Management device, power storage system

By setting the discharge stop period in each cycle, the accuracy and safety of voltage measurement during the equalization process of lithium-ion batteries is ensured, and the problem of inaccurate voltage measurement is solved, and the efficiency and safety of battery equalization processing are improved.

CN112119564BActive Publication Date: 2024-12-03SANYO ELECTRIC CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201980032526.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2018-05-14
Filing Date
2019-04-05
Publication Date
2024-12-03
Estimated Expiration
2039-04-05

AI Technical Summary

Technical Problem

During the equalization process of lithium-ion batteries, the voltage measurement circuit supplied to the microcomputer and the abnormality determination circuit is not accurate enough, resulting in difficulty in setting the period when the discharge is stopped regularly, affecting the equalization efficiency and safety.

Method used

The first discharge stop period and the second discharge stop period are set in each cycle. The first discharge stop period is used for voltage measurement that does not affect the equalization process. The second discharge stop period is used for the determination result of the abnormality determination circuit to ensure the voltage Determination accuracy and safety.

Benefits of technology

While suppressing the decrease in the equalization processing efficiency between multiple singles, the safety is improved, and the voltage abnormality is detected through hardware control to ensure that the equalization discharge start time is as long as possible, and the voltage drop caused by wiring resistance is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112119564B_ABST
    Figure CN112119564B_ABST
Patent Text Reader

Abstract

In order to improve safety while suppressing the decrease in efficiency of equalization processing between multiple monomers, a control unit (40) controls multiple discharge circuits (31) based on the voltages of multiple monomers (V1-V3) measured by a voltage measuring unit (30), thereby performing equalization processing between multiple monomers (V1-V3). An abnormality determination circuit (33) is used to determine whether the voltage of each monomer (V1-V3) measured by the voltage measuring unit (30) is within a normal range. The control unit (40) sets a first equalization stop period in each first cycle, and sets a second discharge stop period in each second cycle longer than the first cycle. The first equalization stop period is used to measure the voltages of multiple monomers (V1-V3) without being affected by the equalization processing during the execution of the equalization processing between multiple monomers (V1-V3), and the second discharge stop period is used to determine the determination result of the abnormality determination circuit (33).
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a management device and a power storage system for managing the states of a plurality of cells connected in series. Background Art

[0002] In recent years, hybrid electric vehicles (HV), plug-in hybrid electric vehicles (PHV), and electric vehicles (EV) have become increasingly popular. Secondary batteries are installed as key equipment in these vehicles. Lithium-ion batteries have become the mainstream secondary batteries for vehicles.

[0003] Generally, in lithium-ion batteries, from the perspective of ensuring safety, the voltages of multiple cells connected in series are always monitored by a voltage measurement circuit. Each input terminal of the voltage measurement circuit is connected to each node (including both ends) of the multiple cells by wiring, and the voltage measurement circuit measures the voltage between two adjacent wirings to measure the voltage of each cell. The voltage of each cell measured by the voltage measurement circuit is sent to a microcomputer for various controls and to monitor whether the voltage of each cell is within a normal range.

[0004] In addition, in lithium-ion batteries, equalization processing is performed to equalize the capacity between multiple cells connected in series to maximize the battery's capabilities. The mainstream of equalization processing between multiple cells is the passive balancing method. In the passive balancing method, the cells other than the cell with the smallest capacity among the multiple cells connected in series are discharged to make the capacity of the other cells consistent with the capacity of the cell with the smallest capacity.

[0005] The discharge circuit for equalization generally adopts a structure in which two adjacent wirings are connected to each other among the plurality of wirings for voltage measurement (for example, see Patent Document 1). In this structure, the voltage drop of a single cell during the equalization discharge process can be observed from the voltage measurement circuit. The longer the wiring (mainly the wire bundle) and / or the larger the equalization current, the larger the voltage drop caused by the wiring resistance.

[0006] In vehicle-mounted applications, the voltage of each cell measured by a voltage measuring circuit is often monitored with a redundant structure. Specifically, the voltage of each cell measured by the voltage measuring circuit is monitored by software control performed by a microcomputer, and the voltage of each cell measured by the voltage measuring circuit is monitored by hardware control through a dedicated abnormality detection circuit. When the measured cell voltage continues to show an abnormal value for a specified time, the abnormality detection circuit determines it as an error. The abnormality detection circuit also detects the voltage of the cell during the equalization discharge process, and detects the voltage of the cell during the equalization discharge process by reducing the voltage drop caused by the wiring resistance, so it is possible to misjudge the voltage of the cell during the equalization discharge process. For example, there is a possibility that a voltage higher than the upper limit threshold is misjudged as a normal voltage.

