Synergistic method of foundation pit support and foundation treatment, structure and underground structure construction method

By using the synergistic methods of foundation pit support and foundation treatment in the upper and lower soft composite formations, including precipitation pipe wells, water stop curtains, prefabricated piles and flexible piles, the work difficulties of construction machinery on the weak base is solved. , achieving the stability and efficiency improvement of foundation pits and underground structure construction.

CN112227380BActive Publication Date: 2024-11-22CIVIL AVIATION AIRPORT PLANNING & DESIGN RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011107282.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-16
Publication Date
2024-11-22
Estimated Expiration
2040-10-16

AI Technical Summary

Technical Problem

In the upper and lower soft composite strata, it is difficult for construction machinery to work on the weak strata of the base, resulting in construction difficulties and even inability to construct.

Method used

The synergistic method of foundation pit support and foundation treatment is adopted, including determining the foundation pit edge line within the construction area, laying precipitation pipe wells and water stop curtains, prefabricated piles to reinforce the foundation pit bottom, flexible piles to reinforce the foundation pit bottom, and along the foundation pit Reinforcement and enclosure piles are arranged on the inner side line to form a stable support structure to ensure the stability of foundation pit excavation and underground structure construction.

Benefits of technology

By reinforcing the structure, the stability of foundation pit excavation and underground structure construction is improved, the difficulty of construction machinery in working on the silt layer is avoided, the needs of construction machinery are met, and construction materials are saved and construction efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112227380B_ABST
    Figure CN112227380B_ABST
Patent Text Reader

Abstract

The present invention provides a synergistic method and structure for foundation pit support and foundation treatment, which is used to reinforce the construction area before excavating the foundation pit in a composite stratum with hard upper part and soft lower part. The foundation pit boundary is determined in the construction area, and a downdraft pipe well is arranged; prefabricated piles are constructed in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit; a water-stop curtain is arranged, and flexible piles are constructed in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit, and a foundation pit edge reinforcement body is constructed along the inner side of the foundation pit boundary, and a foundation pit inner reinforcement body is constructed at preset distances along the longitudinal direction of the foundation pit, and the foundation pit inner reinforcement body extends transversely along the foundation pit and is connected to the foundation pit edge reinforcement body extending longitudinally along the foundation pit on both sides of the foundation pit; and retaining piles are constructed along the foundation pit boundary in affixed to the outer side of the foundation pit edge reinforcement body. The synergistic method and structure of the present invention can solve the technical problem in the prior art that construction machinery has to work on a soft and weak stratum at the base, causing construction difficulties.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of geotechnical engineering, and in particular to a method and structure for synergizing foundation pit support and foundation treatment in an upper hard and lower soft composite stratum, and an underground structure construction method. Background Art

[0002] Among the many factors in the construction environment of underground structures, basic geological and engineering geological characteristics are particularly important for the selection of construction technology, especially for engineering construction in composite strata. Composite strata refer to two or more different strata within the excavation section of underground engineering and in the direction of excavation extension. There are many types of composite strata. In this article, composite strata specifically refer to the type of combination of different strata in the vertical direction of the end face, and the upper hard and lower soft composite strata are one of them; above the bearing layer, this type of stratum structure contains upper and lower strata with different properties. The upper strata are mainly fine and medium sand layers and other strata with good permeability and hard texture, and the lower strata are mainly underconsolidated silt and other strata with poor permeability, high sensitivity and soft texture.

[0003] When constructing underground structures in composite strata, such as pipe galleries, underpasses, and underground parts of terminal buildings and control towers, foundation pit construction is first carried out. After the foundation pit is excavated, the underground structure is constructed in the foundation pit. The stability requirements of the foundation pit need to be met during the foundation pit excavation and underground structure construction. In order to meet the requirements of foundation pit stability, in the conventional foundation pit construction process, retaining piles and passive zone reinforcement are usually constructed around the foundation pit before the foundation pit is excavated, and then the foundation pit is excavated. After the foundation pit excavation is completed, foundation treatment is carried out in the foundation pit to reinforce the base, and then the underground structure is constructed. Since retaining pile construction and passive zone reinforcement are carried out before the foundation pit is excavated, the requirements for foundation pit stability can be met during the foundation pit excavation and underground structure construction.

[0004] However, the above construction technology has defects in the construction of composite strata with hard upper strata and soft lower strata. The maximum thickness of the upper strata often cannot meet the requirements of the buried depth of the underground structure. The excavation of the foundation pit needs to pass through the upper harder strata and go deep into the lower softer strata, which will cause the foundation treatment to work in the silt layer at the base. Due to the low bearing capacity of the silt layer, it is difficult for construction machinery to enter the base to work, and the base reinforcement becomes very difficult or even impossible to construct. Summary of the invention

[0005] The purpose of the present invention is to provide a method, structure and underground structure construction method for synergistic action of foundation pit support and foundation treatment, so as to solve the technical problem in the prior art that construction machinery has to work on soft base strata, resulting in construction difficulties or even impossibility.

