A pipe string for extracting seabed natural gas hydrate
By using a filter combination and a pulley spring system in the subsea natural gas hydrate extraction string, the problem of impurities entering due to the collapse of the overburden layer is solved, and the purity of combustible ice and the stability of the extraction pipe are improved.
Patent Information
- Application Number
- CN201910547202.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-06-24
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2039-06-24
AI Technical Summary
During the extraction process of seafloor combustible ice, the overburden layer collapses, causing the overburden soil to enter the extraction pipe string, reducing the purity of combustible ice.
A submarine natural gas hydrate extraction pipe string is designed, which uses a combination of first and second filters. Through the action of a fixed pulley and a compression spring, the first filter is vibrated to remove impurities in the mesh, and the impurities are removed through the stainless steel and activated carbon filters. Further improve the filtration effect and prevent corrosion and wear.
It effectively reduces the impurities of covering soil entering the extraction pipe string, improves the purity of combustible ice and the service life of the extraction pipe, and ensures the stability and cleanliness of the extraction process.
Smart Images

Figure CN112127846B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of exploitation of combustible ice, and more specifically, to a pipe column for extracting seabed natural gas hydrate. Background Art
[0002] "Natural gas hydrate, also known as "combustible ice," is a solid substance formed by mixing water and natural gas under high pressure and low temperature conditions. It looks very much like ice or solid alcohol and can burn when exposed to fire. It is easy to use, has a high calorific value, and is clean and pollution-free. Combustible ice is the preferred alternative energy source for the "post-petroleum generation." my country's sea areas are mainly silt sand reservoirs, which account for more than 90% of the global storage type, and the seabed strata covering it are generally sandy.
[0003] A Chinese patent with announcement number CN109113594A discloses a combustible ice extraction column, including multiple first limit holes, a limit structure, a conveying structure, a fixing plate and a connecting structure. The invention operates as follows: the conveying structure is connected to a circulating pipeline for cooling to facilitate cooling the interior of the conveying structure during land mining and transportation, effectively preventing the internal temperature of the conveying structure from being too high and causing danger and affecting the conveying quality, thereby improving the conveying quality; connecting two conveying structures through a connecting structure makes it more convenient to install and disassemble the conveying structure, thereby improving the sealing between the conveying structures.
[0004] However, during the process of extracting combustible ice with the extraction pipe, the combustible ice layer partially collapses, which may cause the overburden layer to collapse into the combustible ice layer. At this time, the extraction pipe column will also absorb soil from the overburden layer into the combustible ice layer when absorbing combustible ice, resulting in a decrease in the purity of the absorbed combustible ice. Summary of the invention
[0005] The object of the present invention is to provide a pipe string for extracting seabed natural gas hydrates, so as to reduce the amount of covering soil entering into the extraction pipe string.
[0006] The above technical objectives of the present invention are achieved through the following technical solutions: a subsea natural gas hydrate extraction pipe column, comprising an extraction pipe arranged on an offshore platform and extending to a subsea mining position, wherein the extraction pipe is provided with a first filter screen slidingly connected to the inner wall of the extraction pipe near the subsea mining position, a plurality of first compression springs are arranged around the first filter screen, a plurality of the first compression springs are connected to a second filter screen, the second filter screen is away from the subsea mining position and fixedly connected to the inner wall of the extraction pipe, the first filter screen is fixedly connected to a cable passing through one end of the extraction pipe away from the offshore platform, the cable is wound around a fixed pulley along the direction of the extraction pipe, and the fixed pulley is arranged on the offshore platform.
[0007] By adopting the above technical solution, firstly, impurities such as mud and seabed sediments can be removed through the filtering effect of the first filter screen and the second filter screen; secondly, the first filter screen connected by the cable is driven to move toward the seabed mining area through the pulling force of the fixed pulley, and the fixed pulley is released. Under the action of the compression spring, the first filter screen moves toward the direction of the second filter screen, so as to achieve the purpose of vibrating the first filter screen to remove impurities in the mesh of the first filter screen.
[0008] Preferably, a through-hole device is provided in the extraction pipe to clean the mesh of the second filter screen.