[0007] Prior art literature

[0008] Patent Literature

[0009] Patent Document 1: Japanese Patent Application Publication No. 2011-115015 Summary of the invention

[0010] Problem that the invention aims to solve

[0011] In order to supply accurate cell voltages from the voltage measurement circuit to the microcomputer and the abnormality determination circuit during the equalization process, it is conceivable to periodically stop the discharge during the equalization process and measure the cell voltages during the stop period.

[0012] Since the cell voltage varies slightly in a short time, the microcomputer obtains the cell voltage from the voltage measurement circuit in a short cycle for control. When the discharge is periodically stopped during the equalization process as described above, the discharge stop period needs to be set in a short cycle.

[0013] When the length of the discharge stop period of each cycle is set long, the discharge time for equalization becomes short, and the time until equalization is completed becomes long. On the other hand, when the length of the discharge stop period is set short, the time required for the abnormality detection circuit to identify an error cannot be ensured.

[0014] The present invention has been made in view of such circumstances, and an object of the present invention is to provide a technology for improving safety while suppressing a decrease in the efficiency of equalization processing among a plurality of cells.

[0015] Solutions for solving problems

[0016] In order to solve the above-mentioned problem, a management device according to a certain aspect of the present invention comprises: a voltage measuring unit for measuring the voltage of each of a plurality of cells connected in series; a plurality of discharge circuits, each of which is connected in parallel to the plurality of cells; an abnormality determination circuit for determining whether the voltage of each cell measured by the voltage measuring unit is within a normal range; and a control unit for controlling the plurality of discharge circuits based on the voltages of the plurality of cells measured by the voltage measuring unit, thereby performing equalization processing among the plurality of cells. The control unit sets a first discharge stop period for each first cycle, and sets a second discharge stop period for each second cycle longer than the first cycle, the first discharge stop period for measuring the voltages of the plurality of cells without being affected by the equalization processing during the execution of the equalization processing among the plurality of cells, and the second discharge stop period for determining the determination result of the abnormality determination circuit.

[0017] Effects of the Invention

[0018] According to the present invention, it is possible to improve safety while suppressing a decrease in the efficiency of equalization processing among a plurality of cells. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a diagram for explaining a power storage system according to an embodiment of the present invention.

[0020] Figure 2 Yes means Figure 1 A diagram of an embodiment of a power storage system is shown.

[0021] Figure 3 (a) to (b) are diagrams showing an example of an equalization discharge operation for a plurality of cells and measured voltages of the plurality of cells according to a comparative example.

[0022] Figure 4 (a) to (b) are diagrams showing an example of an equalization discharge operation for a plurality of cells and a measured voltage of a plurality of cells according to the embodiment. DETAILED DESCRIPTION

[0023] Figure 1 This is a diagram for explaining a power storage system 1 involved in an embodiment of the present invention. The power storage system 1 is mounted on a vehicle and used as a driving battery for the vehicle. The power storage system 1 includes a power storage module 10 and a management device 20. The power storage module 10 includes a plurality of cells V1-V3 connected in series. The cells can use lithium-ion battery cells, nickel-metal hydride battery cells, lead battery cells, double-layer capacitor cells, lithium-ion capacitor cells, etc. In the following, in this specification, it is assumed that an example of a lithium-ion battery cell (nominal voltage: 3.6-3.7V) is used.

[0024] exist Figure 1 In the figure, for simplicity, a storage module 10 is depicted in which three cells V1 to V3 are connected in series, but in an actual structure, more cells are connected in series according to the voltage specification required by the storage system 1. In addition, a plurality of cells may be connected in series and in parallel to increase the capacity.

[0025] The power storage module 10 has a first connector CN1 for connecting multiple wire harnesses H0-H3. Multiple internal side terminals of the first connector CN1 are respectively connected to multiple nodes of multiple cells V1-V3 connected in series through multiple internal wirings. The nodes of the multiple cells V1-V3 are set at both ends of the multiple cells V1-V3 and between two adjacent cells. Therefore, when the number of cells is set to m (m is an integer greater than 2), the number of nodes of the multiple cells is (m+1). The number of internal wirings and the number of wire harnesses in the power storage module 10 are also (m+1). Figure 1 In the example shown, the number of cells is 3, so the number of nodes, the number of internal wirings, and the number of wire bundles are 4, respectively.

[0026] Fuses F0-F4 are inserted into each of the plurality of internal wires in the power storage module 10. Fuses F0-F4 melt when a current exceeding a rated value flows through them, thereby protecting the cells and the wiring harness from overcurrent. Fuses F0-F4 do not necessarily need to be inserted and can be omitted.

[0027] The management device 20 includes a voltage measuring unit 30 and a control unit 40. The voltage measuring unit 30 includes a discharge circuit 31 and a voltage measuring circuit 32. The discharge circuit 31 and the voltage measuring circuit 32 are provided on the same substrate.