[0006] To achieve the above object, the present invention provides a method for synergizing foundation pit support and foundation treatment, which is used to reinforce the construction area before excavating the foundation pit in a composite stratum with hard upper and soft lower layers, and comprises the following steps in sequence:

[0007] Step 1: Determine the foundation pit boundary in the construction area and lay out the drainage pipe well;

[0008] Step 2, constructing prefabricated piles in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit;

[0009] Step 3, laying a water-stop curtain near the outside of the foundation pit edge; constructing flexible piles in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit, the flexible piles and the prefabricated piles are arranged alternately along the longitudinal or transverse direction of the foundation pit, and constructing a foundation pit edge reinforcement body along the inner side of the foundation pit edge line, and constructing a foundation pit inner reinforcement body at preset intervals along the longitudinal direction of the foundation pit, the foundation pit inner reinforcement body extends along the transverse direction of the foundation pit and is connected to the foundation pit edge reinforcement bodies extending along the longitudinal direction of the foundation pit on both sides of the foundation pit;

[0010] Step 4, construct retaining piles along the edge of the foundation pit and along the outer side of the reinforcement body at the edge of the foundation pit.

[0011] The present invention also provides an underground structure construction method for constructing an underground structure in a composite stratum with hard upper strata and soft lower strata, which comprises the following steps in sequence:

[0012] Step 1: Determine the foundation pit boundary in the construction area and lay out the drainage pipe well;

[0013] Step 2, constructing prefabricated piles in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit;

[0014] Step 3, laying a water-stop curtain near the outside of the foundation pit edge; constructing flexible piles in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit, the flexible piles and the prefabricated piles are arranged alternately along the longitudinal or transverse direction of the foundation pit, and constructing a foundation pit edge reinforcement body along the inner side of the foundation pit edge line, constructing a foundation pit inner reinforcement body at preset intervals along the longitudinal direction of the foundation pit, the foundation pit inner reinforcement body extends along the transverse direction of the foundation pit and is connected to the foundation pit edge reinforcement bodies extending along the longitudinal direction of the foundation pit on both sides of the foundation pit, and constructing a composite soil body in the active area of ​​the foundation pit;

[0015] Step 4, constructing retaining piles along the edge of the foundation pit and along the outer side of the reinforcement body at the edge of the foundation pit;

[0016] Step 5: excavating the foundation pit, excavating the area defined by the foundation pit edge to a preset depth, and setting supports in the width direction of the foundation pit;

[0017] Step 6, constructing an underground structure in the foundation pit;

[0018] Step 7: backfill the soil under the underground structure slab position, construct the slab, and backfill the foundation pit.

[0019] The present invention also provides a foundation pit support and foundation treatment synergistic structure, which is used to reinforce the construction area before excavating a foundation pit in a composite stratum with upper hardness and lower softness, wherein the foundation pit has a foundation pit boundary line, and the foundation pit support and foundation treatment synergistic structure comprises:

[0020] Water-stop curtains and downdraft wells are laid out in the construction area;

[0021] Precast piles are laid in the passive zone of the foundation pit to reinforce the bottom of the foundation pit;

[0022] Flexible piles are arranged in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit, and the flexible piles and the prefabricated piles are arranged alternately in the longitudinal or transverse direction of the foundation pit;

[0023] The foundation pit edge reinforcement body is arranged along the inner side of the foundation pit edge line;

[0024] The reinforcement bodies in the foundation pit are distributed at preset intervals along the longitudinal direction of the foundation pit, and the reinforcement bodies in the foundation pit extend transversely along the foundation pit and are connected to the reinforcement bodies at the edge of the foundation pit extending longitudinally along the foundation pit on both sides of the foundation pit;

[0025] And the retaining piles are attached to the outer side of the reinforcement body at the edge of the foundation pit and distributed along the edge line of the foundation pit.

[0026] Compared with the prior art, the present invention has the following beneficial effects:

[0027] The synergistic structure and method of foundation pit support and foundation treatment constructed before foundation pit excavation can ensure the stability of the soil in the foundation pit area during and after foundation pit excavation. After drainage of the upper strata, the soil can be effectively consolidated with high strength, meeting the construction needs of construction machinery and avoiding the problem of construction machinery having difficulty working on the silt layer.

[0028] Preferably, the step 3 further comprises constructing a composite soil body in the active area of ​​the foundation pit; and the retaining piles are arranged at intervals of long and short piles in the step 4. The construction of the composite soil body to reinforce and improve the soil body in the active area can reduce the soil pressure of the retaining pile system and is conducive to optimizing the retaining pile mechanism; the retaining piles are arranged at intervals of long and short piles, which can ensure the stability of the support system while saving a large amount of construction materials and improving construction efficiency.

[0029] Preferably, the composite soil body at least includes a first composite soil body unit and a second composite soil body unit; the first composite soil body unit includes a first pile body and the inter-pile soil body borne by the first pile body, the first pile body is close to the foundation pit boundary, and the pile end of the first pile body penetrates into the bearing layer, and the second composite soil body unit includes a second pile body and the inter-pile soil body borne by the second pile body; the shortest distance between the longitudinal axis of the second pile body and the foundation pit boundary is greater than the shortest distance between the longitudinal axis of the first pile body and the foundation pit boundary, and the pile-soil replacement rate of the second composite soil body unit is less than the pile-soil replacement rate of the first composite soil body unit.

