials, and soil materials can be used for the cementitious dam body and the backfilling dam body; the anti-seepage layer is concrete, geomembrane or polyurea; when the dam body includes a concrete dam body, the anti-seepage layer is cast integrally with the concrete dam body; the protective layer adopts concrete or fully cemented cemented rockfill.
[0019] According to some embodiments of the present invention, when the all-material dam includes a concrete dam body and a binder dam body, the boundary portion between the concrete dam body and the binder dam body constructs a transition zone, the concrete dam body and the binder dam body are in close contact with each other in an irregular bite state, and should be constructed as a whole without leaving a construction joint; and / or when the all-material dam includes a binder dam body and a backfill material dam body, the boundary portion between the binder dam body and the backfill material dam body constructs a transition zone, the binder dam body and the backfill material dam body are in close contact with each other in an irregular bite state, and should be constructed as a whole without leaving a construction joint; and / or when the all-material dam includes a concrete dam body and a backfill material dam body, the boundary portion between the concrete dam body and the backfill material dam body constructs a transition zone, the concrete dam body and the backfill material dam body are in close contact with each other in an irregular bite state, and should be constructed as a whole without leaving a construction joint.
[0020] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0022] Figure 1 is a schematic diagram of a full-material dam according to an embodiment of the present invention;
[0023] Figure 2 yes Figure 1 A cross-sectional view of the circled portion;
[0024] Figure 3 is a schematic diagram of a full-material dam according to another embodiment of the present invention;
[0025] Figure 4 is a schematic diagram of a full-material dam according to yet another embodiment of the present invention;
[0026] Figure 5 is a schematic diagram of a full-material dam according to yet another embodiment of the present invention.
[0027] Reference numerals:
[0028] All material dam 100,
[0029] Concrete dam body 1, binder dam body 2, backfill material dam body 3, protective layer 4, retaining wall 5, overflow surface 6, gate pier 7, guide wall 8, transition zone 9, irregular bite shape 10, anti-seepage layer 11. DETAILED DESCRIPTION
[0030] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0031] In the related art, in actual engineering, different amounts of rock materials and earth and stone materials can often be obtained at the same time according to the different geological conditions of the dam site. The present invention aims to propose suitable structural forms for materials with different properties according to the types, properties and quantities of materials obtained on site, and to combine and optimize different structural forms to form an environmentally friendly dam with minimal natural material mining and full utilization, thereby minimizing the environmental impact caused by dam construction while ensuring the safety of the dam.
[0032] Reference below Figure 1-Figure 5 An all-material dam 100 according to an embodiment of the present invention is described.
[0033] According to the all-material dam 100 of the embodiment of the present invention, the all-material dam 100 uses various natural excavated and mined stones, gravel, soil or mixed materials to build the dam. The all-material dam 100 includes: a dam body, an anti-seepage layer 11 and a protective layer 4.
[0034] Specifically, the dam body includes at least one of a concrete dam body 1, a cementitious material dam body 2, and a backfill material dam body 3. For example, in some embodiments of the present invention, the dam body may include a concrete dam body 1; or, the dam body includes a cementitious material dam body 2; or, the dam body includes a backfill material dam body 3; or, the dam body includes a concrete dam body 1 and a cementitious material dam body 2; or, the dam body includes a cementitious material dam body 2 and a backfill material dam body 3; or, the dam body includes a concrete dam body 1 and a backfill material dam body 3; or, the dam body includes a concrete dam body 1, a cementitious material dam body 2, and a backfill material dam body 3. For the full-material dam 100, from the upstream side to the downstream side, the concrete dam body 1, the cementitious material dam body 2, and the backfill material dam body 3 are in order.
[0035] Reference Figure 5The anti-seepage layer 11 can be arranged on the upstream surface of the dam body; in this way, by arranging the anti-seepage layer 11 on the upstream surface of the dam body, the leakage of the all-material dam 100 can be better prevented, which is beneficial to improve the reliability of the use of the all-material dam 100 and extend the service life of the all-material dam 100.
