Heat pump unit coupled with water energy storage system

Through the combination of heat pump unit and single-tank inclined temperature storage tank, the combined supply of hot and cold and load balance is achieved, and the problems of lower heating capacity and high electricity price in air source heat pumps under cold conditions are solved, and the energy consumption of users is reduced Cost and system investment.

CN112013565BActive Publication Date: 2024-11-05STATE POWER INVESTMENT CORPORATION RESEARCH INSTITUTE
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN201910473034.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-05-31
Publication Date
2024-11-05
Estimated Expiration
2039-05-31

AI Technical Summary

Technical Problem

The existing air source heat pump has decreased in cold conditions, and the electricity consumption cost is high during peak periods where initial investment is high and electricity prices are expensive, making it difficult to effectively balance the hot and cold loads.

Method used

A heat pump unit coupled water energy storage and energy supply system is designed, including a heat pump unit and a single tank inclined temperature storage water tank. By switching the water circuit, the water pump and valve are used to adjust the water circuit flow direction, and multiple working modes are realized. To balance the hot and cold loads, reduce the capacity and energy consumption cost of the heat pump assembly machine.

Benefits of technology

It has achieved the constant output of the heat pump unit under cold conditions, balanced daily hot and cold loads, used valley power period to store cold and heat, and released hot and cold during peak periods, reducing the energy consumption cost of users and system operation costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112013565B_ABST
    Figure CN112013565B_ABST
Patent Text Reader

Abstract

The present application discloses a heat pump unit coupled with a water energy storage supply system, the heat pump unit coupled with a water energy storage supply system comprises: a heat pump unit, an energy storage water tank, a first interface, a second interface and a switching water circuit; the energy storage water tank, the second path of the heat exchanger of the heat pump unit, the first interface and the second interface are connected through the switching water circuit, so that the energy storage water tank, the second path of the heat exchanger, the second interface and the first interface can be selectively connected, and the switching water circuit has a water pump; the heat pump unit coupled with a water energy storage supply system has a first heating working mode, a second heating working mode, a first cooling working mode and a second cooling working mode. The heat pump unit coupled with a water energy storage supply system of the present application can balance the daytime cold / heat load, reduce the installed capacity of the heat pump unit, store cold / heat during the off-peak period, and release cold / heat during the daytime peak period, thereby reducing the energy cost of the user.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the field of energy supply technology, and specifically, relates to a heat pump unit coupled with a water energy storage supply system. Background Art

[0002] With the rapid economic development and urbanization in my country, more and more cities have planned various parks far away from the old urban areas. Since such parks are far away from the urban areas, if municipal heating is used, a long heating pipeline network needs to be laid. At the same time, the parks also have cooling needs, so it is necessary to invest in air conditioning systems. The initial investment is high and the energy efficiency is low.

[0003] Air source heat pump is an energy-saving device that uses high-level energy to make heat flow from low-level heat source air to medium-level heat source. It can provide both heating and cooling, and is very suitable for the heating and cooling of new parks. However, there are two problems with the use of air source heat pumps in related technologies: first, under cold conditions, the heating capacity of air source heat pumps drops significantly. To ensure heating, the unit capacity needs to be selected according to the outdoor calculated temperature for heating, which makes the initial investment huge; second, the heating and cooling demand of many parks is mainly during the day, which is during peak or normal periods, and the electricity price is relatively expensive. Summary of the invention

[0004] The present application aims to solve at least one of the technical problems existing in the prior art.

[0005] According to the embodiment of the present application, the heat pump unit coupled with the water storage energy supply system includes: a heat pump unit, an energy storage water tank, a first interface, a second interface and a switching water circuit, the first interface and the second interface are used to connect to the energy supply pipeline network; the energy storage water tank, the second path of the heat exchanger of the heat pump unit, the first interface, and the second interface are connected through the switching water circuit, so that the energy storage water tank, the second path of the heat exchanger, the second interface, and the first interface can be selectively connected, and the switching water circuit has a water pump; the heat pump unit coupled with the water storage energy supply system has a first heating working mode, a second heating working mode, a first cooling working mode, and a second cooling working mode. In the first heating working mode, the heat pump unit is turned on, the water pump is turned on, and the switching water circuit is configured to enable the first interface and the cold water port of the energy storage water tank to supply water to the second path of the heat exchanger, and the second path of the heat exchanger to the second interface, the first interface The hot water port of the energy storage water tank is supplied with water; in the second heating working mode, the heat pump unit is turned on, the water pump is turned on, and the switching water circuit is configured to enable the first interface to supply water to the cold water port of the energy storage water tank and the second path of the heat exchanger, and the hot water port of the energy storage water tank and the second path of the heat exchanger supply water to the second interface; in the first cooling working mode, the heat pump unit is turned on, the water pump is turned on, and the switching water circuit is configured to enable the second interface and the hot water port of the energy storage water tank to supply water to the second path of the heat exchanger, and the second path of the heat exchanger supplies water to the first interface and the cold water port of the energy storage water tank; in the second cooling working mode, the heat pump unit is turned on, the water pump is turned on, and the switching water circuit is configured to enable the second interface to supply water to the hot water port of the energy storage water tank and the second path of the heat exchanger, and the cold water port of the energy storage water tank and the second path of the heat exchanger supply water to the first interface.

[0006] The heat pump unit in the embodiment of the present application is coupled with a water energy storage supply system. By coupling the heat pump unit with an energy storage water tank, combined cooling and heating can be achieved. The energy storage water tank balances the daytime cooling / heat loads and reduces the installed capacity of the heat pump unit. It can store cooling / heat during off-peak hours and release cooling / heat during peak hours, thereby reducing the user's energy costs.