[0009] By adopting the above technical solution, firstly, impurities such as mud and seabed sediments can be removed through the filtering effect of the first filter net and the second filter net; secondly, the first filter net connected by the first cable is driven to move toward the seabed mining area through the pulling force of the fixed pulley, and the fixed pulley is released. Under the action of the compression spring, the first filter net moves toward the direction of the second filter net, so as to achieve the purpose of vibrating the first filter net to remove impurities in the mesh of the first filter net.
[0010] Preferably, the through-hole device comprises a plurality of top plates hinged on the extraction tube by a hinge shaft, the plurality of top plates are arranged along a circle of the extraction tube and distributed between the first filter screen and the second filter screen, a circular support screen is placed on the side of the plurality of top plates facing away from the first filter screen, the support screen comprises an annular support ring, a plurality of support rods are connected to the annular support ring, a plurality of adjacent support rods have a plurality of gaps, a plurality of support rods are fixedly connected with soft bristles on the side facing away from the first filter screen, and a first torsion spring is provided on the hinge shaft to keep the top plate horizontal.
[0011] By adopting the above technical solution, when the fixed pulley drives the first filter to move, the fixed pulley is released, and under the action of the compression spring, the first filter moves toward the second filter, causing the first filter to hit the top plate connected to the inner wall of the extraction tube through the torsion spring, and the top plate moves toward the second filter, so that the top plate and the soft hair on the support plate that are slidingly connected to the top plate touch the second filter, thereby achieving the purpose of cleaning the second filter.
[0012] Preferably, a rubber pad is provided on the side of the top plate facing away from the soft bristles.
[0013] By adopting the above technical solution, since the first filter screen touches the top plate to move upward, the first filter screen and the top plate are easily worn due to the friction, a rubber pad is provided on the side of the top plate away from the soft hair to reduce wear and increase the service life.
[0014] Preferably, the first filter screen includes a first activated carbon filter screen and a first stainless steel filter screen in sequence along the direction close to the seabed mining location, and the second filter screen includes a second activated carbon filter screen and a second stainless steel filter screen in sequence along the direction close to the seabed mining location.
[0015] By adopting the above technical scheme, firstly, the first filter screen is firstly contacted with the extracted gas-liquid combustible ice, making the first filter screen susceptible to corrosion by the gas-liquid combustible ice, and the stainless steel filter screen can increase the service life of the first filter screen and the second filter screen, and play a role in rust prevention; secondly, large molecular impurities such as soil and seabed sediments are initially filtered out, and then small molecular impurities such as soil and seabed sediments are further filtered through the activated carbon filter screen, thereby achieving a better filtering effect.
[0016] Preferably, the offshore platform is provided with a through hole for the extraction pipe to pass through, and a plurality of placement grooves with bottoms distributed in the vertical direction are provided on the circumference of the hole wall of the through hole, and a second compression spring is provided in each of the placement grooves, one end of the second compression spring is fixed to the bottom of the placement groove, and the other end extends out of the notch of the placement groove and an extrusion block that contacts the outer wall of the extraction pipe is provided at the extended end.
[0017] By adopting the above technical solution, the extraction tube is placed in the through hole. At this time, the extrusion block is pressed against the outer wall of the extraction tube under the extrusion force of the compression spring, and then the extraction tube is fixed in the through hole. At this time, the extrusion block is convenient for fixing extraction tubes of different sizes to meet the use requirements.
[0018] Preferably, an annular support plate is fixedly provided on the slot wall of the placement slot in the horizontal direction, and an annular insertion plate is slidably connected to the upper surface of the support plate to close the slots of each placement slot and to contact the hole wall of the through hole, and the insertion plate enables the extrusion block to be completely located in the placement slot.
[0019] By adopting the above technical solution, firstly, the setting of the insertion plate makes it easy to fix the extrusion block in the through hole, and then makes it easy to put the extraction tube into the through hole. After the extraction tube is put into the through hole, the insertion plate is taken out of the through hole. At this time, the extrusion block will be moved out of the through hole under the action of the compression spring and abut against the outer wall of the extraction tube; secondly, the rotation of the rotating part drives the insertion plate to rotate, so that the extrusion block abuts against the outer wall of the extraction tube.
