A method for quickly plugging a fuel pipeline

By setting up isolation valves and special pipe plugs on the fuel pipeline, manually sawing and quickly replacing the pipe sections, the safety risks and long-term problems of fuel pipeline leakage recovery in the existing technology are solved, and rapid permanent sealing and efficient replacement are achieved, ensuring that Safety and efficiency.

CN112066146BActive Publication Date: 2024-11-15HUANENG POWER INT ENERGY DEV CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202011022410.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-25
Publication Date
2024-11-15
Estimated Expiration
2040-09-25

AI Technical Summary

Technical Problem

The existing fuel pipeline leakage recovery method has safety risks and long-term problems. The pressure-mounted sealing method is not permanent, and the welding method requires long-term flushing and increased workload, so it is impossible to quickly restore the leaked fuel pipeline.

Method used

By setting up isolation valves and sewage valves on the fuel pipeline, the pipeline is divided into sections, manually sawed and sealed with special pipe plugs, cleaning inspection and welding are performed, and the pipe sections are quickly replaced to ensure safety and efficiency.

Benefits of technology

It achieves rapid and permanent sealing of leaked fuel pipelines on the basis of ensuring safety, shortens the flushing range, improves the efficiency of replacing pipelines, and avoids explosion risks and high temperature accidents during welding.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112066146B_ABST
    Figure CN112066146B_ABST
Patent Text Reader

Abstract

The present invention relates to a method for rapid plugging of a fuel pipeline, comprising the following steps: closing the isolation valves before and after the leaking pipe section, opening the drain valve to discharge the oil stored in the pipeline; after injecting water into the pipe, manually sawing off the pipe section to be replaced; after the pipeline is disconnected, using a specially designed pipe plug to plug the pipe, and injecting water into the pipes at both ends through the pipe plug; flushing the local small space in the pipe formed by the pipe plug and the fracture with detergent, performing gas detection, and welding a flange at each of the front and rear fractures after passing the gas detection; matching the pipe to be replaced with the welded flange, removing the pipe plug, releasing the water stored in the pipeline, fixing the flange, and resuming operation. The advantages of the present invention are: the plugging method of the present invention shortens the scope of pipeline flushing through the joint cooperation of pretreatment, pipe section cutting, pipe section plugging, cleaning and testing, and pipe section replacement, and isolates it from the overall fuel pipeline, and quickly and permanently plugs the leaking fuel pipeline on the basis of ensuring safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of power generation equipment maintenance, and in particular to a method for quickly plugging a fuel pipeline. Background Art

[0002] Fuel pipelines are pipelines responsible for transporting fuels. Common ones include petrochemical pipelines and natural gas pipelines: Petrochemical pipelines are generally used as pressure transport pipelines for flammable and explosive, high-temperature and high-pressure or low-temperature toxic substances. Pipeline construction is technically difficult and requires a large amount of work. In addition, there are many welding joints in the pipelines, which can easily lead to welding quality problems, which in turn cause leakage of petrochemical fuels, which not only endangers the surrounding ecological environment, but also threatens people's lives. The composition of natural gas pipelines includes two main parts, namely, chemical operation pipelines composed of pipelines and pipelines. From the perspective of the structure of the natural gas pipeline, it is composed of multiple pipelines and related structural accessories. When carrying out construction operations, it is often necessary to strictly follow certain construction process specifications.

[0003] The current methods for restoring leaks in petrochemical pipelines include two categories: 1. Pressure sealing method: Process the pressure sealing fixture according to the size of the pipeline, and use hydraulic tools to press the sealing filler into the fixture to achieve sealing; 2. Welding method: Weld the pipeline after flushing. Flushing can be divided into water flushing and steam flushing.

[0004] The pressure sealing method is a temporary treatment method. After a long time, it may leak again and cannot achieve the effect of permanent sealing.

[0005] The welding method has the risk of explosion if welding is performed directly on the fuel pipeline. If welding is performed after water flushing, the pipeline is long, so the water flushing time is long. The entire cycle is long, generally more than a week, and the conditions for rapid recovery cannot be met, affecting the normal oil use of the power plant units. In addition, the sludge deposited in the pipeline is not easy to be flushed clean, and the residual oil and gas will cause explosion during welding. If welding is performed after steam flushing, a new steam line needs to be connected, which adds new work and takes a long time. Summary of the invention

[0006] The technical problem to be solved by the present invention is to provide a method for quickly plugging a fuel pipeline, which can quickly and permanently plug a leaking fuel pipeline on the basis of ensuring safety.

