A small tunnel advance grouting conduit and construction method
By installing a pressurizing component in the small advance grouting conduit, the problem of insufficient slurry outflow caused by too small grouting holes or insufficient pressure is solved, significantly improving the grouting effect, enhancing the stability of the surrounding rock, and ensuring tunnel excavation. Process safety.
Patent Information
- Application Number
- CN202010980488.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-17
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2040-09-17
AI Technical Summary
When the grouting hole is too small or the grouting pressure is insufficient in the existing small advance grouting conduit, less grout will flow out, affecting the grouting effect and resulting in insufficient stability of the surrounding rock.
A small tunnel advance grouting conduit including a pressurized component is designed. Through the combination of top plug, connecting rod, push plate and feed pipe, the pressurized component is used to make the concrete flow out of the grouting hole more easily and improve grouting. Effect.
Through the design of the pressurized components, the grouting effect is significantly improved, the stability of the surrounding rock is enhanced, and the safety during tunnel excavation is ensured.
Smart Images

Figure CN112012749B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, in particular to a small tunnel advance grouting conduit and a construction method. Background Art
[0002] The advance small conduit is a process method in the tunneling construction process. It is mainly used for pre-support of weak broken zones with short self-stabilization time, shallow buried sections, portal biased sections, sand layers, gravel sections, fault broken zones and other sections. The small conduit originated from the construction of underground caverns using the New Austrian Tunneling Method. Its intention is to pre-construct an advance small conduit with an external insertion angle in the axial direction outside the tunnel design contour line at the front of the tunnel excavation in the weak surrounding rock section, grouting in the small conduit, and forming a relatively dense arch structure in the surrounding rock near the excavation contour line in advance through the diffusion of slurry. In addition, the radial force generated by the small conduit's own stiffness makes the grouting reinforced surrounding rock and the small conduit work together to form a relatively complete bearing body inside the cofferdam. This bearing body directly bears the surrounding rock stress redistribution caused by tunnel excavation to maintain the stability of the surrounding rock, thereby greatly reducing the risk of collapse during the excavation of weak surrounding rock. After the tunnel excavation was completed, the joint support construction of steel frame, system anchor rods, steel mesh hanging and shotcrete was carried out in a timely manner to ensure the safe and stable operation of the tunnel before the concrete secondary lining construction.
[0003] At present, the patent document with the authorization announcement number CN208502792U discloses a small duct for advanced grouting, including a duct body, the duct body has a length of 4.5m-5m, a diameter of 42mm-45mm, and a wall thickness of 4mm-6mm. The duct body includes a grouting section and a grouting stop section. The 30cm-40cm above the bottom of the duct body is the grouting stop section, and the grouting stop section is not provided with grouting holes. The grouting section is above the grouting stop section. The grouting section is provided with grouting holes along the axis of the duct body, and a number of cement mortar overflows are provided on the side wall of the grouting section of the duct body. After grouting, the small duct forms a good protective arch for the surrounding rock around the tunnel, which can ensure the stability of the surrounding rock and control the displacement caused by construction. However, when the grouting hole is too small or the grouting pressure is insufficient, less slurry flows out of the grouting hole, affecting the grouting effect. Summary of the invention
[0004] The purpose of the present invention is to provide a small tunnel advance grouting conduit and a construction method, which can make concrete flow out of the grouting hole more easily by setting a pressure component, and the grouting effect is better, thereby enhancing the stability of the surrounding rock.
[0005] The above-mentioned object of the present invention is achieved through the following technical solutions:
[0006] A small tunnel advance grouting catheter comprises a tube head and a tube body, which are integrally arranged. A pressurizing assembly is arranged at one end of the tube body away from the tube head. The pressurizing assembly comprises a top plug, a connecting rod, a push plate and a feed pipe. The top plug is located inside the tube body. One end of the connecting rod is fixedly connected to the side wall of the top plug away from the tube head. The length direction of the connecting rod is parallel to the length direction of the tube body. The other end of the connecting rod is fixedly connected to the push plate. The feed pipe is fixedly connected to the end of the push plate away from the connecting rod. Through holes are provided on the side walls where the push plate and the top plug are connected to the connecting rod. The connecting rod is also provided with through holes along its length direction. The through holes run through the inside of the connecting rod. The through holes are interconnected. The feed pipe is connected to the tube body through the through holes.