[0020] Preferably, the number of the placement grooves is set to three and they are evenly arranged on the wall of the through hole, and the insertion plate is provided with a first opening, a second opening, and a third opening for the extrusion blocks in the three placement grooves to move out of the placement grooves respectively, the width and height dimensions of the first opening are the width and height dimensions of the extrusion block, the width and height dimensions of the second opening and the third opening are arranged in an arithmetic progression on the dimensions of the first opening with a tolerance of the width and height dimensions of an extrusion block, and the insertion plate is provided with a rotating part for rotating the insertion plate on the support plate.
[0021] By adopting the above technical solution, when it is necessary to move the extrusion block into the placement groove, align the first opening with one of the extrusion blocks, and then rotate the insertion plate so that the extrusion block facing the first opening is resisted by the outer wall of the insertion plate. At this time, the extrusion block facing the second opening is also pushed into the corresponding placement groove. At this time, continue to rotate the insertion plate so that the extrusion blocks facing the first opening and the second opening are resisted by the outer wall of the insertion plate. The extrusion block facing the third opening is also pushed into the corresponding placement groove. At this time, continue to rotate the insertion plate so that the extrusion blocks facing the first opening, the second opening, and the third opening are all resisted by the outer wall of the insertion plate, which makes it convenient for the operator to move each extrusion block into the placement groove alone.
[0022] Preferably, the rotating member comprises a spur gear ring threadedly connected to a side of the insert plate away from the extraction tube.
[0023] By adopting the above technical solution, the insertion plate can be easily moved.
[0024] Preferably, a rotating shaft is circumferentially provided at one end of the extraction pipe close to the seabed mining position, and a plurality of air hoods are circumferentially provided on the rotating shaft through a second torsion spring, and each of the air hoods is tilted and offset in the length direction of the extraction pipe, and one end of the second torsion spring is connected to the rotating shaft, and the other end is connected to the air hood.
[0025] By adopting the above technical solution, when extracting gas-liquid combustible ice, a plurality of gas hoods protect the extraction pipe through the action of the torsion spring.
[0026] To sum up, firstly, impurities such as mud and seabed sediments can be removed through the filtering effect of the first filter and the second filter; secondly, the first filter connected by the first cable is driven to move toward the seabed mining area through the pulling force of the fixed pulley, and the fixed pulley is released. Under the action of the compression spring, the first filter moves in the opposite direction to the second filter, so as to achieve the purpose of vibrating the first filter to remove impurities from the mesh of the first filter; thirdly, the extraction pipe is stabilized and protected, which is beneficial to mining. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a structural schematic diagram of this embodiment;
[0028] Figure 2 is a schematic diagram of the structure of the support ring of this embodiment;
[0029] Figure 3 is a schematic diagram of the structure of the spur gear ring in this embodiment;
[0030] Figure 4 is a schematic diagram of the structure of the insert plate of this embodiment;
[0031] Figure 5 is a schematic diagram of the structure of the first filter screen and the second filter screen of this embodiment;
[0032] Figure 6 is a schematic diagram of the structure of the support rod in this embodiment;
[0033] Figure 7 It is a schematic diagram of the structure of the extrusion block of this embodiment.
[0034] In the figure: 1, offshore platform; 2, extraction tube; 3, first compression spring; 4, through hole; 5, placement groove; 6, straight tooth ring; 7, fixed pulley; 8, cable; 9, air hood; 10, support plate; 11, extrusion block; 12, insertion plate; 13, top plate; 14, support net; 15, soft hair; 16, first filter net; 17, second filter net; 18, rotating shaft; 19, second torsion spring; 20, first torsion spring; 21, rubber pad; 22, second compression spring; 23, first opening; 24, second opening; 25, third opening; 26, hinge shaft; 141, support ring; 142, support rod; 143, gap; 161, first activated carbon filter; 162, first stainless steel filter; 171, second activated carbon filter; 172, second stainless steel filter. DETAILED DESCRIPTION
[0035] The present invention is further described in detail below in conjunction with the accompanying drawings.
