Thick ore body tunneling machine mechanical mining method

Through the cantilever boring machine, the inter-type mining process is divided into layers and arranged in thick ore bodies, and combined with mechanical rock breaking and ventilation and dust removal technology, the problems of safety and low production capacity in inclined ore bodies are solved, and the stable Mining process and efficient ore output.

CN112360463BActive Publication Date: 2024-11-01BEIJING MINING & METALLURGICAL TECH GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110039753.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-01-13
Publication Date
2024-11-01
Estimated Expiration
2041-01-13

AI Technical Summary

Technical Problem

In the mining of thick ore bodies with a tilt to sharp inclination, when the ore bodies are weak and broken and unstable, drilling and blasting mining has problems such as poor safety operating conditions, high support operation difficulty, low degree of mechanization, limited production capacity, and high operating costs. .

Method used

The cantilever boring machine is used to perform mechanical rock breaking, divide multiple layers in vertical direction, divide ore block units on the plane, and arrange cross-type mining access paths in each unit. The boring machine is used to mechanically drop mine and mine, combined with pressing and extracted ventilation to achieve ventilation and dust removal, and fill it in time after each mining operation is completed, forming a stable three-dimensional mesh structure to reduce the risk of ore body collapse.

Benefits of technology

It effectively solves the problem of low safety and mechanization of drilling and explosion methods, improves the safety and production capacity of mining, reduces the risk of ore body collapse, and achieves continuous mining and efficient mining.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112360463B_ABST
    Figure CN112360463B_ABST
Patent Text Reader

Abstract

The present invention provides a mechanical mining method for a thick and large ore body with a roadheader, which relates to the technical field of non-coal mining. The mechanical mining method for a thick and large ore body with a roadheader includes: A. vertically dividing the ore body into multiple layers in stages or segments, and the layer height is the single mining height; plane dividing the ore body of each layer into ore block units; B. arranging a mine exit tunnel in each ore block unit, and arranging a mining access along the mine exit tunnel; C. The mining accesses in adjacent layered ore block units are "X" shaped; D. using a roadheader to mechanically drop ore for mining in the mining access; E. when the roadheader is mining, a combined ventilation method of pressure-in and extraction is used to achieve ventilation and dust removal; F. filling each mining access in time after mining is completed. In the vertical space, the mining accesses in multiple ore block units can form a three-dimensional mesh structure, forming a spatial structure that is conducive to the stability of the filling body, and reducing the probability of ore body collapse during mining.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mining, and in particular to a mechanical mining method of a thick and large ore body tunneling machine. Background Art

[0002] Coal has been continuously mined through mechanical rock breaking, and people have begun to think about and propose to replace the non-coal mining technology based on blasting with continuous rock cutting equipment.

[0003] In the mining of thick and large ore bodies with inclined or steep inclination, when the ore bodies are weak, broken and unstable, drilling and blasting mining has problems such as poor safe working conditions, high difficulty in support operations, low degree of mechanization, limited production capacity and high operating costs. With the changes in the industry and social environment, non-coal mines have a strong internal demand for mechanized operations. Mechanical rock breaking is an important development trend in future mining operations and will play an important role in safe, efficient and intensive mining with reduced manpower.

[0004] The ore body of a large lead-zinc mine is a soft and broken rock mass, and the ore body is suitable for mechanical rock breaking by a cantilever tunneling machine. In the prior art, multiple identical layers are arranged vertically on the ore body, and each layer is mined and filled. However, the supporting effect between two adjacent layers is poor, which easily leads to ore body collapse. Summary of the invention

[0005] The object of the present invention is to provide a mechanical mining method of a thick ore body with a tunneling machine, so as to realize mechanical continuous mining of a thick, soft and broken ore body.

[0006] An embodiment of the present invention provides a mechanical mining method for a thick ore body using a tunneling machine, comprising the steps of:

[0007] A. In the vertical direction, the ore body is divided into multiple layers within the stage or segment, and the layer height is the single mining height; in the plane, the ore body of each layer is divided into ore block units;

[0008] B. Arrange the mine exit tunnel in each ore block unit, and arrange the mining access road along the mine exit tunnel;

[0009] C. The mining routes in adjacent stratified ore blocks are intersected in an "X" shape;

[0010] D. Use mechanical mining machines to mine in the mining access road;

[0011] E. When the roadheader is mining, a combined ventilation method of pressure-in and extraction is used to achieve ventilation and dust removal;

[0012] F. Fill the holes in each mining route in time after mining is completed.