[0028] The voltage measuring unit 30 includes a second connector CN2 for connecting a plurality of wire harnesses H0-H3. The plurality of wire harnesses H0-H3 are respectively connected between a plurality of external terminals of the first connector CN1 of the power storage module 10 and a plurality of external terminals of the second connector CN2 of the voltage measuring unit 30. The plurality of internal terminals of the second connector CN2 and a plurality of analog input terminals of the voltage measuring circuit 32 are respectively connected via a plurality of internal wirings. The number of the internal wirings is also (m+1).

[0029] The voltage measurement circuit 32 measures the voltage between two adjacent wirings in the plurality of internal wirings, thereby measuring each voltage of the plurality of cells V1-V3. The voltage measurement circuit 32 includes, for example, a multiplexer and an A / D converter. The multiplexer sequentially outputs the voltage between two adjacent wirings to the A / D converter. The A / D converter converts the analog voltage input from the multiplexer into a digital value.

[0030] The voltage measuring circuit 32 sends the measured voltages of the plurality of cells V1-V3 to the control unit 40. Usually, the ground potential of the substrate on which the voltage measuring unit 30 is provided is different from the ground potential of the substrate on which the control unit 40 is provided (the former is a high voltage), so the voltage measuring unit 30 and the control unit 40 transmit information through insulated communication.

[0031] The discharge circuit 31 includes discharge resistors Ra-Rc and discharge switches Sa-Sc connected in series between two adjacent wirings of a plurality of internal wirings in the voltage measuring unit 30. The discharge switches Sa-Sc are composed of semiconductor switches such as MOSFET (Metal-Oxide-Semiconductor Field-Effect Transistor). When the first discharge switch Sa is turned on, both ends of the first cell V1 connected in parallel with the first discharge switch Sa and the first discharge resistor Ra are turned on, and the first cell V1 is discharged. The other cells are also discharged when the discharge switches connected in parallel are turned on.

[0032] The control unit 40 manages the power storage module 10 based on the voltage, current and temperature of the plurality of cells V1-V3 measured by the voltage measuring unit 30, the current measuring unit (not shown) and the cell temperature measuring unit (not shown). The control unit 40 can be composed of a microcomputer 41 and a nonvolatile memory 42 (e.g., EEPROM, flash memory).

[0033] The control unit 40 estimates the SOC (State Of Charge) and SOH (State Of Health) of the plurality of cells V1-V3 based on the voltage, current, and temperature of the plurality of cells V1-V3. The SOC can be estimated, for example, by an OCV (Open Circuit Voltage) method or a current integration method. The OCV method is a method for estimating the SOC based on the OCV of the cell measured by the voltage measurement circuit 32 and characteristic data of a pre-retained SOC-OCV curve. The current integration method is a method for estimating the SOC based on the OCV of the cell measured by the voltage measurement circuit 32 at the start of charge and discharge and the integral value of the measured current.

[0034] SOH is defined by the ratio of the current full charge capacity to the initial full charge capacity. The lower the value (the closer to 0%), the more serious the degradation. The degradation of a secondary battery can be approximated by the sum of storage degradation and cycle degradation.

[0035] Storage degradation is degradation that intensifies over time according to the temperature of the secondary battery at each time point and the SOC at each time point, regardless of whether it is in positive charging or discharging. The higher the SOC at each time point (the closer it is to 100%) or the higher the temperature at each time point, the faster the storage degradation rate.

[0036] Cycle degradation is degradation that intensifies as the number of charge and discharge cycles increases. Cycle degradation depends on the operating SOC range, temperature, and current rate (in Japanese: 電流レート). The larger the operating SOC range, the higher the temperature, or the higher the current rate, the faster the cycle degradation rate. Thus, the degradation of the secondary battery depends greatly on the usage environment, and as the usage period lengthens, the deviation in capacity between multiple cells V1 - V3 becomes larger.

[0037] The control unit 40 performs equalization processing among the multiple cells V1 - V3 based on the voltages of the multiple cells V1 - V3 received from the voltage measurement unit 30. In a general cell passive balancing method, the cells among the multiple cells V1 - V3, other than the cell with the least capacity, are discharged until they reach the capacity of the cell with the least capacity (hereinafter referred to as the target value). In addition, the target value can be specified by any one of the actual capacity, SOC, and OCV. When specified by OCV, the OCV of the cell with the lowest OCV becomes the target value. In addition, the target value can also be specified by the dischargeable amount or the chargeable amount.

[0038] The control unit 40 uses the measured value of the cell with the least capacity among the multiple cells V1 - V3 as the target value, and calculates the difference between this target value and the measured values of the other multiple cells respectively. The control unit 40 calculates the discharge amount of each of the other multiple cells based on each calculated difference, and calculates the discharge time of each of the other multiple cells based on each calculated discharge amount. The control unit 40 generates a control signal for equalization processing including the discharge times of the multiple cells and sends it to the voltage measurement unit 30. The switch control circuit (not shown) in the voltage measurement unit 30 controls the multiple discharge switches Sa - Sc to be in an on state for their respective designated times based on the control signal received from the control unit 40.