[0030] Preferably, the composite soil body further comprises a third composite soil body unit, the third composite soil body unit comprises a third pile body and the inter-pile soil body borne by the third pile body, the shortest distance between the longitudinal axis of the third pile body and the edge line of the foundation pit is greater than the shortest distance between the longitudinal axis of the second pile body and the edge line of the foundation pit, and the pile-soil replacement rate of the third composite soil body unit is less than the pile-soil replacement rate of the second composite soil body unit. By adjusting the pile-soil replacement rate of the soil body in the active area of ​​the foundation pit, the pile-soil replacement rate of the soil body farther from the foundation pit is made smaller than the pile-soil replacement rate of the soil body closer to the foundation pit, which plays a transition role in the differential settlement of the soil body between the foundation pit and the periphery of the construction area, thereby effectively meeting the more stringent requirements for differential settlement of the soil body in projects such as airport construction where underground structures are located.

[0031] Preferably, before step 2, the cap-removing support is constructed with a preset slope height to form a slope and a cap-removing platform, the pit edge limit area is located on the cap-removing platform, and the preset slope height does not exceed the depth of the upper stratum; the prefabricated piles, flexible piles, pit edge reinforcement bodies and pit internal reinforcement bodies are constructed on the cap-removing platform. Compared with other support methods, the construction of cap-removing pile support is simpler and has a shorter construction period; the cap-removing construction reduces the required pile length of the prefabricated piles, flexible piles, pit edge reinforcement bodies and pit internal reinforcement bodies, saving a lot of construction materials.

[0032] Preferably, the foundation pit support and foundation treatment synergistic structure also includes a composite soil body arranged in the active area of ​​the foundation pit, and the retaining piles are arranged in a pattern of long and short piles at intervals.

[0033] Preferably, the synergistic structure of foundation pit support and foundation treatment also includes a capping support structure, which includes a slope and a capping platform, the slope is set at a preset slope height, and the preset slope height does not exceed the depth of the upper stratum; the foundation pit edge limiting area is located on the capping platform, and the precast piles, flexible piles, foundation pit edge reinforcement bodies and foundation pit internal reinforcement bodies are arranged on the capping platform. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the embodiments of the present invention, the following is a brief introduction to the drawings required for use in the embodiments. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0035] Figure 1 It is an overall schematic diagram of the synergistic structure of foundation pit support and foundation treatment in an embodiment of the present invention;

[0036] Figure 2 It is a top view of the synergistic structure of foundation pit support and foundation treatment in an embodiment of the present invention. DETAILED DESCRIPTION

[0037] In order to make the purpose, technical solution and advantages of the embodiments of the present invention more clear, the technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings.

[0038] In the following description, the longitudinal and transverse directions of the foundation pit refer respectively to the length direction and width direction of the plane where the bottom of the foundation pit is located; the longitudinal and transverse directions of the pile body refer respectively to the length direction of the pile body and the direction perpendicular to the length direction; the inner side and the outer side refer respectively to the side close to the center of the foundation pit and the side away from the center of the foundation pit; the inner direction refers to the direction from the center of the foundation pit to the edge line of the foundation pit, and the outer direction refers to the direction from the edge line of the foundation pit to the center of the foundation pit; directions such as "up", "down", "top" and "bottom" are only relative to the orientation of the foundation pit shown in the attached drawings, and change with the actual direction of the foundation pit.

[0039] This embodiment discloses a method for synergistic action of foundation pit support and foundation treatment, which is used to reinforce the construction area before excavating a foundation pit in a composite stratum with upper hardness and lower softness, and comprises the following steps in sequence:

[0040] Step 1: Determine the foundation pit boundary in the construction area and lay out the drainage pipe well;

[0041] Step 2, constructing prefabricated piles in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit;

[0042] Step 3, laying a water-stop curtain near the outside of the foundation pit edge; constructing flexible piles in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit, the flexible piles and the prefabricated piles are arranged alternately along the longitudinal or transverse direction of the foundation pit, and constructing a foundation pit edge reinforcement body along the inner side of the foundation pit edge line, and constructing a foundation pit inner reinforcement body at preset intervals along the longitudinal direction of the foundation pit, the foundation pit inner reinforcement body extends along the transverse direction of the foundation pit and is connected to the foundation pit edge reinforcement bodies extending along the longitudinal direction of the foundation pit on both sides of the foundation pit;

[0043] Step 4, construct retaining piles along the edge of the foundation pit and along the outer side of the reinforcement body at the edge of the foundation pit.

