A process for replacing large components of offshore wind turbines in intertidal zones with high beach surfaces

The crane driven by the pontoon crawler and the negative pressure base tube completes the replacement of large parts of the wind turbine in the high beach area, solving the maintenance problem of offshore wind turbines and achieving efficient maintenance and cost reduction.

CN112340618BActive Publication Date: 2024-10-11JIANGSU LONGYUAN OFFSHORE WIND POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011125729.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-20
Publication Date
2024-10-11
Estimated Expiration
2040-10-20

AI Technical Summary

Technical Problem

It is difficult to replace large parts of offshore wind turbines in the intertidal or supratidal zones of high beaches, resulting in long maintenance time and large loss of power generation. The existing technology requires large installation ships or platforms for maintenance, and it is difficult to enter high beach areas. .

Method used

Design a process for replacing large parts of offshore wind turbines in the high beach intertidal zone, using pontoon crawlers and negative pressure base cylinders to drive the crane, combined with telescopic columns and winches, to achieve the hoisting and replacement of large parts, avoiding the need for damage to large ships. Dependent and adaptable to the ebb and flow of the tide.

Benefits of technology

Large parts can be replaced without the need for large deep-draft ships or platforms, which shortens the maintenance cycle, reduces operation and maintenance costs, improves operational flexibility and stability in high beach areas, and ensures the safety of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112340618B_ABST
    Figure CN112340618B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of offshore wind turbine maintenance, and provides a process for replacing large components of offshore wind turbines in high-shoal intertidal zones, including the following steps: an approaching stage, a first pre-hoisting preparation stage, a second pre-hoisting preparation stage, a hoisting stage, a loading and unloading stage, a recovery stage, and a transfer stage, and also includes a replacement stage and a machine collection stage, through floating box crawler walking, negative pressure base tube fixed piling, crane arm hoisting, telescopic pull rod stabilizing trusses, so as to achieve a crane that runs firmly and stably and is easy to walk, and efficient hoisting and replacement. The present invention does not require a large deep-draft offshore wind turbine installation ship or platform to complete the replacement of large components, avoids the waiting time for tide level for the replacement of large components in the high-shoal intertidal zone, greatly shortens the maintenance cycle, significantly reduces the offshore wind power operation and maintenance costs, and also provides a complete solution for the replacement of large components of supratidal wind turbines.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of offshore wind turbine maintenance, and in particular to a process for replacing large components of offshore wind turbines in high-shoal intertidal zones. Background Art

[0002] The major components in the nacelle of an offshore wind turbine are mainly gearboxes, generators, etc., and their reliability has a significant impact on the safety of the unit. Once a failure occurs, maintenance and replacement are extremely difficult, and the failure downtime is long due to the influence of ocean weather and hydrology. Conventional large component replacement uses an offshore wind turbine installation ship or platform, and a large crane on the ship or platform is used to remove the faulty large component and replace it with a new large component. However, offshore wind turbine sites in the intertidal zone or supratidal zone with higher beach surfaces are difficult for large installation ships or platforms to enter, and there is a long waiting time for the tide to rise, resulting in a very large loss of power generation. In view of the above situation, the present invention designs a self-maintenance replacement process for large offshore wind turbine components, which can complete the replacement of large components without the use of large installation ships or platforms. Summary of the invention

[0003] The object of the present invention is to provide a large component replacement process for offshore wind turbines suitable for high-beach intertidal zones or supratidal zones, thereby avoiding long waits for high tides, expanding the maintenance operation window, and reducing maintenance operation costs.

[0004] The technical solution provided by the present invention is as follows: A process for replacing large components of an offshore wind turbine in a high-shoal intertidal zone, comprising:

[0005] S1. During the approaching stage, the crane's boom and telescopic column are folded and placed horizontally above the crane's rectangular base. The negative pressure base installed on the brackets on both sides of the crane's rectangular base is in a raised state. The crane uses pontoon crawlers as a walking mechanism. The pontoon crawlers are connected to the bottom of the rectangular base through legs extending along the diagonal of the rectangular base. The bottom surface of the negative pressure base is higher than the upper surface of the pontoon crawlers. The crane is driven to the intertidal offshore wind turbine maintenance area.

