AI Technical Summary
In the field of logistics and warehousing, in automated warehousing operations, due to task delays and equipment failures, warehousing tasks and handling equipment often fail to arrive in time in the established order, resulting in low warehousing efficiency and the problem of waiting for each other.
By receiving the warehousing tasks to be executed, the target transportation equipment is scheduled to the public waiting area based on the current information and task information of the transportation equipment, and the equipment execution tasks are assigned according to the expected arrival order and priority to avoid the phenomenon of first arrival and last arrival.
It achieves a reasonable allocation of task resources, improves warehousing efficiency, avoids the waiting problem between warehousing tasks and handling equipment, and improves the efficiency of the warehousing process.
Smart Images

Figure CN112016802B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of warehousing logistics, and in particular to an equipment scheduling method, device and electronic equipment. Background Art
[0002] In the field of logistics and warehousing, automated operations have become a common technology today. In automated warehousing operations, a handling device such as a trolley is usually arranged for a warehousing task to be executed. For example, the handling device transports the items to be stored in the warehousing task to the warehouse area. If there are multiple warehousing tasks, each warehousing task will be pre-arranged with a corresponding handling device to execute, and the warehousing tasks usually need to be issued and executed in a pre-set order. However, in actual operations, due to various possible factors such as task delays and handling device failures, in many cases, multiple warehousing tasks cannot arrive at the warehousing site in the established order, and the handling equipment may also be unable to arrive at the warehousing site in time to execute its corresponding tasks on schedule due to various reasons. Therefore, there is often a phenomenon of waiting between the warehousing tasks and the handling equipment, and if the warehousing tasks ranked later arrive at the warehousing site in advance, they also need to wait for the warehousing tasks ranked earlier to be completed before they can be executed by their corresponding handling equipment (that is, first come, wait for last come), which leads to low warehousing efficiency. Summary of the invention
[0003] In view of this, an object of the present invention is to provide an equipment scheduling method, device and electronic equipment, which can effectively improve warehousing efficiency.
[0004] In order to achieve the above purpose, the technical solution adopted by the embodiment of the present invention is as follows:
[0005] In the first aspect, an embodiment of the present invention provides an equipment scheduling method, comprising: if at least one warehousing task to be executed is received, multiple target handling equipment are determined from existing handling equipment according to the warehousing task, and the target handling equipment is scheduled to a common waiting area; the warehousing task in which the items to be stored have arrived at the warehousing site is taken as a target warehousing task, and a corresponding target handling equipment is assigned to the target warehousing task; and the target handling equipment is scheduled to execute the corresponding target warehousing task.
[0006] Furthermore, the step of determining multiple target handling equipment from existing handling equipment based on the warehousing task includes: obtaining current information of each existing handling equipment; the current information includes one or more of location information, power information, equipment type, and status; the status includes an idle state or a task execution state; based on the current information of each of the handling equipment and the task information of each of the warehousing tasks, selecting at least one target handling equipment that matches each of the warehousing tasks; wherein the task information includes one or more of the quantity and type of items to be stored, the estimated time for the items to be stored to arrive at the warehousing site, the location of the warehousing site corresponding to the items to be stored, and the distance required for the items to be stored to be stored.
[0007] Furthermore, the step of selecting at least one target handling equipment matching each of the warehousing tasks according to the current information of each of the handling equipment and the task information of each of the warehousing tasks includes: grouping the equipment according to the current information of each of the handling equipment to obtain a plurality of handling equipment groups; the handling equipment in each handling equipment group has the same designated equipment characteristics, and the designated equipment characteristics of the handling equipment in different handling equipment groups are different; grouping the tasks according to the task information of each of the warehousing tasks to obtain a plurality of warehousing task groups; the warehousing tasks in each warehousing task group have the same designated task characteristics, and the designated task characteristics of the warehousing tasks in different warehousing task groups are different; determining the matching relationship between the handling equipment group and the warehousing task group according to the designated equipment characteristics corresponding to each of the handling equipment groups and the designated task characteristics corresponding to each of the warehousing task groups; for each of the warehousing tasks, according to the matching relationship, all of the handling equipment in the handling equipment group that matches the warehousing task group where the warehousing task is located are used as the target handling equipment matching the warehousing task.
[0008] Furthermore, the step of scheduling the target handling equipment to the common waiting area includes: determining an estimated arrival order of all the warehousing tasks according to the estimated arrival time corresponding to each of the warehousing tasks; wherein the estimated arrival time is the estimated time when the items to be stored in the warehousing task arrive at the warehousing site; determining a sequence of arrival of multiple target handling equipment at the common waiting area according to the estimated arrival sequence of all the warehousing tasks; and scheduling multiple target handling equipment to move to the common waiting area in sequence according to the determined sequence.
[0009] Further, the step of scheduling the target handling equipment to execute the target warehousing task corresponding to it includes: determining whether the actual arrival order of the target warehousing task is consistent with the expected arrival order; if not, determining whether to give priority to the target warehousing task; if it is given priority, scheduling the target handling equipment corresponding to the target warehousing task to the first position in the equipment queue of the public waiting area to give priority to the target warehousing task; or, reselecting the target handling equipment that can directly execute the target warehousing task from the equipment queue of the public waiting area, and scheduling the reselected target handling equipment to give priority to the target warehousing task; if they are consistent or if it is not given priority, executing the target warehousing task when the target handling equipment corresponding to the target warehousing task is at the first position in the queue of the public waiting area.
