Fault diagnosis method of flow meter of meter and hydrogen filling device
By receiving and computing the pressure, temperature and volume information of the hydrogen tank, combined with the flowmeter meter meter measurement data, the flowmeter failure in the hydrogen filling device is determined, which solves the problem of difficulty in continuously verifying the flowmeter accuracy in the prior art, and improves the hydrogen filling Accuracy and security.
Patent Information
- Application Number
- CN201980036677.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2018-05-30
- Filing Date
- 2019-05-27
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2039-05-27
AI Technical Summary
The prior art is difficult to continuously verify the flowmeter accuracy in the hydrogen filling device, resulting in the inability to detect and avoid flowmeter failures in time, affecting the accuracy and safety of hydrogen filling.
By receiving the pressure, temperature and volume information of the tank, the filling amount is calculated, and compared with the filling amount measured using the flow meter, the error value stored in multiple past actual situation data is used to determine whether the flow meter is faulty and output an alarm.
Continuous verification of flowmeter accuracy is achieved, filling errors caused by faults are avoided, and the accuracy and safety of hydrogen filling are improved.
Smart Images

Figure CN112204357B_ABST
Abstract
Description
Technical Field
[0001] This application claims priority to JP2018-103710 (application number) filed in Japan on May 30, 2018. The contents described in JP2018-103710 are incorporated into this application.
[0002] The present invention relates to a flow meter fault diagnosis method of a meter and a hydrogen filling device, for example, to a hydrogen filling device for a car using hydrogen in a hydrogen station as a power source. Background Art
[0003] As a fuel for automobiles, in addition to the conventional fuel oils headed by gasoline, hydrogen has attracted attention as a clean energy source in recent years. Along with this, the development of fuel cell vehicles (FCVs) powered by hydrogen has made progress. In order to popularize the fuel cell vehicles (FCVs), it is necessary to expand hydrogen stations that can quickly fill hydrogen. A multi-stage accumulator including a plurality of accumulators for accumulating hydrogen compressed to high pressure by a compressor is configured at the hydrogen station to quickly fill the FCV vehicle with hydrogen (H2). Moreover, by switching the accumulator to be used while filling through a distributor (meter), a large pressure difference is maintained between the pressure in the accumulator and the pressure of the fuel tank of the FCV vehicle, and hydrogen is quickly filled from the accumulator to the fuel tank using the pressure difference.
[0004] Here, when hydrogen is supplied to the FCV vehicle from a multi-stage accumulator arranged at a hydrogen station via a distributor, the supply amount of hydrogen is usually measured by a flow meter (such as a Coriolis mass flow meter). As for the flow measurement accuracy of the flow meter, when the hydrogen filling device is put into operation, a calibration is performed by a weight method using a scale to directly measure the weight change with traceability (for example, refer to Patent Document 1). Through this calibration, it is confirmed that the accuracy of the flow meter is within a certain specified error range. However, in the weight method, a special large-scale measuring device is required, so it is difficult to repeat the calibration multiple times. Therefore, there is a problem that it is impossible to confirm whether the flow measurement accuracy of the flow meter has decreased due to changes over time or changes in years after the hydrogen filling device is put into operation.
[0005] Prior art literature
[0006] Patent Literature
[0007] Patent Document 1: Japanese Patent Application Publication No. 2017-067470 Summary of the invention
[0008] Problem that the invention aims to solve
[0009] One embodiment of the present invention provides a flow meter failure diagnosis method and a hydrogen filling device for a measuring device, which are capable of continuously verifying the accuracy of the flow meter.
[0010] Solutions for solving problems
[0011] A flow meter failure diagnosis method for a measuring device according to one embodiment of the present invention is characterized in that:
[0012] When a hydrogen tank of a vehicle powered by hydrogen is filled with hydrogen, a flow meter is used to measure the amount of hydrogen filled.
[0013] Information on the pressure, temperature and volume of the receiving tank,
[0014] The tank pressure, temperature and volume are used to calculate the filling amount of hydrogen gas from the gauge to the tank at the end of filling.
[0015] The error value at the end of this hydrogen filling and the multiple error values obtained based on multiple past actual status data stored in the storage device between the measured filling amount at the end of filling measured by the flow meter and the calculated filling amount at the end of filling calculated using the pressure, temperature and volume of the tank are used to determine whether the flow meter is faulty and output the result.
[0016] A flow meter fault diagnosis method for a measuring device according to another aspect of the present invention is characterized in that:
[0017] When a hydrogen tank of a vehicle powered by hydrogen is filled with hydrogen, a flow meter is used to measure the amount of hydrogen filled during the filling period.
[0018] The filling amount of hydrogen gas filled into the tank from the meter is calculated using the pressure, temperature and volume of the tank during filling.
[0019] During the filling period, the calculated filling amount is compared with the filling amount measured at the same timing, and the presence or absence of a flow meter failure is determined based on the comparison result, and the result is output.
[0020] A hydrogen filling device according to one embodiment of the present invention is characterized by comprising:
[0021] A meter for measuring the amount of hydrogen gas filled in a tank of a vehicle powered by hydrogen gas using a flow meter;
[0022] A receiving part, which receives information on the pressure, temperature and volume of the tank;
[0023] a filling amount calculation unit that calculates the filling amount when the hydrogen filling from the meter to the tank is completed, using the pressure, temperature, and volume of the tank;
[0024] A storage device that stores a plurality of error values obtained based on a plurality of past actual status data between a measured filling amount at the end of filling measured by a flow meter and a calculated filling amount at the end of filling calculated by using the pressure, temperature, and volume of the tank;
[0025] a determination unit that determines whether the flow meter has a fault by using the error value at the end of the current hydrogen filling and a plurality of error values based on a plurality of past actual status data stored in the storage device; and
[0026] An output section outputs an alarm indicating a flow meter failure.
[0027] In addition, a hydrogen filling device according to another aspect of the present invention is characterized by comprising:
[0028] A meter for measuring the amount of hydrogen gas filled during filling when a tank of a vehicle powered by hydrogen gas is filled with hydrogen gas using a flow meter;
[0029] a filling amount calculation unit that calculates the filling amount of hydrogen gas filled from the meter into the tank using the pressure, temperature, and volume of the tank during filling; and
[0030] a determination unit that compares the calculated filling amount with the filling amount measured at the same timing during the filling period and determines whether the flow meter has a fault based on the comparison result; and
[0031] The output unit outputs an alarm indicating a flow meter failure during hydrogen filling when it is determined that the flow meter has failed.
[0032] Effects of the Invention
[0033] According to one aspect of the present invention, the accuracy of the flow meter can be continuously verified, thereby preventing the filling operation from being performed when a malfunctioning flow meter is used. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 This is an example of a configuration diagram showing the configuration of the hydrogen filling system of the hydrogen station in the first embodiment.
[0035] Figure 2 1 is a block diagram showing an example of the internal structure of a control circuit for controlling the entire hydrogen filling system in the first embodiment.
[0036] Figure 3 This is a diagram showing an example of changes in the percentage error of the flow meter in the first embodiment with respect to the number of filling times.
[0037] Figure 4 This is a diagram showing another example of the change in the percentage error of the flow meter with respect to the number of fillings in the first embodiment.
[0038] Figure 5 This is a flowchart showing a part of the main process of the hydrogen gas filling method in the first embodiment.
[0039] Figure 6 This is a flowchart showing the remaining part of the main process of the hydrogen gas filling method in the first embodiment.
[0040] Figure 7 This is a diagram for explaining a filling method when differential pressure filling of hydrogen fuel is performed using a multi-stage pressure accumulator in the first embodiment.
[0041] Figure 8 This is a configuration diagram showing an example of the internal configuration of a control circuit for controlling the entire hydrogen filling system in the second embodiment.
[0042] Fig. 9 This is a flowchart showing the remaining part of the main process of the hydrogen gas filling method in the second embodiment.
[0043] Fig.10 This is a configuration diagram showing an example of the internal configuration of a control circuit for controlling the entire hydrogen filling system in the third embodiment.
[0044] Fig.11 This is a flowchart showing the remaining part of the main process of the hydrogen gas filling method in the third embodiment. DETAILED DESCRIPTION
[0045] Example 1
[0046] Figure 1 This is an example of a structural diagram showing the structure of the hydrogen filling system of the hydrogen station in Embodiment 1. Figure 1 In the embodiment, the hydrogen filling system 500 is arranged in the hydrogen station 102. The hydrogen filling system 500 (hydrogen filling loading) comprises a multi-stage accumulator 101, a distributor (meter) 30, a compressor 40 and a control circuit 100. The multi-stage accumulator 101 comprises a plurality of accumulators 10, 12, 14, and the lower limit pressure of use of the plurality of accumulators 10, 12, 14 is set to a plurality of stages. Figure 1 In the example of FIG. 1 , the multi-stage accumulator 101 is composed of three accumulators 10, 12, and 14. Figure 1In the example, for example, accumulator 10 functions as the first group with a low lower limit pressure. Accumulator 12 functions as the second group with a medium lower limit pressure, for example. Accumulator 14 functions as the third group with a high lower limit pressure, for example. However, this is not limited to this. Each accumulator used in the first to third groups can be replaced as needed. A condenser, an intermediate accumulator, and / or a hydrogen manufacturing device (not shown) are arranged in the hydrogen station 102. In addition, a hydrogen trailer (not shown) that is filled and distributes hydrogen comes to the hydrogen station 102.
[0047] In addition, Figure 1 In the embodiment, the suction side of the compressor 40 is connected to the above-mentioned condenser, intermediate accumulator, filling tank of the hydrogen trailer or hydrogen production device through piping.
[0048] The discharge side of the compressor 40 is connected to the accumulator 10 through a pipe via a valve 21. Similarly, the discharge side of the compressor 40 is connected to the accumulator 12 through a pipe via a valve 23. Similarly, the discharge side of the compressor 40 is connected to the accumulator 14 through a pipe via a valve 25.