[0006] S2, pre-hoisting preparation stage 1, driving the telescopic column to rotate and unfold to a vertical state, fixing one end of the telescopic pull rod to the truss at the top of the telescopic column, and fixing the other end to the support leg;

[0007] S3, pre-hoisting preparation stage 2, driving the negative pressure base tube fixed on the bracket to be lowered so that the lower end opening of the negative pressure base tube is inserted into the intertidal mudflat;

[0008] S4, in the lifting stage, the telescopic column is driven to lift and the telescopic rod is driven to stretch. After the truss is lifted to a specified height, the telescopic rod is locked and fixed, and the crane arm on the base above the truss is driven to extend, and the hook at the front end of the crane arm is connected and fixed to the fan component to be repaired or replaced, and the crane arm is driven to rotate and lift the fan component;

[0009] S5, loading and unloading stage, driving the base above the truss to rotate so that the crane arm is away from the wind turbine tower, driving the winch on the truss to lower the rope connected to the hook, and lowering the wind turbine components to a shallow-draft small flat-bottomed ship that can be beached and close to the pontoon crawler;

[0010] S6, recovery stage, driving the winch to recover the rope, adjusting the boom to retract and driving the boom to rotate and descend to a horizontal state, releasing the lock of the telescopic pull rod, and driving the telescopic column to retract and lower;

[0011] S7, transfer stage, drive the negative pressure base cylinder to be lifted to a level higher than the pontoon crawler, drive the pontoon crawler to move the crane to the embankment; or continue to move to another site to be repaired, and repeat steps S3 to S7.

[0012] Furthermore, step Q1 is also included between steps S5 and S6: in the replacement phase, the wind turbine component that has completed maintenance on the flat-bottomed vessel or the brand-new wind turbine component to be replaced is connected and fixed to the hook, the winch is driven to tighten the rope to lift the wind turbine component that has completed maintenance or the brand-new wind turbine component to be replaced, the truss is driven to rotate so that the end of the boom is close to the wind tower, and the winch is driven to lower part of the rope so that the wind turbine component that has completed maintenance or the brand-new wind turbine component to be replaced reaches the wind tower replacement point, thereby completing the replacement of the wind turbine component.

[0013] Furthermore, step S7 further includes step S8: in the stage of folding the machine, the end of the telescopic pull rod connected to the truss is detached, and the end is placed upside down on the fixing buckles on both sides of the rectangular base, and the telescopic column is driven to rotate and fold to a horizontal state.

[0014] Furthermore, a first hydraulic rod is fixed on the base of the crane, the first hydraulic rod is connected to the lower middle portion of the telescopic column, and the telescopic column is telescopically adjusted by a first hydraulic cylinder.

[0015] Furthermore, a second hydraulic rod is fixed to one side of the base above the truss, and the second hydraulic rod is connected to the middle and lower part of the lifting arm.

[0016] Furthermore, the negative pressure base tube is connected to the bracket through a second hydraulic cylinder, and a suction pump is installed above the end of the bracket. After the lower end opening of the negative pressure base tube is inserted into the intertidal mudflat, the suction pump pumps pressure inside the negative pressure base tube.

[0017] Furthermore, the outriggers are connected to the pontoon tracks via a third hydraulic cylinder, and laser rangefinders are installed on all four sides of the outer side of the rectangular base. The laser rangefinders can detect the height of obstacles and the distance between the crane and the obstacles. The crane controls the third hydraulic cylinder to lift the base so that the crane can avoid obstacles during its movement.