[0044] The pit boundary is usually four line segments that enclose a closed rectangular area, which is the pit boundary limit area. The pit boundary limit area is the pit area to be excavated. The pit excavation range is mainly affected by groundwater and partially affected by confined water. Taking advantage of the characteristics of the upper groundwater stratum, which has strong permeability, good water-richness, and large water volume, the upper stratum adopts the arrangement of precipitation wells to pump out shallow water to control groundwater; the lower groundwater is mixed with silty clay and has poor permeability, so the retaining piles are used to set up water-stop curtains to control deep water; the pit is combined with drainage wells to control groundwater. Among them, the water-stop curtain can be selected from three-axis deep-layer deep-mixed piles, and the pile end is deep into the effective waterproof layer, and the two-mixing, two-spraying, and one-hole method is used for construction. Drainage blind ditches and drainage wells are pre-set at the base position, and the drainage blind ditch is arranged along the periphery of the pit area. The precipitation well and drainage well adopt pipe well precipitation. The pipe well can use sandless concrete filter pipe and be protected by bamboo. The filter pipe range is backfilled with filter material, covered with nylon net, and the well mouth is sealed with clay balls. Before the foundation pit is excavated, the surface drainage system and the construction area around the foundation pit are hardened and sealed to avoid ground water accumulation.

[0045] The pit edge reinforcement body and the pit interior reinforcement body adopt triaxial mixing piles, and the pile diameter, pile spacing, pit interior reinforcement body spacing, pit edge reinforcement body and pit interior reinforcement body reinforcement width and depth are selected according to actual conditions. In some embodiments, the top and bottom of the pit are 6m and 11m deep from the ground surface respectively, the pit length is 700m, and the net width is 12m. The triaxial mixing piles have a pile diameter of 0.85m, a pile spacing of 1.2m, a pit interior reinforcement depth of 5m, and a width of 3m. The pit interior reinforcement body is constructed every 12m along the longitudinal direction of the pit to connect the pit edge reinforcement bodies on both sides of the pit horizontally.

[0046] The soil area outside the retaining pile is the active area of ​​the foundation pit, and the retaining pile is deformed by the soil pressure in the active area of ​​the foundation pit; the soil area inside the retaining pile is the passive area of ​​the foundation pit, and the retaining pile is subjected to the soil pressure in the passive area of ​​the foundation pit after deformation. The precast pile is a rigid pile, and the pile length of the precast pile can be set according to the undulation of the bedrock of the stratum, the pile end enters the bearing layer, and a pile cap is set on the pile top. In some embodiments, the passive area of ​​the foundation pit adopts a composite foundation of precast piles combined with cement soil mixing piles. The length of the cement soil mixing pile is less than the length of the precast pile, and the strength of the cement soil meets the strength requirements of the foundation treatment. In this embodiment, the synergistic structure and method of foundation pit support and foundation treatment are constructed before the foundation pit is excavated, which can ensure the stability of the soil in the foundation pit area during and after the foundation pit excavation. After the upper stratum is drained, the soil can be effectively consolidated, and the strength is relatively high, which meets the construction requirements of the construction machinery and avoids the problem that the construction machinery is difficult to work on the silt layer.

[0047] In some preferred embodiments, a reinforced crushed stone cushion is laid on top of the pile to further control the settlement deformation. The laying process of the reinforced crushed stone cushion includes laying a layer of reinforcing material after laying a certain thickness of crushed stone from the pile cap upwards in the cushion. The reinforced crushed stone cushion can be provided with multiple layers; the reinforcing material has sufficient tensile strength, and common materials such as polypropylene double-tension geogrid can be selected as the reinforcing material.

[0048] Specifically, after the construction of the prefabricated piles is completed and before the construction of the retaining piles, a composite soil body is constructed in the active area of ​​the foundation pit; the construction of the composite soil body is to strengthen and improve the soil body in the active area by changing the pile-soil replacement rate in the active area of ​​the foundation pit, which can reduce the soil pressure of the retaining pile system and is conducive to optimizing the retaining pile mechanism. In some preferred embodiments, the retaining piles are arranged at intervals of long and short piles, wherein the pile length of the long pile is the same as the pile length in the process of arranging the retaining piles using all long piles commonly used under the same conditions, and the short piles are the same as the long piles in other aspects except that the pile length is shorter; wherein at least one short pile is arranged between at least two long piles, for example, a short pile is arranged on both sides of each long pile, and a long pile is arranged on both sides of each short pile. Compared with the commonly used process of using all long piles to arrange retaining piles, the above-mentioned use of a certain number of short piles to replace a part of the long piles will have an adverse effect on the stability of the foundation pit uplift. However, since the foundation pit foundation treatment, active area reinforcement and passive area reinforcement work have been completed before the construction of the retaining piles, the foundation pit uplift can be effectively suppressed. At the same time, replacing long piles with short piles does not affect the overall stability of the foundation pit. Therefore, under the same pile spacing and total number of piles, compared with using all long piles to arrange retaining piles, it can not only ensure the stability of the support system, but also save a lot of construction materials and improve construction efficiency.