[0039] In the above circuit configuration, during the cell balancing operation performed by the discharge circuit 31, the cell voltage measured by the voltage measurement circuit 32 decreases or increases relative to the actual voltage due to the influence of the wiring resistance. For example, during the equalization discharge of the second cell V2, a current flows from the positive electrode of the second cell V2 to the negative electrode of the second cell V2 via the first wiring harness H1, the second discharge resistor Rb, the second discharge switch Sb, and the second wiring harness H2. In this current cycle, in addition to the resistance component in the voltage measurement unit 30, there are resistance components based on the wiring resistance of the first internal wiring in the power storage module 10, the resistance of the first fuse F1, the contact resistance of the first connector CN1, the wiring resistance Rw1 of the first wiring harness H1, the contact resistance (×2) of the second connector CN2, the wiring resistance Rw2 of the second wiring harness H2, the contact resistance of the first connector CN1, the wiring resistance of the second internal wiring in the power storage module 10, and the resistance of the second fuse F2.

[0040] Hereinafter, the wiring resistance of the zeroth internal wiring in the power storage module 10, the resistance of the zeroth fuse F0, the contact resistance of the first connector CN1, the wiring resistance Rw0 of the zeroth wire harness H0, and the contact resistance of the second connector CN2 are collectively referred to as the zeroth wiring resistance R0. Among these resistances, the wiring resistance Rw0 of the zeroth wire harness H0 is the largest value.

[0041] Similarly, the wiring resistance of the first internal wiring in the power storage module 10, the resistance of the first fuse F1, the contact resistance of the first connector CN1, the wiring resistance Rw1 of the first wire harness H1, and the contact resistance of the second connector CN2 are collectively referred to as the first wiring resistance R1. The same applies to the second wiring resistance R2 and the third wiring resistance R3.

[0042] For example, due to the equalization discharge of the second cell V2, the equalization current Ib flows to the wiring path from the positive electrode of the second cell V2 to the first input terminal of the voltage measuring unit 30 (hereinafter referred to as the first external wiring), and the equalization current Ib flows to the wiring path from the second input terminal of the voltage measuring unit 30 to the negative electrode of the second cell V2 (hereinafter referred to as the second external wiring). In addition, it is assumed that the first cell V1 and the third cell V3 are not in a state of equalization discharge. That is, it is assumed that no current flows to the zeroth external wiring and the third external wiring.

[0043] A voltage drop of Vf1 = (R1 × Ib) is generated in the first external wiring. In addition, a voltage drop of Vf2 = (R2 × Ib) is generated in the second external wiring. As a result, the potential of the first input terminal of the voltage measuring circuit 32 drops by Vf1, and the potential of the second input terminal of the voltage measuring circuit 32 rises by Vf2. As a result, the cell voltage of the second cell V2 measured by the voltage measuring circuit 32 is measured to be lower than the actual voltage by Vf1 + Vf2. The cell voltage of the first cell V1 adjacent to the second cell V2 is measured to be higher than the actual voltage by Vf1. The cell voltage of the third cell V3 adjacent to the second cell V2 is measured to be higher than the actual voltage by Vf2.

[0044] In addition, when the single-cell balancing operation is not performed by the discharge circuit 31, almost no current flows to the zeroth external wiring line - the third external wiring line, and the voltage of the single cell measured by the voltage measurement circuit 32 is almost consistent with the actual voltage. In contrast, during the single-cell balancing operation performed by the discharge circuit 31, the longer the wiring length of the zeroth electric wire bundle H0 - the third electric wire bundle H3, and / or the larger the equalization current, the larger the difference between the voltage of the single cell measured by the voltage measurement circuit 32 and the actual voltage.

[0045] Figure 2 Yes means Figure 1 1 is a diagram of an embodiment of the power storage system 1 shown in FIG. In vehicle-mounted applications, a configuration in which the voltage measuring circuit 32 is redundant is often adopted. In this embodiment, the voltage measuring unit 30 includes a first voltage measuring circuit 32a, a discharge circuit 31, a second voltage measuring circuit 32b, and an abnormality determination circuit 33. The voltage measuring unit 30 can be configured by, for example, an ASIC (Application Specific Integrated Circuit). In addition, the discharge circuit 31 and the second voltage measuring circuit 32b can be mounted in a single chip.

[0046] The zeroth electric wire bundle H0 to the third electric wire bundle H3 are branched in the middle, one side is connected to the first voltage measuring circuit 32a, and the other side is connected to the second voltage measuring circuit 32b via the discharge circuit 31. Low-pass filters are respectively connected to the input stage of the first voltage measuring circuit 32a and the input stage of the discharge circuit 31. The low-pass filter is an RC filter composed of a resistor Rf and a capacitor Cf, and is used to suppress aliasing.