[0036] Reference Figure 1 The protective layer 4 can be provided on the downstream surface of the dam body, and the thickness of the protective layer 4 is not less than 0.5 m. Thus, the protective layer 4 can make the downstream dam surface resist the scouring caused by flooding, thereby improving the performance of the all-material dam 100.
[0037] The all-material dam 100 according to the embodiment of the present invention uses various natural excavated and mined stones, gravel, earth or mixed materials to build the dam, and comprehensively uses various excavated and mined materials available for the project to design the dam. The design parameters and volume of each dam body are optimized according to their types, performances and quantities, and basically no waste is achieved.
[0038] The all-material dam 100 according to the embodiment of the present invention has strong adaptability to the foundation, can be built on soft foundations and covering layers, can resist flooding, has excellent safety, can fully use various natural building materials, basically achieves no waste, and has outstanding environmental benefits.
[0039] According to some embodiments of the present invention, the upstream face of the dam body may be configured as a vertical face; or, the upstream face of the dam body may be configured as an inclined face inclined toward the downstream side; or, the upstream face of the dam body may be configured to include a vertical face and an inclined face inclined toward the downstream side; when the upstream face of the dam body includes an inclined face, the slope ratio of the upstream face is a single slope ratio, or, the upstream face is composed of multiple slope ratios.
[0040] Here, it should be noted that, due to the different stability levels of different materials, self-stabilization of different materials can be achieved by limiting the slope ratio. The specific shape of the upstream surface of the dam body can be adaptively set according to actual needs.
[0041] Reference Figure 3 According to some embodiments of the present invention, the all-material dam 100 may further include: a retaining wall 5, which may be arranged at the downstream toe of the dam body, the upstream side of the retaining wall 5 being constructed as a stepped structure, and the downstream side of the retaining wall 5 being constructed as a slope.
[0042] For example, when a large amount of rock material is obtained, the dam body can include a concrete dam body 1, a portion of the rock material is used to build the concrete dam body 1, and the excess rock material can be used to build the retaining wall 5. This can fully utilize the rock material, reduce the waste of raw materials, and is beneficial to environmental protection.
[0043] In some embodiments of the present invention, the upstream side of the retaining wall 5 may be constructed as a stepped structure, which is beneficial to improving the stability of the all-material dam 100 and facilitating construction.
[0044] For example, in some optional embodiments of the present invention, the slope ratio of the stepped structure is equivalent to 1:0.45 (for example, the slope ratio of the line connecting the highest point and the lowest point of the step); the slope ratio of the inclined surface is 1:0.2; the retaining wall 5 can be designed as C 90 15. Rockfill concrete material.
[0045] Of course, on the basis of satisfying the stability performance of the all-material dam 100, the upstream side of the retaining wall 5 can also be constructed as a vertical surface, or the upstream side of the retaining wall 5 can also be constructed as an inclined surface, or the upstream side of the retaining wall 5 can also be constructed to include a vertical surface and an inclined surface, etc.
[0046] Reference Figure 4 According to some embodiments of the present invention, when the dam body includes a concrete dam body 1 and / or a cementitious material dam body 2, the full-material dam 100 may further include: an overflow dam section, which may be arranged on the downstream surface of the concrete dam body 1 and / or the cementitious material dam body 2, and an overflow hole is formed on the overflow dam section, and the downstream surface of the overflow dam section is configured as an overflow surface 6; a gate pier 7 is arranged on the top of the dam body, and a guide wall 8 is arranged on the side of the overflow surface 6. Thus, the full-material dam 100 not only has a water retaining function, but also has a flood discharge function.