[0049] The accumulator 10 is connected to the distributor 30 through a pipe via a valve 22. The accumulator 12 is connected to the distributor 30 through a pipe via a valve 24. The accumulator 14 is connected to the distributor 30 through a pipe via a valve 26. In this way, the distributor 30 is commonly connected to the accumulators 10, 12, and 14 constituting the multi-stage accumulator 101.
[0050] exist Figure 1In the embodiment, a shutoff valve 36, a flow regulating valve 33, a flow meter 37, a cooler 32 (precooler), a shutoff valve 38, an emergency disconnecting coupler 41 and a control circuit 43 are arranged in the distributor 30, and a nozzle 44 extending to the outside of the distributor 30 is also arranged in the distributor 30. The distributor 30 delivers the hydrogen (hydrogen fuel) supplied from the multi-stage accumulator 101 to the cooler 32 via the shutoff valve 36, the flow regulating valve 33 and the flow meter 37. At this time, the flow rate per unit time of the hydrogen supplied from the multi-stage accumulator 101 is controlled by the flow regulating valve 33. The distributor 30 measures the filling amount of hydrogen filled from the multi-stage accumulator 101 to the fuel tank 202 of the FCV vehicle 200. Specifically, the mass flow rate of the supplied hydrogen fuel is measured by the flow meter 37. In the first embodiment, for example, a Coriolis mass flowmeter is used as the flow meter 37. The control circuit 43 integrates the mass flow rate measured by the flow meter 37 to measure the filling amount. In addition, the hydrogen to be filled is cooled to -40°C, for example, by the cooler 32. The cooled hydrogen is filled into the fuel tank 202 mounted on the FCV vehicle 200 via the shut-off valve 38, the emergency disconnect connector 41 and the nozzle 44 by using the pressure difference. In addition, the control circuit 43 is configured to be able to communicate with the vehicle-mounted device 204 in the FCV vehicle 200 (a fuel cell vehicle (FCV) powered by hydrogen fuel) that has arrived at the hydrogen station 102. For example, it is configured to be able to communicate wirelessly using infrared rays. In addition, the control circuit 43 is connected to the control circuit 100 that controls the entire hydrogen filling system 500. In addition, a display panel 39 is arranged on the outer surface of the dispenser 30, and alarm lights 34 and 35 are arranged inside the display panel 39.
[0051] In addition, Figure 1 In the hydrogen filling system 500, a plurality of pressure gauges are arranged at different positions in the flow path of the hydrogen fuel between the multi-stage accumulator 101 and the outlet of the distributor 30. Specifically, the pressure in the accumulator 10 is measured by the pressure gauge 11. The pressure in the accumulator 12 is measured by the pressure gauge 13. The pressure in the accumulator 14 is measured by the pressure gauge 15. In addition, in the distributor 30, the pressure near the inlet of the distributor 30 supplied to the distributor 30 is measured by the pressure gauge 27. In addition, the pressure near the outlet of the distributor 30 is measured by the pressure gauge 28. Figure 1In the example, the pressure gauge 27 measures the pressure on the upstream side (primary side) of the shut-off valve 36 located on the primary side of the cooler 32. The pressure gauge 28 measures the pressure on the secondary side of the cooler 32 and near the emergency disconnect connector 41. The pressure data measured by each pressure gauge is output to the control circuit 100 at all times or at a prescribed sampling period (e.g., 10 ms to several seconds). In other words, the control circuit 100 monitors the pressure measured by each pressure gauge at all times or at a prescribed sampling period (e.g., 10 ms to several seconds). In addition, the pressure of the fuel tank 202 mounted on the FCV vehicle 200 is measured by the pressure gauge 206 mounted on the FCV vehicle 200. As described later, during the period when the vehicle-mounted device 204 establishes communication with the control circuit 43, the pressure of the fuel tank 202 mounted on the FCV vehicle 200 is monitored at all times or at a prescribed sampling interval (e.g., 10 ms to several seconds).
[0052] In addition, in the dispenser 30, the temperature of hydrogen gas near the outlet of the dispenser 30 to be supplied to the FCV vehicle 200 is measured by the thermometer 29. The thermometer 29 measures the temperature of the secondary side of the cooler 32 and, for example, near the emergency disconnection coupler 41. In addition, the external temperature near the dispenser 30 is measured by the thermometer 31. The temperature data measured by each thermometer is output to the control circuit 100 at all times or at a predetermined sampling period (for example, 10 ms to several tens of seconds). In other words, the control circuit 100 monitors the temperature measured by each thermometer at all times or at a predetermined sampling period (for example, 10 ms to several tens of seconds). In addition, the temperature of the fuel tank 202 mounted on the FCV vehicle 200 is measured by the thermometer 207 mounted on the FCV vehicle 200. As described later, during the period when the vehicle-mounted device 204 and the control circuit 43 establish communication, the temperature of the fuel tank 202 mounted on the FCV vehicle 200 is monitored at all times or at a predetermined sampling interval (for example, 10 ms to several seconds).
[0053] The hydrogen gas accumulated in the tank of the condenser, the intermediate accumulator or the hydrogen trailer is supplied to the suction side of the compressor 40 in a state where it is reduced in pressure to a low pressure (for example, 0.6 MPa) by various regulators not shown in the figure that are controlled by the control circuit 100. Similarly, the hydrogen gas produced by the hydrogen manufacturing device is supplied to the suction side of the compressor 40 in a state of low pressure (for example, 0.6 MPa). Under the control of the control circuit 100, the compressor 40 compresses the hydrogen gas supplied at a low pressure while supplying it to the various accumulators 10, 12, and 14 of the multi-stage accumulator 101. The compressor 40 compresses until the pressure inside each accumulator 10, 12, and 14 of the multi-stage accumulator 101 reaches a predetermined high pressure (for example, 82 MPa). In other words, the compressor 40 compresses until the secondary side pressure P on the discharge side reaches a predetermined high pressure (for example, 82 MPa). OUTUntil it reaches a prescribed high pressure (e.g., 82 MPa). As to which of the condenser, intermediate accumulator, hydrogen trailer, and hydrogen manufacturing device is to be supplied to the suction side of the compressor 40, it can be determined to be any one of the condensers, intermediate accumulators, hydrogen trailers, and hydrogen manufacturing devices by the control circuit 100. Similarly, as to which of the accumulators 10, 12, and 14 is to be supplied to the compressor 40, it can be determined to be any one of the accumulators by the control circuit 100 controlling the opening and closing of the corresponding valves 21, 23, and 25 disposed on each piping. Alternatively, it can be controlled so that supply is performed to two or more accumulators at the same time.
[0054] In the above example, the pressure P of the hydrogen gas supplied to the suction side of the compressor 40 is shown as IN The pressure may be controlled to be a predetermined low pressure (e.g., 0.6 MPa), but the present invention is not limited thereto. Alternatively, the pressure of the hydrogen gas stored in the condenser, the intermediate accumulator, or the hydrogen trailer may not be reduced, or the hydrogen gas may be supplied to the suction side of the compressor 40 for compression at a pressure higher than the predetermined low pressure (e.g., 0.6 MPa).
[0055] The hydrogen gas accumulated in the multi-stage accumulator 101 is cooled by the cooler 32 in the dispenser 30 , and is supplied from the dispenser 30 to the FCV vehicle 200 that has arrived at the hydrogen station 102 .
[0056] Figure 2 1 is a block diagram showing an example of the internal structure of a control circuit for controlling the entire hydrogen filling system in Embodiment 1. Figure 2In the control circuit 100, a communication control circuit 50, a memory 51, a receiving unit 52, an end pressure / temperature calculation unit 54, a system control unit 58, a pressure recovery control unit 61, a supply control unit 63, a group pressure receiving unit 66, a distributor information receiving unit 67, an output unit 74, a gas weight (Mi) calculation unit 85, a determination unit 86, a setting unit 96, a PVT filling amount (Mpvtfil) calculation unit 87, a filling amount error (Mdiff) calculation unit 89, a determination unit 90, a determination unit 91, a recording / calculation unit 92, an average error (Mdifave) calculation unit 93, an error difference (Mdif.) calculation unit 94, a determination unit 95, a monitor 76, and storage devices 80, 84, 86 such as a magnetic disk device are arranged. The pressure recovery control unit 61 includes a valve control unit 60 and a compressor control unit 62. The supply control unit 63 includes a distributor control unit 64 and a valve control unit 65. Each of the “parts” such as the receiving unit 52, the end pressure / temperature calculation unit 54, the system control unit 58, the pressure recovery control unit 61 (the valve control unit 60 and the compressor control unit 62), the supply control unit 63 (the distributor control unit 64 and the valve control unit 65), the group pressure receiving unit 66, the distributor information receiving unit 67, the output unit 74, the gas weight (Mi) calculation unit 85, the determination unit 86, the setting unit 96, the PVT filling amount (Mpvtfil) calculation unit 87, the filling amount error (Mdiff) calculation unit 89, the determination unit 90, the determination unit 91, the recording / calculation unit 92, the average error (Mdifave) calculation unit 93, the error difference (Mdif.) calculation unit 94 and the determination unit 95 includes a processing circuit, and the processing circuit includes a circuit, a computer, a processor, a circuit substrate or a semiconductor device. In addition, each “part” can use a common processing circuit (the same processing circuit). Alternatively, different processing circuits (separate processing circuits) can be used. The receiving unit 52, the end pressure / temperature calculation unit 54, the system control unit 58, the pressure recovery control unit 61 (the valve control unit 60 and the compressor control unit 62), the supply control unit 63 (the distributor control unit 64 and the valve control unit 65), the group pressure receiving unit 66, the distributor information receiving unit 67, the output unit 74, the gas weight (Mi) calculation unit 85, the determination unit 86, the setting unit 96, the PVT filling amount (Mpvtfil) calculation unit 87, the filling amount error (Mdiff) calculation unit 89, the determination unit 90, the determination unit 91, the recording / calculation unit 92, the average error (Mdifave) calculation unit 93, the error difference (Mdif.) calculation unit 94 and the required input data or the calculated results in the determination unit 95 are stored in the memory 51 each time.