[0036] A pipe string for extracting seabed natural gas hydrate, such as Figure 1 , including an extraction pipe 2 arranged on an offshore platform 1 and extending to a seabed mining position, the extraction pipe 2 is provided with a first filter screen 16 slidingly connected to the inner wall of the extraction pipe 2 near the seabed mining position, a plurality of first compression springs 3 are arranged around the first filter screen 16, a plurality of the first compression springs 3 are connected to a second filter screen 17, the second filter screen 17 is away from the seabed mining position and fixedly connected to the inner wall of the extraction pipe 2, the first filter screen 16 is fixedly connected to a cable 8 passing through the end of the extraction pipe 2 away from the offshore platform 1, the cable 8 is wound around a fixed pulley 7 along the direction of the extraction pipe 2, and the fixed pulley 7 is provided On the offshore platform 1, the filtering effects of the first filter screen and the second filter screen can remove impurities such as mud and seabed sediments. The first filter screen 16 is fixedly connected to a first cable 8 that passes through one end of the extraction pipe 2 and is close to the seabed mining position. The first cable 8 is fixedly connected to a fixed pulley 7 arranged on the offshore platform 1 in the direction away from the seabed mining position. The first filter screen connected by the first cable is driven to move toward the seabed mining area through the pulling force of the fixed pulley. When the fixed pulley is released, the first filter screen moves toward the second filter screen under the action of the compression spring, thereby achieving the purpose of vibrating the first filter screen to remove impurities in the mesh of the first filter screen.
[0037] like Figure 1 , a mesh device for cleaning the mesh of the second filter 17 is provided in the extraction pipe 2, and the first filter 16 connected by the first cable 8 is driven to move toward the seabed mining area by the pulling force of the fixed pulley 7, and the fixed pulley 7 is released. Under the action of the compression spring 3, the first filter 16 moves in the opposite direction to the second filter 17, so as to achieve the purpose of vibrating the first filter 16 to remove the impurities in the mesh of the first filter 16, and a rotating shaft 18 is circumferentially provided at one end of the extraction pipe 2 close to the seabed mining position, and a plurality of gas hoods 9 are circumferentially provided on the rotating shaft 18 through the second torsion spring 19, and each gas hood 9 is tilted relative to the extraction pipe 2, and one end of the second torsion spring 19 is connected to the rotating shaft 18, and the other end is connected to the gas hood 9. There is molten gas-liquid combustible ice in the seabed mining area, and there is unmelted gas-liquid combustible ice at the same time. When the extraction extraction pipe 2 is extracted and contacts the unmelted gas-liquid combustible ice, a plurality of gas hoods 9 protect the extraction pipe 2 through the action of the torsion spring.
[0038] like Figure 1 The first filter 16 and the second filter 17 include an activated carbon filter 21 and a stainless steel filter 22 in sequence along the direction close to the seabed mining position. The stainless steel filter 22 first contacts the extracted gas-liquid combustible ice, making the stainless steel filter 22 susceptible to corrosion by the gas-liquid combustible ice. The stainless steel filter 22 can initially filter out large molecules of soil and seabed sediments and other impurities to prevent rust. Then small molecules of soil and seabed sediments and other impurities are further filtered through the activated carbon filter 21 to achieve a better filtering effect.
[0039] like Figure 1 ,like Figure 2The through-hole device includes a plurality of top plates 13 hinged on the extraction pipe 2 through a hinge shaft 26, and a plurality of the top plates 13 are arranged along a circle of the extraction pipe and distributed between the first filter screen 16 and the second filter screen 17. A circular support screen 14 is placed on the side of the top plates 13 away from the first filter screen 16, and the support screen 14 includes an annular support ring 141, and a plurality of support rods 142 are connected to the annular support ring 141. A plurality of adjacent support rods 142 have a plurality of gaps 143, and a plurality of support rods 142 are fixedly connected to the side away from the first filter screen 16 with soft hair 15, and a first torsion spring 20 is provided on the hinge shaft 26 to make the top plate 13 horizontal, and when the fixed pulley 7 drives the first filter screen 16 to move, the first torsion spring 20 is released. The fixed pulley 7, under the action of the compression spring 3, the first filter screen 16 moves toward the second filter screen 17, causing the first filter screen 16 to hit the top plate 13 connected to the inner wall of the extraction tube 2 through the torsion spring, and the top plate 13 moves toward the second filter screen 17, so that the top plate 13 and the soft hair 15 on the support plate 14 connected to the top plate 13 by sliding connection touch the second filter screen 17, so as to achieve the purpose of cleaning the second filter screen 17. In addition, a rubber pad is provided on the side of the top plate 13 away from the soft hair 15. Since the first filter screen 16 hits the top plate 13 to move upward, the first filter screen 16 and the top plate 13 are easily worn under the action of friction, so a rubber pad is provided on the side of the top plate 13 away from the soft hair 15 to reduce wear and increase the service life.