[0047] For example, in some optional embodiments of the present invention, the dam body may include a concrete dam body 1, and the dam body 100 may be provided with a plurality of dam bodies 100 in the width direction (eg, Figure 4 The concrete dam body 1 may include a plurality of concrete dam sections, and the overflow dam section may be provided between two adjacent concrete dam sections. The overflow dam section is provided with an overflow hole, and the downstream surface of the overflow dam section is configured as an overflow surface 6. For example, in some embodiments of the present invention, when flood discharge is required through the overflow dam section, the flood can flow through the overflow hole and then flow out through the overflow surface 6. In some optional embodiments of the present invention, a gate pier 7 is provided on the top of the dam body, and a guide wall 8 is provided on the side of the overflow surface 6.
[0048] In some optional embodiments of the present invention, the dam body includes a cementitious dam body 2; or, the dam body includes a concrete dam body 1 and a cementitious dam body 2 (combined Figure 4 ); in the width direction of the full material dam 100 (eg Figure 3The cementitious material dam body 2 may include a plurality of cementitious material dam sections, an overflow dam section may be provided between two adjacent cementitious material dam sections, an overflow hole is formed on the overflow dam section, and the downstream surface of the overflow dam section is constructed as an overflow surface 6; a gate pier 7 is provided on the top of the dam body, and a guide wall 8 is provided on the side of the overflow surface 6.
[0049] According to some embodiments of the present invention, when the all-material dam 100 includes a concrete dam body 1, the upstream surface of the concrete dam body 1 is configured as a vertical surface; or, the upstream surface of the concrete dam body 1 is configured as an inclined surface inclined toward the downstream side. When the upstream surface of the concrete dam body 1 is configured as an inclined surface inclined toward the downstream side, the slope ratio of the upstream surface is 1:0-1:0.3, the slope ratio of the upstream surface is a single slope ratio, or the upstream surface includes multiple slope ratios.
[0050] The downstream side boundary of the concrete dam body 1 is configured as a vertical surface; or, the downstream side boundary of the concrete dam body 1 is configured as an inclined surface inclined toward the upstream side; or, the downstream side boundary of the concrete dam body 1 is configured as a step. When the downstream side boundary of the concrete dam body 1 is configured to be inclined toward the upstream side, the slope ratio of the downstream side boundary is 1:0-1:0.8, the slope ratio of the downstream side boundary is a single slope ratio, or, the downstream side boundary includes multiple slope ratios.
[0051] The concrete dam body 1 is provided with transverse joints, and water-stopping facilities are provided between two adjacent transverse joints, and the transverse joint spacing is not less than a predetermined width (e.g., 15m, etc.). The strength grade of the concrete dam body 1 material is C10-C50, and the concrete dam body 1 is at least one of rockfill concrete, roller compacted concrete, or normal concrete.
[0052] Reference Figure 1 According to some embodiments of the present invention, when the all-material dam 100 includes a concrete dam body 1 and a cementitious material dam body 2, the upstream side of the cementitious material dam body 2 is tightly connected to the downstream side of the concrete dam body 1 to form a whole. The downstream side boundary of the cementitious material dam body 2 is configured to be inclined toward the upstream side, and the slope ratio of the cementitious material dam body 2 is 1:0-1:1, and the slope ratio of the cementitious material dam body 2 is a single slope ratio, or the slope ratio of the cementitious material dam body 2 includes multiple slope ratios; or the downstream side boundary of the cementitious material dam body 2 is configured to be stepped (refer to Figure 4 ). The strength grade of the binder in the dam body 2 is C2-C15, the binder is fully or partially cemented, and the binder is cemented rockfill, cemented sand and gravel or cemented soil.
[0053] Combination Figure 1According to some embodiments of the present invention, when the full material dam 100 includes a cementitious material dam body 2 and a backfill material dam body 3, the upstream side of the backfill material dam body 3 is tightly connected to the downstream side of the cementitious material dam body 2 to form a whole. The downstream side boundary of the backfill material dam body 3 is configured to be inclined toward the upstream side, and the slope ratio of the backfill material dam body 3 is 1:1-1:2.5, and the slope ratio of the backfill material dam body 3 is a single slope ratio, or the slope ratio of the backfill material dam body 3 includes multiple slope ratios. The backfill material in the backfill material dam body 3 is at least one of rockfill, earth and stone, gravel and stone, or earth.