[0007] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0008] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0009] Figure 1 It is a structural principle diagram of a heat pump unit coupled with a water energy storage supply system according to one embodiment of the present application.

[0010] Reference numerals:

[0011] User 1, circulating pump 2, heat pump unit 3, first heat exchanger 4, expansion valve 5, second heat exchanger 6, compressor 7, water pump 8, energy storage tank 9, first inlet valve 10 of circulating pump water pump, first outlet valve 11 of circulating pump water pump, second inlet valve 12 of circulating pump water pump, second outlet valve 13 of circulating pump water pump, first main valve 14, second main valve 15, inlet valve 16 of second heat exchanger, outlet valve 17 of second heat exchanger, inlet valve 18 of first heat exchanger, outlet valve 19 of first heat exchanger, first inlet valve 20 of water pump, first outlet valve 21 of water pump, first return valve 22, second inlet valve 23 of water pump, second outlet valve 24 of water pump, second return valve 25. First main pipe 31, second main pipe 32, first interface 33, second interface 34, inlet branch pipe 35, outlet branch pipe 36, first energy supply pipe 37, second energy supply pipe 38, switching water circuit 40. DETAILED DESCRIPTION

[0012] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be understood as limiting the present application.

[0013] In the description of this application, it should be understood that a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0014] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0015] Reference below Figure 1 A heat pump unit coupled with a water energy storage supply system according to an embodiment of the present application is described.

[0016] like Figure 1 As shown, according to an embodiment of the present application, a heat pump unit coupled with a water energy storage supply system includes: a heat pump unit 3, an energy storage water tank 9, a first interface 33, a second interface 34 and a switching water circuit 40.

[0017] Among them, the heat pump unit 3 can be an air source heat pump, and the heat pump unit 3 includes: a first heat exchanger 4, a second heat exchanger 6, a compressor 7, and an expansion valve 5. The first path of the first heat exchanger 4, the compressor 7, the first path of the second heat exchanger 6, and the expansion valve 5 are connected end to end in sequence. One of the first heat exchanger 4 and the second heat exchanger 6 is used as an evaporator, and the other of the first heat exchanger 4 and the second heat exchanger 6 is used as a condenser. When the heat pump unit 3 is turned on, the working fluid absorbs heat in the evaporator and releases heat in the condenser.

[0018] In some embodiments, Figure 1 As shown, the heat exchange circulation loop of the heat pump unit 3 can be designed as a one-way type, that is, a reversing four-way valve is not provided. At this time, the first heat exchanger 4 serves as an evaporator, the second heat exchanger 6 serves as a condenser, and the second path of the first heat exchanger 4 and the second path of the second heat exchanger 6 can be selectively connected to the switching water path 40. When the heat pump unit 3 is required to provide heating, the second path of the second heat exchanger 6 is connected to the outside world, and when the heat pump unit 3 is required to provide cooling, the second path of the first heat exchanger 4 is connected to the outside world.

[0019] Of course, in other embodiments, the heat exchange circulation loop of the heat pump unit 3 may be provided with a reversing four-way valve, and only one of the first heat exchanger 4 and the second heat exchanger 6 can be connected to the outside world. When the heat pump unit 3 is required to provide heat, the heat exchanger connected to the outside world is used as a condenser by switching the four-way valve, and when the heat pump unit 3 is required to provide cooling, the heat exchanger connected to the outside world is used as an evaporator. For the convenience of description, the heat exchange circulation loop of the heat pump unit 3 is only a one-way type as an example for explanation.

[0020] The energy storage water tank 9 may include a single-tank thermocline energy storage water tank, which can store hot water and cold water at the same time. The principle is that the water density is different due to different water temperatures. In a sufficiently large container, due to gravity, hot and cold water with different densities are naturally layered, with hot water on the top and cold water on the bottom, forming a temperature transition layer of about 1m in the middle. Because the single-tank thermocline energy storage water tank 9 can store hot water and cold water at the same time, it is less expensive and saves space compared to multi-tank and multi-tank heat storage devices. The above-mentioned water tank can be a tank body, a box body, and a tank body.

[0021] The switching water circuit 40 may include a plurality of connected pipelines, a water pump 8 and a plurality of valves arranged in the pipelines, the water pump 8 being a booster pump, the water pump 8 being used to increase the water pressure of the switching water circuit 40, and the switching water circuit 40 may also be provided with a first interface 33 and a second interface 34, the first interface 33 and the second interface 34 being used to connect to the energy supply network, such as Figure 1As shown, the first interface 33 is connected to the first energy supply pipe 37, the second interface 34 is connected to the second energy supply pipe 38, and the first energy supply pipe 37 and the second energy supply pipe 38 are connected to each other. By adjusting the switch state of each valve of the switching water circuit 40, different connection relationships between the heat exchanger, the energy storage water tank 9, the second interface 34, and the first interface 33 and different water flow directions can be achieved.

[0022] The energy storage water tank 9, the second path of the heat exchanger of the heat pump unit 3, the first interface 33, the second interface 34, are connected by switching the water path 40, so that the energy storage water tank 9, the second path of the heat exchanger, the second interface 34, and the first interface 33 can be selectively connected. The heat exchanger of the heat pump unit 3 here can be the first heat exchanger 4 or the second heat exchanger 6 mentioned above.

[0023] Due to the setting of the above-mentioned switching water circuit 40, the heat pump unit coupled water energy storage supply system has a first heating working mode, a second heating working mode, a third heating working mode, a fourth heating working mode, a first cooling working mode, a second cooling working mode, a third cooling working mode, and a fourth cooling working mode.