[0007] In order to solve the above technical problems, the technical solution of the present invention is: a method for quickly plugging a fuel pipeline, a plurality of isolation valves are arranged on the fuel pipeline, so as to divide the entire fuel pipeline into a plurality of sections, and a drain valve and a water injection valve are also installed on each section. The innovation point is: the method for quickly plugging comprises the following steps:

[0008] S1 Pretreatment: First, close the two isolation valves at the front and rear positions of the segment where the leaking pipe segment is located, then open the drain valve set on the segment to drain the oil stored in the pipeline of this segment;

[0009] S2 Pipe segment cutting: Open the water injection valve set on the segment, inject water into the segmented pipeline, and then manually saw off the pipe segment to be replaced. After the pipe segment is cut, there are two fractures on the segment;

[0010] S3 Pipe segment plugging: Two special pipe plugs are used to plug the two fractures on the segment respectively. There are flow holes in the special pipe plugs. Water is injected into the pipes at both ends of the segment through the flow holes of the pipe plugs until they are full.

[0011] S4 Cleaning test: flush the small local space in the pipe formed by the pipe plug and the fracture with detergent, and perform gas detection on the small local space after flushing to ensure that the concentration of combustible gas in the gas is lower than 10% of the lower explosion limit. After the gas detection is qualified, weld a first fixed flange at each of the two fractures of the segment;

[0012] S5 Pipe segment replacement: Prefabricate the pipe to be replaced according to the length of the pipe segment to be replaced, and weld a second fixed flange on each side of the pipe to be replaced. Then remove the two special pipe plugs at the break, drain the water in the segmented pipe, connect the pipe to be replaced between the two breaks of the segment, and connect and fix the first fixed flange and the second fixed flange with bolts and nuts to complete the connection between the pipe to be replaced and the segment. Finally, open the two isolation valves before and after the segment to resume operation.

[0013] Furthermore, in step S2, when the pipe section is manually sawed, water is required to cool the section during the sawing process.

[0014] Furthermore, in step S2, the pipe section to be replaced is a pipe section centered at the pipeline leakage point and extending 245-253 mm in front and back.

[0015] Furthermore, in step S3, the dedicated pipe plug includes

[0016] A bracket, the bracket is a T-shaped structure composed of a vertically arranged base and a horizontally arranged water seal pipe, a through hole is provided in the middle of the bracket and runs through the entire bracket horizontally, and the bracket is provided with

[0017] A fixing assembly, the fixing assembly comprises a base and an expansion unit which are sequentially sleeved on the outside of the water seal pipe, wherein one side of the base fits the end surface of the base, the base comprises a support section and a tapered section, and the size of the tapered section gradually decreases from the base to the expansion unit, the expansion unit comprises three expansion blocks which are sleeved on the outside of the tapered section in a herringbone shape, the inner wall of the expansion block is an inner arc-shaped inclined surface which fits the outer wall of the tapered section, the outer wall of the expansion block is an outer arc-shaped surface which fits the inner wall of the fuel pipe, and the outer arc-shaped surfaces of the three expansion blocks are all on the same circle with the center of the bracket as the center, and the three expansion blocks are tightened by an annular spring;

[0018] A sealing assembly, the sealing assembly comprising a rubber pad and a gland which are sequentially sleeved on the outside of the water seal pipe, wherein one side of the rubber pad is in close contact with the expansion unit, and the other side of the rubber pad is in close contact with the gland;

[0019] A tightening assembly, the tightening assembly comprises a liner and a gland which are sequentially sleeved on the outside of the water seal pipe, wherein one side of the liner abuts against the side end of the gland, and a threaded section which is threadedly matched with the gland is provided on the outer edge of the side where the water seal pipe contacts the gland, and the threaded section extends along the long axis direction of the water seal pipe, and the side end of the gland abuts against the other side of the liner;

[0020] The connecting assembly comprises a connecting pipe connected to the side of the water seal pipe away from the base, and the connecting pipe is threadedly matched with the water seal pipe.