[0040] like Figure 3 ,like Figure 4 The offshore platform 1 is provided with a through hole 4 for the extraction pipe 2 to pass through, and a plurality of placement grooves 5 with the bottom of the groove distributed in the vertical direction are provided on the circumference of the hole wall of the through hole 4. A compression spring 3 is provided in each of the placement grooves 5, and one end of the compression spring 3 is fixed to the bottom of the placement groove 5, and the other end extends out of the notch of the placement groove 5 and an extrusion block that contacts the outer wall of the extraction pipe 2 is provided at the extended end. The extraction pipe 2 is placed in the through hole 4. At this time, the extrusion block 11 contacts the outer wall of the extraction pipe 2 under the extrusion force of the compression spring 3, thereby fixing the extraction pipe 2 in the through hole 4. At this time, it is convenient for the extrusion block 11 to fix extraction pipes 2 of different sizes, thereby meeting the use requirements.
[0041] like Figure 5 ,like Figure 6The slot wall of the placement groove 5 is fixedly provided with an annular support plate 10 in the horizontal direction. The upper surface of the support plate 10 is slidably connected with an annular insertion plate 12 that closes the slots of each placement groove 5 and contacts the hole wall of the through hole 4. The insertion plate 12 makes the extrusion block 11 completely located in the placement groove 5. The setting of the insertion plate 12 is convenient for fixing the extrusion block 11 in the through hole 4, and then facilitating the insertion of the extraction tube 2 into the through hole 4. When the extraction tube 2 is placed in the through hole 4, the insertion plate 12 is taken out of the through hole 4. At this time, the extrusion block 11 will be moved out of the through hole 4 under the action of the compression spring 3 and contact with the outer wall of the extraction tube 2. The insertion plate 12 is provided with a rotating part that enables the insertion plate 12 to rotate on the support plate 10. The rotating part includes a straight tooth ring 6 threadedly connected to the side of the insertion plate 12 away from the extraction tube 2. The rotation of the rotating part drives the insertion plate 12 to rotate, so that the extrusion block 11 contacts the outer wall of the extraction tube 2.
[0042] like Figure 5 ,like Figure 7 The number of placement slots 5 is set to three and they are evenly arranged on the hole wall of the through hole 4. The insert plate 12 is provided with a first opening 23, a second opening 24, and a third opening 25 for the extrusion blocks 11 in the three placement slots 5 to move out of the placement slots 5. The width and height of the first opening 23 are the width and height of the extrusion block 11. The width and height of the second opening 24 and the third opening 25 are formed in an arithmetic progression on the size of the first opening 23 with a tolerance of the width and height of one extrusion block 11. When the extrusion block 11 needs to be moved into the placement slot 5, the first opening 23 is aligned with one of the extrusion blocks 11, and then the insert plate 12 is rotated so that the first opening 23 is aligned with the first opening 23. The extrusion block 11 facing the first opening 23 is in conflict with the outer wall of the insertion plate 12. At this time, the extrusion block 11 facing the second opening 24 is also pushed into the corresponding placement groove 5. At this time, the insertion plate 12 is continued to be rotated, so that the extrusion blocks 11 facing the first opening 23 and the second opening 24 are in conflict with the outer wall of the insertion plate 12. The extrusion block 11 facing the third opening 25 is also pushed into the corresponding placement groove 5. At this time, the insertion plate 12 is continued to be rotated, so that the extrusion blocks 11 facing the first opening 23, the second opening 24, and the third opening 25 are all in conflict with the outer wall of the insertion plate 12, which makes it easier for the operator to move each extrusion block 11 into the placement groove 5.
[0043] The above is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.