[0024] In the first heating working mode, the heat pump unit 3 is turned on, and the heat pump unit 3 enters the heating mode, the water pump 8 is turned on, and the switching water circuit 40 is set to make the first interface 33 and the cold water port (lower port) of the energy storage tank 9 supply water to the second circuit of the heat exchanger, and the second circuit of the heat exchanger supplies water to the second interface 34 and the hot water port (upper port) of the energy storage tank 9.

[0025] It can be understood that during the period when the heat load is lower than the heating capacity of the heat pump unit 3, the heat pump unit coupled with the water energy storage supply system enters the first heating working mode. In the mode, the heating power of the heat pump unit 3 is greater than the required power of the heat load, and the energy storage tank 9 stores heat.

[0026] By utilizing the low-price electricity valley, thermal energy can be stored in the energy storage tank 9 in advance, so that the heat pump unit 3 can be kept in high-load operation.

[0027] In the second heating working mode, the heat pump unit 3 is turned on, the water pump 8 is turned on, and the switching water circuit 40 is configured to make the first interface 33 supply water to the cold water port of the energy storage water tank 9 and the second circuit of the heat exchanger, and the hot water port of the energy storage water tank 9 and the second circuit of the heat exchanger supply water to the second interface 34.

[0028] It can be understood that, during the period when the heat load is higher than the heating capacity of the heat pump unit 3, the heat pump unit coupled with the water energy storage supply system enters the second heating working mode. In the mode, the heating power of the heat pump unit 3 is less than the required power of the heat load, and the energy storage tank 9 releases heat, that is, the hot water in the energy storage tank 9 and the hot water produced by the heat pump unit 3 provide heat together.

[0029] In the third heating working mode, the heat pump unit 3 is turned on, the water pump 8 is turned on, at least one of the second interface 34 and the first interface 33 is cut off, and the switching water circuit 40 is set to make the cold water port of the energy storage water tank 9 supply water to the second circuit of the heat exchanger, and the second circuit of the heat exchanger supplies water to the hot water port of the energy storage water tank 9.

[0030] It is understandable that when the heat load is 0, if this is a valley electricity period, no heat is supplied to the user 1, and the low-cost valley electricity is used to drive the heat pump unit 3 to generate heat, and the energy storage tank 9 is used to store heat.

[0031] In the fourth heating working mode, the heat pump unit 3 is turned off, the water pump 8 is turned on, and the switching water circuit 40 is configured to make the first interface 33 supply water to the cold water port of the energy storage water tank 9, and the hot water port of the energy storage water tank 9 supplies water to the second interface 34.

[0032] It is understandable that when the electricity price is high, such as during peak hours, and there is a demand for heating, the heat pump unit 3 can be turned off and only the heat stored in the energy storage tank 9 can be used for heating.

[0033] In the first cooling working mode, the heat pump unit 3 is turned on and enters the cooling mode, the water pump 8 is turned on, and the switching water circuit 40 is set to make the second interface 34 and the hot water port of the energy storage tank 9 supply water to the second circuit of the heat exchanger, and the second circuit of the heat exchanger supplies water to the first interface 33 and the cold water port of the energy storage tank 9.

[0034] It can be understood that when the cooling load is lower than the cooling capacity of the heat pump, the heat pump unit coupled with the water energy storage supply system enters the first cooling operation mode. In this mode, the cooling power of the heat pump unit 3 is greater than the required power of the cooling load, and the energy storage tank 9 stores cold. By utilizing the low-price electricity valley, cold energy can be stored in the energy storage tank 9 in advance, so that the heat pump unit 3 can be kept in high-load operation.

[0035] In the second cooling working mode, the heat pump unit 3 is turned on, the water pump 8 is turned on, and the switching water circuit 40 is configured to make the second interface 34 supply water to the hot water port of the energy storage tank 9 and the second circuit of the heat exchanger, and the cold water port of the energy storage tank 9 and the second circuit of the heat exchanger supply water to the first interface 33.

[0036] It can be understood that, during the period when the cooling load is higher than the cooling capacity of the heat pump unit 3, the heat pump unit coupled with the water energy storage supply system enters the second cooling working mode. In the mode, the cooling power of the heat pump unit 3 is less than the required power of the cooling load, and the energy storage tank 9 cools down, that is, the cold water in the energy storage tank 9 and the cold water produced by the heat pump unit 3 provide cooling together.

[0037] In the third cooling working mode, the heat pump unit 3 is turned on, the water pump 8 is turned on, one of the second interface 34 and the first interface 33 is cut off, and the switching water circuit 40 is set to make the hot water port of the energy storage water tank 9 supply water to the second circuit of the heat exchanger, and the second circuit of the heat exchanger supplies water to the cold water port of the energy storage water tank 9.

[0038] It is understandable that when the cooling load is 0, if this is the off-peak electricity period, no cooling is provided to the user 1, and the low-cost off-peak electricity is used to drive the heat pump unit 3 to produce cooling, and the energy storage tank 9 is used to store cold.

[0039] In the fourth cooling working mode, the heat pump unit 3 is turned off, the water pump 8 is turned on, and the switching water circuit 40 is configured to make the second interface 34 supply water to the hot water port of the energy storage tank 9, and the cold water port of the energy storage tank 9 supplies water to the first interface 33.

[0040] It is understandable that when the electricity price is high, such as during peak hours, and there is a demand for cooling, the heat pump unit 3 can be turned off, and only the cold storage in the energy storage tank 9 can be used for cooling.