[0007] Preferably, threaded steel bars are arranged in the tube body, and the threaded steel bars are passed through the tube body along the length direction of the tube body, and one end of the threaded steel bars extends into the connecting rod through the through hole on the top plug.
[0008] Preferably, the feed pipe is arranged in an L-shape, and the feed port is arranged at the vertical end of the feed pipe.
[0009] Preferably, a thread is provided on the outer side wall of the feed port end of the feed pipe, a screw cap is threadedly connected to the feed pipe, and anti-slip grooves are provided on the outer wall of the screw cap.
[0010] Preferably, the tube head is configured to be conical, and an external thread is provided on the outer side wall of the tube head.
[0011] Preferably, the pipe body is a hot-rolled seamless steel pipe with a diameter of 42mm or 50mm and a wall thickness of 5mm, with a length of 2-6m. Plum blossom-shaped grouting holes are evenly arranged in the middle of the pipe body. The diameter of the grouting holes is 8mm, the hole spacing is 15cm, and no holes are drilled in the tail 40-60cm of the pipe body. At the same time, a steel bar with a diameter of 6mm is welded at the tail of the pipe body to form a steel reinforcement hoop, and the diameter of the threaded steel bar is 20-22mm.
[0012] Preferably, the top plug is set to be cylindrical, and a protective layer is fixedly provided on the side wall where the top plug contacts the inner wall of the tube body, the protective layer abuts against the side wall of the tube body, and the protective layer is made of rubber material.
[0013] The present invention also discloses a construction method of a small tunnel advance grouting conduit. The method is based on the above-mentioned small tunnel advance grouting conduit, and the method comprises the following steps:
[0014] S1: Construction Preparation
[0015] Prepare in advance the tunnel advance grouting small conduit, grouting pipe, ordinary Portland cement with PO42.5 for grouting, YT-28 hand pneumatic drill, 20m3 air compressor, 3SNS grouting pump, high-speed slurry making machine, double-layer slurry storage mixer, 1000L slurry storage barrel, hydrometer, and automatic recorder;
[0016] S2: Lofting and drilling
[0017] The small conduit drilling construction is carried out according to the small conduit construction scope and related parameters required by the design drawings. Before construction, the face is first sealed with sprayed concrete, and then a YT-28 hand drill is used to drill holes through the erected steel frame. The hole diameter is 50mm and the spacing is carried out according to the design requirements;
[0018] S3: Installation of small ducts
[0019] After the drilling is completed, the small conduit is installed into the hole. During the installation process, for soft surrounding rocks, the small conduit is directly driven into the hole by hammering or hand-held pneumatic drill; for sandy soil, a 20mm diameter steel pipe is used to make a blow pipe, which is slowly inserted into the hole and perforated with high-pressure air. After the hole is formed, the small conduit is inserted;
[0020] S4: Small duct grouting
[0021] Before grouting the small conduit, high-pressure air is used to flush the pipe to ensure that there is no accumulation in the pipe, and at the same time, the grouting holes on the small conduit are unobstructed to facilitate the grouting pressure into the surrounding rock; due to the external insertion angle during the construction of the small conduit, when grouting, open the screw cap and inject grout from the feed port end of the feed pipe. After grouting, push the push plate, and the top plug will pressurize the slurry in the pipe body, making it easier for the slurry to flow out of the grouting hole. Grouting uses a grouting pump. The water-cement ratio of the grouting slurry is recommended to be 0.7:1-1:1. The grouting pressure is controlled at 0.5-1.0MPa. The final pressure reaches 1MPa and lasts for 10 minutes to end the grouting. After the grouting is completed, tighten the screw cap; if the groundwater is abundant, cement-water glass double liquid grouting can be used;
[0022] S5: Serous and other strong
[0023] After the small-diameter grouting is completed, the drilling and blasting construction will begin after the strength reaches the design requirements, and the slurry strength is determined by testing.