[0010] Further, the step of judging whether to give priority to the target warehousing task comprises: determining the execution cost and waiting cost of the target warehousing task; if the waiting cost is greater than the execution cost, determining to give priority to the target warehousing task; wherein the execution cost and the waiting cost are both measured in terms of time and / or expenditure; and / or, judging whether the preset priority of the target warehousing task is higher than other warehousing tasks that arrived before the target warehousing task and have not been executed, and if so, determining to give priority to the target warehousing task.
[0011] Further, the step of scheduling the target handling equipment to execute the target warehousing task corresponding to it includes: obtaining the storage location information of the warehousing area corresponding to the warehousing task; allocating an available storage location for the target warehousing task according to the storage location information; and scheduling the target handling equipment to transport the items to be stored in the target warehousing task corresponding to it to the available storage location.
[0012] Furthermore, there are multiple entry sites; there is at least one public waiting area; the entry sites and the public waiting areas have a one-to-one relationship or a many-to-one relationship; the method also includes: determining the entry site corresponding to each entry task based on preset reference factors; wherein the preset reference factors include one or more of the following: location information of each entry site, current information of the target handling equipment staying in the public waiting area corresponding to each entry site, and entry tasks that each entry site has undertaken; for each entry task, the items to be entered in the entry task are transported to the entry site corresponding to it.
[0013] In the second aspect, an embodiment of the present invention also provides an equipment scheduling device, including: a first scheduling module, which is used to determine multiple target handling equipment from existing handling equipment according to at least one warehousing task to be executed, and schedule the target handling equipment to a common waiting area if at least one warehousing task to be executed is received; a task allocation module, which is used to take the warehousing task in which the items to be stored have arrived at the warehousing site as the target warehousing task, and allocate corresponding target handling equipment to the target warehousing task; and a task execution module, which is used to schedule the target handling equipment to execute the corresponding target warehousing task.
[0014] In a third aspect, an embodiment of the present invention provides an electronic device, comprising: a processor and a storage device; the storage device stores a computer program, and when the computer program is executed by the processor, it executes the method as described in any one of the first aspects.
[0015] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the method described in any one of the above-mentioned first aspects are executed.
[0016] The embodiment of the present invention provides an equipment scheduling method, device and electronic device. If at least one warehousing task to be executed is received, multiple target handling equipment are determined from the existing handling equipment according to the warehousing task, and the target handling equipment is scheduled to a common waiting area. Then, the warehousing task for which the items to be stored have arrived at the warehousing site is taken as the target warehousing task, and the corresponding target handling equipment is assigned to the target warehousing task. Finally, the target handling equipment is scheduled to execute the corresponding target warehousing task. The above method provided by this embodiment can, when receiving a warehousing task, first schedule a certain number of equipment from the existing handling equipment to wait in the common waiting area, but will not assign specific handling equipment to each warehousing task. It is not until the items to be stored arrive at the warehousing site that they are taken as the target warehousing task and the handling equipment (target handling equipment) in the waiting area is assigned to perform the task. This method does not establish a corresponding relationship between the warehousing task and the handling equipment at the beginning, but pre-dispatches a part of the handling equipment to the public waiting area according to the warehousing task, and then dispatches the handling equipment in the waiting area to directly execute the warehousing task that matches it and has arrived at the station, realizing the reasonable allocation of task resources, avoiding the problem of warehousing tasks and handling equipment waiting for each other and the problem of first-arrived waiting for the last-arrived, and effectively improving the warehousing efficiency.
[0017] Other features and advantages of the embodiments of the present invention will be described in the following description, or some features and advantages can be inferred or determined without doubt from the description, or can be learned by implementing the above-mentioned techniques of the embodiments of the present invention.
[0018] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 A schematic diagram of the structure of an electronic device provided by an embodiment of the present invention is shown;
[0021] Figure 2 A flow chart of a device scheduling method provided by an embodiment of the present invention is shown;
[0022] Figure 3 A flow chart of a method for scheduling a target handling device to execute a corresponding target warehousing task provided by an embodiment of the present invention is shown;
[0023] Figure 4 A structural block diagram of a device scheduling apparatus provided by an embodiment of the present invention is shown. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution of the present invention will be described below in conjunction with the drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0025] In the process of goods entering the warehouse, it is mainly divided into two stages. The first stage is: the items to be entered corresponding to the entry task arrive at the entry site from other locations; the second stage is: the handling equipment is assigned to transport the items to be entered from the entry site to the specific storage location in the warehouse area. Generally speaking, each entry task has an estimated arrival time, and multiple entry tasks have an estimated arrival order. However, due to various reasons such as task delays, the first stage is not completely controllable. Various entry tasks cannot arrive at the entry site according to the estimated arrival time and the established order, and the handling equipment cannot arrive at the entry site in time to perform its corresponding tasks on schedule due to various reasons, which further leads to problems such as first arrival and last arrival in the second stage, or the handling equipment and the entry task wait for each other, resulting in low efficiency of entry. In order to improve this problem, the embodiment of the present invention provides a device scheduling method, device and electronic device. The core idea of the technology is to flexibly schedule the handling equipment to perform the entry task, so that the cost (such as time cost) required for a limited number of handling equipment to complete the entry task to be executed is the lowest. The technology can be applied to occasions such as warehousing logistics where automated equipment needs to be scheduled to perform entry operations. The following is a detailed description of the embodiment of the present invention.