[0021] Furthermore, the connection between the expansion block and the annular spring is as follows: a groove for embedding and installing the annular spring is provided on the outer arc surface of each expansion block, and the groove extends along the outer arc surface of the expansion block, and the annular spring is respectively embedded in the groove of each expansion block to connect all the expansion blocks as a whole.

[0022] Furthermore, the rubber pad is formed by splicing together a plurality of rubber rings distributed in parallel.

[0023] Furthermore, in step S3, the distance between the pipe plug and the fracture is 217-224 mm.

[0024] The advantages of the present invention are as follows: the plugging method of the present invention shortens the scope of pipeline flushing and isolates the pipeline from the overall fuel pipeline through the cooperation of pretreatment, pipe section cutting, pipe section plugging, cleaning and testing, and pipe section replacement. On the basis of ensuring safety, the leaking fuel pipeline is quickly and permanently plugged.

[0025] When sawing manually, water is used to cool the cross section in order to avoid overheating when sawing the pipe, which may cause combustion, explosion and other safety accidents.

[0026] The length of the pipe section to be replaced is designed to ensure that the entire leaking pipe is cut off, avoiding damage to the remaining pipes during the process of sawing the pipe, thereby increasing the length of the pipe that needs to be cut.

[0027] The design of the special pipe plug, through the cooperation between the bracket, fixing assembly, sealing assembly, tightening assembly and connecting assembly, effectively achieves the isolation of the fracture and the entire fuel pipeline, shortens the scope of pipeline flushing, improves the efficiency of pipeline replacement, and also achieves the purpose of passing water through the segmented pipeline to facilitate the water sealing of the rest of the segmented pipeline, and avoids the residual oil and oil gas in the rest of the segmented pipeline from burning, explosion and other safety accidents due to the high temperature generated during welding.

[0028] The connection between the expansion block and the annular spring is achieved through the cooperation of the grooves on the expansion block, so as to avoid mutual displacement between the annular spring and the expansion block, which would cause the expansion unit to separate and affect the fixation of the entire pipe plug.

[0029] The rubber gasket is made of several rubber rings spliced ​​together to form multiple seals. In this way, even if a rubber ring cannot fit tightly against the inner wall of the pipe, it will not affect the overall seal, thus ensuring the sealing effect.

[0030] The control of the distance between the pipe plug and the fracture is to ensure the smooth welding of the first fixed flange and the fracture to avoid deformation. It also prevents residual oil and oil gas in other parts of the segmented pipeline from burning, exploding and other safety accidents due to the high temperature generated during welding. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0032] Figure 1 It is a schematic diagram of pipe section blocking in the present invention.

[0033] Figure 2 It is a schematic diagram of pipe section replacement in the present invention.

[0034] Figure 3 It is a schematic diagram of the special pipe plug in the present invention.

[0035] Figure 4 It is a top view of the base in the present invention.

[0036] Figure 5 It is a schematic diagram of the distribution of expansion blocks in the present invention. DETAILED DESCRIPTION

[0037] The following embodiments can enable those skilled in the art to more fully understand the present invention, but the present invention is not limited to the scope of the embodiments.

[0038] A number of isolation valves are provided on the fuel pipeline, thereby dividing the entire fuel pipeline into multiple sections, and a drain valve and a water injection valve are also installed on each section.

[0039] The fuel pipeline rapid plugging method of the present invention is achieved through the following steps:

[0040] S1 Pretreatment: First, close the two isolation valves at the front and rear positions of the segment 11 where the leaking pipe section is located, and then open the drain valve arranged on the segment to drain the oil stored in the pipeline of the segment 11.

[0041] S2 Pipe segment cutting: open the water injection valve on the segment 11 and inject water into the pipe of the segment 11. This part of the injected water is used for cooling to avoid heat accumulation when the pipe is subsequently sawed. At the same time, the sawing area can be submerged in water to prevent sparks. Then the pipe segment to be replaced is manually sawed off. After the pipe segment is disconnected, there are two fractures 13 on the segment.

[0042] When manually sawing a pipe section, water is needed to cool the section during the sawing process. When manually sawing, water is used to cool the section in order to avoid overheating during sawing of the pipe, which may cause combustion, explosion and other safety accidents.