[0054] Combination Figure 1 According to some embodiments of the present invention, when the all-material dam 100 includes a concrete dam body 1, a binder dam body 2 and a backfill material dam body 3, the concrete dam body 1 and the binder dam body 2 can be used as an integral rigid dam for anti-sliding stability analysis and stress analysis during the construction period and the operation period. During the analysis, in addition to considering the conventional load of the dam, the earth pressure load generated by the backfill material dam body 3 on it (for example, the all-material dam 100) should also be considered.
[0055] Reference Figure 3 According to some embodiments of the present invention, when the all-material dam 100 includes a backfill dam body 3, the backfill dam body 3 should be subjected to stability, seepage, stress, strain and settlement analysis during the construction period and operation period according to the performance of the backfill material and the requirements of earth dams, earth-rock dams and rockfill dams. When the stability, strength, modulus and deformation of the backfill dam body 3 cannot meet the design requirements, grouting and bonding can be used to improve the corresponding performance.
[0056] Combination Figure 1 According to some embodiments of the present invention, when the all-material dam 100 includes a concrete dam body 1, a cementitious material dam body 2 and a backfill material dam body 3, the concrete dam body 1 can be directly constructed on a foundation not lower than the requirements of a weakly weathered rock foundation; the cementitious material dam body 2 can be directly constructed on a foundation not lower than the requirements of a strongly weathered rock foundation; the foundation of the backfill material dam body 3 is a rock foundation, a gravel covering layer or a soil foundation.
[0057] When the construction foundation of the concrete dam body 1 and the cementitious dam body 2 does not meet the requirements, reinforcement measures should be taken. For example, a foundation reinforcement part can be set at the construction foundation of the concrete dam body 1 and the cementitious dam body 2.
[0058] In some embodiments of the present invention, among the excavated and mined materials, stones that are not lower than the requirements of harder rocks are preferentially used for the concrete dam body 1, the protective layer 4 and the retaining wall 5 at the dam toe. Among the stones that meet the requirements of harder rocks, the stones with a particle size of not less than 150 mm are used as rockfill materials for rockfill concrete, and the remaining stones can be used to process concrete aggregates. The stones not used for the concrete dam body 1 can be used for the cementing material dam body 2 or the backfilling material dam body 3; the softer rocks and soft rock materials, gravel materials, earth and stone materials, and soil materials can be used for the cementing material dam body 2 and the backfilling material dam body 3.
[0059] According to some embodiments of the present invention, the anti-seepage layer 11 may be concrete, geomembrane or polyurea, etc. When the dam body includes a concrete dam body 1, the anti-seepage layer 11 and the concrete dam body 1 may be cast in one piece. Since the concrete dam body 1 itself has a certain anti-seepage function, by arranging the anti-seepage layer 11 on the upstream surface of the concrete dam body 1 and casting the anti-seepage layer 11 and the concrete dam body 1 in one piece, the full-material dam 100 may have a better anti-seepage function.
[0060] The protective layer 4 can be made of concrete or fully bonded cemented rockfill. When the deformation of the dam body below the protective layer 4 is too large or the modulus is insufficient, it can be cemented and reinforced.
[0061] Reference Figure 2 Combined with Figure 1 According to some embodiments of the present invention, when the full-material dam 100 includes a concrete dam body 1 and a cementitious material dam body 2, a transition zone 9 is constructed at the boundary between the concrete dam body 1 and the cementitious material dam body 2, and the concrete dam body 1 and the cementitious material dam body 2 are in close contact with each other in an irregular bite shape 10, and should be constructed as a whole without leaving a construction joint. And / or
[0062] When the full material dam 100 includes a cementitious material dam body 2 and a backfill material dam body 3, a transition zone 9 is constructed at the boundary between the cementitious material dam body 2 and the backfill material dam body 3. The cementitious material dam body 2 and the backfill material dam body 3 are in close contact with each other in an irregular bite shape 10, and the whole construction should be performed without leaving a construction joint. And / or
[0063] When the full-material dam 100 includes a concrete dam body 1 and a backfill material dam body 3, a transition zone 9 is constructed at the boundary between the concrete dam body 1 and the backfill material dam body 3. The concrete dam body 1 and the backfill material dam body 3 are in close contact with each other in an irregular bite shape 10, and should be constructed as a whole without leaving a construction joint.