[0057] In addition, the storage device 80 stores a conversion table 81, which indicates correlation between FCV information, such as the pressure, temperature, and volume of the fuel tank 202 mounted on the FCV vehicle 200, and the remaining amount of hydrogen gas corresponding to the FCV information, and filling information, such as the final pressure and final temperature to be filled in the fuel tank 202. In addition, the storage device 80 stores a correction table 83 for correcting the result obtained based on the conversion table 81.
[0058] In addition, the group pressure receiving unit 66 always receives the pressure measured by each pressure gauge 11, 13, 15 as described above or at a predetermined sampling period (e.g., 10 ms to several seconds), and stores the pressure together with the receiving time in the storage device 84. Similarly, the distributor information receiving unit 67 always receives the pressure measured by each pressure gauge 27, 28 in the distributor 30 or at a predetermined sampling period (e.g., 10 ms to several seconds), and stores the pressure together with the receiving time in the storage device 84. In addition, the distributor information receiving unit 67 always receives the temperature measured by the thermometer 29 in the distributor 30 or at a predetermined sampling period (e.g., 10 ms to several seconds), and stores the temperature together with the receiving time in the storage device 84.
[0059] Here, when hydrogen is supplied from the multi-stage accumulator 101 configured at the hydrogen station 102 to the fuel tank 202 of the FCV vehicle 200 via the dispenser 30, as described above, the supply amount (filling amount) of hydrogen is measured by the flow meter 37 which is a Coriolis mass flow meter. In the flow meter 37, the mass flow rate at the moment of filling is measured, and a pulse is generated every tiny flow unit such as 1g. The pulse signal is output to the control circuit 43. The control circuit 43 counts the pulses from the start of filling to calculate the cumulative mass, thereby measuring the metered filling amount (Mmeter) (also called the filling weight). Regarding the metered filling amount (Mmeter), during the filling, the current value changes continuously and is displayed on the display panel 39 configured on the outer surface of the dispenser 30, and is output to the control circuit 100. The metered filling amount (Mmeter) is the basic data of the fee paid by the consumer. In other words, the amount obtained by multiplying the displayed metered filling amount (Mmeter) by the amount per unit of filling amount is the fee to be paid by the consumer (user) who fills the fuel tank 202 mounted on the FCV vehicle 200 with hydrogen. Therefore, the measurement accuracy of the flow meter 37 is important.
[0060] On the other hand, as described above, FCV information such as the pressure and temperature of the fuel tank 202 and the volume of the fuel tank 202 is output from the FCV vehicle 200 , and these numerical values at the current moment are constantly changing and displayed on the display panel 39 .
[0061] Here, in Embodiment 1, the weight Minitial of the hydrogen gas filled in the fuel tank 202 before filling and the weight Mfinal of the hydrogen gas filled in the fuel tank 202 at the end of filling are calculated by the PVT method (volume method). Specifically, the density ρ(P, T) of the hydrogen gas in the fuel tank 202 at the end of filling can be calculated based on the inherent compressibility of hydrogen using the pressure P and temperature T of the fuel tank 202 before the start of filling. The weight Minitial of the hydrogen gas in the fuel tank 202 before the start of filling can be calculated by multiplying the density ρ(P, T) of the hydrogen gas in the fuel tank 202 before the start of filling by the volume V of the fuel tank 202. Similarly, the density ρ(P, T) of the hydrogen gas in the fuel tank 202 at the end of filling can be calculated based on the inherent compressibility of hydrogen using the pressure P and temperature T of the fuel tank 202 at the end of filling. The weight Mfinal of the hydrogen gas in the fuel tank 202 at the end of the filling can be calculated by multiplying the density ρ(P, T) of the hydrogen gas in the fuel tank 202 at the end of the filling by the volume V of the fuel tank 202. The current PVT filling amount Mpvt can be calculated by the PVT method (volume method) by subtracting the weight Minitially of the hydrogen gas in the fuel tank 202 before the start of the filling from the weight Mfinal of the hydrogen gas in the fuel tank 202 at the end of the filling.
[0062] Therefore, in Embodiment 1, the percentage error of the flow meter 37 is evaluated by subtracting the PVT filling amount Mpvt calculated by the PVT method (volume method) from the metered filling amount (Mmeter) measured by the flow meter 37 , dividing the difference by the PVT filling amount Mpvt and multiplying the result by 100.
[0063] Figure 3 FIG. 1 is a diagram showing an example of a change in the percentage error of the flow meter in Embodiment 1 relative to the number of fillings. Figure 3 The example in FIG. 1 shows an example of a situation where no abnormality occurs in the flow meter 37 during verification. Figure 3 In FIG. 1 , the vertical axis represents the percentage error of the flow meter 37, and the horizontal axis represents the number of fillings. As shown in the figure, by using a large number of filling results to verify the size of the percentage error based on the time series of the number of fillings, it is possible to continuously confirm the change of the flow meter 37 over time. Figure 3 The result shows that the percentage error of the flow meter 37 is stably within the range Δ2. The percentage error of the flow meter 37 is not zero but is offset by Δ1 to the positive side because the fuel tank 202 expands due to filling, so the calculation result obtained by the PVT method is biased due to the expansion.
[0064] Figure 4FIG. 2 is a diagram showing another example of the change in the percentage error of the flow meter in Embodiment 1 relative to the number of filling times. Figure 4 The example in FIG. 1 shows an example of a situation in which an abnormality occurs in the flow meter 37 during verification. Figure 4 In FIG. 3 , the vertical axis represents the percentage error of the flow meter 37, and the horizontal axis represents the number of filling times. Figure 4 In the example of , as the number of fillings increases, the deviation of the percentage error of the flow meter 37 becomes larger, and the value of the number of fillings changes (shifts) stepwise between the Ath and Bth fillings. Figure 4 In the example of , the positive side offset is transferred to the negative side. As described above, a significant change in the percentage error of the flow meter 37 in a short period of time indicates that a major abnormality (failure) other than a change over time has occurred in the flow meter 37.
[0065] First, the deviation of the percentage error of the flow meter 37 can only be determined by the verification performed continuously with a large number of filling times in Implementation Example 1. On the other hand, in the previous weight method, it is usually only measured about four times. Therefore, in the previous weight method, it is difficult to determine whether the deviation has become larger. In addition, regarding the sudden large change (offset) in the percentage error of the flow meter 37, the continuous verification performed in Implementation Example 1 can determine the time point when the percentage error of the flow meter 37 has changed (offset) significantly, so that the abnormality of the flow meter 37 can be detected. According to the above results, it can also be seen that it is useful to conduct a verification that compares the PVT filling amount Mpvt calculated by the PVT method with the measured filling amount (Mmeter) measured using the flow meter 37. Therefore, in Implementation Example 1, the error value between the PVT filling amount Mpvt calculated by the PVT method and the measured filling amount (Mmeter) measured using the flow meter 37 is used to perform fault diagnosis of the flow meter 37. In addition, in Figure 3 and Figure 4 In the example of , the percentage error is used for explanation, but the error value that can be verified is not limited to this. Next, the case where the difference between the PVT filling amount Mpvt calculated by the PVT method and the metered filling amount (Mmeter) measured by the flow meter 37 is used as the error value is explained.
[0066] Figure 5 This is a flowchart showing a part of the main process of the hydrogen gas filling method according to the first embodiment.
[0067] Figure 6 This is a flowchart showing the remaining part of the main process of the hydrogen gas filling method according to the first embodiment.
[0068] exist Figure 5 and Figure 6In the hydrogen filling method in embodiment 1, a judgment step (S100), an FCV information receiving step (S102), a hydrogen weight calculation step in the tank (S104), a judgment step (S106), an initial weight setting step (S108), a filling step (S110), a PVT filling amount calculation step (S112), a flow meter filling amount calculation step (S114), a filling amount error calculation step (S116), a judgment step (S118), an alarm output step (S120), a judgment step (S126), a filling stop processing step (S128), a recording / calculation step (S130), an average error calculation step (S132), a difference calculation step (S134), a judgment step (S136) and an alarm output step (S138) are implemented as an example.
[0069] When the FCV vehicle 200 arrives at the hydrogen station 102, the operator of the hydrogen station 102 or the user of the FCV vehicle 200 connects (fits) the nozzle 44 of the dispenser 30 to the receiving port (receptacle) of the fuel tank 202 of the FCV vehicle 200 and fixes it. Then, the operator or user presses a filling start button (not shown) in the display panel 39 of the dispenser 30.
[0070] As a determination process (S100), the control circuit 43 determines whether the operator or user has pressed a filling start button (not shown) in the display panel 39 of the dispenser 30. When the filling start button is pressed, the FCV information receiving process (S102) is entered. If the start button is not pressed, the next process is not entered. When the nozzle 44 of the dispenser 30 is connected and fixed to the receiving port (socket) of the fuel tank 202 of the FCV vehicle 200 by the user or the operator of the hydrogen station 102 and the start button is pressed, the vehicle-mounted device 204 establishes communication with the control circuit 43 (repeater).
[0071] As an FCV information receiving process (S102), the receiving unit 52 receives FCV information such as the current temperature Ti, pressure Pi and volume V of the fuel tank 202 from an FCV vehicle 200 (fuel cell vehicle: FCV) equipped with a fuel tank 202 for filling hydrogen and using hydrogen as a power source. Specifically, it operates as follows. When the vehicle-mounted device 204 establishes communication with the control circuit 43 (repeater), FCV information (tank information) such as the current pressure, temperature and volume of the fuel tank 202 is output (sent) from the vehicle-mounted device 204 in real time. The FCV information is relayed in the control circuit 43 and sent to the control circuit 100. In the control circuit 100, the receiving unit 52 receives the FCV information via the communication control circuit 50. While the vehicle-mounted device 204 and the control circuit 43 are communicating, the FCV information is monitored all the time or at a predetermined sampling interval (e.g., 10 ms to several seconds). The received FCV information is stored in the storage device 80 together with the information of the reception time.