[0043] The pipe section to be replaced is the pipe section with the leaking part as the center and extending 250mm in front and back. The length of the pipe section to be replaced is designed to ensure that the entire leaking pipe is cut off, avoiding damage to the remaining pipes during the sawing process, thereby increasing the length of the pipe that needs to be cut off.

[0044] S3 Pipe segment plugging: Two special pipe plugs 12 are used to plug the two fractures 13 on the segment 11 respectively. The special pipe plug 12 also has a flow hole 1. Water is injected into the pipes at both ends of the segment 11 through the flow hole 1 of the pipe plug 12 until it is full. Figure 1 shown.

[0045] The distance between the pipe plug 12 and the fracture 13 is 220 mm. The control of the distance between the pipe plug 12 and the fracture 13 is to ensure the smooth welding of the first fixed flange and the fracture to avoid deformation, and also to avoid the oil and gas remaining in the other parts of the segmented pipeline from burning, exploding and other safety accidents due to the high temperature generated during welding; the specific length of this distance can be determined according to the corrosion and thinning of the pipe wall before and after the pipeline leakage to ensure the removal of the thinned pipe section.

[0046] like Figure 3-Figure 5 As shown in the schematic diagram, the dedicated pipe plug 12 includes

[0047] A bracket 2, the bracket 2 is a T-shaped structure formed by a vertically arranged base and a horizontally arranged water seal pipe. A through hole 1 is provided in the middle of the bracket 2 and runs through the entire bracket horizontally.

[0048] The fixing assembly includes a base 3 and an expansion unit 4 which are sequentially mounted on the outside of the water seal pipe, wherein one side of the base 3 fits the end surface of the base, the base 3 includes a support section and a tapered section, and the size of the tapered section gradually decreases from the base to the expansion unit, and the expansion unit 4 includes three expansion blocks which are mounted on the outside of the tapered section in a triangular shape, the inner wall of the expansion block is an inner arc-shaped inclined surface which fits the outer wall of the tapered section, the outer wall of the expansion block is an outer arc-shaped surface which fits the inner wall of the fuel pipe, and the outer arc-shaped surfaces of the three expansion blocks are all on the same circle with the center of the bracket as the center, and the three expansion blocks are tightened by an annular spring 5. The expansion unit 4 uses three expansion blocks distributed in a triangular shape, so that the expansion blocks can fit the inner wall of the fuel pipe more evenly when expanding outward, so that the fixation is more stable.

[0049] The connection between the expansion block and the annular spring 5 is as follows: a groove for the annular spring 5 to be embedded and installed is provided on the outer arc surface of each expansion block, and the groove extends along the outer arc surface of the expansion block, and the annular spring 5 is respectively embedded in the groove of each expansion block, thereby connecting all the expansion blocks as a whole. The connection between the expansion block and the annular spring 5 is achieved by the cooperation of the groove on the expansion block, so as to avoid mutual displacement between the annular spring 5 and the expansion block, which may cause the separation of the expansion unit and affect the fixation of the entire pipe plug.

[0050] The sealing assembly comprises a rubber pad 6 and a gland 7 which are sequentially sleeved on the outside of the water seal pipe, wherein one side of the rubber pad 6 is in close contact with the expansion unit 4 , and the other side of the rubber pad 6 is in close contact with the gland 7 .

[0051] The rubber pad 6 is composed of several rubber rings arranged in parallel and spliced ​​together. The rubber pad 6 is composed of several rubber rings spliced ​​together to form multiple seals, so that even if a rubber ring cannot fit tightly against the inner wall of the pipe, it will not affect the sealing of the entire rubber pad 6, thereby ensuring the sealing effect.

[0052] The tightening assembly includes a liner 8 and a cap 9 which are sequentially sleeved on the outside of the water seal pipe, wherein one side of the liner 8 abuts against the side end of the pressure cap 7, and a threaded section threadedly matched with the cap 9 is provided on the outer edge of the side where the water seal pipe contacts the cap 9, and the threaded section extends along the long axis direction of the water seal pipe, and the side end of the cap 9 abuts against the other side of the liner 8.