[0026] Embodiment 1:
[0027] First, refer to Figure 1 An example electronic device 100 for implementing a device scheduling method, apparatus, and electronic device according to an embodiment of the present invention is described.
[0028] like Figure 1 The electronic device 100 includes one or more processors 102, one or more storage devices 104, an input device 106, an output device 108, and an image acquisition device 110. These components are interconnected via a bus system 112 and / or other forms of connection mechanisms (not shown). It should be noted that Figure 1 The components and structures of the electronic device 100 shown are merely exemplary and non-limiting. The electronic device may also have other components and structures as required.
[0029] The processor 102 can be implemented in at least one hardware form of a digital signal processor (DSP), a field programmable gate array (FPGA), and a programmable logic array (PLA). The processor 102 can be a central processing unit (CPU), a graphics processing unit (GPU), or one or a combination of other forms of processing units with data processing capabilities and / or instruction execution capabilities, and can control other components in the electronic device 100 to perform desired functions.
[0030] The storage device 104 may include one or more computer program products, and the computer program product may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. The volatile memory may include, for example, random access memory (RAM) and / or cache memory (cache), etc. The non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc. One or more computer program instructions may be stored on the computer-readable storage medium, and the processor 102 may run the program instructions to implement the client functions (implemented by the processor) and / or other desired functions in the embodiments of the present invention described below. Various applications and various data, such as various data used and / or generated by the application, may also be stored in the computer-readable storage medium.
[0031] The input device 106 may be a device used by a user to input instructions, and may include one or more of a keyboard, a mouse, a microphone, a touch screen, and the like.
[0032] The output device 108 may output various information (eg, images or sounds) to the outside (eg, a user), and may include one or more of a display, a speaker, and the like.
[0033] The image acquisition device 110 can capture images desired by the user (eg, photos, videos, etc.), and store the captured images in the storage device 104 for use by other components.
[0034] Exemplarily, an example electronic device for implementing the device scheduling method, apparatus, and electronic device according to the embodiments of the present invention may be implemented as an intelligent terminal with processing capabilities such as a computer, a server, or the like.
[0035] Embodiment 2:
[0036] See also Figure 2 The flowchart of a device scheduling method shown in FIG. 1 is a flowchart of a device scheduling method, which can be executed by the aforementioned electronic device and mainly includes the following steps S202 to S206:
[0037] Step S202: if at least one warehousing task to be executed is received, a plurality of target transporting devices are determined from the existing transporting devices according to the warehousing task, and the target transporting devices are dispatched to the public waiting area.
[0038] The warehousing task usually carries task information, which includes but is not limited to the quantity, type, weight of the items to be warehousing, and also includes one or more of the information such as the estimated time for the items to be warehousing to arrive at the warehousing site (also referred to as the estimated arrival time of the warehousing task), the location of the warehousing site corresponding to the items to be warehousing, and the required distance for the items to be warehousing to enter. Based on the task information of each warehousing task received, a certain number of handling equipment that can be used to perform these warehousing tasks can be selected from the existing handling equipment, and the selected handling equipment can be dispatched to the public waiting area as the target handling equipment. Among them, the public waiting area is usually close to the warehousing site, and the handling equipment stays in the waiting area to wait for the warehousing task to arrive at the site before going to perform the task. In this step, the handling equipment will not be specifically allocated for the received warehousing task, but a part of the handling equipment will be pre-scheduled to the public resource pool (public waiting area) based on the warehousing task, so that the handling equipment can be flexibly dispatched to perform the warehousing task arriving at the site later.
[0039] The handling equipment can be a handling cart with automatic navigation capability (or it can also be called a handling robot). In specific implementation, the handling equipment can be an AGV (Automated Guided Vehicle), which can also be called an unmanned transport vehicle. It usually has automatic navigation functions such as electromagnetic or optical, and can travel along a specified navigation path. It can be well used in intelligent logistics to transport goods.
[0040] Step S204: The warehousing task of the items to be warehousing that have arrived at the warehousing site is taken as a target warehousing task, and a corresponding target transport device is allocated to the target warehousing task.
[0041] Among them, the warehousing site can also be called the docking point for the warehousing task. The handling equipment receives the warehousing tasks to be executed at the warehousing site. For example, at the warehousing site, staff or automated equipment (such as robotic arms, etc.) place the items to be stored corresponding to the warehousing task on the handling equipment.
[0042] The warehousing task for the items to be stored that have arrived at the storage site can also be directly referred to as the warehousing task that has arrived at the site. The warehousing task that has arrived at the site is used as the target warehousing task, and the target handling equipment that matches it in the public waiting area is allocated to the target warehousing task. For example, if the number of items to be stored in the target warehousing task is large and the weight is heavy, a large truck that can carry heavy objects at one time in the public waiting area can be allocated to perform the target warehousing task. The above is only an example and should not be regarded as a limitation. In actual applications, factors such as the current power of the handling equipment, the size of the equipment, the load-bearing capacity of the equipment, the current position of the equipment, the current state of the equipment (idle state or task execution state), etc. can also be fully considered to comprehensively determine the target handling equipment that is currently suitable for performing the target warehousing task.