[0072] As the hydrogen gas weight calculation step (S104), the gas weight (Mi) calculation unit 85 calculates the weight Mi of the hydrogen gas filled in the fuel tank 202 at the current time point using the PVT method. The density ρ(Pi, Ti) of the hydrogen gas in the fuel tank 202 at the current time point can be calculated based on the inherent compressibility of hydrogen using the pressure Pi and temperature Ti of the fuel tank 202 at the current time point. The weight Mi of the hydrogen gas in the fuel tank 202 at the current time point can be calculated by multiplying the density ρ(Pi, Ti) of the hydrogen gas in the fuel tank 202 at the current time point by the volume V of the fuel tank 202. If the temperature Ti and pressure Pi of the fuel tank 202 before the start of filling are used, the weight Mi of the hydrogen gas currently filled in the fuel tank 202 before the start of filling can be calculated.
[0073] As a determination step (S106), the determination unit 86 determines whether the determination process is the first determination process since the start of filling. If it is the first determination process, the initial weight setting step (S108) is entered. If it is not the first determination process (if it is the second or later since the start of filling this time), the filling step (S110) described later is continued while entering the PVT filling amount calculation step (S112).
[0074] As the initial weight setting step (S108), if it is determined in the determination step (S106) that it is the first determination process, the setting unit 96 sets the calculated weight Mi of hydrogen gas as the initial weight M0. In addition, since the FCV information of the stage before the start of filling is used, the weight Mi of hydrogen gas calculated based on the FCV information of the stage before the start of filling is the weight of hydrogen gas in the fuel tank 202 before the start of filling (initial weight M0).
[0075] As a filling process (S110), first, the end pressure / temperature calculation unit 54 reads the conversion table 81 from the storage device 80, calculates and predicts the final pressure PF and the final temperature corresponding to the pressure Pa, temperature Ti, volume V of the fuel tank 202, and external temperature T' at the initial reception of the received fuel tank 202. In addition, the end pressure / temperature calculation unit 54 reads the correction table 83 from the storage device 80, and corrects the numerical value obtained by the conversion table 81. In the case where the error of the result obtained only by the data of the conversion table 81 is large, the correction table 83 may be set based on the result obtained by experiment or simulation. The calculated final pressure PF is output to the system control unit 58.
[0076] Next, filling of the fuel tank 202 with hydrogen gas from the multi-stage accumulator 101 (accumulator) storing hydrogen gas via the dispenser 30 is started.
[0077] Figure 7 This is a diagram for explaining the filling method when the multi-stage accumulator is used to perform pressure differential filling of hydrogen fuel in the first embodiment. Figure 7 In the figure, the vertical axis represents pressure and the horizontal axis represents time. When the FCV vehicle 200 is filled with hydrogen fuel by pressure difference, usually, each accumulator 10, 12, 14 of the multi-stage accumulator 101 is pre-pressurized to the same pressure P0 (e.g., 82 MPa). On the other hand, the fuel tank 202 of the FCV vehicle 200 that arrives at the hydrogen station 102 is at a pressure of Pa. The case of starting to fill the fuel tank 202 of the FCV vehicle 200 from this state is described.
[0078] First, the fuel tank 202 is filled from the accumulator 10, for example, as the first group. Specifically, the operation is performed as follows. The supply control unit 63 controls the supply unit 106 under the control of the system control unit 58 to supply hydrogen fuel from the accumulator 10 to the fuel tank 202 of the FCV vehicle 200. Specifically, the system control unit 58 controls the distributor control unit 64 and the valve control unit 65. The distributor control unit 64 communicates with the control circuit 43 of the distributor 30 via the communication control circuit 50 to control the operation of the distributor 30. Specifically, first, the control circuit 43 adjusts the opening of the flow regulating valve in the distributor 30 to open the shut-off valves 36 and 38 in the distributor 30. Then, the valve control unit 65 outputs a control signal to the valves 22, 24, and 26 via the communication control circuit 50 to control the opening and closing of each valve. Specifically, the valve 22 is opened and the valves 24 and 26 are kept closed. Thus, hydrogen fuel is supplied from the accumulator 10 to the fuel tank 202. The hydrogen fuel accumulated in the accumulator 10 is moved to the fuel tank 202 side at a filling speed adjusted by the flow regulating valve by the pressure difference between the accumulator 10 and the fuel tank 202, and the pressure of the fuel tank 202 gradually rises as shown by the dotted line Pt. Along with this, the pressure of the accumulator 10 (the curve shown in the "first group (1st)") gradually decreases. Moreover, at a time point after a time T1 has passed since the start of filling after the lower limit pressure of the use of the first group, the accumulator used is switched from the accumulator 10 to, for example, the accumulator 12 of the second group. Specifically, the valve control unit 65 outputs a control signal to the valves 22, 24, and 26 via the communication control circuit 50 to control the opening and closing of each valve. Specifically, the valve 24 is opened, the valve 22 is closed, and the valve 26 is kept closed. As a result, the pressure difference between the accumulator 12 and the fuel tank 202 becomes large, so that the filling speed can be maintained at a high state.
[0079] Then, the hydrogen fuel accumulated in the accumulator 12 is moved to the fuel tank 202 side by the pressure difference between the accumulator 12 and the fuel tank 202 as the second group, and the pressure of the fuel tank 202 further gradually rises as shown by the dotted line Pt. Along with this, the pressure of the accumulator 12 (the curve shown in the "second group (2nd)") gradually decreases. Moreover, at a time point after a time T2 has passed since the start of filling after the lower limit pressure of the use of the second group has fallen, the accumulator used is switched from the accumulator 12 to the accumulator 14 as the third group. Specifically, the valve control unit 65 outputs a control signal to the valves 22, 24, and 26 via the communication control circuit 50 to control the opening and closing of each valve. Specifically, the valve 26 is opened, the valve 24 is closed, and the valve 22 is maintained closed. As a result, the pressure difference between the accumulator 14 and the fuel tank 202 becomes larger, so that the filling speed can be maintained at a high state.
[0080] Then, the hydrogen fuel stored in the accumulator 14 moves to the fuel tank 202 side due to the pressure difference between the accumulator 14 and the fuel tank 202 as the third group, and the pressure of the fuel tank 202 gradually increases as shown by the dotted line Pt. Along with this, the pressure of the accumulator 14 (the graph shown in "third (3rd)") gradually decreases. Then, the accumulator 14 as the third group is filled until the pressure of the fuel tank 202 reaches the calculated final pressure PF (for example, 65 to 81 MPa).
[0081] As described above, hydrogen gas is sequentially filled into the fuel tank 202 from the first group. In addition, the filling amount of hydrogen gas during the filling period when hydrogen gas is filled into the fuel tank 202 of the vehicle using hydrogen gas as a power source by the dispenser 30 is measured.
[0082] During this filling, as a PVT filling amount calculation step (S112), the PVT filling amount (Mpvtfil) calculation unit 87 calculates the PVT filling amount (Mpvtfil) obtained by subtracting the initial weight M0 from the weight Mi of the hydrogen gas in the fuel tank 202 at the current time. When the PVT filling amount (Mpvtfil) is calculated at the same timing as the start of filling, the weight Mi of the hydrogen gas in the fuel tank 202 at the current time = M0, so the PVT filling amount (Mpvtfil) = 0.
[0083] Similarly, during the filling period, as a metered filling amount calculation step (S114), the dispenser 30 uses the Coriolis flowmeter 37 to measure the metered filling amount of hydrogen (Mmeter=ΣMpulse) when filling the tank of a car powered by hydrogen. Specifically, the mass flow rate at the moment of filling is measured by the flowmeter 37, and a pulse is generated every tiny flow unit such as 1g. The pulse signal is output to the control circuit 43. The control circuit 43 counts the pulses from the start of filling and calculates the cumulative mass, thereby measuring the metered filling amount (Mmeter) (also called the filling weight). The measured metered filling amount (Mmeter) is output to the control circuit 100, received by the dispenser information receiving unit 67, and stored in the storage device 84 together with the metering time. When the metered filling amount (Mmeter) is calculated at the same timing as the start of filling, the metering result of the flowmeter 37 at the current time point is zero, so the metered filling amount (Mmeter)=0.
[0084] Similarly, during the filling period, as a filling amount error calculation step (S116), the filling amount error (Mdiff) calculation unit 89 calculates the filling amount error (Mdiff) by subtracting the PVT filling amount (Mpvtfil) from the metered filling amount (Mmeter) measured at the same timing as the calculated PVT filling amount (Mpvtfil). If it is the same timing as the start of filling, the PVT filling amount (Mpvtfil) and the filling amount error (Mdiff) are both zero, so the error is also zero.
[0085] Similarly, during the filling period, as a determination step (S118), the determination unit 90 compares the calculated PVT filling amount (Mpvtfil) during the filling period with the metered filling amount (Mmeter) measured at the same timing to determine whether the Coriolis flowmeter 37 is faulty. Specifically, the determination unit 90 determines whether the filling amount error (Mdiff) obtained by subtracting the PVT filling amount (Mpvtfil) from the metered filling amount (Mmeter) at the current time point is within the range of the lower limit allowable value α1 or more and the upper limit allowable value α2 or less. In the case where the filling amount error (Mdiff) deviates from the range of the lower limit allowable value α1 or more and the upper limit allowable value α2 or less, the alarm output step (S120) is entered. If the filling amount error (Mdiff) is within the range of the lower limit allowable value α1 or more and the upper limit allowable value α2 or less, the determination step (S126) is entered.