[0013] Furthermore, in step A: the stage height is 30-120m; the segment height within the stage is 9-30m, and each segment is divided into 2-8 layers;

[0014] The layer height is the single mining height of the roadheader, which is 3~8m;

[0015] Each layer is connected by segmented level tunnels and layered connecting roads.

[0016] Furthermore, in step A: when the thickness of the ore body is less than 40 m, the ore blocks are arranged along the strike, the length of the ore blocks is 40-150 m, and the width of the ore blocks is the thickness of the ore body;

[0017] When the thickness of the ore body is greater than 40m and less than 150m, the ore blocks are arranged vertically, the length of the ore block is the thickness of the ore body, and the width of the ore block is 30~100m;

[0018] When the thickness of the ore body is greater than 150m, the ore body is divided into panels and ore blocks are arranged within the panels.

[0019] Furthermore, in step B: when the mining tunnel is arranged in the middle of the ore block, the mining access road is arranged in a fishbone shape on both sides of the mining tunnel, and the angle between the two is 20° to 70°;

[0020] When the mine exit tunnel is arranged on one side of the ore block, the mining access road is arranged in a semi-fishbone shape on one side of the mine exit tunnel, and the turning angle between the two is 20°~70°;

[0021] The stratified mining approaches all intersect with the ore body trend.

[0022] Furthermore, in the mining method, a roadheader is used for mechanical ore recovery in the recovery route D, and two articulated mining trucks are arranged at the rear of the roadheader to alternately receive the ore mined by the cantilever roadheader to achieve continuous mining.

[0023] The embodiment of the present invention provides a mechanical mining method for a thick and large ore body with a tunnel boring machine, the method comprising: dividing the ore body into multiple layers in stages or segments in the vertical direction, and the layer height is the single mining height. Divide the ore body of each layer into ore block units on the plane. Arrange a mine exit tunnel in each ore block unit, and arrange a mining access along the mine exit tunnel. The mining accesses in adjacent layered ore block units are in an "X"-shaped intersection. A tunnel boring machine is used in the mining access for mechanical ore dropping and mining. The mining and mining engineering in the ore body are formed by a cantilever tunnel boring machine in a non-blasting mechanical rock breaking method. Because in the two adjacent ore block units above and below, the two mining accesses located at the same horizontal position are in an "X"-shaped cross structure, and are not aligned up and down, that is, in the vertical projection, the two are in an "X" shape. For example, after the mining access in the upper ore block unit is completed and filled, because the mining accesses in the upper and lower ore block units are not aligned up and down, but have a certain angle, the filling body in the lower ore block unit can support the upper filling body. In summary, in the vertical space, the mining accesses in multiple ore block units can form a three-dimensional network structure, forming a spatial structure that is conducive to the stability of the filling body, and reducing the probability of ore body collapse during mining. When the tunnel boring machine is mining, a combined pressure-in and exhaust-out ventilation method is used to achieve ventilation and dust removal. Because blasting is not used, the pressure-in ventilation is not used to discharge blasting smoke, but to assist the exhaust-out ventilation and dust removal while meeting the breathing requirements of personnel. Each mining access is filled in time after mining is completed to provide guarantee for subsequent mining. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0025] Figure 1 A cross-sectional view along the strike of the ore body in a mechanical mining method for a thick ore body tunneling machine provided by an embodiment of the present invention;

[0026] Figure 2 A cross-sectional view perpendicular to the strike of the ore body in a cantilevered roadheader mechanical mining method for a thick and large ore body with an inclined to steep inclination provided by an embodiment of the present invention;

[0027] Figure 3 for Figure 1 Plan view of adjacent layers in the AA direction.

[0028] Icons: 1- ramp; 2- section connecting road; 3- section level tunnel; 4- layer connecting road; 5- chute connecting road; 6- chute; 7- corner ore recovery access road; 8- mine exit tunnel; 9- recovery access road; 10- filling well or filling borehole. DETAILED DESCRIPTION

[0029] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] like Figure 1-Figure 3 As shown, the embodiment of the present invention provides a mechanical mining method for thick and large ore bodies with a tunnel boring machine. The method is suitable for mining inclined and steeply inclined ore bodies with a thickness of 30m or more, and provides a new idea for mechanical mining.