[0064] The specific embodiment of the full-material dam 100 according to the present invention is described below with reference to the accompanying drawings.
[0065] Embodiment 1:
[0066] Reference Figure 1 and Figure 2 In a certain project, gravel, weathered rock and fresh rock can be obtained from the riverbed section and the dam shoulder mountain through excavation, and the dam structure design is carried out according to the waste-free design concept of the all-material dam 100.
[0067] The bottom of the concrete dam body 1 is a weakly weathered rock foundation. The upstream surface of the concrete dam body 1 includes a slope with a slope ratio of 1:0.2, which slopes toward the downstream side from the foundation surface to 1 / 4 of the dam height. The 1 / 4 of the dam height is a vertical surface upward. The minimum thickness of the dam body is 6m. The thickness direction of the dam body can refer to Figure 1In the left and right directions, the concrete dam body 1 adopts the design number C 90 20W6 rockfill concrete, a 0.5m thick self-compacting concrete anti-seepage layer is set on the upstream side and cast in an integrated manner with the concrete dam body (such as dam body rockfill concrete). The rockfill materials used are large-sized stones in fresh rock or gravel, and their particle size should be no less than 200mm. The sand and gravel aggregates required for self-compacting concrete are obtained by screening excavated gravel or crushing excavated fresh rocks, and their particle size should meet 0.08mm~20mm. The powders required for self-compacting concrete include stone powder and cement, among which stone powder is obtained by crushing and grinding fresh rocks, and cement is purchased material. According to comprehensive calculation, the mass of cement required accounts for about 3%.
[0068] The binder dam body 2 is connected to the concrete dam body 1. The bottom of the binder dam body 2 is a strongly weathered rock foundation or a weakly weathered rock foundation. The downstream side of the binder dam body 2 is a dam slope adopting a broken line scheme inclined toward the upstream side (not shown in the figure): the slope ratio of the first section of the broken line is 1:0.75, the starting point is 8m vertically away from the downstream side of the concrete dam body 1 and the dam top, and the end point is 17m vertically away from the dam top; the starting point of the second section of the broken line is the end point of the first section of the broken line, with a slope ratio of 1:0.3, extending to the dam foundation.
[0069] The cement dam body 2 adopts the design number C 180 10 cemented rockfill materials, the rockfill materials used are gravel, weathered rock or fresh rock with a particle size of not less than 50mm, and the grouting cementing materials used to fill the cemented rockfill should meet the requirements of C 180 The strength grade is 10. The aggregate of the grouting binder can be obtained by screening gravel and stone, crushing weathered rock or fresh rock. The particle size is required to be less than 10mm. Auxiliary vibration rolling is required to ensure the density of the grouting binder. The comprehensive calculation shows that the mass ratio of cement required is about 1%.
[0070] The backfill material dam body 3 is located at the downstream side of the cementitious material dam body 2 and connected to the cementitious material dam body 2. The bottom of the backfill material dam body 3 is a gravel foundation or a strongly weathered rock foundation. The downstream side of the backfill material dam body 3 is a slope with a slope ratio of 1:1.5, which is inclined toward the upstream side. The backfill material dam body 3 can be backfilled with gravel, weathered rock and fresh rock, and compacted by vibration rolling. The material of the backfill material dam body 3 does not need to use cement or other cementitious materials.