[0086] As the alarm output step (S120), when the output unit 74 determines that the Coriolis flowmeter 37 is faulty, it outputs an alarm indicating that the Coriolis flowmeter 37 is faulty to the distributor 30 during the hydrogen filling. In the distributor 30, the alarm lamp 34 indicating that the Coriolis flowmeter 37 is faulty is turned on and an alarm is output.
[0087] Similarly, during the filling, as a determination process (S126), the determination unit 91 determines whether the pressure of the fuel tank 202 has reached the final pressure PF. When the pressure of the fuel tank 202 has reached the final pressure PF, the filling stop processing process (S128) is entered. When the pressure of the fuel tank 202 has not reached the final pressure PF, the filling is continued and the FCV information receiving process (S102) is returned. Before the pressure of the fuel tank 202 reaches the final pressure PF, each process from the FCV information receiving process (S102) to the determination process (S118) is repeated during the filling. In other words, the metered filling amount (Mmeter) of hydrogen during the filling when hydrogen is filled into the fuel tank 202 of the FCV vehicle 200 is repeatedly measured by the Coriolis flowmeter 37 through the dispenser 30. At the same time, the PVT filling amount (Mpvtfil) calculation unit 87 repeatedly calculates the PVT filling amount (Mpvtfil) of hydrogen filled into the tank from the meter using the pressure, temperature and volume of the fuel tank 202 being filled. Furthermore, the filling amount error (Mdiff) calculation unit 89 repeatedly calculates the filling amount error (Mdiff) obtained by subtracting the PVT filling amount (Mpvtfil) from the metered filling amount (Mmeter) measured at the same timing as the calculated PVT filling amount (Mpvtfil). Furthermore, during the filling period, the determination unit 90 compares the calculated PVT filling amount (Mpvtfil) with the metered filling amount (Mmeter) measured at the same timing, and repeatedly determines whether the Coriolis flowmeter 37 has a fault. That is, it is determined whether the filling amount error (Mdiff) obtained by subtracting the PVT filling amount (Mpvtfil) from the metered filling amount (Mmeter) at the current time point is within the range of the lower limit allowable value α1 or more and the upper limit allowable value α2 or less. Furthermore, in the case of a failure of the Coriolis flowmeter 37, the alarm lamp 34 is lit and an alarm is output. In the short period of the filling period, it may be difficult for the filling amount error (Mdiff) to have a large deviation. However, a sudden large change (displacement) in the filling amount error (Mdiff) can be detected.
[0088] As a filling stop processing step (S128), when the pressure of the fuel tank 202 reaches the final pressure PF, the filling of hydrogen gas is stopped and the filling processing is ended. Specifically, when the pressure measured by the pressure gauge 28 near the outlet of the dispenser 30 reaches the final pressure PF, the pressure of the fuel tank 202 reaches the final pressure PF, and the dispenser control unit 64 closes the shutoff valves 36 and 38 in the dispenser 30. In addition, the valve control unit 65 outputs a control signal to the valves 22, 24, and 26 via the communication control circuit 50 to control each valve to be closed.
[0089] Next, as a recording / calculation step (S130), the recording / calculation unit 92 stores the metered filling amount (Mme=Mmeter) at the end of filling measured by the Coriolis flowmeter and the PVT filling amount (Mpvtfil=Mpvtend) at the end of filling calculated by the PVT method using the pressure, temperature and volume of the fuel tank 202 as actual status data in the storage device 86 in association with the data of the filling date and time, and calculates the filling amount error (Mdiffend=Mme-Mpvtend) at the end of filling. Similarly, the filling amount error is stored as actual status data in association with the data of the filling date and time in the storage device 86. A plurality of actual status data are accumulated by repeatedly filling an indefinite number of FCV vehicles 200 with hydrogen. As a result, the storage device 86 stores a plurality of error values obtained based on a plurality of past actual situation data between the measured filling amount (Mme) at the end of filling measured by the Coriolis flowmeter 37 and the PVT filling amount (Mpvtend) at the end of filling (calculated filling amount) calculated using the pressure, temperature, and volume of the fuel tank 202. Here, the case where the filling amount error (Mdiffend) at the end of filling is stored as a plurality of error values is shown.
[0090] As an average error calculation step (S132), the average error (Mdifave) calculation unit 93 reads the filling amount error (Mdiffend) at the end of each past hydrogen filling stored in the storage device 86, and calculates the average value of the filling amount error (Mdiffend), that is, the average error (Mdifave = ΣMdiffend / number of filling times).
[0091] As a difference calculation step (S134), the error difference value (Mdif.) calculation unit 94 calculates the difference between the statistical value of the plurality of difference values obtained based on the plurality of past actual status data and the difference value of the current hydrogen filling, that is, the error difference value (Mdif.). Specifically, the error difference value (Mdif.) calculation unit 94 calculates the error difference value (Mdif.) by subtracting the filling amount error (Mdiffend) at the end of the current hydrogen filling from the average error (Mdifave).
[0092] As a determination step (S136), the determination unit 95 uses a plurality of error values obtained based on a plurality of past actual situation data stored in the storage device 86 between the measured filling amount at the end of filling measured by the Coriolis flowmeter 37 and the calculated filling amount at the end of filling calculated using the pressure, temperature and volume of the fuel tank 202, and compares the plurality of error values with the error value at the end of this hydrogen filling, to determine whether the Coriolis flowmeter 37 is faulty, and outputs the result. In the first embodiment, the Coriolis flowmeter is determined to be faulty based on whether the difference between the statistical value of the plurality of difference values obtained based on a plurality of past actual situation data and the difference value of this hydrogen filling is within the allowable range. Specifically, the determination unit 95 determines whether the calculated error difference value (Mdif.) is within the range of the lower limit allowable value β1 or more and the upper limit allowable value β2 or less. When the error difference value (Mdif.) deviates from the range of the lower limit allowable value β1 or more and the upper limit allowable value β2 or less, the alarm output step (S138) is entered. If the error difference (Mdif.) is within the range of the lower limit allowable value β1 or more and the upper limit allowable value β2 or less, the process ends.
[0093] As an alarm output step (S138), when the output unit 74 determines that the Coriolis flowmeter 37 is faulty, it outputs an alarm indicating the failure of the Coriolis flowmeter 37 to the distributor 30 during the filling of hydrogen gas. In the distributor 30, the alarm lamp 34 indicating the failure of the Coriolis flowmeter 37 is turned on and an alarm is output.
[0094] In the above example, the average error (Mdifave) is used as a statistical value of a plurality of difference values obtained based on a plurality of past actual status data, but the present invention is not limited thereto and may be other than the average value, for example, a median value.
[0095] In addition, the lower limit allowable values α1, β1 and the upper limit allowable values α2, β2 may be appropriately set. The calculated filling amount obtained by the PVT method has a deviation due to the expansion of the fuel tank 202 described above, so the difference between the measured filling amount and the calculated filling amount obtained by the PVT method is usually not zero, and there is a predetermined offset. Considering this point, the lower limit allowable values α1, β1 and the upper limit allowable values α2, β2 may be set.
[0096] In addition, if Figure 5As shown, as a modified example, the determination step (S119), the alarm output step (S121), the determination step (S122), and the alarm output step (S123) may be implemented to replace the above-mentioned determination step (S118) and the alarm output step (S120). Similarly, as a modified example, the determination step (S140), the alarm output step (S141), the determination step (S142), and the alarm output step (S143) may be implemented to replace the above-mentioned determination step (S136) and the alarm output step (S138).
[0097] As a determination step (S119), the determination unit 90 determines whether the filling amount error (Mdiff) obtained by subtracting the PVT filling amount (Mpvtfil) from the metered filling amount (Mmeter) at the current time point is greater than or equal to the lower limit allowable value α1. If the filling amount error (Mdiff) is greater than or equal to the lower limit allowable value α1, the determination step (S122) is entered. If the filling amount error (Mdiff) is not greater than or equal to the lower limit allowable value α1, the alarm output step (S121) is entered.
[0098] As an alarm output step (S121), when the filling amount error (Mdiff) is not equal to or greater than the lower limit allowable value α1, the output unit 74 outputs an alarm 1 indicating a failure of the Coriolis flowmeter 37 to the distributor 30 during the filling of hydrogen gas. In the distributor 30, the alarm lamp 34 indicating a failure of the Coriolis flowmeter 37 is turned on and the alarm 1 is output.
[0099] As a determination step (S122), the determination unit 90 determines whether the filling amount error (Mdiff) obtained by subtracting the PVT filling amount (Mpvtfil) from the metered filling amount (Mmeter) at the current time point is less than the upper limit allowable value α2. If the filling amount error (Mdiff) is less than the upper limit allowable value α2, the determination step (S126) is entered. If the filling amount error (Mdiff) is not less than the upper limit allowable value α2, the alarm output step (S123) is entered.
[0100] As an alarm output step (S123), when the filling amount error (Mdiff) is not less than the upper limit allowable value α2, the output unit 74 outputs the alarm 2 indicating the failure of the Coriolis flowmeter 37 to the distributor 30 during the filling of hydrogen gas. In the distributor 30, the alarm lamp 35 indicating the failure of the Coriolis flowmeter 37 is lit and the alarm 2 is output.
[0101] As described above, in the determination process during filling, on the one hand, when the filling amount error (Mdiff) is not less than the upper limit allowable value α2, it is considered that the cause is both or one of the failure of the flow meter 37 and the leakage of the pipe from the flow meter 37 to the fuel tank 202. On the other hand, when the filling amount error (Mdiff) is not more than the lower limit allowable value α1, it can be determined that the flow meter 37 is failed. Therefore, by performing the determination process separately for the upper limit and the lower limit and distinguishing the content of the alarm, it is possible to easily identify the fault location.
[0102] Similarly, as a determination step (S140), the determination unit 95 determines whether the calculated error difference value (Mdif.) is greater than or equal to the lower limit allowable value β1. If the error difference value (Mdif.) is greater than or equal to the lower limit allowable value β1, the determination step (S142) is entered. If the error difference value (Mdif.) is not greater than or equal to the lower limit allowable value β1, the alarm output step (S141) is entered.