[0047] The first voltage measuring circuit 32a measures each voltage of the plurality of cells V1-V3, and supplies each measured voltage to the control unit 40 and the abnormality determination circuit 33. As described above, the voltage measuring unit 30 and the control unit 40 are connected via an insulated communication line, and the first voltage measuring circuit 32a sends each measured voltage of the plurality of cells V1-V3 to the control unit 40 according to a prescribed communication format. In the voltage measuring unit 30, the first voltage measuring circuit 32a outputs each measured voltage of the plurality of cells V1-V3 to the abnormality determination circuit 33.

[0048] The second voltage measuring circuit 32b measures the voltages of the plurality of cells V1-V3 in parallel with the first voltage measuring circuit 32a, and supplies the measured voltages to the control unit 40. Similar to the first voltage measuring circuit 32a, the second voltage measuring circuit 32b also sends the measured voltages of the plurality of cells V1-V3 to the control unit 40 according to a predetermined communication format.

[0049] The second voltage measuring circuit 32b does not supply each voltage of the plurality of cells V1-V3 to the abnormality determination circuit 33. For the measurement of the cell voltage, the first voltage measuring circuit 32a is the main measuring circuit, and the second voltage measuring circuit 32b is the auxiliary measuring circuit. The discharge circuit 31 for equalization is connected to the second voltage measuring circuit 32b. In the channel where the discharge switch is in the on state, the measured voltage of the second voltage measuring circuit 32b is substantially zero, so the voltage of the channel during the equalization discharge process cannot be measured in the second voltage measuring circuit 32b. On the other hand, the discharge circuit 31 for equalization is not connected to the first voltage measuring circuit 32a. Therefore, in the first voltage measuring circuit 32a, although the voltage of the channel during the equalization discharge process is also affected by the voltage drop caused by the above-mentioned wiring resistance, it can basically be measured. The first voltage measuring circuit 32a continuously supplies the measurement voltage of all channels to the control unit 40 and the abnormality determination circuit 33 regardless of the on / off state of the plurality of discharge switches Sa-Sc.

[0050] The abnormality determination circuit 33 is a dedicated hardware circuit for determining whether the voltage of each cell measured by the first voltage measurement circuit 32a is within a normal range. The abnormality determination circuit 33 includes, for example, a digital comparator, and determines whether the voltage of each cell is in an overvoltage (OV) state higher than the normal range, and whether the voltage of each cell is in an undervoltage (UV) state lower than the normal range.

[0051] Similarly, the microcomputer 41 determines whether the voltage of each cell measured by the first voltage measuring circuit 32a is within a normal range. In addition, the microcomputer 41 determines whether the voltage of each cell measured by the second voltage measuring circuit 32b is within a normal range. When the voltage of any cell measured by the first voltage measuring circuit 32a or the second voltage measuring circuit 32b is abnormal, the microcomputer 41 cuts off the contactor relay inserted in the power line between the power storage system 1 and the load (not shown). In addition, the microcomputer 41 notifies the ECU (Electronic Control Unit) 2 in the vehicle of the abnormal voltage of the cell via the vehicle network 3 (for example, CAN (Controller Area Network)). In this way, the control unit 40 detects the abnormal voltage of the cell through software control and notifies ECU 2. In addition, the above-mentioned contactor relay can also be a structure that is cut off by ECU 2.

[0052] On the other hand, when an abnormality occurs in any cell voltage to be measured by the first voltage measuring circuit 32a, the abnormality determination circuit 33 outputs an abnormality detection signal ALM to the delay circuit 50. When the delay circuit 50 continuously detects the abnormality detection signal for a predetermined period (e.g., 500 ms) or longer, it outputs a hardware stop signal.

[0053] exist Figure 2 In the example shown, the delay circuit 50 stops the communication between the control unit 40 and the ECU 2 through the vehicle network 3 as hardware stop control. When the ECU 2 detects that the communication signal with the control unit 40 is interrupted, it recognizes the abnormality of the power storage system 1. In addition, as the hardware stop control, the control of stopping the communication through the vehicle network 3 is an example, and for example, the control of directly disconnecting the contactor relay may also be used.

[0054] The abnormality determination circuit 33 and the delay circuit 50 detect the voltage abnormality of the cell by hardware control without using software control by the microcomputer 41, and protect the power storage system 1. Therefore, it is possible to construct a protection function with higher stability than the protection function performed by software control by the control unit 40. In general, the response time of hardware control is shorter than the response time of software control.