[0041] The heat pump unit 3 of the embodiment of the present application is coupled with a water energy storage supply system. By coupling the heat pump unit 3 with the energy storage tank 9, combined heat and cold can be provided. The energy storage tank 9 balances the daytime cold / heat load and reduces the installed capacity of the heat pump unit 3. It can store cold / heat during valley power periods and release cold / heat during peak power periods during the day, thereby reducing the energy cost of user 1.

[0042] In some embodiments of the present application, Figure 1 As shown, the heat pump unit 3 coupled to the water energy storage supply system further includes a first energy supply pipe 37 connected to the first interface 33 , a second energy supply pipe 38 connected to the second interface 34 , and a circulation pump 2 .

[0043] The inlet end of the circulation pump 2 is connected to the first energy supply pipe 37, and the outlet end of the circulation pump 2 is connected to the first energy supply pipe 37 through the first branch pipe and the second branch pipe. The connecting port of the first branch pipe and the first energy supply pipe 37 and the connecting port of the second branch pipe and the first energy supply pipe 37 are respectively arranged on both sides of the connecting port of the inlet end of the circulation pump 2 and the first energy supply pipe 37. The connecting port of the inlet end of the circulation pump 2 and the first energy supply pipe 37 is located between the connecting port of the first branch pipe and the first energy supply pipe 37 and the first interface 33, and the connecting port of the second branch pipe and the first energy supply pipe 37 is located between the connecting port of the inlet end of the circulation pump 2 and the first energy supply pipe 37 and the first interface 33.

[0044] A first inlet valve 10 of a circulating pump water pump is provided between the connecting port of the first branch pipe and the first energy supply pipe 37, and between the inlet end of the circulating pump 2 and the connecting port of the first energy supply pipe 37; a second inlet valve 12 of a circulating pump water pump is provided between the connecting port of the second branch pipe and the first energy supply pipe 37, and between the inlet end of the circulating pump 2 and the connecting port of the first energy supply pipe 37; a first outlet valve 11 of a circulating pump water pump is provided on the first branch pipe, and a second outlet valve 13 of a circulating pump water pump is provided on the second branch pipe.

[0045] Through the design of the above structure, the flow direction at the first joint, the second joint, the first energy supply pipe 37 and the second energy supply pipe 38 can be switched by adjusting the state of each valve, so as to realize cooling or heating for the user 1. In the heating working mode, the first inlet valve 10 of the circulating pump water pump and the second outlet valve 13 of the circulating pump water pump are opened, and the first joint is used as a return water joint; in the cooling working mode, the second inlet valve 12 of the circulating pump water pump and the first outlet valve 11 of the circulating pump water pump are opened, and the first joint is used as a water supply joint.

[0046] Some structural forms of the switching water channel 40 are described below.

[0047] When the heat exchange circulation loop of the heat pump unit 3 is a one-way type, the switching water circuit 40 further includes: a first heat exchanger inlet valve 18 , a first heat exchanger outlet valve 19 , a second heat exchanger inlet valve 16 , and a second heat exchanger outlet valve 17 .

[0048] The first heat exchanger inlet valve 18 is connected to the inlet end of the second circuit of the first heat exchanger 4, the first heat exchanger outlet valve 19 is connected to the outlet end of the second circuit of the first heat exchanger 4, the second heat exchanger inlet valve 16 is connected to the inlet end of the second circuit of the second heat exchanger 6, and the second heat exchanger outlet valve 17 is connected to the outlet end of the second circuit of the second heat exchanger 6.

[0049] By adjusting the states of each valve, the heating mode and cooling mode of the heat pump unit 3 can be coordinated. When the heat pump unit 3 is in the heating mode, the second heat exchanger inlet valve 16 and the second heat exchanger outlet valve 17 are opened, and the first heat exchanger inlet valve 18 and the first heat exchanger outlet valve 19 are closed; when the heat pump unit 3 is in the cooling mode, the second heat exchanger inlet valve 16 and the second heat exchanger outlet valve 17 are closed, and the first heat exchanger inlet valve 18 and the first heat exchanger outlet valve 19 are opened.

[0050] like Figure 1 As shown, the switching water path 40 further includes an inlet branch pipe 35 and an outlet branch pipe 36 .

[0051] The inlet branch pipe 35 is connected between the first main pipe 31 and the second main pipe 32, and the first interface 33 is provided on the first main pipe 31. The first main pipe 31 is connected between the cold water port of the energy storage water tank 9 and the water inlet of the second path of the heat exchanger, and the first interface 33 is provided on the first main pipe 31; the second main pipe 32 is connected between the hot water port of the energy storage water tank 9 and the water outlet of the second path of the heat exchanger, and the second interface 34 is provided on the second main pipe 32.

[0052] A first water pump inlet valve 20 is provided between the inlet of the water pump 8 and the cold water port of the energy storage tank 9, a second water pump inlet valve 23 is provided between the inlet of the water pump 8 and the hot water port of the energy storage tank 9, a first water pump outlet valve 21 is provided between the outlet of the water pump 8 and the first interface 33, and a second water pump outlet valve 24 is provided between the outlet of the water pump 8 and the second interface 34.

[0053] In the first heating working mode and the second cooling working mode, the first inlet valve 20 of the water pump and the first outlet valve 21 of the water pump are opened, the second inlet valve 23 of the water pump and the second outlet valve 24 of the water pump are closed, and the second main pipe 32 is connected; in the second heating working mode and the first cooling working mode, the first inlet valve 20 of the water pump and the first outlet valve 21 of the water pump are closed, the second inlet valve 23 of the water pump and the second outlet valve 24 of the water pump are opened, and the first main pipe 31 is connected.