[0018] Furthermore, the replacement process also includes a control method Q2: when it is in the high tide stage, a pressure sensor is installed on the inner side of the pontoon track. When the pressure sensor identifies the pressure of the tide impacting the pontoon track, it drives the third hydraulic cylinder to lower the base and the pontoon track is suspended in the horizontal plane; when it is in the low tide stage, when the pressure sensor identifies that the pressure impacting the pontoon track approaches zero, the third hydraulic cylinder adaptively adjusts the height to enable the crane to avoid obstacles.

[0019] Furthermore, step S7 also includes: when the pontoon crawler is suspended on the horizontal plane, before driving the negative pressure base cylinder to lift, the towing block installed on one side of the base is connected to the shallow-draft small beachable flat-bottomed ship in advance, and then the shallow-draft small beachable flat-bottomed ship is used to tow the crane to the embankment or another site to be inspected.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] (1) The present invention can complete the replacement of major components without the need for large deep-draft offshore wind turbine installation vessels or platforms, thus avoiding the waiting time for the tide level for the replacement of major components in the intertidal zone on the high beach, greatly shortening the maintenance cycle, significantly reducing the cost of offshore wind power operation and maintenance, and also providing a complete solution for the replacement of major components of wind turbines in the supratidal zone;

[0022] (2) The present invention can adapt to the complex terrain of the intertidal zone with high beach surface by walking on the pontoon crawler, and is not easy to get stuck in the mudflat. In addition, the pontoon crawler can float with the tide to ensure that the electromechanical equipment is above the sea level, and the pontoon crawler can adaptively adjust the height under the recognition of the laser rangefinder and the pressure sensor to avoid touching obstacles and improve the horizontal stability of the crane;

[0023] (3) The present invention uses a negative pressure base tube to perform fixed piling, thereby completing the overall positioning and stabilization of the crane, providing strong support for the lifting of the boom, and realizing the pressure extraction inside the negative pressure base tube through a pressure pump, thereby further improving the stability of the crane during the lifting process;

[0024] (4) The present invention stabilizes the truss by using the telescopic tie rod and the telescopic column, further improving the support stability of the truss structure. At the same time, the telescopic tie rod is detachable and the telescopic column is foldable, thereby improving the stability of the crane during travel.

[0025] (5) The present invention can not only adjust the length by telescopic means, but also adjust the height by rotation. At the same time, the rotatable base on the truss can drive the crane arm to rotate horizontally, and the hoisting is performed by controlling the rope to be retracted and released by the winch, thereby realizing multi-directional and efficient hoisting and replacement. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0027] Figure 2 It is a top view of the overall structure of the present invention;

[0028] The reference numerals are as follows:

[0029] 1. Lifting arm; 2. Telescopic column; 3. Rectangular base; 4. Bracket; 5. Negative pressure base tube; 6. Floating box track; 7. Outrigger; 8. Telescopic pull rod; 9. Truss; 10. Base; 11. Hook; 12. Winch; 13. Rope; 14. First hydraulic rod; 15. Second hydraulic rod; 16. First hydraulic cylinder; 17. Second hydraulic cylinder; 18. Third hydraulic cylinder; 19. Towing block. DETAILED DESCRIPTION

[0030] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0031] like Figure 1-2 As shown, a large component replacement process for offshore wind turbines in high-shoal intertidal zones includes:

[0032] S1, during the approaching stage, the crane's boom 1 and telescopic column 2 are in a folded state and horizontally placed above the crane's rectangular base 3, the negative pressure base tube 5 installed on the brackets 4 on both sides of the crane's rectangular base 3 is in a raised state, the crane uses a pontoon crawler 6 as a walking mechanism, the pontoon crawler 6 is connected to the bottom of the rectangular base 3 through legs 7 extending along the diagonal of the rectangular base 3, the bottom surface of the negative pressure base tube 5 is higher than the upper surface of the pontoon crawler 6, and the crane is driven to the intertidal offshore wind turbine maintenance area;