[0043] Step S206, scheduling the target transport equipment to execute the corresponding target warehousing task.
[0044] The target handling equipment is dispatched to depart from the public waiting area to the storage site to perform the target storage task corresponding to it, that is, to transport the items to be stored in the target storage task corresponding to it, and to perform storage operations, such as transporting the items to be stored to the storage location in the storage area. In this embodiment, the form of the storage area is not limited, and it can be directly presented in the form of a warehouse, or in the form of a shelf, or in the form of a flat area, etc. In addition, when the target handling equipment is dispatched to perform the target storage task corresponding to it, the storage location information of the storage area corresponding to the storage task can be further obtained; then, according to the storage location information, the target storage task is allocated an available storage location; finally, the target handling equipment is dispatched to transport the items to be stored in the target storage task corresponding to it to the available storage location. That is, through the above method, the target handling equipment can flexibly place the items to be stored in the specific storage location in the storage area according to the current actual situation. In this embodiment, the required storage locations will not be allocated in advance for the items to be stored. Instead, when the target handling equipment transports the items to be stored to the storage area, the available storage locations can be flexibly allocated based on the current specific storage location information of the storage area, thereby further improving the storage efficiency and avoiding the possible unavailability of storage locations due to other factors caused by allocating storage locations in advance, or delays in storage due to other factors such as congestion during the storage process.
[0045] The above method provided by the embodiment of the present invention can dispatch a certain number of equipment from the existing handling equipment to the public waiting area to wait when receiving a warehousing task, but will not assign specific handling equipment to each warehousing task. It will not be used until the items to be warehousing arrive at the warehousing site. It will be used as the target warehousing task and the handling equipment (target handling equipment) in the waiting area will be assigned to perform the task. This method does not establish a corresponding relationship between the warehousing task and the handling equipment at the very beginning, but pre-dispatches a part of the handling equipment to the public waiting area according to the warehousing task, and then dispatches the handling equipment in the waiting area to directly execute the warehousing task that has arrived at the station that matches it, thereby realizing the reasonable allocation of task resources, avoiding the problem of warehousing tasks and handling equipment waiting for each other and the problem of first-come-first-served waiting, and effectively improving the warehousing efficiency. During the execution of the above method, the guiding ideology of the required decision is to minimize the cost (such as time cost) required for a limited number of handling equipment to complete the warehousing tasks to be performed.
[0046] When determining multiple target handling equipment from existing handling equipment according to the warehousing task, you can refer to the following steps 1 and 2:
[0047] Step 1: Obtain current information of each existing handling device; the current information includes one or more of location information, power information, device type, and status; the status includes an idle state or a task execution state.
[0048] Step 2: Based on the current information of each handling device and the task information of each warehousing task, select at least one target handling device that matches each warehousing task; wherein the task information includes one or more of the number and type of items to be warehousing, the estimated time for the items to be warehousing to arrive at the warehousing site, the location of the warehousing site corresponding to the items to be warehousing, and the required distance for the items to be warehousing to enter. In order to further improve the efficiency of task allocation, this embodiment provides a specific implementation method for selecting target handling devices that match warehousing tasks, which can be implemented by referring to the following steps 2.1 to 2.4:
[0049] Step 2.1: Group the equipment according to the current information of each handling equipment to obtain multiple handling equipment groups; the handling equipment in each handling equipment group has the same designated equipment characteristics, and the designated equipment characteristics of the handling equipment in different handling equipment groups are different. For example, the designated equipment characteristics can be the size and type characteristics of the equipment, the type characteristics of the items that can be handled, the weight characteristics that can be carried, the distance characteristics between the location of the equipment and the storage site, the power characteristics of the equipment, the moving speed characteristics of the equipment, etc.
[0050] Step 2.2: Group the tasks according to the task information of each warehousing task to obtain multiple warehousing task groups; the warehousing tasks in each warehousing task group have the same specified task characteristics, and the specified task characteristics of the warehousing tasks in different warehousing task groups are different. For example, the specified task characteristics can be the type characteristics, quantity characteristics, weight characteristics, expected arrival time characteristics of the items to be warehousing in the warehousing task, and can also be the urgency characteristics of the task to be executed, etc.
[0051] Step 2.3: According to the designated equipment features corresponding to each handling equipment group and the designated task features corresponding to each warehousing task group, determine the matching relationship between the handling equipment group and the warehousing task group. For example, match the handling equipment group whose designated equipment feature is that it can carry a heavier weight with the warehousing task group whose designated task feature is that the number of items to be stored is large and / or the weight is heavy, and match the handling equipment group whose designated equipment feature is that it can carry small parts with the warehousing task group whose designated task feature is that the items to be stored are parts. The above is only an example and is not limited here.