[0054] The first inlet valve 20 of the water pump can be connected between the cold water port of the energy storage tank 9 and the inlet of the water pump 8 through an independently set branch, the second inlet valve 23 of the water pump can be connected between the inlet of the water pump 8 and the hot water port of the energy storage tank 9 through an independently set branch, the first outlet valve 21 of the water pump can be connected between the outlet of the water pump 8 and the first interface 33 through an independently set branch, and the second outlet valve 24 of the water pump can be connected between the outlet of the water pump 8 and the second interface 34 through an independently set branch.

[0055] Of course, the structure of the switching water channel 40 can also be simplified by designing the inlet branch pipe 35 and the outlet branch pipe 36 .

[0056] like Figure 1 As shown, the inlet branch pipe 35 is connected between the first main pipe 31 and the second main pipe 32, the first inlet valve 20 of the water pump and the second inlet valve 23 of the water pump are both arranged on the inlet branch pipe 35, the inlet of the water pump 8 is connected to the inlet branch pipe 35, and the inlet of the water pump 8 is connected between the first inlet valve 20 of the water pump and the second inlet valve 23 of the water pump;

[0057] The outlet branch pipe 36 is connected between the first main pipe 31 and the second main pipe 32, the first outlet valve 21 and the second outlet valve 24 of the water pump are both arranged on the outlet branch pipe 36, the outlet of the water pump 8 is connected to the outlet branch pipe 36, and the outlet of the water pump 8 is connected between the first outlet valve 21 and the second outlet valve 24 of the water pump.

[0058] A one-way valve may be provided between the outlet of the water pump 8 and the outlet branch pipe 36 , and the one-way valve is unidirectional from the water pump 8 to the outlet branch pipe 36 .

[0059] The connection between the inlet branch pipe 35 and the first main pipe 31 and the second main pipe 32 is located at a side close to the energy storage tank 9 relative to the connection between the outlet branch pipe 36 and the first main pipe 31 and the second main pipe 32, and the connection between the outlet branch pipe 36 and the first main pipe 31 and the second main pipe 32 is located at a side close to the energy storage tank 9 of the first interface 33 and the second interface 34. In this way, the total length of the entire switching water circuit 40 is shortened, and the connection relationship between the pipes is clear.

[0060] As shown in the figure, the first main pipe 31 is provided with a first water return valve 22, and the first water return valve 22 is connected between the connection between the inlet branch pipe 35 and the first main pipe 31 and the connection between the outlet branch pipe 36 and the first main pipe 31. A one-way valve may also be provided between the connection between the inlet branch pipe 35 and the first main pipe 31 and the connection between the outlet branch pipe 36 and the first main pipe 31, and the one-way valve is unidirectionally conducted from the first interface 33 to the energy storage water tank 9.

[0061] The second main pipe 32 is provided with a second water return valve 25, and the second water return valve 25 is connected between the connection between the inlet branch pipe 35 and the second main pipe 32 and the connection between the outlet branch pipe 36 and the second main pipe 32. A one-way valve may also be provided between the connection between the inlet branch pipe 35 and the second main pipe 32 and the connection between the outlet branch pipe 36 and the second main pipe 32, and the one-way valve is unidirectionally conducted from the second interface 34 to the energy storage water tank 9.

[0062] In the first heating working mode and the second cooling working mode, the first return water valve 22 is closed and the second return water valve 25 is opened; in the second heating working mode and the first cooling working mode, the first return water valve 22 is opened and the second return water valve 25 is closed.

[0063] Next, we will combine Figure 1 The working principle of the heat pump unit coupled with water energy storage supply system in the embodiment of the present application is described in detail.

[0064] The heat pump unit coupled water energy storage supply system of the present application includes a heating mode and a cooling mode, wherein the heating mode and the cooling mode each have at least four working modes.

[0065] Scenario 1: Heating mode.

[0066] When the heat load is lower than the heating capacity of the heat pump, the first heating working mode is switched on, and the energy storage tank 9 stores heat. The heat pump unit 3 is started, including the first heat exchanger 4, the expansion valve 5, the second heat exchanger 6, and the compressor 7. The working fluid absorbs heat in the first heat exchanger 4 and releases heat in the second heat exchanger 6. The circulation pump 2 and the water pump 8 are started, and the first main valve 14, the first inlet valve 10 of the circulation pump water pump, the second outlet valve 13 of the circulation pump water pump, the second heat exchanger inlet valve 16, the second heat exchanger outlet valve 17, the first inlet valve 20 of the water pump, and the first outlet valve 21 of the water pump are opened. The heating hot water return water passes through the circulation pump 2, mixes with the cold water in the energy storage tank 9 pressurized by the water pump 8, and flows into the second heat exchanger 6 for heat exchange. The second main valve 15 and the second return valve 25 are opened, and part of the heated water passes through the second main valve 15 for heat supply, and the other part passes through the second return valve 25 to flow through the upper part of the energy storage tank 9 to store heat.

[0067] If the heat load is 0 at this time, the third heating working mode is switched on, only the water pump 8 is started, the second heat exchanger inlet valve 16, the second heat exchanger outlet valve 17, the water pump first inlet valve 20, and the water pump first outlet valve 21 are opened, and the cold water in the energy storage tank 9 flows into the second heat exchanger 6 to be heated after being pressurized by the water pump 8. The second return valve 25 is opened, and all the heated water flows back to the hot end of the energy storage tank 9.