[0031] The embodiment of the present invention provides a mechanical mining method for a thick and large ore body with a tunneling machine, the method comprising: dividing the ore body into multiple layers in stages or segments in the vertical direction, and the layer height is a single mining height. The ore body of each layer is divided into ore block units on the plane. A mine exit tunnel 8 is arranged in each ore block unit, and a mining access 9 is arranged along the mine exit tunnel 8. The ore block units and mine exit tunnels 8 of adjacent layers can be arranged alternately; the mining access 9 in the ore block units of adjacent layers are in an "X" shape. The mining access 9 adopts a tunneling machine mechanical ore drop mining. The mining and mining engineering in the ore body are formed by a cantilever tunneling machine in a non-blasting mechanical rock breaking method. Because in the two adjacent ore block units above and below, the two mining access roads 9 located at the same horizontal position are in an "X"-shaped cross structure, and are not aligned up and down, that is, in the vertical projection, the two are in an "X" shape. For example, after the mining access 9 in the upper ore block unit is completed and filled, because the mining accesses 9 in the upper and lower ore block units are not aligned vertically, but have a certain angle, the filling body in the lower ore block unit can support the upper filling body. In summary, in the vertical space, the mining accesses 9 in multiple ore block units can form a three-dimensional network structure, forming a spatial structure that is conducive to the stability of the filling body and reducing the probability of ore body collapse during mining.

[0032] In step A: the stage height is 30-120m; the segment height within the stage is 9-30m, and each segment is divided into 2-8 layers; the layer height is the single mining height of the roadheader, which is 3-8m; and each layer is connected by a segmented horizontal tunnel 3 and a layer connecting road.

[0033] In this scheme, the stage height is 30~120m; the segment height within the stage is 9~30m, and each segment is divided into 2~8 layers; the layer height is determined by the stability of the ore and the maximum and minimum operating heights of the roadheader, which is the single mining height of the roadheader, generally 3~8m, with a reasonable height setting and high mining efficiency. Each layer is connected by a segmented horizontal tunnel 3 and a layered connecting road to facilitate mining and transportation.

[0034] In step A: when the thickness of the ore body is less than 40m, the ore blocks are arranged along the strike, the length of the ore blocks is 40~150m, and the width of the ore blocks is the thickness of the ore body; when the thickness of the ore body is greater than 40m and less than 150m, the ore blocks are arranged vertically, the length of the ore blocks is the thickness of the ore body, and the width of the ore blocks is 30~100m; when the thickness of the ore body is greater than 150m, the ore body is divided into disk areas, and the ore blocks are arranged in the disk areas. Depending on the thickness of the ore body, the arrangement direction of the ore blocks is also different, which can minimize the length of the ore blocks, improve the efficiency of mining, and avoid the potential safety hazards of the ore blocks caused by the excessive length of the ore blocks.

[0035] According to the length of the ore body, the ore body is divided into multiple panels along the strike direction, and each layered ore block unit in the panel is provided with an independent layered connection road 4, which is used to connect with the mine exit tunnel 8 and the segmented horizontal tunnel 3 respectively. Therefore, the cantilever tunneling machine and the staff can enter different layered ore block units through the independent layered connection road 4, so as to facilitate the simultaneous mining between the ore block units and the connection between the upper and lower layers. Specifically, from the outside to the inside, the segmented connection road 2 is constructed from the ramp 1, and the segmented connection road 2 is connected to the segmented horizontal tunnel 3. The layered connection road 4 with a slope of -16~+16° is constructed by the segmented horizontal tunnel 3 outside the vein to connect the ore body and realize the layer transfer. The layered connection road 4 is connected to the mine exit tunnel 8 of the mining field, and the layered connection roads 4 of the adjacent layers are independently set from the mine exit tunnel 8.

[0036] In the step B: when the mining tunnel 8 is arranged in the middle of the ore block, the recovery route 9 is arranged in a fishbone shape on both sides of the mining tunnel 8, and the turning angle between the two is 20°~70°; when the mining tunnel 8 is arranged on one side of the ore block, the recovery route 9 is arranged in a semi-fishbone shape on one side of the mining tunnel 8, and the turning angle between the two is 20°~70°; the layered recovery routes 9 all intersect with the ore body.