[0071] The downstream protective layer 4 is located on the downstream side of the dam and is laid on the downstream surface of the backfill dam body 3. The thickness of the protective layer 4 is 2m. The protective layer 4 adopts the design number C 90The 20W6 rockfill concrete uses large-size rocks in fresh rock or gravel, and its particle size should be no less than 200 mm. The self-compacting concrete filling the gaps in the rockfill is consistent with the self-compacting concrete used in the anti-seepage layer 11. Comprehensive calculation shows that the mass proportion of cement required is about 3%.
[0072] The boundary between the concrete dam body 1 and the cementing material dam body 2, and the boundary between the cementing material dam body 2 and the backfill material dam body 3, should be realized by changing the rockfill material or backfill material, and should not be a neat and regular boundary line. For each layer of construction, the rockfill material or backfill material should be constructed first, and the concrete and grouting material should be poured and bonded last.
[0073] The concrete dam body 1 and the cementitious material dam body 2 can be used as rigid dam parts to conduct anti-sliding stability analysis at different elevations using the rigid body limit equilibrium method. The dam body stress analysis can be conducted using the material mechanics method or the finite element method. In addition to the reservoir water load, deadweight load, uplift pressure, etc. that the dam normally bears, the backfill material dam body 3 should also be used as the earth pressure load on the downstream side of the rigid dam part. The backfill material dam body 3 should be vibrated and compacted to a void ratio of no more than 22%. According to the design requirements of the rockfill dam, the stability, seepage, stress, strain and settlement of the backfill material should be analyzed based on the mechanical performance indicators of the backfill material.
[0074] Taking the 100-meter-high dam section as an example, the anti-seepage layer 11 accounts for about 0.7%, the concrete dam body 1 accounts for about 8%, the cement dam body 2 accounts for about 17%, the backfill dam body 3 accounts for about 70%, and the protective layer 4 accounts for about 4.3%; the required cement consumption accounts for about 0.13% of the total dam body. Compared with concrete dams of the same height, the cement consumption can be saved by more than 80%; compared with panel rockfill dams of the same height, under the condition of similar cement consumption, the dam body land occupation, excavation and total material consumption can be reduced by about 50%; therefore, the all-material dam 100 according to the embodiment of the present invention has significant economic benefits and is energy-saving and environmentally friendly.
[0075] Embodiment 2:
[0076] Reference Figure 3 In a certain project, gravel, weathered rock and fresh rock can be obtained from the riverbed section and the dam shoulder mountain through excavation. According to the preliminary geological survey, the proportion of hard rock in the excavated and mined materials is relatively high. The dam design is carried out by setting a concrete retaining wall 5 at the downstream dam toe.
[0077] In the second embodiment, the design scheme of the concrete dam body 1, the cement dam body 2, and the backfill dam body 3 is basically the same as that in the first embodiment, except that: in the second embodiment, a retaining wall 5 (such as a concrete retaining wall) of a predetermined height (such as a height of 25m, etc.) is set on the downstream side of the backfill dam body 3 to reduce the area occupied by the dam. The upstream side of the retaining wall 5 adopts a stepped scheme with a slope ratio of 1:0.45, and the downstream side of the retaining wall 5 adopts a slope with a slope ratio of 1:0.2. The retaining wall 5 adopts a design number of C 90 15% rockfill concrete material. In addition to analyzing the stability, stress, deformation, seepage, settlement, etc. of the concrete dam body 1, the cementing material dam body 2 and the backfill material dam body 3 according to the scheme in Example 1, the stability and stress of the retaining wall 5 on the downstream side against the earth pressure load of the backfill material dam body 3 should also be analyzed. Calculated based on a 100-meter-high dam section, the total material required for the dam body is saved by 5%, and the dam area is saved by 23%.
[0078] The all-material dam 100 according to the embodiment of the present invention can be built using various natural excavated and mined stones, gravel, soil or mixed materials. Its basic cross-section is a triangle, and from the upstream side to the downstream side, it is a concrete dam body 1, a binder dam body 2, a backfill material dam body 3, and a protective layer 4. Each part should be reasonably designed according to the type and quantity of raw materials and the stability and stress of the dam structure to achieve material acquisition on demand, balanced excavation and construction, and dam construction in situ.