Claims
1. A pipe string for extracting submarine natural gas hydrate, characterized in that: The invention comprises an extraction pipe (2) arranged on an offshore platform (1) and extending to a seabed mining position, wherein the extraction pipe (2) is provided with a first filter screen (16) slidably connected to the inner wall of the extraction pipe (2) near the seabed mining position, a plurality of first compression springs (3) are arranged around the first filter screen (16), the plurality of first compression springs (3) are connected to a second filter screen (17), the second filter screen (17) is away from the seabed mining position and fixedly connected to the inner wall of the extraction pipe (2), the first filter screen (16) is fixedly connected to a cable (8) passing through one end of the extraction pipe (2) away from the offshore platform (1), the cable (8) is wound around a fixed pulley (7) along the direction of the extraction pipe (2), and the fixed pulley (7) is arranged on the offshore platform (1); The extraction pipe (2) is provided with a through-hole device for cleaning the mesh of the second filter screen (17); The first filter screen (16) comprises a first activated carbon filter screen (161) and a first stainless steel filter screen (162) in sequence along a direction close to a seabed mining location, and the second filter screen (17) comprises a second activated carbon filter screen (171) and a second stainless steel filter screen (172) in sequence along a direction close to a seabed mining location.
2. The extraction string for submarine natural gas hydrate according to claim 1, characterized in that: The through-hole device comprises a plurality of top plates (13) hinged on the extraction pipe (2) via a hinge shaft (26), the plurality of top plates (13) being arranged along a circumference of the extraction pipe and distributed between the first filter screen (16) and the second filter screen (17), a circular support screen (14) being placed on the side of the plurality of top plates (13) facing away from the first filter screen (16), the support screen (14) comprising an annular support ring (141), a plurality of support rods (142) being connected to the annular support ring (141), a plurality of gaps (143) being formed between a plurality of adjacent support rods (142), a plurality of soft hairs (15) being fixedly connected to the side of the plurality of support rods (142) facing away from the first filter screen (16), and a first torsion spring (20) for keeping the top plate (13) horizontal is provided on the hinge shaft (26).
3. The extraction string for submarine natural gas hydrate according to claim 2, characterized in that: A rubber pad (21) is provided on the side of the top plate (13) facing away from the soft hair (15).
4. The extraction string for seabed natural gas hydrate according to claim 1, characterized in that: The offshore platform (1) is provided with a through hole (4) for the extraction pipe (2) to pass through, and a plurality of placement grooves (5) with bottoms distributed in the vertical direction are provided on the circumferential direction of the hole wall of the through hole (4), and each of the placement grooves (5) is provided with a second compression spring (22), one end of the second compression spring (22) is fixed to the bottom of the placement groove (5), and the other end extends out of the notch of the placement groove (5) and is provided with an extrusion block (11) that contacts the outer wall of the extraction pipe (2) at the extended end.
5. The extraction string for submarine natural gas hydrate according to claim 4, characterized in that: An annular support plate (10) is fixedly provided on the notch wall of the placement groove (5) in the horizontal direction, and an annular insertion plate (12) is slidably connected to the upper surface of the support plate (10) to close the notch of each placement groove (5) and to contact the hole wall of the through hole (4), and the insertion plate (12) enables the extrusion block (11) to be completely located in the placement groove (5).
6. The extraction string for seabed natural gas hydrate according to claim 5, characterized in that: The number of the placement grooves (5) is set to three and they are evenly arranged on the wall of the through hole (4); the insert plate (12) is provided with a first opening (23), a second opening (24), and a third opening (25) for respectively allowing the extrusion blocks (11) in the three placement grooves (5) to move out of the placement grooves (5); the width and height of the first opening (23) are the width and height of the extrusion block (11); the width and height of the second opening (24) and the third opening (25) are arranged on the basis of the dimensions of the first opening (23) in an arithmetic progression with a tolerance of the width and height of one extrusion block (11); and the insert plate (12) is provided with a rotating member for rotating the insert plate (12) on the support plate (10).
7. The extraction string for submarine natural gas hydrate according to claim 6, characterized in that: The rotating member comprises a spur gear ring (6) threadedly connected to a side of the insertion plate (12) away from the extraction tube (2).
8. The extraction string for submarine natural gas hydrate according to claim 1, characterized in that: A rotating shaft (18) is provided in the circumference of one end of the extraction pipe (2) close to the seabed mining position. A plurality of air hoods (9) are provided in the circumference of the rotating shaft (18) via a second torsion spring (19). Each of the air hoods (9) is tilted and offset from the length direction of the extraction pipe (2). One end of the second torsion spring (19) is connected to the rotating shaft (18), and the other end is connected to the air hood (9).