[0049] Specifically, the composite soil body at least includes a first composite soil body unit and a second composite soil body unit; the first composite soil body unit includes a first pile body and the inter-pile soil body borne by the first pile body, the first pile body is close to the foundation pit boundary, and the pile end of the first pile body penetrates into the bearing layer; the second composite soil body unit includes a second pile body and the inter-pile soil body borne by the second pile body; the shortest distance between the longitudinal axis of the second pile body and the foundation pit boundary is greater than the shortest distance between the longitudinal axis of the first pile body and the foundation pit boundary, and the pile-soil replacement rate of the second composite soil body unit is less than the pile-soil replacement rate of the first composite soil body unit.

[0050] The pile-soil replacement ratio is the ratio of the pile volume to the unit volume of the composite soil in which it is located. The distance from the longitudinal axis of the pile to the edge of the foundation pit is equal to the distance from the point of the longitudinal axis of the pile on the plane where the four foundation pit edges are located to the said foundation pit edge. The shortest distance from the longitudinal axis of the pile to the edge of the foundation pit is the minimum value of multiple distances from the longitudinal axis of the pile to multiple foundation pit edges.

[0051] The longitudinal axis of the first pile body and the adjacent longitudinal axis of the second pile body are symmetrical relative to the interface between the first composite soil unit and the second composite soil unit; when the first composite soil unit is the innermost composite soil unit, the volume of its part inside the first pile body is not greater than the volume of its part outside the first pile body; when the second composite soil unit is the outermost composite soil unit, the volume of its part inside the second pile body is not less than the volume of its part outside the second pile body. The first pile body and the second pile body can adopt common pile types such as triaxial mixing piles and uniaxial deep mixing piles, and the pile diameter is selected according to actual needs. The composite soil body can include one or more first pile bodies, and the longitudinal axes of the multiple first pile bodies are respectively approximately the same as the shortest distances of the foundation pit edge line; the composite soil body can include one or more second pile bodies, and the longitudinal axes of the multiple second pile bodies are respectively approximately the same as the shortest distances of the foundation pit edge line.

[0052] The pile-soil replacement ratio can be adjusted by changing the slenderness ratio of the pile in the composite soil unit. In some embodiments, the first composite soil unit and the second composite soil unit have the same volume, the first pile and the second pile have the same pile diameter, and the first pile is longer than the second pile; in other embodiments, the first composite soil unit and the second composite soil unit have the same volume, the first pile and the second pile have the same pile length, and the first pile is longer than the second pile.

[0053] Specifically, the composite soil body also includes a third composite soil body unit, and the third composite soil body unit includes a third pile body and inter-pile soil borne by the third pile body, the shortest distance between the longitudinal axis of the third pile body and the edge line of the foundation pit is greater than the shortest distance between the longitudinal axis of the second pile body and the edge line of the foundation pit, and the pile-soil replacement rate of the third composite soil body unit is less than the pile-soil replacement rate of the second composite soil body unit.

[0054] The longitudinal axis of the second pile body and the longitudinal axis of the adjacent third pile body are symmetrical relative to the interface between the second composite soil unit and the third composite soil unit. The third pile body can adopt common pile types such as triaxial mixing piles and uniaxial deep mixing piles, and the pile diameter is selected according to actual needs. The composite soil body can include one or more third pile bodies, and the shortest distance between the longitudinal axis of each third pile body and the edge line of the foundation pit is roughly the same.

[0055] The pile-soil replacement rate can be adjusted by changing the pile spacing. In some embodiments, the second pile body and the third pile body have the same pile length and pile diameter, and the distance from the longitudinal axis of the first pile body to the longitudinal axis of the adjacent second pile body is arranged to be smaller than the distance from the longitudinal axis of the second pile body to the longitudinal axis of the adjacent third pile body, so that the volume of the second soil unit inside the second pile body is smaller than the volume of its part outside the second pile body, and at the same time, the volume of the second soil unit outside the second pile body is the same as the volume of the third soil unit inside the third pile body, and the volume of the third soil unit inside the third pile body is not less than the volume of its part outside the third pile body, so the volume of the third composite soil unit is larger than the volume of the second composite soil unit, so that the pile-soil replacement rate of the third composite soil unit is smaller than the pile-soil replacement rate of the second composite soil unit. Similarly, at this time, the pile-soil replacement rate of the second composite soil unit is smaller than the pile-soil replacement rate of the first composite soil unit.

[0056] In each composite soil unit, the upper load is borne by the pile body itself and the soil between the piles borne by the pile body. The greater the pile-soil replacement rate, the greater the load borne by the pile body itself, the smaller the overall compression modulus of the composite soil unit, and the smaller the settlement. By adjusting the pile-soil replacement rate of the soil in the active area of ​​the foundation pit, the pile-soil replacement rate of the soil at a position farther away from the foundation pit is made smaller than the pile-soil replacement rate of the soil at a position closer to the foundation pit, which plays a transitional role in the differential settlement of the soil between the foundation pit and the surrounding area of ​​the construction area, thereby effectively meeting the more stringent requirements for differential settlement of the soil in projects such as airport construction where underground structures are located. Therefore, those skilled in the art can easily understand that when the construction needs to arrange more composite soil units at different distances from the foundation pit edge line, the above method can still be used to adjust the composite soil units with appropriate pile-soil replacement rates.