[0103] As an alarm output step (S141), when the error difference (Mdif.) is not equal to or greater than the lower limit allowable value β1, the output unit 74 outputs an alarm 2 indicating a failure of the Coriolis flowmeter 37 to the distributor 30 during the filling of hydrogen gas. In the distributor 30, the alarm lamp 34 indicating a failure of the Coriolis flowmeter 37 is turned on and the alarm 1 is output.
[0104] As a determination step (S142), the determination unit 95 determines whether the calculated error difference value (Mdif.) is less than the upper limit allowable value β2. If the error difference value (Mdif.) is less than the upper limit allowable value β2, the process ends. If the error difference value (Mdif.) is not less than the upper limit allowable value β2, the process proceeds to the alarm output step (S143).
[0105] As an alarm output step (S143), when the error difference (Mdif.) is not less than the upper limit allowable value β2, the output unit 74 outputs the alarm 2 indicating the failure of the Coriolis flowmeter 37 to the distributor 30 during the filling of hydrogen gas. In the distributor 30, the alarm lamp 35 indicating the failure of the Coriolis flowmeter 37 is lit and the alarm 2 is output.
[0106] As described above, in the determination process at the end of filling, on the one hand, when the error difference (Mdif.) is not less than the upper limit allowable value β2, it is considered that the cause is both or one of the failure of the flow meter 37 and the leakage of the pipe from the flow meter 37 to the fuel tank 202. On the other hand, when the error difference (Mdif.) is not more than the lower limit allowable value β1, it can be determined that the flow meter 37 is failed. Therefore, by performing the determination process separately for the upper limit and the lower limit and distinguishing the content of the alarm, it is possible to easily identify the failure site.
[0107] In addition, through the above-mentioned filling action, the filling amount of hydrogen gas in each accumulator 10, 12, 14 decreases. Therefore, next, the pressure recovery mechanism 104 restores the pressure of each accumulator 10, 12, 14. The compressor 40 and valves 21, 23, 25, etc. constitute the pressure recovery mechanism 104. First, the system control unit 58 selects the supply source of hydrogen fuel connected to the suction side of the compressor 40 from the condenser, intermediate accumulator, hydrogen trailer and hydrogen manufacturing device not shown in the figure. Then, the pressure recovery control unit 61 controls the pressure recovery mechanism 104 under the control of the system control unit 58 to restore the pressure of each accumulator 10, 12, 14. Specifically, it operates as follows. Each group of accumulators used during the filling of the fuel tank 202 of the FCV vehicle 200 can also be pressure-restored during the filling period. However, the time to restore the pressure to the specified pressure is insufficient, so pressure recovery must also be performed after filling. Since the switching is performed in the order of the first group, the second group, and the third group, the pressure of the pressure accumulator 10 of the first group is firstly restored. The valve control unit 60 opens the valve 21 from the state where the valves 21, 23, and 25 are closed.
[0108] Moreover, the compressor control unit 62 drives the compressor 40 to compress and deliver the low-pressure (e.g., 0.6 MPa) hydrogen fuel from the hydrogen fuel supply source, and restores the pressure of the accumulator 10 by filling the accumulator 10 with hydrogen fuel until the pressure of the accumulator 10 reaches a specified pressure P0 (e.g., 82 MPa).
[0109] Next, the valve control unit 60 closes the valve 21 and opens the valve 23. Furthermore, the compressor control unit 62 drives the compressor 40 to compress and deliver the low-pressure (e.g., 0.6 MPa) hydrogen fuel, and restores the pressure of the accumulator 12 by filling the accumulator 12 with hydrogen fuel until the pressure of the accumulator 12 reaches a predetermined pressure P0 (e.g., 82 MPa).
[0110] Next, the valve control unit 60 closes the valve 23 and opens the valve 25. Furthermore, the compressor control unit 62 drives the compressor 40 to compress and deliver the low-pressure (e.g., 0.6 MPa) hydrogen fuel, and restores the pressure of the accumulator 14 by filling the accumulator 14 with hydrogen fuel until the pressure of the accumulator 14 reaches a predetermined pressure P0 (e.g., 82 MPa).
[0111] Through the above process, even if the next FCV vehicle 200 arrives at the hydrogen station 102, the supply of hydrogen fuel can be performed in the same manner.
[0112] As described above, according to Embodiment 1, it is possible to continuously verify the accuracy of the flow meter 37. Therefore, it is possible to avoid performing a filling operation when using a flow meter 37 that has failed.
[0113] Example 2
[0114] In the first embodiment, the case where the difference between the PVT filling amount Mpvt calculated by the PVT method and the measured filling amount (Mmeter) measured by the flow meter 37 is used as the error value is described. However, this is not limited to this. In the second embodiment, the case where the error rate (for example, percentage error) of the measured filling amount (Mmeter) measured by the flow meter 37 relative to the PVT filling amount Mpvt calculated by the PVT method is used is described.
[0115] An example of a configuration diagram showing the configuration of a hydrogen filling system of a hydrogen station in Embodiment 2 Figure 1 same.
[0116] Figure 8 1 is a block diagram showing an example of the internal structure of a control circuit for controlling the entire hydrogen filling system in Embodiment 2. Figure 8 In addition to configuring an average error rate (Mrateave) calculation unit 97 and an error rate difference (Mdif') calculation unit 98 instead of the average error (Mdifave) calculation unit 93 and the error difference (Mdif.) calculation unit 94, the same as Figure 2 Same. Figure 8In the above, each "part" such as the receiving unit 52, the end pressure / temperature calculation unit 54, the system control unit 58, the pressure recovery control unit 61 (the valve control unit 60 and the compressor control unit 62), the supply control unit 63 (the distributor control unit 64 and the valve control unit 65), the group pressure receiving unit 66, the distributor information receiving unit 67, the output unit 74, the gas weight (Mi) calculation unit 85, the determination unit 86, the setting unit 96, the PVT filling amount (Mpvtfil) calculation unit 87, the filling amount error (Mdiff) calculation unit 89, the determination unit 90, the determination unit 91, the recording / calculation unit 92, the average error rate (Mrateave) calculation unit 97, the error rate difference (Mdif') calculation unit 98 and the determination unit 95 includes a processing circuit, and the processing circuit includes a circuit, a computer, a processor, a circuit substrate or a semiconductor device. In addition, each "part" can use a common processing circuit (the same processing circuit). Alternatively, different processing circuits (separate processing circuits) can be used. The receiving unit 52, the end pressure / temperature calculation unit 54, the system control unit 58, the pressure recovery control unit 61 (the valve control unit 60 and the compressor control unit 62), the supply control unit 63 (the distributor control unit 64 and the valve control unit 65), the group pressure receiving unit 66, the distributor information receiving unit 67, the output unit 74, the gas weight (Mi) calculation unit 85, the determination unit 86, the setting unit 96, the PVT filling amount (Mpvtfil) calculation unit 87, the filling amount error (Mdiff) calculation unit 89, the determination unit 90, the determination unit 91, the recording / calculation unit 92, the average error rate (Mrateave) calculation unit 97, the error rate difference (Mdif') calculation unit 98 and the input data required or the calculated results in the determination unit 95 are stored in the memory 51 each time.
[0117] In addition, a flowchart showing a part of the main process of the hydrogen filling method of Embodiment 2 is shown in FIG. Figure 5 same.
[0118] Fig. 9 1 is a flowchart showing the remaining part of the main process of the hydrogen filling method of Embodiment 2. Figure 5 and Fig. 9In the hydrogen filling method of embodiment 2, a judgment step (S100), an FCV information receiving step (S102), a hydrogen weight calculation step in the tank (S104), a judgment step (S106), an initial weight setting step (S108), a filling step (S110), a PVT filling amount calculation step (S112), a flow meter filling amount calculation step (S114), a filling amount error calculation step (S116), a judgment step (S118), an alarm output step (S120), a judgment step (S126), a filling stop processing step (S128), a recording / calculation step (S131), an average error rate calculation step (S133), a difference calculation step (S135), a judgment step (S137), and an alarm output step (S139) are implemented as an example.
[0119] In the second embodiment, the contents of each process from the determination process (S100) to the filling stop processing process (S128) are the same as those in the first embodiment. In other words, the method for diagnosing a fault of the flow meter during the filling period is the same as that in the first embodiment. In the second embodiment, the method for diagnosing a fault of the flow meter at the end of the filling using the past actual status data is described. In addition, the following contents are the same as those in the first embodiment except for the points specifically described.
[0120] As a recording / calculation step (S131), the recording / calculation unit 92 stores the metered filling amount (Mme=Mmeter) at the end of filling measured by the Coriolis flowmeter and the PVT filling amount (Mpvtfil=Mpvtend) (calculated filling amount) at the end of filling calculated by the PVT method using the pressure, temperature and volume of the fuel tank 202 as actual situation data in the storage device 86 in association with the data of the filling date and time. This is the same as in the first embodiment. In the second embodiment, the filling amount error rate (Mrateend=(Mme-Mpvtend) / Mpvtend×100) at the end of filling is calculated, and similarly, it is stored as actual situation data in the storage device 86 in association with the data of the filling date and time. A plurality of actual situation data are accumulated by repeatedly filling an indefinite number of FCV vehicles 200 with hydrogen. As a result, the storage device 86 stores a plurality of error values obtained based on a plurality of past actual situation data between the measured filling amount (Mme) at the end of filling measured by the Coriolis flowmeter 37 and the PVT filling amount (Mpvtend) at the end of filling (calculated filling amount) calculated using the pressure, temperature, and volume of the fuel tank 202. Here, the case where the filling amount error rate (Mrateend) at the end of filling is stored as a plurality of error values is shown.
[0121] As an average error rate calculation process (S133), the average error rate (Mrateave) calculation unit 97 reads the filling amount error rate (Mrateend) at the end of each past hydrogen filling stored in the storage device 86, and calculates the average value of the filling amount error rate (Mrateend), that is, the average error rate (Mrateave = ΣMrateend / number of filling times).