[0052] Step 2.4: For each warehousing task, according to the matching relationship, all the handling equipment in the handling equipment group that matches the warehousing task group where the warehousing task is located is used as the target handling equipment that matches the warehousing task. In this way, instead of assigning specific handling equipment to the warehousing task, a certain number of handling equipment that can perform the warehousing task can be assigned to it, so that the handling equipment that can perform the task can be flexibly selected from them as needed later.
[0053] When scheduling the target handling equipment to the public waiting area, the estimated arrival order of all warehousing tasks can be determined first according to the estimated arrival time corresponding to each warehousing task; wherein the estimated arrival time is the estimated time when the items to be warehousing in the warehousing task arrive at the warehousing station; then, according to the estimated arrival order of all warehousing tasks, the order in which multiple target handling equipment arrive at the public waiting area is determined; finally, according to the determined order, multiple target handling equipment are scheduled to move to the public waiting area in sequence. In actual applications, handling equipment can stay in the public waiting area in the form of a queue, and the warehousing tasks corresponding to the handling equipment at the front of the queue are usually also ranked at the front of the estimated arrival order. When the warehousing task arrives, the handling equipment in the queue can leave the queue to perform the task.
[0054] Through the above method, the efficiency of warehousing can be further improved, especially for the waiting area that requires single entry and single exit of handling equipment. By controlling the order in which the handling equipment arrives at the waiting area, it can effectively avoid spending a long time to dispatch suitable handling equipment to undertake the warehousing task. For ease of understanding, the following example is provided: Assuming that warehousing task 1, warehousing task 2, and warehousing task 3 arrive in the expected order, and the AGVs pre-allocated for warehousing task 1 are A1 and A2, the AGVs pre-allocated for warehousing task 2 are B1 and B2, and the AGVs pre-allocated for warehousing task 3 are C1, C2, and C3, if the AGV queues in the public waiting area are sorted as A1 / A2, B1 / B2, and C1 / C2 / C3, then the AGV queues do not need to be adjusted additionally. However, if the AGV queues are sorted as B1, C1, and A1, when warehousing task 1 arrives, A1 needs to be controlled to go around to the first position in the AGV queue, and B1 and C1 need to move back one position, which will result in extra time waiting for the AGV to shift, reducing the efficiency of warehousing. Therefore, this embodiment can effectively improve the warehousing efficiency by pre-controlling the order in which the transport equipment arrives at the public waiting area.
[0055] When scheduling the target handling equipment to perform the corresponding target warehousing task, you can refer to the following: Figure 3 The steps shown achieve:
[0056] Step S302: Determine whether the actual arrival order of the target warehousing tasks is consistent with the expected arrival order; if not, execute step S304; if consistent, execute step S308;
[0057] Step S304: Determine whether to prioritize the target warehousing task; if yes, execute step S306; if no, execute step S308;
[0058] Step S306: Schedule the target handling equipment corresponding to the target warehousing task to the first position in the equipment queue of the public waiting area to give priority to the target warehousing task; or, reselect the target handling equipment that can directly execute the target warehousing task from the equipment queue of the public waiting area, and schedule the reselected target handling equipment to give priority to the target warehousing task.
[0059] Step S308: When the target handling device corresponding to the target warehousing task is located at the first position in the queue of the public waiting area, the target warehousing task is executed.
[0060] When determining whether to prioritize the target warehousing task, you can refer to the following method 1 or method 2:
[0061] Method 1: Determine the execution cost and waiting cost of the target warehousing task; if the waiting cost is greater than the execution cost, prioritize the target warehousing task; wherein the execution cost and the waiting cost are both measured in terms of time and / or cost.
[0062] In one embodiment, if the waiting cost is less than the execution cost, the target warehousing task is not executed until the target handling equipment corresponding to the target warehousing task is ranked at the head of the queue in the public waiting area; that is, after the other one or more warehousing tasks that are earlier than the target warehousing task in the expected arrival order are executed first, the target warehousing task is executed when it is the turn of the handling equipment pre-assigned to the warehousing task to arrive at the head of the queue. For example, if one or more other warehousing tasks will arrive within the preset time period t1, and if it takes a period of time t2 to dispatch the handling equipment pre-assigned to the target warehousing task to the head of the queue after executing the target warehousing task, and t1<t2, then it can be considered that the waiting cost is less than the execution cost, and at this time, a waiting strategy is adopted, and the target warehousing task is not executed until the handling equipment corresponding to the target warehousing task is ranked at the head of the queue. On the contrary, if t1>t2, then it can be considered that the waiting cost is greater than the execution cost, and the target handling equipment corresponding to the target warehousing task is directly dispatched to the head of the queue in the public waiting area to give priority to the execution of the target warehousing task. If there are multiple handling equipment assigned to the target warehousing task in the handling equipment queue (i.e., multiple handling equipment in the aforementioned handling equipment group that matches the warehousing task), the handling equipment that is closest to the front of the queue will be dispatched to the head of the queue, thereby reducing the moving distance of the handling equipment and the number of required moving handling equipment, so as to move the handling equipment that can execute the target warehousing task to the head of the queue as soon as possible.
[0063] Method 2: Determine whether the preset priority of the target warehousing task is higher than other warehousing tasks that arrived before the target warehousing task and have not been executed. If higher, determine to execute the target warehousing task first.