[0057] Specifically, before step 2, the cap removal support is constructed with a preset slope height to form a slope and a cap removal platform, the foundation pit edge limiting area is located on the cap removal platform, the preset slope height does not exceed the depth of the upper stratum, and the precast piles, flexible piles, foundation pit edge reinforcement bodies and foundation pit internal reinforcement bodies are constructed on the cap removal platform.

[0058] The range of the slope and the decapping platform covers the main construction area of ​​the foundation pit, including the active area and the passive area of ​​the foundation pit. In some preferred embodiments, the composite soil body is constructed at the decapping platform.

[0059] On the one hand, since the upper strata are relatively hard, the slopes and the cap-removing platform are more stable and can meet the needs of foundation pit reinforcement and excavation construction. Compared with other support methods, the construction of cap-removing pile support is simpler and has a shorter construction period. On the other hand, the cap-removing construction reduces the required length of precast piles, flexible piles, foundation pit edge reinforcement bodies, and foundation pit reinforcement bodies, saving a lot of construction materials.

[0060] This embodiment discloses an underground structure construction method for constructing an underground structure in a composite stratum with hard upper part and soft lower part, which comprises the following steps in sequence:

[0061] Step 1: Determine the foundation pit boundary in the construction area and lay out the drainage pipe well;

[0062] Step 2, constructing prefabricated piles in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit;

[0063] Step 3, laying a water-stop curtain near the outside of the foundation pit edge; constructing flexible piles in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit, the flexible piles and the prefabricated piles are arranged alternately along the longitudinal or transverse direction of the foundation pit, and constructing a foundation pit edge reinforcement body along the inner side of the foundation pit edge line, constructing a foundation pit inner reinforcement body at preset intervals along the longitudinal direction of the foundation pit, the foundation pit inner reinforcement body extends along the transverse direction of the foundation pit and is connected to the foundation pit edge reinforcement bodies extending along the longitudinal direction of the foundation pit on both sides of the foundation pit, and constructing a composite soil body in the active area of ​​the foundation pit;

[0064] Step 4, constructing retaining piles along the edge of the foundation pit and along the outer side of the reinforcement body at the edge of the foundation pit;

[0065] Step 5: excavating the foundation pit, excavating the area defined by the foundation pit edge to a preset depth, and setting supports in the width direction of the foundation pit;

[0066] Step 6, constructing an underground structure in the foundation pit;

[0067] Step 7: backfill the soil under the underground structure slab position, construct the slab, and backfill the foundation pit.

[0068] The underground structure may be a common underground structure such as a pipe gallery, an underpass, an underground portion of a terminal building and a control tower. Figure 1 As shown, as the foundation pit is excavated, two supports 8 are set at the top and the middle of the foundation pit to increase the stability of the foundation pit. Although the supports are shown as described above, it should be understood that the number and position of the supports can be adjusted according to the needs of the actual project.

[0069] After the soil under the underground structure slab is backfilled to the slab position, the slab construction and backfilling of the foundation pit are carried out. The foundation pit backfill can be made of materials such as stone chips, crushed stone soil and on-site soil. Geosynthetics can be laid in the backfill soil below the underground structure slab, and geosynthetics can be laid throughout a certain range outside the backfill top surface to reduce the differential settlement between the foundation pit backfill and the surrounding area.

[0070] like Figure 1 and Figure 2 As shown, this embodiment discloses a foundation pit support and foundation treatment synergistic structure, which is used to reinforce the construction area before foundation pit excavation in a composite stratum with upper hard and lower soft ground.

[0071] The foundation pit 1 has a foundation pit boundary 11, and the foundation pit support and foundation treatment synergistic structure includes:

[0072] The water-stop curtain 21 and the downdraft pipe well 22 are arranged in the construction area;

[0073] Prefabricated piles 31 are arranged in the passive zone 12 of the foundation pit to reinforce the bottom of the foundation pit;

[0074] Flexible piles 32 are arranged in the passive area 12 of the foundation pit to reinforce the bottom of the foundation pit. The flexible piles 32 and the prefabricated piles 31 are arranged alternately in the longitudinal or transverse direction of the foundation pit.

[0075] The foundation pit edge reinforcement body 41 is arranged along the inner side of the foundation pit edge line 11;

[0076] The reinforcement bodies 42 in the foundation pit are distributed at preset intervals along the longitudinal direction of the foundation pit, and the reinforcement bodies 42 in the foundation pit extend transversely along the foundation pit and are connected to the foundation pit edge reinforcement bodies 41 extending along the longitudinal direction of the foundation pit on both sides of the foundation pit 1;

[0077] And the retaining piles 5 are arranged to fit the outer side of the outer body of the foundation pit edge reinforcement body 41 and are distributed along the foundation pit edge line 11 .

[0078] Specifically, the foundation pit support and foundation treatment synergistic structure also includes a composite soil body arranged in the active area 13 of the foundation pit, and the retaining piles 5 are arranged in a pattern of long and short piles.