[0068] When the heat load is higher than the heating capacity of the heat pump unit, the second heating working mode is switched on, and the energy storage tank 9 releases heat. Start the heat pump unit 3, including the first heat exchanger 4, the expansion valve 5, the second heat exchanger 6, and the compressor 7. The working fluid absorbs heat in the first heat exchanger 4 and releases heat in the second heat exchanger 6. Start the circulation pump 2, open the first main valve 14, the first inlet valve 10 of the circulation pump water pump, the second outlet valve 13 of the circulation pump water pump, the second heat exchanger inlet valve 16, the second heat exchanger outlet valve 17, and the first return valve 22. The heating hot water return water passes through the circulation pump 2, and a part of it flows into the cold end of the energy storage tank 9 through the first return valve 22, and the other part flows into the second heat exchanger 6 for heat exchange. Start the water pump 8, open the second main valve 15, the second inlet valve 23 of the water pump, and the second outlet valve 24 of the water pump. The hot water in the energy storage tank 9 is pressurized by the water pump 8 and mixed with the hot water at the outlet of the second heat exchanger to provide heat together.

[0069] If the electricity price is high at this time, the fourth heating working mode is switched on, the heat pump unit 3 does not work, then the circulation pump 2 is started, the first main valve 14, the first inlet valve 10 of the circulation pump water pump, the second outlet valve 13 of the circulation pump water pump, and the first return valve 22 are opened. The heating hot water return water passes through the circulation pump 2, and all flows into the cold end of the energy storage tank 9 through the first return valve 22. The water pump 8 is started, the second main valve 15, the second inlet valve 23 of the water pump, and the second outlet valve 24 of the water pump are opened, and the hot water in the energy storage tank 9 is pressurized by the water pump 8 to provide heat.

[0070] Scenario 2: Cooling mode.

[0071] During the period when the cooling load is lower than the refrigeration capacity of the heat pump, the first cooling mode is switched on, and the energy storage tank 9 stores cold. The heat pump unit 3 is started, including the first heat exchanger 4, the expansion valve 5, the second heat exchanger 6, and the compressor 7. The working fluid absorbs heat in the first heat exchanger 4 and releases heat in the second heat exchanger 6. The circulation pump 2 and the water pump 8 are started, and the second main valve 15, the second inlet valve 12 of the circulation pump water pump, the first outlet valve 11 of the circulation pump water pump, the first heat exchanger inlet valve 18, the first heat exchanger outlet valve 19, the second inlet valve 23 of the water pump, and the second outlet valve 24 of the water pump are opened. After the cold water is used for cooling at the user 1, the return water for cooling passes through the second main valve, mixes with the hot water in the energy storage tank 9 pressurized by the water pump 8, and flows into the first heat exchanger 4 for heat exchange. The first main valve 14 and the first return valve 22 are opened, and part of the cooled water passes through the first main valve 14 for cooling, and the other part passes through the first return valve 22 to flow through the lower part of the energy storage tank 9 to store cold.

[0072] If the cooling load is 0 at this time, the third cooling mode is switched on, only the water pump 8 is started, the first heat exchanger inlet valve 18, the first heat exchanger outlet valve 19, the water pump second inlet valve 23, and the water pump second outlet valve 24 are opened, and the hot water in the energy storage tank 9 flows into the first heat exchanger 4 for cooling after being pressurized by the water pump 8. The first return valve 22 is opened, and all the cooled water flows back to the cold end of the energy storage tank 9.

[0073] During the period when the cooling load is higher than the refrigeration capacity of the heat pump unit, the second cooling mode is switched on, and the energy storage tank 9 releases cold. The heat pump unit 3 is started, including the first heat exchanger 4, the expansion valve 5, the second heat exchanger 6, and the compressor 7. The working fluid absorbs heat in the first heat exchanger 4 and releases heat in the second heat exchanger 6. The circulation pump 2 is started, the second main valve 15, the second inlet valve 12 of the circulation pump water pump, the first outlet valve 11 of the circulation pump water pump, the first heat exchanger inlet valve 18, the first heat exchanger outlet valve 19, and the second return valve 25 are opened. The return water for cold supply passes through the circulation pump 2, and a part of it flows into the hot end of the energy storage tank 9 through the first return valve 22, and the other part flows into the first heat exchanger 4 for heat exchange. The water pump 8 is started, the first main valve 14, the first inlet valve 20 of the water pump, and the first outlet valve 21 of the water pump are opened, and the cold water in the energy storage tank 9 is pressurized by the water pump 8, mixed with the cold water at the outlet of the first heat exchanger 4, and used for cold supply together.

[0074] If the electricity price is high at this time, the fourth cooling operation mode is switched on, the heat pump unit 3 does not work, then the circulation pump 2 is started, the second main valve 15, the second inlet valve 12 of the circulation pump water pump, the first outlet valve 11 of the circulation pump water pump, and the second return valve 25 are opened. The return water for cooling passes through the circulation pump 2, and all flows into the hot end of the energy storage tank 9 through the second return valve 25. The water pump 8 is started, the first main valve 14, the first inlet valve 20 of the water pump, and the first outlet valve 21 of the water pump are opened, and the cold water in the energy storage tank 9 is pressurized by the water pump 8 to provide cooling.

[0075] In summary, the heat pump unit coupled water energy storage supply system of the present application is a combined use of heat pump technology and a single-tank inclined temperature layer water storage tank, which can maintain a constant output of the air source heat pump unit 3 over a period of time, storing cold / heat when the cold / heat load is low, and releasing cold / heat when the cold / heat load is high. Using a single-tank inclined temperature layer water storage tank to balance the daytime cold / heat load difference can reduce the installed capacity of the heat pump unit 3, while utilizing more valley electricity and reducing the operating cost of the system.