[0033] S2, pre-hoisting preparation stage 1, drive the telescopic column 2 to rotate and unfold to a vertical state, fix one end of the telescopic pull rod 8 to the truss 9 at the top of the telescopic column 2, and fix the other end to the support leg 7;

[0034] S3, pre-hoisting preparation stage 2, driving the negative pressure base tube 5 fixed on the bracket 4 to be lowered so that the lower end opening of the negative pressure base tube 5 is inserted into the intertidal mudflat;

[0035] S4, hoisting stage, driving the telescopic column 2 to lift and drive the telescopic rod 8 to stretch, after the truss 9 is lifted to the specified height, locking and fixing the telescopic rod 8, and driving the boom 1 on the base 10 above the truss 9 to extend, connecting and fixing the hook 11 at the front end of the boom 1 to the fan component to be repaired or replaced, and driving the boom 1 to rotate and lift the fan component;

[0036] S5, loading and unloading stage, driving the base 10 above the truss 9 to rotate so that the boom 1 is away from the wind turbine tower, driving the winch 12 on the truss 9 to lower the rope 13 connected to the hook 11, and lowering the wind turbine components to a shallow-draft small flat-bottomed ship that can be beached near the pontoon crawler 6;

[0037] S6, recovery stage, driving the hoist 12 to recover the rope 13, adjusting the boom 1 to retract and driving the boom 1 to rotate and descend to a horizontal state, releasing the lock of the telescopic pull rod 8, and driving the telescopic column 2 to retract and descend;

[0038] S7, transfer stage, drive the negative pressure base cylinder 5 to be lifted to a level higher than the pontoon crawler 6, drive the pontoon crawler 6 to move the crane to the embankment; or continue to move to another site to be repaired, and repeat steps S3 to S7.

[0039] Furthermore, step Q1 is also included between steps S5 and S6: in the replacement phase, the wind turbine component that has completed maintenance on the flat-bottomed ship or the brand-new wind turbine component to be replaced is connected and fixed to the hook 11, the winch 12 is driven to tighten the rope 13 to lift the wind turbine component that has completed maintenance or the brand-new wind turbine component to be replaced, the truss 9 is driven to rotate so that the end of the boom 1 is close to the wind turbine tower, and the winch 12 is driven to lower part of the rope 13 so that the wind turbine component that has completed maintenance or the brand-new wind turbine component to be replaced reaches the wind tower replacement point, thereby completing the replacement of the wind turbine component.

[0040] Furthermore, the step S7 further includes a step S8: in the stage of folding, the end of the telescopic rod 8 connected to the truss 9 is detached and placed upside down on the fixing buckles on both sides of the rectangular base 3, and the telescopic column 2 is driven to rotate and fold to a horizontal state.

[0041] Furthermore, a first hydraulic rod 14 is fixed on the base of the crane, and the first hydraulic rod 14 is connected to the lower middle portion of the telescopic column 2 . The telescopic column 2 is adjusted by a first hydraulic cylinder 16 .

[0042] Furthermore, a second hydraulic rod 15 is fixed to one side of the base 10 above the truss 9 , and the second hydraulic rod 15 is connected to the middle and lower part of the lifting arm 1 .

[0043] Furthermore, the negative pressure base tube 5 is connected to the bracket 4 through a second hydraulic cylinder 17, and a suction pump is installed above the end of the bracket 4. The suction pump pumps the inside of the negative pressure base tube 5 after the lower end opening of the negative pressure base tube 5 is inserted into the intertidal mudflat.

[0044] Furthermore, the support legs 7 are connected to the pontoon crawler 6 through the third hydraulic cylinder 18, and laser rangefinders are installed on all four sides of the outer side of the rectangular base 3. The laser rangefinder can detect the height of the obstacle and the distance between the crane and the obstacle. The crane controls the third hydraulic cylinder 18 to lift the base so that the crane can avoid obstacles during its movement.