[0079] Specifically, the composite soil body at least includes a first composite soil body unit and a second composite soil body unit; the first composite soil body unit includes a first pile body 61 and the inter-pile soil body borne by the first pile body 61, the first pile body 61 is close to the foundation pit boundary 11, and the pile end of the first pile body 61 penetrates into the bearing layer, and the second composite soil body unit includes a second pile body 62 and the inter-pile soil body borne by the second pile body 62; the shortest distance between the longitudinal axis of the second pile body 62 and the foundation pit boundary 11 is greater than the shortest distance between the longitudinal axis of the first pile body 61 and the foundation pit boundary 11, and the pile-soil replacement rate of the second composite soil body unit is less than the pile-soil replacement rate of the first composite soil body unit.

[0080] Specifically, the composite soil body also includes a third composite soil body unit, and the third composite soil body unit includes a third pile body 63 and the inter-pile soil borne by the third pile body 63, the shortest distance between the longitudinal axis of the third pile body 63 and the foundation pit edge line 11 is greater than the shortest distance between the longitudinal axis of the second pile body 62 and the foundation pit edge line 11, and the pile-soil replacement rate of the third composite soil body unit is less than the pile-soil replacement rate of the second composite soil body unit.

[0081] Specifically, the synergistic structure of foundation pit support and foundation treatment also includes a capping support structure, which includes a slope 71 and a capping platform 72. The slope 71 is set at a preset slope height, and the preset slope height does not exceed the depth of the upper stratum; the area defined by the foundation pit edge 11 is located on the capping platform 72, and the prefabricated piles 31, flexible piles 32, foundation pit edge reinforcement bodies 41 and foundation pit internal reinforcement bodies 42 are arranged on the capping platform 72.

[0082] Obviously, the described embodiments are only some embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

Claims

1. The synergistic method of foundation pit support and foundation treatment is used to reinforce the construction area before excavating the foundation pit in the composite stratum with upper hardness and lower softness, and includes the following steps in sequence: Step 1: determine the foundation pit boundary in the construction area and lay out the drainage pipe well; construct the cap removal support to form a slope and a cap removal platform at a preset slope height, the foundation pit boundary limit area is located on the cap removal platform, and the preset slope height does not exceed the upper stratum depth; Step 2, constructing prefabricated piles in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit; Step 3, laying a water-stop curtain near the outside of the foundation pit edge; constructing flexible piles in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit, the flexible piles and the prefabricated piles are arranged alternately along the longitudinal or transverse direction of the foundation pit, and constructing a foundation pit edge reinforcement body along the inner side of the foundation pit edge line, and constructing a foundation pit inner reinforcement body at preset intervals along the longitudinal direction of the foundation pit, the foundation pit inner reinforcement body extends transversely along the foundation pit and is connected to the foundation pit edge reinforcement bodies extending longitudinally along the foundation pit on both sides of the foundation pit; constructing a composite soil body in the active area of ​​the foundation pit; wherein, The composite soil body at least comprises a first composite soil body unit and a second composite soil body unit; the first composite soil body unit comprises a first pile body and the inter-pile soil body borne by the first pile body, the first pile body is close to the foundation pit boundary, and the pile end of the first pile body penetrates into the bearing layer; the second composite soil body unit comprises a second pile body and the inter-pile soil body borne by the second pile body; the shortest distance between the longitudinal axis of the second pile body and the foundation pit boundary is greater than the shortest distance between the longitudinal axis of the first pile body and the foundation pit boundary, the pile-soil replacement rate of the second composite soil body unit is less than the pile-soil replacement rate of the first composite soil body unit, and the pile length of the first pile body is greater than the pile length of the second pile body; the composite soil body further comprises a third composite soil body unit, the third composite soil body unit comprises a third pile body and the inter-pile soil body borne by the third pile body, the shortest distance between the longitudinal axis of the third pile body and the foundation pit boundary is greater than the shortest distance between the longitudinal axis of the second pile body and the foundation pit boundary, and the pile-soil replacement rate of the third composite soil body unit is less than the pile-soil replacement rate of the second composite soil body unit; Step 4, construct retaining piles along the edge of the foundation pit and along the edge of the foundation pit, and arrange the retaining piles at intervals of long and short piles.

2. The method for synergistic effect of foundation pit support and foundation treatment as claimed in claim 1, characterized in that: The prefabricated piles, flexible piles, foundation pit edge reinforcement bodies and foundation pit interior reinforcement bodies are constructed at the cap removal platform.