[0024] Preferably, the drilling depth in step S2 is greater than the length of the small conduit, and when hammering or drilling is used in step S3, the insertion length is not less than 90% of the tube length, and the overlapping length of the front and rear rows of small conduits is not less than 1.0 m.
[0025] Preferably, the step S4 strictly controls the grouting mix ratio and initial setting time. After the initial selection of the mix ratio, the mix ratio is adjusted by controlling the initial setting time, and the strength of the solidified body is measured to select the best mix ratio. The grouting pressure increases from small to large, from the initial 0 MPa to the final pressure of 1.0 MPa, and the pressure is maintained for 10 minutes. When the flow meter shows that the grouting amount is small, the grouting is terminated. To ensure the quality of grouting, the excavation surface can be closed if necessary.
[0026] In summary, the beneficial technical effects of the present invention are:
[0027] A pressurizing assembly is provided at the end of the pipe body away from the pipe head, the pressurizing assembly includes a top plug, a connecting rod, a push plate and a feed pipe, the top plug is located inside the pipe body, one end of the connecting rod is fixedly connected to the side wall of the top plug away from the pipe head, the length direction of the connecting rod is parallel to the length direction of the pipe body, the other end of the connecting rod is fixedly connected to the push plate, the feed pipe is fixedly connected to the end of the push plate away from the connecting rod, through holes are provided on the side walls where the push plate and the top plug are connected to the connecting rod, the connecting rod is also provided with through holes along its length direction, the through holes penetrate the inside of the connecting rod, the through holes are interconnected, the feed pipe is connected to the pipe body through the through holes, and by providing the pressurizing assembly, concrete can flow out of the grouting hole more easily, the grouting effect is better, and the stability of the surrounding rock is enhanced. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0029] Figure 2 It is a schematic diagram of the internal structure of the present invention;
[0030] Figure 3 yes Figure 2 A partial enlarged schematic diagram of part A;
[0031] Figure 4 It is a flow chart of the construction method of the present invention.
[0032] In the figure, 1, pipe head; 2, pipe body; 21, grouting hole; 22, reinforcing rib; 3, top plug; 31, protective layer; 4, connecting rod; 5, push plate; 6, feed pipe; 7, screw cap; 8, threaded steel; 9, through hole. DETAILED DESCRIPTION
[0033] The present invention is further described in detail below in conjunction with the accompanying drawings.
[0034] refer to Figure 1-Figure 4 , is a small conduit for tunnel advance grouting disclosed by the present invention, including a pipe head 1 and a pipe body 2. The pipe head 1 and the pipe body 2 are integrally arranged. The pipe head 1 is 10 cm long and is set in a conical shape. The outer wall of the pipe head 1 is provided with an external thread, which makes it easier to insert the small conduit into the drilled hole. The pipe body 2 adopts a hot-rolled seamless steel pipe with a diameter of 50 mm and a wall thickness of 5 mm. The pipe body 2 is 2-6 m long. Plum blossom-shaped grouting holes 21 are evenly arranged in the middle of the pipe body 2, and the slurry flows out from the grouting holes 21. The aperture of the grouting hole 21 is 8 mm, and the hole spacing is 15 cm. The tail 50 cm of the pipe body 2 is not drilled to prevent leakage during the grouting process. At the same time, a steel bar with a diameter of 6 mm is welded at the tail of the pipe body 2 to form a steel reinforcement hoop, which plays the role of overlapping the front and rear rows of small conduits.