[0055] However, the hardware control when detecting voltage anomaly using the abnormality determination circuit 33 and the delay circuit 50 is a redundant emergency stop control, and the power storage system 1 should be protected by the control unit 40 in a regular procedure by software control. Therefore, a predetermined delay time (e.g., 500 msec) is set for the delay circuit 50 so that, when the software control by the control unit 40 functions normally, the power storage system 1 is protected by the software control by the control unit 40 before the hardware control by the abnormality determination circuit 33 and the delay circuit 50. The delay time is set to a time longer than the time taken from the abnormal voltage measurement circuit 32a measuring any cell to the completion of the protection of the power storage system 1 by the software control by the control unit 40.

[0056] As described above, during the cell balancing operation performed by the discharge circuit 31, the cell voltage measured by the first voltage measuring circuit 32a is greatly affected by the voltage drop caused by the wiring resistance of the external wiring. Therefore, it is considered to control the cell balancing operation to be stopped periodically when the voltages of the plurality of cells V1-V3 are measured by the first voltage measuring circuit 32a and the second voltage measuring circuit 32b.

[0057] Figure 3 (a)-(b) are diagrams showing an example of an equalized discharge operation for a plurality of cells V1-V3 and a measured voltage of a plurality of cells V1-V3 according to a comparative example. The voltage of a plurality of cells V1-V3 varies slightly in a short time, so it is necessary to perform voltage measurement in a short cycle using the control unit 40 under software control. Figure 3 (a) shows an example in which the control unit 40 obtains the voltages of multiple cells V1-V3 in a 100 msec period. In the 100 msec period of the unit cycle, the 80 msec period is the period during which equalization discharge is started, and the 20 msec period is the period during which equalization discharge is stopped. The control unit 40 obtains the voltages of multiple cells V1-V3 measured during the 20 msec period during which equalization discharge is stopped.

[0058] Figure 3 The threshold voltage shown in (a) is a threshold voltage for detecting overvoltage. When a voltage higher than the threshold voltage is detected, it is determined to be overvoltage. Even when the equalization discharge of the monomer of the target channel is stopped, when the equalization discharge of the monomer of the other adjacent channel is started, the measured voltage of the monomer of the target channel will be affected by the wiring resistance. For example, Figure 1In the example shown, even when the equalization discharge of the first cell V1 is stopped, when the equalization discharge of the second cell V2 is started, the measured voltage of the first cell V1 is higher than the actual voltage. Therefore, even if the actual voltage of the first cell V1 is within the normal range, it may be erroneously determined as an overvoltage. Therefore, the control unit 40 obtains the voltage of the target cell obtained during the period when the equalization discharge of the target cell is stopped and the equalization discharge of the cells adjacent to the left and right of the target cell is stopped, as the effective measurement voltage.

[0059] Figure 3 (b) is in Figure 2 The abnormality detection signal ALM output from the abnormality determination circuit 33 and the hardware stop signal output from the delay circuit 50 are added to (a) of FIG. 3. When the voltage measured by the first voltage measurement circuit 32a is higher than the above threshold voltage, the abnormality determination circuit 33 outputs the abnormality detection signal ALM. When the abnormality detection signal ALM continues for a predetermined time (in Figure 3 In the example shown in (b), when the delay circuit 50 becomes the start state for more than 500 msec, the delay circuit 50 outputs a hardware stop signal. Figure 3 In the example shown in (b), the maximum continuous output time of the abnormality detection signal ALM is 120 msec, so the hardware stop signal is not output. Figure 3 In the examples shown in (a) and (b) of FIG. 1 , the hardware control using the abnormality determination circuit 33 and the delay circuit 50 does not function effectively.

[0060] As a countermeasure, it is considered to design the system so that the voltage drop value caused by the wiring resistance of the external wiring converges within the allowable value. However, considering the limitations of the wiring harness and the degradation of the connector over time, it is difficult to continuously converge the voltage drop value within the allowable value.

[0061] Next, it is considered to adjust the prescribed time for determining the voltage abnormality of a cell. For example, it is considered to change the prescribed time of 500 msec to 120 msec or less. However, there is a possibility of erroneous determination during the period when the equalization discharge of cells in adjacent channels is started.

[0062] Therefore, it is considered to set the stop period of equalization discharge to more than 500msec. However, when the stop period of equalization discharge is increased, the start period of equalization discharge becomes shorter, and the equalization process is slow. In the example of measuring voltage with a cycle of 100msec, it is impossible to set the time for equalization discharge.

[0063] Therefore, in the present embodiment, the control unit 40 sets a first equalization discharge stop period in each first cycle, and sets a second equalization discharge stop period in each second cycle longer than the first cycle, the first equalization discharge stop period being used to measure the voltages of the plurality of cells V1-V3 without being affected by the equalization process during the execution of the equalization process between the plurality of cells V1-V3, and the second equalization discharge stop period being used to determine the determination result of the abnormality determination circuit 33. The second equalization discharge stop period is set to a period longer than the first equalization discharge stop period.