[0079] Among them, the concrete dam body 1 can be rockfill concrete, roller-compacted concrete or normal concrete; the binder dam body 2 can be cemented rockfill or cemented gravel; the backfill dam body 3 can be earth and stone, gravel or backfill earth and stone, gravel mixed with cementitious materials; the protective layer 4 can be rockfill concrete or cemented rockfill.
[0080] The all-material dam 100 according to the embodiment of the present invention can be built on a soft foundation and a covering layer, can resist flooding, has excellent safety, can fully use various natural building materials, basically achieves no waste, and has outstanding environmental benefits.
[0081] Other structures and operations of the full-material dam 100 according to the embodiment of the present invention are known to those skilled in the art and will not be described in detail here.
[0082] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0083] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0084] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. A full-material dam (100), characterized in that: The all-material dam (100) is constructed using various naturally excavated and mined stones, gravel, soil or mixed materials. The all-material dam (100) comprises: A dam body, the dam body comprising a concrete dam body (1), a binder dam body (2) and a backfill dam body (3); the concrete dam body (1) is located on the upstream side of the binder dam body (2) and connected to the binder dam body (2), the backfill dam body (3) is located on the downstream side of the binder dam body (2) and connected to the binder dam body (2), An anti-seepage layer (11), the anti-seepage layer (11) being arranged on the upstream surface of the concrete dam body (1); A protective layer (4), the protective layer (4) being arranged on the downstream surface of the backfill material dam body (3), the thickness of the protective layer (4) being not less than 0.5 m; The upstream side of the cementitious material dam body (2) is tightly connected to the downstream side of the concrete dam body (1) to form a whole, and the upstream side of the backfill material dam body (3) is tightly connected to the downstream side of the cementitious material dam body (2) to form a whole; The boundary portion between the concrete dam body (1) and the binder dam body (2) and the boundary portion between the binder dam body (2) and the backfill material dam body (3) form a transition zone (9). The concrete dam body (1) and the binder dam body (2) are in close contact with each other in an irregular bite shape (10), and are integrally constructed without leaving any construction joints; The binder dam body (2) and the backfill material dam body (3) are in close contact with each other in an irregular bite shape (10), and are integrally constructed without leaving any construction joints.
2. The all-material dam (100) according to claim 1, characterized in that: The upstream surface of the dam body is configured as a vertical surface; or, the upstream surface of the dam body is configured as an inclined surface inclined toward the downstream side; or, the upstream surface of the dam body is configured to include a vertical surface and an inclined surface inclined toward the downstream side; When the upstream surface of the dam body includes an inclined surface, the slope ratio of the upstream surface is a single slope ratio, or the upstream surface is composed of multiple slope ratios.
3. The all-material dam (100) according to claim 1, characterized in that: The all-material dam also includes: A retaining wall (5), wherein the retaining wall (5) is arranged at the downstream toe of the dam body, the upstream side of the retaining wall (5) is constructed as a stepped structure, and the downstream side of the retaining wall (5) is constructed as an inclined surface.
4. The all-material dam (100) according to claim 1, characterized in that: The all-material dam also includes: An overflow dam section, the overflow dam section being arranged on the downstream surface of the concrete dam body (1) and / or the binder dam body (2), the overflow dam section being formed with overflow holes, and the downstream surface of the overflow dam section being configured as an overflow surface (6); A gate pier (7) is provided on the top of the dam body, and a guide wall (8) is provided on the side of the overflow surface (6).