[0064] If the priority of the target warehousing task is higher than one or more other warehousing tasks that are earlier than itself in the expected arrival sequence, the target handling equipment corresponding to the target warehousing task can be directly dispatched to the first place in the queue of the public waiting area to give priority to the target warehousing task, or the target handling equipment that can currently directly execute the target warehousing task can be reselected to give priority to the target warehousing task, such as judging whether there is a handling equipment that can currently execute the target warehousing task among the handling equipment assigned to other warehousing tasks (such as warehousing tasks that require higher carrying capacity) in the equipment queue of the public waiting area, and the equipment is located before the target handling equipment corresponding to the target warehousing task in the queue. If so, the other equipment that can execute the target warehousing task will be dispatched to the first place in the queue to execute the target warehousing task. Similarly, if the priority of the target warehousing task is lower than one or more other warehousing tasks that are earlier than itself in the expected arrival sequence, the target warehousing task needs to wait until one or more other warehousing tasks that are earlier than itself in the expected arrival sequence are completed first, and then it will be executed when it is the turn of the handling equipment assigned to itself to be ranked at the first place in the queue.
[0065] In practical applications, the above-mentioned method 1 and / or the above-mentioned method 2 can be flexibly selected to realize the judgment of whether to give priority to the target warehousing task.
[0066] In actual applications, there can be multiple entry sites and at least one public waiting area; the entry site and the public waiting area have a one-to-one relationship or a many-to-one relationship; that is, one entry site corresponds to one public waiting area, or multiple entry sites correspond to one public waiting area.
[0067] In this embodiment, when determining the storage site where the items to be stored are to be placed (that is, when determining the storage site where the storage task is to be placed), the following (1) and (2) can be referred to for implementation:
[0068] (1) Determine the entry site corresponding to each entry task according to preset reference factors; wherein the preset reference factors include one or more of the following: location information of each entry site, current information of the target handling equipment staying in the public waiting area corresponding to each entry site, and the entry tasks undertaken by each entry site. The current information of the target handling equipment may include the number of equipment, the type of equipment, the status of the equipment, etc.
[0069] (2) For each warehousing task, the items to be stored in the warehousing task are transported to the corresponding warehousing site.
[0070] That is, when there are multiple entry sites, the site where the entry task is placed can be comprehensively considered based on the above reference factors (site factors and equipment factors corresponding to the site). In practical applications, as long as the items to be entered have not arrived at the entry site, the above method for determining the entry site can be executed, such as temporarily changing the determined entry site. For example, assuming that the entry site corresponding to the entry task 1 is predetermined to be site T, when the entry task 1 has not arrived at the entry site T, it is known that the entry site T is currently too busy, then other entry sites can be reselected for the entry task 1, and the selection basis includes but is not limited to: 1) the time cost and transportation cost of the entry task 1 currently changing to other entry sites. 2) the busyness of other sites, such as judging whether other sites will be relatively busy in the next period of time based on the assigned but unreached task information corresponding to other sites. 3) the task information of the entry tasks that are about to arrive at other sites, such as judging whether the next entry task that is about to arrive at other sites will be close to or conflict with the arrival time of the entry task 1, and the idle entry sites can be given priority. 4) Whether other sites have handling equipment that can be used to perform the warehousing task. If not, reschedule other handling equipment that can be used to perform the warehousing task to see if the scheduling time can match the arrival time of warehousing task 1. The warehousing sites that can match can be given priority. The above is only an example and is not limited here. In actual applications, decisions are made with the goal of minimizing the time required to complete the warehousing task.
[0071] In summary, the above method provided by this embodiment can dispatch a certain number of equipment from the existing handling equipment to the public waiting area to wait when receiving a warehousing task, but will not assign specific handling equipment to each warehousing task. It will not be used until the items to be stored arrive at the warehousing site. It will be used as the target warehousing task and the handling equipment (target handling equipment) in the waiting area will be assigned to perform the task. This method does not establish a corresponding relationship between the warehousing task and the handling equipment at the very beginning, but pre-dispatches a part of the handling equipment to the public waiting area according to the warehousing task, and then dispatches the handling equipment in the waiting area to directly execute the warehousing task that has arrived at the station that matches it, realizing the reasonable allocation of task resources, avoiding the problem of warehousing tasks and handling equipment waiting for each other and the problem of first come first served, and effectively improving the warehousing efficiency.
[0072] Embodiment three:
[0073] For the device scheduling method provided in the second embodiment, this embodiment further provides a device scheduling device, which can be specifically referred to in Figure 4 The structural block diagram of a device scheduling device shown in FIG. 1 mainly includes the following modules:
[0074] A first scheduling module 42 is used for, if at least one warehousing task to be executed is received, determining a plurality of target transporting devices from the existing transporting devices according to the warehousing task, and scheduling the target transporting devices to the public waiting area;
[0075] The task allocation module 44 is used to take the storage task of the items to be stored that have arrived at the storage site as the target storage task, and allocate the corresponding target handling equipment to the target storage task;
[0076] The task execution module 46 is used to schedule the target handling equipment to execute the corresponding target warehousing task.