[0035] A pressurizing assembly is provided at one end of the tube body 2 away from the tube head 1, and the pressurizing assembly includes a top plug 3, a connecting rod 4, a push plate 5 and a feed pipe 6. The top plug 3 is located inside the tube body 2, and the top plug 3 is set in a cylindrical shape. A protective layer 31 is fixedly provided on the side wall of the top plug 3 that contacts the inner wall of the tube body 2. The protective layer 31 abuts against the side wall of the tube body 2. The protective layer 31 is made of rubber material. By setting the protective layer 31, the side wall of the top plug 3 fits more closely with the inner wall of the tube body 2, preventing the slurry from flowing out from the gap between the two, and protecting the side wall of the top plug 3 from wear and tear between the inner wall of the tube body 2. One end of the connecting rod 4 is fixedly connected to the side wall of the top plug 3 away from the tube head 1, and the length direction of the connecting rod 4 is parallel to the length direction of the tube body 2. The other end of the connecting rod 4 is fixedly connected to the push plate 5, and the feed pipe 6 is fixedly connected to the end of the push plate 5 away from the connecting rod 4. The feed pipe 6 is set in an L-shape, and the feed port is set at the vertical end of the feed pipe 6. At the same time, a thread is provided on the outer wall of the feed port end of the feed pipe 6, and a screw cap 7 is threadedly connected to the feed pipe 6, and an anti-slip pattern is provided on the outer wall of the screw cap 7. By setting the feed pipe 6 to be L-shaped and adding the screw cap 7, the slurry is prevented from overflowing from the feed port end of the feed pipe 6 during the pressurization process. Through holes 9 are provided on the side walls where the push plate 5 and the top plug 3 are connected to the connecting rod 4. The connecting rod 4 is also provided with through holes 9 along its length direction. The through holes 9 penetrate the interior of the connecting rod 4, and each through hole 9 is connected to each other. The feed pipe 6 is connected to the pipe body 2 through the through holes 9, and grouting can be injected into the pipe body 2 through the feed port end of the feed pipe 6. Threaded steel bars 8 are provided in the pipe body 2, and the diameter of the threaded steel bars 8 is 20-22 mm. The threaded steel bars 8 are penetrated in the pipe body 2 along the length direction of the pipe body 2 to strengthen the strength of the small conduit. One end of the threaded steel bar 8 extends into the connecting rod 4 through the through hole 9 on the top plug 3, and will not hinder the movement of the top plug 3 when pushing the top plug 3. When grouting into the pipe body 2, unscrew the screw cap 7, inject the slurry from the feed port end of the feed pipe 6, and the slurry will flow through the push plate 5, the connecting rod 4 and the top plug 3 along the feed pipe 6 and the through hole 9 in turn, and then flow into the pipe body 2. After grouting for a period of time, tighten the screw cap 7, tamp the push plate 5 toward the top plug 3, and the slurry in the pipe body 2 will flow out of the grouting hole 21 more easily under the pressure of the top plug 3, so that the grouting effect is better.