5. The all-material dam (100) according to claim 1, characterized in that: The upstream surface of the concrete dam body (1) is configured as a vertical surface; or the upstream surface of the concrete dam body (1) is configured as an inclined surface inclined toward the downstream side; When the upstream surface of the concrete dam body (1) is constructed as an inclined surface inclined toward the downstream side, the slope ratio of the upstream surface is 1:0-1:0.3, the slope ratio of the upstream surface is a single slope ratio, or the upstream surface includes multiple slope ratios; The downstream side boundary of the concrete dam body (1) is configured as a vertical surface; or, the downstream side boundary of the concrete dam body (1) is configured as an inclined surface inclined toward the upstream side; or, the downstream side boundary of the concrete dam body (1) is configured as a step-shaped surface; When the downstream side boundary of the concrete dam body (1) is configured to be inclined toward the upstream side, the slope ratio of the downstream side boundary is 1:0-1:0.8, the slope ratio of the downstream side boundary is a single slope ratio, or the downstream side boundary includes multiple slope ratios; The concrete dam body (1) is provided with transverse joints, water-stopping facilities are provided between two adjacent transverse joints, and the spacing between the transverse joints is not less than a predetermined width; The strength grade of the concrete dam body (1) material is C10-C50, and the concrete dam body (1) is at least one of rockfill concrete, roller compacted concrete or normal concrete.
6. The all-material dam (100) according to claim 1, characterized in that: The downstream side boundary of the cementitious material dam body (2) is configured to be inclined toward the upstream side, the slope ratio of the cementitious material dam body (2) is 1:0-1:1, the slope ratio of the cementitious material dam body (2) is a single slope ratio, or the slope ratio of the cementitious material dam body (2) includes multiple slope ratios; Alternatively, the downstream side boundary of the cementitious material dam body (2) is constructed in a step shape; The strength grade of the binder in the binder dam body (2) is C2-C15, the binder is fully cemented or partially cemented, and the binder is cemented rockfill, cemented gravel or cemented soil.
7. The all-material dam (100) according to claim 1, characterized in that: The downstream side boundary of the backfill material dam body (3) is configured to be inclined toward the upstream side, the slope ratio of the backfill material dam body (3) is 1:1-1:2.5, the slope ratio of the backfill material dam body (3) is a single slope ratio, or the slope ratio of the backfill material dam body (3) includes multiple slope ratios; The backfill material in the backfill dam body (3) is at least one of rockfill material, earth and stone material, sand and gravel material or earth material.
8. The all-material dam (100) according to claim 1, characterized in that: The concrete dam body (1) and the cementitious material dam body (2) can be used as an integral rigid dam to carry out anti-sliding stability analysis and stress analysis during the construction period and the operation period. In addition to considering the conventional load of the dam during the analysis, the earth pressure load generated by the backfill material dam body (3) on it should also be considered.
9. The all-material dam (100) according to claim 1, characterized in that: The backfill dam body (3) should be subjected to stability, seepage, stress, strain and settlement analysis during the construction and operation periods according to the performance of the backfill material and the requirements of earth dams, earth-rock dams and rockfill dams; When the stability, strength, modulus and deformation of the backfill material dam body (3) cannot meet the design requirements, a grouting and bonding method is used to improve the corresponding performance.
10. The all-material dam (100) according to claim 1, characterized in that: The concrete dam body (1) is directly constructed on a foundation not less than the requirements of a weakly weathered rock foundation; The cementitious material dam body (2) is directly constructed on a foundation not less than the requirements of a strongly weathered rock foundation; When the construction foundations of the concrete dam body (1) and the cementitious material dam body (2) do not meet the requirements, reinforcement measures should be taken; The foundation of the backfill material dam body (3) is a rock foundation, a gravel cover layer or a soil foundation.
11. The all-material dam (100) according to claim 3, characterized in that: Among the excavated and mined materials, the stones with a hardness not lower than that of the harder rocks shall be used first for the concrete dam body (1), the protective layer (4) and the retaining wall (5) at the toe of the dam; Softer rock and soft rock materials, gravel, earth and stone materials are used for cementing material dam body (2) and backfill material dam body (3); The anti-seepage layer (11) is concrete, geomembrane or polyurea; The anti-seepage layer (11) and the concrete dam body (1) are cast in an integrated manner; The protective layer (4) is made of concrete or fully cemented cemented rockfill.