[0077] The above-mentioned device provided in this embodiment does not establish a corresponding relationship between the warehousing task and the handling equipment at the beginning, but pre-dispatches a part of the handling equipment to the public waiting area according to the warehousing task, and then dispatches the handling equipment in the waiting area to directly execute the warehousing task that matches it and has arrived, thereby realizing the reasonable allocation of task resources, avoiding the problem of warehousing tasks and handling equipment waiting for each other and the problem of first-arrived waiting for the last-arrived, and effectively improving the warehousing efficiency.
[0078] In one embodiment, the first scheduling module 42 is used to: obtain current information of each existing handling equipment; the current information includes one or more of location information, power information, equipment type, and status; the status includes an idle state or a task execution state; based on the current information of each handling equipment and the task information of each warehousing task, select at least one target handling equipment that matches each warehousing task; wherein the task information includes one or more of the quantity and type of items to be stored, the estimated time for the items to be stored to arrive at the warehousing site, the location of the warehousing site corresponding to the items to be stored, and the distance required for the items to be stored to be stored.
[0079] In one embodiment, the first scheduling module 42 is further used to: group the equipment according to the current information of each handling equipment to obtain multiple handling equipment groups; the handling equipment in each handling equipment group has the same designated equipment characteristics, and the designated equipment characteristics of the handling equipment in different handling equipment groups are different; group the tasks according to the task information of each warehousing task to obtain multiple warehousing task groups; the warehousing tasks in each warehousing task group have the same designated task characteristics, and the designated task characteristics of the warehousing tasks in different warehousing task groups are different; determine the matching relationship between the handling equipment group and the warehousing task group according to the designated equipment characteristics corresponding to each handling equipment group and the designated task characteristics corresponding to each warehousing task group; for each warehousing task, according to the matching relationship, all the handling equipment in the handling equipment group that matches the warehousing task group where the warehousing task is located are used as the target handling equipment matching the warehousing task.
[0080] In one embodiment, the first scheduling module 42 is also used to: determine the expected arrival order of all warehousing tasks based on the expected arrival time corresponding to each warehousing task; wherein the expected arrival time is the expected time for the items to be stored in the warehousing task to arrive at the warehousing site; determine the order in which multiple target handling equipment arrive at the common waiting area based on the expected arrival order of all warehousing tasks; and schedule multiple target handling equipment to move to the common waiting area in sequence according to the determined order.
[0081] In one embodiment, the task execution module 46 is used to: determine whether the actual arrival order of the target warehousing task is consistent with the expected arrival order; if not, determine whether to give priority to the target warehousing task; if it is given priority, schedule the target handling equipment corresponding to the target warehousing task to the first position in the equipment queue of the public waiting area to give priority to the target warehousing task; or, reselect the target handling equipment that can directly execute the target warehousing task from the equipment queue of the public waiting area, and schedule the reselected target handling equipment to give priority to the target warehousing task; if they are consistent or if it is not given priority, the target warehousing task will be executed when the target handling equipment corresponding to the target warehousing task is at the first position in the queue of the public waiting area.
[0082] In one embodiment, the task execution module 46 is further used to: determine the execution cost and waiting cost of the target warehousing task; if the waiting cost is greater than the execution cost, determine to give priority to the target warehousing task; wherein the execution cost and the waiting cost are both measured in terms of time and / or cost; and / or, determine whether the preset priority of the target warehousing task is higher than other warehousing tasks that arrived before the target warehousing task and have not been executed, and if so, determine to give priority to the target warehousing task.
[0083] In one embodiment, the task execution module 46 is used to: obtain the storage location information of the storage area corresponding to the storage task; allocate an available storage location for the target storage task based on the storage location information; and schedule the target handling equipment to transport the items to be stored in the corresponding target storage task to the available storage location.
[0084] In one embodiment, there are multiple entry sites; there is at least one public waiting area; the entry sites and the public waiting area have a one-to-one relationship or a many-to-one relationship; the above device also includes:
[0085] A site determination module is used to determine the entry site corresponding to each entry task according to preset reference factors; wherein the preset reference factors include one or more of the following: location information of each entry site, current information of the target handling equipment staying in the public waiting area corresponding to each entry site, and the entry tasks undertaken by each entry site;
[0086] The site transport module is used to transport the items to be stored in each storage task to the corresponding storage site.
[0087] The implementation principle and technical effects of the device provided in this embodiment are the same as those of the aforementioned embodiments. For the sake of brief description, for matters not mentioned in the device embodiment, reference may be made to the corresponding contents in the aforementioned method embodiment.
[0088] Furthermore, this embodiment provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the above-mentioned device scheduling method is executed.
[0089] The device scheduling method, apparatus and computer program product of the electronic device provided in the embodiments of the present invention include a computer-readable storage medium storing program code. The instructions included in the program code can be used to execute the methods described in the previous method embodiments. The specific implementation can be found in the method embodiments and will not be repeated here.
[0090] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program codes.
[0091] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. A device scheduling method, characterized in that: include: If at least one warehousing task to be executed is received, a plurality of target transporting devices are determined from the existing transporting devices according to the warehousing task, and the target transporting devices are dispatched to the public waiting area; The storage task of the items to be stored that have arrived at the storage site is taken as the target storage task, and the corresponding target handling equipment is allocated to the target storage task; The target handling equipment is dispatched to execute the target warehousing task corresponding thereto.