[0036] The present invention also discloses a construction method of a small tunnel advance grouting conduit. The method is based on the above-mentioned small tunnel advance grouting conduit, and the method comprises the following steps:
[0037] S1: Construction Preparation
[0038] Prepare in advance the tunnel advance grouting small conduit, grouting pipe, ordinary Portland cement with PO42.5 for grouting, YT-28 hand pneumatic drill, 20m3 air compressor, 3SNS grouting pump, high-speed slurry making machine, double-layer slurry storage mixer, 1000L slurry storage barrel, hydrometer, and automatic recorder;
[0039] S2: Lofting and drilling
[0040] The small conduit drilling construction is carried out according to the small conduit construction scope and related parameters required by the design drawings. Before construction, the face is first sealed with sprayed concrete, and then a YT-28 hand drill is used to drill holes through the erected steel frame. The hole diameter is 50mm, the spacing is carried out according to the design requirements, and the drilling depth is greater than the length of the small conduit;
[0041] S3: Installation of small ducts
[0042] After the drilling is completed, the small conduit is installed into the hole. During the installation of the small conduit, for weak surrounding rocks, the small conduit is directly driven into the hole by hammering or hand pneumatic drill. When hammering or drilling rig is used, the insertion length shall not be less than 90% of the tube length, and the overlap length of the front and rear rows of small conduits shall not be less than 1.0m; for sandy soil, a 20mm diameter steel pipe is used to make a blow pipe, which is slowly inserted into the hole and perforated with high-pressure air. After the hole is formed, the small conduit is inserted;
[0043] S4: Small duct grouting
[0044] Before grouting the small conduit, high-pressure air is used to flush the pipe to ensure that there is no accumulation in the pipe, and at the same time, the grouting hole 21 on the small conduit is unobstructed to facilitate the grouting pressure into the surrounding rock; due to the external insertion angle during the construction of the small conduit, when grouting, the screw cap 7 is opened, and grouting is performed from the feed port end of the feed pipe 6. After grouting, the push plate 5 is pushed, and the top plug 3 will pressurize the slurry in the pipe body 2, making it easier for the slurry to flow out of the grouting hole 21. A grouting pump is used for grouting. The water-binder ratio of the grouting slurry is recommended to be 0.7:1. The grouting pressure is controlled at 0.8MPa, and the final pressure reaches 1M Pa and continue for 10 minutes before grouting. During grouting, the grouting mix ratio and initial setting time need to be strictly controlled. After the initial selection of the mix ratio, the initial setting time is used to control and adjust the mix ratio, and the strength of the coagulation body is measured to select the best mix ratio; the grouting pressure increases from small to large, from the initial 0MPa to the final pressure of 1.0MPa, and the pressure is stabilized for 10 minutes. When the flow meter shows that the grouting volume is small, the grouting is ended; to ensure the quality of grouting, the excavation surface can be closed if necessary, and the screw cap can be tightened after the grouting is completed 7; if the groundwater is abundant, cement-water glass double liquid grouting can be used. During the grouting process, a dedicated person records the grouting situation, and adjusts the grouting pressure and progress according to the actual situation to ensure the grouting effect; after completion, the grouting effect is inspected, and those that are unqualified must be supplemented;
[0045] S5: Serous and other strong
[0046] After the small-diameter grouting is completed, the drilling and blasting construction will begin after the strength reaches the design requirements, and the slurry strength is determined by testing.
[0047] Obviously, the above embodiments are merely examples for clearly explaining the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. However, these obvious changes or modifications derived from the spirit of the present invention are still within the scope of protection of the present invention.
Claims
1. A small tunnel advance grouting conduit, comprising a conduit head and a conduit body, wherein the conduit head and the conduit body are integrally arranged, and characterized in that: A pressurizing component is provided at one end of the tube body away from the tube head; The pressurizing assembly includes a top plug, a connecting rod, a push plate and a feed pipe; the top plug is located inside the tube body, one end of the connecting rod is fixedly connected to the side wall of the top plug away from the tube head, the length direction of the connecting rod is parallel to the length direction of the tube body, the other end of the connecting rod is fixedly connected to the push plate, the feed pipe is fixedly connected to the end of the push plate away from the connecting rod, through holes are provided on the side walls where the push plate and the top plug are connected to the connecting rod, the connecting rod is also provided with through holes along its length direction, the through holes penetrate the inside of the connecting rod, the through holes are connected to each other, and the feed pipe is connected to the tube body through the through holes; The pipe body is provided with a threaded steel bar, which is passed through the pipe body along the length direction, and one end of the threaded steel bar extends into the connecting rod through the through hole on the top plug; The feed pipe is arranged in an L shape, and the feed port is arranged at the vertical end of the feed pipe; The outer wall of the feed port end of the feed pipe is provided with a thread, a screw cap is threadedly connected to the feed pipe, and an anti-slip pattern is provided on the outer wall of the screw cap; The pipe head is configured to be conical, and an external thread is provided on the outer side wall of the pipe head; The top plug is set in a cylindrical shape, and a protective layer is fixedly arranged on the side wall where the top plug contacts the inner wall of the tube body. The protective layer abuts against the side wall of the tube body, and the protective layer is made of rubber material.