[0053] The connecting assembly comprises a connecting pipe 10 connected to the side of the water seal pipe away from the base, and the connecting pipe 10 is threadedly matched with the water seal pipe.

[0054] When fixing the special pipe plug 12 in the fuel pipeline, first, the base part, the fixing assembly and the sealing assembly of the bracket 2 are extended to a certain depth in the fuel pipeline, and then the cap 9 is rotated toward the base direction of the bracket 2, thereby driving the liner 8 to move horizontally toward the base direction of the bracket 2. The movement of the liner 8 will drive the rubber pad 6 and the pressure cover 7 to move horizontally toward the base direction of the bracket 2 synchronously, and the movement of the rubber pad 6 will drive the expansion unit 4 to move horizontally toward the base direction of the bracket 2. When the expansion unit 4 moves, it is composed of three expansion blocks. Sliding along the tapered section of the base 3, with the movement of the expansion block, the expansion block will gradually protrude outward, thereby gradually fitting with the inner wall of the fuel pipeline. When the three expansion blocks are fitted and fixed to the inner wall of the fuel pipeline, the relative fixation between the special pipe plug 12 and the pipeline is completed. Then, continue to rotate the cap 9. At this time, the expansion block can no longer move. Therefore, with the rotation of the cap 9, the rubber pad 6 will expand outward due to the joint extrusion of the expansion block and the pressure cover 7, thereby achieving the sealing of the fuel pipeline. At this time, on the outside of the pressure cover 7, the pipe plug 12 and the fracture 13 form a local small space 14.

[0055] The design of the special pipe plug, through the cooperation among the bracket 2, the fixing assembly, the sealing assembly, the tightening assembly and the connecting assembly, effectively realizes the isolation of the fracture 13 from the entire fuel pipeline, shortens the scope of pipeline flushing, improves the efficiency of pipeline replacement, and also realizes the purpose of passing water through the segmented pipeline, so as to facilitate the water sealing of the remaining parts of the segmented pipeline 11, and avoid the residual oil and oil gas in the remaining parts of the segmented pipeline 11 due to the high temperature generated during welding, resulting in combustion, explosion and other safety accidents.

[0056] S4 Cleaning and testing: flush the local small space 14 in the pipe formed by the pipe plug 12 and the fracture 13 with detergent, and perform gas detection on the local small space 14 after flushing to ensure that the concentration of combustible gas in the gas is lower than 10% of its lower explosion limit. After the gas detection is qualified, weld a first fixed flange 15 at each of the two fractures 13 of the segment.

[0057] S5 Pipe segment replacement: prefabricate the pipe 16 to be replaced according to the length of the pipe segment to be replaced, and weld a second fixing flange 17 on both sides of the pipe 16 to be replaced, then remove the two special pipe plugs 12 at the fracture 13, drain the water in the pipe of the segment 11, dock the pipe 16 to be replaced between the two fractures 13 of the segment 11, and connect and fix the first fixing flange 15 and the second fixing flange 17 by bolts and nuts, so as to complete the docking of the pipe 16 to be replaced and the segment 11, as shown in FIG. Figure 2 As shown, finally, open the two isolation valves before and after section 11 to resume operation.

[0058] The plugging method of the present invention shortens the scope of pipeline flushing and isolates the pipeline from the overall fuel pipeline through the cooperation of pretreatment, pipe section cutting, pipe section plugging, cleaning and testing, and pipe section replacement. On the basis of ensuring safety, the leaking fuel pipeline is quickly and permanently plugged.