[0122] As a difference calculation step (S135), the error rate difference (Mdif') calculation unit 98 calculates the difference between the statistical value of multiple error rates obtained based on multiple past actual situation data and the error rate in this hydrogen filling, that is, the error rate difference (Mdif'). In the second embodiment, the error rate difference (Mdif') calculation unit 98 subtracts the filling amount error rate (Mrateend) at the end of this hydrogen filling from the average error rate (Mrateave) to calculate the error rate difference (Mdif').
[0123] As a determination step (S137), the determination unit 95 uses a plurality of error values obtained based on a plurality of past actual situation data stored in the storage device 86 between the measured filling amount at the end of filling measured by the Coriolis flowmeter 37 and the calculated filling amount at the end of filling calculated using the pressure, temperature and volume of the fuel tank 202, and compares the plurality of error values with the error value at the end of this hydrogen filling, to determine whether the Coriolis flowmeter 37 has a fault, and outputs the result. In the second embodiment, the Coriolis flowmeter has a fault based on whether the difference between the statistical value of a plurality of error rates obtained based on a plurality of past actual situation data and the error rate of this hydrogen filling is within the allowable range. Specifically, the determination unit 95 determines whether the calculated error rate difference (Mdif') is within the range of the lower limit allowable value β1' or more and the upper limit allowable value β2' or less. When the error rate difference (Mdif') deviates from the range of the lower limit allowable value β1' or more and the upper limit allowable value β2' or less, the alarm output step (S139) is entered. If the error rate difference (Mdif') is within the range of the lower limit allowable value β1' or more and the upper limit allowable value β2' or less, the process ends.
[0124] As an alarm output step (S138), when the output unit 74 determines that the Coriolis flowmeter 37 is faulty, it outputs an alarm indicating the failure of the Coriolis flowmeter 37 to the distributor 30 during the filling of hydrogen gas. In the distributor 30, the alarm lamp 34 indicating the failure of the Coriolis flowmeter 37 is turned on and an alarm is output.
[0125] In the above example, the average error rate (Mrateave) is used as a statistical value of a plurality of difference values obtained based on a plurality of past actual situation data, but the present invention is not limited to this and may be other than the average value, for example, a median value.
[0126] In addition, the average value of all filling amount error rates (Mrateend) accumulated as actual status data can be calculated as described above, but it is not limited to this. For example, 10 fillings can be regarded as one group, and the average value of the filling amount error rates (Mrateend) of 10 groups (100 data) from the previous 110 fillings to the previous 11 fillings can be calculated as the average error rate (Mrateave). Moreover, it is also preferable to determine whether the difference between the average value of the filling amount error rates (Mrateend) of the 10 groups and the average value of the filling amount error rates (Mrateend) of the group from the previous 10 times to this time is within the allowable range.
[0127] In addition, the lower limit allowable values α1', β1' and the upper limit allowable values α2', β2' may be appropriately set. The calculated filling amount obtained by the PVT method has a deviation due to the expansion of the fuel tank 202 described above, so the error rate between the measured filling amount and the calculated filling amount obtained by the PVT method is usually not zero, and there is a predetermined offset. Considering this point, the lower limit allowable values α1', β1' and the upper limit allowable values α2', β2' may be set.
[0128] In addition, if Fig. 9 As shown, as a modified example, a determination step (S144), an alarm output step (S145), a determination step (S146), and an alarm output step (S147) may be implemented to replace the above-mentioned determination step (S137) and alarm output step (S139).
[0129] As a determination step (S144), the determination unit 95 determines whether the calculated error rate difference (Mdif') is greater than or equal to the lower limit permissible value β1'. If the error rate difference (Mdif') is greater than or equal to the lower limit permissible value β1', the determination step (S146) is entered. If the error rate difference (Mdif') is not greater than or equal to the lower limit permissible value β1', the alarm output step (S145) is entered.
[0130] As an alarm output step (S145), when the error rate difference (Mdif') is not equal to or greater than the lower limit allowable value β1', the output unit 74 outputs an alarm 2 indicating a failure of the Coriolis flowmeter 37 to the distributor 30 during the filling of hydrogen gas. In the distributor 30, the alarm lamp 34 indicating a failure of the Coriolis flowmeter 37 is turned on and the alarm 1 is output.
[0131] As a determination step (S146), the determination unit 95 determines whether the calculated error rate difference (Mdif') is less than the upper limit allowable value β2'. If the error rate difference (Mdif') is less than the upper limit allowable value β2', the process ends. If the error rate difference (Mdif') is not less than the upper limit allowable value β2', the process proceeds to the alarm output step (S147).
[0132] As an alarm output step (S147), when the error rate difference (Mdif') is not less than the upper limit allowable value β2', the output unit 74 outputs the alarm 2 indicating the failure of the Coriolis flowmeter 37 to the distributor 30 during the filling of hydrogen gas. In the distributor 30, the alarm lamp 35 indicating the failure of the Coriolis flowmeter 37 is lit and the alarm 2 is output.
[0133] As described above, regarding the determination process of the error rate difference (Mdif') at the end of filling, when the error rate difference (Mdif') is not less than the upper limit allowable value β2', it is considered that the cause is a failure of the flow meter 37 and a leakage of the pipe from the flow meter 37 to the fuel tank 202. On the other hand, when the error rate difference (Mdif') is not more than the lower limit allowable value β1', it can be determined that the flow meter 37 is faulty. Therefore, as in the first embodiment, by performing the determination process separately for the upper limit and the lower limit and distinguishing the content of the alarm, it is possible to easily identify the fault location.
[0134] As described above, according to the second embodiment, the accuracy of the flow meter 37 can be continuously verified using the error rate (for example, percentage error). Therefore, it is possible to avoid performing a filling operation when using a flow meter 37 that has failed.
[0135] Example 3
[0136] In the first embodiment, it is determined whether the difference between the PVT filling amount Mpvt calculated by the PVT method and the measured filling amount (Mmeter) measured by the flow meter 37 and the average value is within the allowable value range, but the present invention is not limited thereto. In the third embodiment, a case where the deviation of the difference is used as the determination object instead of the average value is described.
[0137] An example of a configuration diagram showing the configuration of a hydrogen filling system of a hydrogen station according to Embodiment 3 Figure 1 same.
[0138] Fig.10 This is a structural diagram showing an example of the internal structure of a control circuit for controlling the entire hydrogen filling system in Embodiment 3. Fig.10 In addition to configuring the deviation (σ) calculation unit 99 instead of the average error (Mdifave) calculation unit 93 and the error difference (Mdif.) calculation unit 94, the same as Figure 2Same. Fig.10 In the above, each "part" such as the receiving unit 52, the end pressure / temperature calculation unit 54, the system control unit 58, the pressure recovery control unit 61 (the valve control unit 60 and the compressor control unit 62), the supply control unit 63 (the distributor control unit 64 and the valve control unit 65), the group pressure receiving unit 66, the distributor information receiving unit 67, the output unit 74, the gas weight (Mi) calculation unit 85, the determination unit 86, the setting unit 96, the PVT filling amount (Mpvtfil) calculation unit 87, the filling amount error (Mdiff) calculation unit 89, the determination unit 90, the determination unit 91, the recording / calculation unit 92, the deviation (σ) calculation unit 99 and the determination unit 95 includes a processing circuit, and the processing circuit includes a circuit, a computer, a processor, a circuit substrate or a semiconductor device. In addition, each "part" can use a common processing circuit (the same processing circuit). Alternatively, different processing circuits (separate processing circuits) can be used. The receiving unit 52, the end pressure / temperature calculation unit 54, the system control unit 58, the pressure recovery control unit 61 (the valve control unit 60 and the compressor control unit 62), the supply control unit 63 (the distributor control unit 64 and the valve control unit 65), the group pressure receiving unit 66, the distributor information receiving unit 67, the output unit 74, the gas weight (Mi) calculation unit 85, the determination unit 86, the setting unit 96, the PVT filling amount (Mpvtfil) calculation unit 87, the filling amount error (Mdiff) calculation unit 89, the determination unit 90, the determination unit 91, the recording / calculation unit 92, the deviation (σ) calculation unit 99 and the input data required or the calculated results in the determination unit 95 are stored in the memory 51 each time.
[0139] In addition, a flowchart showing a part of the main process of the hydrogen filling method of Embodiment 3 is shown in FIG. Figure 5 same.
[0140] Fig.11 1 is a flowchart showing the remaining part of the main process of the hydrogen filling method of Embodiment 3. Figure 5 and Fig.11 In the method for filling hydrogen gas of embodiment 3, a judgment step (S100), an FCV information receiving step (S102), a hydrogen gas weight calculation step in the tank (S104), a judgment step (S106), an initial weight setting step (S108), a filling step (S110), a PVT filling amount calculation step (S112), a flow meter filling amount calculation step (S114), a filling amount error calculation step (S116), a judgment step (S118), an alarm output step (S120), a judgment step (S126), a filling stop processing step (S128), a recording / calculation step (S130), a deviation (σ) calculation step (S150), a judgment step (S152), and an alarm output step (S154) are implemented as an example of a process.
[0141] In the third embodiment, the contents of each process from the determination process (S100) to the recording / calculation process (S130) are the same as those in the first embodiment. In other words, the method for diagnosing a fault of the flow meter during filling is the same as that in the first embodiment. In the third embodiment, the method for diagnosing a fault of the flow meter at the end of filling using past actual status data is described. In addition, the following contents are the same as those in the first embodiment except for the points specifically described.
[0142] As a deviation (σ) calculation step (S150), the deviation (σ) calculation unit 99 calculates the deviation of the plurality of differences based on the plurality of actual situation data in the recent past including the difference in the current hydrogen filling. For example, the standard deviation of the plurality of differences is calculated based on the plurality of actual situation data in the recent past including the difference in the current hydrogen filling.