[0045] Furthermore, the replacement process also includes a control method Q2: when it is in the high tide stage, a pressure sensor is installed on the inner side of the pontoon track 6. When the pressure sensor identifies the pressure of the tide impacting the pontoon track 6, it drives the third hydraulic cylinder 18 to lower the base, and the pontoon track 6 is suspended in the horizontal plane; when it is in the low tide stage, when the pressure sensor identifies that the pressure impacting the pontoon track 6 tends to zero, the third hydraulic cylinder 18 adaptively adjusts the height to enable the crane to avoid obstacles.

[0046] Furthermore, step S7 also includes: when the pontoon crawler 6 is suspended on the horizontal plane, before driving the negative pressure base cylinder 5 to lift, the towing block 19 installed on one side of the base is connected to the shallow-draft small beachable flat-bottomed ship in advance, and then the shallow-draft small beachable flat-bottomed ship is used to tow the crane to the embankment or another site to be inspected.

[0047] In summary, the present invention can complete the replacement of major components without the need for large deep-draft offshore wind turbine installation vessels or platforms, avoiding the waiting time for tide levels for the replacement of major components in the high beach intertidal zone, greatly shortening the maintenance cycle, significantly reducing the offshore wind power operation and maintenance costs, and also providing a complete solution for the replacement of major components of supratidal wind turbines.

[0048] It should be noted that the implementation methods not shown or described in the drawings or the text of the specification are all forms known to ordinary technicians in the relevant technical field and are not described in detail. In addition, the above definitions of each element and method are not limited to the various specific structures, shapes or methods mentioned in the embodiments.

[0049] It should also be noted that the present invention may provide demonstrations of parameters containing specific values, but these parameters do not need to be exactly equal to the corresponding values, but can be approximated to the corresponding values ​​within an acceptable error tolerance or design constraint. Directional terms mentioned in the embodiments, such as "upper", "lower", "front", "back", "left", "right", etc., are only reference directions of the drawings and are not intended to limit the scope of protection of the present application.

[0050] The above description shows and describes the preferred embodiments of the present invention. As mentioned above, it should be understood that the present invention is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the invention concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art do not depart from the spirit and scope of the present invention, and should be within the scope of protection of the claims attached to the present invention.

Claims

1. A process for replacing large components of offshore wind turbines in high-shoal intertidal zones, characterized in that: The following steps are involved: S1. During the approaching stage, the crane's boom and telescopic column are folded and placed horizontally above the crane's rectangular base. The negative pressure base installed on the brackets on both sides of the crane's rectangular base is in a raised state. The crane uses pontoon crawlers as a walking mechanism. The pontoon crawlers are connected to the bottom of the rectangular base through legs extending along the diagonal of the rectangular base. The bottom surface of the negative pressure base is higher than the upper surface of the pontoon crawlers. The crane is driven to the intertidal offshore wind turbine maintenance area. S2, pre-hoisting preparation stage 1, driving the telescopic column to rotate and unfold to a vertical state, fixing one end of the telescopic pull rod to the truss at the top of the telescopic column, and fixing the other end to the support leg; S3, pre-hoisting preparation stage 2, driving the negative pressure base tube fixed on the bracket to be lowered so that the lower end opening of the negative pressure base tube is inserted into the intertidal mudflat; S4, in the lifting stage, the telescopic column is driven to lift and the telescopic rod is driven to stretch. After the truss is lifted to a specified height, the telescopic rod is locked and fixed, and the crane arm on the base above the truss is driven to extend, and the hook at the front end of the crane arm is connected and fixed to the fan component to be repaired or replaced, and the crane arm is driven to rotate and lift the fan component; S5, loading and unloading stage, driving the base above the truss to rotate so that the crane arm is away from the wind turbine tower, driving the winch on the truss to lower the rope connected to the hook, and lowering the wind turbine components to a shallow-draft small flat-bottomed ship that can be beached and close to the pontoon crawler; S6, recovery stage, driving the winch to recover the rope, adjusting the boom to retract and driving the boom to rotate and descend to a horizontal state, releasing the lock of the telescopic pull rod, and driving the telescopic column to retract and lower; S7, transfer stage, drive the negative pressure base cylinder to be lifted to a level higher than the pontoon crawler, drive the pontoon crawler to move the crane to the embankment; or continue to move to another site to be repaired, and repeat steps S3 to S7.