[0037] When the mining tunnel 8 is arranged in the middle of the ore block, there is enough space on both sides of the mining tunnel 8, and the mining access 9 is arranged on both sides of the mining tunnel 8 in a fishbone shape, and the angle between the two is 20°~70°; when there is insufficient space, the mining tunnel 8 is arranged on one side of the ore block, and the mining access 9 is arranged on one side of the mining tunnel 8 in a semi-fishbone shape, and the angle between the two is 20°~70°. The small angle makes it easier for the tunnel boring machine to pass smoothly. The two upper and lower adjacent stratified mining access roads 9 are intersecting with the ore body; and in the two upper and lower adjacent stratified ore block units, the two mining access roads 9 corresponding to the same position in the horizontal direction are in an "X"-shaped cross structure; the mining and mining engineering in the ore body are formed by a cantilever tunnel boring machine in a non-explosive mechanical rock breaking method. Because in the upper and lower adjacent ore block units, the two mining access roads 9 located at the same horizontal position are in an "X"-shaped cross structure, and are not aligned up and down, that is, in the vertical projection, the two are in an "X" shape. For example, after the mining access 9 of the upper ore block unit is mined and filled, because the upper and lower adjacent stratified mining accesses 9 are not aligned vertically, but have a certain angle, the filling body in the lower ore block unit can support the upper filling body. In summary, in the vertical space, multiple stratified ore block unit mining accesses 9 can form a three-dimensional network structure, forming a spatial structure that is conducive to the stability of the filling body and improving the safety of the ore body during mining.

[0038] The mining sequence between the middle sections and within the middle sections is preferably from top to bottom, and the mining route 9 in each layered ore block unit can be mined in the order of one mining at a time. After the route is mined, the goaf is filled with tailings cementation. In the downward mining method, each layer of the route is mined under the filling body, which ensures the safety of the mining process and the stability of the mining route 9.

[0039] Furthermore, the mine exit tunnels 8 of the upper and lower adjacent layers are arranged in a staggered manner in the horizontal direction. Figure 3 As shown, the vertically staggered mining tunnels 8 improve the vertical structural stability and reduce the probability of landslides.

[0040] The mining tunnel 8 is arranged perpendicular to the direction of the ore body, the number of the mining access roads 9 is multiple, and the mining access road 9 closest to the outside of the vein is provided with an inner corner ore mining access road 7 arranged along the direction of the ore body.

[0041] This solution adopts the method of opening the mining tunnel 8 from the outside to the inside, and opening the mining access road 9 along the inclined direction on the side of the mining tunnel 8. Multiple mining access roads 9 can cover the ore body in the width direction of the ore body. In order to increase the mining volume, the inner corner mining access road 7 can be opened on the side wall of the mining access road 9 closest to the outside of the vein, and the area not covered by the mining access road 9 can be supplemented with mining.

[0042] A mine exit tunnel 8 is opened from the inside to the outside, and while the mine exit tunnel 8 is opened, a recovery access road 9 is opened on its side wall, and recovery of the recovery access road 9 is realized, thereby improving mining efficiency.

[0043] Among them, the inner corner ore recovery access road 7 is connected with the recovery access road 9, and the turning angle between the two is an acute angle, which is convenient for vehicles to turn from the recovery access road 9 and enter the inner corner ore recovery access road 7.

[0044] The mining access road 9 is arranged at an angle to the strike direction of the ore body.

[0045] The mining access roads 9 in each layer are arranged at an angle to the strike direction of the ore body, so as to ensure that the cantilevered roadheader can cut and expand the mining access roads 9 from the mine exit tunnel 8.

[0046] The cantilevered tunnel boring machine is used to open the mine tunnel 8 and the mining access road 9 by mechanical rock breaking without blasting.

[0047] In the mining of thick and large ore bodies with inclined to steep inclination, when the ore body and surrounding rock are weak, broken and unstable, the drilling and blasting method has problems such as poor safe working conditions, high difficulty in support operations, low degree of mechanization, limited production capacity and high operating costs. The mechanical ore-dropping method of the cantilevered tunnel boring machine can not only effectively solve the above problems, but also realize the enlargement of the cross-sectional size of the approach, while reducing the amount of preliminary development and mining engineering, and improving the production capacity of the mining site and the economic benefits of the mine. Compared with the drilling and blasting method, the cantilevered tunnel boring machine has less disturbance to the rock mass and the cross-section of the tunnel is regular. The cross-sectional size of the approach for mechanical rock breaking is large, and the cross-sectional size range of the approach can reach 3m~6m wide and 3m~6m high.