[0064] Figure 4 (a)-(b) are diagrams showing an example of an equalization discharge operation for a plurality of cells V1-V3 and a measured voltage of a plurality of cells V1-V3 according to the embodiment. Hereinafter, the control of measuring the voltage of a plurality of cells V1-V3 at predetermined intervals by software control using the control unit 40 is referred to as intermittent equalization control. Figure 3 In the example shown in (a)-(b) of FIG. 1 , intermittent equalization control is performed in which an equalization discharge start period of 80 msec and an equalization discharge stop period of 20 msec are alternately repeated.

[0065] In the embodiment, a period during which the intermittent equalization control is stopped is periodically set. A time longer than a predetermined time required for the delay circuit 50 to determine a cell voltage abnormality is set in each stop period of the intermittent equalization control. Figure 4 In the example shown in (a)-(b) of FIG. 1 , the stop period of the intermittent equalization control is set in a 20-second cycle. In the 20-second period of the unit cycle, the 16-second period is the period during which the intermittent equalization control is activated, and the 4-second period is the period during which the intermittent equalization control is stopped. The delay circuit 50 detects whether the abnormality detection signal ALM continues for more than 500 msec during the 4-second period during which the intermittent equalization control is stopped and becomes the activated state.

[0066] The above-described example assumes that the permissible delay time of the cell overvoltage can be set to 20 seconds or longer. If the permissible delay time is shorter than 20 seconds, the unit cycle of the intermittent equalization control needs to be set within the permissible delay time.

[0067] In addition, Figure 4 In the example shown in (a)-(b), compared to Figure 3 In the example shown in (a)-(b), the efficiency of the equalization process decreases by 20%, but this can be offset by increasing the equalization discharge current by 20%. In addition, when the equalization discharge current is increased, the voltage drop value caused by the wiring resistance increases, but in this embodiment, the voltage of the single cell is measured during the stop period of the equalization discharge, so it is not affected by the voltage drop.

[0068] As described above, according to the present embodiment, a long-period equalization discharge stop period for detecting voltage anomalies by hardware control is provided, in contrast to a short-period equalization discharge stop period for voltage measurement by software control. Thus, during the equalization process, the voltage anomaly detection by hardware control can be effectively performed, thereby ensuring safety by redundancy of software control and hardware control. In addition, the equalization discharge start period can be ensured to be as long as possible. Thus, safety can be improved while suppressing a decrease in the efficiency of the equalization process. In addition, by measuring the voltage of a single cell during a short-period equalization discharge stop period, a high-precision voltage that is not affected by the voltage drop caused by wiring resistance can be measured.

[0069] The present invention has been described above based on the embodiments. The embodiments are illustrative, and those skilled in the art will appreciate that there are various variations of the combinations of the constituent elements and the processing steps, and such variations also fall within the scope of the present invention.

[0070] In the above embodiment, an example of using the above-mentioned equalization process in the power storage system 1 for vehicle use is described, but the above-mentioned equalization process can also be used in the power storage system 1 for stationary power storage use. In addition, the above-mentioned equalization process can also be used in the power storage system 1 for electronic devices such as notebook PCs and smartphones.

[0071] For example, in stationary power storage applications, when the control unit 40 detects an abnormality in the cell voltage, an abnormality detection signal is notified to a higher-level device such as a monitoring server on the cloud or a HEMS (Home Energy Management System) controller.

[0072] In addition, the embodiment can be specified by the following items.

[0073] [Project 1]

[0074] A management device (20), characterized by comprising:

[0075] A voltage measuring unit (30) for measuring the voltage of each of a plurality of cells (V1-V3) connected in series;

[0076] A plurality of discharge circuits (31), the plurality of discharge circuits being respectively connected in parallel to the plurality of monomers (V1-V3);

[0077] an abnormality determination circuit (33) for determining whether the voltage of each cell (V1-V3) measured by the voltage measurement unit (30) is within a normal range; and

[0078] a control unit (40) for controlling the plurality of discharge circuits (31) based on the voltages of the plurality of cells (V1-V3) measured by the voltage measuring unit (30), thereby performing equalization processing among the plurality of cells (V1-V3);

[0079] The control unit (40) sets a first discharge stop period in each first cycle, and sets a second discharge stop period in each second cycle longer than the first cycle, the first discharge stop period being used to measure the voltages of the plurality of cells (V1-V3) without being affected by the equalization process during the execution of the equalization process between the plurality of cells (V1-V3), and the second discharge stop period being used to determine the determination result of the abnormality determination circuit (33).

[0080] According to this, it is possible to improve safety while suppressing a decrease in the efficiency of the equalization process among the plurality of cells (V1 to V3).