[0143] As a determination process (S152), the determination unit 95 uses the error value at the end of this hydrogen filling and the multiple error values obtained based on multiple past actual status data stored in the storage device 86 to determine whether the Coriolis flowmeter 37 is faulty. In Embodiment 3, the Coriolis flowmeter 37 is determined to be faulty based on whether the deviation of multiple difference values obtained based on multiple past actual status data including the difference in this hydrogen filling is within the allowable range. Specifically, the determination unit 95 determines whether the index (e.g., standard deviation) indicating the degree of deviation calculated is below the allowable value γ. If the index σ (e.g., standard deviation) indicating the degree of deviation is below the allowable value γ, the process ends. In the case where the index σ (e.g., standard deviation) indicating the degree of deviation is not below the allowable value γ, the alarm output process (S154) is entered. For example, when the standard deviation exceeds the allowable value γ (γ=1.2~1.7), it is regarded as abnormal and an alarm is output.
[0144] As an alarm output step (S154), when the index σ (e.g., standard deviation) indicating the degree of deviation is not less than the allowable value γ, the output unit 74 outputs an alarm 2 indicating a failure of the Coriolis flowmeter 37 to the distributor 30 during the filling of hydrogen gas. In the distributor 30, the alarm lamp 34 indicating a failure of the Coriolis flowmeter 37 is turned on and an alarm is output.
[0145] As described above, in the third embodiment, the determination is made using the deviation as an index, so that the effort of obtaining a specific difference tolerance value and error rate tolerance value through experiments or the like can be saved.
[0146] In addition, the deviation may be calculated using all filling amount errors accumulated as actual status data as described above, but the present invention is not limited thereto. For example, 10 fillings may be considered as one group, and the standard deviation of the filling amount errors of 10 groups (100 data) from the previous 110 fillings to the previous 11 fillings may be calculated. Furthermore, it is also preferable to determine whether the difference between the standard deviations from the previous 10 times to this time is within the allowable range.
[0147] As described above, according to Embodiment 3, the accuracy of the flow meter 37 can be continuously verified using the deviation. Therefore, it is possible to avoid performing a filling operation when using a flow meter 37 that has failed.
[0148] According to the above embodiments, the abnormal state of the Coriolis flowmeter 37 can be detected in advance, and it will not be ignored. In addition, it can be confirmed that the accuracy can be maintained for many years as long as there is no alarm.
[0149] The above embodiment is described with reference to specific examples. However, the present invention is not limited to these specific examples. For example, the above example shows a case where a FCV vehicle is filled with hydrogen fuel using a multi-stage accumulator 101 including three accumulators 10, 12, and 14, but the present invention is not limited to this. It is also possible to use more accumulators in filling a FCV vehicle according to the volume of the accumulators 10, 12, and 14. Or, conversely, sometimes a FCV vehicle can be filled with two accumulators.
[0150] In addition, regarding the device configuration, control method, etc., parts that are not directly necessary for the description of the present invention are omitted from description, but a necessary device configuration or control method can be appropriately selected and used.
[0151] Furthermore, all flow rate failure diagnosis methods and hydrogen filling devices for measuring devices that include the elements of the present invention and can be appropriately designed and modified by a person skilled in the art are included in the scope of the present invention.
[0152] Industrial Applicability
[0153] The flow meter failure diagnosis method of the measuring device and the hydrogen filling device can be used, for example, in a hydrogen filling device for a car that uses hydrogen from a hydrogen station as a power source.
[0154] Description of Reference Numerals
[0155] 10, 12, 14: accumulator; 11, 13, 15, 27, 28: pressure gauge; 21, 22, 23, 24, 25, 26: valve; 29: thermometer; 30: distributor; 31: thermometer; 32: cooler; 33: flow regulating valve; 36: shut-off valve; 37: flow meter; 38: shut-off valve; 40: compressor; 41: emergency disconnection connector; 43: control circuit; 50: communication control circuit; 51: memory; 52: receiving unit; 54: end pressure / temperature calculation unit; 58: system control unit; 60, 65: valve control unit; 61: pressure recovery control unit; 62: compressor control unit; 63: supply control unit; 64: distributor control unit; 66: group pressure receiving unit; 67: distributor information receiving unit; 74: output unit; 8 0, 84, 86: storage device; 81: conversion table; 83: correction table; 85: Mi operation unit; 86: determination unit; 87: Mpvtfil operation unit; 89: Mdiff operation unit; 90: determination unit; 91: determination unit; 92: recording / operation unit; 93: Mdifave operation unit; 94: Mdif. operation unit; 95: determination unit; 96: setting unit; 97: Mrateave operation unit; 98: Mdif' operation unit; 99: σ operation unit; 100: control circuit; 101: multi-stage accumulator; 102: hydrogen station; 104: pressure recovery mechanism; 106: supply unit; 200: FCV vehicle; 202: fuel tank; 204: vehicle-mounted device; 206: pressure gauge; 207: thermometer; 500: hydrogen filling system.
Claims
1. A flow meter fault diagnosis method for a metering device, It is characterized in that When a hydrogen tank of a vehicle powered by hydrogen is filled with hydrogen, a flow meter is used to measure the amount of hydrogen filled. receiving information on the pressure, temperature and volume of the tank, The filling amount of the tank when the hydrogen filling from the meter to the tank is completed is calculated using the pressure, temperature and volume of the tank. The error value at the end of this hydrogen filling and a plurality of error values between the measured filling amount and the calculated filling amount, which are obtained based on a plurality of past actual status data and stored in a storage device, are used to determine whether the flow meter has a fault, and the result is output, wherein the measured filling amount is the filling amount at the end of filling measured by the flow meter, and the calculated filling amount is the filling amount at the end of filling calculated using the pressure, temperature and volume of the tank, Determining whether the flow meter has a fault includes: calculating the error difference between the statistical value of multiple error values obtained based on the multiple past actual status data and the error value at the end of the current hydrogen filling, and determining whether the error difference is above the lower limit allowable value and below the upper limit allowable value.
2. The flow meter fault diagnosis method of the metering device according to claim 1, It is characterized in that The difference between the filling amount obtained by the calculation and the filling amount obtained by the measurement is used as the error value. Whether the flow meter has a fault is determined based on whether a difference between a statistical value of a plurality of difference values obtained based on the plurality of past actual status data and a difference value during the current hydrogen filling period is within an allowable range.
3. The flow meter fault diagnosis method of the metering device according to claim 1, It is characterized in that using an error rate of the filling amount obtained by the measurement relative to the filling amount obtained by the calculation as the error value, Whether the flow meter has a fault is determined based on whether a difference between a statistical value of a plurality of error rates obtained based on the plurality of past actual status data and the error rate during the current hydrogen filling is within an allowable range.
4. The flow meter fault diagnosis method of the metering device according to claim 1, It is characterized in that The difference between the filling amount obtained by the calculation and the filling amount obtained by the measurement is used as the error value. Whether or not the flow meter is faulty is determined based on whether a deviation of a plurality of difference values obtained based on a plurality of actual status data in the recent past, including the difference value during the current hydrogen filling period, is within an allowable range.
5. The flow meter fault diagnosis method of the metering device according to claim 1, It is characterized in that The flow meter is a Coriolis flow meter.
6. A flow meter fault diagnosis method for a metering device, It is characterized in that When a hydrogen tank of a vehicle powered by hydrogen is filled with hydrogen, a flow meter is used to measure the amount of hydrogen filled during the filling period. The filling amount of the hydrogen gas filled into the tank from the meter is calculated using the pressure, temperature and volume of the tank during the filling period. During the filling period, the calculated filling amount is compared with the filling amount measured at the same timing, and the flow meter is judged to be faulty based on the comparison result, and the result is outputted. Determining whether the flow meter has a malfunction includes determining whether a filling amount error between the calculated filling amount and the filling amount measured at the same timing is greater than a lower limit allowable value and less than an upper limit allowable value.
7. A hydrogen filling device, It is characterized in that have: A meter for measuring the amount of hydrogen gas filled in a tank of a vehicle powered by hydrogen gas using a flow meter; a receiving unit, which receives information on the pressure, temperature and volume of the tank; a filling amount calculation unit that calculates the filling amount when the hydrogen filling from the meter to the tank is completed, using the pressure, temperature, and volume of the tank; a storage device for storing a plurality of error values obtained based on a plurality of past actual status data between a measured filling amount and a calculated filling amount, wherein the measured filling amount is the filling amount at the end of filling measured by the flow meter, and the calculated filling amount is the filling amount at the end of filling calculated by using the pressure, temperature and volume of the tank; a determination unit that determines whether the flow meter has a fault by using the error value at the end of the current hydrogen filling and a plurality of error values based on a plurality of past actual status data stored in the storage device; and an output unit that outputs an alarm indicating a malfunction of the flow meter, Among them, determining whether the flow meter has a fault includes: calculating the error difference between the statistical value of multiple error values obtained based on the multiple actual status data in the past and the error value at the end of the current hydrogen filling, and determining whether the error difference is above the lower limit allowable value and below the upper limit allowable value.
8. A hydrogen filling device, It is characterized in that have: A meter for measuring the amount of hydrogen gas filled during filling when a tank of a vehicle powered by hydrogen gas is filled with hydrogen gas using a flow meter; a filling amount calculation unit that calculates a filling amount of hydrogen gas filled from the meter into the tank using the pressure, temperature, and volume of the tank during the filling period; as well as a determination unit that compares the calculated filling amount with the filling amount measured at the same timing during the filling period, and determines whether the flow meter has a fault based on the comparison result; as well as an output unit that outputs an alarm indicating a failure of the flow meter during hydrogen filling if it is determined that the flow meter has failed, The determining whether the flow meter has a fault includes determining whether a filling amount error between the calculated filling amount and the filling amount measured at the same timing is greater than a lower limit allowable value and less than an upper limit allowable value.