[0076] The present application is a joint use of an air source heat pump unit 3 and a single-tank inclined temperature layer energy storage tank 9. Driven by electric energy, the working fluid absorbs heat in the evaporator and releases heat in the condenser. When the unit produces more cold / heat than the user 1, the excess cold / hot water enters the energy storage tank 9 for storage; when the unit produces less cold / heat than the user 1, the energy storage tank 9 releases heat / releases cold. When storing heat / releasing cold, hot water enters from the upper water distributor of the water tank, cold water is discharged from the lower water distributor, and the transition layer moves downward; when storing cold / releasing heat, hot water is discharged from the upper water distributor, cold water enters from the lower water distributor, and the transition layer moves upward. The mass of water in the energy storage tank 9 remains constant, while the energy changes.

[0077] Through this application, the installed capacity of the heat pump unit 3 can be reduced, especially for the heat and cold user 1 whose demand for heat and cold is mainly during the day, the heat and cold load during the day can be distributed to the whole day, and the installed capacity of the heat pump unit 3 will be greatly reduced. Although a single tank inclined temperature layer water storage and heating system is added, the total investment and total area will be reduced. In addition, for many parks where the demand for heat and cold is mostly during the day, through this system, the system can store cold / heat during the valley power period and release cold / heat during the peak power period during the day, reducing the energy cost of user 1.

[0078] The technical features of this application are:

[0079] (1) Using air source heat pumps for combined cooling and heating is highly efficient and can simultaneously meet the cooling and heating needs of user 1.

[0080] (2) The single-tank thermocline energy storage water tank 9 is used for energy storage. Compared with an ordinary water tank, it can store both cold water and hot water at the same time, so only one tank is needed, which saves space and floor space, and the energy supply quality is guaranteed.

[0081] (3) The energy storage tank 9 balances the daytime cooling / heating load, especially for the scenario where there is cooling / heating demand only for part of the day, which can reduce the investment in the heat pump unit 3 and save floor space.

[0082] (4) Through this system, the system can store cold / heat during off-peak hours and release cold / heat during peak hours during the day, thereby reducing the energy cost of user 1.

[0083] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0084] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.

Claims

1. A heat pump unit coupled with water energy storage and supply system, characterized in that: include: A heat pump unit, an energy storage water tank, a first interface, a second interface and a switching water circuit, wherein the first interface and the second interface are used to connect to the energy supply network, and the energy storage water tank is a single-tank thermocline energy storage water tank; The energy storage water tank, the second path of the heat exchanger of the heat pump unit, the first interface, and the second interface are connected through the switching water path, so that the energy storage water tank, the second path of the heat exchanger, the second interface, and the first interface can be selectively connected, and the switching water path has a water pump; The heat pump unit coupled water energy storage energy supply system has a first heating working mode, a second heating working mode, a first cooling working mode, and a second cooling working mode. In the first heating working mode, the heat pump unit is turned on, the water pump is turned on, and the switching water circuit is configured to enable the first interface and the cold water port of the energy storage water tank to supply water to the second circuit of the heat exchanger, and the second circuit of the heat exchanger to supply water to the second interface and the hot water port of the energy storage water tank; In the second heating working mode, the heat pump unit is turned on, the water pump is turned on, and the switching water circuit is configured to make the first interface supply water to the cold water port of the energy storage water tank and the second path of the heat exchanger, and the hot water port of the energy storage water tank and the second path of the heat exchanger supply water to the second interface; In the first cooling working mode, the heat pump unit is turned on, the water pump is turned on, and the switching water circuit is configured to enable the second interface and the hot water port of the energy storage water tank to supply water to the second circuit of the heat exchanger, and the second circuit of the heat exchanger to supply water to the first interface and the cold water port of the energy storage water tank; In the second cooling working mode, the heat pump unit is turned on, the water pump is turned on, and the switching water circuit is configured to enable the second interface to supply water to the hot water port of the energy storage water tank and the second path of the heat exchanger, and the cold water port of the energy storage water tank and the second path of the heat exchanger to supply water to the first interface.

2. The heat pump unit coupled water energy storage and supply system according to claim 1, characterized in that: The heat pump unit coupled water energy storage supply system has a third heating working mode, a fourth heating working mode, a third cooling working mode, and a fourth cooling working mode. In the third heating working mode, the heat pump unit is turned on, the water pump is turned on, at least one of the second interface and the first interface is cut off, and the switching water path is configured to make the cold water port of the energy storage water tank supply water to the second path of the heat exchanger, and the second path of the heat exchanger supplies water to the hot water port of the energy storage water tank; In the fourth heating working mode, the heat pump unit is turned off, the water pump is turned on, and the switching water circuit is configured to make the first interface supply water to the cold water port of the energy storage water tank, and the hot water port of the energy storage water tank supplies water to the second interface; In the third cooling operation mode, the heat pump unit is turned on, the water pump is turned on, one of the second interface and the first interface is cut off, and the switching water path is configured to make the hot water port of the energy storage water tank supply water to the second path of the heat exchanger, and the second path of the heat exchanger supplies water to the cold water port of the energy storage water tank; In the fourth cooling working mode, the heat pump unit is turned off, the water pump is turned on, and the switching water circuit is configured to enable the second interface to supply water to the hot water port of the energy storage tank, and the cold water port of the energy storage tank to supply water to the first interface.