[0081] [Project 2]

[0082] The management device (20) according to item 1 is characterized in that:

[0083] The second discharge stop period is set to be a period longer than the first discharge stop period.

[0084] Accordingly, the abnormality determination circuit (33) can be operated effectively.

[0085] [Item 3]

[0086] The management device (20) according to item 1 is characterized in that:

[0087] The voltage measuring unit (30) includes a first voltage measuring circuit (32a) and a second voltage measuring circuit (32b).

[0088] The first voltage measuring circuit (32a) supplies the measured voltages of the plurality of cells (V1-V3) to the control unit (40) and the abnormality determination circuit (33).

[0089] The second voltage measuring circuit (32b) is connected to the discharge circuit (31), and supplies the measured voltages of the plurality of cells (V1-V3) to the control unit (40).

[0090] According to this, the voltage measurement circuit is made redundant, thereby improving safety.

[0091] [Item 4]

[0092] The management device (20) according to any one of items 1 to 3, characterized in that:

[0093] The control unit (40) includes a microcomputer (41),

[0094] The microcomputer (41) notifies an abnormality detection signal to a higher-level control device (2) when at least one of the voltages of the plurality of cells (V1-V3) acquired from the voltage measuring unit (30) through communication exceeds a normal range.

[0095] When at least one of the voltages of the plurality of cells exceeds a normal range, the abnormality determination circuit (33) executes a hardware stop process after a delay time longer than a time required for the microcomputer (41) to perform the stop process has elapsed.

[0096] According to this, the system can be stopped by software control in a state where both software control by the microcomputer (41) and hardware control by the abnormality determination circuit (33) are effective.

[0097] [Item 5]

[0098] A power storage system (1), characterized by comprising:

[0099] a plurality of cells (V1-V3) connected in series; and

[0100] The management device (20) according to any one of items 1 to 4, which is used to manage the plurality of cells (V1-V3).

[0101] According to this, it is possible to construct a power storage system (1) that improves safety while suppressing a decrease in the efficiency of equalization processing among a plurality of cells (V1 to V3).

[0102] Description of Reference Numerals

[0103] 1: power storage system; 10: power storage module; V1-V3: single cell; F0-F3: fuse; CN1: first connector; H0-H3: wiring harness; R0-R3: wiring resistance; Rw0-Rw3: wiring harness resistance; Ra-Rc: discharge resistance; Sa-Sc: discharge switch; Rf: filter resistance; Rc: filter capacity; 20: management device; CN2: second connector; 30: voltage measuring unit; 31: discharge circuit; 32: voltage measuring circuit; 32a: first voltage measuring circuit; 32b: second voltage measuring circuit; 33: abnormality judgment circuit; 40: control unit; 41: microcomputer; 42: non-volatile memory; 50: delay circuit; 2: ECU; 3: vehicle network.

Claims

1. A management device, characterized in that: have: a voltage measuring unit for measuring a voltage of each of the plurality of cells connected in series; A plurality of discharge circuits, wherein the plurality of discharge circuits are respectively connected in parallel with the plurality of monomers; an abnormality determination circuit for determining whether the voltage of each cell measured by the voltage measurement unit is within a normal range; as well as a control unit configured to control the plurality of discharge circuits based on the voltages of the plurality of cells measured by the voltage measuring unit, thereby performing equalization processing among the plurality of cells, wherein the control unit sets a first discharge stop period in each first cycle, and sets a second discharge stop period in each second cycle longer than the first cycle, the first discharge stop period being used to measure the voltages of the plurality of cells without being affected by the equalization process during the execution of the equalization process between the plurality of cells, and the second discharge stop period being used to determine the determination result of the abnormality determination circuit, The control unit causes a plurality of the first cycles and one second cycle to repeat alternately.

2. The management device according to claim 1, characterized in that: The second discharge stop period is set to be a period longer than the first discharge stop period.

3. The management device according to claim 1, characterized in that: The voltage measuring unit includes a first voltage measuring circuit and a second voltage measuring circuit. The first voltage measurement circuit supplies the measured voltages of the plurality of cells to the control unit and the abnormality determination circuit. The second voltage measurement circuit is connected to the discharge circuit, and supplies the measured voltages of the plurality of cells to the control unit.

4. The management device according to any one of claims 1 to 3, characterized in that: The control unit includes a microcomputer, When at least one of the voltages of the plurality of cells acquired from the voltage measuring unit through communication exceeds a normal range, the microcomputer notifies a higher-level control device of an abnormality detection signal. When at least one of the voltages of the plurality of cells exceeds a normal range, the abnormality determination circuit executes a hardware stop process after a delay time equal to or longer than a time required for the microcomputer to perform the stop process has elapsed.

5. A power storage system, characterized in that: have: A plurality of cells connected in series; and The management device according to any one of claims 1 to 4, which is used to manage the plurality of units.