2. The process for replacing large components of offshore wind turbines in high-shoal intertidal zones as claimed in claim 1, characterized in that: The step S5 and the step S6 also include a step Q1: a replacement phase, in which the wind turbine component that has been overhauled on the flat-bottomed vessel or a brand-new wind turbine component to be replaced is connected and fixed to the hook, the winch is driven to tighten the rope to lift the wind turbine component that has been overhauled or the brand-new wind turbine component to be replaced, the truss is driven to rotate so that the end of the boom approaches the wind tower, and the winch is driven to lower part of the rope so that the wind turbine component that has been overhauled or the brand-new wind turbine component to be replaced reaches the replacement point of the wind tower, thereby completing the replacement of the wind turbine component.

3. The process for replacing large components of offshore wind turbines in high-shoal intertidal zones as claimed in claim 2, characterized in that: The step S7 also includes a step S8: in the stage of folding the machine, the end of the telescopic pull rod connected to the truss is detached and placed upside down on the fixing buckles on both sides of the rectangular base, and the telescopic column is driven to rotate and fold to a horizontal state.

4. The process for replacing large components of offshore wind turbines in high-shoal intertidal zones as claimed in claim 1 or 3, characterized in that: A first hydraulic rod is fixed on the base of the crane, the first hydraulic rod is connected to the lower middle portion of the telescopic column, and the telescopic column is telescopically adjusted by a first hydraulic cylinder.

5. The process for replacing large components of offshore wind turbines in high-shoal intertidal zones as claimed in claim 4, characterized in that: A second hydraulic rod is fixed to one side of the base above the truss, and the second hydraulic rod is connected to the middle and lower part of the lifting arm.

6. The process for replacing large components of offshore wind turbines in high-shoal intertidal zones as claimed in claim 5, characterized in that: The negative pressure base cylinder is connected to the bracket through a second hydraulic cylinder, and a suction pump is installed above the ends of the bracket. The suction pump pumps the inside of the negative pressure base cylinder after the opening at the lower end of the negative pressure base cylinder is inserted into the intertidal mudflat.

7. The process for replacing large components of offshore wind turbines in high-shoal intertidal zones as claimed in claim 6, characterized in that: The legs are connected to the pontoon tracks via a third hydraulic cylinder. Laser rangefinders are installed on all four sides of the outer side of the rectangular base. The laser rangefinders can detect the height of obstacles and the distance between the crane and the obstacles. The crane controls the third hydraulic cylinder to lift the base so that the crane can avoid obstacles during its movement.

8. The process for replacing large components of offshore wind turbines in high-shoal intertidal zones as claimed in claim 7, characterized in that: The replacement process also includes a control method Q2: when it is in the high tide stage, a pressure sensor is installed on the inner side of the pontoon track. When the pressure sensor identifies the pressure of the tide impacting the pontoon track, it drives the third hydraulic cylinder to lower the base and the pontoon track is suspended in the horizontal plane; when it is in the low tide stage, when the pressure sensor identifies that the pressure impacting the pontoon track tends to zero, the third hydraulic cylinder adaptively adjusts the height to enable the crane to avoid obstacles.

9. The process for replacing large components of offshore wind turbines in high-shoal intertidal zones as claimed in claim 1 or 8, characterized in that: The step S7 also includes: when the pontoon crawler is suspended on the horizontal plane, before driving the negative pressure base cylinder to lift, the towing block installed on one side of the base is connected to the shallow-draft small beachable flat-bottomed ship in advance, and then the shallow-draft small beachable flat-bottomed ship is used to tow the crane to the embankment or another site to be inspected.