2. The method according to claim 1, characterized in that The step of determining a plurality of target transporting equipment from existing transporting equipment according to the warehousing task comprises: Acquire current information of each existing handling device; the current information includes one or more of location information, power information, device type, and status; the status includes an idle state or a task execution state; At least one target transport device matching each warehousing task is selected based on the current information of each transport device and the task information of each warehousing task; wherein the task information includes one or more of the quantity and type of items to be stored, the estimated time for the items to be stored to arrive at the warehousing site, the location of the warehousing site corresponding to the items to be stored, and the distance required for the items to be stored to be stored.
3. The method according to claim 2, characterized in that The step of selecting at least one target transporting device matching each of the warehousing tasks according to the current information of each of the transporting devices and the task information of each of the warehousing tasks comprises: Grouping the equipment according to the current information of each of the handling equipment to obtain a plurality of handling equipment groups; the handling equipment in each handling equipment group has the same designated equipment feature, and the designated equipment features of the handling equipment in different handling equipment groups are different; Tasks are grouped according to the task information of each of the warehousing tasks to obtain a plurality of warehousing task groups; the warehousing tasks in each warehousing task group have the same specified task features, and the specified task features of the warehousing tasks in different warehousing task groups are different; Determine the matching relationship between the transport equipment group and the warehousing task group according to the designated equipment characteristics corresponding to each of the transport equipment groups and the designated task characteristics corresponding to each of the warehousing task groups; For each of the warehousing tasks, according to the matching relationship, all the handling equipment in the handling equipment group that matches the warehousing task group where the warehousing task is located are used as the target handling equipment that matches the warehousing task.
4. The method according to claim 1, characterized in that The step of dispatching the target transport equipment to the public waiting area includes: Determine the estimated arrival order of all the warehousing tasks according to the estimated arrival time corresponding to each warehousing task; wherein the estimated arrival time is the estimated time when the items to be warehousing in the warehousing task arrive at the warehousing site; Determine the order in which the plurality of target handling devices arrive at the common waiting area according to the expected arrival order of all the warehousing tasks; According to the determined sequence, the plurality of target transport devices are dispatched to move to the common waiting area in sequence.
5. The method according to claim 4, characterized in that The step of scheduling the target handling equipment to execute the corresponding target warehousing task includes: Determine whether the actual arrival order of the target warehousing tasks is consistent with the expected arrival order; If they are inconsistent, determine whether to prioritize the target warehousing task; If it is executed first, the target handling equipment corresponding to the target warehousing task is dispatched to the first position in the equipment queue of the public waiting area to execute the target warehousing task first; or, the target handling equipment that can directly execute the target warehousing task is reselected from the equipment queue of the public waiting area, and the reselected target handling equipment is dispatched to execute the target warehousing task first; If they are consistent or if it is not executed first, the target warehousing task will be executed when the target handling device corresponding to the target warehousing task is located at the first position in the queue of the public waiting area.
6. The method according to claim 5, characterized in that The step of determining whether to preferentially execute the target warehousing task comprises: Determine the execution cost and waiting cost of the target warehousing task; if the waiting cost is greater than the execution cost, determine to prioritize the execution of the target warehousing task; wherein the execution cost and the waiting cost are both measured in terms of time and / or cost; and / or, It is determined whether the preset priority of the target warehousing task is higher than other warehousing tasks that arrived before the target warehousing task and have not been executed. If higher, it is determined to give priority to executing the target warehousing task.
7. The method according to claim 1, characterized in that The step of scheduling the target handling equipment to execute the corresponding target warehousing task includes: Obtaining the storage location information of the storage area corresponding to the storage task; According to the storage location information, an available storage location is allocated to the target storage task; The target transport equipment is dispatched to transport the to-be-warehoused items in the corresponding target warehouse-entry task to the available warehouse location.
8. The method according to any one of claims 1 to 7, characterized in that: There are multiple entry sites; there is at least one public waiting area; the entry sites and the public waiting area have a one-to-one relationship or a many-to-one relationship; The method further comprises: Determine the entry site corresponding to each entry task according to preset reference factors; wherein the preset reference factors include one or more of the following: location information of each entry site, current information of the target handling equipment staying in the public waiting area corresponding to each entry site, and the entry tasks undertaken by each entry site; the current information of the target handling equipment includes one or more of location information, power information, equipment type, and status; the status includes an idle state or a task execution state; For each of the warehousing tasks, the items to be warehousing in the warehousing task are transported to the corresponding warehousing site.
9. A device scheduling device, characterized in that: include: A first scheduling module is used for, if at least one warehousing task to be executed is received, determining a plurality of target transporting devices from existing transporting devices according to the warehousing task, and scheduling the target transporting devices to a common waiting area; A task allocation module is used to take the warehousing task of the items to be warehousing that have arrived at the warehousing site as the target warehousing task, and allocate the corresponding target handling equipment to the target warehousing task; The task execution module is used to schedule the target handling equipment to execute the corresponding target warehousing task.
10. An electronic device, characterized in that: include: processor and storage device; The storage device stores a computer program, which, when executed by the processor, performs the method according to any one of claims 1 to 8.
11. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 8 are performed.