[0048] The mechanical mining method of a thick and large ore body tunneling machine comprises the steps of: ventilating the passage in the ore body by using a combined pressure-in and extraction ventilation method. Among them, the extraction ventilation is used to filter and extract dust from the working surface. Because no blasting is used, the pressure-in ventilation is not used to exhaust blasting smoke, but to assist the extraction ventilation in dust removal while meeting the breathing requirements of personnel.

[0049] The mechanical mining method of a thick and large ore body roadheader comprises the following steps: two articulated mining trucks are arranged at the tail of the cantilever roadheader to alternately receive the ore mined by the cantilever roadheader to achieve continuous mining.

[0050] The underground articulated mining car is directly matched with the cantilever roadheader to discharge the ore; every 0.3~1m of excavation of the complete section, the mechanically cut and stripped ore is directly transported to the articulated mining truck at the tail of the cantilever roadheader through the rotating star wheel and scraper conveyor of the cantilever roadheader. Two articulated mining trucks are configured at the tail of the cantilever roadheader to alternately receive the ore to achieve continuous ore discharge.

[0051] The cantilever roadheader mechanical mining method for thick and large ore bodies with an inclination to a steep inclination comprises the following steps: each of the mining access roads 9 is immediately closed and filled after mining is completed.

[0052] Each mining access 9 operates independently, and is immediately sealed and filled after mining is completed. The tailings cementation filling process is adopted, and flexible dehydration pipes are used for rapid and efficient dehydration.

[0053] Vertically, a filling well or a filling borehole 10 is provided in the ore body for inputting filling slurry into the ore body.

[0054] The layered link 4 is connected to a chute link 5 , and a chute 6 is arranged in the chute link 5 .

[0055] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A mechanical mining method for thick and large ore bodies using a tunnel boring machine, characterized in that: Includes steps: A. In the vertical direction, the ore body is divided into multiple layers within the stage or segment, and the layer height is the single mining height; in the plane, the ore body of each layer is divided into ore block units; B. Arrange a mine-exit tunnel (8) in each ore block unit, and arrange a mining access road (9) along the mine-exit tunnel (8); the mine-exit tunnels (8) of upper and lower adjacent layers are staggered in the horizontal direction; C. In the ore block units of the upper and lower adjacent layers, two mining access roads (9) located at the same horizontal position are in an "X"-shaped cross structure; D. Using a roadheader to mechanically mine the ore in the mining access road (9); E. When the roadheader is mining, a combined ventilation method of pressure-in and extraction is used to achieve ventilation and dust removal; F. Each mining route (9) shall be filled promptly after mining is completed.

2. The thick ore body tunneling machine mechanical mining method according to claim 1 is characterized in that: In step A, the stage height is 30 to 120 m; the segment height within the stage is 9 to 30 m, and each segment is divided into 2 to 8 layers; The layer height is the single mining height of the roadheader, which is 3 to 8 meters; Each layer is connected by a segmented level tunnel (3) and a layered connecting road.

3. The mechanical mining method of thick and large ore body tunneling machine according to claim 1 is characterized in that: In the step A: when the thickness of the ore body is less than 40m, the ore blocks are arranged along the strike, the length of the ore blocks is 40-150m, and the width of the ore blocks is the thickness of the ore body; When the thickness of the ore body is greater than 40m and less than 150m, the ore blocks are arranged vertically, the length of the ore block is the thickness of the ore body, and the width of the ore block is 30 to 100m; When the thickness of the ore body is greater than 150m, the ore body is divided into panels and ore blocks are arranged within the panels.

4. The mechanical mining method of thick and large ore body tunneling machine according to claim 1 is characterized in that: In the step B: when the mining tunnel (8) is arranged in the middle of the ore block, the mining access road (9) is arranged in a fishbone shape on both sides of the mining tunnel (8), and the turning angle between the two is 20° to 70°; When the mining tunnel (8) is arranged on one side of the ore block, the mining access road (9) is arranged on one side of the mining tunnel (8) in a semi-fishbone shape, and the turning angle between the two is 20° to 70°; The stratified mining approaches (9) all intersect with the ore body strike.

5. The mechanical mining method of thick and large ore body with a tunnel boring machine according to claim 1, characterized in that: The mining method involves a mining route (9) in D in which a roadheader is used for mechanical ore removal. Two articulated mining trucks are arranged at the rear of the roadheader to alternately receive the ore mined by the cantilever roadheader to achieve continuous mining.