2. A small tunnel advance grouting conduit according to claim 1, characterized in that: The pipe body is made of hot-rolled seamless steel pipe with a diameter of 42mm or 50mm and a wall thickness of 5mm, with a length of 2-6m. Plum blossom-shaped grouting holes are evenly arranged in the middle of the pipe body. The diameter of the grouting holes is 8mm, and the hole spacing is 15cm. No holes are drilled in the tail 40-60cm of the pipe body. At the same time, a steel bar with a diameter of 6mm is welded at the tail of the pipe body to form a steel reinforcement hoop, and the diameter of the threaded steel bar is 20-22mm.
3. A construction method for a small tunnel advance grouting conduit, characterized in that: The method is based on the tunnel advance grouting small conduit as claimed in claim 1 or 2, and the method comprises the following steps: S1: Construction Preparation Prepare in advance the tunnel advance grouting small conduit, grouting pipe, ordinary Portland cement with PO45.2 for grouting, YT-28 hand pneumatic drill, 20m3 air compressor, 3SNS grouting pump, high-speed slurry making machine, double-layer slurry storage mixer, 1000L slurry storage barrel, hydrometer, and automatic recorder; S2: Lofting and drilling Carry out small conduit drilling construction according to the small conduit construction scope and related parameters required by the design drawings; Before construction, the face is first sealed with sprayed concrete, and then a YT-28 hand drill is used to drill holes through the erected steel frame. The hole diameter is 50mm and the spacing is based on the design requirements. S3: Installation of small ducts After the drilling is completed, the small conduit is installed into the hole. During the installation process, for soft surrounding rocks, the small conduit is directly driven into the hole by hammering or hand-held pneumatic drill; for sandy soil, a 20mm diameter steel pipe is used to make a blow pipe, which is slowly inserted into the hole and perforated with high-pressure air. After the hole is formed, the small conduit is inserted; S4: Small duct grouting Before grouting the small conduit, high-pressure air is used to flush the pipe to ensure that there is no accumulation in the pipe, and at the same time, the grouting holes on the small conduit are unobstructed to facilitate the grouting pressure into the surrounding rock; due to the external insertion angle during the construction of the small conduit, when grouting, the screw cap is opened and grouting is injected from the feed port end of the feed pipe. After grouting, the push plate is pushed, and the top plug will pressurize the slurry in the pipe body, making it easier for the slurry to flow out of the grouting hole. Grouting uses a grouting pump, the water-cement ratio of the grouting slurry is 0.7:1-1:1, the grouting pressure is controlled at 0.5~1.0MPa, the final pressure reaches 1MPa and lasts for 10min to end the grouting, and the screw cap is tightened after the grouting is completed; if the groundwater is abundant, cement-water glass double liquid grouting is used; S5: Serous and other strong After the small pipe grouting is completed, the drilling and blasting construction will start after the strength reaches the design requirements. The slurry strength is determined by the test; in: The drilling depth in step S2 is greater than the length of the small conduit. When hammering or drilling is used in step S3, the insertion length is not less than 90% of the pipe length, and the overlap length of the front and rear rows of small conduits is not less than 1.0 m. The step S4 is to strictly control the grouting mix ratio and initial setting time. After the initial selection of the mix ratio, the mix ratio is adjusted by the initial setting time control, and the strength of the solidified body is measured to select the best mix ratio; the grouting pressure is increased from small to large, from the initial 0MPa to the final pressure of 1.0MPa, and the pressure is maintained for 10 minutes. When the flow meter shows that the grouting amount is small, the grouting is terminated; in order to ensure the quality of grouting, the excavation surface is closed.
Citation Information
Patent Citations
Crushed zone tunnel advance support is with leading double -deck ductule
CN208502792U
Cold excavation underpass flyover construction method
CN109611102A
Novel injection device used for model test
CN203310828U
Tunnel advanced grouting small conduit
CN212583692U