3. An underground structure construction method for constructing an underground structure in a composite stratum with hard upper and soft lower layers, comprising the following steps in sequence: Step 1: determine the foundation pit boundary in the construction area and lay out the drainage pipe well; construct the cap removal support at a preset slope height to form a slope and a cap removal platform, the foundation pit boundary limit area is located on the cap removal platform, and the preset slope height does not exceed the upper stratum depth; Step 2, constructing prefabricated piles in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit; Step 3, laying a water-stop curtain near the outside of the foundation pit edge; constructing flexible piles in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit, the flexible piles and the prefabricated piles are arranged alternately along the longitudinal or transverse direction of the foundation pit, and constructing a foundation pit edge reinforcement body along the inner side of the foundation pit edge line, constructing a foundation pit inner reinforcement body at preset intervals along the longitudinal direction of the foundation pit, the foundation pit inner reinforcement body extends transversely along the foundation pit and is connected to the foundation pit edge reinforcement bodies extending longitudinally along the foundation pit on both sides of the foundation pit, and constructing a composite soil body in the active area of ​​the foundation pit; wherein, The composite soil body at least comprises a first composite soil body unit and a second composite soil body unit; the first composite soil body unit comprises a first pile body and the inter-pile soil body borne by the first pile body, the first pile body is close to the foundation pit boundary, and the pile end of the first pile body penetrates into the bearing layer; the second composite soil body unit comprises a second pile body and the inter-pile soil body borne by the second pile body; the shortest distance between the longitudinal axis of the second pile body and the foundation pit boundary is greater than the shortest distance between the longitudinal axis of the first pile body and the foundation pit boundary, the pile-soil replacement rate of the second composite soil body unit is less than the pile-soil replacement rate of the first composite soil body unit, and the pile length of the first pile body is greater than the pile length of the second pile body; the composite soil body further comprises a third composite soil body unit, the third composite soil body unit comprises a third pile body and the inter-pile soil body borne by the third pile body, the shortest distance between the longitudinal axis of the third pile body and the foundation pit boundary is greater than the shortest distance between the longitudinal axis of the second pile body and the foundation pit boundary, and the pile-soil replacement rate of the third composite soil body unit is less than the pile-soil replacement rate of the second composite soil body unit; Step 4, constructing retaining piles along the edge of the foundation pit and along the edge of the foundation pit, and arranging the retaining piles at intervals of long and short piles; Step 5: excavating the foundation pit, excavating the area defined by the foundation pit edge to a preset depth, and setting supports in the width direction of the foundation pit; Step 6, constructing an underground structure in the foundation pit; Step 7: backfill the soil under the underground structure slab position, construct the slab, and backfill the foundation pit.

4. A foundation pit support and ground treatment synergistic structure, used for reinforcing a construction area before excavating a foundation pit in a composite stratum with upper hardness and lower softness, wherein the foundation pit has a foundation pit boundary, and the foundation pit support and ground treatment synergistic structure comprises: Water-stop curtains and downdraft wells are laid out in the construction area; The cap-removing support structure comprises a side slope and a cap-removing platform, the side slope is set at a preset slope height, and the preset slope height does not exceed the depth of the upper stratum; the foundation pit edge limit area is located on the cap-removing platform; Precast piles are laid in the passive zone of the foundation pit to reinforce the bottom of the foundation pit; Flexible piles are arranged in the passive area of ​​the foundation pit to reinforce the bottom of the foundation pit, and the flexible piles and the prefabricated piles are arranged alternately in the longitudinal or transverse direction of the foundation pit; The foundation pit edge reinforcement body is arranged along the inner side of the foundation pit edge line; The reinforcement bodies in the foundation pit are distributed at preset intervals along the longitudinal direction of the foundation pit, and the reinforcement bodies in the foundation pit extend transversely along the foundation pit and are connected to the reinforcement bodies at the edge of the foundation pit extending longitudinally along the foundation pit on both sides of the foundation pit; A composite soil body arranged in an active area of ​​a foundation pit, the composite soil body at least comprising a first composite soil body unit and a second composite soil body unit; the first composite soil body unit comprises a first pile body and the inter-pile soil body borne by the first pile body, the first pile body is close to the foundation pit boundary, the pile end of the first pile body penetrates into the bearing layer, the second composite soil body unit comprises a second pile body and the inter-pile soil body borne by the second pile body; the shortest distance between the longitudinal axis of the second pile body and the foundation pit boundary is greater than the shortest distance between the longitudinal axis of the first pile body and the foundation pit boundary, the pile-soil replacement rate of the second composite soil body unit is less than the pile-soil replacement rate of the first composite soil body unit, the pile length of the first pile body is greater than the pile length of the second pile body; the composite soil body further comprises a third composite soil body unit, the third composite soil body unit comprises a third pile body and the inter-pile soil body borne by the third pile body, the shortest distance between the longitudinal axis of the third pile body and the foundation pit boundary is greater than the shortest distance between the longitudinal axis of the second pile body and the foundation pit boundary, and the pile-soil replacement rate of the third composite soil body unit is less than the pile-soil replacement rate of the second composite soil body unit; And the retaining piles are arranged in a manner that is close to the outer side of the reinforcement body at the edge of the foundation pit and distributed along the edge line of the foundation pit. The retaining piles are arranged in a manner that long and short piles are spaced apart.

5. The foundation pit support and foundation treatment synergistic structure as claimed in claim 4, characterized in that: The prefabricated piles, flexible piles, foundation pit edge reinforcement bodies and foundation pit interior reinforcement bodies are arranged on the cap removal platform.