[0059] Those skilled in the art should understand that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A method for rapid plugging of a fuel pipeline, wherein a plurality of isolation valves are arranged on the fuel pipeline, thereby dividing the entire fuel pipeline into a plurality of sections, and a drain valve and a water injection valve are also installed on each section, characterized in that: The rapid plugging method includes the following steps S1 Pretreatment: First, close the two isolation valves at the front and rear positions of the segment where the leaking pipe segment is located, then open the drain valve set on the segment to drain the oil stored in the pipeline of this segment; S2 Pipe segment cutting: Open the water injection valve set on the segment, inject water into the segmented pipeline, and then manually saw off the pipe segment to be replaced. After the pipe segment is cut, there are two fractures on the segment; S3 Pipe segment plugging: Two special pipe plugs are used to plug the two fractures on the segment respectively. There are flow holes in the special pipe plugs. Water is injected into the pipes at both ends of the segment through the flow holes of the pipe plugs until they are full. Special pipe plugs include A bracket, the bracket is a T-shaped structure composed of a vertically arranged base and a horizontally arranged water seal pipe, a through hole is provided in the middle of the bracket and runs through the entire bracket horizontally, and the bracket is provided with A fixing assembly, the fixing assembly comprises a base and an expansion unit which are sequentially sleeved on the outside of the water seal pipe, wherein one side of the base fits the end surface of the base, the base comprises a support section and a tapered section, and the size of the tapered section gradually decreases from the base to the expansion unit, the expansion unit comprises three expansion blocks which are sleeved on the outside of the tapered section in a herringbone shape, the inner wall of the expansion block is an inner arc-shaped inclined surface which fits the outer wall of the tapered section, the outer wall of the expansion block is an outer arc-shaped surface which fits the inner wall of the fuel pipe, and the outer arc-shaped surfaces of the three expansion blocks are all on the same circle with the center of the bracket as the center, and the three expansion blocks are tightened by an annular spring; A sealing assembly, the sealing assembly comprising a rubber pad and a gland which are sequentially sleeved on the outside of the water seal pipe, wherein one side of the rubber pad is in close contact with the expansion unit, and the other side of the rubber pad is in close contact with the gland; A tightening assembly, the tightening assembly comprises a liner and a gland which are sequentially sleeved on the outside of the water seal pipe, wherein one side of the liner abuts against the side end of the gland, and a threaded section which is threadedly matched with the gland is provided on the outer edge of the side where the water seal pipe contacts the gland, and the threaded section extends along the long axis direction of the water seal pipe, and the side end of the gland abuts against the other side of the liner; A connecting assembly, the connecting assembly comprising a connecting pipe connected to a side of the water seal pipe away from the base, the connecting pipe being threadedly matched with the water seal pipe; S4 Cleaning test: flush the small local space in the pipe formed by the pipe plug and the fracture with detergent, and perform gas detection on the small local space after flushing to ensure that the concentration of combustible gas in the gas is lower than 10% of the lower explosion limit. After the gas detection is qualified, weld a first fixed flange at each of the two fractures of the segment; S5 Pipe segment replacement: Prefabricate the pipe to be replaced according to the length of the pipe segment to be replaced, and weld a second fixed flange on each side of the pipe to be replaced. Then remove the two special pipe plugs at the break, drain the water in the segmented pipe, connect the pipe to be replaced between the two breaks of the segment, and connect and fix the first fixed flange and the second fixed flange with bolts and nuts to complete the connection between the pipe to be replaced and the segment. Finally, open the two isolation valves before and after the segment to resume operation.

2. The method for rapid plugging of a fuel pipeline according to claim 1, characterized in that: In step S2, when the pipe section is manually sawed, water is required to cool the section during the sawing process.

3. The method for rapid plugging of a fuel pipeline according to claim 1, characterized in that: In step S2, the pipe section to be replaced is the pipe section centered at the pipeline leakage point and extending 245-253 mm in front and back.

4. The method for rapid plugging of a fuel pipeline according to claim 1, characterized in that: The connection between the expansion block and the annular spring is as follows: a groove for embedding and installing the annular spring is provided on the outer arc surface of each expansion block, and the groove extends along the outer arc surface of the expansion block. The annular spring is respectively embedded in the groove of each expansion block to connect all the expansion blocks as a whole.

5. The method for rapid plugging of a fuel pipeline according to claim 1, characterized in that: The rubber pad is formed by splicing together a plurality of rubber rings distributed in parallel.

6. The method for rapid plugging of a fuel pipeline according to claim 1, characterized in that: In step S3, the distance between the pipe plug and the fracture is 217-224 mm.

Citation Information

Patent Citations

  • Oil-gas pipeline blocking system and method

    CN105987253A

  • Method for maintaining and replacing natural gas pipeline

    CN110067910A

  • Quick plugging method for fuel pipeline

    CN112066146A

  • Sealing plug capable of expanding at pipe opening

    CN201351789Y

  • Pipeline welding plugging device

    CN210716536U