3. The heat pump unit coupled water energy storage and supply system according to claim 1, characterized in that: The heat pump unit includes: a first heat exchanger, a second heat exchanger, a compressor, and an expansion valve. The first path of the first heat exchanger, the compressor, the first path of the second heat exchanger, and the expansion valve are connected end to end in sequence. The second path of the first heat exchanger and the second path of the second heat exchanger can be selectively connected to the switching water path.

4. The heat pump unit coupled water energy storage and supply system according to claim 3, characterized in that: The switching waterway also includes: a first heat exchanger inlet valve, wherein the first heat exchanger inlet valve is connected to an inlet end of the second circuit of the first heat exchanger; A first heat exchanger outlet valve, wherein the first heat exchanger outlet valve is connected to an outlet end of the second path of the first heat exchanger; a second heat exchanger inlet valve, the second heat exchanger inlet valve being connected to an inlet end of the second circuit of the second heat exchanger; A second heat exchanger outlet valve is connected to an outlet end of the second path of the second heat exchanger.

5. The heat pump unit coupled water energy storage and supply system according to claim 1, characterized in that: It also includes a first energy supply pipe connected to the first interface, a second energy supply pipe connected to the second interface, and a circulating pump, wherein the inlet end of the circulating pump is connected to the first energy supply pipe, and the outlet end of the circulating pump is connected to the first energy supply pipe through a first branch pipe and a second branch pipe, and the connecting port of the first branch pipe and the first energy supply pipe, and the connecting port of the second branch pipe and the first energy supply pipe are respectively arranged on both sides of the connecting port between the inlet end of the circulating pump and the first energy supply pipe, and a first inlet valve of a circulating pump water pump is arranged between the connecting port of the first branch pipe and the first energy supply pipe, and the connecting port of the inlet end of the circulating pump and the first energy supply pipe, a second inlet valve of a circulating pump water pump is arranged between the connecting port of the second branch pipe and the first energy supply pipe, and the inlet end of the circulating pump and the connecting port of the first energy supply pipe, the first branch pipe is provided with a first outlet valve of a circulating pump water pump, and the second branch pipe is provided with a second outlet valve of a circulating pump water pump.

6. The heat pump unit coupled water energy storage and supply system according to any one of claims 1 to 5, characterized in that: The switching waterway comprises: A first main pipe, the first main pipe is connected between the cold water port of the energy storage water tank and the water inlet of the second path of the heat exchanger, and the first interface is provided on the first main pipe; A second main pipe, the second main pipe is connected between the hot water port of the energy storage water tank and the water outlet of the second path of the heat exchanger, and the second interface is provided on the second main pipe; A first water pump inlet valve is provided between the water pump inlet and the cold water port of the energy storage water tank, a second water pump inlet valve is provided between the water pump inlet and the hot water port of the energy storage water tank, a first water pump outlet valve is provided between the water pump outlet and the first interface, and a second water pump outlet valve is provided between the water pump outlet and the second interface; wherein In the first heating working mode and the second cooling working mode, the first inlet valve of the water pump and the first outlet valve of the water pump are opened, the second inlet valve of the water pump and the second outlet valve of the water pump are closed, and the second main pipe is connected; in the second heating working mode and the first cooling working mode, the first inlet valve of the water pump and the first outlet valve of the water pump are closed, the second inlet valve of the water pump and the second outlet valve of the water pump are opened, and the first main pipe is connected.

7. The heat pump unit coupled water energy storage and supply system according to claim 6, characterized in that: The switching waterway also includes: an inlet branch pipe, the inlet branch pipe is connected between the first main pipe and the second main pipe, the first inlet valve of the water pump and the second inlet valve of the water pump are both arranged on the inlet branch pipe, the inlet of the water pump is connected to the inlet branch pipe, and the inlet of the water pump is connected between the first inlet valve of the water pump and the second inlet valve of the water pump; An outlet branch pipe, the outlet branch pipe is connected between the first main pipe and the second main pipe, the first outlet valve of the water pump and the second outlet valve of the water pump are both arranged on the outlet branch pipe, the outlet of the water pump is connected to the outlet branch pipe, and the outlet of the water pump is connected between the first outlet valve of the water pump and the second outlet valve of the water pump; wherein, The connection between the inlet branch pipe and the first main pipe and the second main pipe is located on a side close to the energy storage water tank relative to the connection between the outlet branch pipe and the first main pipe and the second main pipe, and the connection between the outlet branch pipe and the first main pipe and the second main pipe is located on a side of the first interface and the second interface close to the energy storage water tank.

8. The heat pump unit coupled water energy storage and supply system according to claim 7, characterized in that: The first main pipe is provided with a first water return valve, and the first water return valve is connected between the connection between the inlet branch pipe and the first main pipe and the connection between the outlet branch pipe and the first main pipe; The second main pipe is provided with a second water return valve, and the second water return valve is connected between the connection between the inlet branch pipe and the second main pipe and the connection between the outlet branch pipe and the second main pipe; wherein, In the first heating working mode and the second cooling working mode, the first return water valve is closed and the second return water valve is opened; in the second heating working mode and the first cooling working mode, the first return water valve is opened and the second return water valve is closed.

Citation Information

Patent Citations

  • Buried pipe ground source heat pump system and method using peak power for assisting cold / heat storage

    CN104315629A

  • Energy storage type thermoelectric combined cooling and power device suitable for active power distribution network and running method of energy storage type thermoelectric combined cooling and power device

    CN104697238A

  • The heat pump unit is coupled with water energy storage and supply system

    CN210801688U

  • Heat-pump drinking water system, control method thereof, and heat-pump drinking water device

    EP3249318A1

  • Hot-water supplying and air-conditioning system

    JP1997068364A